Home

Contract No - Caird-Hall Construction Inc.

image

Contents

1. i STAIR 2 PON EXISTING TAIR A EXERCISE ROOM STAR h BO O 117 285 1630 1530 120 O O C 7 A008 BE m C EXISTING pu i 2 123 02 I EXERCISE ROOM 4 T i I I FF o 117 A 8 fa 8 A008 FIRE STATION 30 2 KW1X P3 lt lt 8285 S Bl wi 5 9 RENOVATIONS 1300 anes 2030 p7 1379 2 P3 2 489 VICTORIA AVE NORTH gt 360 Uh HAMILTON ON L8L 5H1 CANADA I RELOCATED WASHING e MACHINES i E TT i dp Al david premi Archit
2. GENERAL DEMOLITION NOTES R 90mm CONCRETE BLOCK 1 PATCH AND REPAIR ALL ADJACENT SURFACES TO AREAS OF PHASING LEGEND DEMOLITION AS REGUIRED TO MATCH EXISTING OR READY WORK IN THIS AREA TO BE COMPLETED IN A TIMELY MANNER WITH MINIMAL FOR NEW FINISH 140mm CONCRETE BLOCK HOARDING LINE DISTURBANCE TO THE TENANT S S 2 CLEAN PATCH AND REPAIR ALL SURFACES TO REMAIN AS MAINTAIN ACCESS TO EXIT AT ALL REOUIRED FOR NEW FINISHES 190mm CONCRETE BLOCK TIMES IF EXITING HAS TO BE BLOCKED AREA OF WORK i EE PO ARAN ORAND 3 GC TO COORDINATE EXTENT OF DEMOLITION WITH MECHANICAL ELECTRICAL AND STRUCTURAL DRAWINGS 240mm CONCRETE BLOCK ANY AREA NOT SHOWN ARCHITECTURAL WHICH REQUIRES INSTALLATION OF NEW SERVICES IS TO BE RETURNED TO ORIGINAL STATE TO MATCH EXISTING 290mm CONCRETE BLOCK 4 REVIEW HARDWARE SCHEDULE FOR ALL EXISTING DOORS FIRE STATION 30 TO REMAIN DEMOLISH ANY AND ALL HARDWARE AS i MATCH EXISTING ADJACENT CONCRETE BLOCK REQUIRED FOR INSTALLATION OF NEW DOOR HARDWARE RE
3. 1 2 Warning The following warnings appear in this manual Improper use of the backboard washer can cause injury Use the backboard washer only for the purpose described in this manual Improper operation can cause injury Operate the backboard washer only as described in this manual Reaching into the entrance or exit portals can cause injury Keep hands outside the backboard washer improper maintenance can cause injury Maintain the backboard washer only as described in this manual Modifying the backboard washer can cause injury and damage Use the backboard washer only as designed by Ferno Improper parts and service can cause injury Use only Ferno parts and Ferno approved service on the backboard washer Su STS TO Boxes like the one below emphasize important information Important If the yellow Disinfectant Low light is lit the disinfectant reservoir is empty and the backboard washer will not operate Refill the reservoir before restarting the backboard washer 1 4 Safety and Instruction Labels Safety and instruction labels place important information on the backboard washer Read and follow label instructions Replace worn or damaged labels immediately New labels are available from Customer Relations or from your Ferno distributor page 13 1 5 Bloodborne Disease Notice To reduce the risk of exposure to bloodborne diseases such as HIV 1 and Hepatitis wear di
4. Question 6 In room 110 C at the east partition which at present is a block partition that only goes to approx 8 high see attached picture 30044 we enlarge the door opening and infill with a B6 partition There is no B6 partition indicated on A002 2 please clarify what this partition is Refer to Item 1 1 Drawing A002 2 Overall Plan City Response 6 Shove Question 7 In room 123 New Ambulance Storage There is an item against the east partition with the notation Existing C13 55 13 Addendum 5 Page 4 of 7 Renovations and Reconfiguration of the Hamilton Paramedic Services Station 30 backboard washer to be moved from north garage installed and connected to new plumbing During the site meeting we did not go into any other areas and so were not able to view this item Could a picture of this item be included and some information on what it is such as size weight etc Also is the north garage the building titled Existing Metal Building on the A002 1 drawing If not please provide some information on where the north garage is City Response 7 Refer to Item 1 1 Drawing A002 2 Overall Plan above A cut sheet of the backboard washer is included inincluded in this Addendum General Contractor to confirm the current location of the piece of equipment at the time of construction and notify the Architect prior to relocation Question 8 There are 2 locations for the section de
5. 105 105 SIM 101 DRE i 8 A008 Issue Date 2013 09 11 i I I B x Drawn by PM Checked by DP O ere Project No 11103 07 Scale 1 50 Drawing No PI I WORK AREA 1 DEMOLITION PLAN WORK AREA 1 RENOVATION PLAN SCALE 1 50 SCALE 1 50 A004 ZS KD No Ref 11103 07 Sheet No Title SDA 001 WORK AREA 1 sudor aj No 4 RENOVATION RCP 1 50 2013 09 11 1 A005 Scale Date 125 EX EX STRUC LINE OF LOWER WALL BELOW LINE OF KOWER WALL BELOW dp Al david premi Architects inc TENDER C13 55 13 FIRE STATION 30 RENOVATIONS EXISTING OFFICE NEW AMBULANCE 113 STORAGE 1 A008 128 NEW STAFF ROOM 4 NEW CORRIDOR Sheet No SS SDA 002 SECTION dp Al david premi Architects inc ZN S Ad No 4 IP Scale TENDER C13 55 13 P o FIRE STATION 30 2013 09 00 O RENOVATIONS No Ref 11103 07 5 A008 P1 OR P2 REFER TO PLAN FOR PARTITION TYPES PAINTED HOLLOW META
