Home

Section 2: System Configurations

image

Contents

1. 6 2 1 SAYS CENT COMMU ALIGNS au a np eege 6 2 2 CT 7 SEGTION 3 TEGHNIGAL SPEGIFIGA MUNS uu uu u cc u u u uu ne 10 3 1 NU 10 4 2 Lin E 11 ck BEE 11 SEGUN S TS TEM REUUIREMENTS u u yuyuman 12 A POWER TEE 12 42 ERUN 13 4 3 ALIS pengtiatipit PBELIPBITIBIES ceo ots A E u A i REO Mr PAIGE 13 SECTION SITE SURVEY CHECKLIST 18 Site SURVEY uyu i S Dua AS D EU Error Bookmark not defined Summary af customer responsibilities EE 20 EmpowerMR Site Survey Document 900953 001 Rev 02 2 Section Introduction 1 1 Purpose of this manual This document details information and provides site survey instructions and the site survey checklist for the EmpawerMR Injector System The EmpawerMh will be shown in photos Except where noted in this Injector Site Survey facility is responsible far the installation of the EmpowerMR Injector System and ensuring the proper and necessary room and power specifications are available Facility is responsible for providing complete and accurate information to ALIST regarding the site and engineering designs and ALIST assumes no responsibility far reliance on such information Through use of this document the site will be ensured to receive the proper contiguration far their installation 17
2. A SIEMENS SUPPLIED AND INSTALLED es 4 SIEMENS SUPPLIED AND CONTRACTOR INSTALLED 1 PROCESS WATER SYSTEM AND CONTROL DIAGRAM NO SCALE 19 N W Fifth Avenue Portiand Oregon 97209 503 222 1687 ARCHITECTS ENGINEERS SURVEYORS amp PLANNERS 275 Park Avenus Coos Bay Oregon 97420 541 269 1166 2 3 i HI B It Q DER GTS En ELECTRICAL SYMBOL LIST Nurse Call NURSE CALL STAFF ASSIST CENTER e NURSE CALL DOME LIGHT WALL MOUNTED Technology REQUEST TO EXIT DEVICE D CARD READER SMOKE DETECTOR X WALL MOUNTED STROBE SPEAKER Telecommunications y PROMDE 1 CONDUIT TO ACCESSIBLE CEILING SPACE AND DOUBLE GANG BOX WITH SINGLE GANG ADAPTER PLATE PROVIDE CAT 6 MODULAR JACK ORTRONICS OR TJ600 XX AND 6 PORT FACEPLATE ORTRONICS OR 40300545 COORDINATE JACK AND FACEPLATE COLOR WITH BUILDING FINISHES ALSO PROVIDE ORTRONICS OR 42100002 DUST COVER FOR MODULAR OPENINGS COLOR TO MATCH FACEPLATE PROVIDE 3 6 CABLES BACK TO IDF ROOM LANMARK 1000 SUBSTITUTIONS PROJECT 148 HOSPITAL WS MRI UPGRADE to l ARCHITECTS ENGINEERS SURVEYORS amp PLANNERS TITLE RE ADDENDUM 2 375 Park Avenue Coos Bay Oregon 97420 541 269 1166 REF EDO 19 N W Fifth Avenue Portiand Oregon 97209 503 222 1687 SHEET KEYNOTES 24 PROVIDE NEW 20A 1P CIRCUIT BREAKERS IN PANEL AS REQU
3. Section 3 Technical Specifications 32 Weight Injector w Stand Injector Head Hydraulic Controller Remote Control 3 9 Dimensions Injector w Stand Injector Head Hydraulic Controller Remote Control Electro hydraulic Interconnect EmpowerMR Site Survey 47 pounds 18 1 kg Ib pounds 7 3 kg 47 pounds 21 0 kg Ill pounds 4 0 kg J4 high x ZB wide x 25 deep 1372 mm high x 660 mm wide x mm deep 17 lang x 8 hide x 12 deep 432 mm lang x 203 mm high x 3ll mm deep IH high x 7 wide x Ib deep 483 mm high x 1 8 mm wide x 406 mm deep I3 wide x Il high x 4 deep without mounting kit 94 mm wide x 279 mm high x 02 mm deep 3 4 diameter 19 mm Document 900953 001 Rev 02 11 section 4 System Requirements Al Power requirements The EmpowerMR Injector System requires a standard hospital grade power source with a grounded receptacle Line cords compatible with local voltages are provided with the system A power source with a dedicated circuit is recommended for all ALIST Injector systems wo dedicated receptacles are required for use with the EmpawerMh Injector System The first receptacle is for the Hydraulic Controller and the second receptacle is tor the Remote Control Power receptacles should be either 120 VAC 6U Hz or 240 VAC oU Hz Na adjustment ta the system is required Before installation take careful note as tn where the receptacles located Verity that receptacl
