SECTION 2 Pre-Installation

image

Contents

1. every console One 1 sees L 3T1osuoo jayoos aug UOT adtd Z 840 papaau sr WBTT Hapon j BURT MOT yoromdde 002 001 raw yoroiddy Trod adtd Z aug 8 5504 LITT Trod ue 2 aug YOT WIT 194205 aug YOT pea 62 sjaypos Io ited p 8 sJ i eee aoupuayurTpu si pos papsau st yu TI pmm BURT pr auo MOTD Uotstatp 401041415 TMOA sug SULT oqe syyZt 065 008 20719811 Pare sue 183185 114 Sockets for maintenance 181135 014 131135 014 BURT 1 811 409 T MC2A BOWLING SYSTEM USER MANUAL SECTION 2 Pre Installation Sockets for front desk Install several sockets of 230VAC 15A PH1 with earth wire at the front desk Note The grounding here must share the same grounding system of the sockets for voltage regulator and be separated from the public power net 2 2 4 Layout of pre embedded pipe Two 2 PVC wire tubes must be placed on the ground of the
2. 18837 31 52777 12 20434 32 54374 13 22231 33 56171 14 23828 34 57768 15 25625 35 59565 16 27222 36 61162 17 29019 27 62959 18 30616 38 64556 19 32413 39 66353 20 34010 40 67950 Drawing of Transverse Section of Bowling Lanes 4 lanes Drawing 2 1 MC2A BOWLING SYSTEM USER MANUAL SECTION 2 Pre Installation Required Length amp Height of Bowling Center e g 6 lanes 9 bx hI 5 bx 9 bd 5 4 5 8 gt A 8 x 8 9 5 bd 8 bd 54 bx bd 9 9 9 bd 5 gt lt 247474761664 ee p CONSOLE 24500 DESIGNED AND BUILT BY RESTING AREA TO BE CENTER POWER LIFT a 4800 5100 APPROACH Lane surface 9 lt 8 23 H CURTAIN gt 3300 Masking See DRAWING 5 wg 0007 Drawing 2 2 mm MC2A BOWLING SYSTEM USER MANUAL SECTION 2 Pre Installation e Passage in house passages including the minimum 500mm wide maintenance path beside lane and in house service facilities including pin setter maintenance customer service facilities etc must be taken into consideration for overall arrangements by the design amp construction organi
3. equipment mustn t exceed 70 C The temperature during transportation of the equipment must be kept at 25 C 55 C 2 10 MC2A BOWLING SYSTEM USER MANUAL SECTION 2 Pre Installation 2 6 Information to be provided by the owner of the bowling Center before installation of the equipment The following information must be provided by the owner of the bowling Center one month prior to the installation of the bowling equipment Layout plan of the bowling Center The plane figure amp the side elevation drawing of the bowling Center Schedule of the in house civil work and the furnishing Schedule of the installation of electrical devices The user must provide the plane figure of the bowling Center one and a half months prior to the installation if the user has special requirement on the lanes MC2A BOWLING SYSTEM USER MANUAL SECTION 2 Pre Installation 2 7 2 7 1 2 7 2 2 7 3 2 7 4 2 7 5 2 7 6 Others The owner of the bowling Center is responsible for such safety measures as the guard the fire protection amp the anti burglary work If wood lane is to be installed one warehouse for dangerous goods paint for the lane must be provided Arrange staff according to the contract The installation condition of the bowling Center must be in accordance with the local requirements Before installation of the lanes the maintenance people of the bowling Center must be trained and be certified as qualified
4. must be embedded in advance according to the electrical requirements Equipment especially lane plates lane wood lane frame etc must be stored in bowling Center of qualified conditions They should stay there for 2 weeks before being installed This equipment works under 1000 meters above sea level MC2A BOWLING SYSTEM USER MANUAL SECTION 2 Pre Installation 2 2 Power supply amp Electrical Requirement 2 2 1 2 2 2 The power distributor is shown in Drawing 2 3 the layout plan of the operation desk and the seat system is shown in Drawing 2 4 Power supply of the equipment e Capacity three phase 400 3Kw for each lane excluding lighting air conditioning voltage fluctuation not exceeding 5 If these requirements can t