6. S x Xx VESTIBULE i gt T 3990 114 O u gt Ka T E ma EXISTING EXISTING EXISTING NEW WORK AREA OFFICE STORAGE AND OFFICE OFFICE 113 ae u 113 ane ALL WORK STATIONS OG O 8 OFFICE CHAIRS N I C us 9 EXISTING EXISTING nes RELAXING ROOM RELAXING ROOM T ma lt TIFA 114 5 60 S RU PA g NEW OFFICE SITE VERIFY A m pu JES v 565 M o a EZ 5 EO 612 3 SEO x 219 EXISTING EG EXISTING STORAGE AND OFFICE EXISTING n x ELECTRICAL ROOM EXISTING 110 B ELECTRICAL ROOM 112 STORAGE le 110 EX EXISTING EXISTING OFFICE OFFICE fast 109 109 NE EXISTING EXISTING OFFICE 613 OFFICE NEW CORRIDOR pz au 111 111 8 05 FOR ADDENDUM NO 4 2013 09 11 02 2 NEW STORAGE FOR ADDENDUM NO 2 2013 09 03 02 04 FOR ADDENDUM NO 1 2013 08 28 03 ISSUED FOR TENDER 2013 05 07 i 02 ISSUED FOR CLIENT REVIEW 2013 02 14 EXISTING EXISTING HALL Q Q HALL EX 01 ISSUED FOR PRICING 2012 10 19 106 106 No Issues Revisions Date EXISTING EXISTING k ina Title FOYER STORAGE 9 H Drawing Title LO 102 110 C Q a NEW GROUND LEVEL P ENTARNCE LOBBY DEMOLITION AND RENOVATION PLAN 3000 SIM fa STAIR 1 STAIR 1 A ENTRANCE
7. addenda in their Tender submission All addenda will be posted on the City s Biddingo com bid portal at biddingo com hamilton Procurement Section City of Hamilton Ontario Revised February 5 2013 C13 55 13 Addendum 5 Page 7 of 7 Renovations and Reconfiguration of the Hamilton Paramedic Services Station 30 DEMOLITION LEGEND BLOCK TYPES
8. and workmanship for one year except as follows A External finishes gelcoat decals paint etc are warranted for 90 days B Repairs and services are warranted for 90 days or until the end of the time period s above whichever comes last This limited warranty applies when you use and care for the product properly If the product is not used and cared for properly the warranty is void The warranty period begins the day the product is shipped from Ferno or the day you receive it if you have proof of the delivery date Shipping charges are not covered by the limited warranty We are not liable for shipping damages or damages sustained through using the product Limited Warranty Obligation If a product or part is proven to be defective Ferno will repair or replace it At our option we will refund the product s purchase price The purchaser accepts these terms in lieu of all damages This is a summary of the limited warranty The actual terms and conditions of the limited warranty and the limitations of liability and disclaimers are available upon request by calling 1 800 733 3766 or 1 937 382 1451 8 FERNO CUSTOMER RELATIONS Customer service and product support are important aspects of each Ferno product Serial Number In the U S A and Canada for assistance with the backboard washer please contact Ferno Customer Relations below Telephone N 1 800 733 3766 Telephone 1 937 382 1451 Faxes c
9. lockers go from the edge of the door into room 117 Existing Exercise Room and continue to just before the BF Washroom toilet partition but you can t tell if they are also behind the lockers and if so how far they go tried to determine this at the site meeting but you could not tell City Response 3 All tiles are to be removed We cannot confirm whether they extend behind the lockers but if they do they will have to be removed as well Refer to Item 1 1 Drawing Overall Plan above Question 4 In room 123 Existing Ambulance Storage in the East South corner on the East wall there is an closet type item with 2 sets of double doors see attached picture pic 30088 There is a dotted line on the drawing but no demolition note Please clarify what we are doing with this item City Response 4 Refer to Item 1 1 Drawing A002 2 Overall Plan and Item 1 2 Drawing A004 Ground Level Demolition and Renovation Plan above Question 5 The Demolition note D9 Existing bollard to be removed is indicated at the 2 bollards at the OH Doors being removed on the north and south elevations for a total of 4 However on detail 1 A004 Renovation Plan there are still bollards indicated in all 4 of these locations Please clarify if we are to remove these bollards City Response 5 Refer to Item 1 1 Drawing A002 2 Overall Plan and Item 1 2 Drawing A004 Ground Level Demolition and Renovation Plan above
10. reservoir before restarting the backboard washer 9 USING THE BACKBOARD WASHER 9 1 Before Placing the Backboard Washer in Service U Personnel who will work with the backboard washer need to read this manual U Install the backboard washer following instructions in Installing the Backboard Washer page 7 U Follow the instructions in Inspecting the Backboard Washer page 12 to confirm that the backboard washer operates properly 5 2 General Guidelines for Use The backboard washer is for professional use only Using the backboard washer requires one operator Use and operate the backboard washer as described in this manual Use the backboard washer only when it is in proper working order s Do not leave the backboard washer unattended while it is running DANGER Electric shock can cause death or serious injury Install use operate and maintain the backboard washer only as described in this manual Improper operation can cause injury Operate the backboard washer only as described in this manual ere Ferno Washington Inc 234 3243 00 April 2003 9 3 Operating the Backboard Washer The backboard washer is designed for the operator to push the backboard through the entrance portal and pull it out from the exit portal The backboard washer cleans one backboard at a time 1 Ferno Washington Inc 234 3243 00 April 200
