Home
MP200 in Enclosure Manual V.1.01
Contents
1. 1 8 mm mm mm mm CI Cc o o mm mm mm CI Figure 2 11 Display Components for Mounting in Enclosure e Display module and touch screen 1 e Panel with cutout 8 e Display installation nut 7 e Anti rotation Tee 5 e Rear module containing the electronics to run the display 2 Electro Industries Gauge Tech Doc E180701 The Leader In Power Monitoring and Smart Grid Solutions 2 2 Installation 2 Press the Anti rotation tee 5 into the display module 1 in the hole provided 9 Figure 2 12 Inserting the Display into the Panel 3 Insert the display module with the anti rotation Tee attached into the cutout aligning the anti rotation tee so that it passes through the small hole in the panel 10 4 Place the display installation nut on the portion of the display passing through the panel and finger tighten it 5 Using the socket wrench supplied 6 tighten the display installation nut 7 with a torque between 1 2 and 1 Nm 10 6 to 17 7 in lb Electro Industries Gauge ech Doc E180701 The Leader In Power Monitoring and Smart Grid Solutions 2 Installation Top of panel s Yellow button 2 1 Insert and Oo push Oo oO C1 eu Cc oO C1 oO C1 oO oO Cc oO Cc oO Free Locked Figure 2 13 Connecting the Rear Module to the Display Module 6 Carefully insert the rear module 2
2. ar mr 5 P me Wa li E jo ye 2 3 2 Installation 2 2 Installation Step 2 Drill the Wiring Holes Cut the holes you need in the bottom of the enclosure for the power CT and communications wiring See the figure below for the allowable location TEL TT TE a IE ST 6 En eS D LS DT os Le 1417 OO AN 3 os my Var aa E 38 10 mm 3 75 in 1 50 in HOLES ou can cut holes BOTTOM VIEW OF ENCLOSURE inside this area f 1 00in 25 40mm 1 50in 38 10mm 1 50in 38 10mm rl CZ Figure 2 2 Location for Punch Entries CZ The drawings show the area in the bottom of the enclosure where wiring holes can be cut 1 25 40mm from the front of the enclosure 1 5 38 10mm from the right side of the enclosure 1 5 38 10mm from the back of the enclosure and 3 75 95 25mm from the left side of the enclosure Doc E180701 2 4 Ci Electro Industries Gauge Tech The Leader In Power Monitoring and Smart Grid Solutions 2 Installation CAUTIONS e There are numerous methods for making wire entry holes in the enclosure but it IS imperative that no loose material generated during the process remains in the enclosure During installation and cutting the wire holes all equipment mounted inside or on the enclosure shall be protected from loose material e No matter what procedure is used t
3. Shark MP200 in Enclosure For Three Phase and Single Phase MP200 Metering Systems Er j _ g T 11 f p a _ DE O D t L O 2 v Installation amp Operation Manual V 1 01 July 10 2014 Ja Electro Industries GaugeTech The Leader In Power Monitoring and Smart Grid Solutions 1800 Shames Drive Westbury NY 11590 Tel 516 334 0870 Fax 516 338 4741 Email sales electroind com This page intentionally left blank MP200 in Enclosure Installation and Operation Manual Version 1 01 Published by Electro Industries GaugeTech 1800 Shames Drive Westbury NY 11590 All rights reserved No part of this publication may be reproduced or transmitted in any form or by any means electronic or mechanical including photocopying record ing or information storage or retrieval systems or any future forms of duplication for any purpose other than the purchaser s use without the expressed written permission of Electro Industries GaugeTech 2014 Electro Industries GaugeTech Shark is a registered trademark of Electro Industries GaugeTech The distinctive Shapes styles and overall appearances of all Shark meters are trademarks of Electro Industries GaugeTech MP200 is a trademark of Electro Industries GaugeTech LonWorks is a registered trademark of Echelon Corp BACnet is a registered trademark of ASHRAE Modbus is a registered trademark of Sc
