Contents

1. software Support Services 3 General Terms amp Conditions e Bids may be submitted to undersigned in a SEALED ENVELOPE at the address given below latest by 22 November 2010 by 1500 00 pm The technical bids will be opened on the same date at 15 30 pm Proposals shall be delivered by hand or courier PROPOSALS RECEIVED BY FAX OR EMAIL SHALL NOT BE ACCEPTED PROPOSALS RECEIVED AFTER THE GIVEN DATE amp TIME WILL NOT BE ACCEPTABLE ANY QUERY CLARIFICATION REGARDING RFP SHOULD REACH UNDERSIGNED WITHIN THREE WORKING DAYS OF PUBLISHINING THIS RFP HOWEVER RFP WILL NOT BE REVISED IN ANY CASE Saleem Zubair Ahmad Director IT Punjab Employees Social Security Institution PESSI Address Head Office 3 A Gulberg V Telephone 042 99263129 Fax 042 99263098 e A bid bond in the shape of bank draft pay order in the name of Punjab Employees Social Security Institute Government of Punjab equivalent to 2 of the total cost of bid should be submitted along with the proposal in SEPARATE SEALED ENVELOPE with BID BOND written on it e Bidders will be required to attach a letter with bid document duly acknowledged signed by respective PRINCIPAL that their partner partner s will deliver amp install the requisite hardware amp software within given timelines and also fulfill the scope of work as per contract agreement and any violation will be considered fraud that might be result in other potential remedies blacklisting from participation
2. 08 IP Telephony 09 UPS 10 Precision Cooling System 11 Software Licenses November 2010 All bids must be accompanied by a call deposit CDR of two percent 02 of total bid amount The bids along with the CDR must be delivered to the office of the Director IT Punjab Employees Social Security Institution PESSD 3 A Gulberg V Lahore on or before 1500 hours on 22 November 2010 The Technical bids will be publicly opened in the Committee Room of Punjab Employees Social Security Institution PESSD 3 A Gulberg V Lahore Pakistan at 1530 hours on 22 November 2010 Bidders shall submit Bids which comply with the Bidding Documents Alternative Bids will not be considered Punjab Employees Social Security Institution PESSI Lahore will not be responsible for any costs or expenses incurred by bidders in connection with the preparation or delivery of bids As authority competent to accept the tender the Commissioner PESSI reserves the right to accept or reject one or all the tenders without assigning any reason thereof Failure to supply items within the stipulated time period will invoke penalty as specified in penalty clauses of this document In addition to that 02 Call Deposit CDR amount will be forfeited and the company will not be allowed to participate in future tenders as well Execution installation of the said tendered equipment will be carried out at Lahore Saleem Zubair Ahmad Director IT
3. Punjab Employees Social Security Institution PESSI Head Office 3 A Gulberg V Lahore Tel 092 42 99263 129 E mail saleem zubair yahoo com 1 Description of Work Punjab Employees Social Security Institution PESSI invites proposals from companies having a legal presence in Pakistan for the establishment of Data Centre with provision of hardware amp software at Nawaz Sharif Social Security Hospital Lahore This Request for Proposal RFP is being issued to introduce technology through PESSI in Nawaz Sharif Social Security Hospital to speed up the health process to directly or indirectly help citizens of Pakistan Project aims to enhance the current IT infrastructure at Nawaz Sharif Social Security Hospital to improve internal communications facilitate speedy delivery of services to patients and provide appropriate transparent and speedy access of information 2 Scope of Work PESSI is looking towards building a flexible and responsive centralized data center at Nawaz Sharif Social Security Hospital Lahore that will unify computing resources simplify workload management and automate high availability and disaster recovery Scope of work includes e Establishment of centralized Data Centre that includes provision of Non IT equipment etc e Provision of state of the art IT hardware includes computing routing switching etc with requisite licensed software s e Training of PESSI technical team on delivered hardware amp
4. Request for Proposal RFP On Turnkey Basis For Establishment of Data Centre and provision of IT amp Non IT equipment with requisite software s at Nawaz Sharif Social Security Hospital Lahore Punjab Employees Social Security Institute PESSI Government of Punjab INVITATION TO BID Punjab Employees Social Security Institution PESSI Government of the Punjab Lahore invites sealed bids from eligible bidders for Establishment of Network System amp Supply of Hardware for Nawaz Sharif Social Security Hospital project Punjab Employees Social Security Institution PESSI requests Tender Bids in sealed envelopes on Turnkey Basis Proponents applying for bids should submit two separate bids envelopes for Financial Proposal and Technical Proposal The Technical Proposal should contain all the bid items without quoting the price and must list firm s clientele details of past project resumes CVs of the engineering team after sales service and authorization letters from manufactures etc Financial bids of Firms not pre qualified on Technical basis will not be opened The selected firms would be responsible for complete execution of the equipment and would hand over it in satisfactory running state within stipulated time Sr No Description Amount in Rs 01 Servers 02 External Storage Device SAN 03 Tape Library 04 Computers 05 Laptops 06 Printers Rs 10 000 00 07 Networking
5. Licensing Model The respondent should clearly specify licensing methodology for all components with licensing limitations This will be separately marked during evaluation to judge total cost of ownership to determine long term value of the financial proposal Capacity Requirements Current requirements PESSI is looking at following capacity for various systems as required by their licensing model Number of Network nodes 300 Expansion Considerations The respondent should design the solution keeping in view below mentioned expansion considerations These consideration apply to system technical capability and not to hardware or licensing limitation unless explicitly state PESSI would proceed with additional hardware and licenses as and when required e The core solution should not have any technical limitation with respect to system capacity This will protect the investment against future expansion e The system should be able to scale to additional hardware and licenses Functional Operational Requirements The new solution should fulfil extensive set of requirements as discussed in detail in subsequent chapters Below is a brief outline of major requirements For further explanation on each of the following refer to the hardware table e Firewall e Intrusion Prevention System e Access Control Solution e LAN Core Switch e LAN Access Switch e WAN Edge P STN Router e Wireless LAN Controller e Wireless Access Point e IP
6. Microsoft Vista 32bit 64bit RH Linux 3 0 4 0 5 0 WS SuSE Linux 10 x or later NetWare 3 x 5 1 6 0 Macintosh version OS 9 0 or later and OS X or later Toner Ship With capacity Up to 6 000 page capacity or Higher 24 Network Laser jet Printers Maximum print Speed black Up to 35 ppm Letter or Higher Resolution 1200 x 1200 dpi printer default or Higher processor Speed 400MHz or Higher Maximum Duty cycle Up to 50 000 pages per month or Higher Standard 32MB RAM Upgradeable 288MB RAM or Higher Standard input trays 250 sheet covered drawer 50 sheet multipurpose tray or Higher Standard Output capacity 150 sheet bin or Higher Media types Plain Recycled light Heavy Bond rough no Duplex support Colored Greeting Card Stock Automatic Duplex support Envelopes supported only from MPF Label Paper type Transparencies Laser Letterhead Preprinted Duplexer Automatic duplex unit print both sides Standard interfaces Hi Speed USB 2 0 Parallel IEEE 1284 10 100 BaseT RJ45 Ethernet port print languages and fonts HP PCLR 6 Emulation 2 bitmapped fonts PostScriptR 3 Emulation 89 scalable fonts OCR A and OCR B fonts and code 3 of 9 bar codes Operating Systems OS Support MS Windows 2008 Server 2003 Server 2000 Server NT 4 0 XP 32bit 64 bit 2000 Microsoft Vista 32bit 64bit RH Linux 3 0 4 0 5 0 WS SuSE Linux 10 x
7. The enclosure shall be designed to blend into an IT environment The cabinet shall be equipped for fork truck lifting The UPS cabinet shall be painted with the manufacturer s standard color black All service and installation access shall be from the front and top ii The UPS shall be in a self contained cabinet and comprise 1 OkVA 1 5KVA 20kVA 30kVA or 40kVA power section Bypass Static Switch Battery for standard run time and interface LCD display all mounted in a separate cabinet The UPS shall permit user installable and removable battery units The power section shall be of the Double Conversion On Line topology with power factor corrected inputs 1 The UPS shall be sized for____ kVAand_____ kW load 2 The UPS battery shall be sized for____at a power factor of____ for ___ minutes iii The UPS shall have a short circuit withstand capability of 30kA B SYSTEM INPUT i Nominal Input voltage rating 3 x400 230V adjustable for 3 x380 220V or 3 x4 1 5240V ii Input Voltage range 304 477V iii Earthing principle TN S TN C S TN C TT or IT iv Input frequency 40 70 Hz auto sensing v Input power factor 0 98 vi Magnetizing inrush current NONE if optional input isolating transformer is installed then 500 of nominal input current for less than one cycle vii Input current distortion with no additional filters viii lt 5 THD at 100 load ix Power walk in Soft Start Shall be linear from 0 to 100 of the
8. so that the parts may be delivered to the customer site within 24 hours 4 3 MAINTENANCE CONTRACTS A complete offering of preventative and full service maintenance contracts for the UPS system and the battery system shall be available All contract work shall be performed by factory trained service personnel 4 4 TRAINING UPS service training workshop A UPS service training workshop shall be available from the UPS manufacturer The service training workshop shall include a combination of lecture and practical instruction with hands on laboratory sessions The service training workshop shall include instruction about safety procedures UPS operational theory sub assembly identification and operation system controls and adjustment preventative maintenance and troubleshooting Electrical Power Distribution System a PESSI intends to use a central UPS for each building block Devices are marked on floor plan those would be required to be powered up from central UPS UPS rating should also be calculated and approved based on devices load marked in each block UPS rating shall be between 15 30 KVA b Three phase electrical power distribution system is required for UPS power distribution to final devices including desktop computers switches etc Load on each phase should be balanced c Electrical power distribution should be in accordance with national laws and best industry practices d LV Power distribution system shall include power
9. 12 Runtime calibration complete 13 Battery self test aborted 14 Battery self test started 15 Battery self test completed 16 Number of battery modules decreased 17 Number of battery modules increased 18 Fan fault 19 SBS fault 20 System not in sync 21 Bypass not available frequency voltage out of range 22 Mains voltage frequency out of range 23 Site wiring fault 24 Low battery voltage shut down 25 XR battery breaker or fuse open 26 27 28 29 30 31 32 Defective battery detected Runtime is below alarm threshold Load is above alarm threshold Battery over voltage warning Battery over temperature warning Emergency power supply fault Output overloaded Go a Vi iv The following controls or programming functions shall be accomplished by use of the display unit Pushbutton membrane switches shall facilitate these operations Silence audible Alarm Set the alphanumeric display language Display or set the date and time Enable or disable the automatic restart feature Transfer critical load to and from static bypass 6 Test battery condition on demand 7 Set intervals for automatic battery tests 8 Adjust set points for different alarms 9 Program the parameters for remote shutdown The following shall make up the UPS front panel user interface 1 Indicating LED s e Load On When Green this LED indicates the load is being supported by the UPS output e On Battery When Yellow this LED indicates t
10. 527 mm Depth 163 mm f Operating Conditions g Temperature 0 45 C h Humidity 0 95 RH Non Condensing i Approvals j AS NZS 3548 C Tick Class A k cUL Listed l CE m FCC Part15 Class A n GOST o ICES 003 IRAM p Low Voltage Directive 2006 95 EC NOM q VCCI Class A Chiller Air Cooled Electric chillers are required for supply of chilled water for InRow Cooling units Chillers should meet following specifications a Type Air Cooled Electric Chiller b Voltage 230 400 V c Frequency 50 Hz d Capacity 25 kW 5 at 45 C DB temperature e Altitude 600 meters f Supply Water Temperature 7 2C g Return Water Temperature 12 7C h Flow Rate 14 GPM Minimum i Refrigerant R410A or R407C j EER 3 75 or Above k Compressor Hermetic Scroll l Certification Euro vent Certified m Country of Origin USA or EU n Control Microprocessor Based o Minimum Working Capacity 30 of full load Chilled Water Piping System Chilled water piping is required between chillers and InRow units Piping should be seamless steel piping of schedule 40 or L type copper piping Piping should include all kind of fittings including but not limited to valves bends strainers insulation pumps flow meters purging valves etc It should be complete in all respect in accordance with chiller and InRow cooling unit operational requirements Chillers amp InRow cooling unit data must be consulted and well understood befor
