        WDAT Interconnection Request Application Form
         Contents
1.      10     Exclusivity will be provided at a later date in accordance with this  GIP     This Interconnection Request shall be submitted to the representative indicated below     Southern California Edison Company  Director of FERC Policy  amp  Contracts  P O  Box 800   Rosemead  CA 91770    Overnight address  2244 Walnut Grove Avenue  Rosemead  CA 91770    Representative of Interconnection Customer to contact      To be completed by Interconnection Customer   Name    Title    Company Name   Street Address   City  State     Zip Code   Phone Number   Fax Number   Email Address                                If the Interconnection Customer also requests Distribution Service  additional information  and an additional deposit is required in accordance with Section 15 2 of the Tariff     This Interconnection Request is submitted by        Legal name of Interconnection Customer     By  signature         Name  type or print         Title        Date        Attachment A to  Interconnection Request    WHOLESALE DISTRIBUTION ACCESS TARIFF  GENERATING FACILITY DATA    Provide two copies of this completed form pursuant to Section 7 of Interconnection Request     Each Interconnection Customer will complete Sections   and 2 of this Attachment A    Each Interconnection Customer will complete the applicable data in Sections 3 through 6 of this  Attachment A based on the type of generating facility ies  requesting interconnection   Section 3  for synchronous generators  Section 4 for inducti
2.   Email Address    Interconnection Customer   s DUNS Number                                      f  Point of Interconnection   Distribution Substation  Name and voltage level     or  Distribution Feeder    or       Approximate location of the proposed Point of Interconnection   Distribution Facility Interconnection Point Name   Voltage Level  Proposed Location of Interconnection              g  Interconnection Customer Data  set forth in Attachment A     The Interconnection Customer shall provide to the Distribution Provider the  technical data called for in Attachment A   O Two  2  copies are required     Applicable Interconnection Study Deposit amount as specified in GIP Section 4 2 1 or  4 7 1  as applicable  for the Cluster Study Process or GIP Section 5 2 1 for the  Independent Study Process  or  1 500 as provided in GIP Section 6 2 for the Fast Track  Process made payable to Southern California Edison Company  Send check to  Distribution Provider along with     1  A completed Interconnection Request form for processing   2  Acompleted Attachment A  Interconnection Request Generating Facility  Data      Evidence of Site Exclusivity as specified in GIP Sections 4 2 1  5 2 1  or 6 3  as  applicable  and name s   address es  and contact information of site owner s   Check one   L  Is attached to this Interconnection Request  L  If Interconnection Customer requests processing under the Cluster  Study Process  then deposit in lieu of Site Exclusivity attached  Site    T     8
3.   generator base     e Xd   Direct Axis Synchronous Reactance  p u     e X   d  Direct Axis Transient Reactance  p u    e X   d  Direct Axis Subtransient Reactance  p u   e X2   Negative Sequence Reactance  p u    e X0   Zero Sequence Reactance  p u     Generator Grounding  select one for each model            A  Solidly grounded   B  Grounded through an impedance   Impedance value in p u  on generator base  R  p u   X  p u     C  Ungrounded    Induction Generator Information    Please repeat the following for each generator     OZZPEARASETOAHNMEUINW  gt     Motoring Power  kW    bet or K  Heating Time Constant    Rotor Resistance  Rr   Stator Resistance  Rs   Stator Reactance  Xs   Rotor Reactance  Xr   Magnetizing Reactance  Xm   Short Circuit Reactance  Xd    Exciting Current   Temperature Rise   Frame Size    Design Letter   Reactive Power Required In Vars  No Load    Reactive Power Required In Vars  Full Load    Total Rotating Inertia  H  Per Unit on kVA Base                                                 Wind Turbine Generator  WTG  Information      Proposed projects may include one or more WTG types  Please repeat the following for  each type of WTG      A     moO    Number of generators to be interconnected pursuant to this Interconnection  Request    Average Site Elevation  Single Phase _____ Three Phase   Field Volts   Field Amperes   Motoring Power  MW              Design Letter     HAAROVOZZMPAS TAM       Neutral Grounding Resistor  If Applicable    122t or K  He