4. Ca yr Il e a PR FS Il FT raga Tr rs Ha E E per HR Ma E Le Bottom mounting screws Figure 2 9 Location of Mounting Screws 10 Fold back the CT wiring labels in the upper right and left corners of the enclosure see figure above and tighten the upper two mounting fasteners Ci Electro Industries Gauge Tech Doc E180701 0 18 The Leader In Power Monitoring and Smart Grid Solutions 2 Installation 2 4 Installation Step 4 Install the Display The display ships separately from the enclosure The contents of the display box are shown below Figure 10 10 Display Kit Contents 1 2 3 Power Supply 4 RS485 Serial Cable 10 feet Mounting Hardware 1 Display 2 Rear Module 3 4 5 anti rotation tee 6 socket wrench 7 installation nut attached to the back of the display These items are included in the display box but are only needed if you want to mount the display remotely rather than in the enclosure If you are mounting remotely cover up the display mounting hole that is in the enclosure cover Follow the instructions beginning on the next page to mount the display in the enclosure front cover i Electro Industries Gauge Tech Doc E180701 2 14 The Leader In Power Monitoring and Smart Grid Solutions 2 Installation 1 There are 5 parts to the display as installed in the MP200 in enclosure
5. In Power Monitoring and Smart Grid Solutions 1 2 l Introduction 1 3 Storage Although it has been well packaged this equipment should not be stored outdoors If the equipment is to be stored indoors for any period of time it should be stored with its protective packaging in place Refer to the MP200 Metering System Installation and Operation manual on the enclosed CD for the meter s storage requirements The temperature rating for enclosure storage is 20 to 50 C 1 4 Compliance UL cUL Listed UL508A File number E358101 Electro Industries Gauge ech Doc E180701 The Leader In Power Monitoring and Smart Grid Solutions 1 3 l Introduction This page intentionally left blank Electro Industries Gauge ech The Leader In Power Monitoring and Smart Grid Solutions Doc E180701 1 4 2 Installation 2 Installation WARNING All safety codes safety standards and or regulations shall be Strictly observed in the installation operation and maintenance of this device This device shall be installed in an un energized condition and as per the National Electric Code AVERTISSEMENT Tous les codes de s curit normes de s curit et r glement doi vent tre suivis strictement pour l installation le fonctionnement et la maintenance de cet appareil Cet appareil doit tre install hors tension conform ment au code lectrique national National Electric Code Choose a moun
6. remplissage et autre contaminant de l entr e de l enceinte qui peuvent provoquer une condition dangereuse de l quipe ment i Electro Industries Gauge Tech Doc E180701 pA The Leader In Power Monitoring and Smart Grid Solutions 2 Installation 2 1 Installation Step 1 Unpack the MP200 in Enclosure The MP200 in enclosure ships in two parts e The meter enclosure e The mountable color display The display is shipped separately in order to protect it from being damaged during shipping Instructions for the enclosure begin on the next page Section 2 4 contains instructions for mounting the display Electro Industries Gauge ech Doc FE180701 The Leader In Power Monitoring and Smart Grid Solutions 2 2 2 Installation The enclosure components are shown in the image below e A Current inputs 24 of them e B CT shorting blocks 8 of them e C Voltage inputs and 4 fuses e D Ground wire on back side of enclosure e E Ground wire on enclosure door e F Cable assembly e G Display connectors e H Hole for mounting the display 666 noce Oona Fm Cove r Od hD Sar TOTE Figure 2 1 MP200 in Enclosure as Shipped Electro Industries Gauge Tech The Leader In Power Monitoring and Smart Grid Solutions Doc E180701 If ordered optional Add on Protocol ProtoCom ProtoCom Lon Agen ii 4 1 F z i T z mw ba dd T oa a a i r
7. AY HAVE VOLTAGE PRESENT THAT CAN CAUSE SEVERE PERSONAL INJURY OR DEATH DE ENERGIZE ALL CONDUCTORS BEFORE BEGINNING TO PERFORM ANY WIRING ACTIVITY TO OR WITHIN THE MP200 IN ENCLOSURE AVETI SSEMENT LE CABLAGE DES COMMANDES PEUT AVOIR UNE TENSION PR SENTE QUI PEUT PROVOQUER DES BLESSURES GRAVES POU LA MORT METTRE HORS TENSION TOUS LES CONDUCTEURS AVANT DE COMMENCER LA REALISATION D UNE ACTIVIT DE C BLAGE DANS L ENCEINTE DE L ASSEMBLAGE MP200 Electro Industries Gauge ech Doc E180701 The Leader In Power Monitoring and Smart Grid Solutions 3 3 3 Electrical Wiring pS CT SHORTING BLOCK J M N WHITE CURRENT A HI q BLAC CURRENT LQ WHITE CURRENTBHI q TO MP200 CURRENT INPUTS BLAC CURRENT B LO WHITE CURRENT C HI BLAC CURRENT C LO ONLY ONE 3 PHASE CIRCUIT IS SHOWN DUPLICATE IT FOR ADDITIONAL CIRCUITS FUSE BLOCK SS UNIT POWER L Jas LEE Cd ia 7 VOLTAGE A a Q SS SS TO MP200 VOLTAGE7 POWER INPUTS ii nn a VOLTAGE B S T a I iL lt 5 EE EE EE OLTAGE C M NEUTRAL LOAD Figure 3 2 MP200 Y Three Phase Wiring Diagram Ci Elect
