Home
CE EMC TEST REPORT
Contents
1. Detector Function Peak Quasi peak AV Test Result NOTE L1 Line One Live Line L2 Line Two Neutral Line denotes the emission level was or more than 2dB below the Average limit so no re check anymore Freq Emission frequency in MHz Reading level dBuV Receiver reading Corr Factor dB attenuator Cable loss Level dBuV Reading level dBuV Corr Factor dB Limit dBuV Limit stated in standard Margin dB Level dBuV Limits dBuV Q P Quasi Peak Page 11 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 httpi www tct lab com C Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER Please refer to following diagram for individual ag tee Bary ENS 3014 1 OF __ENS5014 1 AV 0 150 2 Trace 55 Site CC TS Conducted Text Sate Condition ENS501d 1 QP LISN LINE EUT Adapter Model Test Mode On mode Power Rating AC 230V 50Hz Environmant Temp 23 Humi 56 101EPa Test Engineer ez Read Cable Limit Over Level Factor Limit Renark Frequency MHz Average Peak Average Peak Peak Average Peak Average Ge oo L4 P3 to Lay PP Pa D GO O a ih CD i i d we uc s d cn cuc Page 12 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http www tct lab com C Shenzhen TCT Testing Technology Co Ltd Report No TCT112072
2. Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER TEST REPORT For Product Plasma positive and negative ions Trade Name FUWEI Model FUWEI ARC FLASH 7K Report TCT11207230002ER Issued Date Jul 23 2012 Issued for FU WEI HIGH SCIENTIFIC CO LTD No 77 Lane 311 Nangong St YonuKang City Tainan County 710 Taiwan R O C Issued By Shenzhen TCT Testing Technology Co Ltd 11 12F Henglin Building Baoyuan Road Xixiang Street Baoan District Shenzhen Guangdong China Note This report shall not be reproduced except in full without the written approval of Shenzhen TCT Testing Technology Co Ltd This document may be altered or revised by Shenzhen TCT Testing Technology Co Ltd personnel only and shall be noted in the revision section of the document The test results in the report only apply to the tested sample Page 1 This report shall not be reproduced except in full without the written approval of Shenzhen TCT Testing Technology Co Ltd Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER TABLE OF CONTENTS 1 TEST CERTIFICATION 2 TEST RESULT SUMMARY 3 EUT DESCRIPTION 4 TEST METHODOLOGY 4 1 DECISION OF FINAL TEST MODE 4 2 EUT SYSTEM OPERATION 5 SETUP OF EQUIPMENT UNDER TEST 5 1 DESCRIPTION OF SUPPORT UNITS 6 FACILITIES AND ACCREDITATIONS 6 1 FACILITIES 6 2 ACCREDITATIONS 6 3 MEASUREMENT UNCERTAINTY 7 EMISSION TEST 7 1 CONDUCTE
3. www tct lab com C Shenzhen TCT Testing Technology Co Ltd 3 EUT DESCRIP TION Report No TCT11207230002ER Product Model Trade Mark Applicant Housing material EUT Type Serial Number EUT Power Rating AC Line Plasma positive and negative ions FUWEI ARC FLASH 7K FUWEI FU WEI HIGH SCIENTIFIC CO LTD Plastic X Engineering Sample Product Sample Mass Product Sample N A N A N A 1 O PORT N A PORT TYPES TESTED WITH N A Model list and Models difference No Model Number Tested With 1 FUWEI ARC FLASH 7K Other models N A L Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 Page 5 of 36 http www tct lab com C Shenzhen TCT Testing Technology Co Ltd 4 TEST METHODOLOGY 4 1 DECISION OF FINAL TEST MODE Report No TCT11207230002ER The EUT was tested together with the thereinafter additional components and a configuration which produced the worst emission levels was selected and recorded in this report The following test mode s were scanned during the preliminary test Pre Test Mode Conducted Emission Mode Running Emission Disturbance power Mode Running After the preliminary scan the following test mode was found to produce the highest emission level The Worst Test Mode Con
4. 0 5kV Performance Criterion B EN 61000 4 5 Surge Immunity Test 1 2 50 us Open Circuit Voltage 8 20 us Short Circuit Current Power Port Line to line 1kV Line to ground 2kV Basic Standard Signal Port Lines to ground 1kV Specification Performance Criterion B and Performance EN 61000 4 6 Conducted Radio Frequency Disturbances Test CS Criterion 0 15 230 MHz 3Vrms 80 AM 1kHz Performance Criterion A required EN 61000 4 8 Power frequency magnetic field immunity test 50 Hz 3A m Performance Criterion A EN 61000 4 11 Voltage Dips i 30 reduction for 50 period Performance Criterion C ii 60 reduction for 10 period Performance Criterion C Voltage Interruptions 100 reduction for 0 5 period Performance Criterion C Page 18 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http www tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 8 2 GENERAL PERFORMANCE CRITERIA DESCRIPTION Criteria A Criteria B Criteria C The apparatus shell continues to operate as intended without operator intervention No degradation of performance or loss of function is allowed below a performance level specified by the manufacturer when the apparatus is used as intended The performance level may be replaced by a permissible loss of performance If the manufacturer does not specify the minimum performance level or the permissible performance
