Home

memorandum of understanding - MP State Electronics development

image

Contents

1. Allow installation from the front or rear of the faceplate Durability 750 mating cycles on modular jack and 200 termination cycles on 110 block 17 Multimode OM3 Fiber Patch Chords Patch Cords 550 metres channel 10 Gb s The fiber optic patch cord shall be configurable with standard LC SC terminations and shall be available in either 1 6 mm or 3 0 mm duplex zipcord The 1 6 mm cordage shall exceed the requirements for larger diameter cordage and allows at least twice as many fibers to be installed in a cabinet Feature premium fiber that meets IEEE 802 3ae 10 Gigabit Ethernet requirements as well as IEC 60793 2 10 and TIA 492AAAC specifications for laser bandwidth Differential Modal Delay DMD specifications The duplex cordage shall be 1 6 mm by 3 5 mm and have two single fiber cords joined together with a web The connector shall have a pull proof design that helps prevent accidental disconnects and helps to assure optimal performance of equipment Be 100 optically tested to meet the following performance specifications Parameter SUieSpm mize 1800 s00 MHzekm 0 50 0 10 Typical Laser bandwidth 35 of 38 18 Mounting Cords O Length 10 20 30 and 40 feet Conductor 23 24 AWG 7 32 stranded copper Cable Type UTP CAT 6 ANSI TIA EIA 568 B 2 1 Plug Protection Anti snag feature Modular plugs which exceed FCC CFR 47 part 68 subpart F and IEC 60603 7 specifications Warranty 20 year component wa
2. Technical Specification Note Bidder has to provide the following items as required 1 Server Blade Type Server class chipset featuring Nehalem processors to be configured with One No of 2 93 GHz 8MB L3 cache Quad core processor servers should be capable of having two processors Processor Server should be supplied with 12 GB memory The server should have Twelve 12 DDR3 Registered or Unbuffered DIMM Memory Slots Should support Advanced memory protection technologies like AECC memory mirroring and memory lockstep mode Should be supplied with 2 x 146GB 15k rpm SAS drives The internal storage should be configured in RAID 1 for OS Hard Disk Hard drives to be hot pluggable and of small form factor Storage controller capable of providing RAID 0 1 configurations with option for upgradeability to 256 MB Battery Backed Up Write Cache Expansion Slots Should have a minimum of 2 PCle based mezzanine slot and simultaneously host interconnects of Ethernet FC fabrics Server to provide two 10G network ports for connectivity to Ethernet switch Ports to be available for USB Network and management Network FC Card Dual Port Fiber channel Mezzanine card to connect to shared storage Should provide remote management software capable of providing graphical interface virtual media and multi factor authentication Server management software should be of the same brand as the supplier
3. In the event of the specified date for the submission of bids being declared a holiday for the office of the competent authority the bids will be received up to the appointed time on the next working day e Late Bid Any bid received after the deadline for submission of bids prescribed by the competent authority will not be accepted and returned unopened to the bidder f Modifications and Withdrawal of Bid The bidder may modify or withdraw its bid after bid s submission provided that written notice of the modification or withdrawal is received by the competent authority prior to the deadline prescribed for submission of bids g Bid Process Opening of Bids Since it is a Two bid system Technical and EMD envelope will be opened first by the Committee constituted for this purpose If the technical bid specifications offered EMD and deviations asked if any are found in order the Committee will open commercial bid only for the eligible bidders The Committee will open the bids in the presence of Bidders representatives who choose to attend on the date specified at the following location Addl CGM P M P STATE ELECTRONICS DEVELOPMENT CORPORATION LTD 147 Zone Maharana Pratap Nagar BHOPAL 462011 Prospective Bidder representatives shall sign a register evidencing their attendance In the event of the specified date of Bid opening being declared a holiday for the office the Competent Authority the bids shall be opened at
4. Management Server management software capable of providing role based security alerts of critical component failure Hard drive memory CPU and notify the same using email pager SMS Servers should support Industry led operating system platforms including Windows Server 2003 2008 Red Hat Enterprise Linux Virtualization software like VMware Server to provide two 10G network ports for connectivity to Ethernet switch Should have Lan on Motherboard feature providing 10Gb speeds in the design supporting technologies in TOE iSCSI and RDMA Ports to be available for USB Network and management Should provide remote management software capable of providing graphical interface virtual media and multi factor authentication Server management software should be of the same brand as the supplier Management Server management software capable of providing role based security alerts of critical component failure Hard drive memory CPU and notify the same using email pager SMS Servers should support Industry led operating system platforms including Windows Server 2003 2008 Red Hat Enterprise Linux Virtualization software like VMware Expansion Slots Should have a minimum of 2 PCle based mezzanine slot and simultaneously host interconnects of Ethernet FC fabrics Network Server to provide two 10G network ports for connectivity to Ethernet switch 24 of 38 Should have LAN on Moth
5. Physical security of the media stored in cabinets Ongoing support for file and volume restoration requests at the Server Farm vi Server Management The vendor shall perform all system administration tasks like server management and operating system administration user management device management etc The vendor shall ensure high availability of System resources to the users and to maximize the uptime of the system by diagnosing detecting and rectifying the faults in time The Server Administration for any platform will comprise of the following activities Starting Shutdown servers or services at Server Farm Monitoring performance of server resources CPU Usage Memory disks Monitoring access logs and application logs Purging of files and logs Taking data backup and restoration Applying service packs fixes updates and security patches Providing helpdesk related administrative support Server Management operations will comprise of the following Monitoring of software licenses and identification of software license procurement or up gradation Providing and maintaining user access controls creation modification or deletion of access authentication and administrative rights on servers as per defined access policy Maintaining data access security Deployment Monitoring and updating of Anti virus software on servers Coordinating with Anti virus service provider for support for virus attacks and resolution The bidders wi
6. Railway Tickets Payment of Electricity Telephone Bill Marriage Registration Scope of Software Maintenance It is expected that the software maintenance shall cover following activities Diagnose issues related to software operations or security breach Resolve any software bugs reported by field operations or help desk Develop new services as and when required Modify existing service as and when required Integrate with SSDG when it becomes available Maintain application uptime Manage data user privileges and user administration Manage backup activities Manage SQL dba activities Manage application performance Manage Audit trails system db and application access logs Deliverables for Software maintenance It is expected that the software maintenance shall include the following tasks Issue tracking and reports of maintenance on monthly basis Alerts on security operations on event basis Documentation of code altered or enhanced Documentation of test cases used for code change Documentation of operations plans and execution Documentation of maintenance activities on monthly basis Documentation of Sys Admin Ops DBA functions on monthly basis Documentation of performance issues 12 of 38 Documentation of Code and db changes to the production version On going updation of user manual maintenance manual technical manual code design and other software artifacts On going updation of VSS with latest code and documentation SL
7. Top Mounted 1 no per Rack Monitored Thermostat based The Fans should switch on based on the Temperature within the rack The temperature setting should be factory settable This unit should also include humidity amp temperature sensor Depth o 1000 mm Metal o Aluminium extruded profile Side panel o Detachable side panels set of 2 per Rack Width 760mm Network Racks Should be available in 2 Post Configurations Option of 84 height Should be available with an option of Rail Widths 3 6 12 14 5 2 Post EIA 310 E Compliant UL Listed Certification Information Technology and Communications equipment Load Capacity 1000 Ib 2 and 4 Post Al EIA Standard Hole Pattern 12 24 Threads 5 8 127mm 1 2 25 4mm centers Material Al 6061 T6 Aluminum Extrusion 3 Rail Al 6061 T6 0 125 Thick 6 and 12 Rail Steel 14 Gauge 0 075 Thick CRS Finish Durable black epoxy powder coat Easily assembled hardware included Cable Management Ergonomically designed and aesthetically pleasing Lightweight but sturdy Should have dual hinge latching door amp can be opened right or left Cable fingers spaced at 1RMU increments for exact alignment with EIA standard Rack spacing Cable fingers support up to 48 cables per RMU Should be available in 6 12 vertical trough widths double sided 33 of 38 In case of Horizontal cable management the cover should hinges up or down and locks
