Home
        Annex - Passport ERATO Pelletherm 60 v.2
         Contents
1.  p  4 14    iv          s  ES  a     i weg RT A SS y pee  4 wary med 4  5 CATT cats    TK SEU 7 ee adh A    es   N UREE    E E A r A T a    3                      Sn ee   p  od ee ey ek ek ee E Ens iaat Grins Niiair POL iaat         Se a1 OO ESNOOI POCEN OO SOO COPE DORAN N A    Figure 2 3  The flue gases duct lid is detached  the ash residue is clearly  seen on the boiler   s heat exchanger surfaces      Utilize appropriate tool to clean  to grate  the ash and char deposition off the  internal surfaces of the boiler   s body     ATTENTION   the practice shows that the ash grating is connected with  intensive release of fly ash  thus it is highly recommended to wear air  breathing protective mask as well as appropriate clothing in order to  minimize any lung issues and cloth staining     p  5 14       Figure 2 5  Brushing the ash layer of the heat exchanger surfaces     The next step of the cleaning procedure is to clean the ash deposits on the  third part of the flue gases duct of the boiler     p  6 14       Figure 2 6  Cleaning the ash deposits off the heat exchanger surfaces  as well  as off the ash cleaning mechanism     The ash should be thoroughly cleaned off the metal parts  from the cleaning  mechanism and the heat exchanger as well      p  7 14    EXPLANATION   the ash particles  laid on the horizontal surface of the heat  exchanger  at the flue gas pipes side  could be cleared by a specialized vacuum  cleaner or it could be swept down through the pipes to the surfa
2. ANNEX 1    Hot water pellet boiler of series       Pelletherm v2       end user maintenance procedures    Contents   p    1  General principals                   0ccccccccccsscccccccceccaaeeseseeeeccceeeeeeaaaaeeseeeecceeeeeeaaaaas 2  2  Hot water boiler ash cleaning procedure                        cccccccceceeasseseeeeeeeeees 2  2 1  How to stop the operation mode of the hot water boiler                     3  22     SWIC OLE NG Doli ensais E dex 3  2 3  Cooling down the boiler                   cccccccccesssccccccccceceeeeeseeecccceeeeessaaeseeees 4  2 4  Cleaning the ash of the heat exchanger surfaces                          cc008 4  2 5  Attachment and assembly of the elements  detached at the ash  cleamino DEO COOUEC scenerne iena T E EE 14  3  Recommendations and requirements                     ccccccccseseecccceeeeeeseeeceeeeees 14    http    www greenecotherm eu    ANNEX 1 Hot water pellet boiler of series    Pelletherm v2    end user maintenance procedures     Document edition   29 10 2012 14 55     1  General principals    The fuel of the hot water pellet boiler of series    Pelletherm v2    is wood  pellets  or any other  verified and described in the user manual of the boiler  and  the residual of the combustion process is mineral ash  The quantity of the ash  depends on the fuel mineral mass content  1 e  fuel   s quality  The practice shows  that main part of the ash residue is collected in the ash hopper of the boiler   however ash is deposited on the heat e
3. ces underneath      the ash will be cleaned from the surfaces underneath  Detailed description will  be shows in the next sections     The next step of the cleaning procedure is to clean the internal surfaces of  the pipes of the heat exchanger     this is done by manual movement of the pipe   s  ash cleaning mechanism     Ash cleaning lever   used to clean the    ash residue off the  pipe   s heat  exchanger surfaces       Figure 2 7  Attachment of the heat exchanger pipes ash cleaning actuating  lever     The next step is to detach the front face panel of the heat exchanger in order    to get access to the lid of the second ash deposition zone of the boiler     the area  right above the burner and below the pipes     p  8 14       Figure 2 8  Detaching the front panel of the heat exchanger     The next step is to unscrew the fixing nuts of the lid  which closes the  secondary ash deposition zone of the three way flue gas duct of the heat  exchanger  Notice that the lid is tightened in order to prevent any flue gases  leakage or ambient air both in and out of the flue gas duct             i    int  tee i P  ouga eager Soar CR a anos lalate el aaa  sap an ee ain da  2 ae eB ask on r E Eeh ETA ae  Pear ee tt     Toes nt ee  X  A Vie CAA       dez     Figure 2 9  The lid of the secondary ash deposition zone is detached and the  ash layer should be cleaned away     p  9 14       Figure 2 10  Cleaning of the ash in the secondary deposition zone of the heat  exchanger  right benea
4. eaning procedures in  details     p  2 14    Te   ee       Figure 2 1  Working gloves and working apron  provided for easy and safe  cleaning process of the ash residue     2 1 How to stop the operation mode of the hot water boiler    The nominal operation of the boiler should be stopped by switching off its  operating mode     refer to the boiler   s user manual for more details  After the  boiler has been stopped  it takes time until the fuel  which is burning in the    burner will be entirely combusted and the heat exchanger is cooled down to  safe levels of the temperature     2 2 Switch off the boiler    The final shutdown of the boiler going through the switch  POWER   the  condition for this switching is the combustion process has subsided     It is forbidden to stop the boiler through the  POWER  switch at work     p  3 14    2 3 Cooling down the boiler    After the boiler is switched off it should be cooled down     it is necessary to  wait until the temperature of the circulating water is moderate and the heat  exchanging surfaces are cooled down to safe levels and the ash cleaning  procedure could start     2 4 Cleaning the ash of the heat exchanger surfaces    Before the ash cleaning it is necessary to open the top cover of the heat  exchanger body     Unscrew the  fixing nuts and  remove the flue    gas duct lid       Figure 2 2  The top cover of the heat exchanger is lifted up     The fixing nuts should be unscrewed and flue gases duct lid should be  removed    
