Home
Pipes and Fittings User`s Manual Revision 1.0
Contents
1. Untitled Page 1 of 2 Pipes and Fittings User s Manual Revision 1 0 INTRODUCTION This is the documentation for the Pipes and Fittings experiment in the Unit Operations Lab Control for this experiment comes from the Bailey Net 90 computer system Items to be entered into the computer are in bold type QNX is a case sensitive operating system so commands must be entered as typed Please read through all instructions before attempting to run the experiment I EXPERIMENT HARDWARE SETTINGS 1 These are the start up valve settings a Large tank ball valve open b Small tank ball valve closed c Loop bypass ball valve closed d Experiment gate valve open e Experiment ball valve open f Main tank return ball valve open g Main tank hose ball valve closed 2 Fill main tank with approximately 12 inches of water 3 Turn the air on Air valve is located on the east side of the pillar by the control valve 4 Plug in the two plugs from the electrical connection box The electrical box is located on the south side of the pillar by the control valve Il SHUT DOWN PROCEDURES 1 Turn off the pump Refer to section II Pump Control http www et byu edu groups uolab manuals pipesfit manual html 3 1 2004 Untitled Page 2 of 2 2 Disconnect electrical power Section I item 4 3 Turn off the air Section I item 3 4 Use F10 to exit control software menus and to return to the main menu http www et byu e
2. du groups uolab manuals pipesfit manual html 3 1 2004
Download Pdf Manuals
Related Search
Related Contents
Defy Appliances 600STS Oven User Manual AirWave 8.0 and RAPIDS User Guide Creative Labs Woof 2 ASUS c3550 User's Manual Copyright © All rights reserved.
Failed to retrieve file