4. 4 5 Picture of Penetration Panel Installed with Filters view from scanner room EmpowerMR Site Survey Document 900953 001 Rev 02 17 Section 5 MR SITE SURVEY CHECKLIST Section MR SITE SURVEY CHECKLIST Prior to shipment of an Empower Injector System including accessories this form must be completed and returned to the address provided below PLEASE PRINT CLEARLY TO HELP ENSURE SUCCESSFUL INSTALLATION ACIST Medical Systems 7905 Fuller Rd Eden Prairie MN 55344 Attn Sale Orders Phone 1 888 667 6648 Ext 564 Fax 612 656 2318 E mail sales orders acistmedical com Date Site Name Address complete City State Zip Code Contact Name Phone Email Address Fax No Please provide name amp phone number of OEM engineer or site coordinator 1 Injector is being placed in LInew MR suite lremodeled MR suite lexisting MR suite 2 dfthis is a new or remodeled suite is the construction complete LT Yes No Anticipated completion date 3 Scanner manufacturer IDE Philips D ISiemens CJ Toshiba Hitachi lather magnet strength _ 4 sscanner currently operational magnet is on Yes No 18 Section 5 MR SITE SURVEY CHECKLIST scanner shielding room information name plate typically found on scanner room door manufacturer contact name phone number B the system replacing an existing injector system lYes No If yes which manufacturer Medrad LJ Liebel
5. LJ Nemoto other model 1 suite layout Is a layout available showing the Control Scanner and Equipment Rooms YES ND IF No provide the following digital photos to Michael Moore e location of scanner and existing scanner penetration panel e proposed location of ALIST penetration panel picture from both sides e proposed location of Hydraulic Controller Remote Control and Injector e electrical outlets in bath the equipment room and the console area B Penetration Panel s there a location for the panel in the Equipment Room lYes LIN IF yes does this location require finishing work after the panel is installed lYes s there an identified location for the panel in the Control Room Yes LINO If yes does this location require finishing work after panel is installed Yes LINO d Uther requirements s an electrical outlet available and within reach of the Remote Control Yes LAND ls an electrical outlet available and within reach of the Hydraulic Controller lYes LIN ls there an accessible 1 5 conduit or cable available to run the communications cable from the Remote Control to the Hydraulic Controller lYes LIN Are locations of Remote Control and Hydraulic Controller situated lYes LIN within reach of the 7 ft communications cable Are locations of Injector Hydraulic Controller and Penetration Panel lYes LIN within reach of the all ft electro hydraulic interconnecting
6. cable 10 Digital photos must accompany the site survey documenting that the penetration panel has been installed Photos should show the holes for both 3 filters and the wave quide Please refer to section 4 3 thru 4 6 fnr specific details 19 Section 5 MR SITE SURVEY CHECKLIST ll Tentative date for injector delivery on site LU Tentative date for Clinical Applications Specialist to be on site _ 13 If required did you note order the Iris Remote viewer option in the P O YES NO If this requires networking please complete the IRiS Site Survey Customer Responsibilities The following list summarizes the responsibilities of the customer facility where the Injector System is being installed Standard hospital grade power source with a grounded receptacle within 8 7 feet af the Hydraulic Controller see Section 4 1 Standard hospital grade power source with a grounded receptacle located within feet of the Remote Control see Section 4 1 Installation of cable runs ar 172 7 conduits far the communication cable between the Hydraulic Controller and the Remote Control These are supplied and installed by the facility Please note a pull chord must be available Manufacture and installation of the dedicated penetration panel see Section 4 3 the pen panel has been installed DO cover the holes Le with plywood etc Access to both sides of the scan room and equip