be guaranteed use a voltage regulator to guarantee the stability of the power supply Power supply to electrical equipment is in five wire way that is 4 three phase wires plus an additional protective earth wire 2 2 3 Distribution of electrical sockets Electrical sockets for the pin setter One modulus switch box for every two lanes on the inner side of the screen wall with two low voltage amp over voltage protection switches 2 sockets of 400VAC 16A PH3 4 sockets of 230VAC 15A PH1 all with grounding terminal Electrical sockets for ball returning machine every machine needs a power of 430W Every group of lanes two lanes share one ball returning machine three lan
5. the requirements before the bowling equipment is moved into the bowling Center for installation Except for the installation of the lane and the bowling equipment all other works will be designed and done by the owner of the bowling Center The installation requirements amp the size of the multi layer hanging screen are shown in Drawing 2 6 MC2A BOWLING SYSTEM USER MANUAL SECTION 2 Pre Installation 2 5 2 5 1 2 5 2 2 5 3 2 5 4 2 5 5 2 5 6 2 5 7 2 5 8 Requirements of transportation amp storage of bowling equipment pin setter amp lane Width amp load bearing capacity of the road on which the truck 8 15 tons carrying the bowling equipment passes must be taken into consideration Space 8 passage necessary for the forklift crane the installation work amp the transportation should be taken into consideration After the equipment is moved into the installation area it must be placed in order kept form direct sunlight or rain and in good ventilation The passages including the doors for transportation of equipment to the installation site must be sufficient for the easy pass of the pin setter in the sizes of 1350 x 1700 x 2000 mm Transportation of the bowling equipment including the moving during installation must be performed by the user and the relevant cost is to be borne by the user Tools amp expensive parts must be kept properly to avoid possible loss The storage temperature of the
6. MC2A BOWLING SYSTEM USER MANUAL SECTION 2 Pre Installation SECTION 2 Pre Installation CONTENTS 2 1 Civil Construction amp Decoration of the Center 2 2 2 2 Power supply amp Electrical Requirement 2 5 2 3 Lighting Requirement 2 8 2 4 Requirement of Civil Construction amp Furnishing of the bowling Center 2 9 2 5 Requirement of Transportation amp Storage of Bowling Equipment Pin setter amp Lanes 2 10 2 6 Information to be Provided Bowling Center before Installation Of Bowling Equipment 2 11 2 7 Others 2 12 MC2A BOWLING SYSTEM USER MANUAL SECTION 2 Pre Installation 2 1 Civil Construction amp Decoration of the Center 2 1 1 Sizes of center In order to enable the pin setter to work normally the size of the bowling centermust meet the following requirements Size in width accordance with ABC WIBC standards of USA Qty Of Lanes Width mm Qty Of Lanes Width mm 1 1867 21 35807 2 3464 22 37404 9 5261 23 39201 4 6858 24 40798 5 8655 25 42595 6 10252 26 44192 7 12049 27 45989 8 13646 28 47586 9 15443 29 49383 10 17040 30 50980 1
7. SYSTEM USER MANUAL Multi layer MASKING 130 5 LOONA HHL SI NIROS 40 AHL ASA 5 10 GALAO NARIOS JO 4104 0992 MHA0 51 GNITI HHL OL AWT FHL 40 Arog OVANS 734 4 AHL 5 ALON 0008 2 18 NOTLYTTIVLSNI ANIT ONTINVLS 1 9 1008 YELYOS NId 8115 OL 08105021 HIVI HHL XIA i KPIR 2 01114102 EN ONTO 5 5 20122212 ASN AHL NV Hs I AML 425 1 2 Hdi HALVA 1 fie aos 4 i 6291 3MddV 8291 3ddy G ee om Drawing 2 6