5. ELECTROSTATIC DISCHARGE ESD 8 3 1 TEST SPECIFICATION Basic Standard EN 61000 4 2 Discharge Impedance 330 ohm Charging Capacity 150pF Discharge Voltage Air Discharge 8 kV Direct Contact Discharge 4 kV Direct Indirect Polarity Positive amp Negative Number of Discharge Minimum 10 times at each test point Discharge Mode 1 time s Performance Criterion 8 3 2 TEST INSTRUMENT IMMUNITY SHIELDED ROOM Name of Equipment Manufacturer Model Serial Number Calibration Due ESD 2000 EMC PARTNER ESD2000 06 21 2012 NOTE The calibration interval of the above test instruments is 12 months and the calibrations are traceable to international system unit 51 Page 20 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http www tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 8 3 3 TEST PROCEDURE The discharges shall be applied in two ways a Contact discharges to the conductive surfaces and coupling planes Twenty dischargers 10 with positive and 10 with negative polarity shall be applied on each accessible metallic part of the enclosure terminals are excluded In case of a non conductive enclosure dischargers shall be applied on the horizontal or vertical coupling planes Test shall be performed at a maximum repetition rate of one discharge per second Air discharges at slots and apertures and insulating surfaces On those pa
6. 2 The loss of function of the EUT during the test and it was recovered by itself operation after the test Page 26 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 httpi www tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 8 5 SURGE IMMUNITY TEST 8 5 1TEST SPECIFICATION Basic Standard EN 61000 4 5 Wave Shape Combination Wave 1 2 50 us Open Circuit Voltage 8 20 us Short Circuit Current Test Voltage Power line line to line 1 kV line to ground 2kV Telecommunication line 1 kV Surge Input Output Power Line L N L PE N PE Telecommunication line T Ground R Ground Generator Source Impedance 2 ohm between networks 12 ohm between network and ground Polarity Positive Negative Phase Angle 0 90 180 270 Pulse Repetition Rate 1 time min maximum Number of Tests 5 positive and 5 negative at selected points Performance Criterion B 8 5 2 TEST INSTRUMENT prre Shield Room Name of Equipment Model Serial Number Number Calibration Due Due EMC PARTNER TRANSIENT 2000 EMC PARTNER TRA2000 06 11 2012 NOTE 1 The calibration interval of the above test instruments is 12 months and the calibrations are traceable to international system unit SI 2 N C R No Calibration required Page 27 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http www tct lab com Shenzhen TCT Testing Technology Co
7. HCP and isolated by an insulating support of 0 5mm thickness A distance of 1 meter minimum was provided between the EUT and the walls of the laboratory and any other metallic structure FLOOR STANDING EQUIPMENT The equipment under test was installed in a representative system as described in section 7 of IEC 61000 4 2 and its cables were isolated from the Ground Reference Plane by an insulating support of 0 1 meter thickness The GRP consisted of a sheet of aluminum that is at least 0 25mm thick and 2 5 meters square connected to the protective grounding system and extended at least 0 5 meters from the EUT on all sides Page 22 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http www tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 8 3 5 TEST RESULTS Humidity 55 RH Pressure 996mbar Test result Air Discharge Test Levels 1 Resuts Test locations Performance LPD Ll Slot 6Points XC X2 __ _ jNete t 2 Performance Observation B 1 2 L B 1 2 NOTE 1 There was no change compared with initial operation during the test 2 The loss of function of the EUT during the test and it was recovered by itself operation after the test Page 23 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 Bhttp www tct lab com C Shenzhen TCT Testing Technology Co Ltd 8
