Home
Installation manual Spirit
Contents
1. Installation manual Spirit Document ID Sup Rim Eng Date of issue October 22 2015 Revision date May 8 2015 CONTENTS installation quicCkSta eec a 2 le OFS Cy WAS yas ena tae tar da LEE 2 2 Connect Water GISDOS aliviar ri 3 O e a a 3 4 Make sure that machine is switched OFF ccccssccccssseeeccesseecceeseeecsaeeeeceseeessageeecsegeeesseaseeenss 4 Connect Electi CH 4 SA AGUS bse cits le eet 5 Check if coffee pressure gauges indicate line pressure ooccccccnnccncccnncnnccnncnnconanoncnnancnnonnnnnncnnanenoss 5 Tidi Mans Wicho NO BIEN T setate o ict DR ers ee CHEM ARR dust SORT Sd dn I aia enun I b raa 5 Turn mains switch to OFF and back to NO HEAT repeatedly ooooccccocccococccconcncconcnconanoss 5 SWH Machine ONE Tr 5 Flip controller switches upwardsS resorts 5 Sel colleeDrewindg DIeSSUIe erani a a 5 Set hot water temperature when machine is at operational temperature 5 Set dosages for brew shots and hot water cccccccecccescteseeceescceseeeesccceseseessccseecesssceseeeessceeeees 5 WelCO Me sitio 6 mizgzmle ipuecepect a a dd do 6 NOTE OD TIS als idilio do eec 7 PRIOF TO IAsSta lala aa 8 Y reiecit siii 8 IDO Ny ARTI al eterne it 12 Parts included in standard SHIPMENT iii A A tct ires ae 12 Extra materials Deed sororis it title illa dais 12 UPACK ANa DIAC Gon ido odio idas 12 I
2. 2 Activate that group by pressing and releasing the upper button Touchpad Bastone autostop press down and release the brew lever 3 Observe the pressure gauge of the activated group to check how the pressure evolves and wait until it no longer increases 4 Toincrease the pump pressure turn the set screw in the pump housing clockwise see Figure 16 Turn the screw counter clockwise to decrease the pump pressure 5 De activate the group when the pressure is correctly set at 9 Bar A Warning The set screw is made from brass to avoid damage use a screw driver that fits the slot snugly opirit installation manual page 26 FIRST USE pe E Uu d a y set screw E IL gt PA Figure 16 Showing the set screw on the pump to change pump pressure Notes Do not set the pump pressure with a blind filter in the filter holder When a blind filter is used water in the system is trapped between a one way valve and the blind filter Therefore the coffee boiler pressure will not drop when the set screw is turned counter clockwise When pump pressure exceeds approximately 12 Bar the expansion valve will open Increasing the pump pressure further will not result in higher coffee boiler pressure Do not set the operational pressure above 9 Bar since this will reduce the life span of valves etc in your machine Set hot water temperature Hot water from the steam hot water boiler is mixed with some col
3. Danger We cannot be held responsible for damage and or injuries resulting from actions performed on our machines by non qualified personnel A Caution Always ensure water supply to the machine is in perfect working order before connecting electric power Parts needed included in shipment e Machine e 2 high pressure hoses 1 5 m 5 ft e Q high pressure hoses 0 5 m 1 ft 8 in e 1 T fitting 3 8M e 2 pumps with motor 30x20x25 cm length x width x height 12x8x10 inch e 2 discharge hoses with stainless steel clamps more for machines with individual pump per group see Figure 10 Parts needed not included in shipment e Fitting that connects hose 3 8F thread to water treatment system e Waiter treatment system with supplies to connect it to the water mains Tools needed e Spanner 20 22 mm e Spanner 30 mm or adjustable spanner e Teflon tape e Screw drivers flat no 2 and 4 Phillips no 2 e Sharp knife e Bucket e Quick response temperature sensor and appropriate meter Spirit installation manual page 14 INSTALLATION Connect water supply Connect your water mains to the inlet of an efficient device to remove calcium and magnesium ions and Chlorine from the water entering your machine Scale and Chlorine are the worst enemies of an espresso machine Be sure to rinse the water treatment system or de scaling device thoroughly before use also when new Figure 10 shows schematically how to connect the
4. knock empty fill tamp lock into group e Have your cabinet maker fit the knock box prior to installing the espresso machine Whoever installs the machine may not be able or equipped to do so e Have approximately 10 cm 4 of free countertop space at the barista s side of the machine This is useful working space for cups and saucers e Have a fridge installed as close to the espresso machine as possible Cold milk is essential for the proper preparation of a cappuccino Spirit installation manual page 8 INSTALLATION 679 cables 489 709 50 971 489 1267 Figure 4 Footprints of Spirit Duette top and Triplette bottom Measurements in millimetres Black circle Machine foot diameter 2 50 mm White rectangles Suggested locations for openings behind front feet to feed connections through the countertop Minimum sizes of countertop openings Pump hoses 35 mm connector diameter is 22 mm hose is 12 mm 2 drain hoses 40 mm 20 mm each Pump drain hoses 40 mm insert pump hoses first Electric cables 20 mm mains cable plus 2 pump cables no plug All feeds through 1 opening 55 mm insert pump hoses first Spirit installation manual page 9 INSTALLATION O 0 O O O O O Q Bi O iO OQ Q iO OF Y Oo O 0o 0 6 0 O O O 900 006 000 0 oo O 0 0 O 0 Q O O 0 OO 0 00 O O O O OQ O O 000 0 0 Oo O OQ ooo 00000 080 00000000093
