Home

User`s Manual - Azbil Corporation

image

Contents

1. Safety shutoff test Measurement of flame voltage J Handling Precautions e f unexpected burner shutoff may cause a serious damage perform the inspection more frequently e lf the burner manufacturer provides specific instructions about maintenance and inspection always strictly observe them 17 Chapter 6 MAINTENANCE AND INSPECTION E Replacement of the tube unit 1 Turn OFF the power 18 2 After 1 minute or more loosen the cover setscrew rotate the cover and remove it 3 Remove the 2 tube unit fixing screws on the rear of the tube unit 4 Hold the rear of the tube unit and gently raise it upward to remove it 5 Insert a new tube unit into the top of the shutter unit and push the back of the tube unit down to install it 6 Tighten the 2 tube unit fixing screws 7 Make sure that the O ring has not disengaged from the flange unit 8 Tighten the cover firmly and then tighten the cover setscrew Mounting threads Tube unit fixing screws 2 Shutter unit Cover setscrew width across flat 2mm o Handling Precautions The tube unit has polarity Match the polarity with the polarity indication labels F and G on the upper portion of the shutter unit and mount it correctly Additionally there is a height difference on the shutter unit corresponds to the tube unit The tube unit is designed so that it cannot that be mounted the wrong way Do not attempt to forcibly mount the tube un
2. E Before measurement of flame voltage Before measuring the flame voltage check the operation of the AUD500C through the flame voltage output terminals of the AUR series Multimeter or voltmeter AUR series 1 Connect a multimeter to the and terminals of the AUR series 2 Light a lighter in front of the AUD500C s ultraviolet ray sensing tube to check that the voltage is output correctly OVdc to 10Vdc range Input impedance 100 KQ or more Check the terminal numbers in the AUR series user s manual Lo Handling Precautions e When using a flame check that there is no flammable gas around the AUD500C E Measurement of flame voltage If both pilot flame and main flame exist measure each flame voltage Additionally measure the flame voltage in the maximum combustion and minimum combustion states 1 Mount the AUD500C on the monitoring pipe temporarily 2 Start the combustion of the burner 3 To determine an optimal monitoring position measure the flame voltage between the and terminals of the AUR series with a multimeter while moving the monitoring pipe position little by little in order to find the position where the voltage is as highly stable as possible Recommended flame voltage Items to inspect 1 5Vdc or more e Check that the flame is monitored The flame voltage may fluctuate in a correctly range of 0 1 to 0 3V synchronized with fe Check that the light receiving lens of the shutter oper
3. 1 Check the following conditions Power voltage e Check that the power switch is turned ON correctly e Check for loose power terminals e Check that the voltage is within the allowable range Wiring e Check that the terminal number is correct e Check for faulty wiring e Check the insulation for deterioration or damage Ambient temperature Check that the temperature is 60 C or less Ambient humidity e Check that the ambient humidity is 90 RH or less e Check that no dew condensation occurs inside the AUD500C 2 Check the AUD500C according to the flowchart below Q Zero Check the Small flame voltage 1 OK e Clean the monitoring window e Clean the inside of the monitoring pipe Remove the AUD10C Check the NG PE NO closed flame voltage 1 polis ine Monitoring position and or burner OK YES open Check the voltage between the F and G terminals 2 Does the shutter open when power is supplied to the AUR Check the shutter voltage 3 NG 1 Normal when 1 5Vdc or more 2 Normal when 160 to 220Vdc 3 Normal when fluctuating between 0 or 15 to 24Vdc NG OK OK Replace the Check the wiring Replace the Check the wiring AUD10C and replace the AUDS50A and replace the AUR unit AUR unit 16 Chapter 6 MAINTENANCE AND INSPECTION 7 WARNING Be sure to turn the power OFF before removing or mounting the AUD500C Failure to do so might cause electric s
4. Dimensions Unit mm Main body Cover setscrew width across flat 2 Outside earth screw M4 Adapter assembly Adapter oA p y 1 Handling Precautions e Tighten the adapter to the AUD500C with a tightening torque of 12 to 18Nem If the torque is less than 12Nem the AUD500C will not be properly sealed 22 Revision History Feb 2005 CP SP 1181E 1st Edition i July 2006 2l Model No T Outdoors added Certified number of NEPSI added ZAMATAKE Yamatake Corporation Advanced Automation Company 1 12 2 Kawana Fujisawa Kanagawa 251 8522 Japan URL http www yamatake com Printed on recycled paper 05 Specifications are subject to change without notice Printed in Japan 1st Edition Issued in Feb 2005 E 2nd Edition Issued in July 2006 U
