Home

Punch User Manual

image

Contents

1. Acceptor Module Once the bill entry guide is aligned properly remember to go back and tighten the screws on the chassis refer back to Chassis installation instructions e To remove a bill entry guide slide a flat head screwdriver between the bill entry guide and the acceptor module as shown in the diagram on the right 4 MEI CASHFLOW SC83 Page 11 www meigroup com Part 252055088 G4 INSTALLATION gt gt Installing the Cashbox e With the chassis mounted securely to the machine you may now insert the cashbox into the chassis The cashbox has slots on both sides that will guide it into the chassis When you insert the cashbox you will feel some resistance from the two springs inside the chassis Make sure to insert the cashbox all the way in so that the rear of the cashbox is flush against the chassis wall Removing the Cashbox When the note acceptor is installed in a machine you just need to grab the yellow strap on the cashbox and pull firmly to release it The cashbox does not lock on to the chassis To remove the cashbox when the unit is not installed grab on to the yellow handle and place your thumb on the chassis where indi cated in this diagram Placing your thumb at this location will give you sufficient leverage to remove the cashbox PLACE THUMB HERE MEI CASHFLOW SC83 Page 12 www meigroup com Part 252055088 G4 INSTALLATION Installine Locks on the Cashbox The cashbox may
2. Open the acceptor module by placing the palm of your hand on the front of the module and placing your fingers around the top of the yellow cover as shown in the diagram to the right Pull the cover toward your hand and then lift up opening the module head fully Clear the note path area of any foreign objects Wipe the note path and sensor areas as needed with a soft damp cloth For stubborn dirt a small amount of mild non abrasive soap may be added to the water before dampening the cloth Make sure no streaks or residual soap remain on the note path Note Cashflow SC83 does not require the use of a cleaning card Never use a petroleum based product to clean this device Petroleum based products will damage the note path Mild non abrasive soap is preferred over alcohol Calibration The Cashflow SC83 series note acceptor was designed not to require calibration Thus the unit has no switch settings or calibration mode that allows a user to perform a calibration Calibration may only be performed by MEI trained technicians MEI CASHFLOW SC83 Page 21 www meigroup com Part 252055088 G4 TROUBLESHOOTING Diagnostic Codes Red conditions Hard Fault One of the note acceptor components needs to be replaced C gt Yellow condtions Soft Fault The operator can correct the issue at the machine Green conditions No Fault No problem with the note acceptor O Solid Light O Flashing Light LED Indicator
3. What are the MMI Diagnostic Error Codes Green Yellow and Red LED Please refer to page 22 of this operation and maintenance manual for the MMI Diagnostic Error Codes Can a CASHFLOW SC83 unit be calibrated in the Field A CASHFLOW SC83 unit can not be calibrated in the field The CASHFLOW SC83 is designed not to require field calibration Calibration is only required after certain repairs that are done to a CASHFLOW SC83 unit Therefore only an approved CASHFLOW SC83 Service Center ate trained to calibrate a CASHFLOW SC83 unit What are the differences among model s SC6602 is a Flash unit made to interface to IGT s Netplex SPC machines It uses the IGT 1D024 interface and SPC USB interface SC6604 is a Flash unit made to interface to various machines It uses MEI Opto Isolated EBDS Interface SC6607 is a Flash unit made to interface to various machines It uses MEI RS 232 EBDS Interfaces What are the differences among interfaces MEI EBDS Extended Bi Directional Serial Protocol is a proprietary MEI protocol specification used to accomplish two way serial communication between the bill acceptor and a host machine It is not used for interfacing to IGT machines Open collector EBDS uses opto isolated interface hardware RS 232 EBDS uses RS 232 level interface hardware IGT Netplex Serial Protocol is proprietary IGT interface used to communicate between the IGT host machine and the Bill Acceptor IGT SPC U
