Home

AppendixB

image

Contents

1. project preliminari Technology Selection Module TSM Project Preliminary screens1 2 and 3 Edit Cost Spreadsheet DSS Inputs and Display Raw Costs and Marked up Costs Cost Spreadsheet Written to Intangible Costs and Benefits screen fi SESSION xls Yes Restart DSS Restart Cos Module No Exit DSS Figure B 16 Flow chart of the user interface with the cost module 20 ERE HEEE E 2 screen Figure B 17 Project preliminaries Cost Module Unit costs in the cost model are based on a cost index of 100 Figure B 18 Project preliminaries 3 screen Once all of the required project preliminary information has been provided by the user the CDSS will take the user to the Sheeting and Shoring screen Figure B 19 This screen asks the user whether sheeting and shoring will be required for the project It should be noted that sheeting and shoring will apply to any trenches as well as any entrance and exit pits required for the selected technologies This information is used by the program to calculate the trench and entrance exit pit volumes The CDSS assumes that all trenches and entrance exit pits are rectangular when viewed from the side 1 e trench depth does not increase or decrease over the length of the trench 22 Cost Module Figure B 19 Sheeting and shoring screen yes If the user indicates that sheeting and shoring will be required for the project
2. WATER MAIN RENEWAL DECISION SUPPORT SYSTEM Version 1 0 Developed for AWWA Research Foundation By Virginia aan Tech DESIGNERS CONSULTANTS Figure B 1 Start screen Enter Project Name fn on Project Information screen Identify type of problem Structural or pipe is experiencing Hydraulic on Preliminary Details screen Problem Yes Display Renewal Options Flow Capacity on the Renewal Options Evaluation Screen screen Project Specific Information screens 1 2 Preferred Renewal Methods screen Return to Preliminary Details Return to Project Specific Information Screen Yes Perform Cost Analvsis Cost Module Exit DSS Figure B 2 Flow chart of the user interface with the TSM The Project Information screen Figure B 3 is where the user enters the name of the project fn to be used for the current CDSS session This project name will be used later by the program to save the user input from the CDSS session into the following spreadsheet files 1 fn _TECH_INP xls This file contains the user input from the TSM portion of the CDSS 2 fn SESSION xls This file contains the user input from the CDSS session TSM and cost module as well as the cost spreadsheet that was used by the program to calculate costs For example if the user enters TestNo 1 as the project name the CDSS will create the files TestNo 1 TECH_INP xls and TestNo
3. Pipe diameter of existing pipe Sp For open trench Cover depth to top of pipe For entrance exit pits Pit depth B C D Sw Sp Slope 0 when sheeting and shoring will be used Slope Horizontal run Sw vertical rise Sp Figure B 21 Side sloping dimensions used in CDSS to calculate trench volumes 25 the number of service connection valves if any of the service connection pits can be shared between valves or if any of the service connections can be accessed through the entrance or exit pits The program only asks the user to provide information for those technologies that were selected on the Preferred Renewal Options screen Figure B 14 If the user selected the Open an existing file option from Figure B 4 the values that were entered during the selected session will be displayed on this screen The user must ensure that all of the requested information has been provided before clicking the Continue button to proceed to the next screen Information about the entrance and exit pits is provided by the user on the Entrance Pit Information and Exit Pit Information screens Figures B 22 and B 23 The user is only required to provide information for those technologies that were selected on the Preferred Renewal Options screen Figure B 14 If the user selected the Open an existing file option from Figure B 4 the values that were entered during the selected session will be displayed