5. damage or loss of parts If there is any problem with your order please contact your dealer immediately Body AUD500C 1 gt Chapter 7 SPECIFICATION User s Manual CP SP 1181E This manual Effective operation time 9735 001 00 1 label EEffective operation time label AEAEE I OL Effective operation time label N TNo IAAL 4 Be AEH HNR Burner No Model Name Effective operation time MY OE E k mA TEL BOETA Please read instructions carefully before using and use it correctly 9735 001 00 vi The Role of This Manual Seven different manuals are available for the AUD500C and the AUR series Read them as necessary for your spe cific requirements If a manual you require is not available contact Yamatake Corporation or its dealer AUD500C Explosion Proof Advanced UV Sensor Manual No CP SP 1181E This manual It describes the mounting wiring maintenance inspection and troubleshooting of the AUD500C when it is used with combustion equipment AUR300C Advanced UV Relay Manual No CP SP 1142E Personnel in charge of design mounting operation and maintenance of combustion equipment using the AUR300C should read this manual The manual describes the mounting wiring trial run adjustment maintenance and inspection of the AURS300C AUR350C Advanced UV Relay with Communications Manual No CP SP 1175E Personnel in charge of design mounting operation a
6. isotope Other sources producing ultraviolet rays gamma rays and X rays E Final mounting of monitoring pipe 1 When the equipment is operating properly with the specified flame voltage output after all adjustments have been completed correctly turn OFF the power to the equipment remove the AUD500C and weld the monitoring pipe permanently 2 Mount the AUD500C on the monitoring pipe securely and perform the final wiring E Final inspection To control the burner properly perform at least one cycle operation of the equipment to check that all control operations function correctly 15 Chapter 5 TROUBLESHOOTING 7 WARNING Be sure to turn the power OFF before removing or mounting the AUD500C Failure to do so might cause electric shock Do not touch the AUD500C or the F or G terminals of the AUR unit immediately after the power to the AUR unit has been turned OFF The F and G terminals are still electrically alive for 1 minute after the power has been turned OFF posing an electric shock hazard CAUTION Q Only authorized personnel who have technical skills with combustion equipment and flame safeguard controls should carry out the mounting wiring inspection adjustment and maintenance work Tools and parts to be prepared e Multimeter DC range 0 to 10V 0 to 30V 0 to 300V e For details about replacement parts refer to gt Maintenance optional parts on page 2 Troubleshooting procedures
7. obligatory action to prevent possible danger These icons graphically represent the actual action to be carried out The example on the left instructs the user to remove the plug from the outlet WARNING Do not combine the AUD500C with a unit other than Yamatake s flame D safeguard control AUR series Install the AUD500C in accordance with the National Institute of Industrial Q Safety Factory Explosion Proof Electrical Facilities Guide Gas explosion proof 1994 The AUD500C has acquired certification as an explosion proof housing Ex d IIC T4 Install the AUD500C at a location that complies with this certification Q Take sufficient countermeasures if the AUD500C is installed in locations such as the following e Near sources of ultraviolet rays other than the burner flame such as red hot furnace walls 1370 C or more e Near sources of gamma rays and x rays such as diffraction analyzers electron microscopes x ray machines high voltage vacuum switches high voltage capacitors radioactive isotopes etc e In atmospheres that interfere with ultraviolet rays due to steam soot smoke oil spray dust etc Q Install the AUD500C at an angle that prevents it from detecting the ignition spark Do not use the AUD500C where it might detect ultraviolet rays other than S those of the burner flame If the AUD500C responds to other ultraviolet rays a flame failure in the burner will not be detected and fuel will flo
8. screws 2 Tube unit Shutter unit c71 9 f Sos S ide 5 White lead wires Al s kaz G terminal z EAA pil yellow lead wire eae gt Coes F terminal i blue lead wire Bottom view 19 Chapter 6 MAINTENANCE AND INSPECTION 8 Connect the lead wires to the 4 terminals on the shutter unit correctly n Handling Precautions e Connect the blue lead wire to the F terminal and the yellow lead wire to the G terminal Connect the signal wires so that they are matched with the polarity indication labels F and G on the shutter unit 9 Mount the tube unit 10 Subsequent procedures are the same as those after step 6 stated in the previous section W Replacement of tube unit L Handling Precautions e Tighten the terminal screws and cover setscrew with a tightening torque of 1 5N m 20 Chapter 7 SPECIFICATIONS E Specification Description Applicable types of flame City gas natural gas propane gas kerosene heavy oil coke oven gas hydrogen chlorine ammonia naphtha ethylene etc Self checking cycle Approx 75 cycles min Insulation resistance Between flange mounting part and F terminal or blue lead wire between flange mounting part and G terminal or yellow lead wire between flange mounting part and 1 terminal or white lead wire between flange mounting part and S2 terminal or white lead wire 50MQ min by 500Vdc megg
9. unit to be shortened or may cause improper operation or malfunction Provide the AUD500C with protection from the rain 1 Handling Precautions e The surface color of the case may change due to the influence of sunshine or other causes However this will not affect the functioning of the product Chapter 2 MOUNTING E Mounting positions Mount the AUD500C so that its explosion proof cable gland points downward In mounting do not Do not rotate rotate the AUD500C the AUDS00C in this plane in this plane _ Explosion proof cable gland Vertical plane o Handling Precautions e f the AUD500C is wrongly mounted the shutter of the AUD50A shutter unit may be damaged or malfunction From a side view the allowable rotation ranges from an upper limit of 90 explosion proof cable gland is horizontal to a lower limit of 45 Upper limit 90 Horizontal plane Vertical plane Lower limit 45 Chapter 2 MOUNTING E Mounting of monitoring pipe Monitoring pipe materials Use a monitoring pipe with a black inside wall If a pipe with a stainless steel or galvanized inside wall is used diffused reflection of the ultraviolet rays occurs inside the pipe causing malfunction Size of monitoring pipe Mounting space To detect the ultraviolet radiation of the flame at its optimal level it is necessary to widen the light receiving area of the AUD500C If a recommended flame voltage of 1 5V or m
