Home
        User Manual Pump In Sub
         Contents
1.  Manual    Pie Pump In Sub       Safety    WARNING  Trapped air requires considerable time to compress and  when it is compressed is highly dangerous  It has enough stored  energy to separate parts with considerable force     All pressure equipment has a particular pressure rating and care must be  taken to ensure that no item is used in a situation that may cause its working  pressure to be exceeded     All personnel involved in pressure testing must be formally trained  competent  and utilising the appropriate PPE     Ensure the identification band plate is fitted and is displaying the correct  information as per the Tag Sheet Index    This equipment and the equipment it is attached to is heavy never position  yourself below a suspended load          Care to be taken to  avoid trapping fingers   gloves and loose  clothing during stabbing    procedure Figure 1  Pump in Sub Safety    OPS 4846 Rev A ji    User Manual       Phuel Pump In Sub       1 Introduction    1 1 General    The pump in sub is normally positioned between the wireline valve and the  wellhead  Its main function is to facilitate well control by pumping fluid when  the wireline valve is closed     The Phuel pump in sub body is constructed in one piece  The side outlet sub  is a standard API BX flange that allows suitable flow connections  2    2202  weco type in this case  to be attached  The end connections are Otis type with  the Phuel safe lok features incorporated as standard     This user manual serves as
2.  an introduction to the equipment and contains the  relevant specifications  operation  planning and maintenance instructions   parts list and drawings     1 2 Product Identification    Phuel products are identified by a unique serial number that facilitates full  product traceability  Each product is supplied with a documentation pack that  contains product certification and material inspection reports  The serial  number is always etched on the surface of the product but can sometimes be  difficult to find or read after painting  A customer identification number is also  included to allow the customer to track the asset in their system     A stainless steel band secures the nameplate tag that is stamped with the  information shown below  This tag should be located in the first instance to  ensure that this manual refers to the correct equipment     Phuel Oil Tools Ltd  Description  amp  Size  Part Number  Phuel ID    Customer ID  API Details  MWP  amp  Service       OPS 4846 Rev A 1        User Manual      Phuel Pump In Sub       2 Technical Specifications                                           Part No 165 4846 HVO  Connections 15    2 Connection   2    2202 Hammer lug Union  Quick Test Connection 9 16    AEMP  Side Flange 2 1 16    15M Flange  Maximum Working Pressure 15 000 Psi  Service H2S  Weight 1131 lbs 513 Kg  Make Up Length 29 23      0 74m  Recommended Flange Bolt Torque 319lbft  429NM        Table 1  Technical Data       ze    For Detail A  Quick Test Facility 
3.  are supplied in Viton and HNBR material as standard   Many other materials are available please specify when ordering                       Part No Qty Description  190 2823 PEK VALVE SEAT 1  801 0114 V90 O Ring   B S Size 114 1  801 3126 PEK BACKUP  114  1  802 4813 H85 PISTON P SEAL  0 456  1  803 3202 V90   SPRING SEAL FOR 15 2 CONNECTION 2                   Table 4  Redress Kit Part No RDK 4846 HVO  8 1 1 Individual Items  Individual items may be ordered as required using the part number specified  Note  O Rings conform to industry standards and may be substituted with    those from other suppliers      at the sole risk of the user     8 1 2 Special Tools    General workshop tools will be required to maintain  and assemble and  disassemble the equipment     The tamperproof screws require a special tool to undo them   950 4951 STL   Tamperproof Hex Key    OPS 4846 Rev A 13    
4. OLLAR 15 2  SPLIT TYPE  1  3 110 2983 411 SPLIT RING 15 2 1  4 110 2986 480 SAVER SUB  15K WP  1  5 190 2823 PEK VALVE SEAT 1  6 110 3127 316 HP ISOLATION VALVE 1  7 801 0114 V90 O Ring   B S Size 114 1  8 801 3126 PEK BACKUP  114  1  9 802 4813 H85 PISTON P SEAL  0 456  1  10 WNL 0580 316 WASHER NORDLOCK  M12  10  12 SHC 0585 AL7 SOC HD CAP SIZE 1 2 LENGTH 1  10  13 STC 0542 316 3 8  X 1 2  TAMPERPROOF BUTTON HEAD SCREW 1  14 WNL 0540 316 Nord Lock Washer Size 3 8 1  15 950 4978 STL ADAPTOR 2 1 16 15M FLG X 2  FIG 2202 F 1  16 950 2164 STL API SEAL BX 152 1  17 195 4979 AB7 STUD 7 8 9 UN X 4 LONG 8  18 HNC 0700 A2H   HEX NUT 7 8 UNC 8  20 803 3202 V90 SPRING SEAL FOR 15 2 CONNECTION 2  100 910 4682 N66 PROTECTOR 15 00 2 PIN  MALE  1  101 910 4681 N66 PROTECTOR 15 00 2 BOX  FEMALE  1  102 910 4027 N66 PROTECTOR 2  2202 FEMALE 1                Table 3  Parts List 165 4846 HVO    Note  Thread protectors not shown on Assembly Drawing    OPS 4846 Rev A    10       User M       anual  n Sub       33 94           gt           Se swt                Ge       SE       User Manual       Phuel Pump In Sub       EXPLODED DETAIL  A      Figure 6  Assembly Drawing 165 4846 HVO  part 2     OPS 4846 Rev A 12    User Manual       Phuel Pump In Sub       8 Spares  Use only spares supplied or approved by Phuel Oil Tools Ltd     It is recommended that sufficient quantities of the following spares be  maintained to ensure that the equipment is always available when required     Elastomeric spares