4. and replacement technologies 14 Water Main Renewal Decision Support System r Horizontal directional drilling Jack and bore Figure B 13 Preferred renewal methods screen If portions of the pipe to be renewed are considered inaccessible i e highway crossings streams etc the user should treat the project as two separate scenarios in the CDSS in order for the program to select the most appropriate renewal technologies For example a project involves a 500 foot length of pipe to be renewed that crosses a 50 foot stream in the middle of the renewal length If the user attempts to treat the project as a single scenario the CDSS will not select any of the trenched replacement technologies for the project even though these technologies could be used to replace a majority of the renewal length While if the user treats the project as two separate scenarios he she could have a wide variety of technologies to choose from for the portion of the pipe that does not cross the stream and at have the CDSS determine the most appropriate technologies to be used for the portion of the pipe that involves the stream At this stage the user is offered four choices 15 1 Return to the Preliminary Details screen is selected 1f the user wants to restart the whole selection process This will take the user back to Figure B 6 2 Return to the Project Specific Information 1 screen is selected 1f the user wants
5. be displayed by the CDSS Upon selecting the Open an existing file option the user is led to the file box displaying all of the Microsoft Excel files in DSS_PIPE directory see Figure B 5 If the desired file is not in the DSS_PIPE directory the user should open the appropriate directory and select the file For example Figure B 5 shows the selection of the file goodl_Session xls in a directory called Dss 36 All changes to the file good1_Session xls will be saved as fn Session xls where fn is the project name entered on the Project Information screen Figure B 3 This file will be saved to the DSS_PIPE directory When the user has selected the file to be used he she must then click on the Open button in the bottom right corner of Figure B 5 This will take the user to the Preliminary Details screen Figure B 6 Open Look in Dss 36 Package a_session igood1_session a Tech_inp good1_tech_inp C input new Copy of Cost Model ver 22 rules_3 Cost Model ver 22 water File name good1_session Files of type Excel Documents Cancel Z Figure B 5 Dialog box to open a new file NOTE When selecting an existing file the user must select either one of the fn _session xls files or an Excel file containing the cost spreadsheet If the user has clicked on the Select an existing file button by mistake he she can exit the file box by cl
6. regarding the types of problems associated with the pipe or the Renew Pipe option to proceed to the Project Specific Information screens Figures B 10 and B 12 Water Main Renewal Decision Support System Al ES PA Replace with larger size pipe Add an additional parallel pipe lt gt Back to Problem Description Screen Continue Figure B 9 Renewal option categories screen The Project Specific Information screens Figures B 10 and B 12 respectively are where the user must provide the pipe and site specific information for the project The user must select the existing and replacement pipe material by clicking on the correct radio button and also manually enter all of the values in the blank boxes The Diameter of the New Pipe must be selected by the user by clicking the down arrow on the adjacent text box This will show a pull down menu with the available replacement pipe diameters If the user selected the Open an existing file option for the Selection of Cost Spreadsheet screen Figure B 4 then the values that were entered during the selected session will be displayed on this screen with the exception of the Soil Conditions If the user would like to change all of the values that were previously entered he she can click on the Reset button To aid the user in selecting the type of Soil Conditions applicable to their particular project Table B 1 is provided
7. run the program These files include 1 DSS exe the executable file to run the CDSS 2 cost xls a cost spreadsheet which stores data for cost computation and analysis 3 water xls a template file used to generate the output for the technology selection module TSM The presence of the above files implies successful installation and the user can proceed with the execution of the software NOTE Because the original cost spreadsheet cost xls will be modified by the CDSS upon execution of the program the user is advised to make a backup copy of the cost xls file into a directory different from the installation directory prior to running the program Running the CDSS Double clicking on the water tap icon in the DSS_PIPE directory initiates the CDSS Figure B 1 shows the first screen that appears in the program Clicking on the START button starts the program When the user starts the program he she will first go through the TSM portion of the CDSS which selects the appropriate renewal technologies for the project based on pipe and site specific information provided by the user Once the appropriate renewal technologies have been selected the user can utilize the cost module portion of the CDSS to perform present worth cost analysis of each selected technology to assist in the final selection process Figure B 2 provides a flow chart of the user interface with the TSM portion of the CDSS Welcome Iof ES