8. TY IS IN LIEU OF ALL OTHER WARRANTIES EXPRESSED OR IMPLIED INCLUDING ANY IMPLIED WARRANTY OF MERCHANTABIL ITY OR FITNESS FOR A PARTICULAR PURPOSE ELECTRO INDUSTRIES GAUGETECH SHALL NOT BE LIABLE FOR ANY INDIRECT SPECIAL OR CONSEQUENTIAL DAMAGES ARISING FROM ANY AUTHORIZED OR UNAUTHORIZED USE OF ANY ELECTRO INDUSTRIES GAUGETECH PRODUCT LIABILITY SHALL BE LIMITED TO THE ORIGINAL COST OF THE PRODUCT SOLD Electro Industries GaugeTech Doc E180701 The Leader In Power Monitoring and Smart Grid Solutions Use of Product for Protection OUR PRODUCTS ARE NOT TO BE USED FOR PRIMARY OVER CURRENT PROTECTION ANY PROTECTION FEATURE IN OUR PRODUCTS IS TO BE USED FOR ALARM OR SECONDARY PROTECTION ONLY Statement of Calibration Our instruments are inspected and tested in accordance with specifications published by Electro Industries GaugeTech The accuracy and a calibration of our instruments are traceable to the National Institute of Standards and Technology through equipment that is calibrated at planned intervals by comparison to certified standards For optimal performance EIG recommends that any metering device including those manufactured by EIG be verified for accuracy on a yearly interval using NIST trace able accuracy standards Disclaimer The information presented in this publication has been carefully checked for reliabil ity however no responsibility is assumed for inaccuracies The information contained in this d
9. cation of the four mounting points on the surface where the enclosure will reside 63 50 mm 381 00 mm 163 50 mm 2 50 in 15 00 in 2 50 i 31 75 mm 31 75 mm 1 25 in DT eee _ 1 25 in Upper mounting holes 7 amp Se sy Q 2 VS 449 33 mm 449 33 mm 17 69 in 17 69 in N 9 s g S 2 NS Ca pea Lower mounting holes 26 92 mm 26 92 mm 1 06in d 1 06 in 163 50 mm 381 00 mm 63 50 mm 2 50 in 15 00 in 2 50 in Figure 2 8 Mounting Hole Locations and Dimensions 3 Prepare the mounting points using attachment means appropriate for the surface Supporting the enclosure 4 Put two fasteners screws or bolts in the top two mounting locations the fasteners shall have a head diameter of no greater than 0 65 and a maximum body diameter of 0 25 5 Install upper mounting screws leave a 3 8 gap between the screw head and the mounting surface 6 Lift the enclosure and hang it from the top two bolts The Leader In Power Monitoring and Smart Grid Solutions Ei i j Electro Industries Gauge Tech Doc E180701 2 12 2 Installation 7 Install lower mounting screws from the inside of the cabinet Loosely tighten 8 1f necessary shim between the mounting surface and the enclosure to compensate for any irregularities 9 Tighten the lower two fasteners PAR Bend label upward to access the two top on MOUNtING Screws nl F CE
10. closure models are pre wired and programmed for either three phase or single phase operation NOTE The current inputs are only to be connected to external current transformers provided by the installer The CT s shall be Listed to ANSI IEEE C57 13 and rated for the current of the meter used A DISCONNECTING MEANS AND UPSTREAM PROTECTION SHOULD BE INSTALLED FOR ALL CIRCUITS A SHORT CIRCUIT TYPE TERMINAL BLOCK IS PROVIDED FOR THE CURRENT TRANSFORMER CIRCUIT INPUT WIRING SPECIFICATIONS Shorting Block 6 22 AWG CU 10 32 20 Ibf in 2 3 N m Fuse Block 10 18 AWG CU 10 32 20 Ibf in 2 3 N m 12 max CU 8 32 6 Ibf in 0 68 N m Earth Ground 10 12 AWG CU 8 32 10 Ibf in 1 2 N m Electro Industries Gauge ech Doc E180701 The Leader In Power Monitoring and Smart Grid Solutions 3 1 3 Electrical Wiring 3 1 Wiring Instructions WARNING First connect Earth Ground as shown in the figure below AVERTISSEMENT Branchez d abord la mise la terre comme indiqu dans le dessin ci dessous Earth Ground Figure 3 1 Earth Ground Connection Electro Industries Gauge ech Doc E180701 The Leader In Power Monitoring and Smart Grid Solutions 3 2 3 Electrical Wiring Understand the diagram s that pertain to your unit before you begin the field wiring The following figures show the available wiring options Understand your sys tem and use the appropriate figures WARNING CONTROL WIRING M
