Home
        Completion Barrier Valve (patent applied for)
         Contents
1.        Caledyne 2010 Page 2 of 9 www caledyne co uk    Number     Issue    Technical Manual    Caledvne          Technical Specification    5 1 2  x  3 1 2  4 1 2  4 1 2  5 1 2     Parameter m m e   9 5 8   NEN id dl x 9 9 8  _    Large Bore     26 4mm 2 44 4mm 2 44 4mm 3177 3mm 3330 0mm   105 3    108 0      108 0      125 1    131 1      B 88 90mm 114 30mm   114 30mm   140 60mm 140 60mm   3 500      4 500      4 500      5 535      5 535        C  min  71 73mm 82 47mm 82 47mm 115 85mm 120 5 mm   2 824    3 247      3 247      4 561      4 747       140 08mm 149 23mm   153 08mm   204 28mm 212 8mm   5 515   5 875      6 027      8 043      8 378       E 88 90mm 114 30mm   114 30mm   140 60mm   140 60mm   3 5007   4 500    4 500    5 535    5 535     BENT 2013 3mm   2050 2mm   2050 2mm   2334 6mm   2428 0mm   79 37   80 77   80 77   91 97   95 67    BENT 1135 6mm 1165 6mm   1165 6mm   1455 8mm 1514 0mm   44 7    45 9    45 9    57 3    59 67    B 967 7mm 1002 7mm   1002 7mm   1211 8mm   1260 0mm   38 1    39 5    39 5    47 77   49 6      628 5mm 643 5mm 643 5mm  38 5mm  68 0mm  24 7  25 9  25 9  29 1  30 2     895 7mm 925 7mm 925 7mm 1095 8mm 1140mm           35 3    36 47   36 4    43 17   44 97   3 1 2  9 24 4 1 2  4 1 2  5 1 2  234 5 1 2  234  Upper connection  note 1  NEW VAM   15 14 NEW   15 14 NEW   NEW VAM   NEW VAM  Pin VAM Pin VAM Pin Pin Pin  3 1 2  9 24 4 1 2  5 1 2  234 5 1 2  234  Lower connection  note 2  NEW VAM   15 14 NEW   15 14 NEW   NEW VAM   NEW VAM  Pin 
2.  Operational Procedures    For installation of this item of equipment  refer to the appropriate operations manual  but these notes are given  as guidance     The CBV is made up to the tubing string and run in hole  It may be installed either open or closed   Gravel Packing    1  If carrying out gravel packing operations with the CBV  the shifting tool is normally positioned at the  end of the wash string  so the CBV is automatically closed when the wash pipe is withdrawn   2  Once the valve is closed it may be pressure cycled open     Pressure Cycle to Open    1  Apply pressure to the tubing above the maximum threshold pressure as defined in the technical  specification  Hold this pressure for 5 minutes    2  Bleed of pressure to a figure below the minimum threshold pressure as defined in the technical  specification  Hold this pressure for 5 minutes    3  On the bleed down of the last cycle  the valve will open     WP Shifting Tool  The WP Shifting tool can be used to shift the CBV open closed on wash pipe  coil tubing  drill pipe or slickline     1  Once the valve has been cycled open  the WP shifting tool is used to close it again  The WP shifting  tool is set up with shear out keys  so that the internal sleeves are repositioned    Further open and close operations are done with the WP shifting tool set up with auto release keys   RIH to depth    POOH and latch shifting profile    Jar up to shift profile sleeve and close ball    At full travel the shifting tool will auto r
3.  latch shifting profile    Jar down to shift profile sleeve and open ball    At full travel the shifting tool will auto release    POOH    Further open close operations can then be carried out using a suitable CBV shifting tool     pu CP A I    Debris stops the valve from being mechanically opened     RIH with hydrostatic bailer or similar and remove debris from on top of the ball   POOH    Use the WP Shifting Tool or HEST    RIH and tag the ball    POOH and latch shifting profile    If the profile cannot be latched repeat steps 1 to 6    Once shifting profile is latched  Jar down to shift profile sleeve and open ball   At full travel the shifting tool will auto release    POOH     oo ELENCO IM    Paraffin build up in the Shifting Profiles  or similar        Caledyne 2010 Page 8 of 9 www caledvne co uk    Number     Issue    COC Technical Manual  CEA    29 03 10 0000030000       Caledyne    1  Fit key set to suit CBV profile size into the HEST Base Assembly    2  Make up the HEST to coiled tubing    3  RIH to depth    4  At depth begin jetting through HEST with suitable solvent    5  Travel in out of hole jetting all profiles    6  Increase pressure to value detailed in the HEST Technical Manual to inflate the keys   7  Pick up the profile and attempt to shift the CBV ball open closed    8  Ifthe sleeve is still unable to move repeat steps 4 to 6 until the sleeve can move freely   9  Continue to shift ball open closed a number of times to ensure free movement    10  POOH     
