Home

MAN-175 Arc Weldable Vibrating Wire Strain Gauge

image

Contents

1. R is very high R lt 80 Ohm R is between 80 amp 180 Ohm Vv Vv y A severed cable is A faulty readout is A damaged cable is suspected causing suspected Check suspected causing a very high or infinite reading of instrument short resistance with another unit See step 4 It must be suspected that the portable l A faulty instrument is logger used firstis Yes S eain OK wit No gt possible Contact i faulty Contact alternative logger Soil Instruments Ltd User Manual Soil Instruments Ltd 15 DECLARATION OF CONFORMITY WITH COUNCIL DIRECTIVE 3 23 EEC as Amended by 93 638 EEC Date of issue 12 October 2006 Dol Ref Soil CELDA DB Directive PASSIEEC Low Voltage Directive as amended by 93 60 EEC Conforming Apparatus All Vibrating Aire Instruments Manufactured by Soll Instruments Ltd see pages 3 10 of Technical File Manufacturer Soil Instruments Ltd Responsible Person Chris Rasmussen Soll Instruments Ltd Rell Lane Uckfield East SUSSEX The 10L Standards Referenced Annex of 1 a 1 6 1 0 2 a 2 50 2 0 2 d 5 4a 5b amp 4c Directive Technical Fite oll Instruments Ltd EU Low Voltage Directive fa 2sfEEC as BEFEEC Technical Documentation Issue 1 October 2006 Vibrating ire Instruments Ve hereby certify that the apparatus described above conforms with the protection requirements of iA ASJ EEC Low voltage Directive as amended by
2. Where significant movement could take place the cable ties should be left a little slack and sufficient cable left free and positioned so that it cannot be damaged Once the cables have been fixed a full set of readings should be recorded for each instrument Since the gauges are used to record changes in data and not absolute data the stage when the Base or Zero reading is recorded is flexible Where loading tests are to be performed the Base reading for the test data should be recorded just prior to the beginning of the test Data from Vibrating Wire instruments can be recorded in 3 formats Period Linear or Engineering Units The required format should be established prior to any test beginning and remain consistent for the duration of the monitoring program A monitoring schedule should be established by the engineers responsible for the structure so that the monitoring personnel are aware of the data gathering requirements User Manual Section 7 Data Interpretation Data from strain gauges is generally presented in micro strain ue where strain is the ratio of the change in length per unit length Practical K factor 36150 Gauge calibration constant Conversion of Period and Linear Units to micro strain is carried out using either of the formulae detailed below Period Units i 10 10 pe fh __ aal TD To Where HE Change in strain in micro strain K Gauge Calibration Constant To B
3. Ys bavEEC on the approximation of the laws of the Member States relating to Low Voltage Equigment J d Pa f Signed aT a Signatory Chris Rasmussen Technical Director 16 User Manual
4. and involves the handling and tying of often long lengths of cable b The gauge sensor coils are factory fitted with a short say 3m length of cable and the cable from each gauge in an array is routed to a high quality cable joint where it is connected to a multicore cable The multicore cable is then routed to the terminal location With the cable routing planned and the gauges marked with their appropriate location description mounting the gauges can begin User Manual Section 5 Gauge Mounting The Soil Instruments Arc Weldable Strain Gauge is attached to mounting blocks which must first be arc welded to the steel surface to be studied A setting bar is used to correctly space apart the two blocks Firstly the two mounting blocks are fitted over the ends of the setting bar and the jig is used to position them correctly Then the set screws in the mounting blocks are tightened down onto the setting bar Avoid excessive tightening as this only damages the setting bar unduly The steel surface is cleaned using a wire brush to remove all scale rust dirt and oil The blocks are then removed from the spacing jig and pressed firmly against the steel surface using the setting bar as a handle The edges of the mounting blocks are now welded Avoid excessive heat and do not weld the flat end surfaces as this will prevent removal of the setting bar To speed things up where many gauges are being installed it is advantageous to have m
5. 00 N m2 Area r2 JT x outside diameter 2 2 TE x inside diameter 2 2 JE x 1 016 2 2 TE x 0 984 2 TT x 0 508 2 TE x 0 492 TE x 0 258064 TE x 0 242064 0 810732 m 0 760466 m2 0 050266 m2 Force SxA 10937600 x 0 050266 549789 4N 11 User Manual Section 8 Temperature Correction It is best practice to record temperature when you record strain readings You can then use the temperature data as well as strain data to analyse the behaviour of the structure The steel used for the wire in the strain gauge has a thermal coefficient of expansion similar to that of structural steel Thus if the gauge and the steel have the same thermal coefficient of expansion and are Subjected to the same temperature change corrections for temperature change are not required If the gauge is heated by direct sunlight so that its temperature increases faster than that of the structural steel you may see large changes in apparent strain It is difficult to correct for this so try to shield gauges from direct sunlight using thermally insulated covers If the steel in the structure has a thermal coefficient that is quite different from that of the gauge the following temperature correction might be appropriate Aue corrected Ave TC TC x Temp Temp Where Awe is the change in strain TC is the thermal coefficient of the member TC is the thermal coefficient of the gauge 12 2 ue C Temp is the