8. components Documentation amp Lay outs UTP or OFC Cable route with detailed diagram and plan for laying of UTP and OFC for approval Termination of cabling component UTP cable and OFC with labels amp marking as per approved labeling plan amp documentation Documentation for all POPs Hard and Soft Copy to be maintained for entire 5 years of Projects Conduits and Channels 34 of 38 PVC pipe or Casing type Should be 1 diameter with ISI mark At least 4 cable can laid in one casing Using clamp or gulli channel should be fix on wall and distance between two gulli or clamp not more then 6 inches GI pipe Should be 2 inch diameter class B standard At least 2 cable can laid in one pipe only UTP cable laying Should follow approved plan OFC laying on wall or under ground OFC laying on wall or underground in GI pipe vendor should follow as approved plan 15 Jack Panel Should be a 24 port modular discrete patch panel Ports should be individually replaceable and consistent port to port performance Should confirm or exceed TIA EIA 568 B 2 1 and IEC 60603 7 4 standards requirements for CAT 6 Quadrant pair isolation and a Pyramid wire entry system Metallic high strength and 1U height Should be UL Listed Should confirm or exceed TIA EIA 568 B 2 1 and IEC 60603 7 4 standards requirements for CAT 6 Usable bandwidth 550MHz Utilizes TRI BALANCE technology with optimized pair balance design Have rear protective strain relief caps
9. into position with cylindrical finger ends for easy snap on installation Horizontal cable management troughs should be available in 1 2 RMU Open back on 2U horizontal troughs for easy pass through of cables Easy one point removal and installation process for door Handle should be recessed to eliminate snag potential for clothes and arms Should have C Channel bracket allowing for easy access to the cable trough Provision for Tool less installation of Cable Spool 14 UTP Cable Type UTP Cat 6 ANSI TIA EIA 568 B 2 1 The cable jacket shall comply with Article 800 NEC for use as a non plenum cable The 4 pair UTP cable shall be UL and c UL Listed Type CM Conductors 4 pair 23 24 AWG Copper with pair separator for uniform characteristic impedance Insulation Polyethylene Polyolefin Thickness 0 22 0 03mm Operating temperature 20 to 60 Deg C Jacket Flame Retardant PVC Approvals UL Listed Frequency tested up to 550 MHz Delay Skew lt 35ns Impedance 1 100MHz 100 Q 15 100 550MHz 100 Q 22 Performance characteristics to be provided along with bid Attenuation Pair to pair and Powersum NEXT ELFEXT and PS ELFEXT Return Loss and Delay skew tested for 100m channel as well as 90m Permanent Link Cable Laying Cabling Structured Cabling as per industry Standards UL R certified for complete channel for both Fibre and UTP CAT 5e CAT6 cables 20 25 years standard performance warranty should be given on passive
10. of delivery of consignment on submission of bills in triplicate Balance 20 shall be released in 12 Quarterly Instalments along with payment of the Facility management charges The Facility management charges as mentioned in the scope of work shall be released in 12 Quarterly Instalments against proof of satisfactory performance of Management Services The bills for the purpose of release shall be submitted to MPSEDC Bhopal Interest on delayed payment shall not be payable 3 Installation Verification amp Quality Check Checking will be conducted by the officer agency appointed by the Competent Authority 4 Penalty i Delay in time line A delay in supply installation amp commissioning of Hardware amp Software would invite a penalty of 0 5 of the hardware amp software cost per week A delay of more than 4 weeks may result in cancellation of contract amp forfeiture of Performance Guarantee Non performance of Facility management Services The penalty for downtime for Facility management Services shall be 5 of the facility management charges for a downtime time of every 0 5 or part beyond the permissible limits i e 0 5 during PBH and 1 during Non PBH Downtime will be calculated on Quarterly basis The downtime during Non PBH shall be calculated as half of the actual downtime For example a downtime of 2 hours during Non PBH shall be considered as 1 hour If the uptime falls below 95 may result in cancellation
11. to avoid performance issues Offered storage shall support non disruptive online firmware upgrade for both Controllers and disk drives Tape Library Offered Tape Library shall support Native data capacity of 6TB uncompressed expandable to 12 TB compressed Tape Library shall provide web based remote monitoring capability The Tape Library unit shall be configured with FC LTO Gen4 Tape Drives Tape Drive Architecture in the Library shall conform to Ultra3 SCSI standards Offered LTO4 drive in the Library shall conform to the Continuous and Data rate matching technique for higher reliability Offered LTO4 drive in the library shall offer optional WORM support and embedded AES 256 bit Encryption support Offered LTO4 drive shall have native speed of 120MB sec and a compressed speed of 240 MB sec for 2 1 compression Tape Library shall provide Fiber connectivity to SAN Environment For optimal Performance Tape Library shall provide 4Gbps Native FC interface connectivity to SAN switches Tape Library shall be offered with minimum of 24 slots and barcode reader Tape library shall support removable magazine and mail slot 10 nos of tapes to be provided with the tape library 7 SAN Switch For connectivity of Servers SAN and Tape Library 4Gbps Fiber channel SAN Switches with adequate number of active ports should be provided SAN Switch should be scalable to minimum 24 ports amp relevant S w with Licenses for integration of Servers
12. 3 10 09 up to 3 00 PM Date of opening of technical bid Date 23 10 09 at 4 00 PM EMD Rs 1 25 000 in the form of Demand Draft payable to MPSEDC Ltd at Bhopal Place of opening of bids Office of MPSEDC LTD 147 Zone 1 Maharana Pratap Nagar BHOPAL M P Address for communication MPSEDC LTD 147 Zone 1 Maharana Pratap Nagar BHOPAL M P Note Tender can be downloaded from the website www mpsedc com In case tender form has been downloaded from the website the tenderer will have to enclose a Demand Draft of Rs 2500 Rupees Two thousand Five Hundred only of any scheduled bank in favor of MPSEDC Ltd payable at Bhopal along with the tender Any future Corrigenda Information shall be posted only on our website www mpsedc com 1 BACKGROUND The National e Governance plan NeGP is a major initiative of the Government of India GOI for ushering e Governance at a national scale NeGP is one of the most ambitious programs of the Government of India aimed at improving the quality accessibility and effectiveness of government services to citizens and businesses with the help of Information and Communication Technology One of the key focus areas of NeGP is the stress on citizen centric services as against merely computerization of the departments e District has been envisaged by Government of Madhya Pradesh GoMP as automation of workflow and internal processes of District Administration with the possibility of seamless integrati
13. A compliance TAT for code change from request to production for bug fix situation of 5 business days or less TAT for code change from request to production for new code situation of 10 business days or less TAT for document completion for all deliverables of 5 business days or less Expected maintenance environment Independent code development area with server and workstations Independent test area with server and test tools required for above technology stack Independent staging area with server and test data Expected Staffing for 1 year when pilot districts go live 2 full time development engineers with at least 4 years experience in the technology stack above and a minimum of MCA or BTech BE in Computer science Certification on Microsoft XRM is a must 1 Full time tester documentation person with minimum of BCA or BIT degree and 3 years experience in testing 1 full time Sys DB administrator with 5 years experience in SQL Win net IIS related operations support and a minimum of MCA or BTech BE in Computer science Certification of MCSA is a must Expected Staffing for next 4 years when all districts go live Same as above Additional Full time Sys DB administrator with same qualifications as above The tenderer is advised to make his own assessment of the manpower requirement and quote accordingly The customization Code of the Application Software shall be provided by MPSEDC The Facility management will include the