4. 3 The correct acceptor configurations ate selected bills are enabled disabled proper BEG selected Different model acceptors i e SC8304 07 to an SC8302 or vice versa require in addition to the changes above a matching interface card PCB SC8304 07 require EBDS interface card PCB SC8302 require netplex interface card PCB 21 Who can I contact for service on a CASHFLOW SC83 Visit our website at www meigroup com for a list of service centers that repair the CASHFLOW SC83 MEI CASHFLOW SC83 Page 26 www meigroup com Part 252055088 G4 DRAWINGS 0681 XZ eve ANNO HA LSNAAOG HO Hivd HAHLLO AHL ONY ANNOAR EDO LEA HOA Hd TYNOOVIG ANO 3501 SUANALSYA COTIVLSNA Gud DNIE NIHAR WOIHL SZ XO LG OAH MANOS XVW HOEIOMHL Od XF SSTOH ONLUINGGA 094 2662 A A N naNvH JNE byes _ osea 8 FAN o Odds STONV ZZL E roe eses LSL A 3165 ses MOGL oce errs gal s Gari s9 ass e a CORRES i i i ooe I BPO O i gos I 3 oooz tj HT 1 a I 1 i 1 a a L 1 1 i 1 t 2 i i Fami oss iff stol eez4 TERE DEZ 1000 l zos i i i ih fori i ho I i 1 1 1 BSE IH H Hiva Tid b IR BSE EA i 0E Ea f 1 Cires i SLE o i 1 4 h e eee oy I 7 ca fo i g
5. be fitted with either one or two security locks The product is designed to accept locks from a range of manufacturers including Medeco Kaba Abloy VSR Miwa Duo ILCO Standard 5 8 and 1 1 8 formats are supported There is a significant variety of lock designs and spacer washers may be required for some lock types Locking hasps are shipped with every cashbox Contact MEI for cashbox lock specifications Locks vary greatly in price security keying policies etc The customer is responsible for selecting a lock with performance that is fit for the intended purpose MEI does not test or endorse any specific brand of lock for security characteristics For applications requiring NO locks a non secure slam latch is available MEI Part Number 252260001P1 P12 NLC CASHBOX LATCH When only one lock is used the remaining blank hole does not give access to the contents of the cashbox However some jurisdictions may require a blanking plug Contact MEI for assistance in obtaining a suitable plug When two locks are installed they must rotate in opposite directions See the figure below Bottom View of Cashbox MEI CASHFLOW SC83 Page 13 www meigroup com Part 252055088 G4 STS SUPPORT TOOL E MEI Cashflow STS W3 0 Administrator admin _BEE File Jools Reporte User Admin window Help zal n J a l 4 9G a Hew Open SAVE Print Head We rite Handhelds Audit CAL Diagnostics Users Idle de No Produ
6. requirements EN 60335 1 2002 Household and Similar electrical equipment appliances Safety Part1 General Requirements EN60335 2 82 2003 Part 2 82 Particular requirements for amusement hines and personal service machines Ass AA AAA MEI CASHFLOW 5C83 Page 2 www meigroup com Part 252055088 G4 National and International Standards Conformance CashFlow SC83 Series products operate at Safety Extra Low Voltage Level SELV as defined in EN60950 Safety of Information Technology Equipment They may be designed into equipment complying with IEC950 EN60950 Safety of Information Technology Equipment CashFlow SC83 Series products are of Class 2 construction Dangerous Environments The CashFlow SC83 Series must not be operated in the presence of flammable gasses fumes or water Product Disposal Do not dispose of any part of a CashFlow SC83 Series by incineration Published by MEI Unit 51 52 Suttons Business Park Suttons Park Avenue Earley Redding RG6 1AZ United Kingdom Internet http www meigroup com MEI Inc 2007 Except as permitted under the relevant local legislation no part of this publication may be copied transmitted transcribed or distributed in any form or by any means or stored in a database retrieval system or translated into any language natural or computer without the prior permission of MEI Inc Copyright MEI Inc 2007 MEI Inc 2007 MEL Inc
