Home
INGECON SUN 1Play HF Installation manual (English)
Contents
1. Parameters variables and commands are organized as menus and submenus O O O ESC A NY OK a A 13 1 Keypad and LEDs The keypad has four keys ESC To exit a parameter leave a menu and return to the next level up in the structure to not confirm a change or not accept a suggestion DN With this key you can scroll up the list of parameters or folders within the same level or increase the value of an editable parameter by one base unit Vv Scroll down the list of parameters or folders within the same level or decrease the value of an editable parameter by one base unit OK Its purpose is to accept a parameter as valid to enter a lower level menu in the structure to confirm a change or accept a suggestion The panel consists of three LEDs green orange and red 9 Green LED Off inverter disconnected On inverter connected to the grid Flashes once the conditions are not valid for feeding the grid low Vdc voltage or other alarm Flashes six times the connection conditions are valid The inverter is in the process of connecting to the mains O Orange LED Consult section 18 Troubleshooting Red LED Consult section 18 Troubleshooting 32 ABF20111IQE01_B Installation and Operation Manual Display control Ingeteam 13 2 Display The main display shows different inverter data 10 17 AM Current date YYYY MM DD Power reduction percentage and reaso
2. must be taken into account when choosing the location of the unit 0 The surrounding atmosphere must be clean and at temperatures above 40 C the relative humidity must be between 4 and 50 Higher percentages of relative humidity up to 95 are tolerated at temperatures below 30 C Take into account that moderate condensation may occasionally occur as a consequence of temperature variations For this reason apart from the unit s own protection it is necessary to monitor these units once they have been started up on sites where the conditions described above are not expected to be present In the event of condensation never apply voltage to the unit 5 3 Supporting Surface and Fastening These inverters must be installed in accordance with the specifications in the following figure The minimum positive or negative inclination permitted will be 85 in relation to horizontal Reserve a solid wall to which to attach the unit It must be possible to drill the wall and fit suitable wall anchors and self tapping screws to support the unit s weight 5 4 Protection of the connection to the electricity grid It is necessary to install protection elements in the connection between the inverter and the electricity grid Thermomagnetic circuit breaker A thermomagnetic circuit breaker and or fuse must be installed on the connection between the inverter and the electricity grid 18 ABF20111IQE01_B Ins
3. 13 3 Menu structure Daily power graph Start screen ____ piel graph for the last 24 A v ays OK Main menu t Monitoring H Pac Qac Sac PhiCos H Vac lac Fac H Pdc Vdc Idc Riso H Total Energy Time Connections H Partial Energy Time Connections Pac Pwatt Ratio H Alarms H Warnings H Reasons for shutdown Reset stop reasons H Start Stop H Settings H Date amp time H Languages English H Espa ol H Deutsch H Italiano H Fran aise Portugu s H Modbus ID H Partial deletion t Grounding t Not grounded H PV ground PV ground H Contrast String settings H Power settings H Test fans H Diesel grid H No EMS control With EMS control uxiliary relay closure gt Insulation fault Out of Vac Fac limits H Alarms Connected to grid External load F Autotest Comando locale H Advanced settings H Change pass H VIF settings H Country regulations H Factory reset H _ Self cons H PhiCos reference Display lock Inverter data 0 This option is only available if you have selected Se f consumption mode 2 This option is only available if you have selected standard CEI 0 21 SPI INTERNAL Menu intended for the installer and password protected 34 ABF20111IQE01_B Installatio
4. Ingeteam AC connection 10 AC connection This chapter explains the requirements and process for wiring the AC wiring to the unit Read carefully before starting the connection process 10 1 Safety instructions for the AC connection Consult section Important Safety Instructions and the following instructions before working on the unit Make sure there is no voltage present on the unit before starting the connection Do not switch on the power to the unit until you have successfully made the rest of the connections and the unit is closed Ingeteam accepts no liability for any damages caused by incorrect connection Use the personal protective equipment specified in the section Personal Protective Equipment PPE 10 2 Wiring requirements for the AC connection The metal parts of the inverter ground of the unit are connected electrically to the grounding point of the quick connector for AC connection To guarantee the safety of persons for the unit to function correctly and comply with the applicable standards this point must be connected to the ground of the installation The ground and phase cables are connected from the grid to the inverter using a three terminal connector The maximum diameter of the wiring conduit that can be used with the connector is 14 mm The size of the ground cable will be the responsibility of the installer and must meet applicable regulatory requirements in the installation with a
5. maintenance and operation 1 1 Scope and nomenclature This manual is applicable to the following units Complete name Abbreviation INGECON SUN 1Play 2 5HF 2 INGECON SUN 1Play 2 7HF 2 7HF INGECON SUN 1Play 3HF 3HF INGECON SUN 1Play 3 3HF SS INGECON SUN 1Play 3 68HF 3 68HF INGECON SUN 1Play 4 6HF 4 6HF INGECON SUN 1Play SHF SHF INGECON SUN 1Play 5 5HF Dale INGECON SUN 1Play 6HF 6HF This document will refer to the various models by both their complete name and their abbreviation Similarly it will refer generically to any of the models in the INGECON SUN 1Play HF families with the terms unit or inverter 1 2 Recipients This document is intended for qualified personnel The status of qualified personnel referred to in this manual will be as a minimum that which meets all the standards regulations and laws regarding safety applicable to the tasks of installing and operating this unit The responsibility for designating qualified personnel will always fall to the company to which the personnel belong It is necessary to decide which workers are suitable or not for carrying out specific work to preserve their safety at the same time as complying with occupational safety legislation These companies are responsible for providing appropriate training in electrical equipment to their personnel and for familiarizing them with the contents of this manual 1 3 Symbols This manual uses various symbols to emphasize and highlight certai
6. z 0 0 UI Koszykowa 60 62 m 39 00 673 Warszawa Poland Tel 48 22 821 9930 Fax 48 22 821 9931 email polska ingeteam com America Ingeteam INC 5201 Great American Parkway Suite 320 SANTA CLARA CA 95054 USA Tel 1 415 450 1869 1 415 450 1870 Fax 1 408 824 1327 email solar us ingeteam com Ingeteam INC 3550 W Canal St Milwaukee WI 53208 USA Tel 1 414 934 4100 Fax 1 414 342 0736 email solar us ingeteam com Ingeteam S A de C V Ave Revoluci n n 643 Local 9 Colonia Jard n Espa ol MONTERREY 64820 NUEVO LE N M xico Tel 52 81 8311 4858 Fax 52 81 8311 4859 email northamerica ingeteam com Ingeteam Ltda Estrada Du lio Beltramini 6975 Ch cara Sao Bento 13278 074 VALINHOS SP Brazil Tel 55 19 3037 3773 Fax 55 19 3037 3774 email brazil ingeteam com Ingeteam SpA Bandera 883 Piso 211 8340743 Santiago de Chile Chile Tel 56 2 738 01 44 email chile ingeteam com Africa Ingeteam Pty Ltd Unit 2 Alphen Square South 16th Road Randjiespark Midrand 1682 South Africa Tel 2711 314 3190 Fax 2711 314 2420 email kobie dupper ingeteam com Asia Ingeteam Shanghai Co Ltd Shanghai Trade Square 1105 188 Si Ping Road 200086 SHANGHAI P R China Tel 86 21 65 07 76 36 Fax 86 21 65 07 76 38 email shanghai ingeteam com Ingeteam Power Technology India Pvt Ltd 2nd floor 431 Udyog Vihar Phase III 122016 Gurgao