5. machine is switched OFF controller Switches all temperature controller switches point down 5 Connect electricity steam boiler coffee system pump pump s yo back light switch 7 Nh E Connect coffee pump cable s to coffee pump s and steam boiler pump cable to steam boiler pump Double check that steam boiler cable and steam boiler hose are connected to the same pump idem for coffee system Spirit installation manual page 4 INSTALLATION QUICKSTART Te phase Live brown black 3 phase e grey black brown EZ Neutral blue EN whites UE EN Earth green green green Mount cable directly in wall connection box or attach plug to mains power cable and plug in wall Socket Shown above is the 3 phase plug used in Europe The white lead in the USA cable must be hooked up to the anti phase 115VAC live anti phase w r t the black 115VAC live 6 Fire up and adjust Check if coffee pressure gauges indicate line pressure If not check water connections Turn mains switch to NO HEAT Pumps are engaged and boilers will start to fill Engage groups until water runs from group After 2 minutes pump s will disengage Turn mains switch to OFF and back to NO HEAT repeatedly Repeat 3 6 times until pumps stop before 2 minutes have past Switch machine ON And switch back light on Flip controller switches upwards Boilers will heat up this takes abo
6. now been set The programming mode will last for another 4 5 seconds after you have set the timer therefore refrain from handling buttons or levers for another 6 seconds During delivery of hot water some cold water is mixed in to obtain a non spattering quiet flow at the right temperature for preparing Americanos A secondary goal of this added cold water is to lower the strain on the steam boiler as less hot water is needed from the boiler to get the same quantity The pump Is activated whilst dispensing hot water After hot water has been dispensed the steam boiler will start to re fill to its pre determined level automatically The incoming cold water needs to be heated to 125 C quickly to retain full steam capacity For that reason a jet with a diameter of 1 0 mm is installed at the entrance of the boiler fill valve which restricts the flow of cold water to the boiler which allows the heating to partially keep up The pump is activated whilst the steam boiler is being filled The filling procedure is automatically delayed when hot water is dispensed This prevents changes in steam boiler and cold water supply pressure and thus ensures temperature stability of the dispensed hot water Adjust coffee system pump pressure The pressure gauge just left of each group displays the pressure in the corresponding coffee boiler At idle the minimum value is the pressure of the incoming tap water as in other water taps in your establishment
7. oG o oo 0 0 O0 O oO O 6 O0 O O O 0 O O p LET ML T IRE cr e 1 EE LU pe en r lt lt E Hh m O E 1 oq e S ca Wor Ng eS 7 JU x y Xter L Ta 9 E ff cma 2 Uu 37 zm zd s O Em m T7 Su 9 489 L 129 Figure 5 Measurements of Spirit Duette Note that the rubber feet are not present these are 20 mm high and have a diameter of 50 mm Spirit installation manual page 10 INSTALLATION page 11 17333 dadanu LNOHLIM t these are 20 mm 80 CY l 1E Zi 2 Eee Ss Boll y 971 709 S 489 iJ a ES A I3 OS l m Li P Lu V A io a QA O O O O O e Oo o o o o Oo O O o O O o O o o o o o o o o oc Q Q Oo COO Q Q Q Q QO O Q O O0 D OQ O0 O Q Oo OQ Q 6 OO00000000000000000000000000 Oo Q OQ O Q4 O 00 9 0 O0 0 O 0 90 0 Y Y O0 0 9 Q Q OQ Q 00 00 00 Y oo ec 00000 900000000 0 00 0 O O OQ O O QOO OOo O00 00 00 000 00 00 OQ O O O OQ O Q O r 17333 dadanua LNOHLIM Figure 6 Measurements of Spirit Triplette Note that the rubber feet are not presen high and have a diameter of 50 mm G 5 E E E O ES iss 0 CE Y INSTALLATION Upon arrival Parts included in standard shipment e Spirit esoresso machine Accessories e 2 water pumps with electric motors e 2 hi
8. 5 Attach the third short hose at one end to the T fitting and the other end to the outgoing side of the water treatment system see Figure 9 A gasket and or fitting may be necessary depending on the materials used 6 Use a suitable hose to connect the inlet of the water treatment system to your water mains Spirit installation manual page 15 INSTALLATION 7 Fill rinse the water treatment system also when new until the water runs clear see the manual of your water treatment system for this procedure 8 Where appropriate check the quality of your incoming tap water and adjust the bypass on your water treatment system accordingly 9 Open the water supply tap and check the earlier made connections for leakage Tighten when needed but do not use excessive force water softener not included in shipment Figure 9 Water treatment system on right is connected to the pumps on left Flow is shown by the short arrows Water supply tap is right of figure Spirit will be to left of figure The water treatment system and the rightmost hose are not included in your shipment Note The coffee boilers will start to fill immediately when the tap is opened even when there is no power yet to the machine Filling will stop as the air inside the boilers is compressed to water mains pressure Spirit installation manual page 16 INSTALLATION ee ee i Not in shipment T fitting 2 steam otandard Duette and Tri