4.  rmm A 27 ESOS QNA    Hy  SOON AN  FA a     S e z kk a iem m Da my Ju  pos uA er RARA e itin  ee x Mio  Mis te lA S E                     ENEE   a Att hm ce MA MAI AMI  AUT MM  mima imam A OE SA A RE     xs e  x uos cm 54 A      EXP     QE     NN SS SE         kos ddad     SNKKKKKKKKKKN  ddaa dadda ddd     ARAM RAR     AK          NOS pin l bd ee eS See ASS aha  NS    rd i       OPH SSS       Completion Barrier Valve   Recommissioned Locked Open     Caledyne 2010    Page 5 of 9    www caledyne co uk    29 03 10    Caledvne       Caledyne 2010    P mV          PERO TM     e    Technical Manual          tw    E p mm  AE e ue  il nm          EUN ME ii      mtra A e gei Ti A A       WP Shifting Tool       Stinger       HEST    Page 6 of 9       Number     0000030000    www caledyne co uk    Number     Issue    COC Technical Manual  CEA    29 03 10 0000030000       Caledyne    Shipping Storage Preparations       1  Ensure the valve is left open   2  Fit thread protectors to the upper and lower connections     3  Place the CBV in a suitable shipping crate  Ensure that Silica Gel is included in the crate     Care and Maintenance    1  Ensure thread protectors are fitted to the upper and lower connections at all times   If the tool is being stored for more than 3 months  it should be stored vertically to help prevent the  internal o rings taking a set    3  The CBV is not field redressable  The tool should be returned to Caledyne or an approved  refurbishment facility for redress    
5. 5    16  17  18    19  20     21    22      23     nw    25      26      27    28      29    30  ET    32      33    34    85  E       86     37          Caledyne 2010 Page 4 of 9 www caledyne co uk    0000030000  Caledvne    Technical Manual       Number             F  G   0  8 c D 3  G   a  2                  PL S Ss sed AE E TR A p                          MM ENT NUN T pee PS  AAA PA ira A memes a AAA TOWN SSS i a               L     e             E  SSS ANN BULL 227 B EF MIS    SFL Parro FF SS ET SSMA ee a EEE  SS COQUE    Ln i RT TR TR TCR RC ee AAA  ti Li    MER RAROS DOS  gt                  AAA     Lo ba me NENNEN  ll       FERARI FEFFE iii  OOO E OOO    TE   m ANA CEP am mn mam am am am rna a X         A  ee a A S ANS                    Completion Barrier Valve     Locked Closed Position    es    sy  OI A Duae SI REE EERE Pire     ma Berta NAT    o innotat ys Ma  e celica  NN ie N CHRON ROCA HO NONO HC NC RC HONO HONO m m NOR iO DS ris s DRUG e  s  n  l f   1           z AAA RE a e i i a A ARS SUA   TH HFIEF E PT PO E et AN ao T                I ED  FT             E OSOS ri AA   er DN E A A y 5 A A n a   AAA l   A AAAAAKAAA gt A  XS a A E ana     B  m                 a               A  B     E A AN  SSN SN       fa ie te a na    MM A       ir a A Gee a A Tc TRY RC  Ds Peu l i    Lim  AOS  2S ee e    SSSSSSS KN    f       d NS SAS    Completion Barrier Valve     Cycled Open Position             e     TT a  MI A i   T       SS ATT          NNNM a MON SS aa Mi  i i    A
6. Ball cannot be opened and must be milled   The CBV ball has a centre dimple looking up hole when in the fully closed position which acts as a pilot for    milling operations  Mill selection and method should be determined with reference to best practices for  fishing and milling operations        Caledyne 2010 Page 9 of 9 www caledyne co uk    