11. configura tion or the MP200 S single phase circuit configuration and comes standard with either a 3 x5 or 5 x7 touch screen display BACnet or LonWorks protocol is available as an add on to the existing standard Modbus capability See Chapter 6 for ordering instructions 1 1 Product Handling CAUTION READ AND UNDERSTAND THE INSTRUCTIONS CONTAINED IN THIS DOCUMENT BEFORE ATTEMPTING TO UNPACK INSTALL OPERATE OR MAINTAIN THIS EQUIPMENT Every effort is made to insure that the equipment arrives undamaged and ready to be installed Packing is designed to protect internal components as well as the enclosure Do not remove protective packing until you are ready to install the equipment When you receive the equipment you should inspect the shipping container for any obvious signs of rough handling and or external damage that occurred during trans portation Record any external and internal damage for reporting to the transportation carrier and EIG All claims should be as specific as possible and include general order numbers You will find a plastic bag of instruction booklets and or CDs in the shipping container Store these documents in a Safe place g Electro Industries GaugeTech Doc E180701 1 1 The Leader In Power Monitoring and Smart Grid Solutions l Introduction 1 2 Safety Precautions WARNING All safety codes safety standards and or regula tions must be strictly observed in the in
12. el can be removed to facilitate drilling of wiring holes See the follow ing procedure Electro Industries Gauge ech Doc E180701 The Leader In Power Monitoring and Smart Grid Solutions 2 6 2 Installation 2 2 1 Removing and Reinstalling the Panel If it will make it easier to drill the wiring holes you may remove the panel C i natale FU AAA AAA 4 U iion O bk D AT T7 TEE i bid a E EO mi y e p eS pe ar Bids Oooo ne ii pe tap ce Cy a Coe Lu e i i Fille j i i t z Mi Ea Figure 2 4 Removing the Panel 1 If the MP200 in enclosure is equipped with a ProtoCom ProtoCom Lon add on protocol unit remove all connections from the ProtoCom ProtoCom Lon 1 2 Disconnect the green ground wires from the door E 3 Open the cable clamps on the door J and remove the cable assembly F 4 Remove the green ground wires on the lower left side of the enclosure D 5 Remove the four nuts one in each corner of the panel K 6 Carefully remove the panel from the enclosure Drill the wiring holes per the instructions in Section 2 2 You can then re install the panel 1 Place the panel on the four mounting studs in the enclosure and install and tighten a nut on each of the studs K Ci Electro Industries Gauge Tech Doc E180701 2 7 The Leader In Power Monitoring and Smart Grid Solutions 2 Installation 2 Connect the green ground wi
13. he installer shall verify that the hole cutting process will not damage any of the wiring or components installed inside or on the enclosure a The two recommended procedures for cutting the wire entry holes are as follows e Use a C frame punch to cut the wire entry holes This type of punch does not require a pilot hole A typical C frame punch is shown below Figure 2 3 C Frame Punch e Regular punch 1 Place a magnet inside the enclosure where the pilot hole is to be cut and completely cover the area with masking tape or other very sticky tape 2 Drill the pilot hole from the outside and do not let the drill pass more than into the enclosure 3 Remove the tape magnet and cuttings and punch the hole i Electro Industries Gauge Tech Doc E180701 2 5 The Leader In Power Monitoring and Smart Grid Solutions 2 Installation b After wiring and before energizing vacuum the inside of the enclosure to make sure that it is free of foreign material If a vacuum is not available use an alternate method to clean the inside of the enclosure Do not use compressed air or pressurized gas to clean the inside of the enclosure as this may force cuttings into areas that cannot be seen creating a hazard ous condition IMPORTANT All wire entry into the enclosure shall be accomplished with the use of recognized fittings or strain reliefs Bare holes shall not be used NOTE the pan
14. hneider Electric licensed to the Modus Organization Inc Electro Industries Gauge ech Doc E180701 The Leader In Power Monitoring and Smart Grid Solutions Customer Service and Support Customer support is available 9 00 am to 4 30 pm Eastern Standard Time Monday through Friday Please have the model serial number and a detailed problem descrip tion available If the problem concerns a particular reading please have all meter readings available When returning any merchandise to EIG a return materials authorization number is required For customer or technical assistance repair or calibration phone 516 334 0870 or fax 516 338 4741 Product Warranty Electro Industries GaugeTech warrants all products to be free from defects in material and workmanship for a period of four years from the date of shipment During the warranty period we will at our option either repair or replace any product that proves to be defective To exercise this warranty fax or call our customer support department You will receive prompt assistance and return instructions Send the instrument transporta tion prepaid to EIG at 1800 Shames Drive Westbury NY 11590 Repairs will be made and the instrument will be returned This warranty does not apply to defects resulting from unauthorized modification misuse or use for any reason other than electrical power monitoring The MP200 in Enclosure is not a user serviceable product THIS WARRAN