9. Factory setting of the maximum pressure in the boilers is 12 Bar Above this value an expansion valve on the machine will open such that excess pressure is relieved until the maximum value is no longer exceeded this occurs when water with a lower temperature than the set value enters the coffee boiler heats up and thus expands A restrictor in the coffee system reduces the flow when a group is activated This restrictor is placed in between the heat exchanger and the coffee boiler The diameter of the tubing in the group head has the larger opening such that water can more easily flow out of the group than into the boiler While brewing espresso with the group valve open and the pump activated water will first fill the empty infusion tube and dispersion plate and wet the coffee bed such that pressure in the corresponding group will quickly drop to practically zero After wetting of the coffee grinds the pressure will gradually increase to the set pump pressure ideally 9 Bar The pressure at the outgoing side of the pump is proportional to the pressure at the ingoing side of the pump the pump simply multiplies the incoming pressure by a set amount Therefore you should check and possibly adjust the pump pressure after installation Adjustments are made by turning the set screw on the right hand side of the brass pump housing see Figure 16 Procedure 1 Place a filter with ground coffee in a filter holder this can be used coffee
10. NStalaloON Pete 14 pisce c PER 14 Connect water SUDPV Tc 15 Gonrnect Wales AM p diet acte m vcctor a eens nes irit Queis dpa crm e DLE UL Mp DU UTI n EDS 18 ROMO Cele ONC S beoe pas a a cue gres dass 19 Single versus three phase machines cccccsesecccccceeeeeceeceeeeceeeceeueeeecsaeeeeeeessaeeeeeessaaseeeeessaaass 19 Mans SWO A gach O O ue eee eas 20 Note on phase shift of 120VAC or 115VAC Lioooooonccnnccccnnccnnccononncnnononancnnnononancnnnonnnancnnnnnnnnncnnnnnnnns 22 Filling the machine with water from empty ccccooocnncoccnnnnoconcnnccnncnnnononnnnononcnnnnnnnnnonnnnnconancnnonanranennas 23 EXxpelair TOM Cotes Sy SMN ai 24 FESTUS Oi AE o oia 25 A a a tne eine ita amt 25 Del NOt Walel COSACC a io 25 Adjust coffee system pump pressure cccccccccseseeeeeecaeseeeeeccuauseceeeseaaseeeessuaaeeeesauaaseeeessaageeeessaeagss 26 Set hot water temperature essssssssssisssseesee eene nennen nnne nnne nnn rss n nani rris naris n ann nnn 27 More information in the USER MANUAL 1111 eeeieeeecuieeenu eene nnn n nana aaa a sanas a sana anc aaa 29 More information on the USB flash drive 11 e eLeee ee Leee eel Leeeene liene enean nean aan muan 29 Contact MfOrmMmatlO pp 29 opirit installation manual page 1 INSTALLATION QUICKSTART Installation
11. assistance while lifting the Spirit to its place 4 When necessary adjust the feet such that the machine is level and all feet are firmly touching the countertop The rubber feet can be individually lowered loosen the cover nut first then unscrew the foot from the leg When correct height is achieved tighten the cover nut see Figure 7a Spirit installation manual page 12 INSTALLATION cover nut rubber foot Th coffee boilers steam boiler Figure 7a left Adjust the height of an individual leg Loosen the cover nut unscrew the foot from the leg until correct height is reached then tighten cover nut Figure 7b right Location of water supply connections between left legs of machine C coffee system S steam boiler Machines with individual pumps per group have 3 Duette or 4 Triplette water connections marked L C Triplette only R and S left boiler centre boiler right boiler and steam resp Spirit installation manual page 13 INSTALLATION Installation Precaution Installation of and maintenance on the Spirit should only be undertaken by a qualified technician Parts of the machine can reach a temperature of close to 130 C 266 F The steam hot water boiler contains water and pressurised steam at 125 C and 1 35 Bar overpressure 257 F and 20 PSI temperature and pressure in the coffee boiler system may reach up to 96 C and 12 Bar overpressure 205 F and 175 PSI
12. ater spout 13 Hot water lever 14 Steam power adjustment lever right 15 Steam lever right 16 Steam wand right 17 Steam tip right with protective cap A Cup warmer tray B Drip tray Ru ee obse qun Not visible on this photo e Green indicator lights for heating spirals one for each spiral see user manual e Switch for illumination of transparent back panel see p 19 opirit installation manual E age 6 WG PM WELCOME Note on this manual Work on the Spirit manual started in March 2012 and is a continuing process Photographs in the manual are taken in the shop from pre production machines being built at the time For that reason body panels and or parts from the machines on display may be missing and parts in the machine you bought may not look identical to the parts shown in the manual Over time sections are added and or improved sometimes as result of readers making comments If you have suggestions for improvements do not hesitate to send them to The printed version of the manual only comprises the installation manual For more information we refer you to the manual on the USB stick that came with the machine If the manual on the USB stick does not give enough information please contact us for an update of the manual and or more information UU gt MN AED PINEDA 0108410140181 nr TERRELL yl 7 Figure 2 The customer side of the Spirit Duette shown with