8. apply only to the product system which was tested Other similar equipment will not necessarily produce the same results due to production tolerance and measurement uncertainties Jack Li Tested By Check By Page 3 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http www tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 2 TEST RESULT SUMMARY Standard Item Result Remarks Conducted Main Port Meet limit EN 55014 1 2006 A1 2009 Disturbance power PASS Meet limit EN 61000 3 2 2006 A1 2009 PASS Meet limit EN 61000 3 3 2008 ae n AS Meet limit IMMUNITY EN 55014 2 1997 A1 2001 A2 2008 1 Standard Item Result Remarks EN 61000 4 2 2009 PASS Meets the requirements of Performance Criterion EN 61000 4 4 2004 A1 2010 ae PASS Meets the requirements of Performance Criterion EN 61000 4 5 2006 PASS Meets the requirements of Performance Criterion EN 61000 4 6 2009 PASS Meets the requirements of Performance Criterion EN 61000 4 8 2010 PFMF PASS Meets the requirements of Performance Criterion Voltage EN 61000 4 11 2004 2 PASS Meets the requirements of Performance Criterion variations Note 1 The test result judgment is decided by the limit of test standard 2 The information of measurement uncertainty is available upon the customer s request Page 4 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http
9. loss then either of these may be derived from the product description and documentation and by what the user may reasonably expect from the equipment if used as intended After test the apparatus shell continues to operate as intended without operator intervention No degradation of performance or loss of function is allowed after the application of the phenomenon below a performance level specified by the manufacturer when the apparatus is used as intended The performance level may be replaced by a permissible loss of performance During the test degradation of performance is however allowed However no change of operating state if stored data is allowed to persist after the test If the manufacturer does not specify the minimum performance level or the permissible performance loss then either of these may be derived from the product description and documentation and by what the user may reasonably expect from the equipment if used as intended Temporary loss of function is allowed provided the functions is self recoverable or can be restored by the operation of controls by the user in accordance with the manufacturer instructions Functions and or information stored in non volatile memory or protected by a battery backup shall not be lost Page 19 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http Awww tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 8 3
10. 230002ER 8 7 VOLTAGE DIP amp VOLTAGE INTERRUPTIONS 8 7 1 TEST SPECIFICATION Basic Standard EN 61000 4 11 Test Duration Time Minimum three test events in sequence Interval Between Event Minimum 10 seconds Phase Angle 0 45 90 135 180 225 270 315 360 Test Cycle 3 times Performance Criterion B C 8 7 2 TEST INSTRUMENT Immunity shielded room Name of Equipment Manufacturer Model Serial Number Calibration Due EMC PARTNER TRANSIENT 2000 EMC PARTNER TRA2000 06 11 2012 NOTE 1 The calibration interval of the above test instruments is 12 months and the calibrations are traceable to international system unit 51 2 N C R No Calibration required 8 7 3 TEST PROCEDURE The EUT and support units were located on a wooden table 0 8 m away from ground floor Setting the parameter of tests and then perform the test software of test simulator Conditions changes to occur at 0 degree crossover point of the voltage waveform Recording the test result in test record form Page 33 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http www tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 8 7 4 TEST SETUP For the actual test configuration please refer to the related item Photographs of the Test Configuration To AC Dips Interruption EUT and Variations amp Simulator Support Units Controller Computer 8 7 5 TEST RESULTS Te
11. 30002ER go Level ENS5014 1 P ENS5034 1 AV 0 150 2 55 Site OCIS Conducted Test Sate Condation 55014 1 QP LISN LINE EUT Adaptar Model Test Mode On mode Power Rating AC 2304 50Hz Environment Temp 23 Huni 56 101 Test Engineer COH Frequency MHz Remark Read Cable Limit Over Level Factor Limit Average Peak Aver age Peak Peak Average Peak Average o oo ab m3 LO hd CH D cO OD Page 13 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http www tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 7 2 DISTURBANCE POWER MEASUREMENT 7 2 1 LIMITS asi Peak dBpW dBpW 30 300 45 55 35 45 NOTE 1 The lower limit shall apply at the transition frequency 7 2 2 TEST INSTRUMENTS Shielding Room 843 Name of Equipment E Serial Number Calibration Due EMiTestReceiver Test Receiver ESCI 100005 06 23 2012 WT F 201 23mm 06 06 2012 CLAMP TIME CABLE LMR 400 N TYPE04 06 27 2012 MICROWAVE NOTE 1 The calibration interval of the above test instruments is 12 months and the calibrations are traceable to international system unit SI 2 N C R No Calibration Request Page 14 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http www tct lab com Shenzhen TCT Testing Technology Co Ltd R