11. 3 Wear disposable examination gloves to help protect yourself from contaminants while handling the backboard Check the DISINFECTANT LOW light If it is lit the disinfectant reservoir is empty and the backboard washer will not start until you refill the reservoir see page 9 Remove all siraps head immobilizers and any other items from the backboard Twist the STOP or EMERGENCY STOP button to the right until it pops out You must use the button that was last used to stop the backboard washer Push the START button Note If the water doesn t flow turn off the backboard washer immediately to prevent damage to the pump Grasp the sides of the backboard with both hands and slowly push it into the entrance portal Figure 5 Note fa backboard is extremely soiled you can move it back and forth through the interior brushes a few times before you push it completely through the backboard washer Push the backboard through the backboard washer until it protrudes from the exit portal then move to the exit end and pull the backboard out of the portal Figure 6 Push the STOP button on the entrance end of the backboard washer Reaching into the entrance or exit portals can cause injury Keep hands outside the backboard washer Important If the yellow Disinfectant Low light is lit the disinfectant reservoir is empty and the backboard washer will not operate Refill the reservoir before restarting th
12. L FRAME FILLED SOLID W GROUT PAINTED HOLLOW METAL DOOR FRAME ALIGN FRAME W MASONRY STRAP EXISTING DOOR ANCHOR FRAME AT CORRIDOR WALL PAINTED HOLLOW PAINTED HOLLOW METAL DOOR METAL DOOR CONT GWB EDGE TRIM CONT SEALANT ALL W SEALANT AND CONT FOAM AROUND FRAME BOTH BACKER ROD SEALANT COLOUR SIDES SEALANT COLOUR TO MATCH DOOR EXISTING BLOCK WALL TO MATCH DOOR OR B6 PAINTED HOLLOW METAL FRAME FILLED PSs SOLID W GROUT PAINTED HOLLOW METAL DOOR Sheet No me SDA 003 FRAME PROFILES dp Ai david premi Architects inc ZN Add No 4 l lt p DE TENDER C13 55 13 gt oo FIRE STATION 30 2013 09 13 RENOVATIONS No Ref 11103 07 10 A008 Bio Board Technologies by Ferno Backboard Washer April 2003 GLO i O TON Pub No 234 3243 00 Disclaimer This manual contains general instructions for the use operation and care of this product The instructions are not all inclusive Safe and proper use of this product is solely at the discretion of the user Safety information is included as a service to the user All other safety measures taken by the user should be within and under consideration of applicable regulations It is recommended that training on the proper use of this product be provided before using this product in an actual situation Retain this manual for future reference Include it with th
13. LWORK TO BE DEMOLISHED PATCH AND CAVITIES REPAIR ADJACENT SURFACES AS REQUIRED FOR NEW CONSTRUCTION WALL TYPES ce EXISTING LOCKERS TO BE REMOVED AND TURNED OVER TO OWNER A NEW EXTERIOR WALL TO MATCH EXISTING METAL SIDING EXISTING NARCOTICS CABINET TO BE REMOVED AND TO MATCH EXISTING WITH 4 VINYL FACED FIBREGLASS REUSED GC TO STORE AND PROTECT DURING METAL BUILDING INSULATION INSTALLED BETWEEN NEW CONSTRUCTION UNTIL READY FOR RE INSTALLATION METAL GIRTS CONNCTED TO AND MATCHING EXISTING PAINT NEW GIRTS AND NEW INTERIOR LINER WITH EXISTING DOOR METAL SIDING amp INSULATION TO BE ELECTROSTATIC COATING REMOVED REFER TO AND COORDINATE WITH DEMOLITION FLOOR PLAN GENERAL NOTES 69 NOT IN USE 1 NOT ALL BLOCK 8 FURRING TYPES SHOWN MAY BE USED REFER TO FLOOR PLANS FOR TYPES IN THE PROJECT 5 5 EXISTING EXIT SIGN TO BE REMOVED AND REUSED 619 REFER TO AND COORDINATE WITH ELECTRICAL 2 ALL BLOCK PARTITIONS TO EXTEND TO U S OF STRUCTURE DRAWINGS UNLESS OTHERWISE NOTED PROVIDED LATERAL BRACING AS REOUIRED EXISTING CEILING TO BE REMOVED SERVICES TO BE 611 REMOVED BACK TO SOURCE AND CAPPED AS REQUIRED 3 GC TO SITE VERIFY BLOCK TYPES DENOTED WITH A AND AND MAKE READY FOR NEW CEILING MATCH TO EXISTING WORK AREA 1 REMOVE EXISTING WALL BETWEEN TWO ROOMS UP TO A 4 USE 75 SOLID OR GREATER OR LIGHT WEIGHT CONCRETE WORK AREA 2 REFER TO DRAWINGS A004 A005 612 HEIGHT THAT MATCHES THE EXISTING LOWER ACT LEVEL BLOCKS AS REO
14. NOVATIONS 5 PROVIDE TEMPORARY SUPPORT FOR ADJACENT CEILING 489 VICTORIA AVE NORTH LIGHT FIXTURES DIFFUSERS CEILING MOUNTED DEVICES HAMILTON ON L8L 5H1 CANADA ETC AS REQUIRED FOR AREAS WHERE CEILINGS ARE FURRING TYPES H REQUIRED TO BE REMOVED TO INSTALL NEW OR MODIFY EXISTING SERVICES ALL CEILINGS TO BE RESTORE BACK TO ORIGINAL STATE 16mm GYPSUM WALLBOARD ON 13mm RESILIENT d p Al david premi Architects inc HANNEL 6 ALL EXISTING FURNITURE IN THE LUNCH ROOM TO BE S S 126 Catharine Street N Unit 201 NEE SE e aa sov E PROTECT 16mm GYPSUM WALL BOARD ON 22mm FURRING Hamilton ON L8R 1J4 WORK IN THIS AREA TO BE COMPLETED REINSTALLATION CHANNELS t 905 522 0220 IN A TIMELY MANNER WITH MINIMAL 7 j 5995 Gba 1 YPSUM WALL BOARD ON 41 TEEL STUD DISTURBANCE TO THE TENANT 7 ALL OTHER EXISTING FURNITURE TO BE SALVAGED AND ra emm OYPSU en EON mne sm MAINTAIN ACCESS TO EXIT AT ALL FRAMING TIMES IF EXITING HAS TO BE BLOCKED POP alobo PA 1 YPSUM WALLBOARD ON 64 TEEL STUD RE NA CA AL OR AND 8 ALL EXISTING WALL FINISHES TO BE REMOVED WHERE NEW F4 a s PO FINISHES ARE TO BE APPLIED ALL SURFACES TO BE Contractor must verify all dimensions on the job and report any PREPARED FOR NEW FINISHES 16mm GYPSUM WALL BOARD ON 92mm STEEL STUD discrepancy to architects before proceeding with the work FRAMIN DEMOLITION NOTES S All drawings and specifications are the property of the architect and must 16mm GYPSUM WALL BOARD ON 152mm STEEL S
