Home
        ASSAULT WAKEBOARD TOWER
         Contents
1.          M12 X 40mm BOLT  _5 JM12X A5MMBOLT       FORUSEWITHITEMS 3 30    _6 JMI2X875mMBOLT   4  FORUSEWITHITEMS 3        8 JM10X 75mmBUTTONHEAD BOLT   4  FORUSEWITHITEMS 27               9 JMTONVLONLOCKNUT       4                                 8      FOR USE WITH ITEMS   6  FOR USE WITH ITEMS   3  FOR USE WITH ITEMS   3                     FOR USE WITH ITEMS   3  1    28 JLOWERSIDERAILS       2                       3                                      FOR USE WITH ITEMS   16  FOR USE WITH ITEMS   16    FOR USE WITH ITEMS   19  FOR USE WITH ITEMS   30    1  1  1  1  1    11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27    BOARD RACK PACKAGE   PER PACKAGE   2 PACKAGES ARE GENERALY INSTALLED PER TOWER        ITEM   DESCRIPTION QTY COMMENTS  2    _ 1  Forks gja  LOGO PLATE WITH BUNGEE CORD            6 X 20mm BOLT FOR USE WITH ITEMS   1  2    M8 X 16mm BOLT USED TO ATTACH RACK ASSEMBLY TO TOWER    GUIDE   PWB ASSAULT 004    HOLLY   i WAKEBOARDING PRODUCTS       STEP 1    M12 SPLIT The mounting feet will need to be assembled to the side  LOCK WASHERS rail fittings  followed by attaching them to the side rails         lt        LOWER SIDE RAIL    M12 X 45MM    x    M12 X 40MM    AW                STEP 2    Tape off all the areas that may potentially come into con   tact with the side rails     Once the feet are connected to the side rails  hold the  side rail up to your boat  Once the rail is aligned with your  windshield use a small piece of tape to mark th
2.    ASSAULT WAKEBOARD TOWER    INSTALLATION GUIDE          INSTALLATION SUPPORT            GUIDE   PWB ASSAULT 004       OCA   l WAKEBOARDING PRODUCTS       IMPORTANT INFORMATION    This Aerial wakeboard tower fits motor boats with 76 108 inch wide beam widths    This measurement is taken from the Port to Starboard mounting points    Do not fold the tower without having the top section securely fastened to the side sections with  the fasteners provided    Lubricate the telescopic side section tubes that slide in and out of the top section during instal   lation  We recommend using a light grease to help the tubes slide together without binding              e Donotfold the tower by yourself    e      not assemble tower on the ground and then try to install it on the boat    e      not use impact drivers to install any hardware    e Torque set screws to 35ft Ibs   e Torque shoulder bolts 50 ft lbs   e Torque tower foot all thread to 65 ft lbs   e We recommend using red Loctite threadlocker on the threads of all fasteners that will        be  adjusted while lowering or raising the tower    e Check the top section for burr   s before installing side sections to prevent the scratching and  marking of tubes  Aerial does        cover damage caused by burr   s during installation    e Ifthe area of the deck where the tower will be mounted has a fiberglass thickness of less than       inch  a backing plate kit must be purchased and installed to provide adequate support    e Please leav
3.  The  clamp located on the base of the switch blade will be connected to the  lower side rail  We recommend making sure that the clamps on both sides  of the tower are located the same distance from the end of the side rail so  that your tower looks symmetrical    During the clamp installation  don t forget to install the rubber clamp col   lar s between the clamp and the lower side rail  These will be required to  allow the clamps fo firmly fasten in place        10 GUIDE   PWB ASSAULT 004    STEP 14              612227    WAKEBOARDING PRODUCTS       Drilling the top section    The X measurement is a great way to make sure that your  tow point is      the center of your boat  To do this  measure  from the tow point to your rear foot  then to your other  foot  Cover your boat with an old sheet or old cover to  make removing the metal shavings easy  Someone should  hold the top section while you drill     Using the pre drilled holes in the top section tube  mark the  drilling positions      the front leg tubes    Before making vour marks  check to ensure that the tow  point is aligned correctly and positioned vertically  The tow  point should also be positioned on the rear of the top sec   tion tube so that the logo plate is facing towards the bow  of the boat    We then recomend drilling the holes with a smaller drill bit   smaller than the 27 64    drill bit  to make a pilot hole     Following the pilot holes you just drilled  use a 27 64    drill bit  to create the clearanc
