Home
        Quic Quick Framer - Gambrel Roof
         Contents
1.      D   Attach ANGLE BRACKET    B    to ends of each LOWER RAFTER boards and secure with screws through square holes     5  After ANGLE BRACKETS have been attached to one side of arch assembly  carefully turn arch over  leaving scrap boards in place in RIDGE BOARD slots     Repeat steps   4  A  through  D  attaching ANGLE BRACKETS to other side of arch and secure using screws through the ROUND holes  for proper screw alignment  in  ANGLE BRACKETS  Continue assembling the required number of arches according to your structure size     Slide left and right STUDS into end of each ANGLE BRACKET    B    and secure using screws through ROUND holes  Carefully turn arch assembly over and secure ANGLE  BRACKET    B    to STUDS using screws through SQUARE holes  Repeat this step on all arch assemblies     Nail COLLAR TIE to LOWER RAFTER board of each arch assembly  making sure that the top corner of the COLLAR TIE is flush with the outside edge of LOWER RAFTER  board  Be sure to attach the COLLAR TIES facing inside on the two end arches     After all arch assemblies are complete  using two people carefully lift each arch onto the assembled base frame and secure to STUD BRACKETS using screws  Arches should  be perpendicular to base frame  use a square   To hold the arches in a perpendicular position  use 1    x 4    temporary bracing inside of structure and leave in position until  sheathing is in place  as shown in SIDE VIEW drawing  Leave nail heads slightly raised so they can be easi
2.    INSTRUCTIONS      Separate and stack all parts included in kit  STUD BRACKETS  12 pieces      A    ANGLE BRACKETS  24 pieces  and    B    ANGLE BRACKETS  16 pieces    Please refer to    A    or    B     stamped into each ANGLE BRACKET  Cut and mark all lumber to identify as stated in CUT LIST that corresponds to your structure size  Stack all lumber in separate areas     In accordance with your size structure  nail BASE PLATE boards together overlapping ends to form structure base frame   Picture  1  Use the pressure treated lumber for the  bottom of the base frame to prevent rotting  Make sure base frame is square by measuring from corner to corner diagonally     Using screws  attach STUD BRACKETS to outside of top base frame boards  Picture  2  using measurements listed on SIDE VIEW drawing of plans in accordance with your  size structure  Measurements are to center of STUD BRACKETS      A D  NOTE  In order to make sure each arch is built the same  stand short 2    x 4    scrap boards into RIDGE BOARD slots of each ANGLE BRACKET during assembly   Picture  3    A   Begin arch assembly by sliding two UPPER RAFTER boards into top ANGLE BRACKET    A    and secure with screws through SQUARE holes  for proper screw alignment   in bracket     B   Attach two more    A    ANGLE BRACKETS to ends of each UPPER RAFTER board and secure with screws through square holes     C   Slide LOWER RAFTER boards into ends of each    A    ANGLE BRACKET and secure with screws through square holes
3.  2X4 Upper rafters cut to 2  8 1 4   Cut from 4   12    16   2X4 Lower rafters cut to 2  6   Cut from 4   10    8   2X4 Collar ties cut to 6  5 1 4   Cut from 8   8    2   2X4 Door jambs cut to 7  3 1 2   Cut from 2   8    2   2x4 Vertical studs cut to 7  3 1 2   Cut from 2   8    2   2X4 Base plates 14  long  Use 2   14    2   2x4 Base plates cut to 7  4   Cut from 2   8    5   2X4 Ridge boards 14  long  Use 5   14     6   1X4 Temp  bracing door stiffener  Use 6   8      2   2X4 Pressure treated base plates cut to 13 5   Cut from 2   16      2   2X4 Pressure treated base plates cut to 7  11   Cut from 1   16      Brocket  A                  FRONT VIEW  10 X22  BUILDING  oo      Upper rafter  Bracket    A       Sheathing    dimensions Collar tie    Lower rafter    Bracket  B                     Plywood sheathing  1 2         Door jambs  one end only     Stud  2X 4 Base tate   9    L long    base plate  9    11  long     Ridge boards    SIDE VIEW  10 X22  BUILDING     tT tT tT eT ey A A A A    NEREEEREREE    Temporary bracing    IAL EP  2 X 4 Base plates   1     716    long and 1     6    long   SS eS ee ee ee es  EE EE     Pressure treated 2 X 4 base plates z di ee  0 aloe aides  0  e oper PR ka PER 2 ope         5   long      1     16   long and 1   5             CUT LIST  10 X22  Building     24   2X4 Studs cut to 6  4   Cut from 24   8    24   2X4 Upper rafters cut to 3  6 1 8   Cut from 12   8    24   2X4 Lower rafters cut to 3  1   Cut from 12   8    12   2X4 Collar ties