15. OP buttons operate properly U Does the DISINFECTANT LOW light come on when the disinfectant reservoir is empty 0 Is there any evidence of water leakage If inspection shows damage or leakage remove the backboard washer from service until repair is made see Ferno Customer Relations page 13 m E o S i Slel Maintenance Schedule 218 51218 U u lt a Cleaning this page Polishing this page B Inspecting this page Improper maintenance can cause injury Maintain the backboard washer only as described in this manual Modifying the backboard washer can cause injury and damage Use the backboard washer only as designed by Ferno important Water under high pressure can penetrate the air vents and damage the motor Do not use a high pressure washer or steam to clean the E backboard washer Important Cleaners containing bleach phenolics or iodines can cause damage Disinfect and clean only with products that do not contain these chemicals important Using abrasive cleaning compounds or applicators on the backboard washer can cause damage Do not use abrasive materials to clean the backboard washer Ferno Washington Inc 234 3243 00 April 2003 7 LIMITED WARRANTY Limited Warranty Summary Ferno Washington Inc Ferno warrants the products we manufacture to be free from defects in material
16. Profiles as per Supplemental Drawing SDA 003 attached to this Addendum 2 BIDDER QUESTIONS AND CITY RESPONSES In responding to the following questions the City of Hamilton has made every effort to refer the Bidders to the most applicable section s of the Request for Tender where appropriate However in doing so this does not relieve the Bidders of their responsibility to read the entire Request for Tender and to satisfy themselves as to C13 55 13 Addendum 5 Page 2 of 7 Renovations and Reconfiguration of the Hamilton Paramedic Services Station 30 whether there may also be other provisions in the Reguest for Tenders that are responsive to their guestions Guestion 1 Could you provide some information on the height of the existing partitions especially with respect to the partitions we remove Detail 5 A008 shows that at the New Staff Room 115 is a 2 storey situation is this consistent for existing rooms 118 115 114 114A 114B and 102 the rooms we work in on the west side of the building and do the existing partitions go to the underside of the 2nd floor At the New Ambulance Storage Room 123 it is a single storey going the full height of the 2 storeys is this consistent for the existing rooms 123 110A 110B 110 Vending Machine Storage Closet and 110C the rooms we work in on the east side of the building and do the existing partitions go to the u s of the metal deck roof Due to the varying heights it is important tha
17. R RE INSTALLATION LEGEND DENOTES EXTENT OF EXISTING FLOOR FINISH TO TO BE REMOVED EXISTING SLAB TO BE PATCHED AND REPAIRED AS REQUIRED AND MADE READY FOR NEW FINISH PATCH AND REPAIR ADJACENT I H H H H H SURFACES AS REQUIRED TO MATCH EXISTING SOUTH GARAGE P l NORTH GARAGE FOR ADDENDUM NO 4 2013 09 11 FOR ADDENDUM NO 3 2013 09 05 H a 1 i i 4 03 ISSUED FOR TENDER 2013 05 07 02 ISSUED FOR CLIENT REVIEW 2013 02 14 D 01 ISSUED FOR PRICING 2012 10 19 Ze No Issues Revisions Date Drawing Title j OVERALL PLAN O O O O O O O NO 0 i O o M Issue Date 2013 09 11 Drawn by PM Checked by DP Project No 11103 07 Scale AS SHOWN Drawing No GROUND FLOOR OVERALL PLAN A002 2 SCALE 1 150
18. Richard Pajor CSCMP C P P Procurement Specialist City of Hamilton Corporate Services Department Procurement Section M MM Phone 905 546 2424 ext 4740 Hamilton Fax 905 546 2327 E Mail Richard Pajor hamilton ca Date Issued Friday September 13 2013 City of Hamilton REGUEST FOR TENDERS Contract Number C13 55 13 Contract Title Renovations and Reconfiguration of the Hamilton Paramedic Services Station 30 ADDENDUM 5 The following gueries and responses issued by the Procurement Section shall form part of the Reguest for Tenders documents for the above and the revisions and additions noted herein and any attachments shall read in conjunction with all other documents This Addendum shall however take precedence over all previously issued Reguest for Tenders documents where differences occur Included in this Addendum 7 pages for Addendum 5 1 page for Drawing A002 2 1 page for Drawing A004 1 page for Supplemental Drawing SDA 001 1 page for Supplemental Drawing SDA 002 1 page for Supplemental Drawing SDA 003 14 pages for Backboard Washer User s Manual 26 pages in total 1 DRAWINGS 1 DRAWING A002 2 Overall Plan DELETE Drawing A002 2 Overall Plan and REPLACE with Drawing A002 2 Overall Plan issued September 11 2013 attached to this Addendum to incorporate the following 1 Detail 1 Ground Floor Overall Plan 1 ADD North Garage and South Garage labels 2 Block Types 1 ADD bloc
19. TUD be returned at the completion of the work REMOVE EXISTING WALL INCLUDING ALL SERVICES AS FRAMING INDICATED SERVICES TO BE REMOVED BACK TO SOURCE This drawing is not to be used for construction until AND CAPPED AS REQUIRED PATCH AND REPAIR countersigned Date ADJACENT SURFACES AS REQUIRED TO MATCH EXISTING OR MAKE READY FOR NEW FINISHES PARTITION TYPES Seals O MSSo EXISTING APPLIANCE TO BE REMOVED AND REUSED GC X CY TO STORE AND PROTECT DURING CONSTRUCTION UNTIL 16mm GYPSUM WALLBOARD ON ON 92mm STEEL STUD Ya READY FOR RE INSTALLATION REFER TO AND FRAMING SITE VERIFY AND MATCH EXISTING ADJACENT X OF gt COORDINATE WITH FLOOR PLANS WALL TYPE lt O PHASE 1 PHASE 2 ITECTS Z EXISTING SINK TO BE REMOVED PATCH AND REPAIR REFER TO ULC DESIGN NO 453 FOR 2 HR FIRE RATING ADJACENT SURFACES AS REQUIRED TO MATCH EXISTING P2 ASSEMBLY 2 LAYERS OF 16mm GYPSUM WALL BOARD ON DAVID PREMI AND MAKE READY FOR NEW FINISH REFER TO AND 64 mm STEEL STUD FRAMING WITH BATT INSULATION 4 LICENCE S COORDINATE WITH FLOOR PLANS 4456 4 ZA yw CONSTRUCTION PHASI NG PLANS REFER TO ULC DESIGN NO 452 SYSTEM E FOR 2 HR TTD EXSTING WATER CLOSET SHOWER TO BE REMOVED NONBEARING ASSEMBLY RATING INCLUDE BATT E SERVICES TO BE REMOVED BACK TO SOURCE AND INSULATION je CAPPED AS REGUIRED PATCH AND REPAIR ADJACENT SURFACES AS REOUIRED TO MATCH EXISTING 2 16mm GYPSUM WALL BOARD ON 152mm STEEL STUD FRAMING WITH ACOUSTIC INSULATION BLANKETS IN STUD EXISTING MIL