7. 24 3 2 Optional ACCESSONIES aii A aagiiecsmateiatamaranbneaamndaaanaaes 24 8 3 Connecting the potential free auxiliary relay ooccooccccoccccnocncnonnnnnonnnonononnononnnnnnnonnnnnnnnnnnnonnnnnnncnanons 25 3 4 Connectins the disital IMPUt smsi esn io ae aaa a a ra E E E a 26 9 gt CGonnecton ofthe ground COMME OM iii 27 9 1 Safety instructions for the ground CONNECTION ernennen ariaa aa nE EE EOE EES 27 9 2 Wiring process for the ground CONNECTION ooocccccccccoonncononcnnnnonnnnnnnonnnonnnnnnnnonnnnnnnonnnnnnnnnnnnnnnnnnnnnninons 27 TO ACTCONNCCHON cc al ia abla 28 10 1 Safety instructions for the AC CONNECHON mico iria cidad 28 10 2 Wiring requirements for the AC CONNecti0N ooccccocccnccnncncnncnonnnnnnnonnnnnnncnnnnnnnnnnnnnnnnnonnnnnnnnnonnnnnnninns 28 103 AC connection POCOS pom ad iia 28 11 DG CONMECTHON aia dd ina 30 11 1 Satety Instructions tor the DC ConmeCtl ici lcd adn 30 ABF2011I0QE01_B Installation and Operation Manual 7 Ingeteam Contents 11 2 Wiring requirements for the DC CONNECti0ON occccoccnnocnncnconcnnnncnnnncnnononnnnnnnnnnonnnnonnnnonnnnnnnnnnnnnnnoninns 30 11 32 DE gt CONNECHON PIOCESS aiii 30 12 SUP nica in 31 121 Equipment INSPECT OM a cute seluainctes veteran paint dante a Eaa e e cule REE ERE 31 LALIT Me INSPECT OM E T E E datasahcUaacautsteeecvane sens tacvcastavachad sasacdveuctietbce det ieancadtecdeuesess 31 12 1 2 Hermetic scaling of the Ult A aan 31 12 25 NS 31 13 DiS
8. description 2 8 Description of cable inlets A DC connection Quick connector F Communications 16 mm cable grommets B DC connection Quick connector accepted Cable Glameler LOM G Potential free relay 16 mm cable grommets ee ESE accepted cable diameter 4 10 mm D Digital inputs 16 mm cable grommets H SD card reader USB Type B input accepted cable diameter 4 10 mm E Communications 20 mm cable grommets accepted cable diameter 6 13 mm J AC connection Quick connector 2 9 Insulation resistance of the PV array The minimum insulation resistance of the PV array permitted for connection to the inverter grid will depend on applicable regulations Where it is not specified it will be 50 kOhm 14 ABF20111IQE01_B Installation and Operation Manual Receipt of the unit and storage Ingeteam 3 Receipt of the unit and storage 3 1 Reception Keep the unit in its packaging until immediately before installation Keep the unit in a horizontal position at all times 3 2 Equipment identification The serial number of the equipment is its unique identifier You must quote this number in any communication with Ingeteam The unit s serial number is marked on the specifications plate 3 3 Transport damage If the unit has been damaged during transport proceed as fo
9. ground connection Ingeteam 9 Connection of the ground connection These units offer the possibility of grounding the positive or negative pole of the PV array if desired This section explains the process for connecting the cabling to ground the unit Read carefully before starting the connection process 9 1 Safety instructions for the ground connection Consult section Important Safety Instructions and the following instructions before working on the unit Make sure there is no voltage present on the unit before starting the connection Do not switch on the power to the unit until you have successfully made the rest of the connections and the unit is closed Ingeteam accepts no liability for any damages caused by incorrect connection Use the personal protective equipment specified in the section Personal Protective Equipment PPE 9 2 Wiring process for the ground connection The unit comes from the factory without grounding If you wish to ground one of the two poles proceed as indicated in the following figures Without ground connection J103 factory Ground connection of the positive pole Ground connection of the negative pole default status 18 J5 In addition to the connection described you must configure the unit using the display see section 13 6 4 Settings ABF2011IQE01_B Installation and Operation Manual 27
10. inside the packaging If there are signs of condensation the unit must not be installed until you are sure it is completely dry All installation operations must comply with current regulations All operations involving moving heavy weights must be carried out by two people 6 1 General requirements for installation e The environment of the unit must be appropriate and meet the guidelines described in Chapter 5 Preparation for installing the unit Additionally the parts used in the rest of the installation must be compatible with the unit and comply with the applicable legislation e Ventilation and the space for work must be suitable for maintenance tasks according to the applicable regulations in force e The external connection devices must be suitable and sufficiently close as set forth in current regulations e The feed cables must be of the appropriate gage for the maximum current e You must take special care to ensure that there are no external elements near the air inlets and outlets that obstruct proper cooling of the unit 6 2 Attaching the unit to the wall These units have a system for securing them to the wall using a plate The steps for fixing the unit properly are as follows The weight of the unit must be taken into account The top attachment plate for the unit supports the weight The bottom point fixes the inverter to the wall and prevents vibrations 1 Mark the fixing points for the plates on the wa
11. path of the cables so they do not come into contact with live parts e Check the insulation deficiencies and hot spots by checking the color of the insulation and terminals e Check that the connections are properly adjusted 17 4 Cooling system e Check the status of exhaust fans cleaning and replacing them if necessary e Clean the radiator fins and the cooling grids 17 5 Environment Check the environment to avoid amplifying or transmitting the buzzing sound 42 ABF20111IQE01_B Installation and Operation Manual Troubleshooting Ingeteam 18 Troubleshooting This section provides a guide for troubleshooting problems that may arise in the installation and operation of the inverter Troubleshooting for the inverter must be performed by qualified personnel in compliance with the general safety instructions in this manual 18 1 Alarms LED messages LED Lighting Description ABF2011IQE01_B Installation and Operation Manual 4 wm Ingeteam Troubleshooting The number of flashes is indicated Warnings er O The number of flashes is indicated 44 ABF2011 QEO1_B Installation and Operation Manual Waste handling Ingeteam 19 Waste handling These units use components that are harmful to the environment electronic cards batteries or cells etc At the end of the unit s life the waste must be correctly processed by an authorized hazardous waste management company Ingeteam in accord