14. C policies etc Periodic reviews of domain level rights and privileges Maintenance of an updated knowledge base of all the published security vulnerabilities and virus threats for related software including but not limited to operating systems application servers web servers databases security solutions messaging solutions etc Ensuring that patches workarounds for identified vulnerabilities are patched blocked immediately Responding to security breaches or other security incidents and coordinate with respective OEM in case of a new threat is observed to ensure that workaround patch is made available for the same 8 of 38 Undertake maintenance and management of security devices including but not limited to maintaining firewall services to restrict network protocols and traffic detecting intrusions or unauthorized access to networks systems services applications or data protecting email gateways firewalls servers desktops from viruses Implementation and periodic updating of the security policy Operating system hardening through appropriate configuration and patch updates The vendor shall also provide the following anti virus administration services Monitor the Anti Virus tool installed on daily basis and ensure that the latest patches are updated in all the systems Monitor the security console and clean the virus from the systems which are affected and if necessary isolate those systems to avoid f
15. Concurrent Connections Minimum 50 000 New Connections Second 9000 Integrated Network Ports 2 Gigabit Ethernet 3 Fast Ethernet ports Virtual Interfaces VLANs Min 100 Expansion Slot 1 User Accessible Flash slot 1 USB 2 0 Ports 2 Serial Ports 2 console and auxiliary Rack Mountable Yes Memory 256 MB Minimum System Flash 64 MB System Bus Multi bus architecture Application Security Support The Firewall should have Integrated specialized inspection engines for protocols like HTTP FTP ESMTP DNS SNMP ICMP SQL Net NFS H 323 Versions 1 4 SIP MGCP RTSP and TAPI over CTIQBE protocol GTP LDAP ILS RPC and many more The Firewall should provide advanced inspection services to detect and optionally block instant messaging peer to peer file sharing and other applications tunneling through Web application ports It should block popular instant messaging applications such as AOL Instant Messenger Microsoft Messenger and Yahoo Messenger 31 of 38 12 Switch for Data Centre _ Features Specifications Required Interface Slots 1 x 24 ports 10x100 FE 2 x 1000 Mbps ports base single mode or GE VLAN features IEEE 802 1Q VLAN encapsulation Dynamic Trunking Protocol DTP or equivalent Minimum 255 VLAN Management RS 232 Console port Accessibility using Telnet SSH Console access SNMPv1 snmpv2 v3 Miscellaneous All necessary power cords adapters data cables co
16. M P STATE ELECTRONICS DEVELOPMENT CORPORATION LTD A Govt of M P Undertaking Tender Document For Supply Installation and Maintenance of Servers SAN and other hardware components at Data Centre under e District Project Tender no MPSEDC MKT 2009 171 All pages of this document except for Commercial bid to be submitted in original duly signed on each page along with the technical bid envelope The Commercial bid in original is to be enclosed in a separate sealed envelope M P State Electronics Development Corporation Ltd 147 Zone l M P Nagar Bhopal 462011 M P Ph 0755 2769816 2769823 Fax 0755 2769824 INVITATION FOR BIDS Addl Chief General manager MPSEDC Ltd Bhopal invites sealed bids under two envelopes system from bidders for Supply Installation and Maintenance of Servers SAN and other hardware components at Data Centre under e District Project Interested bidders may obtain further information from the office of MPSEDC Itd Bhopal Bids are invited for the work mentioned hereunder Sn Items Description Scope of Work Supply Installation and Maintenance of Servers SAN and other hardware components at Data Centre under e District Project Cost of bid document Rs 2500 00 non refundable by Demand Draft Cash Postal charges Rs 100 00 MPSEDC LTD shall not be responsible for any postal delay Sale of bid documents Date 30 9 09 to 22 10 09 Between 10 30 AM to 5 30 PM Last date of submission of bid Date 2
17. actors Electronic security and control of confidential data Fast processing of public cases appeals grievances dissemination of information as per public requirement To proactively provide an efficient system of disseminating information on the Government schemes planned developmental activities and status of current activities 2 SCOPE OF WORK 1 Following is the scope of work to be performed by the selected vendor Scope of Work Area Description of Scope of Work Deliverables for the Activity General The selected vendor must sign SLA at the time of agreement with MPSEDC The selected vendor must Deliver install configure and provide necessary support for Servers Storage Unit Tape Library Unit and related equipments The selected vendor must Deliver install configure and provide necessary support for any other hardware including servers that is required for the project The selected vendor must provide necessary support for Datacenter and Disaster Recovery Site to their respective vendor s The selected vendor must Install configure and provide necessary support for software on servers and or desktops The selected vendor must provide the Support staff Administrators for Data Center operations The selected vendor must providing necessary support and coordinate with LAN WAN vendors Analysis The selected vendor MUST clearly demonstrate in an effective and efficient manner the overall understanding of MPSEDC s requirements a
18. and other hardware components at Data Centre for the e District project in accordance with the terms amp conditions and confirm our acceptance to execute the order within the time period specified in the tender document at the rates quoted by us in the accompanying Technical amp Commercial bid If after the tender document is accepted we fail to complete the Selection of Vendor for Supply Installation and Maintenance of Servers SAN and other hardware components at Data Centre for the e District project as per the order we agree that MPSEDC Ltd Bhopal shall have full authority to forfeit the earnest money and cancel our order with no obligation on their part We further confirm that We have successfully executed orders of similar nature and have sufficient experience amp financial strength in handling orders of this value We have sufficient qualified manpower amp necessary materials to execute the order efficiently in the specified time schedule The quoted rates shall be valid till the completion of the order We further confirm that all chapters of the tender have been read amp understood amp signed amp there is no deviation discrepancy We do hereby undertake that until a formal contract is prepared and executed this bid together with your written acceptance thereof or placement of letter of intent awarding the contract shall constitute a binding contract between us We confirm that we have not been blacklisted by a
19. cost of repair amp maintenance of all Hardware The selected vendor will be required to maintain an uptime of 99 5 during Prime Business Hours 10 AM to 6 PM and 99 during the rest of the period The facility management services can be provided either by deploying manpower at Bhopal on full time basis or through remote monitoring amp management mechanism wherein manpower may be deployed as amp when required In case of remote monitoring amp management the additional cost of software required and the cost of connectivity to remote site shall be born by the bidder The facility management services shall be quoted for a period of three years which can be extended be extended for further two years 13 of 38 3 ELIGIBILITY CRITERIA The following are the conditions which are to be necessarily fulfilled to be eligible for evaluation of the proposed solution Only those interested bidders who satisfy the following eligibility criteria should respond to this Tender 1 The products offered must be of high quality and manufactured by nationally internationally reputed manufacturer having a minimum turnover of Rs 500 Crore Attach copy of the audited balance sheet and ISO 9001 Services and Manufacturing and ISO 14001 certifications 2 In case of the representative dealer the representative dealer must attach tender specific authorization letter in the enclosed format in the tender form from respective manufacturer for all the prod
20. d shall undertake Change Management interventions as necessary to achieve project objectives The selected vendor shall also be responsible for re training the operators whenever changes are made in the solution Deliverables i Change Management interventions ii Advance Administration training for Data Center Administrators for 10 Days to perform required tasks User Training for officers employees vendors for project in batch sizes not exceeding 30 for deployed system Syllabus and Manual for Training plan for the departmental users to be approved by Competent Authority beforehand Issue supporting documentation such as Training material User Manuals Maintenance Manuals etc on 1 1 basis Sign off from MPSEDC on Training Solution The selected vendor shall also include preparation of documents Documentation including Technical and User Manuals Operational Manual Maintenance Manuals etc vendor shall obtain the sign off from Competent Authority for all the documents submitted for the solution Deliverables i Technical Operational and User Manuals for operation of the deployed solution Maintenance manuals for Data Center Equipments Network Diagrams for Data Center Documentation of IP and Subnet Scheme Routing Tables and ACL etc deployed for Intranet Documentation of all device configurations such as firewall Router Servers SAN etc Facility Management and Administration 2 Service Support Requirements i The service su