7. other flat surface as shown in Fig 2 lc or it can be wall mounted The Hydraulic Controller is to be placed a stable flat level surface EmpowerMR Site Survey Document 900953 001 Rev 02 T Section 2 System Configurations Hydraulic Controller Dedicated Penetration Panel Remote Control Electro hydraulic Interconnect Injector Head Fig 2 14 Hydraulic Controller in Equipment Room Electro hydraulic Interconnect Dedicated Penetration Panel Remote Control Injector Head Communication Cable Hydraulic Controller Fig 2 le Hydraulic Controller in Control Room EmpowerMR Site Survey Document 900953 001 Rev 02 Section 2 System Configurations EmpowerMR Site Survey Document 900953 001 Rev 02 section 3 Technical Specifications 3 1 Power 3 1 1 Voltage SELY Safety Extra Low Voltage supplied from the hydraulic Injector Head controller 100 74 VAL Internal switching power supply that auto seeks to hydraulic Controller applied voltage 00 750 VAL Internal switching power supply that auto seeks to Remote applied voltage 3 1 2 Wattage Injector Head 2 VA maximum supplied from hydraulic controller 370 VA Typical when Running VA Typical in Standby Hydraulic Controller Remote ba VA maximum 3 1 3 Frequency Injector Head N A DC Power Hydraulic Controller all to b Hz Remote 44 to b Hz EmpowerMR Site Survey Document 900953 001 Rev 02 10
8. 07 Fax 882 841 4548 EmpowerMR Site Survey Document 900953 001 Rev 02 PROPRIETARY INFORMATION NOTICE This document contains information proprietary to ALIST Medical Systems Inc All rights are reserved No part of this document may be reproduced transmitted processed or recorded by any means or torm electronic mechanical photographic or otherwise nor be released to any third party without the express written consent of ALIST Medical Systems Inc The written and graphic product descriptions in this manual were etfective at the time of printing ALIST reserves the right to change specifications and designs or ta discontinue any model without prior notitication Patents pending In the United States ALIST can be contacted at In the HI ALIST can be contacted at the the manutacturer distributor Weg ALIST Medical Systems Inc Acist Europe BV 7900 Fuller Road Renier Natzgerstraat 114 Eden Praire MN 00344 6221 KL Maastricht Phone 887 941 8007 The Netherlands Toll Free 888 667 6648 Phone al 0 49 304 al 30 Fax 904 941 4646 Fax 91 043 304 00 www acistmedical com EmpowerMR Site Survey Document 900953 001 Rev 02 l Table of Contents SEG TUN T INTRHDULTIUN iota k uuu uu cc firn os 3 11 Purpose ENS ERUN 3 12 Manual ION uuu a ana W aaa TO n aee 3 13 AER 3 14 EE 4 SECTION 2 SYSTEM CONFIGURATIONS
9. Addendum 2 Page 1 ADDENDUM 2 DECEMBER 23 2011 RE BAY AREA HOSPITAL BUILDING EXPANSION Cv 2840 A MRI Upgrade Cy JOSEPH A SLACK S gt Project 11 48 E FROM HGE INC Architects Engineers Surveyors amp Planners 375 2 COOS BAY OR BR Coos Bay Oregon 97420 Dm lt 541 269 1166 lt OF i TO Prospective Bidders This Addendum forms a part of the Contract Documents and modifies the original Documents dated December 9 2011 as noted below Acknowledge receipt of this Addendum in the space provided on the Bid Form Failure to do so may subject Bidder to disqualification This Addendum consists of 3 pages together with the following attachments e Drawing AD 2 Equipment Room 1 page Drawing AD 2 Mirror Trim Detail 1 page Drawings RM 01 to RM 06 6 pages Drawings RE 01 to RE 03 3 pages EmpowerMR Injector System Site Survey and Site Installation Instructions 21 pages CHANGES TO PROJECT MANUAL 1 Section 01 1000 Summary subparagraph 1 04 Add the following paragraph EmpowerMR Injector System furnished by Owner Contractor to provide rough in See attached EmpowerMR Injector System Site Survey and Site Installation Instructions Contractor to install dedicated injector control penetration panel within shielding wall system refer to attached drawing for location 2 Section 01 2300 Alternates Delete Section Refer to Hoffman Construction Company s list of Alt