12. Autotest The results screens for an autotest are then displayed if the test has been completed and a second case in which the test has not been completed 4 30 2015 10 17 AM 4 30 2015 10 17 AM Autotest complete correct result Autotest not complete no result 13 6 6 Advanced settings The settings included within this menu can only be modified by a qualified installer Ingeteam accepts no liability for incorrect use of the installer password nor the consequences that may arise from incorrect configuration of the unit by the user and or the installer To modify the parameters of this menu the installer password will be requested The installer password is 3725 Within this menu you can change the password adjust the voltage and frequency values or modify the country and the regulations applicable to the inverter 13 6 7 Inverter data From this menu you can consult different data referring to the inverter 38 ABF2011IQE01_B Installation and Operation Manual Firmware update Ingeteam 14 Firmware update See the firmware loading manual for details of the update process To download the manual go to the Ingeteam website www ingeteam com and enter the download zone in the inverter model section You will find a zipped file containing the manual and the latest firmware version ABF2011I0QE01_B Installation and Operation Manual 39 Ingeteam Communication via USB 15 Communication via USB These unit
13. Ingeteam INGECON SUN 1Play HF Installation and Operation Manual ABF20111QE01_B 04 2015 Ingeteam INGECON SUN 1Play HF Installation and Operation Manual ABF2011I0QE01_B Installation and Operation Manual ili Ingeteam The copy distribution or use of this document or of its content requires written authorisation Any breach thereof will be reported for damages All rights reserved including those of patent rights or design registration The conformity of the document content with the hardware described has been checked However discrepancies may exist Liability will not be assumed for total concordance The information contained in this document is regularly reviewed and it is possible that there may be changes in subsequent editions Other functions may be available which are not covered by this document This document may be changed iv ABF2011IQE01_B Installation and Operation Manual Important Safety Instructions Ingeteam Important Safety Instructions This section describes the safety warnings and the Personal Protective Equipment used in the unit Safety conditions General warnings The operations described in this manual may be performed only by qualified personnel The status of qualified personnel referred to in this manual will be as a minimum that which meets all the standards regulations and laws regarding safety applicable to the tasks of installing and operating this unit You must comply wit
14. accessories These units may include the following accessories e Communications accessories e Digital input card e Self consumption kit Communication accessories As standard these units have local communication via USB In addition there is the option of establishing connections using other technology types e RS 485 Ethernet including communication via RS 485 for optional use Ethernet TCP including communication via RS 485 for optional use e GSM GPRS including communication via RS 485 for optional use Bluetooth Bluetooth including communication via RS 485 for optional use The instructions for installing the communications accessories are indicated throughout this manual For more information on their functioning consult the corresponding communication accessories manual Digital input cards In certain countries this card is necessary to comply with their regulations Self consumption kit These inverters are compatible with all the self consumption options offered by Ingeteam 2 3 Electrical safety The design values for electrical safety can be found below 2 3 1 Overvoltage category OVC The design of the unit complies with the regulations EC 62109 1 and IEC 62109 2 The direct current circuits have been designed with an overvoltage category II OVC II and the alternating current circuits with an overvoltage category III OVC 111 2 4 Contamination class The units comply with po
15. ance with ts policy of respect for the environment will inform the authorized manager via this Section of the location of components to be decontaminated The elements within the unit that must be handled individually are 1 Electrolytic condensers or condensers containing PCB 2 Printed circuit board cards 3 Liquid crystal displays ABF2011I0QE01_B Installation and Operation Manual 45 Notes Europe Ingeteam Power Technology S A Energy Avda Ciudad de la Innovaci n 13 31621 SARRIGUREN Navarra Spain Tel 34 948 28 80 00 Fax 34 948 28 80 01 email solar energy ingeteam com Ingeteam GmbH Herzog Heinrich Str 10 80336 MUNCHEN Germany Tel 49 89 99 65 38 0 Fax 49 89 99 65 38 99 email solar de ingeteam com Ingeteam SAS Le Naurouze B 140 Rue Carmin 31676 Toulouse Lab ge cedex France Tel 33 0 5 61 25 00 00 Fax 33 0 5 61 25 00 11 email solar energie ingeteam com Ingeteam S r l Via Emilia Ponente 232 48014 CASTEL BOLOGNESE RA Italy Tel 39 0546 651 490 Fax 39 054 665 5391 email italia energy ingeteam com Ingeteam a s Technologick 371 1 70800 OSTRAVA PUSTKOVEC Czech Republic Tel 420 59 732 6800 Fax 420 59 732 6899 email czech ingeteam com Ingeteam Sp
16. ciding the location of the unit and planning your installation you must follow a set of guidelines based on the specifications of the unit These guidelines are summarized in this chapter 5 1 Environment These units can be installed indoors and outdoors Place the units in a place which is accessible for installation and maintenance work and which permits use of the keyboard and the reading of the front indicator LEDs Avoid corrosive environments that may affect the proper operation of the inverter Never place any object on top of the unit Do not expose the inverters to direct sunlight Do not install the units in inhabited rooms The inverter produces a slight buzz when in operation Ml ols o PAN Y Y x Y as ae LN Y Y x xN If more than one inverter is installed make sure the hot air extraction of one does not interfere with the correct ventilation of another ABF2011IQE01_B Installation and Operation Manual 17 Ingeteam Preparation for installing the unit Keep the following distances free of obstacles 50 cm P 30 cm lt 30 cm 2 Ca _ o 5 2 Environmental conditions Environmental operating conditions indicated in section 2 7 Specifications tables
17. e considered to be work on live equipment ABF2011I0QE01_B Installation and Operation Manual 5 Ingeteam Important Safety Instructions Category III 1000 Volt measuring instruments must be used for checking for the absence of voltage Ingeteam accepts no liability for any damages caused by improper use of the equipment You must propose in advance to Ingeteam any work carried out on any equipment which implies a modification of the original electrical arrangements These must be studied and approved by Ingeteam gt gt Potential hazards for people The equipment may remain charged after disconnecting the renewable power supply Carefully follow the mandatory steps in the manual for removing the voltage Always follow the indications in the manual on moving and placing the unit The weight of this unit can cause injury if not handled correctly DANGER High temperature The flow of outlet air can reach high temperatures which can cause injury to anybody exposed to it gt gt gt Potential hazards for the equipment The unit requires impurity free air flow while it is operating Keeping the inlets free of obstacles is essential for this air flow to refrigerate the unit After all duly authorized handling check that the inverter is ready to start operation Only after this can you connect it following the instructions in the manual Do not touch boards or electronic components The more sensitive comp