10. C from the high voltage Q cables of the ignition transformer and power cables and then always run the signal cables in a different conduit tube Do not reuse the packing gland Doing so would jeopardize explosion proof S performance due to degradation of the packing gland After the wiring work has been completed always check that the wiring is Q correct Incorrect wiring may cause damage or malfunction Only authorized personnel who have technical skills with combustion Q equipment and flame safeguard controls must carry out the pilot turndown test 25 000 operation hours To ensure operational safety replace the tube unit with a new one within this period Q The service life of the AUD10C tube unit built into the AUD500C is 3 years or D CAUTION Do not transport the AUD500C while it is mounted on the combustion equipment Impact or vibration during transportation may cause the AUD500C to malfunction Before transporting remove the AUD500C and put it in its specially designed packing box Replace the AUD50A shutter unit with a new one approximately every 3 years Unpacking Check the following items when removing the AUD500C from its package 1 Check the model number to make sure you received the correct product 2 Check for any obvious damage 3 Check the contents of the package against the packing list to make sure that all items are included Handle the AUD500C and its accessories with care to prevent
11. PAIL ANP AN No CP SP 1181E Explosion Proof Advanced UV Sensor AUD500C User s Manual Thank you for purchasing the AUD500C This manual contains information for ensuring the correct use of the AUD500C It also provides necessary information for installation mainte nance and troubleshooting This manual should be read by those who design and maintain equipment that uses the AUD500C Be sure to keep this manual nearby for handy reference Yamatake Corporation RESTRICTIONS ON USE This product has been developed designed and manufactured in accordance with the standards of explosion protected electrical apparatus When using this product in application requiring particular safety special care should be taken to implement a fail safe and or redundant design concept as well as a periodic maintenance program The notified body and or the applicable standards may vary by the model number Be sure to confirm the specification for the details NOTICE Ensure that this user s manual is provided to the user before the prod uct is used Copying or duplicating this user s manual in part or in whole is forbid den The information and specifications in this manual are subject to change without notice Considerable effort has been made to ensure that this manual is free from inaccuracies and omissions If you should find any inaccuracies or omissions please contact Yamatake Corporation In no event is Yamatake Cor
12. ation of the AUD500C the AUD500C is not duty e Check that foreign matter such as soot has not accumulated in the monitoring pipe 13 Chapter 4 ADJUSTMENT E Pilot turndown test This test is intended to check that the flame correctly ignites the main burner when the AUD500C detects a pilot flame if the gas pressure and air pressure change to their worst possible conditions 7 WARNING To prevent an explosion carry out the pilot turndown test carefully If the AUD500C detects a pilot flame that is too small to ignite the main burner it will determine that there is no flame failure Fuel will be supplied continuously resulting in serious danger of an explosion When performing the pilot turndown test repeatedly stop the equipment completely every time the pilot turndown test is completed in order to completely discharge the unburnt gas or oil accumulated in the combustion chamber or flue If the unburnt gas or oil is not discharged completely it may cause an explosion N CAUTION Only authorized personnel who have technical skills with combustion equipment and flame safeguard controls should carry out the mounting wiring inspection adjustment and maintenance work Only authorized personnel who have technical skills with combustion equipment and flame safeguard controls should carry out the pilot turndown test For details about how to carry out the pilot turndown test refer to the user s manual for the AUR seri
