Home

phantom-installation-manual-soft-copy File type

image

Contents

1. PHANTOM INSTALLATION MANUAL 1 0 INTRODUCTION This installation and instruction manual describes how to install maintain and operate the Planet Model Phantom examination Minor procedure light Prior to installation carefully read through all the instructions enclosed in this manual If there are any concerns or you do not understand please contact customer service at Planet Light ing E WARNING Only qualified electricians can install the Planet model Phantom light It is to be direct wired only Installation performed by unauthorised personnel could result in personal injury and or equipment damage Under no circumstances should any modifications or adjustments other than those de tailed under the Maintenance section be made to the Planet Model Phantom i The Phantom Light Complies with AS NZ standards 3200 2 41 IEC 60601 2 41 7 2 0 PRODUCT INFORMATION The Planet Phantom is a state of the art Minor procedure examination light which utilises cutting i edge Solid State Lighting technology Designed and manufactured in Australia by Planet Lighting established 1911 an R amp D driven exporting designer and manufacturer with over 10 years experi i ence in the design manufacture and supply of Solid State Lighting devices worldwide The Planet Phantom provides an improved working environment significantly reducing on going maintenance with low operational costs and offers a greener alternative to similar pr
2. 0v Input Current 0 12A LIL Input Current 0 12A Frequency 50Hz Frequency 50Hz Classification Class 1 Classification Class 1 Model PHANTOM Ceiling Model PHANTOM Wall PLANET ui PLANET U Li UiksHrinc WWw planetlighting com www planetlighting com 4 0 INSTALLATION The Planet Model Phantom arm is designed to be mounted above the immediate work area Stan dard mounting fixtures for Planet Model Phantom are Ceiling Mount amp Wall Mount specialised mountings are available on application In all cases the suggested mounting height measured at swivel head is two metres from floor level as seen in Fig 1 0 PLANET LIGHTING 4 1 CEILING MOUNT WARNING The qualified electrician who is responsible for the installation of the Phantom must include an isolation switch all pole disconnection in the fixed wiring of the Phantom and a cable tie near the terminal block of the primary 240V wiring Phase and Neutral to secure the cables STRUCTURAL LOADS CEILING MOUNT The structural integrity of the mounting surface is the responsability of the installer Structural loads are as follows 919 907 MASS TOTAL 10 6KG amp MASS ARM ONLY 6 3KG TORQUE 62 36Nm Fig 2 0 4 1 1 MOUNT CEILING PLATE AND LEVEL Use the Ceiling Template found in the centre of this document to mark out the hole locations for the ceiling plate Fig 3 0 1 Installer must ensure sufficient structural integrity of t
3. 9 5600 Fax 61 0 2 66552121 info planetlighting com www planetlighting com
4. en it reaches its end of life the disposal method with the lowest least negative impact on human health and the environment is selected Unlike the sources of traditional light LED s do not contain mercury toxic gases filaments or fragile parts Due to the fixture being over 95 recyclable and there being no Bulbs Globe changing during the ULED life of 50 00 hours your environmental footprint will be signifi cantly reduced When your Phantom light reaches its end of life contact Planet lighting or our local agents to learn about recycling options The Phantom light must be disposed of properly according to local laws and regulations 3 0 PLANNING The Building Facility mechanical and electrical installation works are the responsibility of the pur chaser Prior to installing the Planet Model Phantom Ceiling and Wall mounts the following items should be checked and confirmed 3 1 0 ARCHITECTURAL CONSIDERATIONS 3 1 1 Ensure appropriate mounting structure behind the wall ceiling 3 1 2 For structural loadings and approx product weights refer to Fig 2 0 for Ceiling and Fig 15 0 for Wall mounted 3 1 3 To confirm ceiling wall height measurements at the appropriate nominal recommended height from the floor refer Fig 1 0 3 2 0 ELECTRICAL CONSIDERATIONS 3 2 1 The Planet Model Phantom wall and ceiling mount are designed to be direct wired only 3 2 2 240V AC supply is available at the connection points Voltage 240v Voltage 24