18. ey to access it ABF2011IQE01_B Installation and Operation Manual 35 Ingeteam Display control 13 6 1 Monitoring This menu includes a series of screens which show the main variables being monitored To move between the different screens use the keys and W The structure and interpretation of the variables of this menu are shown below Pac Qac Sac PhiCos Vac lac Fac Pdc Vdc Idc Riso Total Energy Time Connections Partial Energy Time Connections Pac Pwatt Ratio Inverter AC power in watts Inverter AC reactive power in reactive volt amperes Inverter AC apparent power in volt amperes Cosine of Phi Cosine of the phase shift angle between the voltage and current supplied by the inverter AC voltage of the inverter in volts AC current through the inverter in amperes Frequency generated by the inverter in hertz Inverter DC power in watts Inverter DC voltage in volts DC Current in amperes Insulation resistance of the PV array in kiloohms Total energy fed through the inverter throughout its useful life Total time that the inverter has been feeding the grid Total number of network connections Partial energy fed by the inverter Partial time that the inverter has been connected to the grid Partial number of network connections AC power in watts Power fed to the public grid in self consumption mode in watts Self consumption ratio Displays the consumption percenta
19. ge of the loads being fed by the power generated by the inverter 13 6 2 Events This menu shows the events occurring in the inverter Alarms The alarms indicate current events in the inverter that lead to its shut down In section 18 1 Alarms LED messages you can consult the list of alarms and their solution Warnings The warnings are events that do not lead to the shut down of the inverter but do need maintenance action In section Warnings you can consult the list of warnings and their solution Reasons for shutdown Log file that indicates the alarms that have triggered the inverter shutdown indicating the date and time of the shutdown Reset stop reasons This option resets the Stop reasons log file 36 ABF2011IQE01_B Installation and Operation Manual Display control Ingeteam 13 6 3 Start Stop The operation of the inverter can be stopped and started manually using this option 13 6 4 Settings In this menu you can make the following settings Date and time Languages Modbus ID Partial deletion Grounding Contrast String settings Power settings Test fans Diesel grid Factory reset Auxiliary relay closure Autotest Local command 13 6 5 Autotest To modify the date and time of the inverter Selection of the language for the text on the inverter display Assignation of a number that identifies the inverter In photovoltaic installations with more than o
20. h all applicable safety related legislation for electrical work Danger of electric shock Compliance with the safety instructions set out in this manual or in the suggested legislation does not imply exemption from other specific standards for the installation place country or other circumstances that affect the inverter Opening the door of the housing does not imply there is no voltage inside There is a risk of electric shock even after disconnecting all power sources from the system Only qualified personnel may open it following the instructions in this manual When the solar array is exposed to light it supplies a d c voltage to the inverter The entire manual must be read and understood in full prior to manipulating installing or operating the unit Following is a list of the basic obligatory safety standards for each country e RD 614 2001 in Spain e CEI 11 27 in Italy e DIN VDE 0105 100 and DIN VDE 1000 10 in Germany e UTE C18 510 in France Carry out all control and handling without voltage As a minimum security measure in this operation you must always follow the so called 5 golden rules gt POPP bb Disconnect Prevent any possible feedback Check there is no voltage Ground and short circuit 5 Protect from live elements if any and put up safety signs around the work area Until you have completed these five steps the work area cannot be considered voltage free and any work performed will b
21. ironment which damage them such as sources of intense heat objects which could cut them or arrangements which put them at risk of impacts or pulling e Check the polarities of the DC and AC cables Check that the unit is properly secured Check that the unit is secured firmly and is not at risk of falling 12 1 2 Hermetic sealing of the unit Ensure during installation operations that the unit s level of sealing has not been altered during connection of the unit Check the correct adjustment of the connectors and that any cable grommets are well sealed Check that a torque of 6 Nm has been applied to the housing closure screws 12 2 Power up Once a general visual inspection wiring check and sealing check have been carried out connect power to the unit DC and AC In the first inverter connection a number of screens appear in which you must select in this order language country and applicable standards After its configuration a feedback screen appears with the options selected After this first configuration select Main menu gt Start Stop gt Start thus starting the inverter ABF2011I0QE01_B Installation and Operation Manual 31 Ingeteam Display control 13 Display control These units incorporate a display and keypad unit to interface with the installer A N and the user This interface allows the display of the main internal parameters and the configuration of the entire system during installation
22. le sharp changes in temperature is recommended Deterioration of the packaging tears holes etc prevents the units from being kept in optimum conditions before installation Ingeteam accepts no liability in the case of failing to observe this condition ABF2011IQE01_B Installation and Operation Manual 15 Ingeteam Transporting the equipment 4 Transporting the equipment You must protect the unit during transport from mechanical knocks vibrations water splashes rain and any other product or situation which may damage it or alter its behavior Failure to observe these instructions may lead to loss of warranty on the product for which Ingeteam is not responsible 4 1 Transport Transport using a pallet truck You must observe at least the following requirements 1 Place the packaged units centered with respect to the forks 2 Try to locate them as close as possible to the part where the forks and the steering unit meet 3 Inall cases observe the instructions in the pallet truck s user manual Transport using a forklift truck You must observe at least the following requirements 1 Place the packaged units centered with respect to the forks 2 Try to locate them as close as possible to the part where the forks and the steering unit meet 3 Ensure that the forks are perfectly level to avoid overturning the unit 4 Observe the instructions in the forklift truck s user manual under all circumstances Once the unit has been tra