13. ee er ee ee eee ree ee ee 5 E Mounting POSITIONS cee c cece cece cece cece ene eeseeeereseesseeeeeens 6 E Mounting of Monitoring Pipe 6 ce eee cece cece cece cece cece eee eeeeens 7 Chapter 3 WIRING E Wiring diagram ee cece ec eee eee cece reece rece cree eee eeneeeeeeeeees 10 m Wiring E EEE ELE E E E ES EE ESE E E EEEE E EEEE E E E ETE E 11 E Grounding EPE EEE E E E VAN T TERTE E EOE EEEE E E ET 12 Chapter 4 ADJUSTMENT E Before measurement of flame voltage cc eee cece cece eeeeees 13 E Measurement of flame Voltage ccc cece cece cece cece eee eeeeeeees 13 E Pilot turndown teSt ssssssssssssssssssssssooosososossssssosooo 14 M Ignition spark response teSt essssssessesssessoeseseseseeesees 15 E Final mounting of monitoring pipe sssesesssssesessossoseesees 15 E Final inspection ssesessssossssssoosesessosesessosesessooees 15 Chapter 5 TROUBLESHOOTING Chapter 6 MAINTENANCE AND INSPECTION E Periodic INSPECTION sessssssossssssoososessossssssosessssooens 17 E Replacement of the tube unit sssssssssssssssosesesesecosseoes 18 E Replacement of the shutter unit sssssssssssssssssssssscssssoes 19 vili Chapter 7 SPECIFICATIONS E em ol Ted i er 0 0 Ee 21 E Dimensi ns is 65 6 65666 odie oa ees 5s 66S ooo 66 sso tee Sees ee seuss 22 Conventions Used in This Manual The following conventions are used in th
14. er at each of the above locations The tube unit AUD10 must be removed Dielectric strength Between flange mounting part and F terminal or blue lead wire between flange mounting part and G terminal or yellow lead wire between flange mounting part and 1 terminal or white lead wire between flange mounting part and S2 terminal or white lead wire 1500Vac for 1min or 1800Vac for 1s at each of the above locations The tube unit AUD10 must be removed 20 t0 60 C 20 t0 70 C Ambient storage humidity 90 RH at 45 C max no condensation allowed 4 9m s2 max 10 to 55Hz for 2 hours each in X Y and Z directions Pressure resistance for mounting part 690kPa Protection IP67 45 to 90 in side view Mounting on the monitoring pipe Flange Parallel pipe thread G2 1 4 Conversion adapter Taper pipe thread R1 Lead wires AWG18 heat resistant silicone cables 4 cores Flame signal wire requirements and IV wires with 2 0 mm and max 200m in length extension distance Material Aluminum Purple equivalent to DIG257 Approx 2 5kg Explosion proof housing Ex d IIC T4 Certified number TIIS TC17035 NEPSI GYJ06241 Tube unit effective operation time Under 3 years or 25 000 hours of operation time Ultraviolet ray quantity differs according to the type of fuel Also the calorific value of the burner type of equipment and installation conditions will have an influence 21 Chapter 7 SPECIFICATION E
15. es used with the AUD500C as well as the instruction manuals published by equipment manufacturers 14 Chapter 4 ADJUSTMENT E Ignition spark response test 7 WARNING Do not use the AUD500C where it might detect ultraviolet rays other than those of the burner flame If the AUD500C responds to other ultraviolet rays a flame failure in the burner will not be detected and fuel will flow continuously causing an explosion hazard Procedures 1 Close the manual shut off valves of the pilot burner and main burner 2 Operate the burner so that it ignites When the ignition spark occurs check that the flame relay K2 of the AUR series is not energized 3 If the flame relay is energized adjust the monitoring point of the AUD500C to avoid the influence of the ignition spark and its reflection g Handling Precautions e The following shows various sources other than flame that may activate the AUD500C Check that the AUD500C s operation is not influenced by these sources under any operating conditions Examples Ultraviolet ray Red hot furnace walls 1370 C or more within 50cm of sources furnace wall Ignition transformer and welding arc spark Gas laser Sunlamps Disinfecting lamps ultraviolet ray radiation lamps fluorescent lamps Strong flashlight toward UV sensor Gamma ray and Diffraction analyzer X ray sources Electron microscope X ray cameras High voltage vacuum switches High voltage capacitors Radioactive
16. h the National Institute of Industrial Safety Factory Explosion Proof Electrical Facilities Guide Gas explosion proof 1994 Be sure to turn the power OFF before wiring the AUD500C Failure to do so might cause electric shock Be sure to use only the packing gland that comes with the AUD500C Use of a different gland may invalidate the explosion proof certification When measuring the voltage between the F and G terminals of the AUD500C in the wiring check do not touch any terminal with bare hands Doing so may cause an electric shock Be sure to check wiring when the surrounding area is not an explosion proof environment CAUTION Only authorized personnel who have technical skills with combustion equipment and flame safeguard controls should carry out the mounting wiring inspection adjustment and maintenance work Always separate the signal cables of the AUD500C from the high voltage cables of the ignition transformer and power cables and then always run the signal cables in a different conduit tube Do not reuse the packing gland Doing so would jeopardize explosion proof performance due to degradation of the packing gland Chapter 3 WIRING E Wiring diagram Advanced UV Sensor AUD500C When performing the wiring work put all lead wires used for the connection with the AUR series in a conduit tube or conduit box Additionally run these lead wires separately from other power cables n Handling Precautio