12. 4 ELECTRICAL FAST TRANSIENT EFT 8 4 1 TEST SPECIFICATION Basic Standard Test Voltage Polarity Impulse Frequency Impulse Wave shape Burst Duration Burst Period Test Duration Performance Criterion 8 4 2 TEST INSTRUMENT EN 61000 4 4 Power Line 1 kV Signal Control Line 0 5 kV Positive amp Negative 5 kHz 5 50 ns 15 ms 300ms Not less than 1 min B Report No TCT11207230002ER Immunity Shield Room Name of Equipment Manufacturer Model Serial Number Calibration Due EMC PARTNER TRANSIENT 2000 EMC PARTNER TRA2000 06 11 2012 NOTE 1 The calibration interval of the above test instruments is 12 months and the calibrations are traceable to international system unit SI 2 N C R No Calibration required 8 4 3 TEST PROCEDURE a Both positive and negative polarity discharges were applied b The length of the hot wire from the coaxial output of the EFT generator to the terminals on the EUT should not exceed 1 meter The duration time of each test sequential was 1 minute d The transient burst waveform was in accordance with EN 61000 4 4 5 50ns Page 24 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http www tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 8 4 4 TEST SETUP Support Units EFT Burst Non Conductive Table Surge Generator Controller Computer Comm Line 3m 10cm Burs
13. 6 23 2012 LISN ls ase 16010222119 06 28 2012 LISN EUT AN3016 04 10040 06 21 2012 NOTE 1 The calibration interval of the above test instruments is 12 months and the calibrations are traceable to international system unit SI 2 N C R No Calibration Request Page 9 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http www tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 7 1 3 TEST PROCEDURES Procedure of Preliminary Test The EUT and Support equipment if needed was set up as per the test configuration to simulate typical usage per the user s manual When the EUT is a tabletop system a wooden table with a height of 0 8 meters is used and is placed on the ground plane as per EN55014 1 see Test Facility for the dimensions of the ground plane used When the EUT is a floor standing equipment it is placed on the ground plane which has a 3 12 mm non conductive covering to insulate the EUT from the ground plane All I O cables were positioned to simulate typical actual usage as per EN55014 1 All support equipment power received from a second LISN The EUT test program was started Emissions were measured on each current carrying line of the EUT using an EMI Test Receiver connected to the LISN powering the EUT The Receiver scanned from 150 kHz to 30MHz for emissions in each of the test modes During the above scans the emissions were maximized by
14. 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http Awww tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 8 5 5 TEST RESULTS Humidity 55 RH Pressure 996mbar Test Result v Performance Criterion w _ re mw NOTE 1 There was no change compared with initial operation during the test 2 The loss of function of the EUT during the test and it was recovered by itself operation after the test Test Point Polarity Observation Result Page 29 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 httpi www tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 8 6 CONDUCTED RADIO FREQUENCY DISTURBANCES CS 8 6 1 TEST SPECIFICATION Basic Standard Frequency Range Field Strength Modulation Frequency Step Coupled cable Coupling device Performance Criterion EN 61000 4 6 0 15 MHz 230 MHz 1kHz Sine Wave 80 AM Modulation 1 of preceding frequency value Power Mains Shielded CDN M3 2 2 wires A 8 6 2 TEST INSTRUMENT CS Test Name of Equipment Manufacturer Model Serial Number Calibration Due Signal Generator 2022D 119246 003 06 20 2012 Power Amplifier A00181 1000 9801 112 06 29 2012 NOTE 1 The calibration interval of the above test instruments is 12 months and the calibrations are traceable to international system unit SI 2