8. 1 SESSION xls within the DSS PIPE directory In general if fn is the project name the files fn TECH_INP XLS and fm SESSION XLS are created in the DSS_PIPE directory Once the required name is entered the user can proceed to the next screen by clicking on the Continue button E Water Main Renewal Decision Support System O x Enter the name of the project estNo 1 Continue Figure B 3 Project information screen The Selection of Cost Spreadsheet screen Figure B 4 is where the CDSS is instructed on which cost spreadsheet to use If the user selects the Start a new session option the user input from the CDSS session will be written to the cost xls cost spreadsheet by default and the user will be taken to the next screen NOTE First time users must select the Start a new session option Water Main Renewal Decision Support System Ox Se re Do you want to start a new session OR Work with a previously saved session 3 Open a previously saved Start a new session session Figure B 4 Selection of cost spreadsheet screen However if the user has previously completed a CDSS session which has been saved as fn Session xls he she can select the Open an existing file option and select the appropriate file to be used by the CDSS By selecting this option many of the user inputs provided during the previous session will automatically
9. APPENDIX B USER INTERFACE WITH THE CDSS The software for the Comprehensive Decision Support System CDSS is written in Microsoft Visual Basic 6 0 and runs in the Windows 95 98 environment It also requires the use of Microsoft Excel preferably Excel 97 The PC should have a Pentium 100 MHz processor or better and a minimum of 32 MB RAM for efficient processing The software by itself occupies approximately 4 MB of space on the hard drive Familiarity with Microsoft Excel is assumed in the design of this software package User friendly screens facilitate data entry analysis and output The user should familiarize him herself with the details given in this user manual before attempting to execute of the software Components Microsoft Visual Basic 6 0 has been used to create the Graphical User Interface for this software package This works as the front end of the program and provides the interface between the user and the cost spreadsheet program The cost spreadsheet program is a Microsoft Excel file which is used for data storage and computation Installation The CDSS is distributed along with a user friendly SETUP program that aids in the installation of the software Upon executing the SETUP program the user will be prompted for the selection of an appropriate folder directory for the installation Within this user specified installation directory a subdirectory named DSS PIPE will be created with the files necessary to
10. CAC concrete 8 Diameter of existing pipe inches Diameter of new pipe inches No of bends Renewal length feet fe 300 No of service connection 5 valves to be replaced a No of service connection valves No of isolation valves to 1111 No of isolation valves be replaced Note PVC and HDPE pipes are subject to permeation by Are hydrocarbons present tf Yes C No hydrocarbons Therefore if hydrocarbons are in the soil ecm present the user may want to re evaluate the use of PYC and HDPE pipes Reset Back Continue Figure B 11 Project Specific Information 1 with warning The Project Specific Information 2 screen Figure B 12 asks the user to provide more site specific information about the project If the user selected the Open an existing file option at the Selection of Cost Spreadsheet screen Figure B 4 then the value that was entered during the selected session for the Cover Depth will be displayed on this screen All other values must be provided by the user This screen is also provided with a Reset button if the user 12 would like to change all of the values that have been entered Once again the user must enter values for each field on this screen before clicking on the Continue button If the user has left any of the required fields blank and tries to proceed to the next screen a message will appear asking the user to provide the missing informa