5. OPS 4846 Rev A 8       User Manual    pp Phuel Pump In Sub       6 Testing    All testing is to be carried out in the designated test area and by suitably  qualified and competent personnel     WARNING  Trapped air requires considerable time to compress and  when it is compressed is highly dangerous  It has enough stored  energy to separate parts with considerable force     On completion of reassembly fit the appropriate test caps to either end  of the pump in sub and to flange crossover   When making up the Phuel 15    2 connection  the collar should be fully  made up and then backed off a maximum of a 1 4 turn    Fill with test fluid and bleed off any air in the system   Apply a pressure of 500 psi and ensure pressure holds for a minimum  of 10 minutes   Increase pressure to Maximum Working Pressure  allow to stabilise  and maintain this pressure for 15 minutes with no visible leaks   Testing  to be carried out to Test pressure when decreed by maintenance  schedule    Bleed off pressure  drain test fluid and dry   Remove test caps   Apply coating of de watering solution to protect the bore and threads  Fit thread protectors    On completion of all maintenance ensure the maintenance record sheet  Para  5 4  is completed    OPS 4846 Rev A 9    Phue     User Manual  Pump In Sub                                                                               7 Parts List and Drawings   Item Part Number Description Qty  1 165 4888 480 BODY 15 2 X 2 1 16 BX 1  2 110 2982 411 SPLIT C
6. Pe    Unit 17 Denmore Industrial Estate  Denmore Road  Bridge of Don  Aberdeen AB23 8JW    User Manual  Pump In Sub    This Manual Covers the Following Part Numbers     165 4846 HVO    OPS 4846 Rev A    User Manual     QPhuel Pump In Sub       Table of Contents    Revision ABA    i  Sale eebe ii  1 tele  02   Co  E 1   Ma        1 1 11   EE 1   1 2 Product Identification    un  na dee 1  2 Technical Specifications nn 2  3 Technical Description EE 3   3 1 Top Sub Quick Test Facility esc ccsece essen 3   3 2   Flange Crossover ne ede een ae eee ieee 4  4         le EE 5   Ze WR  k   E 5   42 During Job een nenne  5   POSE ee eier 5  5 Mentee Seege ae 6   51 7 INIRSONCHON See ee te ee ee ne era  6   5 2 Eeer 6   5 3  Redress Ge s s   s scoccssiessnsseccousetesenvnseeavcusoseeeedavaesvauscoesennstaneest 7   5 4 Maintenance Record heet    8   S E EE 9  7 Parts List and Drawings sen ee ee 10  8 SPAS nee 13  Table 1  Technical Data EE 2  Table 2  Maintenance Record    een 8  Table 3  Parts List  1Gb A846G HM    10  Table 4  Redress Kit Part No RDK 4846 HV0                cccceeeeeeeeeeeeeeeeeeeeeeeeeees 13  Figure 1  Pump in Sub Safety EE ii  Figure 22 P  mp alike  EEN 2  Figure 3  Quick Test Face 3  Figure 4  Flange Ee EE 4  Figure 5  Assembly Drawing 165 4846 HVO  Part  1   11  Figure 6  Assembly Drawing 165 4846 HVO  part 21  12    Revision History       Issue  Release Date Description       Rev A  19 Sep 12 Initial Issue                            OPS 4846 Rev A i           User
7. eplacing   Remove 4 cap screws and washers from the split collar  Loosen split rings from collar and remove from split collar  Remove split  collar from bottom sub   Remove hex nuts   Remove flange crossover and seals   Remove and discard spring seals from bottom sub  Degrease and clean all components   Inspect threads for damage   Fit thread protectors    Re Assembly    Remove thread protectors   Inspect all threads for signs of damage and clean with wire brush  Slide the Split Collar over the bottom sub  make up the two halves of  the split ring and tighten down until the ends are flush with the collar   Back off slightly to align the holes   Insert 4 cap screws and washers    Fit spring seals to the bottom sub   Insert studs fully into the body and tighten by hand   Fit the BX seal to the groove and retain with some grease   Fit flange crossover to flange sub  ensure bottom seal correctly  positioned  and tighten down into place with hex nut to a torque of  319lbft  429NM    Screw valve seat into body   Fit P seal to valve  and screw into body  retaining with the Tamperproof  button screw and washer    Fit o ring and back up to saver sub and refit using cap screws and  washers    Fit thread protectors    OPS 4846 Rev A 7    User Manual                                                                                           Phuel Pump In Sub  5 4 Maintenance Record Sheet  Date Type of Performed Verified   Comments  Performed Maintenance By By  Table 2  Maintenance Record  