11. 8GB Memory in Total Dual Power Supply 20 Desktops for standard usage Intel Core i3 Processor 540 3 06 GHz 4MB Cache Intel Q57 Express Chipset 1 GB DDR 3 Memory 160GB SATA Hard Drive with Raid 1 0 Support Integrated VGA Integrated Sound Integrated Gigabit Ethernet USB Key Board USB Optical Mouse Minitower Chassis 18 LCD or higher Monitor Standard Power Supply Custom Factory Integration and Institute Logo at BIOS Proper BIOS based Locking solution Manufacturer standard 260 21 Desktops for professional usage Intel Core i5 Processor 650 3 20 GHz 4MB Cache Intel Q57 Express Chipset 1 GB DDR 3 Memory 160GB SATA Hard Drive with Raid 1 0 Support Integrated VGA Integrated Sound Integrated Gigabit Ethernet USB Key Board USB Optical Mouse Minitower Chassis 18 LCD or higher Monitor Standard Power Supply Custom Factory Integration and Institute Logo at BIOS 40 Proper BIOS based Locking solution Manufacturer standard Intel Core i3 370 Processor 2 4 GHz 3MB Cache Intel HM57 Express Chipset 4 GB DDR 3 Memory 2 x 2GB 320GB SATA Hard Drive 7 2K RPM DVD RW Drive 14 Wide LED Anti Glare Display Integrated Camera Integrated Gigabit NIC Wireless Network Integrated Graphic Media Accelerator
12. Assuming rack mount PDU is fed from a circuit breaker with an 80 percent continuous rating a single rack mount PDU shall be capable of distributing up to 3 2 7 kW in a single rack 1 2 Overhead Distribution 1 2 1 Flexible Distribution Conductors For purposes of overhead distribution wiring of data center branch circuits flexible conductors of either an SJO type or TC type shall be available as a distribution means Flexible conductors shall be equipped with NEMA or IEC style cord caps and shall be agency approved under UL 60950 as part of the system 1 2 2 Cable Ladder For purposes of routing data and power cables between rows in a data center aisle layout cable ladders shall be available to span the gap between rows Cable ladders shall be agency approved under UL 60950 as part of the system The use of overhead cable management shall minimize the need to run data and power cable beneath a raised floor thus minimizing potential air flow obstructions for down flow type precision cooling solutions This means of cable management shall also facilitate ease of installation of power and data cabling in data centers not utilizing raised floor Optional covers shall be available for ladders as a means of adhering to local codes requiring such 1 2 3 Cable Trough For purposes of routing data and power cable along the length of a row of IT enclosures in a data center environment cable troughs shall be available as a means of separating and
13. HD Laptops for 10 22 professional usage Bluetooth Module Finger Print Reader Integrated Audio Network Connector RJ45 USB ports Docking connector etc 6 Cell Liyhium lon Primary Battery 90W AC adapter Original Carrying Case Customer Factory Integration and Institute Logo at BIOS Proper Locking Solution As per Manufacturer Standard 23 Laser jet 30 Printers Maximum print Speed black Up to 35 ppm Letter or Higher Resolution 1200 x 1200 dpi printer default or Higher processor Speed 400MHz or Higher Maximum Duty cycle Up to 50 000 pages per month or Higher Standard 32MB RAM Upgradeable to 160MB RAM or Higher Input trays 250 sheet covered drawer 50 sheet multipurpose tray or Higher Output capacity 150 sheet bin or Higher Media types Plain Recycled light Heavy Bond rough no Duplex support Colored Greeting Card Stock no Duplex support Envelopes supported only from MPF Label Paper type Transparencies Laser Letterhead Preprinted Duplexer Automatic duplex unit print both sides Standard interfaces Hi Speed USB 2 0 Parallel IEEE 1284 print languages and fonts HP PCLR 6 Emulation 2 bitmapped fonts Post Script R 3 Emulation 89 scalable fonts OCR A and OCR B fonts and code 3 of 9 bar codes Operating Systems OS Support MS Windows 2008 Server 2003 Server 2000 Server NT 4 0 XP 32bit 64 bit 2000
14. Oracle Database 11 g Enterprise Edition 02 12 Oracle Application Server 1 1g Enterprise Edition ol Lelp a Oracle RAC License 01 Cost of Licenses provided by PESSI will be deducted from Grand total Quantity will be finalized at the time of issuing purchase order Annexure II FORMAT OF FINANCIAL PROPOSAL Unit Cost Total Cost S N Item Quantity Rs Rs Total in Pak Rupees GRAND TOTAL IN RUPEES INCLUSIVE OF ALL TAXES DUTIES All the taxes duties must be included in the total costs No additional cost will be payable in addition to total cost for the above mentioned items ANNEXURE II FORMAT FOR RESUMES 1 General Details 2 Education 3 Certifications Please provide photocopies of certifications with prescribed resume format Certifications will not be considered valid without the photocopies 4 Experience Total IT Experience Yrs Total Experience in Propose Technology Yrs DETAILS OF LT EXPERIENCE 1 2 3 PROJECTS DETAILS ANNEXURE A Bid Specifications For Server Room Data Center Contents General Network Critical Physical Infrastructure NCPI Physical Infrastructure Management System PIMS Optional Uninterrupted Power System UPS Power Distribution System IT Server Racks Pre
15. Page buttons are used to access each page of 12 buttons and provide status Network Management Software That Should Provide functionality such as information about latest threats Network Chokes performance indicators Traffic Logging etc for 361 nodes along with complete management of Network Infrastructure 01 LCD for Display Panasonic Sony Samsung or equivalent International brands Sr Item Description Qty 10 5 LCD Displays 56 inch LCDs CATEGORY 03 POWER amp COOLING INFRASTRUCTURE S No Item Description Qty 1 Supply Installation and 42 U 600 mm Wide Racks as per specifications in 4 Commissioning of IT Rack Annexure A gt Supply Installation and 8 KVA Rack mount UPS as per specifications in Commissioning of Data Center Annexure A 3 UPS 3 Supply Installation and 18 2 KW Precision cooling units as per 2 Commissioning of In Row specifications in Annexure A Cooling Units 4 Supply Installation and Compatible with InRow Cooling as per 2 Commissioning of Chillers specifications in Annexure A Supply Installation and Schedule 40 Piping system including all required meager valves gates of required size for connection 5 Commissioning of Chilled 3 1 ies between Chillers amp InRow Cooling Units as per Water Piping System Pin specifications in Annexure A IP based monitoring system comprising of 6 Supply Installation
16. Routing capability ICMP May work with TACACS and RADIUS Scalability to 4 096 virtual ports VLAN port instances Should be having Fault tolerant load sharing power supplies Access Switch Minimum 24 10 100 1000 PoE 2T SFP Ethernet uplink ports Minimum switching bandwidth 3 2Gbps Minimum Forwarding bandwidth 16Gbps Maximum Transmission Unit MTU Up to 9000 Bytes Layer 2 switching with intelligent Layer 2 4 services Power over Ethernet Plus for next generation high power devices Automatic QoS support DHCP support Remote Switch Port Analyzer RSPAN Layer 2 Trace route TFTP support Port security and VLAN capability 18 Core Router PSTN Gateway Edge Router Offer embedded hardware encryption acceleration voice and video capable digital signal processor DSP slots optional firewall intrusion prevention call processing voicemail and application services Should support Embedded hardware based cryptography acceleration IPSec SSL Minimum 01 E1 expandable to 4E1 for PSTN Connectivity Minimum 3 x 10 100 1000 Ethernet Ports Should have 2 x External USB 2 0 flash memory slots Type A Should have 1 x Service Module slots Should have minimum 1 x Serial console port Able to be deployed in high speed WAN environments with concurrent services enabled up to 75 Mbps Supporting a multi gigabit fabric MGF that enables high bandwidth module to module communication without compro
17. Storage should have the ability to do an instant restore from a snapshot Each Controller should have 2 iSCSI port 2 FC host ports Dual Redundant Controller 2GB cache per controller or higher At least 32 x 600GB SAS 15k RPM SAS Drives Supporting RAID level 0 1 5 6 RAID 10 with Hot Spare Useable after RAID 5 at least 14TB with 4 hot Spare drives OR Tier 1 10TB Raw Storage using 4Gbps FC 15K RPM Disk or 6Gbps SAS 2 0 15K RPM Tier 2 14 TB Raw Storage using 4Gbps SATA 7 2K RPM Disk or 6Gbps Near Line SAS 7 2K RPM Disk Support for replication in future Online RAID level Migration software must be included Online Volume migration from SAS to FC or Vice Versa 17 Data Backup Software Symantec Backup Exec 2010 networker Tivoli HP Open view Automatic Data backup software with agents for MS Exchange Oracle Open Files Should have the capability to take data backup online off line 18 Tape Library Up to at least 48 slots 2 x LTO5 6Gb SAS FC Drive s 1 x Cleaning Cartridge Tape Media for LTO5 Quantity 25 Connecting SAS Cables Rack Rails amp Accessories SAS 6Gbps HBA card FC HBA Based on Proposed Solution 19 Backup Server for Backup Software 2 x Intel Xeon E5620 2 40Ghz 12M Cache Turbo HT 1066MHz 2 x 146GB 10K RPM Serial Attached SCSI 3GBps 2 5 inch Hot Plug Hard Drive Dual Port Gigabit NIC
18. and Cameras Temperaure Humidity Sensors and 1 Commissioning of Integration device software etc as per Environment Monitoring specifications in Annexure A Installation Testing amp Commissioning of all 7 System Integration components including interconnection cables 1 Job ducts labor software licenses etc as per specifications in Annexure A 8 Supply Installation and Central UPS for each block as per specifications in 4 Commissioning of Block UPS Annexure B 9 Supply Installation and Power distribution system for each block as per 4 Jobs Commissioning of Electrical Power Distribution System specifications in Annexure B CATEGORY 04 LICENSED SOFTWARE S PESSI requirement is qualifying for Academic Discounts so please quote all the software s with Educational Discounts Sr Description Qty 1 Windows Server 2008 Enterprise Edition Educational 02 2 Microsoft Exchange Server 2010 Enterprise Edition Educational 02 3 Windows Server 2008 Standard Edition Educational 09 4 Windows Server CALs Educational 320 gt Exchange Server CALs Educational eae 7 Windows 7 Business Upg Educational 320 8 Microsoft Office Std 2007 Educational 320 9 Enterprise Antivirus Management Server for managing clients and pushing virus 01 definitions to clients Server Client Solution 10 antivirus Client Security compatible with the management server 320 11
19. battery modules Verify neutral and ground conductors are properly landed e oP Gk Ne Inspect external maintenance bypass switch for proper terminations and phasing D Site Testing Ensure proper system start up Verify proper firmware control functions Verify proper firmware bypass operation Verify proper maintenance bypass switch operation Verify system set points Verify proper inverter operation and regulation circuits Simulate utility power failure QE EIU Or E R Ges Naa S Verify proper charger operation 9 Document sign and date all test results E On Site Operational Training During the factory assisted start up operational training for site personnel shall include key pad operation LED indicators start up and shutdown procedures maintenance bypass and AC disconnect operation and alarm information A Worldwide service The UPS manufacturer shall have a worldwide service organization Available consisting of factory trained field service personnel to perform start up preventative maintenance and service of the UPS system and power equipment The service organization shall offer 24 hours a day 7 days a week 365 days a year service support B Replacement parts Parts shall be available through the worldwide service organization 24 hours a day 7 days a week 365 days a year The worldwide service organization shall be capable of shipping parts within 4 working hours or on the next available flight
20. housing data and power cable Optional covers shall be available for troughs as a means of adhering to local codes requiring such The use of overhead cable management shall minimize the need to run data and power cable beneath a raised floor thus minimizing potential air flow obstructions for down flow type precision cooling solutions This means of cable management shall also facilitate ease of installation of power and data cabling in data centers not utilizing raised floor 2 IT Server Racks IT enclosures shall be available for housing of Owner supplied IT equipment Enclosures shall be listed under the same UL 60950 agency approval as other products outlined within this Section 2 1 General Requirements a The enclosure shall be designed to provide a secure managed environment for computer and networking equipment The enclosure shall conform to EIA 310 and accommodate industry standard 19 inch 483 mm rack mount equipment The enclosure shall be designed with four vertical posts to allow rack mount equipment installation utilizing four vertical mounting rails The enclosure shall be available with a vertical equipment mounting space of 42U 1U 1 75 inch 44 45 mm A four post open frame configuration shall be available with 42U vertical equipment mounting space 2 2 Physical Requirements a External width dimensions shall be 23 5 inches 597 mm for 19 inch 483 mm rack enclosures and 29 4 inches 747 mm fo
21. including weights and dimensions f Information about terminal locations for power and control connections 2 Delivery Submittals a Installation manual which includes instructions for storage handling examination preparation installation and start up of UPS b User manual which includes operating instructions B PRODUCT a MECHANICAL DESIGN 1 The UPS is contained in a rugged steel cabinet with two plastic front bezels 2 The UPS dimensions are 263 x 432 x 663mm 10 4 x 17 x 26 in 3 The UPS cabinet is capable of conversion between Tower and Rack Mount configurations b SYSTEM CHARACTERISTICS 1 System Capacity a The system is rated to be capable of supporting 2 3 4 i 8kVA or 6 4kW whichever limit is reached first 83k VA model The UPS efficiency is at least 92 without degradation of output regulation as specified Input a AC input nominal voltage 220 230 240VAC single phase 3 wire L N G or 380 400 41 SVAC three phase 5 wire L1 L2 L3 N G b AC input voltage window i 160 280VAC L N at full load while providing nominal charging to the battery system ii 100 280 VAC L N at 50 load while providing nominal charging to the battery system c Input frequency range 45 65Hz d Input Power Factor Minimum 0 95 lagging at 100 load at 230VAC e Input Current Distortion Maximum 6 at 100 load at 230VAC f Crest factor 3 1 UPS Output a AC Outpu