15. D EMISSION MEASUREMENT 7 2 DISTURBANCE POWER MEASUREMENT 8 IMMUNITY TEST 8 1 GENERAL DESCRIPTION 8 2 GENERAL PERFORMANCE CRITERIA DESCRIPTION 8 3 ELECTROSTATIC DISCHARGE ESD 8 4 ELECTRICAL FAST TRANSIENT EFT 8 5 SURGE IMMUNITY TEST 8 6 CONDUCTED RADIO FREQUENCY DISTURBANCES CS 8 7 VOLTAGE DIP amp VOLTAGE INTERRUPTIONS 9 PHOTOGRAPHS OF EUT Page 2 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http www tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 1 TEST CERTIFICATION Product Plasma positive and negative ions Trade Name FUWEI Model FUWEI ARC FLASH 7K Applicant FU WEI HIGH SCIENTIFIC LTD No 77 Lane 311 Nangong St YonuKang City Tainan County 710 Taiwan R O C Manufacturer FU WEI HIGH SCIENTIFIC CO LTD No 77 Lane 311 Nangong St YonuKang City Tainan County 710 Taiwan R O C Tested Jul 17 Jul 23 2012 Applicable EN 55014 1 2006 A1 2009 EN 55014 2 1997 A1 2001 A2 2 E EN 61000 3 2 2006 1 2009 EN ed P dn 61000 3 3 2008 765 EN 61000 4 3 2006 1 2008 2 2010 EN 61000 4 4 2004 1 2010 EN 61000 4 5 2006 EN 61000 4 6 2009 EN 61000 4 11 2004 Deviation from Applicable Standard The above equipment has been tested by Shenzhen TCT Testing Technology Co Ltd and found compliance with the requirements set forth in the technical standards mentioned above The results of testing in this report
16. Ltd Report No TCT11207230002ER 8 5 3 TEST PROCEDURE a c For EUT power supply The surge is applied to the EUT power supply terminals via the capacitive coupling network Decoupling networks are required in order to avoid possible adverse effects on equipment not under test that may be powered by the same lines and to provide sufficient decoupling impedance to the surge wave The power cord between the EUT and the coupling decoupling networks was shorter than 2 meters in length For test applied to unshielded un symmetrically operated interconnection lines of EUT The surge was applied to the lines via the capacitive coupling The coupling decoupling networks didn t influence the specified functional conditions of the EUT The interconnection line between the EUT and the coupling decoupling networks was shorter than 2 meters in length For test applied to unshielded symmetrically operated interconnection telecommunication lines of EUT The surge was applied to the lines via gas arrestors coupling Test levels below the ignition point of the coupling arrestor were not specified The interconnection line between the EUT and the coupling decoupling networks was shorter than 2 meters in length 8 5 4 TEST SETUP To AC So rce Surge Immunity ou Support Units Controller Computer For the actual test configuration please refer to the related item Photographs of the Test Configuration Page 28 of 36 Hotline 400
17. N C R No Calibration required Hotline 400 6611 140 Page 30 of 36 Tel 86 755 27673339 Fax 86 755 27673332 http www tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 8 6 3 TEST PROCEDURE The EUT shall be tested within its intended operating and climatic conditions The test shell performed with the test generator connected to each of the coupling and decoupling devices in turn while the other non excited RF input ports of the coupling devices are terminated by a 50 ohm load resistor The frequency range was swept from 150 kHz to 230 MHz using the signal level established during the setting process and with a disturbance signal of 80 amplitude The signal was modulated with a 1 KHz sine wave pausing to adjust the RF signal level or the switch coupling devices as necessary The sweep rate was 1 5 x 10 decades s Where the frequency range is swept incrementally the step size was 1 of preceding frequency value from 150 kHz to 230 MHz The dwell time at each frequency was less than the time necessary for the EUT to be exercised and able to respond Sensitive frequencies such as clock frequency ies and harmonics or frequencies of dominant interest was analyzed separately Attempts was made to fully exercise the EUT during testing and to fully interrogate all exercise modes selected for susceptibility 8 6 4 TEST SETUP Power PC Amplifier Controller 10 cm isolation suppor
18. Technology Co Ltd Report No TCT11207230002ER Please refer to following diagram for individual Disturbance Power Measurement 30 000 57 00 84 00 111 00 133 00 165 00 192 00 219 00 246 00 000 Site site 1 Temperature 26 Limit EN55014 Clamp QP Humidity 60 Note AC Line Reading Correct Measure No Mk Freq Level Factor ment Limit Over Position MHz dBuV dB dBpW dBpwW dB Detector cm Comment 34 0800 22 01 22 02 44 03 4515 112 24 0800 5 58 22 02 1644 35 15 18 71 AVG 608400 22 33 22 17 4450 46 14 164 QP 60 8400 6 88 22 17 1529 3614 2085 AVG 97 2000 24 98 20 42 45 40 4749 2 09 QP 97 2000 8 03 2042 12 39 37 49 2510 AVG 1358400 2673 19 22 4505 4802 297 QP 135 8400 7 82 19 22 1140 38 92 27 52 AVG 195 8800 22 56 18 73 41 29 51 14 9 85 195 8800 8 61 18 73 10 12 41 14 31 02 276 0000 27 19 22 64 49 83 5411 428 276 0000 6 73 22 64 1591 4411 2820 Maximum data x Over limit over margin Reference Only Page 17 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http www tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 8 IMMUNITY TEST 8 1 GENERAL DESCRIPTION Product EN 55014 2 1997 A1 2001 A2 2008 Standard Test Type Minimum Requirement EN 61000 4 2 Electrostatic Discharge ESD 8kV air discharge 4kV Contact discharge Performance Criterion B EN 61000 4 4 Electrical Fast Transient Burst EFT Power line 1kV Signal line