10. IRED UPDATE PANEL SCHEDULE IN DOOR WITH NEW TYPED PANEL SCHEDULE 25 PROVIDE CABLE ROUTE FROM EQUIPMENT ROOM TO CONTROL ROOM VIA HALLWAY FOR INJECTOR PUMP HYDRAULIC CONTROL UNIT CONTRACTOR TO INSTALL OWNER FURNISHED CABLE EQUIPIVE UPS CONTROL CABINET MOUNTED ABOVE E LIEBERT UNIT L3A2 78 80 82 PARTIAL THIRD FLOOR PLAN 1 POWER AND SIGNAL gg SCALE 1 2 1 0 PROJECT SAT AREA HOSPITAL MRI UPGRADE TITLE ae ADDENDUM 2 INCE lee Oregon 97420 541 260 1166 ARCHITECTS ENGINEERS SURVEYORS amp PLANNERS 8 GENERAL SHEET NOTES A ALL RACEWAY BOXES AND ASSOCIATED ACCESSORIES WITHIN RF ENCLOSURE MUST BE OF NONFERROUS MATERIAL B COORDINATE ALL WORK RELATED TO THE IMAGING EQUIPMENT RACEWAY SYSTEM WITH EQUIPMENT VENDOR REPRESENTATIVE C PROVIDE A PULL STRING IN ALL EMPTY CONDUITS MUSIC SYSTEM IN MRI PROVIDED BY SIEMENS PARTIAL THIRD FLOOR PLAN 1 POWER AND SIGNAL mmm SCALE 1 2 1 0 PROJECT SAY AREA HOSPITAL MRI UPGRADE j em ARCHITECTS ENGINEERS SURVEYORS amp PLANNERS TITLE RE 3 ADDENDUM 2 el gt gt iid de i aci uen REF 19 N W Fifth Avenue Portiand Oregon 97209 503 222 1687 EMPOWERMR INJECTOR SYSTEM SITE SURVEY AND SITE INSTALLATION INSTRUCTIONS SYSTEMS ALIST Medical Systems Inc Eden Prairie MN 50844 Phone 902 941 30
11. Manual organization The manual is organized into the following sections Section Introduction Identities the purpose and organization nf this manual Section 7 System Contiguration Describes the EmpawerMR Injector System Section Technical Specifications Provides power weight and dimensional specifications Section 4 System Requirements Provides information regarding the electrical requirements equipment location and room penetrations Section dite Survey Checklist Farm to be completed during the site survey visit Manual conventions This manual uses the following conventions Bold indicates emphasis or heading luteis used to set off important information trom the rest of the text This manual also uses the following warning Format The WARNING symbol alerts you to a hazard that may result in equipment damage or personal injury EmpowerMR Site Survey Document 900953 001 Rev 02 3 Section 1 Introduction 14 Labels Patient Applied Part degree of protection against electric shock Injector Head Attention Read the user s manual before using Potential equalization Protective earth ground MR Conditional symbol identities an item that has been demonstrated ta pose no known hazards in a specified Mh environment with specified conditions nf use MR Unsafe symbol identities an item that is known to pose hazards in all MR environments With respect t
12. N WITH ARCHITECTURAL REFLECTED CEILING PLAN C COORDINATE FINAL PIPE ROUTING IN MRI EQUIPMENT 370 WITH ELECTRICAL EQUIPMENT AND CABLE TRAYS D PROVIDE MINIMUM 5 FLEX DUCT ON DIFFUSER GRILLE CONNECTIONS MAXIMUM 7 SHEET KEYNOTES 1 CONNECT DUCTS TO WAVE GUIDE PROVIDED BY RF SHIELD MANUFACTURER 2 CONNECT CHWS AND CHWR TO MRI EQUIPMENT PER SIEMENS MRI EQUIPMENT DRAWINGS CONTRACTOR SHALL VERIFY THAT TOTAL ONE WAY PIPE LENGTH IS LESS THAN 82 FEET AND LESS THAN 25 90 ELBOWS ARE USED TO CONNECT THE KRAUS CHILLER 1 AND THE SEIMENS INTERFACE PANEL IFP REFER TO SIEMENS MRI EQUIPMENT DRAWINGS OTHERWISE USE 2 1 2 CHILLED WATER SUPPLY amp RETURN PIPING 6 CRYOGEN VENT CONNECT TO MRI EQUIPMENT PER SIEMENS REQUIREMENTS AND ROUTE VENT THROUGH EXISTING ROOF PENETRATION ADJUST ROOF PENETRATION AS NECESSARY AND COORDINATE WITH STRUCTURAL REFER TO SIEMENS MRI EQUIPMENT DRAWINGS AND SHEET M401 4 OXYGEN MONITORING SENSOR TO BE CONNECTED TO DDC SYSTEM WIRING TO BE ROUTED THROUGH RF FILTER COORDINATE WITH ELECTRICAL AND EQUIPMENT MANUFACTURER DAT AREA HOSPITAL ARCHITECTS ENGINEERS MRI UPGRADE Ee SURVEYORS amp PLANNERS TITLE RI 1 22 ADDENDUM 2 375 Park Averue Coos Bay Oregon 97420 541 269 1166 REF M21 19 N W Fifth Avenue Portland Oregon 97209 503 222 1687 1 PARTIAL ROOF PLAN HVAG 1 8 1 0 DETAIL KEYNOTES DEMOLISH EXISTING QUENCH VENT DISCHARGE AND