4.  50 000 plus  1 000 per MW of  electrical output of the Generating Facility  or the increase in electrical output of the existing Generating Facility  as  applicable  rounded up to the nearest whole megawatt  up to a maximum of  250 000         O Site Exclusivity   Check here if you will be submitting a    posting of a Site Exclusivity Deposit of  100 000   for a Small Generating Facility or  250 000  for a Large Generating Facility      Refer to section 4 2 1 of the  WDAT Attachment 1     O Independent Study Process  ISP         Interconnection Study Deposit equal to  50 000 plus  1 000 per MW of  electrical output of the Generating Facility  or the increase in electrical output of the existing Generating Facility  as  applicable  rounded up to the nearest whole megawatt  up to a maximum of  250 000         L  Fast Track Process        The Interconnection Customer shall submit its Interconnection Request to the Distribution  Provider  together with a non refundable processing fee of  500 and a non refundable study deposit of  1 000          Other  specify       WHOLESALE DISTRIBUTION SERVICE REQUEST       An Eligible Customer requesting service under the Tariff must submit an Application  with a deposit of  2 00 per anticipated  average monthly kilowatts of Generation or Wholesale Distribution Load  to the Distribution Provider as far as possible in  advance of the month in which service is to commence      Section 15 2 of the Wholesale Distribution Access Tariff    Anticipa
5.  Generating Facility     Project Name        Project Location   Street Address   City  State     County   Zip Code   GPS Coordinates                       Maximum net megawatt electrical output  as defined by section 2 c  of  Attachment A to this appendix  of the proposed new Generating Facility or the  amount of net megawatt increase in the generating capacity of an existing  Generating Facility     Maximum net megawatt electrical output  MW   or  Net Megawatt increase  MW      Type of project  i e   gas turbine  hydro  wind  etc   and general description of the  equipment configuration  if more than one type is chosen  include net MW for  each      O Cogeneration     MW  O Reciprocating Engine MW  O Biomass MW  O Steam Turbine MW  O Gas Turbine     MW  O Wind     MW  O Hydro MW  O Inverter Based  MW    e g   Photovoltaic  Fuel Cell    If Fuel Cell  please describe primary fuel source   C Combined Cycle MW  O Other  MW     Please describe         Proposed In Service Date  and Other Key Dates  Month Day Year   Dates must  be sequential     Requested Back Feed Date   Proposed In Service Date    Proposed Trial Operation Date   Proposed Commercial Operation Date              bE ee N  eg ae  N       Proposed Term of Service  years      e  Name  address  telephone number  and e mail address of Interconnection  Customer s contact person  primary person who will be contacted      Name    Title    Company Name   Street Address   City  State     Zip Code   Phone Number    Fax Number  
6.  Study Process   L  Independent Study Process   L  Fast Track Process   O Other  specify        2  This Interconnection Request is for  check only one    L A proposed new Generating Facility   O An increase in the generating capacity or a Material Modification of an existing  Generating Facility   L  A change to Full Capacity Deliverability Status for a Generating Facility  previously studied as Energy Only Deliverability Status in accordance with  Section 4 7 of the GIP  Full Capacity Deliverability Study      3  Deliverability Study is performed by the ISO  Requested Deliverability Status is for   check only one     O Full Capacity Deliverability Status  this option applies to the Cluster Study  Process and Independent Study Process only    CL  Partial Capacity Deliverability Status for___ MW  specify requested MW to be  evaluated for Deliverability  This MW amount should be less than the total MW  of the Generating Facility  of electrical output  this option applies to the Cluster  Study Process and Independent Study Process only    O Energy Only Deliverability Status  this option applies to the Cluster Study  Process  Independent Study Process  and Fast Track Process     4  Interconnection Customer provides the following information   a  Address or location  including the county  of the proposed new Generating    Facility site  to the extent known  or  in the case of an existing Generating  Facility  the name and specific location  including the county  of the existing   