23. ll Ingeteam YX TM il MM dl H hi iI iI i 4i x F 324 2 Drill holes in the wall with a suitable bit for the fastening elements to be used to secure the plate to the wall later 20 ABF2011IQE01_B Installation and Operation Manual Installing the unit Ingeteam 3 Fix the plate using fastening elements that are appropriate for the wall onto which it is to be installed The diameter of the holes of the plate is 7 5 mm PSN 4 Suspend the unit from the plate by fitting the slats in the openings on the back of the unit 5 Mark the lower attachment point remove the unit and drill the hole in the wall Install the unit again and fix the bottom attachment using a suitable fastening element Said hole has a diameter of 7 5 mm 6 Check that the unit is properly secured Once the unit has been installed correctly the connection process will begin Make the connections in the following order 1 Connection of accessories optional 2 Connection of the ground connection optional 3 AC connection 4 DC connection It is mandatory to follow the order described above Do not switch on the power until you have made all the connections and closed the unit ABF2011I0QE01_B Ins
24. llows 1 Do not proceed with the installation 2 Notify the distributor immediately within five days of receipt of the unit If ultimately you must return the unit to the manufacturer you must use the original packaging 3 4 Storage Ingeteam accepts no liability for damage resulting from the failure to follow these instructions A Failure to follow the instructions in this section may lead to damage to the unit If the unit is not installed immediately after reception take into account the following points in order to avoid damage e The unit must be stored in its original packaging e The package must be stored in the horizontal position Keep the unit free of dirt dust shavings grease etc and away from rodents Keep it away from water splashes welding sparks etc e Cover the unit with a breathable protective material in order to prevent condensation due to ambient humidity Units in storage must not be subjected to weather conditions other than those indicated in Section 2 7 Specifications tables It is very important to protect the unit from chemical products which can cause corrosion as well as from salty atmospheres Do not store the unit outdoors 3 5 Conservation In order to permit correct conservation of the units they must not be removed from their original packaging until it is time to install them In case of prolonged storage the use of dry places avoiding as far as possib
25. llution class 2 as required for this type of inverter 10 ABF20111IQE01_B Installation and Operation Manual Unit description Ingeteam 2 5 Acoustic contamination The unit produces a slight buzz when in operation Do not place it in an occupied room or on light supports which might amplify this buzz The mounting surface must be firm and appropriate for the weight of the unit 2 6 Electrical diagram of the system l l l l trr Optional i Photovoltaic input iii Filter ii High frequency transformer iv AC output for connection to the grid ABF2011I0QE01_B Installation and Operation Manual 1 Ingeteam Unit description 2 7 Specifications tables MANE IEEE EE Depending on the type of installation and the geographic location 2 Never exceed this value Consider the voltage increase of the panels Voc at low temperatures For each C of increase the output power is reduced by 1 8 Consumption from the PV array m N ABF2011IQE01_B Installation and Operation Manual Unit description Ingeteam Depending on the type of installation and the geographic location Never exceed this value Consider the voltage increase of the panels Voc at low temperatures For each C of increase the output power is reduced by 1 8 Consumption from the PV array ABF2011IQE01_B Installation and Operation Manual 13 Ingeteam Unit
26. minimum gage equal to that of phase and neutral If the inverter and the grid connection point are far enough apart to require the use of cables with a larger gage an external distribution box should be used close to the inverter to make this connection 10 3 AC connection process 1 Wire the connector observing the instructions printed on it line L neutral N and ground ground symbol 28 ABF2011IQE01_B Installation and Operation Manual AC connection Ingeteam 2 Insert the connector as shown in the following figure 3 Ensure the connection is firm checking that the safety tab is properly inserted If you wish to remove the connector you must press this tab with a suitable instrument to release it ABF2011I0QE01_B Installation and Operation Manual 29 Ingeteam DC connection 11 DC connection This chapter explains the requirements and process for wiring the DC wiring to the unit Read carefully before starting the connection process 11 1 Safety instructions for the DC connection Consult section Important Safety Instructions and the following instructions before working on the unit Make sure there is no voltage present on the unit before starting the connection Do not switch on the power to the unit until you have successfully made the rest of the connections and the unit is closed Ingeteam accepts no liability for any damages caused by incorrect connection Use the pe
27. mmet ABF2011I0QE01_B Installation and Operation Manual 23 Ingeteam Connection of accessories 8 Connection of accessories Throughout this chapter the process is explained for connecting the optional accessories in the unit along with the potential free relay and the digital input Optionally a communication system can be installed in order to establish a connection with the unit to monitor and configure it either locally or remotely depending on the type of communication chosen and the needs of the installation As standard these units have local communication via USB In addition there is the option of establishing connections using other technology types e RS 485 Ethernet including communication via RS 485 for optional use Ethernet TCP including communication via RS 485 for optional use e GSM GPRS including communication via RS 485 for optional use Bluetooth Bluetooth including communication via RS 485 for optional use See the corresponding communication accessories manual for further information Read carefully before starting the connection process 8 1 Safety instructions for connecting accessories Consult section Important Safety Instructions and the following instructions before working on the unit Make sure there is no voltage present on the unit before starting the connection Do not switch on the power to the unit until you have successfully made the rest of the c
28. n Haryana India Tel 91 124 420 6491 5 Fax 91 124 420 6493 email india ingeteam com Australia Ingeteam Australia Pty Ltd Suite 112 Level 1 Mike Codd Building 232 Innovation Campus Squires Way NORTH WOLLONGONG NSW 2500 Australia email australia ingeteam com ABF20111QE01_B 04 2015 Ingeteam Ingeteam Power Technology S A www ingeteam com
29. n and Operation Manual Display control Ingeteam 13 4 Daily power graph 4 30 2015 10 17 AM In this screen you can consult the daily power graph The daily energy values Ed from the first connection of the day to the time of the query the total accumulated energy Et and the power P are also listed 13 5 Energy graph for the last 24 days 4 30 2015 10 17 AM In this screen you can consult the energy graph for the last 24 days The daily energy values Ed from the first connection of the day to the time of the query the total accumulated energy Et and the power P are also listed 13 6 Main menu 4 30 2015 10 17 AM The main menu contains the following submenus Monitoring This menu includes a series of screens which show the main variables being monitored The right hand screen shows the first one as an example Events This shows the main events such as alarms warnings and reasons for shutdown Start Stop Start up and shutdown the inverter manually Settings Modify parameters to adapt the unit to different operational conditions Advanced settings To carry out advanced settings in the inverter Its access is restricted by the installer password Is not user accessible Inverter data Key information referring to the inverter serial number firmware loaded etc To access the various menus and submenus the desired option must be highlighted over a black background using the and W keys and press the OK k