13. OR GE 2 Z HC E Ki d A INSTALLATION MUST COMPLY FULLY WITH MANUFACTURER DRAWINGS Y NOTIFY ENGINEER OF ANY DISCREPANCIES Jr 2 QUENCH VENT DUCT SYSTEM 3 SCALE lt S A DEE y 5 my Sq 1 90 Ve d At zi ZZ 58 OS 2 0 QUENCH VENT CAP a rd DE i A Fl DG og i eg lt n 5 2 j T WGINCB D D DEFLECTOR PLATE 2D FLASHING 2D E ROOF LINE E O DETAIL KEYNOTES mi 1 3 8 WIRE MESH 2 5 TIMES THE r CROSS SECTIONAL AREA OF THE QUENCH PIPE lt I T 1 3 QUENCH VENT ius NO SCALE E ad gt IL OL o y oo dl EE Ca 005 5 42 L 2 cHWS R 2 ROOF Di 1 d S y AUTOMATIC AIR VENT gt CHILLED WATER SYSTEM BYPASS WTH FULL SIZE PIPING TO INCLUDE 3 4 MINIMUM BOILER DRAIN AND MINIMUM 3 4 AU BYPASS PIPE WTH BALL VALVE AND 3 4 T BOILER DRAIN WITH CAP THIRD FLOOR HELIUM COMPRESSOR NOTES DETAIL KEYNOTES A ALL PIPING AND PLUMBING FIXTURES FURNISHED BY 1 OVERFLOW DRAIN MECHANICAL CONTRACTOR 2 CONTRACTOR SHALL VERIFY THAT TOTAL ONE WAY PIPE B REFER TO SIEMENS DRAWINGS LENGTH IS LESS THAN 82 FEET AND LESS THAN 25 90 ELBOWS ARE USED TO CONNECT THE KRAUS CHILLER AND THE SIEMENS INTERFACE PANEL IFP REF M 101 OTHERWISE USE 2 1 2 CHILLED WATER SUPPLY amp RETURN PIPING
14. ROUTE NEW VENT THROUGH EXISTING ROOF PENETRATION REFER TO 2 M4 1 3 M4 1 AS WELL AS SIEMENS MRI EQUIPMENT DRAWINGS FOR QUENCH VENT INSTALLATION REQUIREMENTS AND GUIDELINES 2 DEMOLISH EXISTING EQUIPMENT AND REPLACE WITH NEW KRAUS CHILLER PROVIDED BY SIEMENS 1 CHW PUMP INCLUDED IN KRAUS CHILLER SYSTEM PROJECT 1 48 AREA HOSPITAL ARCHITECTS ENGINEERS SURVEYORS amp PLANNERS Miel UPGRADE TITLE 22 ADDENDUM 2 Oregon 97209 008 2221687 RF ENCLOSURE 3 PROVIDE 1 1 2 JACKETED INSULATION oh ISOLATION JOINT ROUTE 6 VENT THROUGH EXISTING ROOF PENETRATION BY MRI VENDOR RF VENDOR TO PROVIDE ALL VENT PIPING FROM MRI CONNECTION TO VENT BY MRI VENDOR WAVEGUIDE COORDINATE ISOLATION SLEEVE INSTALLATION TO AVOID CONTACT WITH FINISHED CEILING INSTALL WAVEGUIDE AT ENCLOSURE PENETRATION TO ALLOW FOR ROOM DEPRESSURIZATION BUS NOTES AME Z 23 OS 2 0 4 4 M DETAIL KEYNOTES DEIAL RE INTE DS ROOF FULLY WELDED 6 16 GA SS OR ALUMINUM QUENCH VENT ISOLATE VENT D XC 2 PROVIDE 1850 LB AXIAL AND LONGITUDINAL THRUST RESTRAINTS AT EACH TS ISOLATION JOINT BY RF CHANGE OF DIRECTION CONTRACTOR TO SUBMIT ENGINEERED SHOP Ow ZE SHIELD VENDOR DRAWINGS FOR ALL RESTRAINTS AND ATTACHMENTS STAMPED BY 5 GUIDE BY RF REGISTERED STRUCTURAL ENGINEER IN STATE OF OREGON lt SE SHIELD VEND
15. Y AREA HOSPITAL aa ARCHITECTS ENGINEERS ees SURVEYORS amp PLANNERS ING 325 Park Avenue Coos Bay Oregon 97420 541 269 1166 AD 2 EQUPIMENT ROOM 19 N W Fifth Avenue Portland Oregon 97209 503 222 1687 WALL B HEAD TRIM EASE OUTSIDE EDGES 1 8 Ix2 OAK TRIM STAIN TO MATCH FLOOR 4 OTHER TRIM IN MRI ROOM INSIDE CHAMFER 3 8 MIRROR GLASS SET IN MIRROR ADHESIVE J CHANNEL SUPPORT INSIDE CHAMFER 3 8 Ix3 OAK TRIM STAIN TO MATCH FLOOR 4 OTHER TRIM IN MRI ROOM EASE OUTSIDE EDGES 1 8 MIRROR TRIM DETAIL SCALE 3 1 0 375 Park Avenue Coos Bay Oregon 97420 541 269 1166 19 N W Fifth Avenue Portland Oregon 97209 503 222 1687 PROJECT BAY AREA HOSPITAL E ARCHITECTS ENGINEERS MRI UPGRADE SURVEYORS amp PLANNERS el TILE MIRROR TRIM DETAIL jl o CHWR UP 00 TO CH d Lo J d ED STAFF LOCKERS o I rN INE 7 7 PARTIAL THIRD FLOOR PLAN HVA E Em SCALE 1 4 1 0 PROJECT AY AREA HOSPITAL MRI UPGRADE TITLE RM ADDENDUM 2 REF M2 ARCHITECTS ENGINEERS SURVEYORS amp PLANNERS ENCI 375 Park Avenue Coos Bay Oregon 97420 541 269 1166 19 N W P Avenue Portland Oregon 97209 503 222 1687 GENERAL SHEET NOTES A ALL DUCTWORK WITHIN RF SHIELD TO BE ALUMINUM CONSTRUCTION COORDINATE GRILLE DIFFUSER LOCATIO
16. agraph 2 04 A Replace factory applied clear varnish finish with factory applied stain to match floor with clear varnish finish 12 Section 13 4941 RF Shielding paragraph a 2 03 add F Install Owner furnished dedicated penetration panel for Injector System paragraph b 3 03 add Contractor to install floor shielding in existing 7 8 inch recess and provide fill as necessary for finish flooring to be level with adjacent non shielded flooring at door thresholds CHANGES TO DRAWINGS 1 Sheet A2 3 Key Notes Delete Key Note 7 2 Sheet A3 1 Details 5 and 4 A3 1 Note Floor shielding contractor to provide floor filler in addition to Dielectric Isolator and RF shielding Finish flooring to be flush with adjacent flooring at door thresholds Fill material shall