19. cable manipulation The test mode s described in Item 3 1 were scanned during the preliminary test After the preliminary scan we found the test mode described in Item 3 1 producing the highest emission level The EUT configuration and cable configuration of the above highest emission levels were recorded for reference of the final test Procedure of Final Test EUT and support equipment were set up on the test bench as per the configuration with highest emission level in the preliminary test A scan was taken on both power lines Line 1 and Line 2 recording at least the six highest emissions Emission frequency and amplitude were recorded into a computer in which correction factors were used to calculate the emission level and compare reading to the applicable limit The test data of the worst case condition s was recorded Page 10 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http Awww tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 7 1 4 TEST SETUP Vert reference plane 4 EMI receiver 1 QO mn A O is M Reference ground plane For the actual test configuration please refer to the related item Photographs of the Test Configuration 7 1 5 TEST RESULTS 6dB Model No FUWEI ARC FLASH 7K Bandwidth 10 KHz Environmental
20. ducted Emission Mode Running Emission Disturbance power Mode Running 4 2 EUT SYSTEM OPERATION 1 Setup EUT with the support equipments 2 Make sure the EUT work normally during the test Page 6 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http Awww tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 5 SETUP OF EQUIPMENT UNDER TEST 5 1 DESCRIPTION OF SUPPORT UNITS The EUT has been tested as an independent unit together with other necessary accessories or support units The following support units or accessories were used to form a representative test configuration during the tests s eer eae Note All the equipment cables were placed in the worst case configuration to maximize the emission during the test Grounding was established in accordance with the manufacturer s requirements and conditions for the intended use Page 7 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http www tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 6 FACILITIES AND ACCREDITATIONS 6 1 FACILITIES All measurement facilities used to collect the measurement data are located at TCT Lab The sites are constructed in conformance with the requirements of ANSI C63 4 and CISPR Publication 14 All receiving equipment conforms to CISPR Publication 16 1 Radio Interfere
21. eport No TCT11207230002ER 7 2 3 TEST PROCEDURE Procedure of Preliminary Test The EUT is place on a 0 8 meters height wooden table above the ground plane and kept at least 0 8 m from other metallic object The straight portion of main lead would put on 6 m long testing bench of if main lead is shorter than 6 m it should be extended as per CISPR 14 EN 55014 1 Any lead connecting the main appliance to an auxiliary apparatus is disconnected if this does not affect the operation of the appliance or is isolated by means of ferrite rings or an absorbing clamp close to the appliance The EUT test program was started Emissions were scanned and measured using a receiver connected to the absorbing clamp The absorbing clamp is positioned for maximum indication at each test frequency 30MHz to 300 2 that means is clamp moved along the main lead until the maximum emission value is found The test mode s described in Item 3 1 were scanned during the preliminary test After the preliminary scan we found the test mode described in Item 3 1 producing the highest emission level The EUT and cable configuration antenna position polarization and turntable position of the above highest emission level were recorded for the final test Procedure of Final Test EUT and support equipment were set up on the wooden table as per step 6 of the preliminary test The receiver scanned from 30MHz to 300MHz Emissions were scanned and measured t