21. e or incomplete Tenders Failure to conform to the rules or requirements contained in the Tender Failure to sign the Tender as an authorized representative Proof of collusion among bidders in which case all Tenders involved in the collusive action will be rejected Non compliance with applicable law unauthorized additions or deletions conditional bids incomplete bids or irregularities of any kind which may tend to make the bid incomplete indefinite or ambiguous as to its meaning Any exclusion of requirement within the Tender h Contacting the Competent Authority No Bidder shall contact on its own the Competent Authority on any matter relating to its bid from the time of the bid opening to the time the contract is awarded Any effort on part of a Bidder to influence the Competent Authority or members or Technical Monitoring committee in its decisions on bid evaluation bid comparison or contact award may result in rejection of the bidder s bid The Bid Security may be Forfeited If a Bidder withdraws its bid during the period of bid validity specified by the bidder on the bid Form or In case of a successful Bidder if the Bidder fails i To accept the order 16 of 38 To furnish performance security If the Vendor after accepting the purchase order fails to deliver the material services as per the order i Bid Price The bidders shall indicate on the prescribed Price Schedule including item wise and final Bid Price of the i
22. e performed by the Implementation selected vendor i Integration with Existing Coming Infrastructure ii Deployment of required Servers Storage Desktops Peripherals vii The selected vendor must describe how the testing methodologies will conform to requirements External Tie Ups amp The selected vendor will support and provide necessary inputs for Certification Support Integrating the IT Infrastructure by coordinating with Application Developer for commissioning and smooth maintenance of the system Operational Support The selected vendor shall provide operational support and maintenance and Maintenance O services for a period of 3 years for overall system stabilization solution and M maintenance system administration security administration database administration and end user problem resolution etc The operational support shall ensure that the solution is functioning as intended and attending to all the problems associated in operation of the deployed system Solution Warranty The selected vendor MUST warrant that the systems and overall solution supplied shall have no defects arising from design or workmanship or any act or omission of the service provider The warranty shall remain valid for a period of 3 years Comprehensive The selected vendor is required to train retrain if required the designated Training and Change technical and end user staff to enable them to effectively operate the Management system an
23. ed only for the proposals which are found eligible and technically acceptable by the Committee and approved On the day specification for the opening of bid the Committee appointed by the Corporation will open the commercial bids of eligible bidders and scrutinize the same minutely The bidder is required to quote for all the items mentioned in price schedule Therefore any bid which does not indicate price for all the items and any item have been left blank it will be considered that the cost of item has been included in the other items and the total of the price quoted include for all the required items In case complete product is left blank it will be considered as non responsive bid and thus liable for rejection After scrutiny the Corporation after having examined the proposal may accept the same or accept the bid price of any other bidder found suitable or reject all or any proposal The decision of the Corporation in this regard shall be final and binding The corporation reserves the right to negotiate the prices with bidder bidders The quantity mentioned in the tender document is as per our estimate only however Corporation reserves the right to place order for the less higher quantity or segregated delivery schedule depending on the actual requirement Rejection of Bids The Competent Authority reserves the right to reject bids which are non responsive including without limitation bids which contain or involve the following Lat
24. erboard feature providing 10Gb speeds in the design supporting technologies in TOE iSCSI and RDMA Ports to be available for USB Network and management Management Should provide remote management software capable of providing graphical interface virtual media and multi factor authentication Server management software should be of the same brand as the supplier Server management software capable of providing role based security alerts of critical component failure Hard drive memory CPU and notify the same using email pager SMS Servers should support Industry led operating system platforms including Windows Server 2003 2008 Red Hat Enterprise Linux Virtualization software like VMware Server Blade Type II Same as Type given above but with 16 GB RAM in place of 12 GB RAM Server Blade Type III Same as Type given above but with 24 GB RAM in place of 12 GB RAM Specification for blade chassis Chassis The Blade Chassis should be configured with minimum 14 Nos of Blades Accordingly the No of Chassis to be quote with interoperability Support for Quad CPU and Dual CPU blades in the same enclosure Same enclosure should support Intel Xeon AMD Opteron RISC EPIC based blades Same enclosure should support server storage and expansion blades to enable consolidation of hardware Should support simultaneous housing of Ethernet FC iSCSI IB interconnect fabrics offering Hot Plu
25. figuration management through CLI GUI based software utility and using web interfaces GUI tools shall be provided Event and system history logging functions shall be available Support for Syslog Server required Support pre planned timed reboot to upgrade Hardware to a new software feature and plan the rebooting as an off peak time Shall support boot options booting from remote Network node ToS CoS Queuing prioritizing Qos IP Precedence Policy based routing Display of input and output error status on all interfaces Debug amp Diagnostics Display of Dynamic ARP table Display of physical layer line status signals like DCD DSR DTR RTS CTS on all interfaces Display of Routing table Trace route Ping extended PING Router should be mountable on 19 Rack 30 of 38 Physical All necessary power cords adapters data cables connectors CDs manuals brackets accessories wire managers etc should be provided minimum 0 2mpps Performance 1 x Channelised STM 1 2 x Gigabit Ethernet Interfaces Interface Requirements 11 Firewall Users Nodes Unlimited Firewall Throughput Up to 300 Mbps Maximum Firewall and IPS Throughput Up to 150 Mbps with AIP SSM 10 3DES AES VPN Throughput Up to 170 Mbps IPsec VPN Peers 250 SSL VPN Peers Included Maximum 2 250
26. g hardware 2 Packs Blanking Panel 1 varying from 4 U to 5 U size Keyboard Tray with BB Slides Rotary Type 1 no per Rack Stationery Shelf 627mm Network 2 sets per Rack All racks must be lockable on all sides with unique key for each rack Racks should be compatible with floor throw as well as top throw data centre cooling systems Server Racks should have the following things in addition to the above mentioned hardware o PS 2 Interface adapter o USB Interface adapter 32 of 38 Racks should have Sliding vertical patch panel vertical cable management finger vertical cable management tray sliding vertical bracket to mount patch panels Wire managers o Two vertical and four horizontal Power distribution Unit o Power Distribution Unit Vertically Mounted 32AMPs with 25 Power Outputs 20 Power outs of IEC 320 C13 Sockets amp 5 Power outs of 5 13 Amp Sockets Electronically controlled circuits for Surge amp Spike protection LED readout for the total current being drawn from the channel 32AMPS MCB 5 KVA isolated input to Ground amp Output to Ground 1 No per Rack Door o The racks must have steel solid grill mesh front rear doors and side panels Racks should NOT have glass doors panels o Both front and rear doors must have the ability to open from the left and right without the need for any field modifications or tools Fan trays Fan 90CFM 230V AC 4 dia 4 Nos per Rack Fan Housing Unit 4 Fan Position
27. ggable amp Redundancy as a feature for the mentioned I O devices Ethernet Switch 2 No s 10G Ethernet Switching Modules to be provided in redundant configuration for Connecting to all the blade servers to external Switch Configuration should help minimize the Ethernet Cables Fiber Channel Modules The Blade Chassis should be configured with redundant Fibre Channel SAN Switches Each SAN Switch should be minimum 20 Port capable providing connectivity to each blade server slot and providing at least 4Gbps Uplink ports for connectivity to External Storage Management Module System Management Port to allow simultaneous management access of multiple Blade Servers in the Chassis GUI console based deployment server to set up multiple OS and application configurations Power Modules The enclosure should be populated fully with suitable power supplies for the full capacity Power supplies should support N N or N 1 redundancy configuration where N is greater than 1 Should offer choice of a single phase or 3 phase power subsystem for flexibility in connecting to datacenter power enabled with technologies for lower power consumption Guaranteeing complete availability even on failure of any 2 power units across the enclosure Cooling Each blade enclosure should have a cooling subsystem consisting of redundant hot pluggable fans or blowers enabled with technologies for improved power consumption and acoust