20. UIRED TO ACHIEVE FIRE SEPARATIONS REFER TO NOTES ON A002 REMOVE ALL SERVICES AS INDICATED SERVICES TO BE NOTED COORDINATE W FIRE 8 LIFE SAFETY DRAWINGS V l REMOVED BACK TO SOURCE AND CAPPED AS REQUIRED ENSURE FIRE SEPARATIONS ARE SEALED AT ALL PATCH AND REPAIR ADJACENT SURFACES AS REQUIRED PENETRATIONS AND TO STRUCTURE W FIRE STOP ah TO MATCH EXISTING OR MAKE READY FOR NEW FINISHES 2400 00 27 e a PROTECT EXISTING ACT AND REPAIR IF DAMAGED 5 FURRING TO EXTEND TO 150mm ABOVE FINISHED CEILING 7 OR TO U S OF STRUCTURE WHERE NO CEILING EXIST e L REMOVE EXISTING GYPSUM BOARD ON BOTH ENDS OF REFER TO REFLECTED CEILING PLANS UNLESS o G s G are P g m S S THE STUD KEEP THE STUD IN PLACE FOR INSTALLATION OTHERWISE NOTED OF NEW GYPSUM BOARD FOR FIRE RATING REFER TO N PLAN FOR NEW PARTITION TYPE l EXISTING ACT CONTINUES ABOVE DEMOLISHED WORK AREA 2 NI PARTITION REPAIR OR REPLACE EXISTING ACT TILE IF O DAMAGED GENERAL NOTES i i 77 rp aaa TO BE REMOVED REFERTO 1 PAINT ALL SIDING SURFACES TO MATCH EXISTING Iw 2 REFER TO MECHANICAL DRAWING FOR SCOPE OF X MECHANICAL WORK i o LE amp J Gi EXISTING MILLWORK TO BE REMOVED AND REUSED GC 3 REFER TO ELECTRICAL DRAWINGS FOR SCOPE OF TO STORE AND PROTECT DURING CONSTRUCTION UNTIL ELECTRICAL WORK READY FO
21. asher can be bolted to the floor hardware not supplied or fitted with four adjustable feet that are shipped with the unit Whether installed indoors or outdoors the backboard washer must be kept level to operate properly Prepare the installation site to local code The backboard washer must be hardwired by a qualified electrician to a 120 V AC junction box with disconnect capability so the power can be turned off if the machine requires service Refer to the wiring schematic shipped with the backboard washer All plumbing must meet the National Plumbing Code at minimum Check with your local government for additional local codes affecting your area Have a qualified plumber install a 3 4 inch diameter hard or flex hot water line hookup from the water supply to the backboard washer A 3 4 inch diameter NPT National Pipe Thread female fitting is factory installed If a backflow preventer is required by code contact Ferno Customer Relations page 13 The factory installed drain hookup must be connected to a 2 inch schedule 40 PVC drain pipe Refer to the plumbing schematic shipped with the backboard washer 3 2 Attaching the Adjustable Feet The backboard washer is shipped with four adjustable feet that can be attached to keep it level The backboard washer must be level to operate properly To install the adjustable feet unpack them and screw them into the threaded holes in the base of the legs Use an adjustable wrench to ad
22. asher us 5 6 5 3 Operating the Backboard Washer 11 2 1 Backboard Washer Description sssssssrssseeresssen s 5 6 Maintaining the Backboard Washer essssessssses 12 2 2 General Specifications eeeereeeeeee 5 AE O Va PR tego 12 2 3 Components arera b ana 6 62 Canarie Backboard Wash sa otitis 2 3 Installing the Backboard Washer esssssssosossssserssrese 7 6 3 Polishing the Backboard Washer Lu 12 3 1 Site Setup ananas 7 6 4 Inspecting the Backboard Washer 12 3 2 Attaching the Adjustable Feet 7 7 Limited Warranty ss 13 4 Using the Features 8 Ferno Customer Relations sm 13 4 1 Control Panel mionna nezna 8 Training Record eee NE 14 4 2 Emergency Stop Button een 8 illustrations GOmMpOMENts sn nania loan 6 Figure 5 Pushing a Backboard into Figure 1 Control Panel 8 the Entrance Portal 11 Figure 2 Emergency Stop Button 8 Figure 6 Pulling a Backboard from the Exit Figure 3 Disinfectant Flowmeter 8 Portal eia aaa 11 Figure 4 Disinfectant Reservoir c cccccccsssessescsssscessscerssvenss 9 Maintenance Table 12 O Ferno Washington Inc 234 3243 00 April 2003 m ug 1 SAFETY INFORMATION 1 3 Important 1 1 Danger The following danger alert appears in this manual A DANGER Electric shock can cause death or serious injury Install use operate and maintain the backboard washer only as described in this manual
23. ckboard maximum depth 3 in 8 cm General specifications are rounded to the nearest whole number Metric conversions are calculated before rounding the English measurements For more information contact Ferno Customer Relations page13 or your Ferno distributor Ferno reserves the right to change specifications without notice Ferno Washington Inc 234 3243 00 April 2003 2 ABOUT THE BACKBOARD WASHER Improper use of the backboard washer can cause injury Use the backboard washer only for the purpose described in this manual 2 3 Components Emergency Stop Disinfectant Fill Cap Button Start Button Stop Button Disinfectant Flowmeter Disinfectant Low Light Entrance Portal USERS MANUAL Not Shown For additional free Exit Portal Side Vents Users Manuals you 4 can contact Ferno Customer Relations at 1 800 733 3766 or www ferno com Ferno Washington Inc 234 3243 00 April 2003 3 INSTALLING THE BACKBOARD WASHER 3 1 Site Setup The backboard washer can be installed indoors or outdoors If it is installed outdoors it must be installed inside a shelter where it is not exposed to harsh elements or freezing temperatures Both sides of the backboard washer must be positioned at least two feet away from the walls of the room or shelter in which it is installed The backboard w
