Home
baymak lđnyđtomat plus domestic solid fuel boilers instruction and
Contents
1. ANEN 2 49 9 EAA 1 JA BWOULIN ding a gg aE a ge a n ram hu ennn IVIWOLIANT MVWAVE Janno Addins ham adid Jajem LI0CI5LIC9X8 uoisuedxg YUP uoisuedxa uado yuey TayeM 104 25 V00II615VI Topog 32 63 9810 0293 Rev 00 08 09 2008 OPERATING AND MAINTENANCE INSTRUCTIONS e Recommended that the annual equipment service should be made by Baymak official services e Loading coal of the boiler should be made from middle door The ash cleaning door only should be used for skewering to coal and getting out of the try If lover cover is open while the middle cover opened for coal loading process unconditionally lover cover must be closed If you want the ash cleaning door is open after loading process finishes it may open But while the ash cleaning door open ash or particles of charcoals which be occurred as a result of burning process you must be sure if there isn t any flammable or burning things at the front side of the boiler lf there is any restricting at the chimney clack it should be certainly stayed open position at first burning the chimney should be restricted using the clack after getting some enough flame Otherwise upper side of the coal will be black and won t be burnt as
2. The chimneys have to be comlied with national and European Standards Caution Mount an air relief device onto outlet pipe of boiler hot water Air relief device must be installed by installator company in accordance with installation to the points where air may be exist on installation except boiler Carrying and transportation must be done together with original packaging material of device considering the marking on the boiler Please protect the boiler against factors that can damage to packaging material and device Caution Check the slants of boiler installation connetions with a water gauge After slants have been done there must not been any air in the system operation of the boiler without water water must not be pumped to the boiler directly The boiler water must be gave at low temperature when the boiler does not operate Otherwise system may come to harm Cold water must not be pumped into hot boiler Otherwise the boiler will be out of warranty and manufacturer company is not responsible for physical and sipiritual damages Caution As the boiler works in case of 63 9810 0293 00 08 09 2008 12 Location of the device must be done in accordance with CE national standards and local regulations to ambients that air current exists The open expansion tank must be connected to the boiler The closed expansion tanks are very dangeorus for solid fuel boilers If closed expansion tank is used the boi
3. Gbaymak GROUP BAYMAK LINYITOMAT PLUS DOMESTIC SOLID FUEL BOILERS INSTRUCTION AND OPERATING MANUAL 63 9810 0293 00 08 09 2008 www baymak com tr BAYMAK LINYITOMAT PLUS DOMESTIC SOLID FUEL BOILERS INSTRUCTION AND OPERATING MANUAL WARNING All local regulations including those referring to national and European standards need to be complied with when installing the appliance Please read this manual carefully before you use the boiler You will have the Service Center Address Book which include the information dealing with the authorised service center with this book The boilers initial operating must be done by Baymak authorised service otherwise the boiler will be out of warranty 5 VE A S Orhanl Beldesi Orta Mahalle Akdeniz Caddesi No 7 Tuzla ISTANBUL Tel 0216 304 20 44 304 10 88 pbx Fax 0216 304 20 13 http www baymak com tr E mail yonetim baymak com tr 63 9810 0293 Rev 00 08 09 2008 2 LINYITOMAT PLUS 20 40 60 80 63 9810 0293 00 08 09 2008 3 MAAN baymak com tr 63 9810 0293 00 08 09 2008 4 Top view 63 9810 0293 Rev 00 08 09 2008 www baymak com tr Right side view Front view Left side view 63 9810 0293 Rev 00 08 09 2008 gt 1 Boiler water temperature indicator
4. 1 3 capacity of coal per excreted in the boiler The average 5 20kg After coal loading process the fan can be on position In this position even the fan off burning can be started but it s depending to the coal quality You can choose the burning methods at above according to the coal quality and statement of combustion e Loaded 1 3 capacity coal start to burning and begin to charcoals the ash cleaning door to be opened and skewered and than to be made last loading e For the last loading completely fill the boiler During the burning open the the ash cleaning door and skewer to the coal every 2 3 hour Also open the coal loading door and reverse sunburned coal parts using a rabble During the coal loading process to be sure if ON OFF switch at OFF position If it is not turn it OFF t is important that fan s electrical connections to be done right otherwise the fan doesn t work correctly and doesn t give enough air into combustion chamber e Load the boiler with coal before the coal completely burn When the coals become completely charcoals Operating the boiler in this way is more economic and more efficient the mornings the ash cleaning door to be opened and skewered After starting of the burning can be loaded coal Before this process the fan may be made Switch On e f coal loading was not enough in the previous evening or in the day coal level gets low load some wood and after getting enough burning and loa
5. chimney flue Caution Subjects refering considerations during mountings related with operations of heating or a tank are below To prevent from water damages that will occure due to especially water leakages in tank convenable precuations must be taken for mounting Drain lines and safety system must be suitable and checked periodically during first start up and operation Ambient where is boiler in must be dry and must not frost between 0 and 45 Operations about supplying required air to burn the boiler and discharging waste gas must be in accordance with CE standards and local distrubition companies that is responsible from that region Place the boiler to a boiler room Do not place the boiler to your bedroom 63 9810 0293 Rev 00 08 09 2008 9 www baymak com Settle the boiler onto concrete base Ambient where is boiler in should not be dusty and moist LinyitomatPLUSLP20 08 07 10 _ PLUS LP 12 Linyitamat PLUS LP 80 boiler should be placed onto the concrete base The size of the concrete base 15 shown on the table After placing the boiler to base it should be balanced from the ground surface Concrete base Caution Waste gas way must be as short as possible Waste gas pipes must be installed as in slanting direction towards chimney and connections must have full imperviousness The chimney must be designed considerin