7. with a soft lint free cloth and an appropriate cleaning solution Refer to Question 13 16 What is the operating voltage for a CASHFLOW SC83 unit The operating voltage range is 12 to 28 VDC 17 Does a CASHFLOW SC83 unit have dip switches A CASHFLOW SC83 unit does not have any dip switches Notes can be enabled and disabled by using a configuration coupon Contact MEI for more information 18 What is the purpose of the red black and white wires that come out of the main harness The wires are connected to an internally mounted switch and are used in conjunction with Player Tracking Systems to identify that a cashbox is present or that it has been pulled Different combinations allow normally open or normally closed wiring MEI CASHFLOW SC83 Page 25 www meigroup com Part 252055088 G4 FREQUENTLY ASKED QUESTIONS SS 19 How do I clear a note jam Remove the acceptor by pulling upwards on the release lever located on the front of the acceptor module and pull away from the chassis Open the acceptor by sliding the yellow acceptor latch forward then clear the note jam 20 Is it OK to swap Acceptors among my machines Same model Acceptors may be easily swapped i e SC8302 to another SC8302 Verify that the following has been confirmed by the STS program before installing back into the machine and applying power 1 The correct firmware is installed 2 The correct BEG is installed for that particular machine
8. 21 cashflow MEI Cashflow C83 Installation amp Operation Manual 2008 MEI Inc All Rights Reserved The MEI device MEI CASHFLOW MEI EASITRAX and SODECO are registered trademarks of MEI in the U S and other countries Information is subject to change without notice MEI has made every effort to assure that the information in this document is accurate However we cannot be held responsible for any errors or omissions MEI CASHFLOW SC83 Page 1 www meigroup com Part 252055088 G4 a I TM MEI UK International LtD Unit 51 52 Suttons Business Park Suttons Park Avenue Earley Redding RG6 1AZ UK Phone 44 0 118 938 1100 Fax 44 0 118 919 7878 EC Declaration of Conformity Document Number 20199 003110005 EC G5 We MEI certify that the product described is in conformity with the following Directive s 89 336 EEC Electromagnetic Compatibility Directive as amended 73 23 EEC Low Voltage Directive as amended 2002 95 EC Restriction of Hazardous Substances Directive as amended Description of product Cashflow SC83 Series Note Acceptors The product has been assessed by application of the following standards EN 55022 1998 Information Technology equipment Radio disturbance characteristics Limits and methods of measurement BS EN 55024 1998 Information Technology Equipment Immunity characteristics Limits and methods of measurement EN 60950 1 2001 Information Technology Equipment Safety Part 1 Generic
9. SB Protocol is proprietary IGT interface used to communicate between the IGT host machine and the Bill Acceptor MEI CASHFLOW SC83 Page 24 www meigroup com Part 252055088 G4 FREQUENTLY ASKED QUESTIONS 12 How is a CASHFLOW SC83 unit manufacturing date determined Locate the unit s serial number on the product label The product label is located on the front of the acceptor module below the entry guide The first three digits of the serial number are the date code of the note acceptor The first two digits indicate the week of the year it was made The third digit indicates the year of manufacture For example 082 means the unit was manufactured the 8th week of 2002 13 How and how often should I clean the CASHFLOW SC83 unit The best way to clean a note acceptor is with mild non abrasive diluted cleaning solution sprayed onto a soft cloth and not directly onto the note acceptor Remove the acceptor and open the note acceptor s mouth Wipe out the note path Cleaning should be performed after two years depending upon use or if the unit s acceptance rate drops below normal 14 Can I use alcohol to clean a CASHFLOW SC83 unit Alcohol is not the preferred cleaning solution Refer to Question 13 15 Can I use cleaning cards Not necessary Cleaning cards offer simple preventative maintenance for some note acceptors Since the CASHFLOW SC83 unit is easily opened more effective cleaning can be accomplished