8. es need two machines Note usually lanes are in pairs such as 2 4 6 Special arrangements can be proposed by customers One socket of 230VAC 10A PH1 is installed at every ball returning machine Electricity is supplied in single phase three wire method Voltage regulator socket at the operation table every lane needs a constant voltage power supply of 300W Power supply to the operation table must be voltage regulated Every lane has one operation table One socket of 230V 10A must be installed in the 200 x 100 mm hole below the operation table or the power wire that is 1 meter out of the floor has a grounding Note The earth wire here must be an independent grounding separated from the earth wire of the public power net Socket for the 29 monitor each monitor needs a power of 150W Two 29 monitors are installed above the front side of the ball returning machine one monitor for each lane Above each holder of the monitor install a socket of 230VAC 5A PH1 Sockets for installation amp maintenance Install several sockets of 230VAC 15A PH1 on the walls or columns of the bowling Center for the purpose of installation maintenance amp cleaning Sockets for pin setter chamber One socket of 230VAC 15A PH1 must be installed on the wall behind each set of pin setter for the purpose of installation amp maintenance SECTION 2 Pre Installation MC2A BOWLING SYSTEM USER MANUAL x pipe between
9. gutter between the pin setter to the ball returning machine one for each lane Two 1 1 2 PVC wire tubes must be placed between the main operation tables and between the first main operation table and the front desk Note 1 Two 1 1 2 PVC wire tubes must be placed between every main operation table and the relevant secondary operation table If the scoring system is Zhonglu 2000 serial then one 1 1 2 PVC wire tube must be placed between every main operation table and the front desk Note 2 One 2 PVC wire tube must be placed between the pin setter and the 29 monitor one for every two lanes going along the ceiling One 2 PVC wire tube must be placed from each side of the ball returning machine to the operation table one for each lane The tube at the operation table must be 10mm 20mm above the floor entering the table One 1 1 2 PVC tube must be pre embedded from the main operation table to the front desk The tube of the main operation table side must be 10mm 20mm above the floor entering the operation table Remarks 1 The PVC wire tubes shall be provided by the owner of the bowling Center and will be used when installing the lane is Each lane is 40 meters long 2 Main operation platform when one scoring system controls 2 lanes as QUBICA amp Zhonglu 2000 serial the left lane of the pair is the main lane the operation table here is the main one computer is installed inside this table and the
10. istance between the water proof layer and the surface of the concrete the thickness of the concrete layer mustn t be less than 60 mm in order to avoid any damage to the water proof layer The flatness deviation of the concrete surface mustn t be over 6 mm The grade number of the cement must be over No 600 and the surface of the concrete mustn t be sandy Load bearing requirement of installation area Pin setter chamber installing area of pin setter not less than 450 Kg m Lane area not less than 300 Kg m Installation of pin setter amp lanes must be started two weeks after the completion of the civil construction amp furnishing of the bowling Center Installation of monitor hanging rails must be installed according to Drawing 2 2 amp Drawing 2 4 sizes are only for reference can differ according to different conditions of different bowling Centers The hanging rails must be able to bear the weight of the monitor 60 Kg each without any deformation or bending Installation of operation tables and seats must be started after finishing the installation of the floor of the area of players and spectators The parquet of the seat area and the spectators area can be installed directly on the concrete surface Otherwise use a middle layer of wood board between the concrete surface and the parquet The power supply to the pin setter all kinds of sockets pre embedded wiring tubes and in house lighting must be finished to