28. ics 25 of 38 Management Should be able to perform comprehensive system data collection and enable users to Software quickly produce detailed inventory reports for managed devices Software should save the Reports for further analysis Should provision for a single console to monitor multiple enclosures Should support simultaneous remote access for different servers in the enclosure The management controlling software s must be from the OEM itself Management Software Licenses for a fully populated Blade Enclosure should be given The software should provide Role based admin user operator etc security which allows effective delegation of management responsibilities by giving systems administrator s granular control The management software should provide proactive notification of actual or impending component failure alerts Should support automatic event handling that allows notification of failures via e mail Should be able to perform comprehensive system data collection and enable users to quickly produce detailed inventory reports for managed devices Software should save the Reports in some format for further analysis Should help to proactively identify out of date BIOS drivers and Server Management agents and enable the remote update of system software firmware components The server performance monitoring software should be able to detect analyzes and explain hardware bot
29. ithout actually copying the actual data blocks of previous full backup Backup Software is able to rebuild the Backup Database Catalog from tapes in the event of catalog loss corruption The proposed Backup Software shall offer OPEN File Support for windows The proposed Backup Solution has certified Hot Online backup solution for different type of Databases such as Oracle MS SQL Sybase etc Backup software shall also support Microsoft Share point Portal server The solution shall provide with the unlimited or at least 100 licenses for Bare Metal restore for windows servers The Proposed backup solution shall provide granularity of single file restore The Proposed backup solution shall be designed in such a fashion so that every client server in a SAN can 28 of 38 share the robotic e Backup Solution shall be able to copy data across firewall e Backup Solution shall support automatic skipping of backup during holidays Disk to Disk Backup Offered Disk to disk backup device shall be Modular design to allow configuration add capacity increase performance Offered device shall be offered with Minimum of 3TB of usable space in Raid 6 scalable to 7TB usable space in Raid 6 Offered device shall have the ability to configure at least 16 tape drives 700 or more Cartridge slots in the single appliance Offered Solution shall have capability to deliver selective restore from disk Library itself Solution shall integrate and uti
30. ked EMD technical bid and commercial bid The bid will consist of the following i The bidder should have service support network in Madhya Pradesh for after sales services Details of which to be submitted along with the bid Technical deviations if any from the terms conditions and specifications as specified in the bid document Bid form duly filled in signed and complete in all respects The price should be firm inclusive of all taxes and local levies if any On FOR destination basis The rates should be free from all escalation However all Tax and duty benefits if applicable should be passed on to us The inner and outer envelopes shall be addressed to the competent authority at the following address THE Additional Chief General Manager P M P STATE ELECTRONICS DEVELOPMENT CORPORATION LTD 147 Zone Maharana Pratap Nagar BHOPAL 462011 14 of 38 The inner envelopes shall also indicate the name and address of the Bidder to enable the bid to be returned unopened in case it is declared late If the outer envelope is not sealed and marked the competent authority will assume no responsibility for the bids misplacement or premature opening Telex cable facsimile or fax bids will be rejected Conditional bids are liable to be rejected d Deadline for Submission of Bid Bids must reach to the competent authority at the address specified but not later than the time and date specified in the invitation of Bids
31. lize customer s current tape backup infrastructure in the following aspects Compatibility with the existing backup server media servers at customer Compatibility with existing tape library and tape drives Compatibility with existing backup software Compatibility with existing SAN switch hardware Compatibility with all the leading backup software products and CUSTOMER BACKUP SOFTWARE specifically Offered solution shall have de duplication in built engine Ability to flexibly emulate tape drive tape formats LTO Gen2 LTO Gen3 LTO Gen4 etc Offered device shall have Minimum of 2 x 4Gbps Fibre Channel connections or 1 x 2Gbps ISCSI connection Fault tolerance in the offered Virtual tape library shall be achieved by active disk redundancy technology like RAID Offered device shall support and offered with de duplication license De duplication shall not have any dependency on the backup software Offered device shall offer inbuilt Data compression feature without using from Backup software Offered device shall support throughput of 300GB hr Offered device shall have capability to attach direct LTO drives for auto migration facility 10 Router for DataCenter Hardware Architecture Multiple services Data voice video Technologies like IP MPLS etc Modular Chassis Shall support variety of interfaces like V 35 Serial E1 Port ISDN BRI Fast Ethernet Interface Slots Ethernet Ports 2 x 10 100 1000 Mbps E1 Interfaces 2
32. ll provide the backup frequency and recovery plan A combination of full on Tape Media and incremental Day time backups should be employed to ensure disaster tolerance The bidder MUST provide an Industry Standard BCP Disaster Recovery plan vii Installation and maintenance of E District Application software State has developed state of the art e District application for managing citizen centric services delivered by the District administration and the same is being rolled out to 5 districts in the pilot phase and shall be rolled out to rest of the districts in coming months 10 of 38 Salient features of the Application are 44 services for the district administration Portal for the citizen with e District forms content and status tracking of pending applications Independent workbenches for CSC District Administration roles and e District Society Rule based workflow with manual over ride Forms management Document management Document delivery Digital signatures Biometric Fingerprint identification Citizen registration and Photograph capture Integration with third party databases Integration with SSDG Integration with MP online payment gateway Multi level security Configuration based development and scalability Multi tier web based architecture SoA compliant architecture Organization and audit management Multi lingual interface Extensive SLA tracking and service delivery statistics Reporting views and MIS The a
33. nd the ability to meet the specific hardware requirements The bidder MUST study the IT infrastructure needs of MPSEDC and Data Network at specified locations Create Logical IP Schemes with Routing Tables and ACL for Intranet and deploy the same with proper documentation Creation of logical and physical Security Plans for Data Center Data Networks Security Policy Implementation etc Testing The selected vendor must build up an overall plan for testing and Acceptance acceptance of system in which specific methods and steps should be clearly indicated The acceptance test plan will be defined by the selected vendor agreed and approved by MPSEDC and include all the necessary steps to ensure complete functionality operation and performance of the system All levels of testing will be conducted at the installation sites Testing must demonstrate that the new system satisfies the operational and technical performance criteria It is vendor s responsibility during the tests to evaluate and recommend any further changes to the infrastructure Any recommendations for change will be discussed with MPSEDC The selected vendor must outline the methodology that will be used for testing The selected vendor must define the various levels or types of testing that will be performed The selected vendor must provide necessary checklist documentation that will be required for testing Solution Following activities but not limited to needs to b
34. ng the tenure of the contract Troubleshooting issues in the infrastructure network and application to determine the areas where fixes are required and ensuring resolution of the same Identification diagnosis and resolution of problem areas pertaining to the Server farm infrastructure and application and maintenance of assured SLA levels Implementation and maintenance of standard operating procedures for maintenance of the infrastructure Management of the user names roles and passwords of all the relevant subsystems including but not limited to servers applications devices etc System administration activities shall include the following tasks but not limited to the following Configuring and apportioning storage space Setting up of working e mail accounts and mailing lists Management and integration of databases Implementing security on the Internet Intranet Setting up of firewalls and authorization systems Performing periodic backup of data and automating reporting tasks Executing hardware and software updates when necessary ili Storage and Database Administration The vendor shall administer the databases which have been setup in the server farm and provide a repository of information for Business Critical applications Database Administration involves data backups amp restores and monitoring the database server Storage and Database administration activities shall include the following Installation and config
