Home
        ASCENT WAKEBOARD TOWER
         Contents
1.    ASCENT WAKEBOARD TOWER    INSTALLATION GUIDE       Se ee WAKEBOARDING PRODUCTS 6     Shown with               accessories   25   p pommel  INSTALLATION SUPPORT               GUIDE   BT ASCENT 005          HOLD     WAKEBOARDING PRODUCTS    IMPORTANT INFORMATION    The Aerial Assent tower fits motor boats with 67 96 inch wide beam widths  This measure   ment is taken from the Port to Starboard mounting points    Do not fold the tower without having the top section securely fastened to the side sections  with the fasteners provided    Lubricate the telescopic side section tubes that slide in and out of the top section during  installation  We recommend using a light grease to help the tubes slide together without  binding    Do not fold the tower by yourself    Do not assemble tower on the ground and then      to install it on the boat    Do not use impact drivers to install any hardware    We recommend using threadlocker on the threads of all fasteners that will not be adjusted  while lowering or raising the tower    Check the top section for burrs before installing side sections to prevent the scratching and  marking of tubes  Aerial does not cover damage caused by burrs during installation    If the area of the deck where the tower will be mounted has a fiberglass thickness of less  than      inch  a backing plate kit must be purchased and installed to provide adequate sup   port    Please leave the foam wrap on the tower until the installing is complete    Please note tha
2.   INCL  M6 X 12mm BOLT  Pa fo   3  DECK MOUNT         4      2  40     BOLT     FORUSEWITHITEMS 1 2     6  m2x amp 75mmBot  4 FORE WITHITEMS 3 O   8  Miox75mmBUTTONHEADBOLT   4 FORUSEWITHITEMS 19      9  morosonur  4                               5 19 O                        46                               meanenkey                 48                       a     49  ropsectontuse a     20 kees fc         GUIDE   BT ASCENT 005          HOLA    WAKEBOARDING PRODUCTS       With masking tape  cover the  area where the mounting  brackets will be placed  This  should be done at all points  where the tower will make  contact with the deck as well  as the surrounding area  This  will help to eliminate scratches  to your boat while adjusting  and measuring your tower  attachment points       66                                              Approx 1175mm  46 25           With your tape measure  measure the distance across the beam of  your boat where the rear mounts will be fixed and write down the  measurement numbers    Next  measure up from the rear mounts to the front mounting loca   tions and mark a general location on the masking tape where the  mount will sit        Attach the tower fittings and mounting feet to the tower legs    STEP 3 using the bolts provided and lightly secure these with an Allen  wrench     6 X 12MM Note  do not over tighten these as you need to adjust them    during the following installation steps     DECK 1    TOWER LEG          2 25  TOWER JOINT   THRU 
3.  PROCEDURE    z          SMALL 17 32    DRILL BIT COUNTERSINK  DAIMETER 7  THROUGH GELCOAT       PILOT HOLE  gt    gt               WA      7 GUIDE   BT ASCENT 005                                                                         KEBOARDING PRODUCTS         STEP 9 Install the tower mounts to the boat deck in the order shown in the diagram   Note  in the case where the deck of your boat is less than 1 4    thick  a reinforcing kit  is required to thicken and reinforce the deck in the mounting locations     FLAT DECK   MOUNT ASSEMBLY      _      _ M12    75MM       BLACK NYLON WASHER    4     MOUNT    NYLON WASHER    FLAT DECK       REINFORCEMENT  IF REQUIRED     4     RUBBER WASHER        ALUMINUM BACKING PLATE  ae     gt    SPLIT LOCK WASHER         NYLON LOCK NUT    CURVED DECK   MOUNT ASSEMBLY   lt         12  75      694       BLACK NYLON WASHER     lt         MOUNT    NYLON WASHER  Ca  SS CURVED RUBBER WASHER  a       nS    CURVED DECK       ZA REINFORCEMENT  IF REQUIRED        RUBBER WASHER   gt  aaa  1                    ALUMINUM BACKING PLATE   lt  ae SPLIT LOCK WASHER    O     NYLON LOCK NUT    Once the mount and its parts are assembled they can then be secured in position    with a wrench                          NOTE       When folding the tower the aluminum mounts will rotate on the surface of the nylon  washer  When fastening the mount to the boat deck  ensure that the mount is securely  tightened in position but not overly tight that it will prevent the mou