15. l connectors to the meter N Remove the 4 mounting screws securing the MP200 to the panel 8 Remove the meter The Leader In Power Monitoring and Smart Grid Solutions Ei i j Electro Industries Gauge Tech Doc E180701 5 5 5 Maintenance 5 2 Reinstalling the Meter Follow this procedure to reinstall the meter 1 Place meter in its location on the panel 2 Tighten the 4 mounting screws 3 Insert all connectors into the appropriate sockets on the meter 4 Connect the 48 current leads to the meter making sure they are attached in the proper order 5 Install the 4 fuses in the fuse block in their proper location 6 Unscrew all shorting screws on the CT connection block See the figure below TURN SCREWS COUNTER CLOCKWISE TO OPEN THE CT Figure 5 2 Opening the CTs 7 Verify that no foreign material remains inside the enclosure clean it out if found 8 Energize all circuits and verify operation Ci Electro Industries Gauge Tech Doc E180701 5 6 The Leader In Power Monitoring and Smart Grid Solutions 6 Ordering Information 6 Ordering Information ENCMP200 Y 60 10 V2 485P MDSN ProtoCom 1 2 3 4 5 6 7 8 1 Model ENCMP200 MP200 Metering System in NEMA 1 Enclosure 2 Circuit Configuration Y Three Phase WYE S Single Phase Only 3 Frequency 50 50Hz 60 60Hz 4 Current Class 10 10 Amp Secondary 2 2 Amp Secondary 5 V Switch Key Pack V1 Transduce
16. ng block The pre installed jumper connects all lows together and to ground Ci Electro Industries Gauge Tech Doc E180701 5 1 The Leader In Power Monitoring and Smart Grid Solutions 5 Maintenance WARNING The screws need to be screwed down until the screw makes contact with the internal bar enabling the bar to become electrically common with the terminal strip and grounded Les vis doivent tre viss es jusqu ce que la vis soit en contact avec la barre interne permettant a la barre de devenir lectriquement commune a la bar rette de raccordement et mise a la terre The figure below shows where the screws are located that must be tightened down to Short the CTs IMG dad Eh Le TE ONE TOUT DOO iy Het Dia 299999 DE Die le ame sr Es ee FE THT Figure 5 1 CT Shorting Block Location Electro Industries Gauge Tech Doc E180701 The Leader In Power Monitoring and Smart Grid Solutions 5 2 5 Maintenance TURN SCREWS CLOCKWISE C TO SHORT THE CT 5 2 Shorting the CT WARNI NG When you re install the meter make sure all CT connections are made BEFORE unscrewing the shorting screws See Section 5 2 AVERTI SSEMENT Lorsque vous r installez le compteur assurez vous que toutes les connexions de TC transformateur de courant sont faites AVANT de d visser les vis de cour
17. ocument is subject to change without notice Symbols Used in This Manual This warning symbol indicates that the operator must refer to an important explanation in the operating instructions The word follow ing the symbol indicates the type of warning being given Ce symbole d avertissement indique que l op rateur doit se r f rer une explication importante dans les instructions d utilisation Le mot suivant le symbole indique le type d avertissement ne soit donn CAUTION The instructions given must be followed to prevent damage to equipment Les instructions doivent tre respect es pour viter d endommager l quipement WARNING The instructions given must be followed to prevent serious injury to people Les instructions doivent tre respect es pour d viter de graves blessures aux personnes Electro Industries Gauge ech Doc E180701 iii The Leader In Power Monitoring and Smart Grid Solutions This page intentionally left blank Electro Industries Gauge ech The Leader In Power Monitoring and Smart Grid Solutions Doc E180701 Table of Contents Table of Contents Customer Service and Support Il Product Warranty Il Use of Product for Protection lil Statement of Calibration lil Disclaimer lil Symbols Used in This Manual iii 1 Introduction 1 1 1 1 Product Handling 1 1 1 2 Safety Precautions 1 2 1 3 Storage 1 3 1 4 Compliance 1 3 2 Installation 2 1 2 1 Installation Ste