6. an be spliced in accordance with recommended procedure with suitably qualified personnel Soil INSTRUMENTS Bell Lane Uckfield East Sussex t 44 0 1825 765044 e info itmsoil com TN22 1QL United Kingdom f 44 0 1825 744398 w www itmsoil com Soil Instruments Ltd Registered in England Number 07960087 Registered Office 5th Floor 24 Old Bond Street London W1S 4AW 13 User Manual Appendix A Vibrating Wire Data Frequency Units f The tension of a wire can be measured by registering the frequency note at which it naturally vibrates If the wire is plucked electronically the frequency at which it vibrates can be measured The most common units used to express frequency are Hertz Hz or KiloHertz KHz The disadvantage of these units is that there is no linear conversion from Hertz to change in wire tension Linear Units L In order to overcome the problem of a linear conversion described above the frequency value can be squared thereby rendering it linear but quite large To reduce its size it is often divided by 1000 or multiplied by 10 3 The expression f 1000 or f x 10 3 is the most commonly adopted as a linear digital output Period Units P Electronic devices and digital technology often utilise the counter function available in some common circuits Period Units represent the time taken for the wire to vibrate over one full oscillation expressed in seconds Due to the very small size o
7. ase reading in Period units x 10 T Current reading in Period units x 10 B Batch Factor supplied with each gauge 10 10 z is positive the resultant strain is tensile T M Please note when Linear Units ue K Fi Fy x10 xB Where HE Change in micro strain K Gauge Calibration Constant Fy Base reading in f 4 1000 units F Current reading in f 7 1000 units B Batch Factor supplied with each gauge Please note when F Fy is positive the resultant strain is tensile The calculation of Load in a member using data from strain gauges is often complex The fundamental problem is determining the composite Young Modulus E of the member since it is often difficult to accurately determine the properties of the insitu materials 10 User Manual Once a Young Modulus is calculated the following equations can be used to calculate the loading on the structural member at the location of the Strain Gauge Force F Stress S x Area A Where A Cross sectional area in m2 Where F units Newton s Where S units N m2 Stress S Young Modulus of Elasticity E x Strain Where E units N m2 Example calculation Steel pipe outside diameter 1 016m Steel pipe inside diameter 0 984m Calculated change from the strain gauges 54 688 16 Young Modulus of Elasticity of the steel pipe 200 000 000 000 N m2 Stress E x amp 200 000 000 000 x 0 000054688 109376
8. cal cable If continuity exists a damaged cable is confirmed Step 2 The resistance across the two conductors of the electrical cable should be checked This can be done using a multimeter device across the two exposed conductors if the cable has not been connected to a terminal cabinet or can be done just as easily across the two conductors if the instrument has been connected to such a terminal or Dataloggers The resistance across the two conductors should be approximately of the order of 802 to 1809 The majority of these resistances arise from the transducer and the remainder from the electrical cable connected to the transducer Step 3 If the resistance across the two conductors is much higher than the values quoted in Step 2 or is infinite a damaged cable must be suspected Step 4 If the resistance across the two conductors is much lower than the values quoted in Step 1 say 80Q or less it is likely that cable damage has occurred causing a short in the circuit Step 5 If the resistance is within the values quoted in Step 1 i e 800 to 1809 AND no continuity exists between conductor and earth screen and on checking the reading from the transducer it proves to be still unstable or wildly fluctuating it must be assumed that the integrity of the circuit is good A faulty transducer must be Suspected and Soil Instruments should be consulted NOTE If the location on site of cable damage is found the cable c
9. current temperature Temp is the initial temperature User Manual 12 Section 9 Troubleshooting Guide If a failure of any vibrating wire transducer or its electrical cable is suspected the following steps can be followed The transducers themselves are sealed and cannot be opened for inspection The Troubleshooting Flowchart should also be followed if any instrument failures are suspected The steps below and the Troubleshooting Flowchart are applicable generally to any vibrating wire instrument Step 1 Before any of the following steps are followed the readout unit should be used to verify the stability of the reading and the audio signal from the portable logger should be heard The period reading from the transducer should not vary by more than 2 units and the audio signal should be crisp and of a consistent tone and duration Unstable wildly fluctuating readings from a transducer or an unsteady audio signal are either indications of possible problems with instruments or their related electrical cables IMPORTANT If a portable data logger is giving faulty readings or audio signals from all transducers a faulty readout unit must be suspected Another readout unit should be used to check the readings from the transducers and Soil Instruments should be consulted about the faulty readout unit Before proceeding to Steps 2 and 3 if possible the continuity should be checked between conductors and earthing screen of the electri