11. However these may assist the user in his her final selection When the user is finished looking at the intangible costs and benefits he she can click on the Continue button to proceed to the next screen Intangible Costs and Benefits Minimal service interruption Bends tees valves and fittings should be removed before lining A long and successful experience record 4 bypass line is required to provide service to customers for four Substantial improvement in flow carrying capacity to seven days during the cleaning and lining process Can be effective in solving water quality problems Work cannot be performed as effectively in the winter when there is a danger of freezing the bypass systems Contractors may not be locally available Bue to high mobilization costs the process is not cost effective for small rehabilitation projects i e those less than 5 000 ft The diameter of the pipe will be reduced Cement mortar lining can result in high pH water for a short duration of time May not be suitable lining material in systems with very soft water Figure B 32 Intangible costs and benefits screen Figure B 33 displays the Exit CDSS screen At this point the user has 3 options 1 If the user wants to restart the CDSS from the beginning he she can click the Restart DSS button 2 Ifthe user wants to exit the CDSS he she can click the Exit CDSS button 3 If the user wants to
12. The user should consult the appropriate soil map of the area for proper selection 10 Water Main Renewal Decision Support System x Figure B 10 Project specific information 1 screen Table B 1 Soil type by size Soil type Size millimeters Hard ground mixed gravel and cobble hard to drill Clay less than 0 002 Sand 0 05 1 0 Source U S Dept of Agriculture 1985 The user must enter values for each field on this screen before clicking on the Continue button If the user has left any of the required fields blank and tries to proceed to the next screen a message will appear asking the user to provide the missing information 11 If the user selects either PVC or HDPE as the replacement pipe material on the Project Specific Information 1 screen Figure B 10 a question will appear at the bottom left corner of the screen Figure B 11 regarding the presence of hydrocarbons at the site If the user answers Yes to hydrocarbons being present in the soil a warning note in red will appear indicating that PVC and HDPE are subject to permeation by hydrocarbons and the user should reevaluate the use of PVC or HDPE at this site Figure B 11 E Water Main Renewal Decision Support System Iof x Pipe Characteristics If replacement is an option select a pipe material PVC C HDPE DI Steel m Existing pipe material epoca c pyc e Prestressed e see
13. e information for those 17 technologies that were selected from the Preferred Renewal Options screen If the user selected the Open an existing file option from Figure B 4 the values that were entered during the selected session will be displayed on these screens The Project Preliminaries 1 amp 2 screens ask the user to answer questions regarding the use of flushing cleaning bypass and traffic management for each of the technologies selected on the Preferred Renewal Options screen The questions can be answered by selecting the radio button next to the Y Yes or the N No The CDSS assumes that cleaning and flushing will not be performed with any of the replacement technologies NOTE Figure B 15 Project Preliminaries 1 will be displayed only if rehabilitation technologies were among those selected on the Preferred Renewal Methods screen Figure B 14 If there were no rehabilitation technologies selected then the user will be taken directly to Figure B 17 Project Preliminaries 2 The Project Preliminaries 3 screen Figure B 18 asks the user to provide more project specific information It is required that the user answer all questions displayed on each of the Project Preliminaries screens before clicking the Continue button 18 xi Ol E z D o E MA cae cece dle ARANA es 1 screen Figure B 15 Cost module
14. ent worth cost analysis for At this stage of the program all of the user input and the recommended technologies are written to an output file which is named fn TECH_INP xls where fn is the project name that the user entered on the Project Information screen Figure B 3 and saved in the DSS_PIPE directory 16 Water Main Renewal Decision Support System r Horizontal directional drilling Jack and bore Cathodic protection Close fit sliplining Pipe bursting Conventional sliplining Figure B 14 Preferred renewal methods screen with addition of new technologies Present Worth Cost Analysis The cost module portion of the CDSS asks the user project specific information regarding the technologies that were selected by the TSM This information along with the pipe and site characteristic information that was entered by the user in the TSM is written to a cost spreadsheet that calculates the present worth cost of each selected technology The cost spreadsheet is either the cost xls file or the spreadsheet selected by the user from Figure B 5 A flow chart of the user interface with the cost module portion of the CDSS is provided in Figure B 16 Once the user has selected Perform Cost Analysis option from the Preferred Renewal Options screen Figure B 14 the CDSS will display the Project Preliminaries screens Figures B 15 B 17 and B 18 The program only asks the user to provid