7. Ground at full load and 40  C  ft  Ground Wire Type  Size  Distance to Ground  ft       Attach Tower Configuration Diagram  Summer line ratings in amperes  normal and emergency        Positive Sequence Resistance   R    p u     for entire line length   Positive Sequence Reactance    X    p u     for entire line length   Zero Sequence Resistance   RO    p u     for entire line length   Zero Sequence Reactance    X0    p u     for entire line length   Line Charging  B 2   p u          On 100 MVA and nominal line voltage  kV  Base    Plant Level Reactive Power Compensation Data   Provide the following information for plant level reactive power compensation  if  applicable     A  Number of individual shunt capacitor banks   B  Individual shunt capacitor bank rated voltage  kV    C  Individual shunt capacitor bank size  KVAR at rated voltage               Planned dynamic reactive control devices  SVC  STATCOM    Control range  kVAR  lead  kVAR  lag   Control mode  e g  voltage  power factor  reactive power    Please provide the overall plant reactive power control strategy                Ammo    10  Load Flow and Dynamic Models     The WECC Data Preparation Manual for Power Flow Base Cases and Dynamic Stability Data  has established power flow and dynamic modeling requirements for generation projects in  WECC base cases  In general  if the aggregate sum of generation on a bus exceeds 10 MVA  it  should not be netted  Furthermore  the total netted generation in an area should not e
8. Information    Please repeat the following for each generator     A     Indicate the Manufacturer and Type   of excitation system used for the generator  For exciter   type  please choose from 1 to 9 below or describe the specific excitation   system     1  Rotating DC commutator exciter with continuously acting  regulator  The regulator power source is independent of the  generator terminal voltage and current     2  Rotating DC commentator exciter with continuously acting  regulator  The regulator power source is bus fed from the  generator terminal voltage     3  Rotating DC commutator exciter with non continuously acting  regulator  i e   regulator adjustments are made in discrete          3C    3D    w    HoA    increments      4  Rotating AC Alternator Exciter with non controlled  diode   rectifiers  The regulator power source is independent of the  generator terminal voltage and current  not bus fed      5  Rotating AC Alternator Exciter with controlled  thyristor   rectifiers  The regulator power source is fed from the exciter  output voltage     6  Rotating AC Alternator Exciter with controlled  thyristor   rectifiers     7  Static Exciter with controlled  thyristor  rectifiers  The regulator  power source is bus fed from the generator terminal voltage     8  Static Exciter with controlled  thyristor  rectifiers  The regulator  power source is bus fed from a combination of generator terminal  voltage and current  compound source controlled rectifiers system     9  Ot
9. SOUTHERN CALIFORNIA    E D   S O N Grid Interconnection  amp  Contract Development    Request for Payment Instructions  Wholesale Distribution Access Tariff  WDAT  Attachment I   GIP    Submittal Instructions       Prior to submitting your application and fee or deposit  please complete and submit this form to   Grid Interconnections sce com    In response  you will receive detailed payment instructions within a Request for Advance Payment form that will greatly  facilitate the tracking and processing of your request  The Request for Advance Payment form will contain mailing and  wiring instructions along with a document number for SCE to track your payment  Please do not mail any checks along  with your interconnection application  instead  please use the instructions provided     Absent extraordinary circumstances  instructions should be sent to you within 3 business days of receipt of this completed  Request for Payment Instructions form     Once the payment confirmation and complete application package are received  your request will be forwarded for  processing and review     INTERCONNECTION CUSTOMER INFORMATION       Customer Name        Customer Address        Project Contact Name        Project Contact Phone Number  E mail        Project Name        New Project Generating Facility Gross Nameplate Rating  In MW         INTERCONNECTION STUDY PROCESS    Select the one study processes listed below     L  Cluster Study Process        Interconnection Study Deposit equal to 