8. igns of damage  Ensure threads are clean  Ensure thread protectors are fitted    OPS 4846 Rev A 5    User Manual     QPhuel Pump In Sub       5 Maintenance    All maintenance to be carried out by suitably qualified and competent  personnel    5 1 Introduction    Regular maintenance of the equipment using Phuel redress kits or Phuel  approved parts is essential to its continued safe operation  Ensure that the pre  and post job operating procedures are followed and that maintenance records  are kept     5 2 Schedule    The maintenance schedule may be governed by international or company  standards and the following is considered to be the minimum requirements     5 2 1 Pre  amp  Post Job    Refer to Section 4 1 and Section 4 3 for details  5 2 2 Yearly    e Inspect the condition of all sealing surfaces and surface coatings   e Re coat threads and sealing surfaces if necessary  If in doubt contact  Phuel Oil Tools Ltd   Replace all elastomeric seals with items from redress kit  See spares   Re grease components   Re assemble  see below    Pressure test to maximum working pressure   Inspect paint work and repair as necessary    5 2 3 Five Yearly  e Recertification by Phuel Oil Tools in accordance with DNV RP E101    OPS 4846 Rev A 6    User Manual     QPhuel Pump In Sub       5 3 Redress Procedure    5 3 1    5 3 2    Dis Assembly    Remove saver sub and discard seal   Remove Tamperproof button screw and washer  Unscrew valve and discard seal   Unscrew valve seat and discard if r
9. see over    Figure 2  Pump in Sub    OPS 4846 Rev A 2         User Manual    Pie Pump In Sub       3 Technical Description       3 1 Top Sub Quick Test Facility    The box of the top sub allows a dual seal arrangement typical on Phuel 15 2  pin connections to be tested with an isolated test port connection  The Quick  Test Facility provides a single connection in the Riser string that can be  broken and then made up and tested without the need to pressure test the  whole string  thus reducing the operational time required to install tools in the  well  Notice that the Seals are not exposed when the Sub is separated  which  helps avoid damage when stabbing back in     When making up the Phuel 15    2 connection  the collar should be fully made   up and then backed off a maximum of a 1 4 turn     The Isolation Valve consists of a metal cone seal that is energised against a  replaceable peek seat by tightening the valve with a hex key  The Valve  should be open  i e  screw backed out  when testing between the seals and  closed  screwed in  when wanting to isolate from the well pressure in the  event of a O Ring failure  The Tamperproof Button Head Screw prevents the  full removal of the Valve              PHUEL 15 2 PIN  CONNECTION    SPRING GEAL  TAMPER PROOF  BUTTON HEAD  SCREW    VALVE    HIGH PRESSURE  SAVER SUB    15 2 TOP SUB    Figure 3  Quick Test Facility    OPS 4846 Rev A 3     lt  User Manual    Pie Pump In Sub    OIL TOOLS       3 2 Flange Crossover    The side outle
10. t sub is a standard API BX flange that allows suitable flow  connections  2    2202 hammer lug union in this case  to be attached    eo            oO    Figure 4  Flange Crossover    OPS 4846 Rev A 4    User Manual     QPhuel Pump In Sub       4 Operation    All operations to be carried out by suitably qualified and competent  personnel    When making up the Phuel 15    2 connection  the collar should be fully made   up and then backed off a maximum of a 1 4 turn     Once the relevant valve has been connected to the hammer lug union  connection the pump in sub is ready for connection between the wireline valve  and the wellhead to allow well control    The pump in sub can also be utilised to allow fluid sampling and or inhibitor  injection     4 1 Pre Job    Ensure thread protectors are fitted   Check maintenance record sheet and ensure the equipment has been  maintained by competent personnel   Check all certification is in date   Confirm information band is fitted and correct   Ensure equipment is suitable for the maximum working pressures and  services involved   Ensure seals are seated correctly and there are no signs of damage  Ensure threads are clean   Inspect for signs of damage   Pressure test at least to 1 2x the maximum well pressure   Ensure all connections are tight and that the test port is tightly fitted    4 2 During Job    Ensure collar lock has operated correctly and the collar is locked in  position  Avoid excessive movement    4 3 Post Job    Inspect for s
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
RapidWash - Hudson Robotics  Embedded DVR User Manual - Electrosa Security & Networking  エマージェンシータニケット P-910A 取扱説明書  "user manual"  SilverStone Technology SILVERTONE NS312 User's Manual  SERVICE MANUAL  ASUS Nexus 7 (2013) 1A002A 32GB 3G 4G Black  Notice d`utilisation    Copyright © All rights reserved. 
   Failed to retrieve file