18. p 1 Unpack the Enclosure 2 2 2 2 Installation Step 2 Drill the Wiring Holes 2 4 2 2 1 Removing and Reinstalling the Panel 2 7 2 3 Installation Step 3 Mount the Enclosure 2 9 2 4 Installation Step 4 Install the Display 2 14 2 5 Installation Step 5 Lock the Enclosure 2 18 3 Electrical Wiring 3 1 3 1 Wiring Instructions 3 2 4 Operation 4 1 4 1 Overview 4 1 Ci Electro Industries Gauge Tech Doc E180701 TOC 1 The Leader In Power Monitoring and Smart Grid Solutions 4 2 Troubleshooting 5 Maintenance 5 1 Removing a Meter From Service 5 2 Reinstalling the Meter 6 Ordering Information Electro Industries Gauge Tech The Leader In Power Monitoring and Smart Grid Solutions Table of Contents Doc E180701 4 1 5 1 5 6 TOC 2 l Introduction 1 Introduction The MP200 in Enclosure lets you expand your switchgear capability and or easily meter circuits without expensive and time consuming redesign Simply mount the enclosure in any convenient location next to your switchgear or on a wall and you are ready to go with no downtime This is an ideal solution for a retrofit when there is no metering compartment avail able The unit comes standard with a NEMA 1 rated enclosure and is factory wired with the metering system installed Standard safety equipment includes voltage fuses and Shorting blocks for current transformers The enclosure can be ordered with either the MP200 Y three phase circuit
19. ped with captive shorting screws see instructions in Section 5 1 The temperature rating for enclosure operation is 20 to 50 C Refer to the MP200 Metering System Installation and Operation Manual for specific operating instructions for the system in your enclosure 4 2 Troubleshooting Symptom Extremely inaccurate readings of voltage and or harmonics Perform these two tests 1 With fuses removed from the unit test the fuses with an ohmmeter All of the fuses must show a resistance of lt 2 Ohms 2 With the unit fully powered measure the voltage on the input side and output side of the fuse The voltages should differ by less than 1 Volt Electro Industries Gauge ech Doc FE180701 The Leader In Power Monitoring and Smart Grid Solutions 4 1 4 Operation This page intentionally left blank Electro Industries Gauge ech The Leader In Power Monitoring and Smart Grid Solutions Doc E180701 4 2 5 Maintenance 5 Maintenance The MP200 in Enclosure is designed to be relatively maintenance free under normal use However because of the variability of application conditions and the importance placed on dependable operation and inspection you should perform maintenance checks on a regularly scheduled basis Visually inspect for loose parts wires and or hardware inspect for discoloration of insulation and damaged or discolored compo nents be alert for accumulation of dirt and or moistu
20. r V2 Basic Logger V3 Advanced Logger 6 Communication X RS485 Only Modbus WIFI Ethernet and WiFi Modbus 7 Display MDSN 3 5 Touch Screen HMI Display with installation kit MDLN 5 7 Touch Screen HMI Display with installation kit Display Installation Kit includes Display and Rear Module RS485 Serial cable Power Supply Mounting Hardware 8 Add on Protocol X No Add on Protocol ProtoCom BACnet Protocol ProtoCom Lon LonWorks Protocol Electro Industries GaugeTech Doc E180701 The Leader In Power Monitoring and Smart Grid Solutions 6 Ordering Information Example above ENCSMP200 Y 60 10 V2 X MDSN ProtoCom MP200 Y Metering System with 60Hz frequency Current Class 10 V 2 V Switch key RS485 only MDSN 3 5 Touch Screen HMI Display and ProtoCom converter Electro Industries Gauge ech Doc E180701 The Leader In Power Monitoring and Smart Grid Solutions 6 2
21. re on structure check operation of disconnecting means and continuity of fuses where applicable 5 1 Removing a Meter From Service Follow these steps 1 De energize all circuits feeding the case 2 If possible de energize lines that the CTs are on 3 Tighten all the shorting screws on all the CT shorting blocks by turning all the screws clockwise until they bottom out WARNING If the meter must be removed from service the secondary side of the current transformers MUST be short circuited to prevent a dangerous high voltage condition from appearing across the secondary wires of the current transformer Arcing and damage to personnel and or equipment can occur if the screws provided on the shorting block are not installed in the correct locations prior to disconnecting any wires AVERTISSEMENT Si le compteur doit tre enlev du service le c t secondaire du transformateur actuel DOIT tre court circuit pour pr venir une condition de haute tension dangereuse d apparaitre dans les cablages secondaires du transformateur actuel La brulure d arc et l endommagement d un quipement ou des blessures sont susceptibles de se produire si les vis fournies sur le court circuit ne sont pas install es dans les emplacements corrects avant de d brancher les cables The six screws on each shorting block are used to short the high sides and the low side of the CT outputs to the brass bar that is internal to the shorti