10. VERVIEW Features Q LIGHT BAR 4 LENSED RECEIVER CUSTOM BAR CODE READER 100 MHZ DSP PROCESSOR E EARLY NOTE PICK UP SMOOTH SEALED NOTE PATH DIRECT ROLLER DRIVE RIDGES MATE WITH ACCEPTOR E INTERNAL DIRECT ROLLER DRIVE ELEVATOR SHORT NOTE PATH DURABLE WELDED PLASTIC EXTERIOR RECESSED PLASTIC GEARS DUAL LOCK CAPABILITY COMMON ACCEPTOR MODULES rc STYLE EDGE CONNECTOR INTERFACE CARDS ACCEPTOR RELEASE LATCH NOTE PATH RELEASE DISPUTE RESOLUTION WINDOW ENTRY GUIDE amp POWER MOUNTING CONFIGURATION BUTTON NOT USED ON SC83 SERIES EL DIAGNOSTIC LEDS SEE PAGE 22 FOR DETAILS USB SERVICE PORT SEE PAGE 15 AND FIGURE 2 FOR DETAILS ACCEPTOR USER INTERFACE FLEXIBLE HANDLE l PASSIVE CASHBOX LATCHES MEI CASHFLOW 5C83 Page 7 www meigroup com Part 252055088 G4 OVERVIEW Main Components of the CASHFLOW SC83 Bill Acceptor The CASHFLOW SC83 consists of three main components Cashbox LRC Acceptor Module Chassis The Acceptor Module and Cashbox are interchangeable with other identical SC83 models Bill Entry Guides for the CASHFLOW SC83 Not all bill entry guides fit in every machine Your choice regarding bill entry guides will depend on machine specifications Below are two bill entry guides that we currently manufacture For customers who prefer to tool their own bill entry guide please contact our technical department Platform Bill Entry Guide Univer
11. amming Module PROM versions of CASHFLOW SC83 units can be updated by replacing the PROM Chip that is located under the yellow acceptor latch on the acceptor What is a PPM Cashflow Portable Programming Module and how does it work A PPM is a yellow handheld device that is programmed by MEI and is used to download software into a CASHFLOW SC83 Flash units The PPM consists of a yellow button a red and green LED and 2 USB connectors To use a PPM first connect a USB harness to the front of a CASHFLOW SC83 unit then connect the other end to the PPM Then press the yellow button and the PPM downloads new software into the CASHFLOW SC83 unit The PPM uses the red and green LEDs to report its status and also gives error messages For more information on the PPM refer to the PPM User Guide MEI CASHFLOW SC83 Page 23 www meigroup com Part 252055088 G4 FREQUENTLY ASKED QUESTIONS 6 1 5 9 10 11 Can a PPM be used to update software for PROM CASHFLOW SC83 units No A PPM can only be used to download software into Flash CASHFLOW SC83 units How can I tell the difference between a Flash and PROM CASHFLOW SC83 unit There are two ways to determine the difference 1 The STS Program can be used to determine if a unit is a PROM or Flash 2 You can remove the yellow cover on the acceptor If a PROM is in the socket it is a PROM unit If no PROM is present it is a Flash unit Refer to pages 17 thru 19 on PROM units
12. cts Connected Mo Handhelds 4 20 2008 1243 FH Z Aa STS Support Tool is software that is installed on your computer for use with the CASHFLOW SC83 Bill Acceptor This software together with the Portable Programming Module PPM handheld device supports the Bill Acceptor both in the field and the workshop The enabled functions will depend on the type of license given to you but may include 1 Handhelds allows you to manage Handheld Devices downloading files for Bill Handhelds Acceptors changing Audit settings and upgrading of Handheld firmware 2 Configuration allows you to load and save configuration to or from a file and also a connected Bill Acceptor or Handheld device This configuration includes Bill Acceptor Bootloader and Application Firmware as well as basic Bill Acceptor and Bill Settings 3 Audit allows you to view stored and retrieve new audit data from Bill Acceptor devices Handhelds will automatically save retrieved audits to the database on connection 4 CRC allows you to perform CRC checks on a connected Bill Acceptor device 5 Diagnostics allows you to perform scripted or self tests on a connected Bill Acceptor Diagnostics More Detail information on this tool is offered in the STS User Manual For additional information on this tool please contact your MEI representative MEI CASHFLOW SC83 Page 14 www meigroup com Part 252055088 G4 UPDATING SOFTWARE There ar