15. erating material and disposal costs that will be associated with each category Some of the quantity values are calculated by the spreadsheet using input data provided by the user during the CDSS session these cells have been highlighted purple and protected in the File Edit View Insert Format Tools Data Window Help 218 x Meat aO y ma Bee FARR OSH SE SRY limas B 2 AA Ma 100 ana o B uaa 0 2 S22 4 OG EE B C D Rate Units Description or Comments Equipment Rental Costs Vehicles Geoprobe Siday Pickup truck 4x4 Siday Water truck 6000 gal Siday CIPP truck Bday Flatbed truck 3 ton Siday Jet truck Siday Instruments Depth to water meter Bday Video camera Siday Metal detector Siday 1 Pipe Utility locator Siday Pitot tube Pressure gauge assembly Siday Cleaning Tools Mechanical scraper Siday Pig day Winch truck s Siday Safety Equipment Safety Epquipment Slot day Barriers with flashers Siday Cones Siday Direction signs w posts Siday Arrow Boards Siday Excavating and Construction Equipment Pavement saw Siday Dump truck 12 ton Siday Backhoe loader 80 hp Siday Tamper single 35 Ib Siday Steel wheel roller Siday Air compressor 250 cfm Siday 50 ft air hose 1 5 in diarneter Siday Welding machine 300 amp Siday Pumps 2 Diaphragrn pump Siday 2 Suction line 20 feet day 2 Discharge line 20 feet Siday 2 Centrifugal boo
16. he she will go to the Duration and Service Connection Information screen when the Continue button is clicked However if the user answers No to the sheeting and shoring question four additional questions will appear on this screen These additional questions refer to the side sloping dimensions to be used for the project Figure B 21 illustrates the side sloping dimensions used by the program If the user selected the Open an existing file option from Figure B 4 the values that were entered during the selected session will be displayed on this screen Information regarding project duration and service connection excavations is provided by the user on the Duration and Service Connection Information screen Figure B 20 The project duration is used by the CDSS to calculate the costs associated with bypassing the water main and any associated traffic control costs Therefore the duration entered by the user should 23 be the amount of time that the associated technology will need bypass service and require traffic control It should be noted that the number of service connection excavations may be less than Cost Module P e 5 Figure B 20 Duration and service connection information screen 24 A No of inches to be excavated on either side of the pipe B No of inches to be excavated below the pipe No of inches to be excavated above the pipe before side sloping begins D
17. icking on the cancel button located the bottom right corner Figure B 5 Figure B 6 shows the Preliminary Details screen where the user identifies the nature of the problem associated with a selected pipe The problems are identified by clicking on the circular radio buttons labeled Yes and No The user has the option of selecting the No button or leaving it blank when the problem does not exist If the user makes a mistake in choosing the options he she can click the Reset button at the bottom left corner of the screen to clear the previous selections and the user can start again If the pipe is experiencing either a structural or hydraulic problem clicking on the Continue button will take the user to the Flow Capacity Evaluation screen Figure B 7 However if the pipe is experiencing only joint leak or water quality problems the user is directed to the Renewal Option Category screen Figure B 9 E Water Main Renewal Decision Support System A x Problem Description Structural problem C Yes No Hydraulic problem Yes C No Joint leaks C Yes O No Water quality problem Yes C No Please check all that apply Any items not checked will default to No Reset Back Continue Figure B 6 Preliminary details The Flow Capacity Evaluation screen Figure B 7 allows the user to determine whether the existing pipe and renewed pipe are undersized The