5. g the operating mode of the boiler as well as the ash content of the  raw fuel     ATTENTION     e After each cleaning procedure  the boiler should be checked out     the  correct attachment of the element  the air tightness of the lids and the  boiler   s functionality     e At the end of the heating season it is necessary to perform thorough ash  cleaning of the boiler  because the mineral ash acts as corrosive reagent  and reduces the reliability of the boiler  It is recommended to take away of  the fuel hopper any pellets  of other fuel if utilized  as the pellets could  absorb moisture from the ambient air and cause clogging of the fuel  transport auger  issues with the ignition  etc      The above depicted ash cleaning procedure is OBLIGATORY  In case that the  ash cleaning and boiler   s maintenance procedures are not followed  it is  possible to decrease the efficiency and performance reliability of the boiler   even operation failure could be achieved  for example clogging of the ash  cleaning mechanism  flue gas fan blockage  etc       p  14 14    
6. th the pipes of the heat exchanger      EXPLANATION   it is recommended to position the ash hopper in a position   which will allow easy collecting of the ash residue     The next step is to clean the ash and char residue  deposited in the burner     ATTENTION  before lifting up the cover of the burner  it is necessary to make  a safety check  1 e  to verify that the temperature of the burner   s details is low  enough to handle and continue with the manipulations  It is strongly  recommended to get measures for self protection        Figure 2 11  Lift of the burner s arc lid     EXPLANATION   the lid of the burner is freely mounted and no fixing items  are used  It is positioned by special locking pins  fixed to the lower part of the  burner in its front side     p  10 14       Figure 2 12  Ash and char cleaning procedure of the material  laid on the  burner   s grate        Figure 2 13  Brushing and cleaning the ash residue and any other char  remaining particles on the burner   s grate     After the burner   s grate has been thoroughly cleaned  it is necessary to clean the  ash beneath the grate     p  11 14    EXPLANATION  the burner   s grate is detached by lifting and alongside  pulling action  It is possible to have difficulties when detaching the grate due to  the deposited ash and eventually any thermal deformation of the details  It is  necessary to take care at the grate removal procedure and to keep the ash  grating element not damaged  it is not necessary to appl
7. xchanging surfaces as well and other  surfaces that are in direct contact with the flue gases  the burner  the flue gas  fan  etc      The ash residue quantity  collected in the main ash hopper  positioned in  the combustion chamber  should be cleared periodically  considering the  operating mode of the boiler as well as the fuel quality     The practice shows that according to the ash in that hopper should be  cleaned  thrown away  periodically     between one and five days  the fuel should  cover the requirements  depicted in the user manual of the boiler      It is advisable to clean the convective part of the heat exchanger     by  utilizing the applied the specialized lever     it should be plugged in the profiled  orifice and swing the lever in both direction several times  which actually will  activate the semi mechanized cleaning system of the boiler      The total ash cleaning procedure should be performed once per month      advisably  but not more that two months period of hot water boiler   s operation   The period between ash cleaning of the boiler should be clarified at practice  as  it depends mainly on the fuel quality     2  Hot water boiler ash cleaning procedure  ATTENTION   it is strongly recommended to have self protection     utilize  gloves  protection glassed and appropriate clothing  as the risk of injuries is    high at high temperatures of the surfaces in the combustion chamber of the unit     The following sections will describe the cleaning ash cl
8. y excessive force in  order to remove away the grate      Ash grating element  moved forward backward by special  mechanism       Figure 2 14  Detaching the grate of the specialized burner     p  12 14       Figure 2 15  Cleaning the ash residue  fallen beneath the grate of the burner     The next steps are to take away the ash hopper  placed on the bottom of the  combustion chamber  to deposit away the ash residue in special fire protected  container  The cooled down ash could be utilized as soil fertilizer        Figure 2 16  Tacking the ash hopper out of the combustion chamber     p  13 14    2 5 Attachment and assembly of the elements  detached at the ash  cleaning procedure    The attachment procedure should be done in reverse sequence of the steps   depicted in the previous sections of the manual     ATTENTION  it is necessary to ensure air tightness if the lids of the flue gases  duct of the boiler  these are the lid of the ash deposition secondary zone  as well  as the top lid  covering the flue gases duct of the heat exchanger   in order to  ensure high reliability and efficiency of the appliance     3  Recommendations and requirements    It is highly recommended to perform the above described procedure of ash  deposition cleaning as it will ensure high efficiency and reliability of the boiler   It is recommended to ash clean the unit on a period of a month of operation  but  it is necessary to clean the ash on operation period of no more than two months   considerin
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Bedienungsanleitung - Fernbedienung ANV 2010S EU  Manual de Instrucciones  高機能無停電電源装置 Smart-UPS SMT 1500RMJ 取扱説明書    運 行 管 理 規 程  Mode d`emploi pour variateur et thermostat pour    SYBA SD-EXPC34-2F  Fagor FSV-85    Copyright © All rights reserved. 
   Failed to retrieve file