22. load 9 Input voltage window 304 477 V 10 Typical battery recharge time per IEEE 485 Batteries 1 Standard battery technology shall be Valve Regulated Lead Acid VRLA 2 Batteries shall be housed in the same rack as the power section Batteries shall be modular on pull out shelves for quick replacement and servicing 3 Battery voltage shall be Battery Temperature Compensated as outlined in the rectifier section above 4 End of discharge 160Vdc 5 For longer runtimes external battery frames in the same design should be offered 6 Battery Charge Current Limit The UPS shall be capable of limiting the energy sourced from the mains for purposes of battery charging As a default setting the battery charge energy will be set to 100 of its nominal value When signaled by a dry contact such as from an emergency generator the UPS shall be capable of limiting the battery charge energy taken from the mains This shall take place in user selectable increments of 75 50 25 10 and 0 of the nominal charge power The selection shall be made from the UPS front panel display control unit 7 The battery charging circuit shall remain active when in Static Bypass and in Normal Operation Inverter 1 The inverter shall consist of fast switching IGBT power module 2 Inverter shall be PWM controlled using DSP logic Analog control shall not be acceptable 3 The inverter modules shall be rated for an output power factor at 0 8 4 N
23. manager and respective technical team members along with a list of persons deputed for this project with their roles responsibilities Particular focus should be on core skills set required for implementation of project of this nature PESSI requires the resumes of staff assigned to this project as per format given in Annexure II in the following three categories 1 Total Staff assigned to the project Please specify role of each person as per minimum requirements mentioned above 2 Total Staff assigned for Project Implementation 3 Total Staff assigned to the project for Support purposes 4 Total staff assigned to the project for Training purposes IMPLEMENTATION amp PAYMENT SCHEDULE Milestone Time Period Payment S No Milestone Time Period Payment 10 Mobilization Signing of contract One week from issuance of LOI Advance Against Bank 1 Guarantee Delivery of hardware communication environmental system Four TO SIX weeks from date of signing 70 gt and software s etc and of contract 9 training of PESSI technical team Installation amp T ks fi ly of hard Configuration of the ene ee oe wale 10 licensed software 3 hardware One week after installation and configuration Performance Guarantee Submissi f should be valid for three years from the Neer O date of supply of hardware licensed 10 on submission of Performance Guarantee at aen software All the contractual obligations Performan
24. 0 100 1000 Ethernet ports Minimum 24 GigE SFP Ethernet ports Up to 24Gbps bandwidth per slot with future scalability 280 Gbps of system bandwidth capacity 225 Mpps of forwarding rate Should provide enough capacity to forward wire rate nonblocking 250 mpps for IPv4 and 125 mpps for IPv6 and supports up to 8 switching modules Supports Layer 2 MAC Layer 3 IP address and Layer 4 TCP UDP port switching Provides automated switch and router neighbor discovery Authentication MDA allow any vendor s IP phone with an IEEE 802 1x supplicant and a single host behind the IP phone to independently authenticate into the network Support 802 1x for Identity Based Network Services Supporting 802 1x Inaccessible Authentication Bypass Supporting 802 1x Unidirectional Controlled Port that allows the Wake on LAN WoL magic packets to reach a workstation attached to an unauthorized 802 1x switch port Provides QoS for both Layer 2 class of service CoS and Layer 3 type of service ToS traffic shaping sharing policing and congestion avoidance with Dynamic Buffer Limiting DBL SSO Aware Hot Standby Router Protocol HSRP Port Security on trunk port Per VLAN Spanning Tree Plus PVST and Per VLAN Rapid Spanning Tree PVRST Spanning Tree PortFast and PortFast Guard Spanning Tree UplinkFast and BackboneFast IP routing protocols Open Shortest Path First OSPF Routing Information Protocol RIP and RIPv2 Static Routing Inter VLAN
25. 30kVA 40kVA System AC to AC efficiency 50 load Acoustical noise dB A of noise typically measured at 1 meter from the operator surface 95 7 95 7 95 3 94 6 96 0 1 10kVA 94 1 2 I5KVA 95 7 3 20kVA 95 7 4 30kVA 94 6 5 40kVA 96 5 1 LOkVA 64 2 15kVA 64 3 20k VA 67 a 5 40k VA 67 Rectifier 1 Each UPS power module shall include an active power factor corrected Insulated Gated Bipolar Transistor IGBT rectifier DC buss voltage shall be 192Vdc nominal The battery charging shall keep the DC bus float voltage of 220v 1 The DC buss voltage shall be compensated against temperature variations Battery Temperature Compensation to always maintain optimal battery float charging voltage for temperature excursions above or below 25 C Temperature compensation rate shall be 320mV C for ambient temperatures gt 20 C and OmV C for ambient temperatures lt 20 C 5 DC ripple voltage shall be less than 1 of nominal with no battery connected 6 Input power factor shall be 0 98 lagging at 100 load with out the use of passive filters Rectifier shall employ electronic waveform control technology to maintain the current sinusoidal 7 Pulse Width Modulation PWM current control shall be used Digital Signal Processors DSP shall be used for all monitoring and control tasks Analog control is not acceptable 8 Reflected input current Total Harmonic Distortion THD shall not exceed 5 at 100
26. C input source the critical load shall continue being supplied by the output power stage inverter which shall derive its power from the battery system There shall be no interruption in power to the critical load during both transfers to battery operation and retransfers from battery to online operation 3 Bypass The bypass mode shall be used to provide transfer of critical load from the inverter output to the primary power source This transfer along with its retransfer shall take place with no power interruption to the critical load In the event of an emergency this transfer shall be an automatic function 4 External Service Bypass Panel SBP The maintenance service bypass panel shall provide power to the critical load from the bypass power source during times where maintenance or service of the UPS is required so that removal of the UPS is desired The SBP shall provide a mechanical means of complete isolation of the UPS from the electrical wiring of the installation The SBP shall be constructed in a free standing rack mounted or wall mounted NEMA 1 enclosure unless otherwise stated in this specification It shall be designed for single phase input with a no break transfer between bypass and UPS power c SUBMITTALS 1 Proposal Submittals a As bid system bill of materials b Product catalog sheets or equipment brochures c Product guide specifications d System single line operation diagram e Installation information
27. EXPERIENCE Responding Organizations must demonstrate relevant experience in projects with similar nature industry sector size and geography Responding organization should provide the details of experience in similar projects according to the following format An ideal reference will include projects of similar nature in the government sector with same size and geography i e South Asia The number of references is restricted to five Name of the Project Sr Nature of Total Value Geography Size of Customer Contact Proiect PKR Mil Proiect nerson amp Contact Details TE CHNOLOGY ROADMAP Responding Organization to clearly mention the roadmap for services that are quoted as part of the total solution A detailed chapter covering at least the following e Support of various IEEE standards e Technology refresh strategy for the renewal and or upgrade of technology employed at different times during the lifecycle of the project e Investment Robustness avenues to safeguard investment in technology e g using industry standards modularizing the system upgradeability and scalability Any other supporting documents graphs or charts which describe the technology roadmap of hardware software platform used for applications and equipment quoted may also be provided STAFF ASSIGNED TO THE PROJECT Responding Organizations are required to name and provide resumes of at least the planned project
28. IP H 323 MGCP and SCCP Protocol Native SIP line and trunk side support Native video telephony support Support Call Control Discover Support Analysis Manager Support Product nodes inventory and grouping Support Trace setting Support Trace collection on demand Scheduled trace collection Support Templates for setting trace levels and trace file server Support Collection and viewing of system configuration information Support System call tracking Caller ID on Media Gateway Control Protocol MGCP foreign exchange office FXO Key Expansion Module support LDAP filtering Ability to create multiple custom LDAP filters that can be assigned to one or more synchronous agreements Support Audio message waiting indicator AMWI Support Automated bandwidth selection Support Automatic route selection ARS 9 3 IP Phones Standard handset that can support for voice communication Supports two lines and offers a full duplex speakerphone Fixed keys for hold transfer and conference tri color LED line Support POE Support network features include IEEE 802 1 p q tagging and switching Support 10 100BASE T Ethernet connection through two RJ 45 ports Support G 71 1a G 71 1 G 729a G 729b and G 729ab audio compression codecs 275 9 4 IP Phones Color Screen Standard handset that can support for voice communication e supports eight lines and offers a full duplex speakerphone e Support Power O
29. Monitoring shall be possible through a standard MIB II compliant platform D SOFTWARE COMPATIBILITY i The UPS manufacturer shall have available software to support graceful shutdown and or remote monitoring for the following systems e a Microsoft Windows 95 98 XP e b Microsoft Windows NT 4 0 SP6 2000 e c OS 2 e d Netware 3 2 5 1 e e MAC OS 9 04 9 22 10 e g Digital Unix True 64 e h SGI 6 0 6 5 e j SCO UNIX e k SVR4 2 3 2 41 e m SCO Unix Ware 7 0 7 11 e n SUN Solaris 2 6 2 8 e o SUN OS 4 13 4 14 e p IBM AIX 4 3x 4 33 5 1 e q HP UX 9 x 11 i Part 4 EXECUTION A FACTORY ASSISTED START UP If a factory assisted UPS start up is requested factory trained service personnel shall perform the following inspections test procedures and on site training A Visual Inspection Inspect equipment for signs of damage Verify installation per manufacturer s instructions Inspect cabinets for foreign objects Inspect Battery Units Inspect Power Module s B Mechanical Inspection 1 Check all UPS and external maintenance bypass cabinet internal power wiring connections 2 Check all UPS and external maintenance bypass cabinet terminal screws nuts and or spade lugs for tightness C Electrical Inspection Verify correct input and bypass voltage Verify correct phase rotation of all mains connections Verify correct UPS control wiring and terminations Verify voltage of all
30. REMENTS A system shall be as described in the following specification O COOLING TYPE INROW PRECISION O Total net cooling capacity 18 2 kW O Sensible net cooling capacity 18 2 kW O Return air dry bulb temperature 29 4C DB O Humidity 55 RH Air volume 2900 CFM Electrical supply 230V 50Hz Dual Power Input 1 03 STANDARD COMPONENTS A CABINET CONSTRUCTION 1 Exterior panels shall be 18 gauge metal with 5 Ib ft 80 kg m density foam insulation Insulation complies with UL94 SVA ASTM E84 flame spread and smoke developed rating of 25 5 0 Front and rear exterior panels shall be 18 gauge perforated steel with 69 5 open free area and equipped with a keyed lock to provide a means of securing access to the internal components of the unit 2 The frame shall be constructed of 16 gauge formed steel welded for maximum strength All units shall provide full service from the front and rear allowing units to be placed within a row of racks 3 All exterior panels and frame shall be powder coated for durability and attractive finish Exterior frame and panel color shall have color values L 74 50 a 53 b 8 20 4 Units shall include casters and leveling feet to allow ease of installation in the row and provide a means to level the equipment with adjacent IT racks B VARIABLE SPPED DIRECT DRIVE MIXED FLOW DC FAN ASSEMBLY 1 Fan The unit shall be configured for draw through air pattern to provide uniform air flow ove
31. S or as a rack mounted UPS The pushbutton switches located at the Display Control Unit The following controls functions can be accomplished by use of the pushbutton switches located at the Display Control Unit a b c d e f Turn the UPS on Turn the UPS off Initiate self test in order to test battery condition Silence audible alarm Cold start Displaying input RMS voltage on the battery capacity LED bar graph Bypass switch On the rear panel of the UPS models rated 5000VA and higher there s a switch that when engaged forces the UPS into bypass state provided the input voltage and frequency are within acceptable limits 5 EPO switch The UPS is equipped with Emergency Power Off EPO terminal which can be wired so as to provide means to instantaneously de energize the UPS and its load from a remote location in case of emergency 6 Data displayed on the Display Control Unit The following indicators are available on the Display Control Unit a b c d e f 2 h The UPS load LED bar The UPS is online The UPS is on battery The UPS is in bypass The UPS is overloaded The UPS is in fault state The battery needs to be replaced The battery capacity utility voltage LED bar 7 Audible Alarms Using audio signal the UPS will notify the user about important events The following is the list of distinct audio alarms a b c d e f The UPS is on battery The UPS is on b
32. SSI name on each hardware component Responding organizations may only quote branded equipment in this tender Local brands will not be considered 1 The RO will provide managed support services for the equipment and OS platforms This may be renewed on yearly basis 2 The RO will provide on site for support of the system for a period of one year The proposed equipment must comply with the minimum specifications mentioned at Annexure I In the absence of compliance statement the proposal will be automatically rejected RO should have adequate support capabilities Support experience with Public Sector Government organizations on projects of similar nature should be clearly mentioned in proposal RO should also clearly provide list of technical staff for onsite technical support along with problem solution timelines as per the following format along with their bid failing to not meet timelines may result in delay in financial payments as well as blacklisting from Public sector organizations etc S Items Complaint Response Resolution Contact person warranty time time name E mail amp in hours in hours Mobile No RO should clearly mention the duration of delivery amp installation of equipment in bid document The quantities of the required hardware may be increased or decreased by PESSI The Punjab Employees Social Security Institution reserves the right not to accept the lowest or any proposal