be approved by RF shielding manufacturer Delete note regarding cement based underlayment 3 Sheet A6 1 Elevation 1 A6 1 Delete windows shown in RF shielded doors 4 Sheets P0 0 P4 1 Delete new medical gas piping or outlets work All medical gas lines and outlets to remain Contractor required to remove and reinstall existing medical gas outlets as required for the shielding installation 5 Sheet M2 1 Add oxygen sensor in MRI Equipment Room 370 delete General Note and edit Key Note 3 Refer to attached Addendum Sheets RM 01 and RM 02 Bay Area Hospital Building Expansion MRI Upgrade 11 48 December 9 2011 Addendum 2 Paqe 3 Shee
17. ernates found within their Bid Package 5 MRI Upgrade Addendum No A 3 Section 06 4100 Architectural Wood Casework subparagraph 2 06 Add the following G All Accessories in MRI Room must be non ferrous 4 Section 06 4100 Architectural Wood Casework subparagraph 2 07 Add the following G All Hardware in MRI Room must be non ferrous 5 Section 07 7346 Prevailing Wage Rates subparagraph 1 01 Replace July with January 6 Door Schedule Change Door 4 by RF Manufacturer to Door Type A no window Bay Area Hospital Building Expansion MRI Upgrade 11 48 December 9 2011 Addendum 2 Page 2 7 Section 08 8000 Glazing subparagraph 2 01 Add the following paragraph D Mirror Glass Clear with silvering 1 Application s Where shown A6 1 2 Type Float glass 3 Thickness 1 4 inch 4 Trim 1x3 red oak trim factory applied stain to match floor with clear varnish finish Refer to Addendum Drawing 5 Accessories J Channel mirror clips as needed and mirror adhesive chemically compatible with mirror coating and wall substrate 8 Section 09 2116 Gypsum Board Assemblies subparagraph 3 05 Delete item C 9 Section 09 2116 Gypsum Board Assemblies subparagraph 3 05 A 1 Replace Level 4 with Level 5 10 Section 10 1101 Visual Display Boards subparagraph 2 02 B Replace 1 8 inch with 1 4 inch 11 Section 10 1101 Visual Display Boards subpar
18. es are within reach of the supplied line cords Nate Extension cords should not be used I receptacles are not within reach of the supplied line cords it is the facility s responsibility to have proper receptacles installed The length of the supplied line cords are as follows e Hydraulic Controller 8 2 Feet 2 0 Meters e Remote Control Feet 2 Meters EmpowerMR Site Survey Document 900953 001 Rev 02 12 Section 4 System Requirements 4 2 Equipment location 4 2 1 Injector The Injector is placed in the Scanner Room and should be capable of maneuvering to both the front and rear of the gantry Nate Patient access to the gantry must not be impeded by the Injector system Cables on the floor are a potential hazard and should not be in the patient or hospital staff access path 4 2 2 Hydraulic Controller As previously described in Section 2 System Configurations the location of the Hydraulic Controller can be either in the Equipment Room or the Control Room Preferably the Hydraulic Controller should be located in the Equipment Room The Equipment Room should have better provisions for installing a penetration panel as well as providing better protection from damage to the Hydraulic Controller The Electro hydraulic interconnect that runs fram the Hydraulic Controller through the penetration panel and to the Injector is ol feet long The location of the Hydraulic Controller must be such that the ul feet of cable is su
19. fficient to maneuver the Injector tn both the front and rear of the gantry Nate The cable length is limited to 217 feet only The Communications cable that runs from the Hydraulic Controller to the Remote Control is 78 feet long This must also be taken into consideration when locating the Hydraulic Controller Nate The Lommunications cable does not go through the Scanner and therefore does not pass through a waveguide An accessible conduit or cable run between the Remote Control and Hydraulic Controller is required 4 2 3 Remote Control The Remote Control is to be placed in the Control Room where it is easily accessible during a scan 4 3 