10. ata related to the  short circuit characteristics of proposed inverter based generation systems  For  example  the applicant can provide a sinusoidal waveform test data showing  faulted condition at the AC side of the inverter for a three phase and single line   to ground fault    Harmonics Characteristics     1  Inverter switching frequency     2  Harmonic characteristics for each unit up to switching frequency      3  Harmonic characteristics for aggregate generation facility    K  Inverter disconnection characteristics  Applicant to provide voltage sinusoidal  waveform test data which shows the voltage characteristics during disconnection  of inverter system from distribution system at 100  and at 50  of rated output     Distribution Provider may require testing verification of voltage and harmonic  performance during commissioning test of the inverter based generation systems   Step Up Transformer Data    For each step up transformer  e g  main step up transformers  padmount transformers    fill out the data form provided in Table 1    Interconnection Facilities Line Data     For transmission lines that are to be planned by the generation developer  please provide  the following information                 Nominal Voltage  kV   Line Length  miles     Line termination Points    Conductor Type  Size    If bundled  Number per phase    Bundle spacing  in    Phase Configuration  Vertical    Horizontal    Phase Spacing  ft   A B    B C    C A    Distance of lowest conductor to 
11. ating Time Constant    Rotor Resistance    Stator Resistance    Stator Reactance    Rotor Reactance    Magnetizing Reactance                      Short Circuit Reactance     Exciting Current     Temperature Rise           Frame Size           Reactive Power Required In Vars  No Load    Reactive Power Required In Vars  Full Load    Total Rotating Inertia  H  Per Unit on 100 MVA Base    Note  A completed General Electric Company Power Systems Load Flow  PSLF  data    sheet must be supplied with the Interconnection Request  If other data sheets are  more appropriate to the proposed device then they shall be provided and discussed  at Scoping Meeting     Distribution Provider may require testing verification of voltage and harmonic  performance during commissioning test of WTG based generation projects     Inverter Based Generation Systems Information      Proposed inverter based generation projects may include one or more types of inverters   Please repeat the following for each type of inverter      Hm OMmMoOOw gt     Inverter Manufacturer and Model   Number of Inverters              Nameplate Rating  AC  each inverter     kW  Nameplate Voltage Rating  AC   kV  Maximum AC line current  Amps    Nameplate Power Factor Rating  AC     Please attach capability curve describing reactive power or power factor range  from no output to full rated output   Inverter control mode  e g  voltage  power factor  reactive power     Short Circuit Characteristics  Applicant to provide technical d
12. d output  MW for each unit    Manufacturer of the Generating Facility   Year Manufactured    Nominal Terminal Voltage  kV    Rated Power Factor       Type  induction  synchronous  D C  with inverter    Phase  3 phase or single phase                        RA en Qs    voz z    Connection  Delta  Grounded WYE  Ungrounded WYE  impedance grounded         Generator Voltage Regulation Range           Generator Power Factor Regulation Range           For combined cycle plants  specify the plant net output capacity  MW  for an  outage of the steam turbine or an outage of a single combustion    turbine       Synchronous Generator  Information     3A    3B    Generator Information    Please repeat the following for each generator     TA ee    Q     T    Rated Generator speed  rpm    Rated MVA    Rated Generator Power Factor   Generator Efficiency at Rated Load       Moment of Inertia  including prime mover    Inertia Time Constant  on machine base  H  sec or  MJ MVA   SCR  Short Circuit Ratio   the ratio of the field current required for rated  open circuit voltage to the field current required for rated short circuit  current    Please attach generator reactive capability curves    Rated Hydrogen Cooling Pressure in psig  Steam Units only                              Please attach a plot of generator terminal voltage versus field current that  shows the air gap line  the open circuit saturation curve  and the saturation  curve at full load and rated power factor     Excitation System 