5. he bear ing sheath with the countersunk holes on the ceiling tube as shown in Fig 14 0 18 Insert the countersunk head set screws as shown in Fig 14 0 19 Optional remove or replace the lamp head twist the conical end of the arm and pull the head and s bend section as shown in Fig 14 0 MAINTENANCE ONLY 20 Unscrew the end cap for access to the spring balance adjustment as shown in Fig 14 0 21 Adjust the spring balance using a 4mm allen key adjust the screw inside the knuckle Clockwise Tightening the screw will cause heavier engagement of the spring this will improve head droop Anticlockwise loosening the spring balance will fix a rising head issue as Shown in Fig 14 0 22 Friction adjustment Clockwise tightening this screw will apply more friction to the arm mecha nisms The arm will require more force to move however will not continue to move with moment This should be set to the staff preference as shown in Fig 14 0 4 2 WALL MOUNT STRUCTURAL LOADS WALL MOUNT The structural integrity of the mounting surface is the responsability of the installer Structural loads are as follows 1068 907 MASS TOTAL 10 22KG 9 MASS ARM ONLY 6 3KG TORQUE LOAD 68 53Nm Fig 15 0 4 2 1 MARK UP AND MOUNT WALL UNIT CEILING LEVEL S WALL MOUNT j TEMPLATE FLOOR LEVEL Fig 16 0 Fig 17 0 1 Use the wall mount template from the centre page of this document Measure up 1907mm from the flo
6. he mounting surface 2 Fix the ceiling plate to the structural ceiling using suitable fixings to be selected by the installer 3 It is very important that the installer ensures the mounting plate and collar are level This will ensure that the centre axis of the mounting collar is plumb and the light is balanced NOTE If ceiling tube is the pre welded type please goto section 4 1 5 4 1 2 DETERMINE THE CEILING TUBE LENGTH 8 THRU HOLES BY INSTALLER 2000 MIN COUNTERSUNK HOLES BY PLANET LIGHTING Fig 4 0 4 1 3 CUT CEILING TUBE TO LENGTH WARNING Do not cut tube end with countersunk holes Fig 5 0 4 Cut ceiling tube to length based on the table in Fig 4 0 5 Measure and drill through hole for the locking bolt as shown in Fig 5 0 PLANET LIGHTING NG FIT OUT 4 1 4 PRE CEILI Fig 6 0 Fig 7 0 6 Assemble ceiling tube to ceiling plate with the locking bolt and nut as shown in Fig 6 0 7 Reticulate 240v power to the power supply mounting location in accordance with local standards and regulations Attach the mounting plate earth and reticulate power to the mounting location as shown in Fig 7 0 4 1 5 RETICULATE POWER TO CEILING LEVEL i Fig 9 0 8 Drill cable access hole in the ceiling tube at the sub ceiling level as shown in Fig 8 0 Take care to remove power cords from the drilling area before drilling 9 Complete the reticulation of 24v power to the power sup
7. ockwise loosening the spring balance will fix a rising head issue as shown in Fig 18 0 11 Friction adjustment Clockwise tightening this screw will apply more friction to the arm mecha nisms as shown in Fig 18 0 The arm will require more force to move however will not continue to move with moment This should be set to the staff preference 5 0 MAINTENANCE Cleaning and disinfection Protocol KAN WARNING e Turn off the light before commencing any cleaning e Let the light cool down Disinfect and clean the light and body including any cables only when it is cold e Make sure that excess water cleaning agent has been removed from cleaning cloth before com mencing e Useadamp NOT wet Cloth e Use alcohol detergent having medium alkaline level but no active chlorine LN ATTENTION Do not use abrasive products petrol paint thinners alkaline detergent acidic cleaning agents or aldehydes Make sure the proportions of the detergents cleaning agents are accurate based on manufacturers Instructions LN WARNING The disinfectants cleaning agents may contain substances harmful to health use disinfectants only recommended by your health authorities and follow the manufacturer s user instruction carefully Customer Service can be contacted on the phone number below Mon Friday 9am 5pm ne P L A N E T Made in Australia Exported to the World Su Tamarind Drive Bellingen NSW 2454 Australia Coil G H T Phone 61 0 2 665