17. he packing gland that comes with the AUD500C Use of a different gland invalidates the explosion proof certification iil CAUTION The AUD500C is specially designed for intermittent burner operation system Q is started and stopped once or more within 24 hours and 24 hour continuous burner operation combustion continues for 24 hours or longer An AUR series device with a self check function must be used as an amplifier in combination with the AUD500C exposed to certain chemicals or fumes such as those containing ammonia sulfur chlorine or ethylene compounds or acids and other corrosive gases S Do not install the AUD500C in locations where it is likely to be directly Be sure to observe the ambient temperature indicated in the specifications Q Failure to do so may cause damage or malfunction Only authorized personnel who have technical skills with combustion Q equipment and flame safeguard controls should carry out the mounting wiring inspection adjustment and maintenance work If the AUD500C is operated in an atmosphere where any steam smoke oil Q mist dust and or organic solvents exist that interfere with ultraviolet rays take appropriate corrective measures When using multiple burners mount the AUD500C in a position where it Q detects only the flame of the burner to be monitored Q Carry out wiring work in conformity with the specified standards Always separate the signal cables of the AUD500
18. hock Do not touch the AUD500C or the F or G terminals of the AUR series immediately after the power to the AUR unit has been turned OFF The F and G terminals are still electrically alive for 1 minute after the power has been turned OFF causing an electric shock hazard Only authorized personnel who have technical skills with combustion equipment and flame safeguard controls should carry out the mounting wiring inspection adjustment and maintenance work The service life of the AUD10C tube unit built into the AUD500C is 3 years or 25 000 operation hours To ensure operational safety replace the tube unit with a new one within this period E Periodic inspection 1 Turn OFF the power to the AUR unit 2 Clean the monitoring window and monitoring pipe periodically Remove the AUD500C from the monitoring pipe and clean the inside of the monitoring pipe and or the lens with a cloth rag 3 To check the operation of the AUD10C tube unit perform a safety shutoff test periodically For details about safety shutoff test refer to gt the user s manual for the AUR300C No CP SP 1142E user s manual for the AUR350C No CP SP 1175E 4 Adjust the burner so that it operates at the optimal operating level recommended by the burner manufacturer Frequency of maintenance and inspection Inspection contents Inspection frequency Check for fouling of monitoring window and monitoring Once a month or more pipe and loose screws
19. ing distance is 200m This ensures flexible installation e Maintenance parts such as the AUD10C tube unit and AUD50A shutter unit can be handled as a single unit This ensures easy replacement and maintenance work E Part names Main unit Outside earth screw Explosion proof cable gland 4 Cable Tube unit AUD10C2100 Label Fixing screw Thermo label Ultraviolet ray input Tube unit AUD10C2100 Shutter unit AUD50A2100 fe Fixing screw O Housing Chapter 1 Overview Shutter unit AUD50A2100 pC unit Y G terminal yellow lead wire DEn for shutter driver connection white lead wire E Model No Model No Special treatment AUD500C2101D Inspection certificate provided AUD500C21010T Tropicalization AUD500C2101DT Tropicalization AUD500C21110 AUD500C2111D AUD500C21110T Tropicalization AUD500C2111DT Inspection certificate provided Tropicalization E Configuration Combined combustion safety controller Model No AUR300C AUR350C Advanced UV Relay AUR400C AUR450C Dynamic Self Checking Burner Controller Adapter 81441151 001 Adapter G2 1 4 gt R1 Maintenance optional parts Model No AUDI002100 AUD50A2100 Shutter unit Chapter 2 MOUNTING 7 WARNING Install the AUD500C in accordance with the National Institute of Industrial Safety Factory Explosion Proof Electrical Facilities Guide Gas explo
20. is manual C Handling Precautions Handling precautions are items that the user should pay attention to when handling the AUD500C Note Notes indicate useful information that the user might benefit by knowing gt This indicates the item or page that the user is requested to refer to gt gt Indicates the result of an operation details displayed on the personal com puter or devices or the state of a device after an operation 1X Chapter 1 OVERVIEW E Overview The AUD500C Explosion Proof Advanced UV Sensor hereafter referred to as the AUD500C is a flame detector designed to sense the ultraviolet radiation of an oil or gas burner flame The AUD500C is used in combination with the dedicated Advanced UV Relay or Dynamic Self Checking Burner Controller hereafter referred to as the AUR series Any malfunction that has occurred in the UV sensor or UV relay can be accurately detected by the continuous self check function of the built in shutter driven by the relay ensuring highly reliable combustion safety control E Features e The AUD500C comforms to standards for explosion proof housings Ex d II C T4 e For a self checking flame sensor the AUD500C is compact and lightweight This ensures unrestricted burner mounting The operating ambient temperature is 60 C and the protection structure is IP67 This ensures excellent environment proof performance Vertical mounting is possible and the maximum wir