13. bles attached to the Spirit are the pump cables Attach each pump cable to its corresponding pump motor by connecting it inside the box on top of the pump motor see Figure 13 Make sure that the cable for the coffee system pump is connected to the pump that feeds the coffee system and the cable for the steam hot water boiler pump is connected to the pump that feeds the steam hot water boiler connect to connect to blue yellow green lead in lead in pump pump cable cable connect to black lead in pump cable 14 Figure 13 Pump cables must be mounted on the connector inside the black installation box on top of the pump motor In this picture the lid of the installation box has been removed and the capacitor has been laid aside for better view 3 Attach the thick mains cable directly to a 230 VAC earthed power outlet three phases or one phase depending on model and type or to a suitable plug see Figure 14 Spirit installation manual BO page 20 INSTALLATION 1 3 phase phase USA gt Yellow Yellow Earth Green green green Figure 14 Shown here is the 3 phase plug 3P N E 16A 400V used in Europe The white lead in the USA cable must be hooked up to the anti phase 115VAC live anti phase w r t the black 115VAC live Danger When your machine was ordered without a mains plug or when the mains plug has been removed to fit the cable through a small countertop opening have a qualified electrician con
14. d water before it is dispensed Water temperature at the hot water spout depends on the temperature and amount of the mixed in cold water The temperature of the incoming cold water differs from place to place and possibly by season as well The amount of cold water inflow is related to the pressure and can thus be adjusted by changing the outgoing pressure of the steam hot water boiler pump Increasing the pump pressure decreases the temperature at the spout and vice versa a ROA bi a decrease temperature Da AR SS increase temperature B ES d b 3 P Figure 17 the steam boiler pump pressure is used to set the hot water temperature Procedure 1 Wait for the machine to be completely warmed up at least ON and heating for 25 minutes and used to dispense hot water at least 5 times over the last 5 minutes opirit installation manual page 27 Spirit installation manual FIRST USE Get the main controller in programming mode to get a long lasting flow of hot water Touchpad press and hold upper button on left hand touchpad Bastone autostop two way switch of left hand group in left position press and hold program button for 6 seconds LED s will start flashing Within 4 seconds activate water dispensing by pressing down and releasing the hot water lever Water will start flowing LED s are now lit Measure the temperature of the outflowing water with a quick response temperature sensor and then de activa
15. e phase mains power 3x 230VAC so as to divide power consumption over three different mains leads The mains cable has five wires 2 5 mm each three phases neutral and earth For safe operation of the machine a phase shift of 120 per phase which is common in Europe is essential as this 120 phase shift reduces the power flux through the common neutral lead of the mains cable The earth lead to the frame is a 6 mm wire When a three phase machine is to be converted to a single phase machine the mains cable has to be exchanged and some modifications on the inside connections have to be made In order to accommodate different electrical systems around the world we also produce a so called single phase version of the machine When we speak of a single phase machine the mains cable has 3 wires North America AWG 10 5 26 mm each rest of the world 3G6 6 mm each Within the machine power is divided into three separate circuits exactly as in three phase machines In some countries where our single phase machines are used the mains voltage is in fact 230VAC e g Australia New Zealand the blue wire in the mains cable is connected to the neutral in the machine the brown wire in the mains cable is powering the different circuits in the machine The yellow green lead in the mains cable is the earth lead In other countries where our single phase machines are used the mains voltage is in fact 120VAC or 115VAC e g USA Ca
16. e water mains are opened the boilers cannot completely fill up because the air inside cannot escape from the groups The boilers will only fill until the air inside is compressed to water mains pressure Therefore engage the temperature controller on a coffee boiler only after water has run from the group EN steam boiler MW coffee boiler controller DN T controller Figure 15 Showing the temperature controllers and their on off switches of the steam boiler and both groups on a Spirit Duette Switches are in off position with levers pointing down displays are not lit Procedure 1 If present remove the filter holders from all groups 2 Make sure that all temperature controller switches PID s for all groups plus the controller for the steam boiler are in the off position lever pointing down see Figure 15 3 Make sure that coffee pressure gauges indicate line pressure If not check water connections 4 Turn the mains switch on the machine to NO HEAT The mains switch is mounted on the right hand side of the machine see Figure 12a The machine will wait for approximately 3 seconds before activating the pump and starting to fill the steam hot water boiler Power to the heating elements is disconnected for 3 reasons 1 mains switch is in position NO HEAT 2 The temperature controllers are not switched on yet 3 Safe water level in the steam hot water boiler is not yet reached Note As the machine s