24. e backboard washer Important If water does not flow turn off the backboard washer immediately to prevent damage to the pump Figure 5 Pushing a Backboard Into the Entrance Portal ES DEMS Ee A EAA Figure 6 Pulling a Backboard from the Exit Portal 11 6 MAINTAINING THE BACKBOARD WASHER 6 1 Maintenance Schedule The backboard washer reguires regular maintenance Setup and follow a maintenance schedule The table at right represents minimum maintenance When using maintenance products follow the manufacturers directions and read the manufacturers material safety data sheets In the U S A contact Ferno Customer Relations to order Ferno disinfectants and cleaners page 13 6 2 Cleaning the Backboard Washer Clean exterior surfaces of the backboard washer with a nonabrasive cleanser Follow the manufacturer s directions for use Wipe dry after cleaning 6 3 Polishing the Backboard Washer Clean the backboard washer before polishing it Apply a stainless steel polish to the exterior surfaces of the backboard washer once a month 6 4 Inspecting the Backboard Washer Have your equipment maintenance personnel follow the instructions in Using the Backboard Washer pages 10 and 11 and check the following U Are all exterior components present U Are all visible screws nuts and bolts securely in place U Do the START STOP and EMERGENCY ST
25. e product in the event of transfer to new users Additional free copies are available upon request from Customer Relations Proprietary Notice The information disclosed in this manual is the property of Ferno Washington Inc Wilmington Ohio USA Ferno Washington Inc reserves all patent rights proprietary design rights manufacturing rights reproduction use rights and sales use rights thereto and to any article disclosed therein except to the extent those rights are expressly granted to others or where not applicable to vendor proprietary parts Copyright Ferno Washington Inc All Rights Reserved Ferno Washington Inc 70 Weil Way Wilmington OH 45177 9371 U S A Telephone U S A and Canada 1 800 733 3766 Telephone Worldwide 1 937 382 1451 Fax United States ee 1 937 382 1191 Fax Outside U S A 1 937 382 6569 Tntorn a ai satin www ferno com pen mn Ferno Washington Inc 234 3243 00 April 2003 TABLE OF CONTENTS Section Page Section Page 1 Safety Information 4 4 3 Disinfectant Flowmeter eee 8 1 1 Dangers a Se a 4 4 4 Disinfectant Reservoir 9 1 2 Warning iii 4 5 Using the Backboard Washer cssesssessrsssseereee 10 11 ES opora ea A 4 5 1 Before Placing the Backboard Washer in 1 4 Safety and Instruction Labels ee 4 DOPVI E l vu E aE AN S 10 1 5 Bloodborne Disease Notice u 4 5 2 General Guidelines for Use 0 10 2 About the Backboard W
26. ects inc O f q pm 126 Catharine Street N Unit 201 A h J ja ON L8R 1J4 t 905 522 0220 z 8 83 A NEW AMBULANCE A EXISTING S STORAGE e info dpai ca WOMENS WRM lt tes 4 s p e 23 m 118 E 11 amp Drawi e rawings are not to be scaled FA A 05 7 gt ZX Contractor must verify all dimensions on the job and report any D o S e o D LaS discrepancy to architects before proceeding with the work n O Fa a All drawings and specifications are the property of the architect and must 7 be returned at the completion of the work NEW WOMEN S WRM 2 H B g This drawing is not to be used for construction until EXISTING lt amp CHANGING RMS countersigned Date AMBULANCE STORAGE RELOCATED SINK a 123 B3 3 X L 8 EYEWASH STATION TE P at S a x i EXISTING BACKBOARD sO Ca e PeT I B4 H WASHER TO BE MOVED lt V 4 A a I M 7 FROM NORTH GARAGE OF ane INSTALLED amp CONNECTED J 4 2 pee TO NEW PLUMBING ITECIS Z O 5 oi O DAVID PREMI O 57 OI J Mw 02 PA Ey EX UCENCE S 02 gt E MW 01 i j ALIGN K 4456 yw M Hr M O A EXISTING RELOCATED A KITCHEN APPLIANCES i GD SHA 6 z STAR Rodu Je v NEW STAFF ROOM aaa 115 115 X x MW 06 X Pa STORAGE AND Q VENDING SPACE O S EX X EX B EX EX 618 122A 01 F RELOCATED 122A 02 MEX C NARCOTICS CABINETS J He E AS X O EXISTING
27. hes he na v 1 937 382 1191 Outside the U S A and Canada for assistance with the backboard washer please contact your Ferno distributor or Ferno Customer Relations as listed below Telephone Worldwide 1 937 382 1451 Fax Outside U S A 1 937 382 6569 temet ic ena eue es o www ferno com i d Please have the serial number of your backboard E PE V COURS washer available when calling Ferno Customer injury Use only Cerno parts and Ferio Relations and include it in all written communications approved service on the backboard washer Ferno Washington Inc 234 3243 00 April 2003 TRAINING RECORD Date Name Training Method I spo O Ferno Washington Inc 234 3243 00 April 2003 A if i