18. on these screens The user must ensure that all of the requested information has been provided before clicking the Continue button to proceed to the next screen Cost Module Include those pits that will function as both entrance and exit pits im mm mm o E MIA AT Figure B 22 Entrance pit information screen Cost Module A Xx Exit Pit Information Exit Pits Technology Cement mortar lining Epoxy resin lining Conventional sliplining Close fit sliplining CIPP Narrow trench Pipe bursting Horizontal directional drilling AN a MA NA AN Jack and bore D Figure B 23 Exit pit information screen In order to perform the present worth cost analysis the user is asked to provide the following information for each applicable pipe liner material the initial number of years when no maintenance costs are expected the number of years where maintenance costs will be incurred and the expected uniform annual maintenance costs on the Annual Maintenance Costs screen Figure B 24 On this screen the replacement pipe material selected by the user on the Project Specific Information 1 screen Figure B 10 will be used as the pipe material for all replacement technologies selected on the Preferred Renewal Options screen Figure B 14 while the user must enter values for each rehabilitation technology that was selec
19. on this screen the CDSS selects the cost xls cost spreadsheet by default However if the user selects the Open an existing file option on this screen the cost spreadsheet that was selected by the user will be edited NOTE First time users must select the Yes button on this screen since unit cost information and quantity information for each cost category in the cost xls spreadsheet must be provided To assist the user Appendix A contains a sample scenario with the cost spreadsheets completely filled out NOTE As soon as the cost spreadsheet is opened the unit cost worksheet will be displayed Figure B 28 and the following message will pop up while in Excel Do you want to save changes to cost xls The user must click on the Cancel button in order to continue making changes to the spreadsheet Contractual Factors Cost Module Figure B 25 Unit cost modification screen The cost spreadsheet is organized into several worksheets each performing cost computations for a specific cost category Section 1 provides a brief explanation of each of the worksheets contained in the cost spreadsheet Once the unit cost information has been entered the user can proceed to the next worksheet by clicking on the tab at the bottom of the screen to modify cost category information For each cost category assumptions were made regarding the types of direct costs 1 e the equipment labor op
20. red Renewal Options screen Figure B 14 will be displayed on Figures B 30 and B 31 NOTE The costs displayed in Figures B 30 and B 31 should not be considered actual costs but should be treated as comparative costs only They are not a substitute for a detailed contractor s bid for constriction For actual costs the user should contact a local contractor Figure B 29 Cost computation screen Cost Module a 8 110 916 72 421 64 013 AAA JE daddi a Present Worth Capital Cost Present Worth of Annual Maintenance Costs EUAC Equivalent Uniform Annual Cost Figure B 30 Calculated raw costs screen Contractual Factors Cost Module u E E MON MO E O a MO ML l Figure B 31 Calculated marked up costs screen The intangible costs and benefits for selected technologies can be displayed on the Intangible Costs and Benefits screen Figure B 32 To see the advantages and disadvantages associated with a technology the user can click on the pull down menu and select a particular technology This will cause the advantages and disadvantages to be displayed in the corresponding boxes The boxes have scroll bars at the bottom and sides to allow the user to scroll through the text displayed The advantages and disadvantages do not influence the selection of a technology by the CDSS or the direct costs of the selected technologies
21. restart the CDSS from the cost module he she can click the Restart Cost Module button Contractual Factors Cost Module Figure B 33 Exit DSS screen
22. ster pump Siday 3 Diaphragm pump Siday 3 Suction line Bday 3 Discharge line Siday PIPIN Unit Costs Pre Construction Survey A Mob amp Demob A Ske Preparation A PermitFees A FlushingCostDetails A CleaningCostDetals A fa oraw gt ly Autoshapes NADO Ed UA o 2 A S BM Ready n PET OT Figure B 26 Unit cost worksheet S Eile Edit view Insert Format Tools Data Window Help 1 x IE Close E Save s B RA g amp o y 3 gt Y 75 Y E fe Replace l a tata ale a ama o 4 as u 7 5829008 Al v Al B E D E F G H l J K LG 1 Quantity Units Unit Cost Units Total 2 3 Pipe Installation 4 Equipment Costs E Backhoe loader 80 HP 1 day s 290 10 day 290 6 Other 1 0 7 Other 2 0 8 Labor Costs B Equipment operator medium 1 Person day s 227 20 HPerson day 227 10 Skilled worker foreman 1 Person day s 240 40 HPerson day 240 11 Skilled worker 2 Person day s 224 40 WPerson day 449 12 Other 1 0 13 Other 2 0 14 Operating Costs 15 Other 1 0 16 Other 2 0 17 Material Costs 18 Piping 1000 feet 10 497 Moo 10 437 19 Sand 3241 cy 3 75 fey 122 Assume 6 bedding 20 Other 1 0 21 Other 2 0 22 Disposal Costs 23 Other 1 0 24 Other 2 0 25 26 User Entered Total Cost 0 27 28 Total Equipment Costs 290 29 Total Labor Costs 916 30 Total Operating Costs 0 31 Total Material Costs 10 559 32 Total Disposal Costs 0 33 To