7. Technical Manual    Caledvne          Completion Barrier Valve  patent applied for     Description   The Caledyne Completion Barrier Valve  CBV  is a down hole barrier  valve  which uses a ball to provide isolation between the upper and lower  completions     The CBV may be opened remotely by applying tubing pressure cycles   which actuate an opening mechanism at the top of the tool     The CBV may be mechanically opened and closed with a shifting tool   both before and after it is cycled open        Key Benefits  Forces due to pressure differentials across the ball do not affect the  open close mechanism or the remote opening module     Smooth internal bore with a minimal number of locations for debris to  collect     Remote opening module can be replaced for different actuation modules  or to vary the number of pressure cycles to open     Multiple remote opening modules may be fitted without increasing the tool  length  giving full redundancy across this part of the tool     Internal equalizing mechanism across the ball allows for reduced loads to  open the ball under high differential pressures     Trigger mechanism can be independently tested prior to assembling  inside the valve     Application  e Formation isolation when installing the upper completion   e Packer setting valve    Certification  Consult your Caledyne representative           Caledyne 2010 Page 1 of 9 www caledyne co uk    Number     Issue    COC Technical Manual  CEA    29 03 10 0000030000       Caledyne
8. VAM Pin VAM Pin Pin Pin  1 20 cycles  5 000psi  4 000psi  3 000psi  1 000psi  500psi  0 150  C       172 500lbf 294 000lbf   294 000lbf   398 000Ibf 398 000lbf  NEW VAM NEW VAM   NEW VAM   NEW VAM NEW VAM  Yield Yield Yield Yield Yield    1 2 F of S   1 2 F of S     1 2F of S     1 2 F of S   1 2 F of S    AISI 4140 45 18 22Rc 80ksi   AISI 420 18 22Rc 80ksi 13 Cr  Inconel 718  UNS NO7718   per NACE MRO175    Tensile rating  80ksi Material     Metallurgy Options       HEST Base Assembly Size 2 200 2 200  2 200  3 000  3 000           Caledyne 2010 Page 3 of 9 www caledyne co uk    Number     Issue    COL Technical Manual  CEA    29 03 10 0000030000       Caledyne    Bill of Material  Description  Top Sub  Hydrostatic Housing  Outer Extension  Lower Coupling  Ball Housing  Lock Housing  Bottom Sub  Upper Hydrostatic Piston  Lower Hydrostatic Piston  Profile Sleeve  Key Housing  Locking Key  Snap Ring  Hyd Piston Interlock Key  Side Plate A  Side Plate B    10    12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  2   28  29  30  31  32  33  34  35    Trunnion  Ball Seat Assembly  Transfer Sleeve  Snap Ring  Ball Seat  Cvclic Trigger Sub  No Go Ring  Burst Disc Assembly  Adjuster Rod  Va    x Vs    Long Socket Head Set Screw  14  UNC x 14    Long Brass Shear Screw  Wave Spring  O Ring Viton 70  Back Up Nitrile 90  O Ring Viton 70  Back Up Nitrile 90  Tee Seal  Tee Seal  36 Tee Seal  37 147 NPT Flush Plug    PLAA2528010A    Item    6  8  Ea    10      12       13    14  1
9. elease    POOH     QUO UIS de       Caledyne 2010 Page 7 of 9 www caledyne co uk       Technical Manual  29 03 10 0000030000  Caledvne  Stinger    The Stinger is mounted on the bottom of an upper completion  The CBV is installed closed  When the upper  completion is installed the WP Shifting Tool will open the valve  On removal  the valve is automatically closed     1   2   3   4   5   6     HEST    Fit Stinger to bottom of upper completion    RIH to depth  The Stinger will pick up the lower shifting profile  opening the ball   Continue RIH to depth    To close the ball  POOH with upper completion    The Stinger will pick up the upper shifting profile  closing the ball    Continue POOH     The High Expansion Shifting Tool  HEST  is a coil tubing deployed shifting tool allowing the operator to run  through restrictions above the CBV and expand the shifting keys out to locate the profile once at depth   Nozzles at the bottom of the HEST also allow the operator to jet through the tool to clean up profiles prior to  shifting     Fit key set to suit CBV profile size into the HEST Base Assembly    Make up the HEST to coiled tubing    RIH to depth    At depth begin jetting through HEST    Increase pressure to value detailed in the HEST Technical Manual to inflate the keys   Pick up the profile and shift the CBV ball open closed    POOH     a ey    Contingency Measures    Pressure cycling does not open the valve     Use the WP Shifting Tool or HEST    RIH and tag the ball    POOH and
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
AFC PC-LS  Coup de pouce CLE : la lecture, une chance !  アレイ366XA取扱説明書 - 株式会社ティ・アンド・シー・テクニカル    ModeEmploiMSA19108_LIVRET 1  rascal a bit of a  Dell M1000E User's Manual    LED フラッシュライト取扱説明書 ご使用方法      Copyright © All rights reserved. 
   Failed to retrieve file