4. e hole for the joining bolts    As each hole is drilled we recommend inserting each bolt  so that      keeps the parts aligned while drilling the next  hole     GUIDE   PWB ASSAULT 004     GLY   l WAKEBOARDING PRODUCTS       STEP 17    Once all the holes are drilled and all the fasteners are inserted   M10 x 75mm   Button Head Socket Bolt  the nylon lock nuts can  be installed and all of the fasteners and nuts can be firmly tight   ened    You may need to vacuum up the debris and aluminum shavings     Note  We recommend using Red Loctite Threadlocker when  installing these fasteners and any other fasteners that will not  require loosening once installed        STEP 18    To install the board rack fingers  use the socket head cap  screws provided and attach the fingers to the diamond  shaped plate  This diamond plate will then be installed to  the rear switch blade legs         MIA  Res       Once you are happy with your tower installation and all   of the fittings are lined up to allow the tower to fold and  function correctly it will then be important to firmly lock the  fittings in place to prevent any unwanted rotation or loos   ening  We recommend using threadlocker during this step        M6 X 12MM    12 GUIDE   PWB ASSAULT 004    HOLLY   l WAKEBOARDING PRODUCTS       STEP 20   LOWERING THE TOWER          Lowering the tower requires at least 2 people    Never trailer your boat with the tower in the lowered position   Always check to make sure all fasteners are tight and 
5. e position of  the mounting feet        5 GUIDE   PWB ASSAULT 004     OLD   l WAKEBOARDING PRODUCTS       STEP 4    Once the desired position is achieved  place one of the  nylon mount washers over the piece of tape and trace  around it with a permanent marker     Transferring marks from the other side    This step is very important  After taping the second side of  the boat in approximately the same areas as the first side  you will need to measure the distance that you marked on  the first side of the boat       It is best to take measurements from the back of the boat  and mark with blue tape  Be sure to measure from the  same point on both sides           GUIDE   PWB ASSAULT 004    HOLL   i WAKEBOARDING PRODUCTS       Drilling  Once you have marked your 4 holes  check the  underside of the deck for wires     If necessary  you should move the wires out of   the way while you drill  We recommend drilling a small pilot  hole which will keep the 17 32    drill bit from walking  mov    ing   A small rat tail file can be used to ease the edge          keep the gel coat from chipping    Be careful of wires        SMALL 17 32    DRILL BIT COUNTERSINK    DAIMETER  THROUGH GELCOAT   PILOT HOLE      Gelcoat         GUIDE   PWB ASSAULT 004    HOLL   l WAKEBOARDING PRODUCTS       STEP   Install the tower mounts to the boat deck      the order shown      the diagram   Note  in the case where the deck of your boat is less than 1 4    thick  a reinforcing kit  is required to thicken and 
6. e the foam wrap on the tower until the installing is complete    e Please note that when towing your boat you may notice what appears to be movement in  your tower  It is important to understand that the boat is also moving on the trailer and that this  movement can be visually deceiving    e Frequently wash your tower with soap and water    e Asrequired  use Mothers Mag  amp  Aluminum polish to restore your tower to its original finish    e BE CAREFUL when assembling this product  We CANNOT be liable for any burring or scratch   ing that may occur when sliding sections in and out of each other    e NEVER modify this product      any way    e NEVER climb  stand or ride on this product    e NEVER tow watersport tubes or inflatable   s with this or any other Aerial Wakeboard Tower    e ALWAYS use caution with approaching bridges or overpasses    e ALWAYS inspect this product for loose bolts  fittings or damage before each use      Always carefully CONSULT the user manual for proper installation  maintenance and usage     Aerial is not liable for personal injury or property damage from the use of this or any other  Aerial product     GUIDE   PWB ASSAULT 004        HOLLY   i WAKEBOARDING PRODUCTS    EXPLODED VIEW       3 GUIDE   PWB ASSAULT 004    WAKEBOARDING PRODUCTS       PARTS LIST    TOWER PACKAGE       ITEM   DESCRIPTION COMMENTS    QTY  2 25  TOWER JOINT   THREADED  INCL  M6 X 12mm BOLT                      2 25  TOWER JOINT   THRU HOLE  INCL    6    12mm BOLT   pecekmount