30. n for this reduction Current time hh mm Voltage and power of the PV array Both pieces of data are displayed alternately Power voltage and current fed to the public grid nmoomw gt Wattmeter for instantaneous self consumption This symbol is only shown if the inverter is configured to work in self consumption mode If it flashes this is due to a communication failure with the wattmeter Pressing the key OK takes you to the main menu Pressing the key displays the daily power graph Pressing displays the energy graph for the last 24 days The reasons for power reduction are as follows T Temperature The inverter is limiting the power due to internal overheating C Communications The inverter is limiting the power after having received a reduction setpoint through communications F Grid frequency The inverter is limiting the power due to the grid frequency variation V Grid voltage The inverter is limiting the power due to the grid voltage variation Q Reactive priority The inverter is limiting the power due to the injection of reactive power A Configuration The inverter is configured to limit its power R Initial connection ramp The inverter is limiting the power after a reconnection to the grid S Self consumption mode The inverter is limiting the power due to functioning in self consumption mode M Reserved mode ABF2011IQE01_B Installation and Operation Manual 33 Ingeteam Display control
31. n texts The general meanings are explained below A General warning General information AN Electrical danger AR Read the section indicated in this manual AN Hot surface Prohibition ABF2011IQE01_B Installation and Operation Manual 9 Ingeteam Unit description 2 Unit description 2 1 Overview The basic purpose of an inverter is to convert the direct current generated by the PV array into alternating current to feed into the electricity grid These units are single phase PV inverters with a high frequency transformer which therefore provide galvanic insulation between the panel and the electricity grid grounding the PV panel at either positive or negative terminals There are technology types for panels in which the manufacturer indicates that it is advisable to ground one pole of the panel to prolong its useful life Likewise the regulations of certain countries require galvanic insulation between the electricity grid and the PV array This inverter is suitable for these conditions It includes a power conversion stage with a high frequency transformer with which its weight and size decrease considerably compared to conventional transformers At the same time the use of a high frequency transformer substantially improves the performance of the unit As standard the inverter includes communication via USB an SD card reader for updating the firmware a potential free relay for signaling and two digital inputs 2 2 Optional
32. ne inverter each one must be assigned a different number Ingeteam recommends using correlative numbering Deletes the partial meters From this menu you can configure the PV array grounding In addition to this configuration you must make the connections indicated in section 9 Connection of the ground connection To adjust the screen contrast of the inverter Not applicable Reduce the unit power By accessing this option it is possible to run a test to check the inverter fans are working properly Intended for hybrid installations whereby the grid is generated by a diesel generator From this menu you can select whether or not the inverted is managed using the INGECON EMS Manager This returns the inverter to factory default status Selection of the reason the auxiliary relay closes The selectable reasons are insulation fault Vac and Fac out of range values connected to grid or external load This menu is only available when the standard selected is CE 0 21 SPI INTERNAL The autotest enables an automatic verification of the grid voltage and frequency limits bringing these limits toward the real value of the measurement and ensuring that the unit disconnects in the set time when the measurement does not comply with the limit This menu is only available when the standard selected is CE 0 21 SPI INTERNAL From this menu you can change the bottom and top frequency limits These limits must correspond to the selected
33. nsported to the place where it is to be located and only when it is to be installed unpack the unit At this time it can be transported vertically over a short distance without packaging Follow the guidelines indicated in the following point Transport of the unpackaged unit You must observe at least the following requirements 1 Follow the necessary ergonomic advice for lifting weights 2 Do not release the unit until it is perfectly secured or placed 3 Ask someone else to guide the movements to be made 4 2 Unpacking Correct handling of the units is vitally important in order to Prevent damage to the packaging which enables them to be kept in optimum condition from shipping until they are installed e Avoid knocks and or falls which may harm the mechanical characteristics of the units e g cause incorrect closure of doors loss of IP rating etc e Avoid as far as possible vibrations which may cause subsequent malfunction If you observe any anomaly please contact Ingeteam immediately Separating the packaging All the packaging can be delivered to a non hazardous waste management company In any event each part of the packaging may be recycled as follows e Plastic polystyrene bag and bubble wrap the appropriate container e Cardboard the appropriate container 16 ABF20111IQE01_B Installation and Operation Manual Preparation for installing the unit Ingeteam 5 Preparation for installing the unit When de
34. onents can be damaged or destroyed by static electricity gt gt Do not disconnect or connect any terminal while the unit is operating Disconnect and check for absence of voltage first Personal Protective Equipment PPE When working on the unit use the following safety equipment recommended by Ingeteam as a minimum Explanation Safety footwear In compliance with standard UNE EN SO 20345 2012 In compliance with standard UNE EN 397 1995 provided there are elements A cies eine with directly accessible voltage Working clothes Close fitting non flammable 100 cotton Dielectric gloves In compliance with standard EN 60903 2005 Tools and or equipment used in live work must have at least Category 111 1000 Volts insulation Should the country s regulations demand another kind of personal protection you should appropriately supplement the equipment recommended by Ingeteam 6 ABF20111IQE01_B Installation and Operation Manual Contents Ingeteam Contents Important Safety AStTUCIAN Sa 5 Safety conditions ene a A a 5 Personal Protective Equipment PPE land cds 6 CONTENTS anadir ocn 7 T About this Manli rita ai 9 Lolo COPE AN nomenclature csser a ad 9 12 Recipes s 9 A 9 2 Unit descrita 10 A a o E A 10 2 2 Optional ACCESSOMES cnica ad 10 2 ElectHCal Sea r a E e a E e E A E E E EAE EE E 10 2 3 1 Overvoltage category OVC i cicsiisccccavsccticsssuacdessaceduenecigastunedaedundvecdtavdtoduwedia