21. it in the reverse direction When transporting or storing the tube unit always put it in its specially designed packing box If the thermo label pasted on the AUD10C has turned black no longer white the temperature has probably exceeded the allowable operating temperature range If the advanced UV senser is operating where ambient temperature is excessive cool the AUD500C using air purging The thermo label should be regarded as a reference only Always confirm the correct ambient temperature with a thermometer When putting the cover on mount the O ring of the flange unit securely Failure to do so may cause lower sealing ability Tighten the terminal screws and cover setscrew with a torque of 1 5N m Chapter 6 MAINTEANCE AND INSPECTION E Replacement of the shutter unit N CAUTION Q Replace the AUD50A shutter unit with a new one approximately every 3 years 1 Turn OFF the power 2 Loosen the cover setscrew rotate the cover and remove it 3 Remove the 4 terminal screws 2 white lead wires 1 blue lead wire 1 yellow lead wire to disconnect the lead wires from the shutter unit 4 Remove the 2 shutter unit fixing screws 5 Remove the shutter unit from the flange 6 Remove the tube unit from the shutter unit For details refer to the previous section gt E Replacement of tube unit on page 18 7 Secure a new shutter unit to the flange unit Shutter unit fixing screws 2 Tube unit fixing
22. nd maintenance of combustion equipment using the AUR350C should read this manual The manual describes the mounting wiring trial run adjustment maintenance and inspection of the AUR350C AUR400C 450C Flame Safeguard Control Dynamic Self Check Burner Controller Manual No CP SP 1196E This manual should be read by personnel using the AUR400C 450C for the first time those in charge of designing combustion equipment that uses the AUR400C 450C or designing the hardware for mounting the device in a con trol panel and personnel performing maintenance The manual gives an overview of the product its mounting and wiring for connection to other equipment its operation trial run adjustment mainte nance and inspection and specifications Vil Contents SAFETY PRECAUTIONS The Role of This Manual Conventions Used in This Manual Chapter 1 OVERVIEW ME OW SRV IGW soc ooo ose ooo 56 5 wh oe ee ted E E E E N 1 MD P AttIiGS 6x6 46 os oe EEEE E E AE ko ie E 2 oe sed E T E T 1 E Parl Names io ooo os ee ss ei es oe eh es eae sites ia 1 E Mode NO 8s s6 lt sst de ddceseiciawsi cde eieossdendeoses jones sciudiet eee taweted 2 E Configuration 2 cece cece cece reece cere nen e eee ee eee eesserceenees 2 Chapter 2 MOUNTING E Before mounting the AUD500C cece eee cece cece eee eee eeeees 4 E Monitoring of burner flame ccc cece cece cece cece cece eee eeeeeeeeees 4 Babee i o seereerren es Serr rrr er
23. ng pipe 1 Prepare the monitoring pipe and make the mounting hole e Make the mounting hole for the monitoring pipe at the selected monitoring pipe mounting location e Screw in one end of the monitoring pipe and cut the monitoring pipe to a desired length so that its length is as short as possible 2 Weld the monitoring pipe temporarily e Weld the monitoring pipe temporarily to the plate of the combustion chamber of the boiler etc At this time do not weld the monitoring pipe completely since inspection and adjustment are required for the flame to be detected properly Monitoring pipe Weld these parts temporarily Furnace wall Plate refractory material 3 Mount the AUD500C e Attach the conversion adapter to the AUD500C mounting threads The recommended tightening torque is 12 to 18Nem e Mount the AUD500C so that its cable gland faces downward using a union pipe joint or the like 4 Purging of monitoring pipe air e Attach an air purge pipe R1 8 after removing the adapter plug To do an air purge make the internal pressure of the conversion adapter higher than the internal pressure of the furnace Note e Air purging of the inside of the monitoring pipe is useful for cooling the AUD500C and keeping the monitoring area clean In particular if the ambient temperature of the AUD500C exceeds 60 C cooling such as by air purging is needed Chapter 3 WIRING 7 WARNING Install the AUD500C in accordance wit
24. ns e Never run the lead wires to the AUD500C in the same conduit tube that contains high voltage cables such as power cables or ignition transformer cables e Put the high voltage cables of the ignition transformer and the grounding cables in the same conduit tube Ground one end of this conduit tube well In particular this caution must be observed strictly when using an automotive spark plug e f the surge of the ignition transformer adversely affects the AUD500C ground both ends of the conduit tube between the AUD500C and combustion safety control unit or change the cable routing 10 Chapter 3 WIRING E Wiring check 7 WARNING Do not use the AUD500C where it might detect ultraviolet rays other than those of the burner flame If the AUD500C responds to other ultraviolet rays a flame failure in the burner will not be detected and fuel will flow continuously causing an explosion hazard Before applying voltage to the AUD500C check that the wiring is correct Procedures 1 In the relay box disconnect the blue and yellow lead wires that come from the AUDSOOC 2 Turn ON the power to the AUR series 3 Measure the DC voltage between the F and G terminals with a multimeter or digital voltmeter 4 Connect the positive probe to the G terminal yellow lead wire and the negative probe to the F terminal blue lead wire gt gt If a voltage of 160 Vdc to 220Vdc is output the wiring work has been performed c