8. oducts The Planet model Phantom allows the accurate positioning of the lamp head above any work sur Face It is designed to be mounted on a wall or ceiling and be pulled down from above when required remaining there until re positioned At Planet we take great pride in the design and production of our lights and we are sure you will de rive satisfaction from owning and using our products When installed and maintained in accordance with the instructions contained in this service leaflet this product will provide many years of trouble free operation Should you have any enquiry comment or special lighting need we would like to hear from you We back our products with pride service and a five year warranty WALL MOUNT 2000 MIN 2 1 0 ENVIRONMENTAL CONSIDERATIONS 2 1 1 PACKAGING Confirm boxes containing a complete Phantom lamp with Installation and users manual have ar rived and there is no obvious transport damage 2 1 2 TRANSPORT Transport to be carried out by road while maintaining the following environmental conditions Temperature 15 60 degrees Celsius Humidity 10 75 Atmospheric pressure h Pa 500 1060 2 1 3 STORAGE The devices packaged must be stored warehoused in a dry place and as per the same environmen tal conditions mentioned above 2 2 0 DISPOSAL AND RECYCLING INFORMATION The Phantom light has been designed taking into account what the manufacturing components are made out of This is to ensure wh
9. or and align the bottom of the wall mount template with this mark Position and fix the template into position ensuring that both edges are level to the vertical and horizontal as shown in Fig 16 0 Use the template to mark hole positions for cable access and mounting 2 Installer to select suitable fixings and fix the wall unit to the structurally sound wall ensuring that the unit is level on all edges Fig 17 0 3 Reticulate the 240v power to the power supply location and connect to the fitting at the terminal block as shown in Fig 17 0 4 2 3 MOUNT FITTING Fig 18 0 4 Lift Phantom arm into place and engage the 24v plugs as shown in Fig 18 0 5 Insert the arm bearing into the wall unit taking care to align the threaded holes on the arm side bearing sheath with the corresponding holes on the bearing sheath on the wall unit as shown in Fig 18 0 6 Insert and tighten the two grub screws to complete the fixing of the arm to the wall unit as shown in Fig 18 0 7 Replace the wall unit cover as shown in Fig 18 0 8 Fix in the place with the countersunk screws provided as shown in Fig 18 0 MAINTENANCE ONLY 9 Unscrew the end cap for access to the spring balance adjustment as shown in Fig 18 0 10 Adjust the spring balance using a 4mm allen key adjust the screw inside the knuckle Clockwise i Tightening the screw will cause heavier engagement of the spring this will improve head droop Anticl
10. ply mounting location as shown in Fig 9 0 4 1 6 POSITION POWER SUPPLY AND TIGHTEN ONTO THE CEILING TUBE i 4 Ki Fig 10 0 10 Slide power supply into mounting position as close to the ceiling as possible as shown in Fig 10 0 11 Using the u bolt nuts and washers supplied attach the power supply assembly to the ceiling tube as shown in Fig 10 0 4 1 7 CONNECT POWER 24V DC OUTPUT 24V DC OUTPUT FOR THE LED INDICATOR LIGHT 724V DC OUTPUT TERMINAL THIS IS THE MAIN OUTPUT FOR MEANWELL RPS 60 24 THE LIGHT FITTING 24V DC POWER SUPPLY UBOLT FOR FIXING THE DRIVER ASSEMBLY TO EARTH LINK THE MAIN SUPPORT STEM 240V INPUT ma kA EARTH TO DRIVER ASSEMBLY 240V AC INPUT TERMINAL Fig 11 0 12 Connect the 24v power feed and earth for the light fitting into the terminal shown in Fig 11 0 13 Connect the 240v AC input and earth into the terminal as shown in Fig 11 0 4 1 8 ATTACH CEILING COVER Fig 12 0 Fig 13 0 14 Move ceiling cover into place and connect the 24v DC output for the LED indicator light 15 Push the ceiling cover up against the ceiling and tighten the grub screw to lock it in place as shown in Fig 13 0 4 1 9 ATTACH LIGHT FITTING TO CEILING TUBE Fig 14 0 16 Lift Phantom arm into place and engage the 24v plugs as shown in Fig 14 0 17 Insert the arm bearing into the ceiling tube taking care to align the threaded holes on t

Download Pdf Manuals

image

Related Search

Related Contents

User Manual  枠用親綱支柱取扱説明書  IOcab 8444opto Basic Example  Lenco Podo-151  Home Decorators Collection 1911120210 Use and Care Manual  hth kontral  UM-X - FAFNIR GmbH      帰”ロTE= 圧ロプロジェクターヘッドライト取扱説明書  

Copyright © All rights reserved.
Failed to retrieve file