33. Telephony REQUIRED PASSIVE LAN Sr No Specification Description systimax 3M Clipsal Molax or equvillent only QTY European American Australian Brands would be considered 1 Fiber Optic Cable Outdoor 6 Core Multimode 50 125 microns per running feet 3 000 2 24 Port Fiber Optic Patch Panel SC Multimode 2 3 6 Port Fiber Optic Patch Panel SC Multimode 8 4 SC Pigtails 96 5 Fiber Multimode Patch Cord 16 6 CAT6 UTP Cable Roll of 305 meter 70 7 CAT6 UTP Patch Cord 1 meter 361 8 CAT6 UTP Patch Cord 2 meter 361 9 CAT6 48 Port Patch Panel Loaded 9 10 Dual Information Outlet with backbox 150 11 Single Information Outlet with backbox 61 12 42U Cabinet with Fans and 8 x Power sockets local 1 13 27U Cabinet with 2 Fans and 2 x Clipsal PDU 4 port each 8 14 Duct 16 x 38 mm per running feet 3 000 15 Duct 40 x 40 mm per running feet 16 Duct 60 x 60 mm per running feet 17 PVC Pipe 1 with accessories Sockets Joints Bends amp Saddles per running feet 5 000 18 UTP laying charges per running feet 70 000 19 Piping amp ducting charges per running feet 8 000 20 UTP termination amp testing charges with Fluke Tester Report 361 21 Systems Integration amp Commissioning Charges 1 22 Fiber pulling laying Charges per running feet 3 000 23 Fiber Splicing Charges per core 96 Note Required quantities may be increased decreased Payment will be made as per actu
34. ability P2P file sharing detection techniques capability Support for 802 1 q traffic analysis Secure communication IP Security IPSec or Secure Sockets Layer SSL between sensor and management console Administration via Web user interface using HTTPS Command line interface CLI console CLI Telnet or SSH amp enterprise network management tool Access Control Solution Should be a highly scalable high performance access control server that operates as a centralized RADIUS or TACACS server It should enforce a uniform security policy for all users regardless of how they access the network Should have a central database for all user accounts centralizes the control of all user privileges and distributes them to hundreds or thousands of access points throughout the network Should have accounting capability The device should have a web based user interface which should simplify and distribute configuration for user profiles group profiles and server configuration The server should support large networked environments with support for redundant servers remote databases and database replication and backup services e The server should be able to synchronize with remote database like Microsoft Active directory etc via secure method e The server should support Lightweight Directory Access Protocol LDAP authentication authentication of user profiles stored in directories from leading directory vendors including S
35. al usage Required Local Area Network ACTIVE EQUIPMENT S ITEM SPECIFICATIONS QTY Firewall State full firewall with application and protocol inspection engines Throughput shouldbe at least 650 Mbps VPN throughput should be at least 325 Mbps Concurrent sessions should be at least 400 000 IPSEC VPN peers up to 5000 Should be having at least 4 Gigabit Ethernet and x Fast Ethernet Interfaces Virtual Interfaces VLANs support up to 200 VPN Clustering and Load Balancing support High availability feature Should integrate with AAA services through RADIUS and or TACACS Should support routing protocols like OSPF amp Transparent module static routing Provide protection from Denial of Service attacks Integrated Anti X services including Antivirus antispyware file blocking anti spam anti phishing URL blocking and filtering and content filtering Must include 3 years of subscription service Intrusion Prevention System Performance should be at least 2 Gbps Should have separate monitoring and managing interfaces Should have UTP based managing interface Extensive protocol monitoring All major TCP IP protocols are to be monitored including IP ICMP TCP UDP also state fully decode application layer protocols such as FTP SMTP HTTP DNS RPC NetBIOS NNTP Telnet and peer to peer P2P Should respond immediately to stop attacks Intelligent threat investigation cap
36. alogue sheets or equipment brochures iii Product guide specifications iv System single line operation diagram v Floor layout vi Capacity data vii Piping connection drawing viii Installation guide ix Drawings for requested optional accessories Delivery Submittals i Installation manual which includes instructions for storage handling examination preparation installation and start up of all systems ii User manual which includes operating instructions iii As built equipment drawings iv InfraStruXure Welcome Package 1 6 QUALIFICATIONS A B Manufacturer experience The manufacturer shall have a minimum of 20 years experience in the design manufacture and testing of UPS and cooling systems ISO 9001 Certification The manufacturer shall be ISO 9001 amp 14001 certified Certification assures that the vendor s quality control amp environmental measures have been certified by an accredited registrar and meet internationally recognized standards 1 7 ENVIRONMENTAL REQUIREMENTS Storage ambient temperature 50 C to 40 C Operating ambient temperature 0 C to 40 C 15 C to 25 C is ideal for batteries above the battery lifetime is reduced Relative humidity 0 to 95 non condensing Storage elevation 0 to 1 5000m Operating altitude with no derating 0 to 1000m feet above sea level Part 2 PRODUCT 2 1 STATIC UPS A GENERAL i The UPS shall be housed in a free standing enclosure
37. and to annul the bidding process without assigning any reason whatsoever Prices may be quoted in PKR Pakistan Rupees Format of Financial proposal is placed at Annexure II Bidders must follow the same format Bidder must provide an affidavit on judicial paper that the bidding firm never had been blacklisted by any Government or Semi Government Organization As per format at annexure D Penalty Clause The contract to be executed between PESSI and the selected vendor will contain penalty clauses for delay in the implementation schedule as well as failure to comply with the provision of providing the required services during the post approval phase FORMAT FOR THE SUBMISSION OF PROPOSAL Proposal may be submitted in the following format l pa 3 3 x copies of Technical proposal along with softcopy in CD 1 x Bid Bond separate sealed envelope 1 x financial proposal separate sealed envelope INITIAL SCREENING CRITERIA The Technical evaluation of RO s will be done on the basis of the following parameters Lead RO should be a Pakistani IT company or a multinational corporation operating in Pakistan through a branch office The lead RO has been in the IT business for at least 3 years Lead RO should have an average annual turnover of Rs Thirty 30 millions for the last three 3 years RO or Lead bidder should have at least twenty full time relevant technical resources for last one year e RO must have successfully
38. ard Remote management functionality 1 x Intel Xeon E5620 2 40Ghz 12M Cache Turbo HT 1066MHz Blade Server for print 2 x 146GB 10K RPM Serial Attached SCSI 3GBps 2 5 inch Hot Plug Hard 11 service to be Drive integrated in blade chassis Dual Port Gigabit NIC 8GB Memory in Total Remote assistant card Remote management functionality 1 x Intel Xeon E5620 2 40Ghz 12M Cache Turbo HT 1066MHz Blade Server for Antivirus 2 x 146GB 10K RPM Serial Attached SCSI 3GBps 2 5 inch Hot Plug Hard 12 service to be Drive integrated in blade chassis Dual Port Gigabit NIC 8GB Memory in Total Remote assistant card Remote management functionality 1 x Intel Xeon E5620 2 40Ghz 12M Cache Turbo HT 1066MHz Blade Server for WSUS 2 x 146GB 10K RPM Serial Attached SCSI 3GBps 2 5 inch Hot Plug Hard 13 service to be Drive integrated in blade chassis Dual Port Gigabit NIC 8GB Memory in Total Remote assistant card Remote management functionality 2 x Intel Xeon X5650 2 66Ghz 12M Cache Turbo HT 1333MHz Bottom of Form Blade Server 14 88 failover 2 146GB 10K RPM Serial Attached SCSI 3GBps 2 5 inch Hot Plug Hard node to be Drive integrated in blade chassis Dual Port Gigabit NIC 32GB Memory in Total Remote assistant card Remote management functionality 15 42U branded Rack with accessories 96 key Server Keyboard with Touch Pad USB plus PS 2 connections 17FP Rack Console 17 LCD W 1U Tra
39. at control Responding to sophisticated network attacks and threats Identity management Intelligently protecting endpoints using technologies such as authentication authorization and accounting AAA and public key infrastructure PKI Should have support of 2 external Compact Flash slots Should support USB based console access for management Should have minimum of 3 on board Gigabit Ethernet Interfaces Should support services integration and modularity on a single platform performing multiple functions optimizes raw materials consumption and energy usage Supported wide range of voice embedded services Support voice and video capable digital signal processor DSP slots Wide range of wired connectivity options such as T 1 E 1 T3 E3 fiber GE Support EHWIC HWIC slot provides enhancements to the prior generation s high speed WAN interface Support WAN interface cards WICs voice interface cards VICs and voice WAN interface cards VWICs support PVDM modules Providing support for richer density for rich media voice Supporting a broad array of signaling and physical network interfaces Support transcoding conferencing and QoS Standards certified VoiceXML browser services Wireless LAN Controller Should have minimum 8 uplink ports 1 OOOBaseT 1 O00Base SX and 1000Base LH transceiver slots Should support a higher density of clients and delivers more efficient roaming Should Support minimum 50 a
40. attery and the remaining battery capacity is low The UPS has shutdown due to low battery capacity The battery needs to be replaced The UPS is overloaded The UPS is in fault state C PART 3 ACCESSORIES a SERVICE BYPASS PANEL SBP 1 The service bypass panel shall provide power to the critical load from the bypass source during times where maintenance or service of the UPS is required The SBP shall provide a mechanical means of complete isolation of the UPS from the electrical wiring of the installation The SBP is constructed in a free standing rack mounted or wall mounted enclosure unless otherwise stated in this specification b SOFTWARE AND CONNECTIVITY 1 Network Adaptor SmartSlot Network Management Card shall allow one or more network management systems NMS to monitor and manage the UPS in TCP IP network environments The 8kVA unit is fitted with an UPS Network Management Card w Environmental Monitoring as standard 2 Unattended Shutdown a The UPS in conjunction with a network interface card shall be capable of gracefully shutting down one or more operating systems during when the UPS is on battery mode b The UPS is also capable of using an RS232 port to communicate to the host computer by means of serial communications so as to gracefully shut down one or more operating systems during an on battery situation c REMOTE UPS MONITORING CONFIGURATION AND CONTROL 1 The following three methods of remo
41. batteries are modular hot swappable user replaceable In addition this specification describes the performance functionality and design of the UPS Service Bypass Panel hereafter referred to as the SBP the external Battery Systems and connectivity solutions The UPS and associated equipment shall operate in conjunction with a primary power supply and an output distribution system to provide quality uninterrupted power for mission critical electronic equipment load All programming and miscellaneous components for a fully operational system as described in this specification shall be available as part of the UPS Configuration Specifics UPS shall be rack tower convertible In rack configuration it shall occupy no more than 6U space in standard IT Rack a STANDARDS 1 ENS50091 1 2 EN50091 2 3 EN55022 Class A 4 EN55024 5 EN62040 1 1 6 EN61000 3 2 3 3 4 2 4 3 4 4 4 5 4 6 4 8 4 11 7 EN60950 1 8 IEC60950 1 9 GOST 10 IEC 60950 11 CE 12 VDE 13 C tick 14 ISO 9001 15 ISO 14001 b MODES OF OPERATION 1 Online The input PFC power stage and the output power stage inverter shall operate in an on line manner to continuously regulate power to the critical load The input PFC stage shall be capable of full battery recharge while simultaneously providing regulated power to the load for all line and load conditions within the range of the UPS specifications 2 On Battery Upon failure of the A
42. ccess points for business critical wireless services at locations of all sizes Capable of Separate SSID tunnels to allow both corporate and personal Internet access Offers Control and Provisioning of Wireless Access Points CAPWAP compliant DTLS encryption to ensure full line rate encryption between access points and controllers across remote WAN LAN links Support IEEE 802 1la 802 11b 802 11g 802 11d WMM 802 11e 802 1 1h 802 11n e WPA RFC 2104 HMAC Keyed Hashing for Message Authentication RFC 2406 IPsec RFC 2407 Interpretation for ISAKMP RFC 2408 ISAKMP RFC 2409 IKE RFC 2451 ESP CBC Mode Cipher Algorithms RFC 3280 Internet X 509 PKI Certificate and CRL Profile RFC 3602 The AES CBC Cipher Algorithm and Its Use with IPsec AES CBC CCM CCMP DES DES CBC 3DES SSL and TLS RC4 128 bit and RSA 1024 and 2048 bit DTLS AES CBC IPSec DES CBC 3DES AES CBC IEFE 802 1X RFC 2865 RADIUS Authentication RFC 3748 Extensible Authentication Protocol Web based authentication TACACS support for management users SNMP v1 v2c v3 Telnet HTTP Can be managed through HTTP HTTPS Command line interface Telnet Secure Shell SSH Protocol serial port Wireless Access Point High Performance Access Point With Layer 3 Functionality Should be compatible with the following IEEE standards IEEE 802 11a b g IEFE 802 11n IEFE 802 11h IEFE 802 11d support PoE power over Ethernet Manageabl