4.  cut to 8  3 1 2   Cut from 12   10    2   2x4 Door jambs cut to 8  3 1 2   Cut from 2   10    2   2x4 Vertical studs cut to 8  3 1 2   Cut from 2   10    2   2X4 Base plates 16  long  Use 2   16     2   2X4 Base plates cut to 6   Cut from 1   12    2   2x4 Base Plates cut to 9  4   Cut from 2   10    5   2X4 Ridge boards 16  long  Use 5   16     5   2X4 Ridge boards 6  long  Cut from 2   12  and 1   8    10   1X4 Temp  bracing  door stiffener  Use 10   8     2   2X4 Pressure treated base plates 16  long  Use 2   16     2   2X4 Pressure treated base plates cut to 9  11   Cut from 2   16      2   2X4 Pressure treated base plates cut to 5 5   Cut from above 16 s     
5. choice  metal  fiberglass  rolled roofing  shingles  etc    2     3    Nails  16d   3     1 1 4    Deck screws    MATERIALS LIST     10   X22    Building   GRADE  2 OR BETTER LUMBER IS RECOMMENDED  3    Quick Framer Universal Framing Kits  49    8 2X4   s  18    10   2X4   s  3    12   2X4   s  7    16    2X4     4    16 Pressure Treated 2x4   s  10      8 1X4   s    28     4X8 Sheets of sheathing material of your choice  plywood  waferwood  T 111 etc      330 square feet of roofing material of your choice  metal  fiberglass  rolled roofing  shingles  etc    4      3    Nails  16d   5     1 1 4    Deck screws    G amp T SALES  Inc     415 Reservoir Road    Whitefish  MT 59937    1 406 253 5138 or 1 406 250 7054    Fax 1 800 880 3178    email  info gtsales us  MADE IN U S A     Dealer Inquiries Invited    FRONT VIEW  8 X14  BUILDING     Bracket  A                   Upper rafter    Bracket  A     eee tie        Lower rafter    Sheathing  dimensions    __      _ Bracket    B            Plywood sheathing  1 2     Door jambs  one end only        2x4 Base Plate Picture  3   7    4    long     Pressure treated 2 X 4 base    plate  7    11    long     SIDE VIEW    Ridge boards  8 X14  BUILDING        _            9 6 9 16     Temporary bracing    2 X 4 Base plate   14    Long     Bend tab around corner                 P    ted 2 X 4 i ie       n     0     base plate  13 8   long   2 apeere oaeee    CUT LIST  8   X14    Building     16   2X4 Studs cut to 5  6   Cut from 8   12    16  
6. e bracket and place the 16    ridge board into slots of  top    A    angle brackets  Move to back end of structure and place the 6    ridge board into slots in remaining top    A    angle bracket  Make sure all arch assemblies are in correct  positioning and adjust if needed  Secure all ridge boards using screws through bottom holes in angle brackets     5  Optional 1X4   s may be used as corner trim     6  Sheathing may be installed above pressure treated base plates to prevent moisture damage     G amp T SALES  Inc     415 Reservoir Road    Whitefish  MT 59937    1 406 253 5138 or 1 406 250 7054   e Fax 1 800 880 3178    email  info gtsales us  U S  Patent  5 524 397 Canadian Patent  2 227 540    FRONT VIEW  7 X8  BUILDING     Bracket  A Stud Brackets  Sheathing  dimensions Ma     Upper rafter    2   1   p  see Bracket     A           gt   GN          Collar tie    _    Lower rafter      _    Bracket     B       Plywood sheathing  1 2           Stud    Door jambs  one end only     2 X 4 Base plates   6    4    long     Pressure treated 2 X 4 base  7      0  plate  6   11    long           Picture  2    SIDE VIEW  7 X8  BUILDING        Ridge boards  a ee                  2 X 4 Base plate   8    long     Picture  1 Bend tab around corner        fi    Cerlter Cehter E  Pressure treated 2 X 4 pps     Temporar  base plate  7    5    long     2   8   28 Se saci         0    CUT LIST  7   X8    Building     8   2X4 Studs cut to 4  7 1 8   Cut from 4  10    8   2X4 Lower Rafters cu