28. just each foot until the backboard washer is level Ferno Washington Inc 234 3243 00 April 2003 e DANGER Electric shock can cause death or serious injury Install use operate and maintain the backboard washer only as described in this manual 4 USING THE FEATURES 4 1 Control Panel The control panel Figure 1 is on the entrance end of the backboard washer It contains a green START button a red STOP button and a yellow DISINFECTANT LOW light For instructions on using the STOP and START buttons see Operating the Backboard Washer page 11 The DISINFECTANT LOW light comes on when the disinfectant reservoir is empty The backboard washer will not start if the DISINFECTANT LOW light is on 4 2 Emergency Stop Button The EMERGENCY STOP button is located on top of the backboard washer near the exit end Figure 2 Note The STOP button on the entrance end of the backboard washer also can be used as an emergency stop To restart after stopping the backboard washer with either the EMERGENCY STOP or STOP button 1 Twist the EMERGENCY STOP or STOP button to the right until it pops out 2 Push the START button at the entrance end of the machine 4 3 Disinfectant Flowmeter The disinfectant flowmeter Figure 3 increases or decreases the number of ounces of disinfectant per gallon of water mixed and sprayed on a backboard Follow the disinfectant manufacturer s directio
29. k type B6 3 Demolition Legend 1 ADD General Demolition Note No 8 C13 55 13 Addendum 5 Page 1 of 7 Renovations and Reconfiguration of the Hamilton Paramedic Services Station 30 2 REVISE demolition note D5 3 REMOVE demolition note D9 2 DRAWING A004 Ground Level Demolition and Renovation Plan DELETE Drawing A004 Ground Level Demolition and Renovation Plan and REPLACE with Drawing A004 Ground Level Demolition and Renovation Plan issued September 11 2013 attached to this Addendum to incorporate the following 1 Detail 2 Work Area 1 Demolition Plan 1 REMOVE demolition note D9 2 ADD demolition note D5 to the current oxygen cylinder storage millwork 2 Detail 1 Work Area 1 Renovation Plan 1 REVISE section tag 5 A007 to 5 A008 2 REVISE elevation tag 3 A007 in Room 122 A to 4 A007 3 DRAWING A005 Ground Level Demolition Plan and New RCP 1 Detail 1 Work Area 1 Renovation RCP 1 Revise section tag 5 A007 to 5 A008 as per Supplemental Drawing SDA 001 issued September 11 2013 and attached to this Addendum 4 DRAWING A007 Interior Elevations 1 Detail 4 Work Area 1 Renovation RCP 1 Revise title to STORAGE AND VENDING SPACE INTERIOR ELEVATIONS 5 DRAWING A008 Sections and Details 1 Detail 5 1 Revise detail tag Z A008 to 1 A008 as per Supplemental Drawing SDA 002 issued September 11 2013 and attached to this Addendum 2 ADD Detail 10 Door Frame
30. ns for use The flowmeter should be set by authorized personnel to produce the disinfectant manufacturer s recommended mixture of disinfectant and water Turn the flowmeter knob clockwise to reduce the flow of disinfectant Turn the knob counterclockwise to increase the flow Operating Instructions Label Start Button Stop Button Disinfectant Low Light Electrical Hazard Label Figure 1 Control Panel Figure 3 Disinfectant Flowmeter assises Ferno Washington Inc 234 3243 00 April 2003 4 4 Disinfectant Reservoir The disinfectant reservoir holds nine gallons of disinfectant which is sprayed on the backboard as it passes through the backboard washer If the yellow DISINFECTANT LOW light Figure 1 page 8 is lit the disinfectant reservoir is empty This will cause the backboard washer to stop It cannot be restarted until the reservoir is filled To fill the reservoir 1 Unscrew the disinfectant fill cap on top of the backboard washer 2 Fill the reservoir with a disinfectant approved by your local city county or state government for disposal in sanitary drains Figure 4 3 Replace the cap Ferno Washington Inc 234 3243 00 April 2003 DA Figure 4 Filling the Disinfectant Reservoir Important If the yellow Disinfectant Low light is lit the disinfectant reservoir is empty and the backboard washer will not operate Refill the
31. provide a detail on these City Response 12 Refer to Details 1 and 2 on Drawing S1 1 Question 13 At the Partial Plan at the new Coiling Door you indicate HHS columns at the jambs of the new door opening and a C200 at the head On the A008 drawing detail 6 it indicates a C Channel at the door jamb Please clarify if we are to include for HHS Columns or C Channels at the new door jambs City Response 13 Drawing A008 Detail 2 and Drawing A008 Detail 6 which show jamb details state that you should refer to structural drawings for the O H Door metal frame Refer to Drawing S 1A for all structure on the jambs Question 14 The one question there still seems to be some confusion about which havent asked already is at the east corridor wall in the area of the new office Above and below this area we are creating a false ceiling as per detail 5 A007 and it has a 2 hour fire rating In this one small section however it tells us to extend the existing drywall partition type P1 P1 which is only 1 hour fire rated to u s of existing concrete slab So there are a couple of issues that we are confused about lf the sections of this partition to the north and south are a 2 hour fire rated partition why is this area only a 1 hour fire rated partition Detail 5 A007 seems to show that the concrete slab creating the second floor stops at the west side of this corridor so how do we extend the wall on the ea