35. onnections and the unit is closed Ingeteam accepts no liability for any damages caused by incorrect connection Use the personal protective equipment specified in the section Personal Protective Equipment PPE 8 2 Optional accessories Depending on the type of accessory to install you must use the connector INGECON Connect or those marked as INGECON Comm of the inverter power card Hit Ee 8 Q Se Be y INGECON GEEET 24 ABF2011IQE01_B Installation and Operation Manual Connection of accessories Ingeteam If the accessory must be connected in the INGECON Connect you must install the two vertical guides shown in the figure above on the electronic circuit board and use them to insert the card of the accessory After connecting the card or the corresponding connectors insert the cable necessary for its proper installation into the unit through the packing glands for the communication accessories To ensure the protection class of the unit the cables used must be of a diameter of between 4 and 10 mm if the 16 mm cable grommet is used or between 6 and 13 mm if the 20 mm cable grommet is used 8 3 Connecting the potential free auxiliary relay These inverters have a potential free output which can have several functions C C C C C osing the re osing the re osing the re osing
36. play Control vecino a Aid da 32 SL Keypad sam G EDS aaa ala da 32 EPA O newest ET 33 13 37 Menu struct A Sd 34 13 4 Daily power raPO oiiia dad 35 13 5 Enerey graph torthedast24 Gays aranica no e E cma daecvealadanc maces setlacmedeslqanes anadnueabomnancseadansanassnce 35 13 6 Mad Melia a odiada 35 L326 Monitorear lidia dla bolis 36 EAS A 36 13 63 SUSO a Aldaia 37 MEN e MRTA aN E E E E A EEE O a E E E E OO 37 IO AOS A A A Ai 37 13 60 06 Advanced Settings ice 38 EA O RRR 38 LA Firmware UPA ds 39 15 COMMUNICATION via USB osierocenie a ia ariba indian dendsassncidunsshadensubedactindeaision dd 40 5 1 WIFE PROCESS a A da 40 16 Shutting down the ade E 41 16 1 Process of shutting down the Unos at a Ee ahaaa aih 41 I7 Preventive maintenant ereire en aa a aaae ia irad i aa e Aa EEEE EAE 42 17 1 Safety CONOS ceisia oa a a aa a a a n aaa a e 42 17 2 Condition OF the NOUSING sasono aoon ie NAAA E a 42 17 3 Condition Of Cables and terminal Sisi a idas E dde dida 42 T74 o O thecagneteyaceadecs 42 1757 EMVINOMME Nt aise ae a a a a clade tueld a A a e aaa E a a RE 42 18 TrOUBLIESHOOLIME coissi ae ea aaa aa aa 43 18 1 Alarms LED Messages a A a Eei Eea AAEN ENE Ri 43 TOs Waste handle aaa idea E EA 45 8 ABF2011IQE01_B Installation and Operation Manual About this manual Ingeteam 1 About this manual This manual describes the INGECON SUN 1Play HF units and provides information for their correct reception installation start up
37. ration Manual Shutting down the unit Ingeteam 16 Shutting down the unit This section describes the procedure to shut down the unit If you wish to work inside the unit you must carry out these instructions in the order shown here to remove the power 16 1 Process of shutting down the unit 1 2 3 Proceed to stop mode from the inverter display Remove voltage from a means of disconnection outside the unit Wait 5 minutes for the internal capacitances to discharge the hot parts which may cause burns to cool and the fan blades to stop turning Check that there is no voltage at the DC and AC inputs Signal cut off point Vac and Vdc with a sign reading Caution no switching If necessary rope off the work area ABF2011I0QE01_B Installation and Operation Manual 4l Ingeteam Preventive maintenance 17 Preventive maintenance The recommended preventive maintenance tasks must be carried out at least annually except where otherwise stated 17 1 Safety conditions You must consider the set of conditions listed below as minimum requirements Before opening the unit you must remove the power see Section 16 Shutting down the unit An open housing never implies an absence of voltage in the unit so only qualified personnel may access the unit following the safe operation guidelines stipulated in this document Ingeteam accepts no liability for any damages caused by improper use of the equipment You mu
38. rsonal protective equipment specified in the section Personal Protective Equipment PPE 11 2 Wiring requirements for the DC connection The wiring gage for the DC connection is specified in the following table Recommended gage for DC cables 4 mm 11 3 DC connection process 1 Remove the caps from the connectors 2 Insert the connectors respecting the polarities indicated on the lower connections plate of the unit Pi 3 Ensure the connections are firm If you wish to remove the aerial connectors use the specific tool to do SO 30 ABF2011IQE01_B Installation and Operation Manual Start up Ingeteam 12 Start up This chapter details the process for the starting up the unit 12 1 Equipment inspection You must check the correct condition of the installation before start up Each installation is different depending on its characteristics the country in which it is located or other special conditions which may apply In all cases before starting up it is necessary to ensure that the installation complies with the applicable legislation and regulations and that at least the part to be started up is complete 12 1 1 Inspection Before inverter start up you must carry out a general inspection of the units involving mainly Wiring inspection e Check that the cables are correctly joined to their connectors e Check that these cables are in a good condition and that there are no hazards in their env
39. s can communicate locally with a PC via USB using the plant management software INGECON SUN Manager available on the Ingeteam website www ingeteam com Consult the INGECON SUN Manager manual for more information The maximum length of the USB cable used to make the connection must not exceed 3 meters 15 1 Wiring process 1 Remove the cover from the USB Type B connector Connect the cable to the inverter cable not supplied by Ingeteam 2 Connect the Cable to a USB port of the PC 3 The PC will recognize the device and install its driver If it is necessary to install the driver manually it can be downloaded from following link http www ftdichip com Support Documents InstallGuides htm 4 Once the installation process has finished open the device administrator from the control panel In the element Ports COM amp LPT a new COMx port related to the inverter will be shown This will be determined as USB Serial Port or FTDI USB Serial Port this will depend on the version of the driver installed 6 Run the INGECON SUN Manager software indicating the port number in the previous step To maintain the protection rating of the unit after this task you must always replace the cover over the USB connector While the inverter remains connected by USB the protection rating of the unit is lower than that specified throughout this document 40 ABF20111IQE01_B Installation and Ope
40. st propose in advance to Ingeteam any work carried out on any equipment which implies a modification of the original electrical arrangements These must be studied and approved by Ingeteam All the maintenance checks included here must be carried out with the machine stopped under safe conditions for handling including those specified by the client for these types of operation When carrying out maintenance work on the unit you must wear the personal protective equipment specified in Section Personal Protective Equipment PPE of this document A After completing the maintenance task replace the front cover and secure it with the bolts supplied 17 2 Condition of the housing A visual check of the condition of the housing must be carried out confirming the condition of the seals and the cover as well as the fixing of the units to their anchor points on the wall In addition you must check the condition of the housing for dents or scratches that might degrade the housing or cause it to lose its protection classification If these types of defect are noticed the affected parts must be repaired or replaced Check that there is no moisture inside the housing If moisture exists dry it before making electrical connections Check the correct fixing of the housing components to their corresponding anchoring points Check the door seal of the unit is in good condition 17 3 Condition of cables and terminals e Check the correct