17. erature The initial overshoot will be taken up by the steel mass of the group which is also heating up from cold E Check if the machine is leaking Even when the boilers have reached their correct operating temperature after firing up the machine from cold it takes some more time until the groups are at their optimum temperature You can speed up this process by making 2 cups of coffee 5 times per group to get the groups at the correct temperature you may use the same coffee puck each time Set hot water dosage The hot water lever central lever with red knobs activates a timer which in turn engages the pump and opens valves in the hot water system so that water will start flowing from the hot water spout After the set amount of time the flow will stop automatically The delivered quantity of water depends on pressure in the steam hot water boiler and the flow of added cold water Because these may fluctuate slightly the quantity of water delivered in the set time may vary a little as well You can adjust the amount of time that the water will run from the hot water spout Procedure Touchpad version e Press and hold the upper button of the left hand touchpad for 6 seconds the main controller is now in programming mode The LED in the upper button of all touchpads will be flashing but no water will flow from the groups e Within 4 seconds activate water dispensing by pressing down the hot water lever and releasing it The hot water l
18. ers on levers pointing up The displays will light up after about 3 seconds and the coffee boiler heating elements are now engaged E Check if the machine is leaking Expel air from coffee system You now have to expel remaining air from the coffee system Procedure 1 While the machine heats up let each group run for approximately 10 seconds to expel any remaining air pockets E Check if the machine is leaking Spirit installation manual page 24 FIRST USE First use Heating up Heating up all of the boilers takes about 25 minutes after the temperature controllers are turned on When the temperature in the steam boiler reaches boiling point some steam will escape through the anti vacuum valve and is discharged into the drain The escaping steam makes a hissing or sputtering sound inside the machine and will stop when the valve is shut by the increasing pressure inside the boiler The main steam boiler is adjusted at the factory to 125 degrees Celsius centre digital controller corresponding to approximately 1 35 Bar When heating up from cold the coffee boiler PID s will initially overshoot the set temperature for example it will heat up to 94 7 C instead of 93 0 C Although the PID parameters could be set such that this initial overshoot is nearly absent this setting would reduce the temperature stability once the corresponding group is warm and will increase the time it takes to reach the set temp
19. ever red knobs is located on top of the front panel between the groups As long as the water is running all upper LED s will remain lit If you wait longer than 5 seconds the controller will leave the programming mode automatically all LED s unlit Use of a stopwatch is advised e Press down and release the hot water lever again when the desired quantity of water has been dispensed The electronic timer has now been set The programming mode will last for another 4 5 seconds after you have set the timer therefore refrain from handling buttons or levers for another 6 seconds Procedure Bastone autostop version e Make sure that the 2 way switch underneath the left hand group lever is pointing to the left e Press and hold the program button push button underneath left group lever for 6 seconds the control LED will start flashing and the main controller is now in programming mode e Within 4 seconds activate water dispensing by pressing down the hot water lever and releasing it The control LED s on all groups will be lit The hot water lever red knobs is located on top of the front panel between the groups opirit installation manual AY page 25 WS FIRST USE If you wait longer than 5 seconds the controller will leave programming mode automatically all LED s unlit Use of a stopwatch is advised e Press down and release the hot water lever again when the desired quantity of water has been dispensed The electronic timer has
20. gh pressure steel webbed hoses each 1 5 m 5 ft e 3 high pressure steel webbed hoses each 0 5 m 1 ft 8 in e 1 T fitting 8 8M connections e 2 discharge hoses inner diameter 15 mm 5 8 with stainless steel hose clamps e Filter holders with filter baskets Duette 2x Triplette 3x e Stainless steel Kees van der Westen tamper compliant with VST specifications e Blind filter Duette 2x Triplette 3x e Jar with cleaning powder e Group brush e 2 Kees van der Westen shot glasses e 1 T shirt Spirit e Kit with consumable parts to facilitate service and routine maintenance composition depends on whoever is responsible for installation and maintenance Machines ordered with an individual pump per group have different amounts of these items Extra materials needed e Water treatment system at least an effective de scaler e Materials to connect the water treatment system to the T fitting on the hoses to the water pumps e Coffee grinder e Knock box e Pitcher Unpack and place Tools needed e Phillips screw driver no 2 preferably a power tool Procedure 1 Remove the lid of the crate 2 Remove the four side panels of the crate 3 Lift the machine by its legs and place on the countertop A Caution Lifting the machine other than by its legs may cause damage For that reason you have to remove the side panels from the crate A Warning The machine has a considerable weight Make sure you have