ACIST penetration requirements The EmpawerMR Injector System requires a dedicated penetration panel see Fig 4 2 It is the facility s responsibility to have this penetration panel manufactured and installed ACIST personnel will not install the penetration panel his penetration panel needs to be professionally installed by either the scanner room manufacturer contractor or other qualified personnel It is EmpowerMR Site Survey Document 900953 001 Rev 02 13 Section 4 System Requirements recommended to use the scanner manufacturer s penetration panel The installation of the panel needs to be completed betore or during the injector system installation The ACIST penetration panel is used to allow the Electro hydraulic interconnect to pass into the Scanner Room This panel must ha
20. ment room is needed to install the filters Customer must sign the MR letter which explains the penetration requirements See Sales force for a copy of the letter Special requirements i e Union facilities will have labor guidelines Lead tech name Phone number Department Director Manager signature Date TSM or RSM signature Date 20
21. o electric shock fire mechanical and other specified hazards only in accordance with UL BDBUI I and 27 2 medical equipment Compliance European directive 3 42 EEC Medical Device Directive EmpowerMR Site Survey Document 900953 001 Rev 02 Section 1 Introduction Environmental enclosure rating protected against objects ot greater than 17 mm and protected against dripping water Injector Head The WEEE Waste of Electrical and Electronic Equipment symbol indicating when the user wishes to discard the product it must be sent to appropriate facilities for recover and recycling Do not tilt out of the upright position EmpowerMR Site Survey Document 900953 001 Rev 02 section 2 System Configurations 2 System configurations The EmpowerMR Injector System consists of the Injector Head Remote Control Hydraulic Controller Electro hydraulic Interconnect and AL line cords see 2 la 7 16 and 2 Ic Throughout this manual the terms yector Head and Injector are used interchangeably and the terms emote Lontro and ferte are used interchangeably During operation the Injector in the scanner room communicates with the Remote in the control room through the hydraulic controller There is a communication cable 7 feet long routed between the Remote and the Hydraulic Controller that does not penetrate the scanner room Far the Hydraulic Controller only AC Line power is required Far the Remo
22. stem Requirements The dimensions af the filters are shown in Fig 4 1 The dimensional requirements for the penetration panel are shown in Fig 4 2 Pictures of the penetration panel and filters are shown in Figs 4 3 4 4 and 4 0 Fig 4 1 DC Filters All dimensions in mm EmpowerMR Site Survey Document 900953 001 Rev 02 15 Section 4 System Requirements Front View O st O iz O O O 3 O O 2 O O O O O DO Dice Thirty x places Dia Waveguide Minimum length 4 times inside dia Mounting holes determined by installer Side View bow Notes 1 Material to be determined installer depending on the snielded room material Typical materials are steel stainiess and cooper Ze G DEAE Sens vun COSC OI Se 9o configuration xime Sens Ons De tUe Ou und waveguide can differ from the drawing as long as they are all within a similar proximity each Great Minimum panel thickness is 0 040 Maximum panel thickness is 0 118 Fig 4 2 Dedicated Penetration Panel Dimensions are in inches not drawn to scale EmpowerMR Site Survey Document 900953 001 Rev 02 16 Section 4 System Requirements Fig 4 3 Picture of Penetration Panel Fig 4 4 Picture of Penetration Panel Installed with Filters view from equipment room Fig