7. joint  This is then followed by attaching the clamp  to the lower base  using the stainless steel socket head cap  screw         GUIDE   PWB ASSAULT 004    HOLLY   i WAKEBOARDING PRODUCTS       STEP 11    The lower section of the switch blade can now be assembled to the  lower fittings and clamp using the trim washer  M12 X 45mm socket  head cap bolt and threaded lap joint        STEP 12 Insert the front leg hinge joint into the lower section of the front arm   repeat for the other side   Its important not to completely tighten  the fittings as some adjustment will necessary before the installation is  complete     Before inserting the top section  make sure there are no burrs in the  top section  Someone will need to hold the top section for you as you  insert the front arm into the top section and fit the hinge into the side  rail         IMPORTANT NOTES         Lubricate telescopic parts with a light grease before sliding together     Grease will not prevent the smaller diameter tube from being  scratched by the top section tube during insertion so be very care    ful not insert the side section tube any further than the final installation  width        Once the sides and top section are assembled the fittings that con   nect to the ends of the front legs can now be firmly tightened so that  they do not rotate     STEP 13    The rear switch blades can now be installed by attaching the top switch  blade fitting      the fitting located on the upper section of the front leg 
8. reinforce the deck in the mounting locations     FLAT DECK   MOUNT ASSEMBLY CURVED DECK   MOUNT ASSEMBLY          12 X 75MM      MI2X75MM                        BLACK NYLON WASHER    Se BLACK NYLON WASHER  mm      MOUNT    4       MOUNT  NYLON WASHER    NYLON WASHER       CURVED RUBBER WASHER    FLAT DECK    L    REINFORCEMENT Pars           RUBBER WASHER  eo           Ced  ALUMINUM BACKING PLATE  DT ALUMINUM BACKING PLATE    4e                           4 NYLON LOCK NUT    CURVED DECK       REINFORCEMENT    STEP 8    Measuring from your windshield  check the distance to the  side rail to make sure both sides are symmetric     Ll    Te III    i            8 GUIDE   PWB ASSAULT 004     GLY   l WAKEBOARDING PRODUCTS       STEP 8   CONTINUED       The side rails need to be mounted straight up and down  If  they are leaning in or out  this will cause a problem with the  tower when you want to fold it        STEP 9    SPLIT LOCK WASHER    M6 X 12MM         Assembling the Switch Blade  Rear Leg              THREADED LAP JOINT Start at the top of the switch blade and attach the trim                 SPLITLOCK WASHER washer  shoulder bolt and threaded lap joint    M12 X 40MM We recommend assemblying all the blade components    before installing the blade on the tower   M12 X 45MM            M12 X 40       fe SPLIT LOCK WASHER              THREADED LAP JOINT  14   0    M10 X 25MM         SPLIT LOCK WASHER    STEP 10    You will then need to attach the lower base to the thread   ed lap 
9. secure before  using the tower again     OPTION A OPTION B  DISCONNECT DISCONNECT  LOOSEN       LOOSEN    STEP 21   INSTALLING THE NAVIGATION LIGHT                      NAVIGATION LIGHT   SHIPPED SEPARATELY        The navigation light is shipped separately   It is designed to be installed      the top of the tow point     For a clean wiring installation the wires supplied can be passed  through the center of the tow point  along the inside of the top sec   tion and down inside the front leg tube  The wires will need to exit the  front leg tube just above the fittings and then be passed over the fit   tings before entering back into the side rail front tube  Finally the wires  will exit the side rail front tube just above the mounting foot and then  enter the deck of the boat  through a hole that will need to be drilled   so that thev can be connected to a switch and power source     Note  The tower is not supplied with pre drilled wiring holes as each  customer mav have a different wiring requirement depending on how    thev fold their tower or the accessories that thev will mount to the  tower         www aerialwakeboarding com    GUIDE   PWB ASSAULT 004    
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
User Manual Mounting and Installation Notes Servovalves  Heath Zenith SL-4100 User's Manual  Philips SBC5380NB User's Manual  HーTACHー - 日立の家電品  Archos 1 Vison  FORERUNNER ® 4 0 5 manuale dell`utente  haze-gard dual - BYK Additives & Instruments  Operação Symmetra® PX    Respondus 4.0    Copyright © All rights reserved. 
   Failed to retrieve file