43. ce Guarantee 4 PESSI ee must be completed during this period otherwise the duration of performance guarantee will be increased accordingly End of Warranty Period Three 03 Months after the end of Release of Performance 5 warranty period Guarantee Infrastructure Functionality Required Converged Infrastructure Failover Mechanism Blade System should support Power Manager which allows users to monitor and report standard feature of power usage and thermal information track actual power consumption over time to aid in datacenter decision making Power Manager should capable also monitors storage and third party equipment with the use of intelligent PDUs Blade Servers should support Solid state drive along with SAS drives Blade System should support Predictive Failure Analysis on critical components on the blades Blade System should capable to do automate failover and handle pools of up to one or multiple blade chassis if not the built in feature of the system additional software should be mentioned separately Blade system should support Moving Virtual MAC addresses VMAC to another slot requires Automated or manually and integrated with resource pooling Blade System should support assigning Ethernet MAC and Fiber Channel WWN addresses to the Blade system slots in such a way that any blades plugged into those slots will take on the assigned addresses Manually or automated Blade System should support eith
44. cision Cooling System Security amp Environmental Monitoring Chillers Chilled Water Piping System 1 General This guide specification is written in accordance with the construction specifications institute CSI master format This section must be carefully reviewed and edited by the architect or the engineer to meet the requirements of the project Coordinate this section with other specification sections in the project manual and with the drawings 39 66 Where reference is made throughout this section to provide install submit etc it shall mean that the contractor subcontractor or contractor of lower tier shall provide install submit etc unless otherwise indicated 2 Network Critical Physical Infrastructure NCPD Network Critical Physical Infrastructure should be an innovative architecture for using an open building block approach and standardized modular components It should fully integrate power cooling security and environmental management within a rack row optimized design NCPI should be designed in such a way that it lets us install only what is required today yet easily scale to meet future demands It also increases system availability while decreasing design and install time from months to days 3 Uninterruptible Power System UPS A SUMMARY 1 This specification describes the operation and functionality of a continuous duty single phase solid state static Unint
45. completed at least five similar projects in size worth Rs 30 Millions in public sector e RO or Lead bidder has done three project similar in nature or at least 50 similar in nature e Provided documentary proves of aforementioned information along with photo copies of Income Statement or Annual financial reports National Tax Numbers and Sales Tax Registration Numbers etc as part of bid document DETAILED TECHNICAL EVALUATION CRITERIA Detailed technical evaluation will be done for those firms who qualify the initial screening criteria Tender award committee of PESSI will make the detailed technical evaluation based on the parameters given in this proposal Ratings for the Detailed Technical Evaluation will be as follows Relevant Experience of Responding Organization s 3 20 Relevant Experience of Permanent Staff 20 Support Capabilities of Responding Organization 30 Solution proposed as per RFP requirement presentation required 30 NOTE Bidders who will qualify initial technical evaluation screening criteria will be asked to arrange technical presentation of solution proposed FINANCIAL EVALUATION CRITERIA Financial bids of firms who score at least 70 in the technical evaluation as a whole will be opened before the representatives who wish to attend the tender opening NOTE Decision of PESSI tender award committee to finalize the successful bidder will in no case be challengeable in any forum RELEVANT
46. d to less than 100 of the system rating e The inverter is active on 4 The static bypass switch shall be equipped with a manual means of transferring the load to bypass and back to inverter 5 If more than 10 transfers from and to inverter occur in a 10 minutes period the load shall be locked on static bypass An alarm communicating this condition shall be annunciated E MECHANICAL i AIS3000 1 The AIS3 000 UPS power section Static Bypass Switch internal manual bypass switch and the VRLA batteries for standard runtimes shall be housed in a free standing enclosure The enclosure shall be designed to blend into an industrial environment The cabinet shall be equipped for fork truck lifting The UPS cabinet shall be painted with the manufacturer s standard colour ANSI 61 All service access shall be from the front The enclosure shall have the following specifications e Dead front construction e Caster fitted for mobility Leveling feet shall be supplied as standard e The cable entry shall be from the bottom on the back of the UPS e The AIS3 000 UPS enclosure shall meet an ingress level of min IP2 1 e The AIS3000 UPS should be fitted with air filter in the front ii UPS 1 The UPS power section Static Bypass Switch internal manual bypass switch and the VRLA batteries shall be housed in a free standing enclosure in a matching black color having the following specifications e Colour finish Black e Dead front cons
47. distribution boards cables sockets cable conduits cable trays etc It should be complete in all respects so that end devices can be power up without any additional equipment e Cables should be 99 99 pure copper and PVC PVC insulated Cable sizes should be calculated based on circuit load requirement ambient temperature laying method length of cable etc Final selection should be approved before implementation and design calculations should also be approved for competent authority Switch gear used should be A class and of European origin Distribution boards should be made of 14 SWG MS sheet and powdered coated to house switchgear They must have metering devices like indication lights digital voltmeter ammeters CT etc with branch circuit protection Switch boards must have 1 5 2 KV electrical isolation Annexure D Note Following to be submitted with Technical Bid on Judicial Stamp Paper of Rs 100 Certificate I On behalf of M s do hereby declare that 1 The Firm mentioned above is a bonafide firm registered and engaged in the business of Computer Server equipment in Pakistan under Law of land 2 That the Firm has not been declared Bankrupt and has a reasonable capital for supply of the equipment for which bid is being submitted 3 That the Firm has not been declared as defaulter by any Government Department in Pakistan on any ground whatsoever except that the decision has been set by competent au
48. e console port RJ 45 telnet SSH http 802 1 1i Wi Fi Protected Access 2 WPA2 WPA 802 1X Advanced Encryption Standards AES Temporal Key Integrity Protocol TKIP 15 e Extensible Authentication Protocol Transport Layer Security EAP TLS e EAP Tunneled TLS TTLS or Microsoft Challenge Handshake Authentication Protocol Version 2 MSCHAPv2 e Protected EAP PEAP v0 or EAP MSCHAPv2 e Extensible Authentication Protocol Flexible Authentication via Secure Tunneling EAP FAST e PEAPv1 or EAP Generic Token Card GTC e EAP Subscriber Identity Module SIM IP Telephony Call Control Server A cost effective high availability Unified Communications Manager Appliance Support upto 300 IP communication users Support a 36 72 GB_ universal serial bus USB external Digital Audio Tape DAT drive part number DAT USB EXT 72 or an optional 36 72 GB USB rack mount DAT drive part number DAT USB RM 72 Single Intel Dual Core Xeon E8400 3 0GHz 6M L2 2 onboard Ethernet network interface card NIC 10BASE T cable support 1OOBASE TX cable support 1000BASE T cable support 9 2 Call Control Software Scalable distributable andhighly available enterprise IP telephony call processing Software Support Call Control Server Support Unified Mobility service including single number reach presence visual voice mail etc Provide Unified Communications Manager CDR Analysis and Reporting Tool CAR Support S
49. e undertaking any installation works Pipe sizes should be calculated on chilled water flow rate velocity and piping equivalent distance between chiller and InRow cooling units International standards should be observed while designing and installation of complete system Appropriate size chiller water pump should be incorporated with each chiller to maintain required flow rate and head pressure All design calculations and drawings must be consulted and approved from relevant principals before installation Chilled water tank and pressure tank should be provided with piping system A 20 mesh Steiner must be provided in piping system before InRow Cooling units Complete system should be tested for any kind of leakage for at least 24 hours Drip tray should be provided within data center room for early detection of condensate or leakage Chiller must be installed on foundation or steel base as per manufacturer recommendations ANNEXUR B Central Block Wise UPS Part 1 GENERAL 1 1 SUMMARY A This specification describes a three phase on line continuous operation solid state uninterruptible power supply UPS The UPS shall operate as an active power control system working in conjunction with the building electrical system to provide power conditioning and on line power protection for the critical loads 1 2 DESCRIPTION 1 3 A B ii iii iv vi F The UPS shall consist of the following easy to re
50. er NPIV or full fabric Fiber Channel supports switch stacking for network simplification Blade system should support Single or multi login across multiple blade system Blade System should support and delivers extreme flexibility when it comes to blade expansion Blade System can expand the blade in the future if an application requires Blade system should offered extreme flexibility with local storage the Storage amp I O Expansion Module plus iSCSI or Fiber Channel external SAN All the infrastructure software for Blade Chassis amp Storage should be GUI enabled In case of One blade Chassis Failure Second Blade Chassis should remain connected to SAN iSCSI for continuous operation The Infrastructure Software should be able to create a flexible highly available Manageable and centralized architecture Annexure I CATEGORY 01 COMPUTING STORAGE ROUTING SWITCHING amp INFRASTRUCTURE Minimum Hardware Base Line Note 1 Vendors are requested to come up with equivalent or higher but justifiable configurations 2 Sr Item Required Specification QTY description IBM DELL HP or Equivalent Blade Chassis form factor as per manufacturer standard Should be able to support at least 14 2 Socket blade servers or higher Minimum 8 I O Slots or higher any I O fabric Redundant Onboard Blade Chassis Administration Modules No Keyboard 1 Blade Chassis No Mouse 2 Int
51. ernal External DVD writer Drive 8x Max Speed USB Connection with RAM Rack rails Integrated KVM Redundant Power Supply Redundant PDU s as per manufacturer standard Chassis 16 ports 10 100 1000BASE T auto sensing Gigabit Ethernet switching 5 Integrated ports or above j Gigabit 4 external fixed 10 100 1000Mb Gigabit Ethernet RJ 45 ports or above Switch All internal Blades shall be connected via HBA with SAN in case of FC Internal Exter solution iSCSI switches should connect all the internal blades with nal FC SAN Controller of Storage 3 Switches 4 iSCSI SAN As per vendor Solution Switches Database 2 x Intel Xeon X5620 2 4 Ghz 12M Cache Turbo HT 1066 MHz 4 Servers to be 2 Installed in blade chassis 2 x 146GB 10K RPM Serial Attached SCSI 3GBps 2 5 inch Hot Plug Hard Drive RAID Dual Port Gigabit NIC 32GB Memory in Total Remote assistant card Remote management functionality Application Server to be Installed in blade chassis 2 x Intel Xeon E5620 2 4Ghz 12M Cache Turbo HT 1066MHz 2 x 146GB 10K RPM Serial Attached SCSI 3GBps 2 5 inch Hot Plug Hard Drive Dual Port Gigabit NIC 16GB Memory in Total Remote assistant card Remote management functionality Blade Server for Exchange front end to be integrated in blade chassis 2 x Intel Xeon E5620 2 40Ghz 12M Cache Turbo HT 1066MHz 2 x 146GB 10K RPM Serial Attached SCSI 3GBps 2 5 inch Hot P
52. erruptible Power System UPS hereafter referred to as the UPS 2 The UPS utilizes double conversion online topology designed to protect electronic equipment by supplying reliable network grade power featuring extremely tight voltage and frequency regulation The UPS also features internal bypass and input power factor correction 3 The primary sections of the UPS are input disconnect and filter stage input PFC power stage energy storage stage DC bus capacitor bank output power stage inverter bypass and a battery charger The control of power module and fault detection logic is microcontroller based Input disconnect and filter stage contains input backfeed relay in models with a input wire plug input filter transient suppression battery select transfer relays Input PFC power stage contains non isolated power factor correcting AC DC converters This converter is capable of full power operation in very wide input voltage range or from a nominal DC battery voltage The energy storage stage is a split DC bus capacitor handling seamless transitions from battery to line and vice versa as well as the low and high frequency power stages ripple The inverter stage operates directly from the DC bus and produces an AC output voltage of 200 208 220 230 240VAC output The output of UPS is either connected through a bypass relay to the inverter or to the input filtered line UPS contains a battery charger which operates from the DC bus The UPS
53. es any of its obligations under the contract including slippages in the committed schedules The attention of prospective Bidders is drawn to i the fact that they will be required to certify in their bids that all Equipment is delivered by the Bidder as per contract and ii that violations are considered fraud which is among other remedies punishable by potential blacklisting from participation in future procurements RO should provide three 03 year comprehensive warranty against the equipment quoted including replacement of parts and onsite support RO should be responsible to provide comprehensive training to PESSI technical team on the delivered hardware amp software The responding organization RO must be authorized Partner Distributor of THE ORIGINAL MANUFACTURER in Pakistan No refurbished used equipment will be delivered by successful bidder The equipment should be supplied through verifiable distribution channels Along with the delivery RO should submit a certificate from manufacturer for the verification of distribution channel Successful bidder will be required to deliver spare parts of EVERY critical equipment i e blade chassis chassis of switch with critical modules etc at the time of initial delivery at project site for the smooth availability of IT infrastructure failing to do so may result in delay in financial payments as per project payment milestones Successful bidder will be responsible to emboss PE