21. hoses T fittings and pumps to your machine Described below is the standard lay out for machines with 2 pumps 1 Use a 20 mm spanner to attach the elbow end of the two long high pressure hoses to the water supply of the steam boiler rear fitting and coffee water system front fitting on the Spirit respectively 3 8 connections see Figure 7b There is no need for any type of gasket The rounded end of the hose fits snugly onto the fitting providing a leak free connection when turned tightly When your is machine is equipped with individual pump per group these are marked L C Triplette only R and S left group centre group right group and steam 2 Attach the other ends of the long high pressure hoses to the outlet of an individual pump 3 8 connections No need for gaskets Note The outlet of the pump is marked with an arrow pointing up away from the pump housing see Figure 8 3 Attach the loose ends of two of the short high pressure hoses to the inlets of the water pumps No need for gaskets Note The inlet of the pump Is marked with an arrow pointing down towards the pump housing see Figure 8 Figure 8 Pump with inlet and outlet shown Below under 4 to 6 the procedure to include a water treatment system is described Make sure that you install a water treatment system or de scaler in between the incoming tap water and the high pressure pumps 4 Attach the T fitting on the two short high pressure hoses
22. huts down when the filling valve is active for more than 2 minutes continuously the operating level will not be reached yet because the machine shuts down and filling will stop 5 While the steam boiler is filling activate the groups Bastone autostop tap brewing lever downwards Touchpad shortly press top button one by one to engage the group solenoid valve and pump and bleed all air from the corresponding coffee boiler Deactivate the group again tap brewing lever down or shortly push upper button when water flow from the group is more or less continuous Note The electronic temperature controllers just behind the drip tray can only be activated when the safety water level inside the steam boiler is reached The heating elements should of course at all times be immersed in water when operated Spirit installation manual page 23 INSTALLATION 6 Turn the mains switch to OFF to reset the main controller and back to NO HEAT the steam hot water boiler will continue filling after a 3 second delay 7 Repeat step 5 and 6 Continue activating the groups one by one until water flow from all groups is more or less continuous 8 Turn the mains switch to OFF and then to ON and then switch the steam boiler controller on lever pointing up The display will light up after about 3 seconds and the steam boiler heating elements are now engaged 9 You may now switch the coffee boiler temperature controll
23. l schemes and a troubleshooting guide Contact information Kees van der Westen Espressonistic Works B V Van Elderenlaan 6 5581WJ WAALRE The Netherlands Telephone 31 40 2223433 Email info keesvanderwesten com Website www keesvanderwesten com Ordering replacement parts Check our website if the webshop is already up and running If not order via spareparts keesvanderwesten com Spirit installation manual page 29
24. nada the white and black wires in the mains cable should be connected to a two phase mains 120 115VAC 180 phase shift see note on phase shift at end of paragraph The possibly present neutral wire of the electric power mains is not used The green lead in the mains cable is the earth lead C mains LED light supply switch Figure 12a left Showing mains switch in OFF position In position NO HEAT the machine is functional except that no power is fed to the heating elements used for testing etc Figure 12b right Showing cables for mains and pumps plus the on off switch for the LED light The switch is in off position lever pointing down Note Depending on model and type the Spirit has a maximum power consumption of 8400 9300 Watts from your AC outlet This occurs when all heating elements and pumps are active simultaneously At 230 Volts this is equivalent to approximately 31 6 40 5 Amps We therefore insist that the machine has its own power circuit breaker s Spirit installation manual page 19 INSTALLATION Mains switch The function of position NO HEAT of the mains switch is that only a small portion of the machine pumps main controller back side LED light will get power which allows for testing without heat Only in position ON can power be fed to the heating elements Procedure 1 Make sure that the mains switch is in position OFF see Figure 12a 2 The thinner electrical ca