13. e Color Signal P2 pin 1 White Aux A 14 2 Gray LED 12 3 Red V opt 7 4 Yellow V ret 3 5 Blue Ground 2 amp B 6 Pink Isolated Reset 6 7 Black Aux B 15 8 Purple LED 8 9 Brown Isolated TXD 4 10 Orange Isolated RXD 5 11 Green Power 1 amp A 12 Not Populated NOTES RXD refers to input to the note acceptor I XD is an output Pins 12 and 5 are tied with a loop of wire in back of the 12 pin connector WWW meigr oup com MEI CASHFLOW SC83 Page 20 Part 252055088 G4 Non Committed Contacts Depending on the desired interface the Cashflow SC83 may be supplied with one or two sets of non committed contact leads for OEM use The contacts are rated at 125VAC 5AMPs Maxi mum Wire connections ate as follows OEM SW1 or 2 COM OEM SW1 or 2 NC OEM SW1 or 2 NO Maintenance Periodic maintenance can improve the performance and extend the working life of a note acceptor Additional attention may be required if the note acceptor becomes inoperable due to a jammed object or acceptance rates fall below normal Cleaning the Acceptor Module Note You must remove the acceptor module from the chassis to open the front sensor area Forcing the note path open without removing the acceptor module from the chassis will damage the unit Remember to turn off the machine as per machine manufacturer when performing any cleaning Remove the acceptor module from the chassis Instructions on how to remove it are on page 10
14. e two ways of updating the software of a Cashflow SC83 note acceptot 1 Via a hand held device called the Cashflow Portable Programming Module PPM 2 By replacing the programmed PROM Chip Change Portable Programming Module Connecting the PPM to the CASHFLOW SC83 1 Locate the two USB ports located on the top of the Portable Programming Module See fig 1 below 2 Plug the type A end of your USB harness to the USB type A port of the PPM Plug the type B end of the same USB harness into the USB type B port of the Cashflow SC83 see fig 2 Type A USB port Type B USB port download button fig 1 CPM fig 2 Note Once a PROM chip is installed the note acceptor can no longer be programmed via the programming module PPM Installation of a PROM will disable the ability of the programing module PPM to communicate with the note acceptor Future software changes can only be made by replacing the PROM chip change MEI CASHFLOW SC83 Page 15 www meigroup com Part 252055088 G4 UPDATING SOFTWARE SSS CPM Downloading Procedure 1 After connecting the PPM to the Cashflow SC83 via the USB interface refer to previous page illustration you are now ready to start the download procedute 2 Press the square download button located on the front of the PPM see fig 2 on previous page 3 When downloading the PPM will have a solid green and a flashing red LED indicating the PPM is busy Once the dowload is co
15. ign the cover back to the position shown below MEI CASHFLOW SC83 Page 18 www meigroup com Part 252055088 G4 UPDATING SOFTWARE Replacing the programmed PROM Continued 8 Once in position move the yellow cover forward as if you were opening the acceptor module until the cover locks into place 9 Close the acceptor module and re install it into the chassis 10 If the power is on the unit will power up and perform a run and stack MEI CASHFLOW SC83 Page 19 www meigroup com Part 252055088 G4 HARNESSING AND CONNECTORS G 2 C f f EBDS Interface Pin Out Note Some Cashflow SC83 units will come with connectors that are OEM Specific Please refer to the host machine manual for pinout and connector information Cashflow SC83 note acceptors with an EBDS Interface will have a harness with a 12 pin con nectot Pa Latch Pin 12 Pin Chassis Docking Station Connector End View SC8307 RS232 EBDS version Connector Pin Wire Color Signal P2 pin 1 White External Inhibit 10 2 Gray Bezel LED drive 12 3 Not Populated 4 Yellow Out of Service 11 5 Blue Ground 2 6 Pink RS232 EBDS RXD L 7 Blue Power B 8 Purple LED Supply 9 9 Not Populated n 10 Not Populated 11 Green Power 1 amp A 12 Tan RS232 EBDS TXD K NOTES RXD refers to input to the note acceptor I XD is an output 2 Pins 7 and 5 are tied with a loop of wire in back of the 12 pin connector SC8304 Opto Isolated EBDS version ConnectorPin Wir