54. hall be provided with an internal manual bypass to simplify the installation and shall be used for supplying the load directly from the mains supply while the UPS is taken out for maintenance External maintenance bypass optional The external maintenance bypass switch shall be used for supplying the load directly from the mains supply if the UPS is to be replaced An UPS input output and bypass switch shall be housed in the same low voltage assembly The bypass switch must be monitored by the UPS via an auxiliary contact The maintenance bypass must be housed in a wall mounted low voltage assembly that complements the appearance of the UPS The UPS shall be provided with RS 232 signalling and WEB SNMP integration This system must provide a means for logging and alarming of all monitored points plus email notification The UPS shall have nominal voltage of 3400 230V adjustable for 3380 220V 3415 240V 50Hz 3 and 4 wire earth configurations The UPS shall be compatible with all types of data centers data rooms and facilities Dedicated service to one specific environment shall not be acceptable STANDARDS A Safety EN50091 1 1 IEC 62040 1 1 B Emissions EN5 009 1 2 IEC 62040 2 C D E Performance EN IEC 62040 3 IEC 6 1000 3 2 IEC 6 1000 3 3 1 4 CLASSIFICATION A Classification according to EN IEC 62040 3 VFI SS 1 12 1s SUBMITTALS A Proposal Submittals i Bid system bill of materials ii Product cat
55. he UPS is running from Battery power e Bypass When Yellow this LED indicates the load is being supported by static bypass mechanical bypass e Fault When Red this LED indicates there is a fault condition present in the UPS 2 Push Button User Controls e Up Arrow e Down Arrow e Help Key e Escape Key e Enter Key Potential Free Dry Contacts 1 The following potential free contacts shall be available on an optional relay interface board e Normal Operation e Battery Operation e Bypass Operation e Common Fault e Low Battery e UPS Off vii For purposes of remote communications with the UPS the following shall be available and contained within the UPS on a removable hot swappable smart slot interface card 1 RJ 45 Interface port for remote communications with a network via web browser or SNMP 2 Environmental monitoring feature capable of locally monitoring temperature and humidity as well as one additional generic set of user determined dry contacts capable of taking an input signal from any third party on off signal such as water detection smoke detection motion or fire detection G BATTERY i The UPS battery shall be of modular construction made up of user replaceable hot swappable fused battery modules Each battery module shall be monitored to determine the highest battery unit temperature for use by the UPS battery diagnostic and temperature compensated charger circuitry ii The battery blocks
56. hipped loose with the unit If water or other conductive liquids contact the cable anywhere along its length the main controller visually and audibly annunciates the leak 2 The detector shall be provided with a 20 ft 6 1 m of cable Cable may be cascaded up to 80 ft 24 4 m N BRIDGE POWER CABLE TROUGH Overhead power distribution bridge between adjacent NetShelter racks that allows for removal of the unit without disrupting the overhead power cabling O BRIDGE DATA PARTITION Overhead cable distribution between adjacent racks that allows for removal of the unit without disrupting overhead cabling 1 02 CHILLED WATER The unit shall be piped in accordance with the highest commercial quality procedures All pipe forming shall be tool bent with the proper bend radii to prevent flattening in the curve The chilled water piping shall be insulated with closed neoprene thermal insulation All piping connections should be made at the rear of the unit for top or bottom accessibility Environment Monitoring amp Surveillance This specification describes the features of integrated security and environment monitoring system ISEMS The ISEMS shall be a centralized appliance with a client console It also included sensor pods for environmental temperature and humidity monitoring The system must have following specifications a Equipment Support b Up to 12 sensor pods c Physical Dimensions d Weight 1 74 Kg e Height 114 mm Width
57. housed within each removable battery module shall be of the Valve Regulated Lead Acid VRLA type Part 3 ACCESSORIES A EXTENDED RUNTIME XR OPTION i For purposes of extending the UPS battery runtime external extended runtime options shall be available The extended runtime option shall be housed in line up and match type enclosures and shall contain necessary hardware and cables to connect to the UPS or between XR enclosures Each XR enclosure shall be equipped with removable hot swappable battery units housed in draw out cartridges ii The extended runtime system shall have a 250 VDC rated thermal magnetic trip molded case circuit breaker Each circuit breaker shall be equipped with shunt trip mechanisms and 1A 1B auxiliary contacts The circuit breakers are to be equipped as part of a line up and match type battery enclosure 3 2 SERVICE BYPASS PANEL SBP i The service bypass panel shall provide power to the critical load bus from the bypass source during times where maintenance or service of the UPS is required The SBP shall provide a mechanical means of complete isolation of the UPS from the electrical wiring of the installation The SBP shall be constructed in a free standing or wall mounted IP20 enclosure unless otherwise stated in this specification ii As a minimum the SBP shall contain the following features and accessories 1 Switches of the appropriate size and withstand rating 30 kA for the system 2 Minim
58. in future procurements in public sector etc e Lead bidder should be a company firm having legal presence in Pakistan Alternative solutions shall not be considered Responding Organizations MUST address SOLUTION ON TUNRNKEY BASES No partial bidding of equipment from any single category is allowed All proposal and price shall remain valid for a period of 120 days from the date of the submission of the proposal However the responding organizations are encouraged to state a longer period of validity for the proposal The RO shall be responsible for the payment of any duties taxes etc that are imposed by the GoP during the currency of the project The responding organizations are hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan from all payments for the equipment including hardware and software supplied by the responding organization who signs a contract with the Government At the time of last payment milestone the vendor shall be required to deposit Performance Guarantee in the form of a Bank Guarantee equivalent to ten percent 10 of the contract value This Bank Guarantee shall be issued by a Scheduled Bank operating in Pakistan Including the fulfillment of all other contractual obligations this guarantee must remain valid from the date of issue until the expiry of warranty period Government may cash the Performance Bond Bank Guarantee if the responding organization breach
59. jor components NETWORK MANAGEMENT CARD The unit shall include a network management card to provide management through a computer network through TCP IP Management through the network should include the ability to change set points as well as view and clear alarms COOLING COIL AND CONDENSATE PAN 1 1 Cooling coil shall use raised lance type aluminum fin and 3 8 inch OD 9 5 mm copper tube coils Coil end supports shall be a minimum 18 gauge galvanized steel Coil shall be rated for a maximum pressure of 400 psig 2757 9 kPa The unit shall consist of a primary and secondary drain pan Secondary drain pan shall be piped to primary pan for removal of condensate Primary drain pan shall include a condensate pump and dual floats for control and overflow protection Condensate pans are V O thermal formed anti fungal non ferrous material for higher indoor air quality 2 WAY 3 WAY FLOATING POINT VALVE Chilled water system shall utilize a three way valve to regulate the amount of chilled water to the cooling coil to maintain desired conditions Unit shall be equipped with a manual shut off to close the by pass leg for field configuration of 2 way or 3 way operation Valve shall be piped internally with unions to allow for easy replacement in the field The standard valve pressure rating shall be 600 psig Valve Actuator Actuator shall be direct connect rotary floating point style actuator and should be capable of being replaced witho
60. light so that the parts may be shipped to the customer site within 24 hours MAINTENANCE CONTRACTS 1 A complete offering of preventative and full service maintenance contracts for the UPS system and the battery system should be available from principal of Section Uninterrupted Power System ______ UPS 1 Power Distribution System 1 1 Rack Mount Power Distribution Units Optional For purposes of distributing power within an IT enclosure rack mount power distribution units shall be available for installation within the IT enclosure The rack mount power distribution units shall be capable of being installed in the back of the accompanying enclosure to consume zero U space in the front of the rack and shall not require tools for installation within the rack 1 1 1 Input Connection For ease of installation the rack mount PDU shall be connected via a twist lock connecter and shall be capable of being fed from agency approved flexible corded distribution wiring as described elsewhere in this Section The input shall be capable of being served by 400Y230 volts from an L21 20 Type NEMA connector A hard wired version of the product shall also be available as an option and shall be capable of being fed from a single pole circuit breaker 1 1 2 Output Connections The output of the rack mount PDU shall be fed from 230 volts and shall be distributed to receptacles capable of supplying power to cord connected equipment
61. load over a 1 5 second period C SYSTEM OUTPUT i Nominal Output voltage rating 3x400 230V ii Earthing principle TN S TN C S TN C TT or IT iii Output voltage regulation for steady state and transient variations at default parameter settings iv vi ix PUR we eS xii xiii 1 1 steady state for a static 100 balanced load 2 1 steady state for a static 100 unbalanced load 3 5 for a0 to 100 load step Max voltage transient recovery time 50 milliseconds to nominal Output frequency regulation 1 Synchronised to mains over the range of 47 53Hz or 57 63Hz in normal operation 2 50Hz 0 1 Hz in battery operation Output voltage harmonic distortion 1 lt 2 THD maximum and 1 single harmonic for a 100 linear load 2 lt 5 THD maximum for a 100 non linear load Overload capability 1 150 for 30 seconds in normal operation 2 110 continuous in bypass operation 3 800 for 500 milliseconds in bypass operation Phase displacement 1 20 degrees 1 degree for balanced load 2 20 degrees 1 degree for 50 unbalanced load 3 20 degrees 3 degrees for 100 unbalanced load Output Power Factor Rating For loads exhibiting a power factor of 0 5 leading to 0 5 lagging no derating of the UPS shall be required Short circuit withstand The UPS must withstand a bolted fault short circuit on the output without damage to the UPS module System AC to AC efficiency 100 load 10kVA 15kVA 20kVA
62. lug Hard Drive Dual Port Gigabit NIC 16GB Memory in Total Remote assistant card Remote management functionality Blade Server for Exchange Intel Xeon E5620 2 40Ghz 12M Cache Turbo HT 1066MHz Mail box to 2 x 146GB 10K RPM Serial Attached SCSI 3GBps 2 5 inch Hot Plug Hard be integrated Drive in blade 7 F chassis Dual Port Gigabit NIC 16GB Memory in Total Remote assistant card Remote management functionality 2 x Intel Xeon E5620 2 40Ghz 12M Cache Turbo HT 1066MHz Server for ae 2 x 146GB 10K RPM Serial Attached SCSI 3GBps 2 5 inch Hot Plug Hard Integrated in blade chassis Drive Dual Port Gigabit NIC 8GB Memory in Total Remote assistant card Remote management functionality Blade Servers for Domain DHCP to be integrated blade chassis in 2 x Intel Xeon E5620 2 40Ghz 12M Cache Turbo HT 1066MHz 2 x 146GB 10K RPM Serial Attached SCSI 3GBps 2 5 inch Hot Plug Hard Drive Dual Port Gigabit NIC 8GB Memory in Total Remote assistant card Remote management functionality Blade Servers for file service 2 x Intel Xeon E5620 2 40Ghz 12M Cache Turbo HT 1066MHz 2 x 146GB 10K RPM Serial Attached SCSI 3GBps 2 5 inch Hot Plug Hard Drive 10 to be integrated in Dual Port Gigabit NIC Dladexchass s 32GB Memory in Total Remote assistant c
63. mising routing performance Should be having high performance multi core processors that can support the growing demands of high speed WAN connections QoS Class Based Weighted Fair Queuing CBWFQ Weighted Random Early Detection WRED Hierarchical QoS Policy Based Routing PBR Performance Routing PfR and Network Based Advanced Routing NBAR Ethernet 802 1q VLAN Point to Point Protocol PPP Multilink Point to Point Protocol MLPPP Frame Relay Multilink Frame Relay MLFR FR 15 and FR 16 High Level Data Link Control HDLC Serial RS 232 RS 449 X 21 V 35 and EIA 530 Point to Point Protocol over Ethernet PPPoE and ATM IPv4 IPv6 static routes Open Shortest Path First OSPF Enhanced IGRP EIGRP Border Gateway Protocol BGP BGP Router Reflector Intermediate System to Intermediate System IS IS Multicast Internet Group Management Protocol IGMPv3 Protocol Independent Multicast sparse mode PIM SM PIM Source Specific Multicast SSM Distance Vector Multicast Routing Protocol DVMRP IPSec Generic Routing Encapsulation GRE Bi Directional Forwarding Detection BVD IPv4 to IPv6 Multicast MPLS L2TPv3 802 lag 802 3ah L2 and L3 VPN PSTN gateway router must support SIP MGCP H 323 and VXML protocols Should support integrated LAN Switching Secure connectivity Secure collaborative communications with Group Encrypted Transport VPN Dynamic Multipoint VPN DMVPN or Enhanced Easy VPN Integrated thre