25. nect your Spirit to the mains The yellow green or green lead must be connected to earth to properly ground the machine This is essential to work safely with the machine Note If your machine is equipped with a 5 wire cable 3 phases 230VAC with 120 phase shift blue is neutral grey brown and black are phases hot live yellow green is earth If your machine is equipped with a 3 wire cable Australia and New Zealand single phase 230VAC brown is phase hot live blue is neutral yellow green is earth USA and Canada 2 phases 120VAC or 115VAC with 180 phase shift white is phase hot live black is phase hot live green is earth Connect all wires to the appropriate outlet opirit installation manual page 21 INSTALLATION Note on phase shift of 120VAC or 115VAC When you want to use your machine in a 120VAC or 115VAC environment check whether the mains is a 180 degrees phase shift most houses or a 120 degrees phase shift most commercial buildings You can measure the resulting voltage between two phase leads of the mains with a common voltage meter set to measure VAC The resulting voltage should be 220 240VAC With a 120 degrees phase shift you will measure 201 208VAC The machine will only work well with a resulting voltage of 220 240VAC If your location is powered with three phase 120VAC with a 120 degrees phase shift we suggest to use a 10 booster a so called auto transformer or buck booster
26. on two leads of the three phase mains which will raise 208VAC to 239VAC and 201 VAC to 221 VAC Have a qualified electrician install the necessary equipment as the booster must be able to supply 37 41 Amps The 120VAC three phase may lead to erratic behaviour of the machine when no booster is installed although the machine will seem to function properly for a while Without booster the heating elements are reduced in power to 82 of its original rating at 208VAC instead of 230VAC thus 736W for the coffee boilers was 900W and 4907W was 6000W in a Triplette or 3925W was 4800W in a Duette for the steam boiler opirit installation manual page 22 INSTALLATION Filling the machine with water from empty Several jets and restrictors are present within the machine These jets and restrictors slow down the flow within the machine in order to optimise the coffee extraction process in terms of pressure profiling and temperature stability While filling the machine from empty these jets and restrictors hamper free flow to the steam hot water and coffee boilers which may thus not fill up as quickly as you possibly expect As a safety measurement the main controller shuts the machine down when any solenoid valve in the machine apart from the steam solenoid valves is open for more than 2 minutes continuously to prevent flooding of the establishment in case of a malfunction A Caution Although the coffee boilers start filling as soon as th
27. or power mains outlet box must be nearby max 1 5 meter Depending on the machine ordered the power mains is 230 VAC 3 phases 120 phase shift with neutral 230 VAC 1 phase with neutral or 115 VAC 2 phases 180 phase shift also called split phase without neutral All power mains must have an earth connection and should be able to safely deliver the maximum power consumption of 7200 Watts 31 5 Amps Duette or 9300 Watts 40 5 Amps Triplette You may want to have the water drain and power fed through one or more openings in the countertop see Figure 4 Footprints of the Duette and Triplette As the Spirit has full free space underneath the opening s in the countertop can be positioned anywhere For a visually pleasing result we recommend feeding the pump and drain hoses through an opening located just behind the front left foot and the mains and pump cables through an opening just behind the front right foot of the machine Notes Make sure that the mains and pump cables bend upwards in the cabinet below the machine to prevent the possibility that water dripping along these feeds reaches the wall socket or pump motors Be aware of the location and functioning of the knock box when planning the design of the connections to your machine General tips e Install the knock box centred underneath the espresso machine or near the grinder s in the back of the bar This will result in a favourable routing of the filter holder
28. plette 1 Water ___ Water 1 3 faucet E all groups Or group L A group M sss Wl ii Water t esie on Figure 10 Lay out of hoses fittings and pumps for the standard Spirit one pump for steam hot water system one pump for the coffee system and for Spirits with an individual pump for each group Spirit installation manual page 17 INSTALLATION Connect water discharge The machine is equipped with two discharge hoses of small diameter This allows for hiding of the discharge behind the left hand front leg of the machine 1 Position the stainless steel hose clamp on one end of the discharge hose Slide the end of the hose over the machines waste pipe see Figure 11 and tighten the hose clamp 2 Dothe same with the discharge hose of the drip tray 3 Insert the other ends of the discharge hoses into the drain or a discharge container Note To prevent sedimentation of sludge the discharge hoses should slope down to your drain or discharge container over the entire length of the hoses 4 If necessary cut the discharge hoses to desired length gt ts cw machine waste y Figure 11 Spirit seen from bottom front without hoses attached to the machine waste and drain pipe on the drip dray Spirit installation manual page 18 INSTALLATION Connect electrics Single versus three phase machines The Spirit is designed to operate on 220 240VAC with thre