32. sposable examination gloves when operating the backboard washer Ferno Washington Inc 234 3243 00 April 2003 2 1 Backboard Washer Description The Bio Board Technologies by Ferno Backboard Washer referred to in this manual as the backboard washer is designed to guickly disinfect and clean backboards It can accommodate all standard backboards as well as Ferno s EXL Scoop The backboard washer is for professional use only The backboard washer is a stationary sealed stainless steel unit with internal jets that dispense disinfectant and a constant stream of hot water Rotating internal brushes clean backboards as they are fed through the backboard washer one at a time The backboard washer can be installed indoors or outdoors inside an appropriate shelter The backboard washer is for use with backboards at least 60 inches in length and a maximum of 20 inches wide 2 2 General Specifications Overall Height 47 in 119 cm From floor to bottom of backboard washer 22 in 56 cm Wen otha assets elses vette teen voce 50 in 127 cm WAGE iii sala 37 in 94 cm Weights cities an 401 1b 182 kg Entrance Exit Portals 3 1 4 in x 20 3 8 in 8 3 x 51 8 cm Disinfectant Capacity 9 gal 34 ltr Drain DALE osla ni i 5 cm VOLS r a a O deo a en 120 V AC AIDS iz EBE ona 20 Lame ne pm ana 60 Backboard minimum length 60 in 152 cm Backboard maximum width 20 in 51 cm Ba
33. st side of the corridor to the u s of the concrete slab Wouldn t the partition in this area need to be extended to the u s of the steel deck approximately 22 ft AFF and if so why wouldn t we just put the same false ceiling at this location as we do to the north and south of it City Response 14 Refer to Drawing A003 for fire ratings Detail 5 of Drawing A008 is a section cut through the corridor at that particular portion where there is no second storey above and the corridor needs a rated horizontal separation above it The floor slab of the second floor is existing above existing rooms 110 110 A and 110 B C13 55 13 Addendum 5 Page 6 of 7 Renovations and Reconfiguration of the Hamilton Paramedic Services Station 30 Question 15 The hollow metal contractors would like some additional information on the frame There currently is no detail through the frame and they are assuming you are looking for a 5 1 2 throat but would think that would differ depending on the material the door is installed into They are also looking for an elevation of the doors or confirmation that they are all just a slab style door City Response 15 They are all just slab style doors Refer to Item 1 5 Drawing A008 Sections and Details END OF ADDENDUM 5 Bidders providing a signed Form of Tender have made any necessary inguiries with respect to addenda issued by the City and have provided for all
34. t we have this information City Response 1 1 Room 115 is not a 2 storey situation Detail 5 A008 is a section showing the new corridor s relationship to existing conditions which is further detailed in Detail 1 A008 Existing rooms 118 115 114 114A 114B and 102 are all single storey What might be confused as a second storey is a false ceiling as called out in Detail 1 A008 Partitions were not checked to see if they went to the underside of the second floor Existing Room 123 is a partitioned off area of the vehicle storage garage meaning it has no ceiling cap This condition applies to Room 110 and 122 A Rooms 110 A 110 B and 110 C have a second storey above them Please refer to Drawing A005 which shows all existing and new ceilings Question 2 In room 118 Existing Women s Washroom there are existing ceramic wall tiles on the North East and South Partitions Can you please clarify if the tiles on the partitions that remain are to be removed City Response 2 Refer to Item 1 1 Drawing A002 2 Overall Plan above Question 3 If they are to be removed can you please provide some clarification on what we include for the removals on the North partition ask this because as you see from the C13 55 13 Addendum 5 Page 3 of 7 Renovations and Reconfiguration of the Hamilton Paramedic Services Station 30 attached picture pic 30137 you can tell they start at the end of the lockers the
35. tail 5 A007 believe this should be 5 A008 Please clarify if this is correct correct City Response 8 That is correct Refer to Item 1 2 Drawing A004 Ground Level Demolition and Renovation Plan above Question 9 In room 122 A Storage and Vending Space there is an elevation reference 3 A007 believe this should be 4 A007 Please clarify if this is correct correct City Response 9 That is correct Refer to 1 2 Drawing A004 Ground Level Demolition and Renovation Plan above Question 10 These elevations reference east and west elevations believe these should reference north and south elevations Please clarify if this is correct City Response 10 This reference is based on the true east and west Refer to elevation tags on plans if unsure which elevation it is Question 11 These details all indicate a stainless steel finish on them Please provide some information on the stainless steel what type what gauge and what finish you require City Response 11 16 Gauge 304 Brushed Stainless Steel Sheet Question 12 You indicate a pier and footing below the Gate Control C13 55 13 Addendum 5 Page 5 of 7 Renovations and Reconfiguration of the Hamilton Paramedic Services Station 30 Cabinet and it tells us to refer to the structural drawing do not see any information on the structural drawings with regards to these piers and footings Please

Download Pdf Manuals

image

Related Search

Related Contents

  User Manual • Benutzerhandbuch • Manuel de l - Hu  CDFISH user manual - Computational Ecology Laboratory  HERMA Inkjet CD labels A4 Ø 116 mm white paper matt 50 pcs.  Samsung SGH-E700 Brugervejledning  MODE D`EMPLOI - Heta A/S Support  + V - Deutsche Digitale Bibliothek  Impresario Chronis RTS  Ives 60 User's Manual  Operación con seguridad  

Copyright © All rights reserved.
Failed to retrieve file