Home
Trial Column Request Form
Contents
1. 420 Lexington Ave Ste 2335A New York NY 10170 Phone 212 370 0033 x 109 E mail Support Shodex net CAPTURE THE ESSENCE Terms and Conditions The Shodex Demo Program allows you to test one or more of our analytical HPLC columns depending on availability For a period of 30 days you can evaluate our column performance for your specific application The demo will be shipped to you free of charge however you will bear the cost of return shipment Demo columns are used for testing purposes only The guard column must be used in line with and before the analytical column When satisfactory results are attained the user can purchase a factory sealed column from our warehouse The Demo columns remain the property of Showa Denko America throughout the customer trial period Please do not damage or label the items or box that are out on loan All contents of the original packaging including Certitficate of Analysis and User Manual must be returned After the 30 day testing period all demo columns column guard must be returned within 14 days No product returns are accepted after this 14 day return period and the user will be billed for the full amount of the product Please include the chromatogram of your trial run along with a signed non hazardous cetrificate with the return shipment of the demo unit All units are to be returned in like condition as received from Showa Denko America normal use expected Please sign and incl
2. ude this contract with the return of the demo column Return Checklist Demo column in original packaging Cert of Analysis User Manual Sample conditions form Sample chromatogram End User Signature and Date NOTE This form must be signed and Initial Conditions next page must be completed before the trial column and guard can be shipped Column LC Conditons and Checklist please fill completely Column analog if proprietary Samplemetrn over O S SS oes S a ss A S S Total load mass on SR ES load per injection x injections column Total number of injections rove O a ee ti e aii Se replaced ao oo TUS check for leaks fe o etc in box a A 1 Initial conditions section unshaded areas must be completed before the trial column and guard can be shipped
Download Pdf Manuals
Related Search
Related Contents
Millar Pressure-Volume Systems MPVS Especificaciones Técnicas PSB Speakers CW160R Speaker User Manual Configure the stick reader 3D Lift Plan Manual Yellow Jacket 40812 Refrigeration System Analyzer (Total)Old FCP 600 組付・取扱説明書 Copyright © All rights reserved.
Failed to retrieve file