29. quickstart If the information in this section is not sufficient we refer to the installation manual which you can find in a following section page 14 onwards of this manual or contact your local installation technician 1 Connect water water treatment ere o Ti Up A PR I gt an E F i E sn um s P mr M e p E ai ES s 2 I i nr ele adi m s memm a 2 a dB s 0 0 o RA th Install water treatment system not in shipment and connect water treatment system to both pumps Lay out is different for machine with individual pumps per group outlet adjust pump pressure Spirit installation manual page 2 INSTALLATION QUICKSTART Standard Spirit has markings C and S C coffee boilers S steam boiler Spirit with individual pump per boiler has markings L C R and S L left coffee boiler C centre coffee boiler Triplette only R right coffee boiler S steam boiler coffee boilers steam boiler Connect high pressure hoses of both pump outlets to Spirit 2 Connect water disposal s o Pee A lt nee AR machine waste discharge pipe r d on drip tray g tad AX Attach both drain hoses to Spirit 3 Open water mains Check for leaks at all connections just made opirit installation manual E age 3 WG dis INSTALLATION QUICKSTART 4 Make sure that
30. standard logo a A emir amp 65s RI J Un YN n z o He nr ih ES s A 35 2 dM p T9 44 yr L o3 y 3 IM 3i AK Ei Y Av a S tre RECA M 14 P T BG AX as gt x E v Ae ere E sm 45 ae Ja xe 1 4 1 ha B Axe M Le eh d ER P oer oy 3 i act 5 a YE j fy SDD ae Ms M ES 1 k pee Ste ee 2p 2 SA iu wera P EAE E 7 AI HO 12V Figure 3 A Spirit Triplette Touchpad version seen from the front NEW PHOTO NEEDED Spirit installation manual page 7 INSTALLATION Prior to installation Area preparation Before unpacking the machine you must be sure that the area where the machine will be placed has been prepared properly The countertop should be level and firm enough to carry the weight of the machine up to 135 kg 300 lbs even when force is applied to it to lock in the filter holders tamp the coffee bed etc A countertop height of 85 100 cm 33 40 is suitable for most baristas The water supply and water treatment system must be nearby max 1 5 meter 5 feet the machine Discharge may not be further away than 1 5 meters have an internal diameter of at least 40 mm 1 1 2 to accommodate two somewhat flexible hoses with external diameter 20 mm and must be fitted with a syphon There must be space nearby to locate the two or more water pumps with their individual electric motors depth x width x height 30 x 20 x 25 cm each 12 x 8 x 10 A wall socket
31. te the hot water by pressing down and releasing the lever again We recommend a water temperature of around 95 C If the temperature is too low decrease pump pressure of the steam hot water boiler pump If the temperature is too high increase pump pressure see Figure 17 After adjusting the pump pressure make sure that the boiler is at operational temperature and measure the hot water temperature again When the required temperature is reached reset the hot water timer to the desired amount of water see section set hot water dosage If you do not have a quick response temperature sensor decrease the pump pressure until boiling water is flowing from the spout flow will sputter instead of dispensing a calm flow Then increase the pump pressure a little until a calm flow is obtained page 28 INFORMATION More information in the USER MANUAL Please check the SPIRIT USER MANUAL for information on how to operate the machine set brew volumes and remarks thereabouts adjust steam power change temperature settings etc More information on the USB flash drive Included in the shipment is a USB flash drive with comprehensive information on the Spirit espresso machine Besides this installation manual it includes the user manual an explanation of how the machine works some notes on tap water quality detailed descriptions of materials needed and procedures to follow whilst performing maintenance routines electrica
32. ut 20 30 minutes Set coffee brewing pressure By adjusting coffee system pump pressure use coffee puck not blind filter Set hot water temperature when machine is at operational temperature Increase hot water temperature by decreasing steam boiler pump pressure Decrease hot water temperature by increasing steam boiler pump pressure Set dosages for brew shots and hot water See user manual for details If the information in this section is not sufficient we refer to the installation manual which you can find in a following section of this manual page 14 onwards or contact your local installation technician opirit installation manual ex age 5 WG is WELCOME Welcome Parts identification EL LUN UE E 4 J3 A Figure 1 Showing main operational parts of the Spirit Duette Bastone version The Spirit Triplette is wider since it has three groups but its functions are identical to the Duette On the Touchpad version the group brewing lever units are replaced with touchpads see Figure 3 1 Mains switch Coffee boiler PID temperature controller right group Coffee boiler heating on off switch right group Steam boiler temperature controller Steam boiler heating on off switch Volume switch left group Program button left group Group indicator light left group 9 Group brewing lever left group 10 Pressure gauge coffee boiler left group 11 Group left 12 Hot w
Download Pdf Manuals
Related Search
Related Contents
はじめに 各部の名称 のプびは AD 『h ー 『放射温度 ープキ買し 上げし 10" 座警告 a お手入れについて PDF NW-HD3 - Sony Europe EUROLIVE B212A/B215A Aranda ASSET MANAGEMENT [1] Pioneer DVD-V7400 Copyright © All rights reserved.
Failed to retrieve file