13. e   both high and low pressure turbines     3  If steam with reheat process  or if combined cycle  indicate in the    space provided  the percent of full load power produced by each  turbine    Low pressure turbine or gas turbine      High pressure turbine or steam turbine     For combined cycle plants  specify the plant net output capacity   MW  for an outage of the steam turbine or an outage of a single  combustion turbine        B  Hydro turbines            1  Turbine efficiency at rated load      2  Length of penstock  ft   3  Average cross sectional area of the penstock  ft2   4  Typical maximum head  vertical distance from the bottom of the  penstock  at the gate  to the water level   ft   5  Is the water supply run of the river or reservoir    6  Water flow rate at the typical maximum head  ft  sec   7  Average energy rate  kW hrs acre ft   8  Estimated yearly energy production  kW hrs  C  Complete this section for each machine  independent of the turbine type    1  Turbine manufacturer    2  Maximum turbine power output  MW   3  Minimum turbine power output  while on line   MW   4  Governor information      a  Droop setting  speed regulation      b  Is the governor mechanical hydraulic or electro hydraulic   Electro hydraulic governors have an electronic speed  sensor and transducer       c  Other comments regarding the turbine governor system              3E Short Circuit Duty Information   For each generator  provide the following reactances expressed in p u  on the
14. her  specify     Attach a copy of the block diagram of the excitation system from its   instruction manual  The diagram should show the input  output  and all   feedback loops of the excitation system    Excitation system response ratio  ASA     Full load rated exciter output voltage    Maximum exciter output voltage  ceiling voltage     Other comments regarding the excitation system                 Power System Stabilizer     PSS     Information     Please repeat the following for each generator model  All new generators are  required to install PSS unless an exemption has been obtained from WECC  Such  an exemption can be obtained for units that do not have suitable excitation                systems     A  Manufacturer    B  Is the PSS digital or analog    C  Note the input signal source for the PSS     1 Bus frequency   L  Shaft speed   L  Bus Voltage   L  Other  specify source    D  Please attach a copy of a block diagram of the PSS from the PSS  Instruction Manual and the correspondence between dial settings and the  time constants or PSS gain    E  Other comments regarding the PSS        Turbine Governor Information    Please repeat the following for each generator model      Please complete Part A for steam  gas or combined cycle turbines  Part B for  hydro turbines  and Part C for both     A  Steam  gas or combined cycle turbines    1  List type of unit  Steam  Gas  or Combined cycle     2  If steam or combined cycle  does the turbine system have a reheat  process  1 
15. k diagram  In addition  GE  PSLF modeling information and various modeling guidelines documents have been prepared by  the WECC Modeling and Validation Work Group  This information is available on the WECC  website  www wecc biz      If you require assistance in developing the models  we suggest you contact General Electric   Accurate models are important to obtain accurate study results  Costs associated with any  changes in facility requirements that are due to differences between model data provided by the  generation developer and the actual generator test data  may be the responsibility of the  generation developer     TABLE 1    TRANSFORMER DATA   Provide for each level of transformation     UNIT     NUMBER OF TRANSFORMERS PHASE    RATING H Winding X Winding Y Winding    Rated MVA   Connection  Delta  Wye  Gnd    Cooling Type  OA OA FA  etc     Temperature Rise Rating  Rated Voltage   BIL   Available Taps    of rating   Load Tap Changer   Y or N   Tap Settings    Percent E  MVA Base  Tested Taps  WINDING RESISTANCE  Ohms       CURRENT TRANSFORMER RATIOS  Ho xX Yes N  PERCENT EXCITING CURRENT 100   Voltage  110  Voltage  Supply copy of nameplate and manufacturer   s test report when available       For Generating Facilities with multiple step up transformers  identify the transformer datasheet unit  number with that of the single line     