4.  that will need to be drilled  so that they can be connected to a switch and  power source    Note  The tower is not supplied with pre drilled wiring holes as each customer  may have a different wiring requirement depending on how they fold their  tower or the accessories that they will mount to the tower            www aerialwakeboarding com    GUIDE   BT ASCENT 005    
5.  using threadlocker during  this step        M   X 12MM    0 7    STEP 13   FOLDING THE TOWER         REMOVE FASTENERS  FROM BOTH SIDES  OF THE TOWER     LOWER THE FRONT AND REAR LEGS  TOWARDS THE STERN OF THE BOAT    SX    MOUNTS WILL     ROTATE SLIGHTLY    To fold the tower we recommend removing the 2 fasteners that connect the top of each rear leg to  the front legs  This will allow you to fold the rear legs back  or remove them  and allow the front legs  to fold back and rest on the deck of the boat  The fasteners that connect the legs to the mounts may  also require loosening before folding the tower    When folding the tower down you will notice that the tower mounts will rotate on the nylon washers  located under the mount on the surface of the deck    Before using the tower again  be sure to check and tighten all the fasteners that may have been loos   ened or removed during the folding process         10 GUIDE   BT ASCENT 005          HOLD     WAKEBOARDING PRODUCTS    INSTALLING THE NAVIGATION LIGHT                NAVIGATION LIGHT   SHIPPED SEPARATELY        The navigation light is shipped separately    It is designed to be installed on the top of the tow point    For a clean wiring installation the wires supplied can be passed through the  center of the tow point  along the inside of the top section and down inside  the front leg tube  The wires will need to exit the leg tube just above the  mounting foot fittings and then enter the deck of the boat  through a hole 
6. HOLE    SPLIT LOCK WASHER    wee M12 X 45MM  Pr  SPLIT LOCK WASHER  M12 X 40MM    5 GUIDE   BT ASCENT 005    STEP 4             5             HOLA    WAKEBOARDING PRODUCTS    Using the front mount width  measured in Step 2   connect the 2 front  tower legs to the top section tube by inserting the upper straight tube  sections of the front legs inside the top section tube  Make sure you do  not over insert the front leg telescopic tubes during this process as the  top section tube will mark and scratch the smaller front leg tube  It is also  important to keep the top section centered during the process            IMPORTANT NOTES         Lubricate telescopic parts with a light grease before sliding together      Grease will not prevent the smaller diameter tube from being scratched  by the top section tube during insertion so be very careful not insert the  side section tube any further than the final installation width     Note  Both SIDE and TOP mounts are possible  Be sure to compensate for  the additional width of approx  3    required for a side mount     Bring the assembled portion of the tower up and over the front  mounting area and position the mounts over the marks that you  made in step 2    Confirm that the mounting locations for both the front and rear  deck mounts are suitable    We recommend tracing around the deck mount to mark its  exact location on the deck    Once the deck mounts have been traced  remove the tower  and mark the drill locations using the centr