64. ng and terminations c Verify voltage of all battery modules d Verify neutral and ground conductors are properly landed e Inspect external service bypass panel for proper terminations 4 Site Testing 5 a Ensure proper system start up b Verify proper firmware control functions c Verify proper firmware bypass operation d Verify proper bypass switch operation where applicable e Verify proper inverter operation and regulation circuits f Simulate utility power failure g Verify proper charger operation h Document sign and date all test results On Site Operational Training During the factory assisted start up operational training for site personnel shall include key pad operation LED indicators start up and shutdown procedures maintenance bypass and AC disconnect operation and alarm information MANUFACTURER FIELD SERVICE 1 2 Worldwide service The UPS manufacturer has a worldwide service organization available consisting of factory trained field service personnel to perform start up preventative maintenance and service of the UPS system and power equipment The service organization offers 24 hours a day 7 days a week 365 days a year service support Replacement parts Parts are available through the worldwide service organization 24 hours a day 7 days a week 365 days a year The worldwide service organization is capable of shipping parts within 4 working hours or on the next available f
65. ominal output voltage shall be 3x400 230V and adjustable for 3x380 220V or 3x415240V 50Hz L1 L2 L3 N PE 5 Efficiency of each module at full load Not less than 10kVA 94 7 1SkKVA 94 7 20k VA 94 7 30kKVA 94 5 40k VA 94 8 6 Output Voltage Total Harmonic Distortion at full load e Less than 2 for 100 resistive load e Less than 5 for computer load as defined by EN50091 3 IEC 62040 3 7 Output voltage regulation e Static Less than 1 at full linear load e Dynamic 5 at 100 step load 8 Output frequency 50Hz free running 9 Crest factor Unlimited but regulates it down to 2 7 a Remote Emergency Power Off EPO shall be standard wall switch and wiring shall be provided by the electrical contractor iv Static Bypass Switch 1 The static switch shall consist of fully rated Silicon Controlled Rectifiers SCRs Part rated SCRs with a wrap around contactor are not acceptable 2 The static bypass switch shall automatically transfer the critical load to bypass input supply without interruption after the logic senses one of the following conditions e Inverter overload beyond rating e Battery runtime expired and bypass available e Inverter failure e Fatal error in control system 3 The static bypass switch shall automatically retransfer from bypass to the inverter when one of the following conditions occurs e After an instantaneous overload induced transfer has occurred and the load current has returne
66. or later NetWare 3 x 5 1 6 0 Macintosh version OS 9 0 or later and OS X or later network protocols TCP IPv4 IPv6 DHCP DNS 9100 LPR SNMP HTTP IPSec EtherTalk Novell NetWare IPX SPX NDS Bindery iPrint DHCP BOOTP SLP SSDP Rendezvous Bonjour DDNS Lite WINS TCP Port 2000 LPR Port 515 Raw Port 9100 IPP Port Printing Secure IPP SNMPv1 2 3 HTTP HTTPs Telnet SMTP E mail Notification Toner Ship With capacity Up to 6 000 page capacity or Higher 30 Digital Copier Panasonic Canon Konica Minolta or equivalent Memory 25 6MB Type Digital CPM 45 Pages Per Minute 25 Digital Copier 2 0 25 400 01 Electric Sorting Built in Network Printing amp Color Scanning Built in Paper Capacity 1200 Sheets Bypass try Built in Duplex Built in Direct USB Printing pu Note also provide the cost of the consumables and per page copy cost Laser Jet Fax Machine Panasonic Canon Konica Minolta or equivalent Technology Laser Speed 10 Pages Min Function 12 cpm copier Fax Caller ID Yes 26 Memory 16MB RAM 01 Printing quality Laser Transmission Speed 33 6Kbps Zooming 50 to 200 Document Feeder 30 Pages Paper Tray 150 Sheets CATEGORY 02 COMMUNICATION amp SURVELLANCE Requirements Classification All PESSI requirements given in subsequent sections are classified a
67. pair modular rectifier inverter sections and easy to install internal and external modular battery units The UPS shall be provided with separate feeds for rectifier inverter section and the static bypass switch Modes of operation The UPS shall operate as an on line system in the following modes Normal The inverter and the rectifier shall operate in an on line manner to continuously regulate the power to the critical load The rectifier shall derive power from the AC input source and supply DC power to float charge the battery Battery Upon failure of the AC input source the critical load shall continue being supplied by the main inverter without any switching The inverter shall obtain its power from the battery There shall be no interruption in power to the critical load upon failure or restoration of the AC input source Recharge Upon restoration of the AC input source the UPS shall simultaneously recharge the battery and regulate the power to the critical load Bypass The static bypass switch shall be used for transferring the critical load to input supply without interruption Automatic re transfer to normal operation shall also be accomplished with no interruption in power to the critical load The static bypass switch shall be fully rated and shall be capable of manual operation The UPS shall be able to recharge the batteries while supplying full power to the load via the static bypass switch Internal maintenance bypass The UPS s
68. perational status of the connected air conditioning unit Controls The microprocessor controller shall come equipped with control keys to allow the user to navigate between menus select items and input alpha numeric information Alarms The microprocessor controller shall activate a visible and audible alarm in the occurrence of the following events a Internal Communications Fault b Link Isolation Relay Fault Cooling Failure Ps ee Rack Inlet High Temperature Air Filter Clogged Lower Return Air Sensor Fault Upper Return Air Sensor Fault m ae O Lower Supply Air Sensor Fault pis Upper Supply Air Sensor Fault Rack Inlet Temperature Sensor Coil Fluid Valve Actuator Fault Fan Fault p Water Detection Fault P B Condensate Pump Fault Fluid Flow Meter Failure Entering Fluid High Temperature eae Dp 9 Entering Fluid Temperature Sensor m Leaving Fluid Temperature Sensor s Condensate Pan Full Alarm t Power Feed Failure u Fan Power Supply Fault v Air Filter Run Hours Exceeded w RACS Air Pressure High x Supply Air High Temperature y Return Air High Temperature z Group Communications Lost aa Filter Sensor Fault ab RACS Pressure Sensor Fault 4 Logging The microprocessor controller shall log and display all available events Each alarm log shall contain time date stamp as well as operating conditions at the time of occurrence Controller shall display the run time hours for ma
69. r 23 inch 584 mm rack enclosure External depth dimensions shall be 42 2 inches 1070 mm Rack enclosures of a 42U design shall have a maximum external height of 81 5 inches 2070 mm to allow passage through a standard 7 foot 2134 mm doorway without tipping Rack enclosure shall support a dynamic load rolling on castors of 2000 Ibs 909 kg total weight Rack enclosure shall also be designed and manufactured to be matching in both color and construction to the UPS PDU system bypass and extended runtime battery enclosures to provide a uniform and consistent appearance in a data center environment 2 3 Equipment Access and Mounting a The enclosure shall provide 42U of equipment vertical mounting space b The vertical mounting rails shall be adjustable to allow different mounting depths C Front and rear doors of the enclosure shall be designed with quick release hinges allowing for easy detachment without the use of tools 3 Cooling System The environmental control system shall be designed specifically for precision temperature control applications It will automatically monitor and control cooling and filtering functions for the conditioned space The system shall be built to the highest quality engineering and manufacturing standards and shall be floor mounted and configured for horizontal airflow with draw through air pattern to provide uniform air distribution over the entire face of the coil 1 02 DESIGN REQUI
70. r the entire face of the coil Each unit shall include eight 200 mm mixed flow direct drive DC axial fans Each fan assembly should be designed to provide 362 5 CFM 171 1 I s for total unit airflow of 2900 CFM 1368 6 I s 2 Variable Speed Fans Fans shall be variable speed capable of modulating from 30 100 Fans shall soft start to minimize in rush current when starting 3 Fan Protection Each fan assembly shall consist of a plastic injection molded bezel with integral fan discharge finger guard Inlet of the fan should include a cage type finger guard 4 Operation and Service The unit should be capable of operation in the event of a fan failure Fans shall be replaceable while the unit is in operation C DUAL POWER SUPPLIES AND A B POWER INPUT 1 Input Power Feeds Dual A B power inputs should be a locking NEMA or IEC plug connection suitable for the input power selected 2 Power Supplies The unit shall include two power supplies each capable of running the unit at 60 capacity in the event of a single power supply failure Unit power consumption is not to exceed 1100 watts during normal operation 3 Operation and Service Power supply shall be user replaceable D MICROPROCESSOR CONTROLLER 1 Monitoring and Configuration The master display shall allow monitoring and configuration of the air conditioning unit through a menu based control Functions include status reporting set up and temperature set points Four LEDs report the o
71. recise regulation of the DC bus voltage battery charging and output power stage inverter regulated output power Input Current Total Harmonic Distortion The input current THD shall be held to 6 or less at full system while providing conditioned power to the critical load bus and charging the batteries under steady state operating conditions This shall be true while supporting loads of both a linear or non linear type This shall be accomplished with no additional filters magnetic devices or other components Input Current Limit a The input converter shall control and limit the input current draw from utility to 150 of the UPS output During conditions where input current limit is active the UPS shall be able to support 100 load charge batteries at 10 of the UPS output rating and provide voltage regulation with mains deviation of up to 20 of the nominal input voltage b In cases where the source voltage to the UPS is nominal and the applied UPS load is equal to or less than 100 of UPS capacity input current shall not exceed 130 of UPS output current while providing full battery recharge power and importing necessary power for system losses e OUTPUT POWER STAGE INVERTER 1 The UPS output power stage inverter constantly recreates the UPS output voltage 2 waveform by converting the DC bus voltage to AC voltage through a set of IGBT switches In both online operation and battery operation the output power s
72. s Critical All requirements are necessary to meet business objectives of PESSI and hence any proposed solution should comply with these requirements Business Requirements Technology consolidation The basic purpose of this exercise is to achieve technology consolidation Nawaz Sharif Social Security hospital building is having multiple departments spread over 3 floors Ground First and Second The solution should offer unified view of Network However at the same time the solution should offer flexibility Professional Services All professional services for design amp deployment should be approved and performed by principle technology vendor locally in Pakistan with the help of local Certified Technology Partner CTP Specify the local staff available from principle vendor for e Quality Assurance e Project management e Design e Deployment e Maintenance services The principle technology vendor should have certified local partners with support of the underlying infrastructure IP Telephony Network etc at each call center location Clearly identify local partners at each location with e Certified network engineers e Available stock of network infrastructure spare parts The core solution may be deployed by principle vendor or certified technology partner CTP In case the services are also provided by CTP the CTP should have e Experience of deployment across the region e carrier grade reference customers in the region
73. s of a heavy duty electromechanical bypass contactor 3 Automatic Transfers An automatic transfer of load to bypass takes place whenever the load on the critical bus exceeds the overload rating of the UPS Automatic transfers of the critical load from bypass back to normal operation takes place when the overload condition is removed from the critical bus output of the system Automatic transfers of load to bypass also take place if for any reason the UPS cannot support the critical bus 4 Manual Transfers Manually initiated transfers to and from bypass may be initiated through the UPS computer interface via serial or USB communications or by engaging the bypass switch on the rear panel of the unit BATTERY 1 The UPS battery system is comprised of user replaceable hot swappable battery modules Minimum two battery modules must be installed one providing 192VDC nominal for the positive DC bus rail the other providing 1 92VDC nominal for the negative DC bus rail 2 The battery jars housed within each removable battery module are of the Valve Regulated Lead Acid VRLA type 3 The UPS incorporates the Intelligent Battery Management system to continuously monitor the health of each removable battery module as well as external battery modules installed in extended run battery cabinets This system shall notify the user in the event that a failed or weak battery module is found 4 Charging a The intelligent battery management