16. on generators  Section 5 for wind turbine  generators  and Section 6 for inverter based generators     Each Interconnection Customer will complete Sections 7 through 10  as applicable    At any time  Distribution Provider may require Interconnection Customer to provide additional  technical data  or additional documentation supporting the technical data provided  as deemed  necessary by the Distribution Provider to perform Interconnection Studies  other studies  or  evaluations as set forth under the GIP     1  Provide two original prints and one reproducible copy  no larger than 36    x 24     of  the following     A  Site drawing showing generator location and Point of Interconnection with the  Distribution Provider   s Distribution System   B  Single line diagram showing applicable equipment such as generating units  step     up transformers  auxiliary transformers  switches disconnects of the proposed  interconnection  including the required protection devices and circuit breakers   This one line drawing must be signed and stamped by a licensed Professional  Engineer if the Generating Facility is larger than 50 kW                 2  Generating Facility General Information   A  Total Generating Facility rated output  MW    B  Generating Facility auxiliary Load  MW    C  Project net capacity  MW    D  Standby Load when Generating Facility is off line  MW    E  Number of Generating Units         Please repeat the following items for each generator   Individual generator rate
17. ted average monthly kilowatts of Generation or Wholesale Distribution Load for your proposed   project  ____                   SCE GRID INTERCONNECTION CONTACT INFORMATION    If you have any questions  please contact us   Via E mail  InterconnectionQA sce com  The Grid Interconnection phone number is  626 302 3688     Fees and deposits are calculated using the Wholesale Distribution Access Tariff  sectioni5 2  as well as Attachment I  also known as the  GIP  Section 4 for the Cluster Study Process  Section 5 for the Independent Study Process  and section 6 for the Fast Track process   Please refer to the tariff for the most current fee and deposit information as well as refund guidelines  A copy of the Wholesale  Distribution Access Tariff can be found on our Open Access site  www sce com GridInterconnection       Southern California Edison Company as of 02 22 2013  Wholesale Distribution Access Tariff    Effective Date  12 08 2012 Status  Effective   FERC Docket  ER13 00532 000 434   FERC Order  BOL Order Date  02 11 2013  APPENDIX 1 to GIP    WHOLESALE DISTRIBUTION ACCESS TARIFF  INTERCONNECTION REQUEST FOR A  GENERATING FACILITY    Provide two copies of this completed form pursuant to Section 7 of this GIP Appendix 1 below     1  The undersigned Interconnection Customer submits this request to interconnect its  Generating Facility with Distribution Provider s Distribution System pursuant to the  following process under Appendix I of the Tariff  check only one     O Cluster
18. xceed five  percent of the area   s total generation  Based on current WECC modeling requirements  the  following information will be required for all generation projects whose net capacity is greater  than 10 MVA  The following information may also be required for generation projects less than  10 MVA on a case by case basis  based on the amount of generation in the area of the requested  Point of Interconnection     A  Provide load flow model for the generating plant and its interconnection facilities  in GE PSLF   epc format  including new buses  generators  transformers   interconnection facilities  An equivalent model is required for the plant with  generation collector systems  This data should reflect the technical data provided  in this Attachment A     B  For each generator  governor  exciter  power system stabilizer  WTG  or inverter  based generator  select the appropriate dynamic models from the General Electric  PSLF Program Manual and provide the required input data  Include any user  written   p EPCL files to simulate inverter based plants    dynamic responses   typically needed for inverter based PV wind plants   Provide a completed   dyd  file that contains the information specified in this section     The GE PSLF manual is available upon request from GE  There are links within the GE PSLF   User   s Manual to detailed descriptions of specific models  a definition of each parameter  a list   of the output channels  explanatory notes  and a control system bloc
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Fujitsu LIFEBOOK E781  Belkin Wireless G+ MIMO Router DSL Wi-Fi Ethernet LAN Black  Toshiba Satellite C55t-A5350  Adhésion Mode d`emploi  User Manual  New England Arbors VA42044 Installation Guide  BM80917 4000 PSI Pressure Washer Replacement    WARN WINCH LINE (Europe)  設置工事説明書    Copyright © All rights reserved. 