7. al hole in the large  nylon washer as a template     Note  During this step it is also important to confirm that the top  section width is correct     After confirming  double check  that your top section width  measurements are correct  remove the tower from the boat and  secure all three tubes together while ensuring that the tow point  is correctly aligned vertically as well as being centered on the  tower    To do this you will need to drill  Using a 27 64    drill bit  4 holes  through the two front leg tubes  making sure they are aligned  with the pre drilled holes in the top section  Then take the 4 sup   plied M10 x 75mm bolts and M10 Logo nuts  and fasten the three  tower tube sections together     NOTE  The tow point should also be positioned on the rear of the  top section tube so that the logo plate is facing towards the bow  of the boat    GUIDE   BT ASCENT 005          HOLA    WAKEBOARDING PRODUCTS    Once you have marked your deck mount drilling locations  it is very important that you check the underside of the  deck for wires  If necessary  you should move the wires out  of the way in preparation for drilling           STEP 8    It is now time to drill the mounting holes in the deck of your boat for  the front deck mounts    We recommend first drilling a small pilot hole which will keep the  17 32    drill bit from walking  moving   A countersinking bit or a small  rat tail file can be used to ease the edge and keep the gel coat  from chipping        DRILLING
8. nt from rotating     GUIDE   BT ASCENT 005          HOLD     WAKEBOARDING PRODUCTS    Attach the rear tower legs to the front tower legs with the mounting fittings and fasteners supplied   All mounts are designed to swivel to ensure a square and even installation   Once all the fittings are correctly aligned they must then be firmly secured in position with an Allen    wrench  We recommend using threadlocker during the installation of these fasteners   only on fasteners  that will not require loosening in order to fold the tower     STEP 10          TOWER TOP SECTION    FRONT TOWER LEG  SPLIT LOCK WASHER              gt        6 X 25MM    2 25  TOWER JOINT   THREADED    REAR TOWER LEG    M   X 25MM     lt  lt    2 25  TOWER JOINT   THRU HOLE    REAR DECK MOUNT x  SS eae  Qa M12 X 45MM    SA  2 SPLIT LOCK WASHER            STEP 11   MARKING  DRILLING AND INSTALLING THE REAR DECK MOUNTS    Follow steps 5  7  8  amp  9 for marking  drilling and installing the rear deck mounts     GUIDE   BT ASCENT 005          HOLD     WAKEBOARDING PRODUCTS    STEP 12   LOCKING THE ROTATING FITTINGS    Once you are happy with your tower installation and alll   of the fittings are lined up to allow the tower to fold and  function correctly it will then be important to firmly lock the  rotating fittings in place to prevent any unwanted rotation  or loosening  To do this the pre instaleld M   x 10mm fasten   ers found in the fittings will need to be firmly tightened with  an Allen key  We recommend
9. t when towing your boat you may notice what appears to be movement in  your tower  It is important to understand that the boat is also moving on the trailer and that  this movement can be visually deceiving     CLEANING    Frequently wash your tower with soap and water   As required  use Mothers Mag  amp  Aluminum polish to restore your tower to its original finish     WARNING    BE CAREFUL when assembling this product  We CANNOT be liable for any burring or scratch   ing that may occur when sliding sections in and out of each other    NEVER modify this product in any way    NEVER climb  stand or ride on this product    NEVER tow watersport tubes or inflatable   s with this or any other Aerial Wakeboard Tower   ALWAYS use caution with approaching bridges or overpasses    ALWAYS inspect this product for loose bolts  fittings or damage before each use    Always carefully CONSULT the user manual for proper installation  maintenance and usage   AERIAL WAKEBOARDING is not liable for personal injury or property damage from the use of  this or any other Aerial product              GUIDE   BT ASCENT 005              HOG     WAKEBOARDING PRODUCTS    TOWER EXPLODED VIEW           IMPORTANT     LUBRICATE PARTS WITH  A LIGHT GREASE BEFORE  INSERTING INTO THE TOP  SECTION TUBE              GUIDE   BT ASCENT 005        WAKEBOARDING PRODUCTS    PARTS LIST       TOWER PACKAGE  ITEM   DESCRIPTION COMMENTS    2 25  TOWER JOINT   THREADED  INCL  M6 X 12mm BOLT  EE  2 25  TOWER JOINT   THRU HOLE
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Minka Lavery 688-14 Instructions / Assembly  LED- 12 - DailyMusic  Sun StorageTek 2500 Series Controller Removal and Replacement  Samsung HT-C350 Uporabniški priročnik  Recommandation N 33  IP-S2 Standard+カタログ  59RP - Grand Banks Yachts      Copyright © All rights reserved. 
   Failed to retrieve file