74. system contains a temperature monitoring circuit and compensation algorithm that regulates the battery charging current so as b to optimize battery life The battery charging circuit remains active when in bypass and online states 5 Additional battery modules may be added to increase runtime These modules are hot pluggable allowing for easy and quick installation or replacement without the need for electrical wiring electrician services or powering down of the UPS The number of external battery modules that may be connected to the UPS is unlimited 6 The UPS is shipped with battery modules preinstalled but disconnected h DISPLAY AND CONTROLS 1 Control Logic The UPS is controlled by an embedded microcontroller which performs functions 2 3 4 a b c d e f g h Monitoring quality of output voltage Monitoring vital parameters of the UPS Executing the state machine Intelligent battery management Remaining runtime calculation Self diagnostics self test and proactive fault detection Communication to the host server via serial port Communication to the Network Interface Card or another SmartSlot accessory card if equipped Display Control Unit A display control comprised of 16 LEDs and 2 pushbutton switches is located on the front side of the UPS The display control unit may be turned 90 degrees clockwise or counterclockwise to accommodate for the way the UPS is mounted as a tower UP
75. t Nominal Output 200V AC 208VAC 220VAC 230VAC or 240VAC user selectable Single Phase b Output connectors Hardwire 3 wire Phase N G 4 IEC 320 C13 and 4 IEC 320 C19 c Output frequency 50 60 3Hz tracking or 50 60 0 1Hz tracking user selectable d AC output voltage distortion Max 2 100 linear load Max 5 100 non linear Load e AC output static voltage regulation 1 f AC output dynamic voltage regulation 8 maximum for 100 load step at less than 1 Oms recovery time g Overload Rating i Online 105 infinite 125 1 minute 150 30 seconds ii In bypass Overload is limited by the upstream branch protection feeding the UPS h Output Power Factor Rating 0 2 1 0 lagging nominal 0 7 lagging c ENVIRONMENTAL a Storage Ambient Temperature 4F to 140F 20C to 60C b Operating Ambient Temperature 32F to 104F OC to 40C 77F 25C is ideal for most battery types c Relative Humidity 0 to 95 non condensing d Storage altitude 50 000 feet 1 5000m above sea level e Operating altitude 10 000 feet 3000m above sea level At altitude of 10 000 feet the UPS must be loaded up to 90 of its nominal capacity only f Audible noise less than 55dBA at 3 feet 1 m d INPUT PFC POWER STAGE 1 2 3 The input PFC power stage of the UPS constantly rectifies the power imported from the mains input of the system converting input mains AC power to DC power for p
76. tage inverter creates an output voltage waveform independent of the mains input voltage waveform Input voltage anomalies such as brown outs spikes surges sags and outages do not affect the amplitude or sinusoidal nature of the recreated output voltage sine wave of the output power stage inverter Overload Capability The output power stage inverter is capable of withstanding 150 overload for 30 seconds or 125 overload for 1 minute or 105 overload for indefinite length of time 3 Output Contactor The output power stage inverter is equipped with an output mechanical relay to provide physical isolation of the inverter from the critical bus With this feature a failed inverter shall be removed from the critical bus 4 Battery Protection The inverter is provided with monitoring and control circuits to limit the level of discharge on the battery system AUTOMATIC BYPASS 1 As part of the UPS a system automatic bypass switch is provided The system automatic bypass shall provide a transfer of the critical load from the Inverter output to the automatic bypass input source during times when the inverter cannot support the load Such times may be due to prolonged or severe overloads or UPS failure The UPS constantly monitors the output current as well as the bypass source voltage and inhibits potentially unsuccessful transfers to automatic bypass from taking place 2 The design of the automatic bypass switch power path consist
77. te UPS control configuration and monitoring are available a Web Monitoring Remote monitoring configuration and control is available via a web browser such as Internet Explorer provided the UPS is equipped with b Monitoring configuration and control via PowerView Remote Display four line multilingual intelligent alphanumeric LCD up to 15 feet Smeters away c Dry contact monitoring and control provided the UPS shall be equipped with Smart Slot Relay I O Card d SOFTWARE COMPATIBILITY 1 A Included with the UPS is PowerChute Network Shutdown software The software supports graceful shutdown and remote monitoring for the following systems a Windows 2000 and later b Linux c Novell Netware d Sun Solaris e AIX f HP UX g MacOSX D Part 4 EXECUTION a FACTORY ASSISTED START UP If a factory assisted UPS start up is requested factory trained service personnel shall perform the following inspections test procedures and on site training 1 Visual Inspection a Inspect equipment for signs of damage b Verify installation per manufacturer s instructions c Inspect battery modules 2 Mechanical Inspection a Check all UPS and external service bypass panel internal power wiring connections b Check all UPS and external service bypass panel terminal screws nuts and or spade lugs for tightness 3 Electrical Inspection a Verify correct input and bypass voltage b Verify correct UPS control wiri
78. thority or court of Law 4 That the Firm has not been punishment by any court of law on any ground whatsoever except the decision has been set aside by competent authority or Superior Courts 5 That the Firm has not been declared as Black Listed by any Government Department in Pakistan except the decision has been set aside by competent authority or court of Law That all the above declarations are correct and based on facts That if any of the above certificate proven fake PESSI reserve the fight to take appropriate action Name Designation Stamp
79. truction e Caster fitted for mobility Leveling feet shall be supplied as standard e The cable entry shall be from the bottom on the back of the UPS e The UPS enclosure shall meet an ingress level of min IP20 iii UPS module dimensions HeightWidthDepth Choose one depending on UPS kVA and required backup time 10 KVA 1490x352x928 15 KVA 1490 352 928 15 KVA 1490 523 928 30 KVA 1490x523x928 F 2 9 DISPLAY CONTROLS AND ALARMS i A microprocessor controlled display unit shall be located on the front of the system The display shall consist of an alphanumeric display with backlight an alarm LED and a keypad consisting of pushbutton switches ii The following metered data shall be available on the alphanumeric display 1 Year Month Day Hour Minute Second of occurring events 2 Input AC Voltage 3 Output AC voltage Output AC current Input Frequency DEN R Battery voltage 7 Highest Internal Battery temperature The display unit shall allow the user to display an event log of all active alarms and of the 64 most recent status and alarm events The following minimum set of alarm conditions shall be available Static bypass switch on EPO Active Mechanical bypass activated External bypass switch Q3 activated 1 2 3 4 5 Battery discharged 6 Return from low battery 7 Low battery 8 Load not powered from UPS 9 UPS in bypass 10 Runtime calibration aborted 11 Runtime calibration started
80. um 1 NO NC auxiliary contact for the purpose of relaying status information of the manual maintenance bypass switch to the UPS in order to make sure that the UPS will go be in static bypass operation so the UPS is not damaged 3 The SBP shall be CE marked according to at least EN IEC60439 B SOFTWARE AND CONNECTIVITY i The Ethernet Web SNMP Adaptor shall allow one or more network management systems NMS to monitor and manage the UPS in TCP IP network environments The management information base MIB shall be provided in DOS and UNIX tar formats The SNMP interface adaptor shall be connected to the UPS via the RS232 serial port on the standard communication interface board ii Unattended Shutdown iii The UPS in conjunction with a network interface card shall be capable of gracefully shutting down one or more operating systems during when the UPS is on reserve mode iv The UPS shall also be capable of using an RS232 port to communicate by means of serial communications to gracefully shut down one or more operating systems during an on battery situation C REMOTE UPS MONITORING i The following three methods of remote UPS monitoring shall be available 1 Web Monitoring Remote monitoring shall be available via a web browser such as Internet Explorer 2 RS232 Monitoring Remote UPS monitoring shall be possible via either RS232 or contact closure signals from the UPS 3 Simple Network Management Protocol SNMP Remote UPS
81. un Novell and Microsoft e Should support different access levels for different administrators and should have the ability to group network devices enable easier control and maximum flexibility to facilitate enforcement and changes of security policy administration over all the devices in a network Server should offer token server support for any OTP vendor that provides an RFC compliant RADIUS interface such as RSA PassGo Secure Computing ActiveCard Vasco or CryptoCard e Should provide dynamic quotas for time of day network use number of logged sessions and day of week access restrictions Should support administrator password policy and should provide a mechanism to enforce a configurable minimum password length and mix of characters upper lower case numeric punctuation e Should support administrator password policy and should provide a mechanism to enforce a configurable minimum password length and mix of characters upper lower case numeric punctuation e Should display password history for administrators and should prevent administrators from reusing passwords e Syslog support and should provide the native syslog support to log data out of server e Should have support of Protected Extensible Authentication Protocol PEAP with Extensible Authentication Protocol Transport Layer Security EAP TLS Core Switch Minimum 6 slot chassis Line card slot minimum speed 48 Gbps Minimum 48 x 1
82. ut disconnecting piping from the valve CONDENSATE PUMP Factory Installed and wired condensate pump shall pump 1 3 gal h 5 9 liters hour at 16 ft 4 9 m of lift and a 50 ft 15 2 m horizontal run I FILTERS 1 Standard Air filter lt 20 efficient per ASHRAE 52 1 MERV 1 per ASHRAE 52 2 1 2 washable mesh filter 2 Optional Air filter High capacity 2 pleated UL 900 Class 2 Moisture with average atmospheric dust spot efficiency of 30 per AHRAE Standard 52 1 MERV 8 per ASHRAE 52 2 J SELECTABLE TOP OR BOTTOM PIPING 1 Pipe connections for field connection from either the top or bottom of the unit Unit connections shall be made internal to the unit 2 Pipe adapter The unit shall include two pipe adapters that convert a 1 in 25 4 mm NPT to a 1 in 25 4 mm BSPT manufactured in accordance with BS21 Pipe adapters shall ship loose with the unit for field installation where applicable K REMOTE TEMPERATURE SENSOR Remote temperature sensor shall ship factory wired to the unit for placement in the field to provide control input based on rack inlet temperature L FLOW METER Flow meter shall be factory piped inside the unit and connected to microprocessor controls to provide water flow rate through the unit The microprocessor controller shall also use this information to provide total unit capacity out of the unit while in operation M CABLE WATER DETECTOR OPTIONAL 1 A leak detection sensing cable shall be s
83. ver Ethernet POE 25 IP address assignment can be statically configured or configured through the DHCP client 5 6 inch 14 cm graphical TFT color touch screen display Support for wideband G 722 codec adherence to TIA 920 including handset headset and speakerphone e Support G 711a G 711u G 729a G 729ab G 722 and iLBC audio compression codecs e Provides direct access to voicemail e Support 2 port Ethernet switch allows for a direct connection to a 10 100 1000 BASE T e Supports differentiated services code point DSCP and 802 1Q p standards Built in support for more than 30 languages 9 5 Attendant Console with Phone amp Expansion Module e Console that can support up to 25 operator clients Support directory size up to 1 0000 IP Phones e Support for 50 queues with prioritization e Overflow options e Support Directory integration with IPT UC Call Control server 5 inch 12 5 cm high resolution 320 x 222 graphical monochrome 4 bit grayscale display IP Phone e Support Power Over Ethernet POE e Support network features include IEEE 802 1 p q tagging and switching e Support 10 100BASE T Ethernet connection through two RJ 45 ports e Support G 711a G 711 G 729a G 729b and G 729ab audio compression codecs 4 3 inch high resolution 480 x 272 graphical monochrome 4 bit grayscale display Expansion Module e Module support 12 physical buttons 24 with page key Support two
84. y And Rapid Rails With Out Keyboard Shelf For Monitor Equipment Tray For Mini Keyboard PDU S As per quoted Solution FAN Kit 16 External Storage 8 Gbps FC iSCSI Modular Storage Architecture SAN Functionality The array must have enterprise software that will enable online expansion of storage capacity with no downtime or disruption to application automatic load balancing clustering multi path Input Output failover storage Virtualization and boot from SAN Storage must be easily upgraded with little or no downtime needed to upgrade Firmware or replace Field Replaceable Units The performance must scale as additional disks are added We do not want to be restricted by the controllers and network connections as we add capacity Storage must support Windows Linux Unix Solaris AIX HPUX UAX and other industry standard operating systems including multipathing and load Balancing software Storage must be presented as a single architecture that can grow on demand without interruption Scalability upto 90TB required for future Storage must allow multiple generations of hardware procured over time to work on the same volumes at the same time Storage must have a shared architecture that provides load balancing across multiple controllers and caches on the same volume at the same time Storage should have the ability to clone a snapshot volume

Download Pdf Manuals

image

Related Search

Related Contents

FR Mode d`emploi  Central Pneumatic 93289 User's Manual  Host application developing for the RF-family  AA ARC administrators guide.book  X-Analysis User Manual 11.1  Chart Navigator User Manual  Netac Tech T610 User's Manual    Manual de instalación y programación  取付・取扱説明書 - AutoExe  

Copyright © All rights reserved.
Failed to retrieve file