16. is a registered trademark MEI reserves the right to change the product product specifications at any time MEI has made every effort to ensure that the information in this document is accurate MEI disclaims any liability for any direct or indirect losses how so ever caused arising out of use or reliance on this information When installing the SC83XX into a host machine turn off all power When installing or removing the PROM observe all ESD precautions to prevent damage MEI CASHFLOW SC83 Page 3 www meigroup com Part 252055088 G4 TABLE OF CONTENTS OVERVIEW Model AAA II Y AGE EE WRO L 5 ai E W aso oai E R G 3 L CAUULE u T A u uu E u uu JAKA 6 7 Main Components of the SC83 Note Acceptor 8 Power Requirement 9 INSTALLATION AND REMOVAL OF COMPONENTS lnstaline te BR O OE 9 Inserting and Removing the Acceptor Module 10 Installing an Entry Guide 11 MONS CIN the CashDOX PRZE 12 Removing the Cashbosx 12 Installing Locks on the Cashbosx 13 EU POOR IDOL asirios 14 UPDATING SOFTWARE Cashflow Portable Pr
17. ith the machine door closed Screws must not exceed a 6mm depth through the mounting plate otherwise they may interfere with the removable cashbox Earth Grounding Considerations Use star washers when mounting the chassis via the rear mounting holes to ensure the chassis has a good electrical connection to the machine s mounting plate When using the side mounting holes ensure the lower upper if Up Stacker mounting hole is used MEI CASHFLOW 5C83 Page 9 www meigroup com Part 252055088 G4 INSTALLATION Inserting and Removing the Acceptor Module Insert the Acceptor Module so that the release lever locks into place The acceptor should be firmly seated to ensure proper engagement of the locking feature To remove the unit pull upwards on the release lever located on the front of the Acceptor Module and pull away from the chassis Acceptor Module MEI CASHFLOW SC83 Page 10 www meigroup com Part 252055088 G4 INSTALLATION Installing A Bill Entry Guide e To install a bill entry guide just slide it onto the Acceptor Module until it locks into place No screws ate required If the bill entry guide has lights you will have to first connect the har ness from the bill entry guide to the eight pin connector located on the left hand side of the face of the Acceptor Module e Make sure that the bill entry guide is aligned so the machine door closes properly Eight pin harness connector Bill Entry Guide
18. module will not be able to be re programmed with a PPM To re program an acceptor module that has had a PROM installed you MUST change or insert a new PROM perform a chip change When power is re applied the Acceptor module will be re programmed from the PROM 1 Remove the acceptor module from the chassis Instructions on how to remove it are on page 10 2 Open the acceptor module by placing the palm of your hand on the front of the module and placing your fingers around the top of the yellow cover as shown in the diagram below Pull the cover toward your hand and then lift up opening the module head fully 3 Remove the yellow cover from the acceptor module by turning the acceptor module so that the top of the cover is facing you Wedge the tips of your fingers underneath the left and right front top corners of the yellow cover Lift the cover s corners out and then back toward you to release the cover The cover will be released once the cover has cleared the black ramps as shown in the diagram below 4 Once the yellow cover is released in the front slide it back and remove it MEI CASHFLOW SC83 Page 17 www meigroup com Part 252055088 G4 UPDATING SOFTWARE Replacing the programmed PROM Continued 5 You may now remove the PROM using a PLC puller 6 Insert the new PROM Replacing the yellow cover Note To install the yellow cover the acceptor module must remain open 7 To re install the yellow cover al