23. tal Cost 11 765 34 v M4 MZ Cathodic 7 Cathodic Summary Open Trench Cost Details Open Trench 4 i of Ready TI Or NM Figure B 27 Open trench cost details worksheet worksheet to avoid being written over by the user If there are additional direct costs that are not displayed on the worksheet additional rows have been provided Other 1 and Other 2 so the user can enter the quantity Column C in Figure B 27 value and the unit cost Column E in Figure B 29 value directly on the worksheet However if the user does not wish to break the costs for each category down into such detail each worksheet provides the user with the option to enter a User Entered Total Cost Value Row 26 on Figure B 27 Ifthe user wishes to enter a total cost value the quantity fields for all other direct costs must be set to zero Figure B 27 displays and example of the Open trench cost details cost category worksheet Once all of the necessary changes have been made to the cost spreadsheet the user must save the file and exit Microsoft Excel When the user exits Microsoft Excel he she is taken back to the Construction Cost Factors screen Figure B 28 in the CDSS The Construction Cost Factors screen Figure B 28 asks the user to enter the following factors which will be used by the CDSS to calculate total marked up costs for each technology Contractor profit influenced by geographic location degree of compe
24. ted For example Figure B 14 displays Close fit sliplining Cathodic protection Open trench Horizontal directional drilling and Jack and bore as the preferred renewal options Therefore the user must enter the annual maintenance cost values for DI selected by the user on Figure B 10 NOTE The annual maintenance costs associated with cathodic protection are for the maintenance associated with the anodes not the host pipe The user must ensure that all of the requested information has been provided before clicking the Continue button to proceed to the next screen Contractual Factors Cost Module Iof x Annual Maintenance Costs Pipe Liner Material m n A Years Years year fi 0000 m Initial number of years where NO maintenance costs are expected n Number of years in which maintenance costs will be incurred A Expected uniform annual maintenance costs NOTE m n useful life of pipe liner material Cement mortar lining Epoxy resin lining Close fit Sliplining CIPP Cathodic protection D Continue Figure B 24 Annual maintenance costs screen The Unit Cost Modification screen Figure B 25 is where the user indicates whether he she would like to modify the cost spreadsheet This will open the Microsoft Excel program and open the cost spreadsheet specified by the user on the Selection of Cost Spreadsheet screen If the user selects the Start a new session option
25. tion Table B 2 describes the site characteristic information requested on this screen A Water Main Renewal Decision Support System Figure B 12 Project specific information 2 screen 13 Table B 2 Definition site specific information from Figure B 12 Factor Definition Rural Re paving and extensive traffic management are not needed work space is not limited Urban Re paving and traffic management needed Limited work space Insufficient work space available at the ground surface to operate machinery Unrestricted work Sufficient work space available at the ground surface to operate machinery space Major obstructions There are other underground utilities within 3 ft of the pipe presence of building foundations in the path of the pipe to be renewed or underground boulders High water table Groundwater can seep into the trench and or entrance and exit pits Cover depth Depth of soil to the top of the pipe The information from the two project specific information screens is used by the CDSS to select the appropriate renewal technologies using the knowledge base discussed in briefly Section 1 0 of the user s manual and in more detail in Chapter 5 of the Decision Support System for Distribution Piping Replacement and Rehabilitation Report The renewal technologies selected by the CDSS are displayed on the Preferred Renewal Methods screen Figure B 13 The renewal technologies are grouped into rehabilitation