41. standard Autotest allows for the grid voltage and frequency limits to be tested automatically checking that the unit disconnects correctly within the time set by standard This menu is only available for some standards such as CEI 0 21 SPI INTERNAL During autotest the disconnection time of the following protections is tested Fmax 81 gt S1 Fmin 81 lt S1 Fmax 81 gt S2 Fmin 81 lt S2 Vmax 59 S1 Vmax 59 52 Vmin 27 S2 Lowest upper limit of the frequency protection Highest lower limit of the frequency protection Highest upper limit of the frequency protection Lowest lower limit of the frequency protection Lowest upper limit of the voltage protection Highest upper limit of the voltage protection Lower limit of the voltage protection There are three different states ABF2011IQE01_B Installation and Operation Manual 37 Ingeteam Display control Non eseguito No autotest running and none has been performed during the time in which the inverter has been switched on Riconnessione State awaiting reconnection for the next measurement after an Fmax Fmin Vmax or Vmin check Completato A full autotest has been carried out during the time in which the inverter has been switched on Press OK on Avviare Autotest to start autotest Access Risultati to consult the results of the different tests observing whether the result is correct or incorrect An autotest can be stopped when running by pressing OK on Eseguire
42. tallation and Operation Manual Preparation for installing the unit Ingeteam The following table provides the necessary data for the selection of these devices by the installer Rated current for the o type B thermomagnetic INGECON SUN 1Play HF current circuit breaker 13 5 A BE 26 2 A ZA NAAA AA 3 68HF 26 2 A ZA NO AAA ENE 26 2 A EBA A A A Aue 26 2 A HA When selecting the protection in an installation you must take into account that its breaking capacity is greater than the short circuit current of the mains connection point You must take into account when correctly selecting the protection that the ambient working temperature influences the maximum current permitted by these protections as indicated by the manufacturer Residual current device You must comply with applicable regulations governing the protection of people in the electricity grid 5 5 Cable length The inverter measures the voltage in its connection terminals For this reason the installer must use an AC cable with a sufficiently low impedance so that increasing the voltage in the cable between the distribution transformers and the unit does not cause the unit to be disconnected due to high voltage ABF2011IQE01_B Installation and Operation Manual 19 Ingeteam Installing the unit 6 Installing the unit Before installing the unit you must remove the packaging taking special care not to damage the housing Check that there is no condensation
43. tallation and Operation Manual 21 Ingeteam Installing the unit 6 3 Opening and closing the housing To install the equipment it is not necessary to open the housing unless you wish to modify the ground connection or install an accessory To access the inside of the unit open the cover of the housing by removing the four front screws ee ee ee ae ES JQ ee a SER ae a o Ingeteam A ser a After making the different connections explained in the sections below close the unit before starting it To close the housing tighten the aforementioned screws applying a torque of 6 Nm Check that the unit is correctly closed before starting up the unit 22 ABF20111IQE01_B Installation and Operation Manual Use of cable grommets Ingeteam 7 Use of cable grommets There is a series of cable grommets to insert cables into the unit Follow the instructions below for their correct use 1 Make a hole in the cable grommet membrane using a screwdriver 2 Insert the cables through the hole made Make sure the cable passes through the rear structure of the cable grommet correctly 3 Pull the cable gently outwards until resistance is felt so that the cable is correct secured and the membrane creates a seal Section 2 8 Description of cable inlets indicates the range of cable diameters valid for each cable gro
44. tdestd Gatesaibanerwehanece 10 ZA COMLAMINATION iaa 10 2 50 ACOUSTIC contain ii 11 2 6 Electrical diasramm Of the SM du epa ee e aE aE a E EE 11 2 7 SPCCHICATIONS Tables ia dada 12 2 8 Description OF cable liinda ds 14 2 9 Insulation resistance of the PV array coacalco 14 3 Receipt of the unit and Sri andina 15 Sl RECEP Mss sneen E a a E cds 15 3 2 Equipment Identification sssini a a a a aa a EAE E 15 3 3 Transport damage id 15 94 trapen E E EAE daaan ac ave nents aaaay cise mnactaanseeesasamadioacnoadcu uactaagiie temic masse uaamecedasaaes 15 3 01 Conservati Nros ridad 15 A Trans porting the Eq Ul MOM aia dai 16 AL Mss IANS DOW atodos 16 4 2 Unpacking cirenean E E EAR NE Eae E Aa EREE aE e E S AE E 16 5 Preparationtor installing Ne UM On 17 Dil ENVIA MEN rc tdi da di 17 5 2 Environmental Conditions iia 18 5 3 Supponting Surtace and Fastening incidir a e aE AE E ERATE EEREN 18 5 4 Protection of the connection to the electricity grid oooccconcccoonnconnnccnonnnonnncnnnnonnnnonnnnononnnoncnnnnnnnnns 18 o II a ea n Eaa aE aa i EAA DEIA 19 6 Installing Midas aaa 20 6 1 General requirements forinstalldtin ino aria laa 20 6 2 Attaching the Unit to the Wallis 20 6 3 Opening and closing the ho ME ii a DAD amaia 22 7a USO cable OM MS io a bei 23 Sx Connection Of ACCESSOLES tdci add 24 8 1 Safety instructions for connecting ACCESSOLIES occccoccccoccncnnnnonnnnnnncnnnnnnnonnnnonnnnnnnnnnnnnnnnnnnnonnnnnnnnninnns
45. the re osing the re ay in the event of an insulation fault default option ay in the event of a grid voltage or frequency out of range alarm ay in the event of any alarm in the inverter ay upon connection of the inverter to the grid ay if the estimated power of the PV array exceeds the load power When this mode is selected the user will also have to enter another configuration parameter the load power The gage of the cables used must be between 0 25 and 2 5 mm This device is connected using a conduit with at least two poles To insert the cable into the unit use the cable grommet provided for this purpose Connect the cable to the corresponding terminal As it is a potential free relay there is no polarity ABF2011I0QE01_B Installation and Operation Manual 25 Ingeteam Connection of accessories 8 4 Connecting the digital input These inverters have a digital input O J105 IERIE The digital input can be used with a potential free contact or with a power supply both outside the unit External potential free contact External power supply The truth table for said input is as follows Potential free contact Voltage level Open 5V 24V 0 Closed R lt 100 Ohm OV pike Closed R gt 100 Ohm 1V 5V X 26 ABF2011IQE01_B Installation and Operation Manual Connection of the
Download Pdf Manuals
Related Search
Related Contents
取扱説明書 Manuel d`utilisation C60 System - User Manual Origin Storage 512GB MLC SATA TESOURA PARA UNHAS hp officejet 5100 series all-in-one Samsung CLX-4195FN manual de utilizador ACU Modbus/TCP Copyright © All rights reserved.
Failed to retrieve file