10. ecuring Screw Mounting Block Sensor Gauge Pick up Coil Tensioning Screws User Manual Section 4 Preparation of the Gauges Where a number of gauges are to be installed on a structural element it is essential that each gauge and its associated cables are accurately and effectively identified A permanent marking system should be adopted to ensure gauges can be identified throughout their working lifetime and this information safely stored for future reference Check the resistance between the two lead wires It should be around 150 ohms If the gauge contains a thermistor check its resistance Check the reading against that which should be obtained at the existing ambient temperature Any faulty units should be returned to the factory Gauges should not be opened in the field The choice of gauge installation location is a critical factor in the design of an instrumentation scheme Prior to installation of the gauges it is essential to plan the cable routing from the gauge location to the terminal position The cables should be marked and where possible extended before the gauge is installed Two approaches to cable routing are commonly adopted each with their own merits a Each gauge sensor coil is factory fitted with a length of cable to reach from the gauge location to the terminal This removes the need for jointing cables on site in often unsatisfactory conditions It is however the slightly more expensive option
11. f the number generated most equipment manufacturers display the unit multiplied by 10000000 or 10 The relationship between Period Units and frequency units is expressed as Pul frequency Period units are therefore convenient to measure but do not have a linear relationship to change in wire tension Calibration Constants Each instrument is supplied with a Calibration Constant value to convert the raw data into engineering units The value of the calibration constant will vary depending upon the engineering units into which the data is to be converted and the readout units For example the data from piezometers may convert into Kg cm mH20 Bar Psi etc and therefore the Calibration Constant for each will be different Some instruments have Generic Calibration Constants and others are calibrated to generate the Constant The constant is generated by using the following calculation Constant K Range Reading Full Range Reading Range Zero x 10 14 User Manual Appendix B reading from portable logger stable sensible and audio signal steady Does a continuity exist between earthing screen and conductor Check magnitude of resistance R between conductors Trouble Shooting Flowchart There is no reason to suspect a faulty instrument Yes gt A damaged cable or Yes damaged cable joint are suspected
12. ng of the strain gauge is as follows 910 Hz 830 F2 1000 Linear 10976 Period units x 10 For sweep excitation readout units set the sweep range to 400 1200 Hz Corrosion at the weld points can be inhibited by applying a coat of rust preventative paint IMPORTANT The final reading and position of the gauge should be accurately recorded since this detail will be required for interpretation of its readings User Manual Section 6 Protection and Cable routing of the Installation 6 01 Protection All efforts must be taken to protect the gauge during and after installation An insulated protective cover is available to protect the gauge from physical damage and the temperature effects of direct sunlight This can be either welded over the gauge installation or secured with threaded fixings Where the gauge is installed in a vulnerable position good practice is to spray the area with marker paint as a warning 6 02 Cable Routing Having established and marked the preferred route of the cables and decided upon the type of cabling arrangement to be adopted begin running the cables from the gauges furthest from the readout location Where cables are not to be ducted they should be strapped in a position where they are least likely to be damaged using strong tape or cable ties Cable should be supported every 400 500mm and care should be taken to avoid over stretching the cables especially where movement loading could take place