26. tition and project size Project oversight refers to the cost of field supervision and project management activities Engineering design and support influenced by project complexity project size and engineering services to be provided Legal and administrative fees influenced by permitting difficulties land acquisition requirements outside legal services requirements Contingency influenced by uncertainties in project definition and level of cost estimate The user will only be required to provide cost information for those technologies that were selected on the Preferred Renewal Options screen Figure B 14 If the user selected the Open an existing file option from Figure B 4 the values that were entered during the selected session will be displayed on this screen The user must ensure that all of the requested information has been provided before clicking the Continue button to proceed to the next screen i g poo Figure B 28 Construction cost factors screen To compute the raw costs the user must click on the Compute raw costs button on the Cost Computation sheet Figure B 29 This allows the raw and marked up costs to be computed based on all of the user inputs and displayed on the Calculated Raw Costs screen Figure B 30 and the Marked up Costs screen Figure B 31 Only the costs for those technologies that were selected on the Prefer
27. to modify only pipe and site characteristic information This will take the user back to Figure B 10 3 Exit the CDSS is selected 1f the user does not want to make any changes to the existing session and does not want to perform the cost analysis 4 Continue with the cost calculation is selected 1f the user want to perform a present worth cost analysis on the technologies displayed on this screen Ifthe CDSS did not select one or more technologies that the user would like to include in the cost analysis the user can include these technologies by using the pull down menus below the selected rehabilitation and replacement technologies For example to add a rehabilitation technology the user clicks on the down arrow located under the box that displays the selected rehabilitation technologies This activates a pull down menu showing the list of remaining rehabilitation technologies The user selects a technology by clicking on 1t with the mouse and then clicking the Add button This technology will then be displayed in the main Rehabilitation Technologies box In the example shown in Figure B 14 Cathodic protection Conventional sliplining and Close fit sliplining have been added to the selected rehabilitation technologies The technologies displayed on the Preferred Renewal Methods screen at the time the user clicks on the Perform Cost Analysis button will be the technologies that the model performs a pres
28. user must provide information about the original pipe at the time of its original installation as well as in its present condition and the renewal pipe liner Once the required information has been entered the user must hit the Flow evaluation button so that he she can calculate the percent of original flow capacity for the existing pipe and the percent of original flow capacity for the renewed pipe An example is provided in Figure B 8 Based on the flow evaluation the user is asked to decide if the pipe is undersized or not After answering either Yes or No to the Is the pipe undersized question the user can proceed to the Renewal Option Category screen which will display the appropriate renewal option categories based on the type of problem indicated by the user and whether the user has determined the pipe to be undersized or not E Water Main Renewal Decision Support System Figure B 7 Flow capacity evaluation screen Water Main Renewal Decision Support System r Figure B 8 Flow capacity evaluation screen after flow evaluation With the pipe problems identified and flow capacity evaluated for structural and hydraulic problems only the CDSS will display the applicable renewal option categories Figure B 9 At this point the user can select the Back to Preliminary Details option which will take the user back to the Preliminary Details screen to modify the information

Download Pdf Manuals

image

Related Search

AppendixB appendix b appendix burst appendix book appendix b fsis appendixbasis appendix burst symptoms appendix body part appendix before or after references appendix b of notice 2024-20 appendix bno appendix betekenis appendix burst survival rate appendix book meaning appendix bedeutung

Related Contents

USER MANUAL - Wa  Alcatel OneTouch 318D Owner's Manual  取扱説明書ダウンロード  WV-NP502    LG E739BKDU Data Sheet  Preview Sewing Information for #21013  

Copyright © All rights reserved.
Failed to retrieve file