25. ore cannot be maintained make the monitoring pipe wider so that it receives a sufficient amount of ultraviolet radiation e Use a monitoring pipe as large as possible and connect the pipe to the AUD500C with the reducer e Make the length of the monitoring pipe as short as possible However always keep the operating ambient temperature within 60 C Keep a sufficient space to allow easy maintenance inspection and service work Adapter Monitoring pipe 25A or more Use 2B to 3B pipe Reducer Furnace wall Union pipe joint Connection nipple 1B If air purging is needed supply air through the air purge pipe R1 8 of the adapter J Handling Precautions e Mount the AUD500C so that it monitors the burner at an angle from above Ifthe AUD500C is mounted so that it monitors the burner at an angle from below or in the same horizontal plane dust or soot may accumulate on the monitoring window or in the monitoring pipe This may block the ultraviolet rays so that the flame is not detected e Mount the AUD500C so that its monitoring direction intersects the flame axis at as small an angle as possible This ensures a wide overlap of the AUD500C s monitoring area and the flame Thus the amount of ultraviolet radiation that is detected is maximized Chapter 2 MOUNTING Depth of flame when checked at an acute angle Incorrect Depth of flame is small Temporary welding for positioning of monitori
26. orrectly If the measured DC voltage is a negative value the wiring to the F and G terminals is reversed 5 Next measure the DC voltage between the shutter voltage S1 and S2 terminals both are white lead wires o Handling Precautions e The polarity of the S1 and S2 terminals is not specified When measuring the voltage with an analog multimeter in order to check the polarities set a large voltage range so that the indication needle does not deflect over the negative scale After that measure the shutter voltage gt gt If the shutter voltage changes in a range of 15Vdc to 24Vdc the wiring is connected correctly If the shutter voltage of the multimeter shows 24Vdc constantly or if it shows OV the wiring may be incorrect If a flame exists the shutter voltage changes within a range of OVdc to 24Vdc 6 Re connect the lead wires minute or longer after the power to the AUR unit has been turned OFF n Handling Precautions e Because the F and G terminals are still electrically live for 1 minute after the power has been turned off touching them within that time is an electric shock hazard 11 Chapter 3 WIRING E Grounding Be sure to check that the wiring is correct before turning the power on 1 Grounding with a direct connection to an outside earth terminal 2 Grounding by connecting an outside earth terminal to the ground terminal of the relay box Relay box 12 Chapter 4 ADJUSTMENT
27. poration liable to anyone for any indirect special or consequential damages as a result of using this product 2005 Yamatake Corporation ALL RIGHTS RESERVED EF SAFETY PRECAUTIONS WW E About Icons The safety precautions described in this manual are indicated by various icons Please be sure you read and understand the icons and their meanings described below before reading the rest of the manual Safety precautions are intended to ensure the safe and correct use of this prod uct to prevent injury to the operator and others and to prevent damage to proper ty Be sure to observe these safety precautions Q WAR N f N G Warnings are indicated when mishandling this product might result in death or serious injury i CAUTI O N Cautions are indicated when mishandling this product might result in minor injury to the user or only physical damage to the product E Examples Triangles warn the user of a possible danger that may be caused by wrongful operation or misuse of this product These icons graphically represent the actual danger The example on the left warns the user of the danger of electric shock White circles with a diagonal bar notify the user that specific actions are prohibited to prevent possible danger These icons graphically represent the actual prohibited action The example on the left notifies the user that disassembly is prohibited Filled in black circles instruct the user to carry out a specific
28. s Failure to do so may cause damage or malfunction Only authorized personnel who have technical skills with combustion equipment and flame safeguard controls should carry out the mounting wiring inspection adjustment and maintenance work If the AUD500C is operated in an atmosphere where any steam smoke oil mist dust and or organic solvents exist that interfere with ultraviolet rays take appropriate corrective measures When using multiple burners mount the AUD500C in a position where it detects only the flame of the burner to be monitored Chapter 2 MOUNTING E Before mounting the AUD500C e To mount the AUD500C correctly thoroughly read the instruction manuals published by burner boiler and or other equipment manufacturers Make the proper mounting plan while referring to such instruction manuals e It is necessary that the AUD500C actually monitors the flame As long as the overall layout and temperature around the burner and other limitations permit mount the AUD500C as close to the flame as possible The closer the AUD500C is to the burner nozzle the more ultraviolet radiation it will detect e Mount the AUD500C far from the ignition transformer Mount the ignition transformer as close to the burner as possible and then ground it well E Monitoring of burner flame Monitoring of pilot flame only continuous pilot intermittent pilot The main burner must be reliably ignited with the minimum pilot flame that