13. ore than one setting bar After welding cool the mounting blocks with a water soaked rag then slacken the screws and slide out the setting bar Clean away all welding slag using a chipping hammer and wire brush 5 01 Setting the Strain Gauge Clip the plucking coil over the gauge secure with the securing clamp as shown below and connect it to the readout box User Manual When the mounting blocks are welded in place the strain gauge is now positioned into the holes of the mounting blocks ensure that the grooved end of the gauge lies inside the mounting block without the slot and the gauge is orientated so that the coil and clamp are not in contact with the structure The cone point set screw should be tightened hard down into the V groove in one end of the gauge Note Do not rotate the gauge once the end has been clamped by the set screw Check that readings can be displayed by the readout unit The reading frequency can be made to increase by gripping the coil assembly and pushing in the direction of the free end Readings can be made to decrease by pushing directly on the free end When the desired reading is obtained mid range 2500us compressive readings approximately 3500ue and tensile strains approximately 150Q0us the free end is secured inside the mounting block by tightening down hard on the oval point set screws The reading may alter slightly during this operation which is normal The approximate mid position readi
14. soll INSTRUMENTS Arc Weldable Vibrating Wire Strain Gauge User Manual Man 175 6 0 2 06 08 14 Lucie Williams Phil Day Chris Rasmussen Manual No Revision Date Originator Checked Authorised for Issue User Manual Contents Section E FOWO caian a a E 3 Section Zs INIrOdUCTUO Masni a 4 Section 3 lt EGUIDMENE SUPPEA irisean a a AEEA KEA 5 Section 4 Preparation Of the GAUGES sssssss2222222222220202202222202u220u2u2u2u22uunnnnsnnnnnnnnnnnn 6 Section 5 Gauge MOUNTING aeiia OERA 7 5 01 setting the Strail GAUGE rrira AAs aa E AE A O AN E AAA 7 Section 6 Protection and Cable routing of the Installation susssssnunununnnnnnnnnnnnnnnnnnn 9 6 01 PFOCECUOM areais opea a a a a a A a 9 6 02 CIDE ROUNO a cae a a a N a A 9 SEction 7 Data MterpretatiOl isina AEA ARANNA NENN Aa REAA KAREA AREAN 10 Section 8 Troubleshooting Guide sisisiicissiisiccctentisdvccssandsiectsciscciaaciecentaseecdscanseieatsrisneians 13 Appendix A VIDFAtING Wire Data wiiesiatncsestericevstanacsessarneedstannceusureceanneiectientaunecensuxes 14 TFOUDIE Shooting FIOW GCHAR divensincitmeweriiarivanecirawirce teenie merawiitnaverenariMariedeerireiretrcnneaviednee 15 User Manual Section 1 Foreword Soil Instruments Vibrating Wire Arc Weldable Strain Gauge as with all our equipment has been designed to operate consistently in a construction site environment and is therefore relatively robust However it is essential that the equipment co
15. sure the ends of the strain gauge are not rotated as this may damage the gauge and result in unreliable readings Portable readouts or fixed data acquisition systems available from Soil Instruments will provide the necessary excitation to pluck the wire and convert the measured frequency to display the reading directly in microstrain User Manual Section 3 Equipment Supplied For each installation you should have been supplied with Two mounting blocks including gauge securing screws Sensor unit gauge securing clamp Each gauge is supplied with a pickup coil fitted with a user specified length of cable The cable can be spliced to other cables for routing to a terminal location Cables can be routed over distances in excess of 1000 metres without degradation of signal Together with these a setting bar should be used to accurately locate the mounting blocks for welding such bars are available from Soil Instruments Although gauges are checked prior to leaving Soil Instruments damage can occur during transit It is suggested that the gauges are visually checked immediately upon receipt Additionally it is prudent to check the operation using a vibrating wire readout device to ensure steady readings if an audio signal is available on the readout device this can give a good indication of the quality of the signal Before installation a note should be made of the batch factors for the Strain Gauges for future data interpretation S
16. vered by this manual is both operated and maintained by competent and suitably qualified personnel They must READ AND UNDERSTAND the procedures outlined in this manual before attempting installation or operation of the equipment on site Soil Instruments will not accept for repair under guarantee instruments that have been neglected or mishandled in any way User Manual Section 2 Introduction The Soil Instruments Arc Weldable Strain Gauge is intended primarily for long term strain measurements on structural steel members such as tunnel linings arches struts piles sheet piling etc The primary means of attachment is by conventional arc welding but they can also be used to measure strain changes on concrete or rock surfaces using anchors grouted into boreholes The nature of the instrument dictates that it is used to measure changes in strain i e change in length per unit length Strains are measured using the vibrating wire principle a length of steel wire is tensioned between two mounting blocks that are welded to the steel surface being studied Deformations i e Strain changes of the Surface will cause the two mounting blocks to move relative to each other thus altering the tension in the steel wire The tension is measured by plucking the wire and measuring its resonant frequency of vibration The wire is plucked and its resonant frequency measured by means of an electromagnetic coil positioned next to the wire Note En

Download Pdf Manuals

image

Related Search

Related Contents

User Guide - Kroll Ontrack    Gamma Manager_1.1 (G)  21A-352B597  電子体温計の性能テスト  Instructions 1  Integral IN1T1GERKBXK2 memory module  

Copyright © All rights reserved.
Failed to retrieve file