Home
User Manual
Contents
1. to the breaker BAT another cable from BAT of the 3 layer the 18 bat goes to the breaker N BATN the last cable from BAT of the 1 layer goes to the breaker BAT Shown in Fig 6 2 6 When battery installation is completed check that the wiring and battery voltage are both correct then install the panels on both side and top cover Now the battery cabinet is completed installed Note the positive and negative cannot be reversed when connecting batteries and cannot be touched by cables otherwise it will cause the battery damaged or the other incidents don t touch the positive and negative when connectted and should be connected by one person the specifications of the external grounding cables for users is at least 50mm HPM3300 200KVA battery cabinet user manual 3 Overall wiring diagram 6th pile otn pile 4th pile rd pile 2nd pile 1st pile Figure 6 4 Accessories list HPM3300 200K Built in 630A breaker battery cabinet contains the following 3 emise 125mm ac s Ca Cable 4 450mm acid 1 i Fs a a a E a E
2. HPM3300 200KVA battery cabinet user manual 1 Battery cabinet instruction The battery cabinet dimension for HPM3300 200KVA is 1097mm 600mm 2000mm CW D H It includes built in connection cables and breaker One cabinet can hold up to 36pcs of 120AH 12V batteries 6 layers 6pcs for each layer 36pcs are connected in series including 2 sets of 18pcs and BAT BATN BAT The cabinet is grounding The appearance is shown as Fig 1 Figure 1 2 Battery cabinet installation steps are as following 2 1 Place the battery cabinet well then remove the right left and rear panel shown in Fig 2 Fig 2 HPM3300 200KVA battery cabinet user manual 2 2 Remove the battery bases and top covers of the oo S layer respectively Put the batteries on the first base according to the wiring diagram then do the connection and lock the cables of the battery pole tightly as the Fig 3 shows the connection is shown as Fig 4 Figure 3 2 3 Connection for each layer to 2rd pile BAI to breaker HPM3300 200KVA battery cabinet user manual 2 4 Then install the battery bases of the Shas ed Am 5 and 6 one by one in the cabinet and put the batteries The battery direction is the same with the first layer Finally check that the battery connection of all the 6 layers is completed according to the Fig 6 As the Fig 5 shows Figure 5 2 5 After finishing the battery connection a cable from the BAT of the 6 layer goes
Download Pdf Manuals
Related Search
Related Contents
Medidor de espesor de precisión Multi Channel AV Receiver Octigen 629489PTOTG computer case OZ Biosciences / Protocol 3D-FectIN™ / vs. 1.6 / www.ozbiosciences LG LFX32945ST Energy Guide : Free Download, Borrow, and Streaming : Internet Archive 出願日12/08/19-12/08/25 (PDF 1593KB) - TM V7 Standard Mouse USB USER MANUAL - Bell support Ultimate Receiver 手動圧着工具 Manual crimping tools Copyright © All rights reserved.
Failed to retrieve file