22. res to the ground stud on the bottom left of the enclosure D 3 Insert the cable assembly F into the cable clamps on the door J 4 Connect the two green ground wires to the stud on the door E 5 If the MP200 in enclosure is equipped with a ProtoCom ProtoCom Lon attach all connections to it Continue to Section 2 3 to mount the enclosure Electro Industries Gauge ech Doc FE180701 The Leader In Power Monitoring and Smart Grid Solutions 2 8 2 Installation 2 3 Installation Step 3 Mount the Enclosure 1 Determine the enclosure mounting location where there are no obstacles and the exterior wiring can be easily accomplished Install as per the NEC or local code requirements Refer to the following diagrams for the enclosure dimensions 516 19 mm 20 32 in 517 91 mm 20 39 in Figure 2 5 Enclosure Front Dimensions Electro Industries Gauge ech Doc E180701 2 9 The Leader In Power Monitoring and Smart Grid Solutions 2 Installation 185 67 mm 7 31 in 166 31 mm 508 00 mm 20 00 in Figure 2 6 Enclosure Side Dimensions Cj Electro Industries GaugeTech Doc E180701 The Leader In Power Monitoring and Smart Grid Solutions 2 Installation 508 00 mm 20 00 in a Figure 2 7 Enclosure Top Dimensions The Leader In Power Monitoring and Smart Grid Solutions i Electro Industries Gauge Tech Doc E180701 2 11 2 Installation 2 Mark the lo
23. ro Industries GaugeTech Doc E180701 The Leader In Power Monitoring and Smart Grid Solutions 3 Electrical Wiring CT SHORTING BLOCK CURRENT 1 HI CURRENT ILO I ONLY ONE CIRCUIT IS SHOWN DUPLICATE FOR ADDITIONAL CIRCUITS FUSE BLOCK UNIT POWER L BZ VOLTAGE A TO MP200 VOLTAGE POWER INPUTS BE VOLTAGE B VOLTAGE C Figure 3 3 MP200 S Single Phase Wiring Diagram Ci Electro Industries GaugeTech Doc E180701 The Leader In Power Monitoring and Smart Grid Solutions 3 Electrical Wiring This page intentionally left blank Electro Industries Gauge ech The Leader In Power Monitoring and Smart Grid Solutions Doc E180701 3 6 4 Operation 4 Operation 4 1 Overview The MP200 in Enclosure is equipped with three 10mm x 38mm 600V 100mA fast acting fuses and one 10mm x 38mm 500V 3A Time Delay fuse for the protection of the meter s sense voltage and control power circuits respectively A disconnecting means and upstream protection should be installed for all circuits Short circuit type terminal blocks are provided for the current transformer circuit The terminal blocks for the current circuits are short circuit type and are equip
24. stallation operation and maintenance of this device Hazardous voltages that can cause death or severe personal injury are present inside enclosure Follow proper installation operation and maintenance procedures to avoid these voltages Avertissement tous les codes de s curit normes de s curit et r glements doivent tre suivis strictement dans l installation le fonctionnement et la maintenance de cet appareil Des tensions dangereuses peuvent provoquer la mort ou des blessures graves suivre l installation ad quate le fonctionnement et les proc dures de maintenance pour viter ces tensions Completely read and understand the material presented in this document before attempting installation operation or application of the equipment In addition only qualified persons should be permitted to perform any work associated with the equipment Any wiring instructions presented in this document must be followed precisely Failure to do so could cause permanent equipment damage All possible contingencies that may arise during installation operation or mainte nance and all details and variations of this equipment do not purport to be covered by these instructions If further information is desired by purchaser regarding a particular installation operation or maintenance of particular equipment contact an Electro Industries GaugeTech EIG representative Electro Industries Gauge ech Doc E180701 The Leader