35. nnectors CDs manuals brackets accessories wire managers etc should be provided 42U Server Rack 19 42U racks shall be used in the Data Centre for hosting the department applications of Government of Madhya Pradesh All the racks should be mounted on the floor with castor wheels with brakes set of 4 per rack Floor Standing Server Rack 42U with Heavy Duty Extruded Aluminium Frame for rigidity Top cover with FHU provision Top amp Bottom cover with cable entry gland plates Heavy Duty Top and Bottom frame of MS Two pairs of 19 mounting angles with U marking Depth support channels 3 pairs with an overall weight carrying Capacity of 500Kgs The racks should conform to EIA 310 Standard for Cabinets Racks Panels and Associated Equipment and accommodate industry standard 19 rack mount equipment Cabinets shall have a provision for baying so as to suitable for both network amp server applications Front and Back doors should be perforated with atleast 70 or higher perforations Dual hinged front and quad hinged rear doors open from either left or right and are easily removable Cabinets shall have provision to mount patch panels vertically between bayed position of the cabinets using vertical sliding bracket All racks should be OEM racks with Adjustable mounting depth Multi operator component compatibility Numbered U positions Powder coat paint finish and Protective grounding provisions All racks should have mountin
36. ny Government Government organization in India The information given along with the Bid is true and we understand that if the information provided by us is found to be wrong at any point of time during the Bid Process or Contract period our Bid Contract may be cancelled and the BidSecurity Performance Guarantee may be forfeited Signature of the Tenderer With stamp and date 21 of 38 22 of 38 Annexure Manufacturers Authorization Form To The Additional Chief General Manager M P State Electronics Development Corporation Limited 147 Zone Maharana Pratap Nagar Bhopal 462011 DUG Date sicieecsecciceiesccorsea es Dear Sir We who are established and reputed Manufacturers of having factories at address of the factory do hereby authorize Name amp Address of the Bidder to submit a bid and subsequently negotiate and sign the contract with you against the above tender We hereby extend our full guarantee warranty and support and also in meeting warranty obligations by providing necessary spares in time for the goods amp services offered by the above firm against this tender as per standard as well as MPSEDC warranty terms Yours faithfully Name Name of the manufacturer Note This letter of authority should be on the letterhead of the manufacturer be signed by a person competent and having a power of attorney to bind the manufacturer The bidder in its bid should include it 23 of 38
37. of contract amp forfeiture of Performance Guarantee 18 of 38 6 GENERAL INFORMATION AND EMD DETAILS 1 EMD Details DD No and date Amount in Rs Name of the Bank Name and Address of the Tenderer Contacts Telephones Fax E mail Mobile No Category of the tenderer Whether company partnership firm or Proprietary concern Name of Chief Executive Officer and Telephone No Year of Establishment Sales Tax Commercial Tax CST nos Income Tax PAN GIR No Yearly Turn over of the Last 2 years Name and Address of the Banker List of major Clients and the size of orders executed Note Separate sheets may be attached wherever necessary Signature of the Tenderer 19 of 38 With stamp and date 20 of 38 Letter for Submission of tender The MPSEDC Bhopal Madhya Pradesh Reference Tender No 0000 Dated Sir Having examined the tender document relating to the Selection of Vendor for Supply Installation and Maintenance of Servers SAN and other hardware components at Data Centre for the e District project as detailed in your tender Conditions and Scope of Work etc and having understood the provision amp requirement relating to the preparation and all other factors governing the tender We hereby submit our offer to carry out the Selection of Vendor for Supply Installation and Maintenance of Servers SAN
38. ofile after three unsuccessful log on attempts The system should be able to log successful and failed attempts to the system The bidder MUST clearly state the measures equipment and software for security functions in order to prevent system from risks The bidders will have the prime responsibility of the risk control Information hardware and software MUST be secured to both internal and external parties such as through password encryption The security measures adopted MUST be of wide range and of high quality to create confidence in the systems security and integrity The system MUST be protected against deliberate or accidental misuse that might cause a loss of confidence in it or loss or inconvenience to one or more of its users System level and application level authentication between sites and between applications within sites if any to ensure against security attacks Security administration activities shall include the following Monitoring of various devices tools such as firewall intrusion detection content filtering and blocking virus protection and vulnerability protection through implementation of proper patches and rules Root domain administration by creating the root and sub domains and setting the root level security policies such as authentication mechanisms single multi factor password policies such as password length password complexity password expiry account lockout policy certificate policies IPSE
39. on of various departments for providing services to the citizens This project is of paramount importance to the State as it would help in creating an electronic workflow system for the district administration and help in providing efficient individual department services through Common Service Centers CSCs Samadhan Ek Din centers MP Online kiosks and internet which would be the primary front end channels as envisaged in the project Madhya Pradesh Government has chosen five districts to pilot the e District project and provide integrated citizen centric services in the district The identified districts are Guna Gwalior Indore Sagar e Shivpuri Purpose of e District Project The main purpose of the e district project is to computerize the workflow system and internal processes of the district administration of the pilot districts with the help of Information amp Communications Technologies ICT The state envisages meeting the following objectives with the implementation of e Districts project e Implementation of an efficient electronic workflow system for District Administration e To create an efficient IT enabled delivery mechanism for citizen services information being delivered from District Administration and its subordinate offices Infusion of transparency and accountability in operations Reduction of workload of department personnel Ensuring longevity of the data protection from damage from moisture and other climatic f
40. ports BRI 1 Ports Console port 1 numbers RAM 128 MB upgradeable to 256 MB or more Memory Inbuilt Flash Memory 32 MB upgradeable to 64 MB or more GRE and IP Sec 3DES AES VPN for configuration of VPN tunnels Security Encryptions IP Sec 3DES AES NAT PAT 29 of 38 Access control Multilevel Support for Standard Access Lists to provide supervision and control Controlled SNMP Access using ACL on router to ensure SNMP access only to identified NMS EMS Controlled SNMP access through the use of SNMP with MD5 authentication Multiple Privilege Levels for managing amp monitoring Support for RMON 1 amp 2 groups as and when required Support for Remote Authentication User Service RADIUS and AAA PPP CHAP support PAP optional Static Routes Routing Protocols RIPv1 RIPv2 OSPF v2 and v3 BGP4 IS IS Route redistribution between any of the above protocols PPP Multi link PPP Protocols HDLC IPv4 IPv6 MPLS VRRP HSRP Using external Hardware software infrastructure IP Accounting Packet amp Byte Counts Start amp End Time Stamp Network Time Protocol Input amp Output interface ports Type of service TCP Flags amp Protocol Source amp Destination IP addresses Source amp Destination TCP UDP ports Accessibility using Telnet SSH Console access Management Easier Software upgrades through network using FTP TFTP etc SNMPv1 snmpv2 v3 Con
