Home
        Plate Processor 68/85 Maintenance Chart
         Contents
1. By chemistry  change or   1 hour  once a month         Clean the circulation pumps     Every 3 months   1 2 hours               Clean the replenish pumps     Every 3 months Every 3 months   1 2 hours                  Change brush  Every 25 000 m2   30 min    1 hour       Install Preventive Maintenance Kit Minor  bearings   O rings   V seals       Every year or 500 hours   1 2 hours       Install Preventive Maintenance Kit Medium  gears   bearings   V seals   poppet valves      guides   bushings   pump head   7  Every 2 years or 1 000 hours   3 4 hours       Install Preventive Maintenance Kit Major  gears   bearings   guides   8 Every 4 years or 2 000 hours   5 6 hours         Check the water level  fill up if necessary  Every 2 months   5 min                                Change of chemistry filter is based on the type of chemistry    Machine with water circulation system built in  Chemistry type    See the cleaning instructions in the User s Manual  Chemistry change    Use lukewarm water  Filter change    See the instructions in the processor Service Manual    See the instruction of Preventive Maintenance Kit Minor    See the instruction of Preventive Maintenance Kit Medium    See the instruction of Preventive Maintenance Kit Major    Make certain that tank section and filter housing have been drained completely of chemistry  fill up the section with  PROCESSOR CLEANER   1 4  and let the circulation pump run for 5 10 min  Drain the section again  both the tank section and t
2. Plate Processor 68 85 B Maintenance Chart    V OPERATION SECTION  gt  Pre heat Pre wash Developer Cooler Cleaning Time    Check the replenisher container        Check the waste container        Safety check of the mechanical components          Clean the transport rollers from residues          Change the filter  and reset the filter counter  See  3   gt  Manual tasks            Change the water and clean the section with the hand shower  and reset the wash  water counter  See    3   gt  Manual tasks          Run the gum clean program  Automatic function when switching the processor to  sleep mode if  Auto gum rinse  is set to  Yes            Change the chemistry  and reset the developer counter   See  E3   gt  Manual tasks       Main cleaning  Pre wash 3     a  Clean the brush roller  ef iets  b  Clean the tank with the  PROCESSOR CLEANER     c  Clean the tubes and drain with backflush  once a month          Main cleaning  Developer 3  9   a  Clean all rollers and guides  By chemistry  b  Clean the tank with the  PROCESSOR CLEANER   change or   c  Clean the spray tubes with brush  once a month  d  Clean the tubes and drain with backflush        Main cleaning  Wash 3    a  Clean the brush roller    b  Clean the tank with the  PROCESSOR CLEANER    c  Clean the tubes and drain with backflush     By chemistry  change or  once a month       Main cleaning  Gum 4    a  Flush the gum pumps and solenoid  4    b  Clean the rollers    c  Clean the tank with the  PROCESSOR CLEANER      
3. he filter housing   fill with water and let  the pump run again for 5 10 min  Drain the section and the filter housing again  Remove the filter and clean it  MAKE ABSOLUTELY CERTAIN THAT NO WATER REMAINS IN THE FILTER HOUSING  Install filter  Close filter bottom valve and section drain valve and fill up the section  with fresh chemistry        Part Number 10061365 AB  GB     
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
iStarUSA T5-SA storage enclosure  Severin AT2583 toaster  Rust-Oleum Automotive 248657 Use and Care Manual  Samsung 320 W 2.1Ch Soundbar H551 Hướng dẫn sử dụng  Bedienungsanleitung Instruction manual Mode d`emploi Manuale di  Sony WM-FX251 User's Manual  Commercial Electric CER4742AWH30 Instructions / Assembly  Lopi WILMINGTON DVS FACE 99500148 User's Manual  PSC piccolo Seminario 5 lotto bis  HERMA Present IT    Copyright © All rights reserved. 
   Failed to retrieve file