25. t circuit Voir la section 5 2 Electro Industries Gauge Tech Doc E180701 The Leader In Power Monitoring and Smart Grid Solutions 5 3 5 Maintenance MOUNTING SCREWS 4 LOCATIONS CURRENT INPUT METER 5 CURRENT INPUT RUG METER 1 E CURRENT INPUT ic 18 CURRENT INPUT METER 2 METER 6 CURRENT INPUT CURRENT INPUT METER 7 METER 3 CURRENT INPUT CURRENT INPUT METER 8 METER 4 FUSE BANK POWERAND jy USES GND VOLTAGE CONNECTION CONNECTION CONNECTION Figure 5 3 MP200 Y in Enclosure Location of Fuses Current Leads Connectors Mounting Screws Ci Electro Industries Gauge Tech Doc E180701 The Leader In Power Monitoring and Smart Grid Solutions 5 4 5 Maintenance MOUNTING SCREWS 4 LOCATIONS aaa INPUT CURRENT INPUT 4 6 CURRENT INPUT ye gt 7 9 CURRENT INPUT 10 12 i CURRENT INPUT 13 15 MT TATT HT D CURRENT INPUT 16 18 Me LIRE EEE 1 i 11 1 1 l a Ty a T4 i 4 7 HFHS i i Ta O _ 2 CURRENT INPUT 19 21 O MCE A Cr l Huns u e a T D To A i x UN 4h LEUR CURRENT INPUT 22 24 GND VOLTAGE X4 FUSES NEUTRAL CONNECTION CONNECTION CONNECTION Figure 5 4 MP200 S in Enclosure Location of Fuses Current Leads Connectors Mounting Screws 4 Remove the 4 fuses from the fuse block 5 Un screw and disconnect the 48 current leads to the meter 6 Disconnect al
26. ting location that offers a flat rigid mounting surface capable of Supporting the weight of the equipment The unit weighs 48 5 Ibs 22 kg maximum Mount the equipment in a suitable environment This enclosures is designed for NEMA 1 rated environments and is manufactured of painted steel Check to make certain that there are no pipes wires or other mounting hazards in the immediate mounting area that could create a problem Also make sure you have enough clearance around the enclosure to run wiring to it safely EIG recommends at least 2 feet of clearance around the enclosure See Section 2 1 for enclosure dimen SIONS Carefully remove all packing material from the unit Even though an equipment inspection was made when the equipment was received make another careful inspec tion of the enclosure and the devices inside as packing material is removed Be especially alert for distorted metal loose wires or damaged components This is important because wiring can come loose in shipping and could cause a short circuit or voltage to be on the wrong terminal WARNING Extreme care shall be taken when mounting the enclosure and making wire entry holes to prevent metal chips filings and other contami nants from entering the enclosure which may damage the equipment and create a hazardous condition AVERTI SSEMENT Attention extr me lors de la monture de l enceinte et lors de la mise terre pour pr venir les articules m talliques
27. with the yellow button to the top of the enclosure and push the rear module until it locks into place When it is in place you will hear a click 7 Connect the cable to the rear module see Figure 2 1 The Leader In Power Monitoring and Smart Grid Solutions i Electro Industries Gauge Tech Doc E180701 2 17 2 Installation 2 5 Installation Step 5 Lock the Enclosure The enclosure has been fitted with means for securing the door so it cannot be opened or tampered with A key lock is provided along with two keys Enclosure Lock Figure 2 14 Location of Enclosure Lock 1 Lock the enclosure by putting the key in the lock and turning it clockwise 2 Remove the key and store it in a safe place When you want to open the enclosure put the key in the lock and turn it counter clockwise Repeat step 1 to re lock the enclosure i Electro Industries Gauge Tech Doc E180701 2 18 The Leader In Power Monitoring and Smart Grid Solutions 3 Electrical Wiring 3 Electrical Wiring The MP200 in Enclosure is factory wired and tested Installation requires solidly mounting the enclosed unit and connecting field wiring This document has diagrams of wiring options Review and understand the appropriate diagrams for the unit you have ordered NOTE See the diagram below for input wiring specifications Consult your local and or National Electric Code for external wiring requirements Both en
Download Pdf Manuals
Related Search
Related Contents
StarTech.com USB 2.0 300 Mbps Mini Wireless-N Network Adapter - 802.11n 2T2R WiFi Adapter Situation 2 > Débat - Santillana Français HeatTransfer Fluid Instructions Samsung Induktiokeittotaso CTN364EE04 Käyttöopas SERVICE MANUAL Samsung HT-DS1000 User Manual Samsung Galaxy Note Uživatelská přiručka(Ice Cream Sandwich) Genius EasyPen M406XE Speedball French Copyright © All rights reserved.
Failed to retrieve file