11. operator by our company Other work that requires co operation MC2A BOWLING SYSTEM USER MANUAL 700 700 ORNAMENTAL CEILING OMNITOR 2 GR 60KG EACH GUTTER CAPPING GUTTER f Drawing 2 4 2 2370 SECTION 2 Pre Installation 3150 2 13 MC2A BOWLING SYSTEM USER MANUAL SECTION 2 Pre Installation ZL2000 Z2 Seat System Layout 3394 RUN UP LINE Y PM gute ae L P 1 BALL SHELF OF BALL RETURNING MACHINE ee 2 gt lt CENTER LINE OF GUTTER N gio ao APPR 4500 Drawing 2 5 1 MC2A BOWLING SYSTEM USER MANUAL SECTION 2 Pre Installation ZL2000 Z3 Seat System Layout RUN UP LINE OP TABLE sr 18 ap BALL SHELF OF BALL RETURNING CENTER LINE OF GUTTER 3394 Drawing 2 5 2 MC2A BOWLING SYSTEM USER MANUAL SECTION 2 Pre Installation ZL2000 Z4 Seat System Layout RUN UP LINE BALL SHELF OF BALL RETURNING MACHINE _ 3000 21 CENTER LINE GUTTER 3394 Drawing 2 5 3 2 BOWLING SYSTEM USER MANUAL SECTION 2 Pre Installation VIA EVOLUTION ON LANE SEATING SYSTEM 0161 0 0 51 0 0191 0 0691 70 Drawing 2 5 4 SECTION 2 Pre Installation MC2A BOWLING
12. other is called the secondary operation table when one scoring system controls only one lane the relevant operation table is called the main operation table 2 2 5 Requirements of grounding The section area of the earth wire mustn t be smaller than 4 mm the grounding resistor mustn t be over 42 MC2A BOWLING SYSTEM USER MANUAL SECTION 2 Pre Installation 2 3 2 3 1 2 3 2 2 3 3 2 3 4 LIGHTING REQUIREMENTS The lighting brightness of the lane area must reach 300LUX 350 LUX The lighting in the area of players and spectators must be 150LUX 200LUX Two 40 W fluorescent lamps must be installed over the center line of every two pin setters in the pin setter chamber The above mentioned electrical devices must be taken into consideration during the design construction installation amp furnishing of the bowling Center They must be finished and supplied with power before the installation of the bowling equipment and meet the above mentioned requirements All sockets must be equipped with plugs When pre embedding the wire tubes try to avoid bending of the tube and iron wires must be put inside the tubes for drawing wires MC2A BOWLING SYSTEM USER MANUAL SECTION 2 Pre Installation 2 4 2 4 1 2 4 2 2 4 3 2 4 4 2 4 5 2 4 6 2 4 7 2 4 8 2 4 9 REQUIREMENTS OF THE CIVIL CONSTRUCTION amp FURNISHING OF THE BOWLING CENTER Because concrete nails are sometimes used during installation the d
13. zation of the bowling Center 2 1 2 2 1 10 2 1 11 2 1 12 2 1 13 The Water Proof of the floor and the wall must be taken into consideration during the design of the Center Safety passage must be taken into consideration during the design of the Center The side door to the pin setter chamber must be at least 2200mm in width and 2400 mm in height so that there is sufficient room for moving the pin setter and the lane materials of 4500 mm long into the installation area The overall size of the pin setter is 2850 mm in length 1560 mm in Width and 1780 mm in height it is 865 Kg in weight The lane plate weighs 70 Ko m Effective acoustic materials must be used for the inside wall and the ceiling of the pin setter chamber Ventilation of the chamber must be taken into consideration Fire proofing materials must be used for decoration Design amp installation must be in accordance with local safety regulations The pin setter chamber must be equipped with fire extinguishers Air conditioning Room temperature of the bowling Center must be kept at 22 C 24 C and the relative humidity must be kept at 40 50 Room temperature of the pin setter chamber must be kept at 22 C 28 C The heat generation of each pin setter is 1000Kcal H e Air conditioning must be started 15 days prior to the installation of the lanes in order to guarantee the quality of installation Wire pipes and other necessary pre embedded parts

Download Pdf Manuals

image

Related Search

Related Contents

  ProForm 831.297471 User's Manual  Philips Bulb 929689883604    Scotts Weed Control For Lawns  取扱説明書(PDF)はこちら  Carpet Master 30 - Floor Equipment Parts  CATALOGUE N° 18 ANNEE 2013  (B. O. I S\351rie n\272 9 - 2011indd.indd)  

Copyright © All rights reserved.
Failed to retrieve file