22. he center point of each unit of the EUT and 0 1 meters from the front of the EUT The long axis of the discharge electrode was in the plane of the HCP and perpendicular to its front edge during the discharge At least ten single discharges in the most sensitive polarity were applied to the center of one vertical edge of the Vertical Coupling Plane VCP in sufficiently different positions that the four faces of the EUT were completely illuminated The VCP dimensions 0 5m x 0 5m was placed vertically to and 0 1 meters from the EUT Page 21 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http Awww tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 8 3 4 TEST SETUP EUT amp Support units T T 1 Support Units Ground Reference For the actual test configuration please refer to the related item Photographs of the Test Configuration NOTE TABLE TOP EQUIPMENT The configuration consisted of a wooden table 0 8 meters high standing on the Ground Reference Plane The GRP consisted of a sheet of aluminum at least 0 25mm thick and 2 5 meters square connected to the protective grounding system A Horizontal Coupling Plane 1 6m x 0 8m was placed on the table and attached to the GRP by means of a cable with 940k total impedance The equipment under test was installed in a representative system as described in section 7 of EN 61000 4 2 and its cables were placed on the
23. nce Measuring Apparatus and Measurement Methods 6 2 ACCREDITATIONS Our laboratories are accredited and approved by the following approval agencies according to ISO IEC 17025 USA FCC TIMCO Japan VCCI Canada INDUSTRY CANADA Germany TUV EMCC 6 3 MEASUREMENT UNCERTAINTY Where relevant the following measurement uncertainty levels have been estimated for tests performed on the EUT as specified in CISPR 16 4 2 Uncertainty This uncertainty represents an expanded uncertainty expressed at approximately the 95 confidence level using a coverage factor of k 2 Page 8 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http Awww tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 7 EMISSION TEST 7 1 CONDUCTED EMISSION MEASUREMENT 7 1 1 LIMITS At mains terminal At load terminal and additional terminal FREQUENCY MHz NOTE 1 The lower limit shall apply at the transition frequencies 2 The limit decreases in line with the logarithm of the frequency in the range of 0 15 to 0 50 MHz 3 All emanations from device or system including any network of conductors and apparatus connected thereto shall not exceed the level of field strengths specified above 7 1 2 TEST INSTRUMENTS Conducted Emission Shielding Room Test Site 843 Name of Equipment Manufacturer Mode Model Serial Number Calibration Due EMI Test Receiver RS ESCI 100005 0
24. o moving the absorbing clamp along the main lead until the maximum emission value is found Recorded at least the six highest emissions Emission frequency amplitude antenna position polarization and turntable position were recorded into a computer in which correction factors were used to calculate the emission level and compare reading to the applicable limit and only Q P reading is presented The test data of the worst case condition s was recorded Page 15 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http Awww tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 7 2 4 TEST SETUP Test Receiver For the actual test configuration please refer to the related item Photographs of the Test Configuration Absorbing 6 meter 7 2 5 TEST RESULTS Model No No FUWEI ARC FLASH 7K TestMode Mode _ rie a mr Oe Detector Function Function Peak Peak Quasi Peak AV Peak AV Test Result Result Pass Freq Emission frequency in MHz Reading level dBpW Receiver reading Corr Factor dB Attenuator factor Cable loss Measurement dBpW Reading level dBpW Corr Factor dB Limit dBpW Limit stated in standard Margin dB Measurement dBpW Limits dBpW Page 16 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http www tct lab com Shenzhen TCT Testing
25. rts of the EUT where it is not possible to perform contact discharge testing the equipment should be investigated to identify user accessible points where breakdown may occur Such points are tested using the air discharge method This investigation should be restricted to those area normally handled by the user A minimum of 10 single air discharges shall be applied to the selected test point for each such area The basic test procedure was in accordance with IEC 61000 4 2 a The EUT was located 0 1 m minimum from all side of the HCP dimensions 1 6m x 0 8m The support units were located another table 30 cm away from the EUT but direct support unit was were located at same location as EUT on the HCP and keep ata distance of 10 cm with