19. mplete the LED on the PPM will change to solid green and a solid red indicating a successful download The note acceptor will perform a run and stack and the the LEDs on the PPM will turn off 4 Disconnect the USB harness from the Cashflow SC83 once the LEDs on the PPM are off 5 Once dowload is complete the Cashflow SC83 s diagnostic LEDs will flash five times green continuously until communication between the note acceptor and the machine is re established Diagnostic Codes For The PPM Led Codes solid green PPM on solid green flashing red PPM busy solid green solid red upgrade complete battery low wrong product connected Error Codes flashing green alternating flashing green and red solid green flashing red 1 time notes reader error solid green flashing red 2 times PPM error solid green flashing red 3 times program error O PPMon O dE PPM busy Do not disconnect PPM O 4 O upgrade complete Disconnect PPM LED Codes battery low __ wrong product connected bill reader error Error Codes _ Program O error x3 www meigroup com Part 252055088 G4 MEI CASHFLOW SC83 Page 16 UPDATING SOFTWARE Replacing the programmed PROM Chip Change This is not necessary for all applications but only those that occur in jurisdictions requiring PROM to be installed Note As soon as even one PROM has been installed into an acceptor module the acceptor
20. ograming Module PP N 15 16 Replacing the PRONI 17 19 HARNESSING AND CONNECTORS EBDS MoeraAcCE Pin 9 1 1 A AA irienner EErEE EEEE EERS 20 SPA ara Pin ODi esseere parn rE A 20 MAINTENANCE Cleaning the Acceptor Module 21 A R 21 TROUBLESHOOTING Diacn stie CO amp PP w A S gu A Gia hdi Ze Frequently Asked Questions 23 26 SC83 DIMENSION DRAWINGS 27 MEI CASHFLOW SC83 Page 4 www meigroup com Part 252055088 G4 OVERVIEW Model Number SC 83 XX X L Flash Unit No software programmed E Easitrax R Retail Industry Unit U USB 2 OEM Proprietary 4 Opto Isolated EBDS 7 RS232 EBDS O Downstacker 1 Upstacker Secure Cashbox 83mm bill path EBDS is a MEI protocol EBDS stands for Extended bi directional serial Note Other interfaces will also be supported Serial Number WW Y LCC F Sequential Production Number Configuration Code Manufacturing Location Year Manufactured Last digit of year Week Manufactured 0 52 MEI CASHFLOW SC83 Page 5 www meigroup com Part 252055088 G4 OVERVIEW COMPONENTS Chassis Cashbox MEI CASHFLOW SC83 Page 6 www meigroup com Part 252055088 G4 O
21. opening the machine door you will disable the primary interface The 10 second delay allows you to see a normal condition on the unit prior to the MMI display update MEI CASHFLOW SC83 Page 22 www meigroup com Part 252055088 G4 FREQUENTLY ASKED QUESTIONS 1 2 3 4 5 What are the 3 parts that make up a CASHFLOW SC83 unit A CASHFLOW SC83 unit consists of an acceptor module chassis and cashbox For more information on these modules refer to page 8 of the CASHFLOW SC83 Installation amp Operation Manual What purpose do the Cashbox arrows serve Arrows highlight a cashbox s position upright or upside down Arrows provide a visual aid to crews who frequently arrange cashboxes by position to signal that they are full or empty What is the purpose of the USB and 8 pin connectors on the front of the Acceptor Module The USB connector is used to connect a PPM Portable Programming Module to a CASHFLOW SC83 unit The PPM is used to download new software into a CASHFLOW SC83 The pupose of the 8 pin connector is to provide appropriate drive voltage and enable signals in some lighted entry guides that get installed on the note acceptor Some entry guides do not plug into the note acceptor they plug directly to the host machine How is software updated in CASHFLOW SC83 Flash units and PROM units in the field Flash versions of CASHFLOW SC83 units can be updated in the field by using a PPM Portable Progr