41. pplication uses following technology stack Microsoft XRM 4 0 Microsoft Share point Server Microsoft NET 3 5 Microsoft SQL 2008 Microsoft SQL reporting services Microsoft SQL IS and AS packs Microsoft Active Directory Microsoft Windows Workflow Framework Https http SOAP XML interfaces Custom plug ins for security digital certificates digital signatures Biometric API Payment gateway List of services Issuance of Certificates Domicile Certificate Caste Certificate Income Certificate Birth and Death Certificate Solvency Certificate Disability Certificate Social Welfare Pension Tribal Development Department Janamshri Insurance Scheme Rahat Sahyata Yojna Sahariya Development Abhikaran Ladli Laxmi Yojana Freedom Fighter Honorarium 11 of 38 Scholarship Tribal and SC ST Revenue Court Services Govt Dues amp Recovery Public Distribution System RTI Grievances Right to Information RTI Grievance Redressal Licensing Arms License Agriculture Small Savings Agency License Issuance Renewal of Stamp Vendor License Businesses Issuance and Renewal for Cinema Video Parlor Permissions Permission to organize fair use loud speakers Transport Mining Quarry Lease Auction Quarry Temporary Permission for Government Mining Temporary Permission for Mining Excise NOC for Foreign Liquor Shop Education Vyapam Land Record Copy of B1 Khasra Nakal Utility Services Booking of
42. pport contact point to be established at Bhopal headquarter city The call status report indicating the call received call attended call rectified and closed call pending with in beyond limit shall be required from the successful vendor on fortnightly basis The details of components replaced during the period will also be made available by successful bidder Successful vendor should ensure the proper monitoring and timely call attending The successful vendor should ensure that problem in the supplied item be handled and rectified within 24 hours from the issuance of complaint In order to avoid delay in work the defective item should be replaced with new one before taking away the defective one The delay in rectification of call will result in penalty prolonged and regular delays will be considered as poor after sales support and may result in vendor disqualification from participating in future MPSEDC purchases 3 System Management Administration and Security Requirement i General Requirements In addition to the management administration and security requirements specified in each sections covering the various hardware and software components of the System the System must also provide for the following management administration and security features at the overall system level System installation procedures should be self explanatory menu driven and should require minimum user interaction A detail on line help for in
43. rranty Cable Type Cat 6 Terminals 50 micro inches minimum of gold plating over nickel contacts Jacket PVC The cable jacket shall comply with Article 800 NEC for use as a non plenum cable The 4 pair UTP cable shall be UL and c UL Listed Type CM non plenum End point connector Factory fitted RJ 45 plugs at both ends with Push Pull latching design Metallic isolator inside plug for optimum NEXT performance Insulation Flame Retardant 36 of 38 Annexure 7 Bill of Material Server SAN Storage SAN Switch Tape Library Router for DC Switches for DC Firewall Hardware 42 U Rack Backup Software Disk to Disk Backup Monitor 19 LCD for blade server console 42 U Rack UTP Cable as required Jack Panel as required NR gt ma om ms mat m _ mM MO gt PVC Pipe Casing Capping GI Pipe as required 10 Patch Cord Mounting Cords as required Cabling as required 37 of 38 Annexure 8 Details of Financial Rate Server SAN Storage SAN Switch Tape Library Router for DC Switches for DC Firewall Hardware 42 U Rack Backup Software Disk to Disk Backup hM NM NM _ gt NM gt gt O CO N a BR Ww N gt Monitor 19 LCD for blade server console 42 U Rack UTP Cable as required LS Jack Panel as req
44. rray Controller card Cache memory FAN Power supply etc Cache shall be mirrored across both controllers using dedicated PCl e bus instead of disk data path The storage array should have a minimum of 4GB mirrored cache which should be automatically be managed for Read write operations Storage box shall have more than 130 000 cache IOPS Storage box shall support more than 1200MB sec sequential bandwidth Offered Storage shall have minimum of 4 host ports and 4 device ports for Servers and disk connectivity Offered storage shall be end to end 4Gbps The storage array should support hardware based RAID 0 0 1 1 5 levels 26 of 38 The storage array should support 4Gbps dual ported 146 300 400GB 450GB hot pluggable Enterprise FC and S ATA F ATA 1TB drives in the same disk shelfs Offered storage shall have Switching support for disk drives for better performance and lower arbitration In case of power failure storage subsystem shall have the Capability to keep the uncommitted information inside cache for at least 96 hours or in a de staged fashion Bidder shall ensure that in case of de stage mode Dual redundant Standby power supplies are configured The Storage Array should support incremental resynchronization between Primary and Snapshot clone volume Incase of Disk failure inside the storage subsystem Disk re building time shall have any relation with the number of disk drives in the disk group for better recovery time and
45. selective set of data for faster restores operation to client servers The proposed backup solution should allow creating tape clone facility after the backup process The proposed Backup Solution has in built calendar based scheduling system and supports Clustering the Backup Server and Media Server on Windows and Linux Backup solution shall be configured in such a fashion that licenses for LAN and SAN based backup should be provided The proposed backup solution shall be offered with client licenses for SAN based backup and LAN based backup The proposed Backup Solution Software has inbuilt Java Web based GUI for centralized management of backup domain Backup Software shall support encryption and all encryption keys shall be stored on to backup server for effective management Backup software shall provide import and export facility of encryption keys for protection The proposed solution also supports advanced Disk staging The proposed Backup Solution has in built media management and supports cross platform Device amp Media sharing in SAN environment It provides a centralized scratched pool thus ensuring backups never fail for media Backup Software shall support Synthetic backup so that Full backup can be constructed directly from the disk based incremental backups Backup software shall also support disk based Incremental Forever or Virtual full backup whereas every incremental backup shall be equivalent to Full backup w
46. stallation should also be provided Installation procedure should set all the required system parameters for successful installation of the system The bidder should take into account ease of deployment for while proposing a solution The Bidder shall preferably follow best practices for security ii Facility Management and Administration The Facility Management operations shall include the following tasks Configuration of server parameters operating systems administration and tuning Operating system administration including but not limited to management of users processes resource contention preventive maintenance and management of upgrades including migration to higher versions and patches to ensure that the system is properly updated Re installation in the event of system crash failures Maintenance of a log of the performance monitoring of servers including but not limited to monitoring CPU disk space memory utilization I O utilization etc Event log analysis generated in all the sub systems including but not limited to servers operating systems databases applications security devices messaging etc Ensuring that the logs are backed up and truncated at regular intervals Periodic health check of the systems troubleshooting problems analyzing and implementing rectification measure Ensuring the upkeep of existing systems that would be reused and also incorporate necessary changes for new applications if any duri
47. tems listed Prices quoted by the Bidder shall be fixed during the Bidder s performance of the contract and shall not be subject to variation on any account A bid submitted with an adjustable price will be treated as non responsive and rejected 17 of 38 Terms and Conditions 1 Performance Security The project will carry a performance guarantee for three year This guarantee may be invoked on violation of any of the condition s given below If any of hardware or services which shall be given by you does not perform satisfactorily The observed output deliverables of the project is not in accordance with the approved specification The security system is not foolproof with unauthorized person being able to access infiltrate into the system The corporation suffers losses by way of some of the module generating illegal incorrect reports output In order to take care of the concerns outlined above the tenderer is required to furnish Performance Guarantee worth of 10 of the value of project valid up to a period of three years Performance security should be submitted within 7 days of receiving the work order 2 Project Time line and Payment Milestone Total period for Supply Installation and Commissioning of Servers SAN and other hardware components at Data Centre will be 90 days Payment shall be released by MPSEDC as per the following terms Payment for 80 of the value of goods supplied shall be released against proof