7. ice   See Helpful Hints     HELPFUL HINTS  ALL SIZES       Install wall sheathing horizontally on sides of 7   X8    building  Install wall sheathing vertically on ends of 7   X8    building  Install all wall sheathing vertically on larger size    buildings  Install roof sheathing horizontally on all building sizes  Save the pieces of sheathing that you cut off and use them elsewhere  such as the other side of the roof    Use completed arch as pattern to trace cut lines on sheathing for ends of building     2  Roofing material may be metal  corrugated fiberglass  rolled roofing or shingles     3  Doors can be cut from plywood sheathing  Outline each half with 1X4 boards to make them rigid  Screw hinges to door jambs  On larger buildings  full sheets of plywood    may be used to construct 8   doors       On 10    x 22    structures  stagger ridge board seams as follows  Start at front end of structure and place 16    ridge board into slot in    B    brackets   you may need to tap into    place using a hammer  Move to back end of structure and place 6    ridge board into slot in remaining    B    angle brackets  Repeat on opposite side of structure  At front end of  structure  move up to lower angle bracket    A    and place the 6    ridge board into slots in lower    A    angle brackets  Move to back end of structure and place 16    ridge board into  slots in remaining lower    A    angle brackets  Repeat on opposite side  At front end of structure  move up to top    A    angl
8. ly pulled out  The end arch assemblies should set flush with the  base frame corners  Bend STUD BRACKETS around each corner of base frame and secure using screws     10  After arch assemblies are set into place  remove scrap boards from    B    ANGLE BRACKET slots on one side of structure and place RIDGE BOARD into slots in    B    brackets     1     i    12     13     You may need to tap boards into place using a hammer  Repeat on opposite side of structure  Move up to lower ANGLE BRACKET    A    remove scrap boards and place  RIDGE BOARD into slots in lower    A    brackets  Repeat on opposite side of structure  Remove scrap boards from top ANGLE BRACKET    A    and place RIDGE BOARD into  slots in top    A    angle brackets  Make sure all arch assemblies are in correct positioning and adjust if needed  Secure all RIDGE BOARDS using screws through bottom holes  in ANGLE BRACKETS   For 10    x 22    structures  see  4 of Helpful Hints       Install DOOR JAMBS as shown in FRONT VIEW drawings in accordance with your building size  Nail top of DOOR JAMBS to COLLAR TIE of end arch assembly  Screw    STUD BRACKETS to bottom of each DOOR JAMB  Attaching to outside of top BASE PLATE     Install two VERTICAL STUDS in back wall   Same layout as Step 11  Nail top of VERTICAL STUDS to COLLAR TIE of end arch assembly  Screw STUD BRACKETS to bottom of each VERTICAL  STUD  Attaching to outside of top BASE PLATE     Your frame is now complete and ready to sheathe with materials of your cho
9. t to 2  1   Cut from 2  10    8   2X4 Upper rafters cut to 2  4   Cut from 2   10    4   2X4 Collar ties cut to 5  6 1 4   Cut from 2   12    2   2X4 Door jambs cut to 6  3 1 2   Cut from 2   8    2   2x4 Vertical studs cut to 6  3 1 2   Cut from 2   8    5   2X4 Ridge boards 8  long  Use 5   8     2   2X4 Base plates 8  long  Use 2   8     2   2x4 Base plates cut to 6  4   Cut from 2   8    4   1X4 Temp  bracing   door stiffener  Use 4   8     2   2X4 Pressure treated base plates cut to 7   5   Cut from 1   16      2   2X4 Pressure treated base plates cut to 6  11   Cut from 1  16             G7        Quick    yi       SS      MATERIALS LIST     7   X8    Building   GRADE  2 OR BETTER LUMBER IS RECOMMENDED  1    Quick Framer Universal Framing Kit  13    8 2X4   s  8    10   2X4   s  2    12   2X4   s  2    16 Pressure Treated 2X4   s  4    8 1X4   s  9    4X8 Sheets of sheathing material of your choice  plywood  waferwood  T 111 etc       86 square feet of roofing material of your choice  metal  fiberglass  rolled roofing  shingles  etc    2     3    Nails  16d   2     1 1 4    Deck screws    MATERIALS LIST     8   X14    Building   GRADE  2 OR BETTER LUMBER IS RECOMMENDED  2    Quick Framer Universal Framing Kits  14    8 2X4   s  4    10   2X4   s  12    12   2X4   s  7     14    2X4   s  3    16 Pressure Treated 2x4   s  6    8 1X4   s    16    4X8 Sheets of sheathing material of your choice  plywood  waferwood  T 111 etc      170 square feet of roofing material of your 
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Manual de Usuario Teletramitación Homologación de Máquinas de  Powerware 15 KVA Power Supply User Manual  Novell Evolution  計測器向けソフトウェア・プラットフォームの開発  IAN 79925  Aufbau- Bedienungsanleitung Adventure 4 & 5  CROSS CiRCUIT PRO KIT  STR-DN1030 - Sony Europe    Samsung GT-P7100 Наръчник за потребителя    Copyright © All rights reserved. 
   Failed to retrieve file