22. s Status You Need to Solid Green O Normal Take no action pla Casa O Disabled by machine Fix the machine condition Interface e g fill the coin hopper 2 Flash Green O Disabled by netwotk Correct the network interface if applicable condition Solid Yellow O Cashbox not seated or not present 1 Flash Yellow O Poor acceptance Clean the acceptor 2 Flash Yellow O O Jam in acceptor Clear the jam from the acceptor 3 Flash Yellow O O O Jam in cashbox Remove the acceptor and try to clear Jam Solid Red O Cashbox full Replace with an empty cashbox Acceptor fault 1 Flash Red COL ab Replace the acceptor with a programmed spare 2 Flash Red Interface board Replace the interface hardware fault board 3 Flash Red Invalid Config Coupon Edit or Refill another Coupon aa ete ston O O O Hardware fault Re program or Replace Interface Card a oO In Calibration Mode Insert Calibration Test Coupon EASITRAX SC DIAGNOSTIC CODES 4 Flash Red O Me n mas Insert cashbox w blank or matching asset in RF tae 5 Flash Red Acceptor fault Insert cashbox with a RF tag 6 Flash Red sn s o Reseat cashbox or replace w cashbox w another RF tag Re seat the cashbox 7 Flash Red Aser wor and Enter Asset into Acceptor head using STS Software Green Yellow Red O O O Checking tag Status Wait 5 seconds to determine tag All Solid All Flash O O Antenna PCB not Found status Replace Antenna PCB Note By
23. sal Bill Entry Guide Power Requirements Standby 10 Watts Acceptance Peak 30 Watts Stacking Peak 70 Watts Input Voltage 12 28 VDC MEI CASHFLOW SC83 Page 8 www meigroup com Part 252055088 G4 INSTALLATION Note Always power down machine prior to Installation The cashbox does not lock to the chassis When you remove the unit from the container or when the unit is not installed in the machine you must never carry the bill acceptor by the handle of the cashbox The cashbox may release causing the rest of the unit to fall and damage the chassis Installing The Chassis Most models have a configuration specific cable installed on the back of the chassis see Interface Manual 002850103 for more details Connect the cable from the chassis to the machine Always dress all wires to avoid interference with any equipment operation Mounting Holes Mounting Holes use M4 screws use M4 screws Locating Holes Back Side Bottom Note If you have a custom configuration you may need to contact our technical support group for assistance Once the connections are made you will need to line up the locating holes on the bottom of the chassis with the machine s locating pins Line up the mounting screw holes and insert M4 screws through several of the 10 mounting holes There are three on each side of the chassis and four located on the back Leave screws slightly loose until the bezel is mounted and aligned w
24. t Z W o oos AA MM ZZA i u S 686 1 S i a BHLO XV OVEEHL PAS R k at ATIVOLLUZA HO STIGH ONLINNON X8 Sao SSO 44 f fi ATIVLNOZIHOH l all 2 BAY fF LIXA AYN SS3NMHVH 3 EN pa r p 3 L HTA ZOVAWALNI LSOH SEIIS Z 4901 XOSHSVO TVNNALLXE Rz RE se CY R OE eee ie WNOILdO HOS LOTS _ Oy e nents SEEE E asr a S Sv_ XZ SPE XZ Sz rest reer AANA NIYALS SSANHYH o HT AAA pica 30493 NI HOI 8901 I TL a L U i E r esr y i ah O O E I S6XZ eat R rue Lb it 098 XZ remi i 3 i a Lose I i o Bl elo si a 3 GI sez SL HLd3d XVN EPE gt FAL S370H DNILNNOW AHOSSIDIV m al k a Led xp TO ee A Ea U bor SR TA O TH y esz 92 HLAHO XVIA l I P fi Z SITOH ONILNNOW AJOSSIDOV e u aoe Bly lav ls eg XP LT Lave nn a 0 OL a A 086 gt 046_ XZ esri asri waf E asa AER pi ag AR Sar HI ts bd me l 200 ty E SD O e 2 O DAJ 99 MOTHHISYO PTE zl 49 8 MOTHHSYVO lor El ore Hlyd LON X pie 08 HLJ VA MIHIS FLILSV ld v U0d TIAVLING 80110476 xz MEI CASHFLOW 5C83 Page 27 Part 252055088 G4 WWW meigr oup com

Download Pdf Manuals

image

Related Search

Related Contents

CLIMATIC™ 50 Manuel d`utilisation  1.81MB(Vol.2015.3)  Bulletin d`informations  Taurus TC-8  Cooper Lighting RKS140RS-48-10B User's Manual  WL-K600  ASX16-18 IO MANUAL  研修受講に係る留意事項について  Samsung RT55KZRSL دليل المستخدم  HP 2012 90W Docking Station  

Copyright © All rights reserved.
Failed to retrieve file