23. t M4 1 a Edit Key Note 1 at Partial Roof Plan HVAC regarding quench vent Refer to Addendum Sheet RM 03 b Modify title of Detail 2 per Addendum Sheet RM 04 Quench Vent Duct System c Detail Quench Vent Cap See Addendum Sheet RM 05 for added note Sheet M4 2 See clarification note per attached Addendum Sheet RM 06 Sheet 0 See note per attached Addendum Sheet RE 01 regarding telecommunication conduit Sheet E3 1 a Add Change power receptacles in MRI Equipment Room and Control Room per attached Addendum Sheets RE 02 and RE 03 b See Addendum Sheets for other additional notes requirements END OF ADDENDUM Bay Area Hospital Building Expansion MRI Upgrade 311 48 December 9 2011 A SLACK 2 NOTE THIS DRAWING I9 FOR CLARIFICATION OF EQUIPMENT LOCATIONS IN MRI EQUIPMENT ROOM REFER TO RESPECTIVE PLAN DRAWINGS FOR REQUIREMENTS lt 2840 Pop gif LIGHT FIXTURE POWER SUPPLY PANELS SEE EZ KKT KRAUS HVAC INTERFACE PANEL SIEMENS MRI COMPRESSOR Fo ELECTRONICS SIEMENS Ris use MRIEQUIPMEN RF FILTER PLATE EXISTING LIEBERT UNIT TO REMAIN T CLOSE TO CEILING P HYDRAULIC lt 4 CONTROLLER POWER DISCONNECT DEDICATED AND TRANSFORMER INJECTOR SEE PENETRATION PANEL 6 ABOVE FLOOR FURNISHED BY CONTRACTOR INSTALLED BY CONTRACTOR MRI EQUIPMENT ROOM 370 SCALE 1 4 1 0 BA
24. te only Line power is required Mounting accessories far the Remote facilitate either desktop or wall mounting Far the Injector a flexible Electro hydraulic bundle 90 feet long from the Hydraulic Controller provides the following e DL power via a wired cable e Four hydraulic tubes to actuate the hydraulic cylinders e Bidirectional optical communication link Two system configurations are possible as shown in Fig 7 ld and 2 le The only difference between the two system configurations is the location of the Hydraulic Controller In one configuration the Hydraulic Controller is located in the Equipment Room and in the other it is located in the Control Room the Equipment Room being the preferred location due to the noise of the Hydraulic Controller The site survey will state where the Hydraulic Controller is to be installed EmpowerMR Site Survey Document 900953 001 Rev 02 6 Section 2 System Configurations The Injector head is MR Conditional and is the only part of the EmpawerMR Injector System that should be placed in the MRI scanner room The Remote Control and Hydraulic Controller are MR Unsafe and should never be placed in the MRI scanner room Failure to comply may lead to serious injury and or death Fig 2 la Injector Head Fig 2 1 Remote Control 2 2 Mounting system The Injector Head is mounted to a floor stand as shown in Fig 2 la The Remote Control includes a pedestal mount tor placement desk or
25. ve a waveguide far the hydraulic and fiber optic connections and three mounting holes far the ALIST supplied filters These filters are used tor the DE power between the Hydraulic Controller and the Injector ALIST personnel will install the filters during the Injector System installation Typically the scanner manufacturer s penetration panel will be between the Equipment Room and the Scanner Room In the Scanner Room it is common for the panel to be in a closet or behind a cabinet this is done for aesthetic reasons to hide the cabling Ideally the Injector penetration panel should also be located in the closet or cabinet An empty space the wall large enough to accommodate the penetration panel shown in Fig 7 is all that is required If this is not possible an alternate location would be in the wall between the Equipment Room and Scanner Room above a drop ceiling Locating the panel above a drop ceiling ensures that the filters will not get accidentally damaged However if the panel is located above a drop ceiling the Electro hydraulic interconnect will be visible running down the wall to the injector Lastly the penetration panel can be located lower on the wall with the panel closer to the ground the visible interconnect running along the wall is eliminated but this may require some finishing work and or protective covering added to cover the penetration panel EmpowerMR Site Survey Document 900953 001 Rev 02 14 Section 4 Sy

Download Pdf Manuals

image

Related Search

Related Contents

Vivitek D-Point 2 user manual German  Produits naturels de santé  MANUAL DE USUARIO - Comunidad de Madrid  

Copyright © All rights reserved.
Failed to retrieve file