48. the specified time and location on the next working day In case the commercial bid is not opened on the same or next day of opening of technical bid the Committee may decide to open the commercial bid on subsequent dates In such case the date time and place of opening of commercial bid will be intimated to the bidders or their representatives Attach below is a diagram that represents the way the entire bidding process will take place Preliminary Examination Before starting evaluation the bids will be examined to determine whether they are complete whether any computational errors have been made whether required sureties have been furnished whether the documents have been properly signed and whether the bids are generally in order In case of computational error the basic price will prevail In case of error in totals and grand total the sub total will prevail If bid is determined as not substantially responsive the competent authority will reject it and only the 15 of 38 substantially responsive commercial bids will be considered The process of evaluation of commercial bid is as follows The Committee appointed by the Corporation will first verify that the Bank Draft for Bid Security is in order and as per requirement of the bid The Committee will examine the bid on Eligibility Criteria as specified The scrutiny of technical proposals will be based on the Evaluation Criteria determined The Commercial bid will be open
49. tlenecks Also it should be able to log the data over time and allow it to replay the same in a short time frame for performance analysis The Deployment software should provide for User friendly GUI console based deployment to set up and install multiple OS and application configurations in individual blade server Should be able to move add or change server network connections on the fly The blade system should have the capability of managing all the blades in the Enclosures simultaneously capable of monitoring both physical and virtualized environments with single signon capability for all devices in the enclosure Storage Area Network SAN The storage array should support industry leading Operating System platforms amp clustering including Windows Server 2008 Enterprise Edition Sun Solaris HP UX IBM AIX Linux and Novell NetWare Offered Array should have usable 5 TB capacities with RAID 5 protection on 146 GB FC drives and should be scalable to at least minimum of 96 numbers of Drives The storage array should support dual redundant hot pluggable active active array controllers with high performance RISC ASIC based CPUs Storage array shall be based on latest PCl e technology to ensure that there is no IO bottleneck Controllers shall be true active active and should support automatic changeover in case of controller failure Offered Storage Array shall be configurable in a No Single Point of failure including A
50. ucts quoted by him In case of dealer the bidder must have turnover more than Rs 5 crore for the year 2006 or 2007 or 2008 Attach copy of the audited balance sheet Bidder or manufacturer must have successfully executed at least 1 project in the last three years for the Supply Installation Maintenance Facility management and Integration of the project for a minimum value of Rs 50 lakhs in the government sector attach satisfactory completion from the authorized representatives of the client along with the work order The Bidder must have working office and service center in the state of Madhya Pradesh for at least three years attach copy of MPST CST TIN issued by M P 4 INSTRUCTIONS TO BIDDERS a Amendments To Tender Any changes additions or deletions to the tender will be available on the website www mpsedc com No written communication will be circulated b Tender Evaluation amp Contract Award Any changes additions or deletions to the tender will be available on the website issued by the Additional Chief General Manager MPSEDC Bhopal No written communication will be circulated c Sealing and Marking of Bids The bidders shall submit EMD technical bid containing the technical specifications offered literature leaflets etc and the technical and commercial deviation if any and one original copy of commercial bid in separate envelopes should be sealed in one main envelope All the envelopes should be distinctly mar
51. uired LS PVC Pipe Casing Capping GI Pipe as required LS IO Patch Cord Mounting Cords as required LS Cabling as required LS Additional RAM for the server specified In the tender in 4 GB Modules Per 4 GB modules 16 modules or 64 GB Additional 146GB 15k rpm SAS hot pluggable HDD for the server specified In the tender Nos 10 Additional processor for the server specified In the tender Total Cost of Hardware 1 to 19 Facility Management Services charges as per details specified in scope of work as a percentage of total Hardware cost per quarter Three months of Sr No 20 per Quarter 12 Quarters Total Bid cost Sr no 20 21 The quantity of hardware may be changed as per requirement Payment shall be made as per actual quantity installed Charges for facility management shall be calculated accordingly
52. uration of the storage system Management of storage environment to maintain performance at desired optimum levels Development of storage management policy configuration and management of disk array SAN fabric switches tape library etc Configuration of SAN whenever a new application is hosted at the server farm This shall include activities such as management of storage space volume RAID configuration zone security business continuity volumes NAS performance etc End to end management of database on continuous basis to ensure smooth functioning of the same Management of any changes to database schema disk space storage user roles Review of Code of Conduct and configuration to improve performance of the application or to resolve bottlenecks if any Performance monitoring and Databases on a regular basis including preventive maintenance of the database as required Applying patches and database upgrades as and when required with minimal downtime Regular backups for all databases in accordance with the backup and archive policies and conduct recovery whenever required with appropriate permissions Use of DBA tools related to performing database creation maintenance and database monitoring tasks iv Security Administration The system should allow user to change his her password based on a given time frame as well as give the User the option to change his password at any time The system should disable the User pr
53. urther spreading of viruses Alert users on new virus breakouts based on the info received from the MPSEDC IT team Install configure and test latest security patches Troubleshoot and rectify all virus related problems reported and also escalate if not rectified by the AV tool Monitor the client security tools and adhere to the security policies of MPSEDC Monitoring the efficiency and effectiveness of the Anti Virus tool Registering and updating the Anti Virus tool on the server and the clients periodically Providing feedback on any new viruses detected and alarm the protection systems v Backup and restore The backup and restore functions will comprise of the following activities Backup of operating system database and application as per stipulated policies at the Server Farm Monitoring and enhancement of the performance of scheduled backups schedule regular testing of backups and ensure adherence to related retention policies Ensuring prompt execution of on demand backups of volumes files and database applications whenever required by User Departments or in case of upgrades and configuration changes to the system Real time monitoring log maintenance and reporting of backup status on a regular basis Prompt problem resolution in case of failures in the backup processes Media management including but not limited to tagging cross referencing storing logging testing and vaulting in fire proof cabinets
54. with Storage 8 Backup Software The proposed Backup Solution should be available on various OS platforms such as Windows and UNIX platforms and be capable of supporting SAN based backup restore from various platforms including TRU64 UNIX HP UX Linux Open VMS NetWare and Windows Proposed backup solution should be offered with 4 no of online agents for taking backup of the running Database on Windows and necessary license of taking backup from disk to tape library Proposed backup solution shall support industry leading cluster solution Proposed backup solution shall have same GUI across heterogeneous platform to ensure easy administration 27 of 38 The proposed Backup Solution should support tape Mirroring with primary backup e g With the primary volume Backup 4 additional tape copies can be created The proposed backup solution should allow creation of additional backup copies run concurrently with primary backup within the same Library or over the network to another tape library stand alone drive of different format medium e g Ultrium to SDLT etc to allow easy valuating operation The proposed Backup Solution supports the capability to write up to 32 data streams to a single tape device or multiple tape devices in parallel from multiple clients to leverage the throughput of the Drives using Multiplexing technology The proposed backup solution support de multiplexing of data cartridge to another set of cartridge for

Download Pdf Manuals

image

Related Search

Related Contents

  Valueline VLAB25000B10  Introduction  AD-1673 取扱説明書  intext:Bedienungsanleitung filetype:pdf  Philips DLA71023  [U4.52.03] Opérateur MODE_ITER_SIMULT  Sony LVR1 Live-View Remote  NG-NetMS Rel 3.4 User Install documentation  Capi2 brochure  

Copyright © All rights reserved.
Failed to retrieve file