29. sion proof 1994 The AUD500C has acquired certification as an explosion proof housing Exd II CT4 Install the AUD500C at a location that complies with this certification Take sufficient countermeasures if the AUD500C is installed in locations such as the following e Near sources of ultraviolet rays other than the burner flame such as red hot furnace walls 1370 C or more e Near sources of gamma rays and x rays such as diffraction analyzers electron microscopes x ray machines high voltage vacuum switches high voltage capacitors radioactive isotopes etc e In atmospheres that interfere with ultraviolet rays due to steam soot smoke oil spray dust etc Install the AUD500C at an angle that prevents it from detecting the ignition spark Be sure to turn the power OFF before removing or mounting the AUD500C Failure to do so might cause electric shock Do not use the AUD500C where it might detect ultraviolet rays other that those of the burner flame If the AUD500C responds to other ultraviolet rays a flame failure in the burner will not be detected and fuel will flow continuously causing an explosion hazard CAUTION Do not install the AUD500C in locations where it is likely to be directly exposed to certain chemicals or fumes such as those containing ammonia sulfur chlorine or ethylene compounds or acids and other corrosive gases Be sure to observe the ambient temperature indicated in the specification
30. te monitoring HM Location Temperature Vibration Outdoors To avoid unnecessary shut off as much as possible and increase the reliability of the system we recommend duplicate monitoring Make a redundant system using two AUD500C s to monitor the burner flame If either AUR series device does not output a flame signal or if a false signal exists an alarm signal is output but combustion continues If both AUR series devices detect a flame failure at the same time the system is shut off This method prevents unnecessary shutoff resulting from flame fluctuation or from the failure of the AUD500C or the combustion safety controller Determine the optimal mounting location of the AUD500C while carefully observing the following items Mount the AUD500C in a place where the operating temperature range is 20 C to 60 C 1 Handling Precautions elf the above temperature range is not observed the AUD10C tube unit or AUD50A shutter unit components of the AUD500C may malfunction or shut off unnecessarily e f the actual temperature may exceed the operating temperature range put an appropriate thermal insulation plate between the combustion chamber and the AUD500C or carry out air purging to put the temperature within the operating temperature range Mount the AUD500C in a place where the acceleration is 4 9 m s or less 1 Handling Precautions e Vibration may cause the service life of the AUD10C tube unit or AUDS50A shutter
31. the AUD500C can detect Therefore throttle the pilot fuel manual valve until the main burner barely ignites Mount the AUD500C under these conditions so that the AUD500C monitors only the top of the pilot flame Put the monitoring area as close to the top of the flame as possible so that the AUD500C monitors the pilot flame along with the axis of the pilot flame Monitoring of both pilot flame and main flame continuous pilot intermittent pilot Mount the AUD500C so that its line of sight intersects both the pilot flame and the main flame Monitoring of main flame only interrupted pilot Mount the AUD500C so that the AUD500C monitors the main flame in any state the most stable part of the flame during both low combustion and high combustion In special combustion where high combustion and low combustion are mixed the use of two units in order to monitor the main flame of each is recommended Multiple burners in one combustion chamber Mount an AUD500C on each burner and carry out the mounting work so that neither AUD500C detects the flame of the other burner incorrectly Additionally the AUD10C tube unit of the AUD500C may produce an electrical discharge phenomenon inside the tube This electrical discharge may emit ultraviolet rays from the tube Therefore when using multiple units adjust their positions so that no ultraviolet radiation from the other tube unit is detected Chapter 2 MOUNTING Redundant system duplica
32. w continuously causing an explosion hazard Be sure to turn the power OFF before removing or mounting the AUD500C Q Failure to do so might cause electric shock Be sure to turn the power OFF before wiring the AUD500C Failure to do so Q might cause electric shock Q To prevent an explosion carry out the pilot turndown test carefully If the AUD500C detects a pilot flame that is too small to ignite the main burner it will determine that there is no flame failure Fuel will be supplied continuously resulting in serious danger of an explosion WARNING When performing the pilot turndown test repeatedly stop the equipment completely every time the pilot turndown test is completed in order to completely discharge the unburnt gas or oil accumulated in the combustion chamber or flue If the unburnt gas or oil is not discharged completely it may cause an explosion Do not touch the AUD500C or the F or G terminals of the AUR series immediately after the power to the AUR series has been turned OFF The F and G terminals are still electrically alive for 1 minute after the power has been turned OFF causing an electric shock hazard When measuring the voltage between the F and G terminals of the AUD500C in the wiring check do not touch any terminal with bare hands Doing so may cause an electric shock Be sure to check wiring when the surrounding area is not an explosion proof environment Be sure to use only t

Download Pdf Manuals

image

Related Search

Related Contents

HP Pavilion x360 13-a012cl  MODE D`EMPLOI  Network Nav User Manual  取扱説明書 D903i  HiPath 4000 Hicom 300 E/300 H  Smartcat (BL2100) - Digi International  Huntkey X7  Vogel's PUC 2508  Kambrook KRC8 User's Manual  Steba LB 6 CUBE  

Copyright © All rights reserved.
Failed to retrieve file