EUT The time interval between two successive single discharges was at least 1 second Contact discharges were applied to the non insulating coating with the pointed tip of the generator penetrating the coating and contacting the conducting substrate Air discharges were applied with the round discharge tip of the discharge electrode approaching the EUT as fast as possible without causing mechanical damage to touch the EUT After each discharge the ESD generator was removed from the EUT and re triggered for a new single discharge The test was repeated until all discharges were complete At least ten single discharges in the most sensitive polarity were applied at the front edge of each HCP opposite t
26. st Power 230Vac 50Hz rerom DW De DX De me 2 9 B EE NOTE 1 There was no change compared with initial operation during and after the test No unintentional response was found during the test 2 The function stopped during the test but can be recoverable by itself operation after the test 3 The function stopped during the test but can be recoverable manually after the test Page 34 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http Awww tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 9 PHOTOGRAPHS OF EUT Appearance photograph of EUT 3 24 gt lt 18 19 20 21 22 2 l temet a 12 13 14 15 16 17 18 19 20 21 Appearance photograph of EUT D 11 12 133 14 1516 17 18 19202 13 14 15 16 17 PRU Pa PPR 1 Page 35 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http www tct lab com ow Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER Appearance photograph of EUT Appearance photograph of EUT Page 36 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http www tct lab com
27. t Generator Injection Clamp For the actual test configuration please refer to the related item Photographs of the Test Configuration NOTE TABLETOP EQUIPMENT The configuration consisted of a wooden table 0 8m high standing on the Ground Reference Plane The GRP consisted of a sheet of aluminum at least 0 25mm thick and 2 5m square connected to the protective grounding system A minimum distance of 0 5m was provided between the EUT and the walls of the laboratory or any other metallic structure FLOOR STANDING EQUIPMENT The EUT installed in a representative system as described in section 7 of IEC 61000 4 4 and its cables were isolated from the Ground Reference Plane by an insulating support that is 0 1 meter thick The GRP consisted of a sheet of aluminum at least 0 25mm thick and 2 5m square connected to the protective grounding system Page 25 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http www tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 8 4 5 TEST RESULTS Humidity 55 RH Pressure 996mbar Test result Test mode ON TestBy Test Level Performance Se disi Pee Observation B x2 PASS _ ee ew p 3 p 5 Ee pem n PE NP hem E NOTE 1 There was no change compared with initial operation during the test
28. ter 0 1m L lt 0 3m EUT and Support units Note 1 The EUT is setup 0 1m above Ground Reference Plane 2 The CDNS and or EM clamp used for real test depends on ports and cables configuration of EUT For the actual test configuration please refer to the related item NOTE TABLE TOP AND FLOOR STANDING EQUIPMENT The equipment to be tested is placed on an insulating support of 0 1 meters height above a ground reference plane All relevant cables shall be provided with the appropriate coupling and decoupling devices at a distance between 0 1 meters and 0 3 meters from the projected geometry of the EUT on the ground reference plane Page 31 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http www tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207230002ER 8 6 5 TEST RESULTS Humidity 55 RH Pressure 996 Test Result Field Frequency Injected Injection Performance Band MHz PERL Position Method Criterion Observation NOTE 1 There was no change compared with initial operation during the test 2 The loss of function of the EUT during the test and it was recovered by itself operation after the test 3 This item is tested by Shenzhen Academy of Metrology amp Quality Inspection Page 32 of 36 Hotline 400 6611 140 Tel 86 755 27673339 Fax 86 755 27673332 http Awww tct lab com Shenzhen TCT Testing Technology Co Ltd Report No TCT11207
Download Pdf Manuals
Related Search
Related Contents
Whirlpool GJC3055R User's Manual 食安監発第0713001号 平成18年7月13日 都 道 府 県 各 保健所設置 HP 2101us User's Manual Samsung E258 Purple User Manual PowerPoint プレゼンテーション Samsung MAX-ZB550 Manual de Usuario V A L A I S - Ecole 平成27年度 設 計 書 pdf cpc 100 Copyright © All rights reserved.