6. non recommended fuels Don t use liquid fuels Don t make any unauthorized modification on the appliance 63 9810 0293 Rev 00 08 09 2008 7 gt A Use only replacement parts recommended by the manufacturer Danger Please take into considirations the cautions on the boiler Wrong operation of the boiler causes serious damages Applications of first start up setting maintenance and cleaning must only be done by authorized service When breakdowns occur in the heating system system must be shut down Damaged components must be changed by authorized service stations The accesories in the system must be suitable to technical rules components in question must be approved by manufacturer relating to Baymak boiler Connections sealed with bolt paint must not be pulled out by a person who is not expert or member of service These seals prove that bolts which is necessary for perfect and safe operation has not been changed If seals get damage boiler will be out of warranty Alteration structural cursory modifications and all similar works are forbidden These kind of modifications may be dangerous for people and cause damages on boiler In case of neglagence of these subjects boiler will be out of warranty Obstruction of holes of air ventilation and air relief is dangerous and forbidden Do not place easy explosive and ignitable materials near to boiler Danger in case of gas smell In case of existing gas
7. smell do not operate switches by electricity Ventilate the room and shut down gas prevention mechanism If the source of the smell can not be found gas supplier administration must be informed Poisoning Danger Do not drink heating system water Water is not clean due to precipitates 63 9810 0293 Rev 00 08 09 2008 8 Caution Safety valve and air release line must be open everytime because of water discharge for safety Safety valve must be checked occasionally Safety valve must be installed onto boiler directly and there must not be any other valve or equipment All used equipment must be in accordance with CE standards Electricshock Danger Before protective hat and pieces of cover are taken out all electrical connections on boiler must be disassembled Works that will be done when electric is on must be carried on by authorized people after all necessary precuations are supplied Please read this manual before using the boiler Start up must be done by authorized service station Otherwise the boiler will be out of warranty Important Points for Mounting and Mounting Place The appliance shall be installed on floors with an adequate load bearing capacity If existing construction doesnt meet this prerequisite suitable measures e g load distributing plate shall be taken to achieve it The installation of the appliance need to provide access for cleaning the appliance the flue gas connector and the
8. to 30 C stops the fan 2 Pass Firing model Installation OON 1 Expansion outlet Control Panel Chimney Top C op Cover Chimney hood Turbulators Cleaning door Middle Cover Installation return Expansion return Filling Up Ash tray At Linyitomat 80 plus model boilers when you don t want to work fan you can switch the off button on the control panel In this case the fan doesn t work You can have a good combustion without fan It depends on the quality and thermal efficiency of coal The fixable and adjustable flue gas flap system was designed to control combustion Pulling the arm to yourself by the help of spring and pin you will control the combustion When the chimney draught is too high you can throttle the flap to have a good combustion Fixable and adjustable flap 63 9810 0293 Rev 00 08 09 2008 16 The flue gas box is designed as demountable The sealing of the flue gas is ensured with ceramic rope When necessary you can demount the flue gas box from the boiler by loosening the nuts This demounting operation must be done when the boiler doesn t work The flue gas box cleaning cover is opened by loosing the wingnuts You can easily clean the flue dust in the flue gas box gt Demounted flue gas box The Linyitomat plus boiler doors have slotted hinges and they are easily adjustable to have good sealing by loosening tighteening the socket head scr
9. 2 Temperature adjustment thermostat 3 Fan starting button 4 Pump working button 5 Manuel 0 Automatic Selection button 6 Flue pipe cleaning door 7 loading door 8 Ash cleaning door 9 Flue gas box pipe 10 Boiler water outlet pipe 11 Expansion tank outlet pipe 12 Boiler water inlet pipe 13 Expansion tank outlet pipe 14 Boiler filling and drainage pipe 15 Fluegas box 16 Fluegas box cleaning door 17 Boiler top casing 18 Boiler right side casing 19 Boiler left side casing 20 Boiler back casing 21 Boiler front bottom casing 22 Boiler front middle casing 23 Door opening amp closing handle 24 Ash shaking amp discharging handle 25 Top door casing 26 Middle door casing 6 Symbols in the manual A A Danger Negligence of this warning creates danger for your body and life Electricshock danger Negligence of this warning creates danger for your body and life due to electricshock Attention Negligence of this warning creates danger for ambient health and device Warning Info You can find special information and advices here Reference to additional information in other documents General Safety Cautions All local regulations including those referring to national and European standards need to be complied with when installing the appliance Don t use the appliance as an incinerator or any other different way from which it has been conceived Don t use unsuitable or
10. To start to burn at the mornings the coal in the boiler should be skewered at the lover side for reveal of the charcoals If the charcoals are not enough some wood parts to be added for to being increased charcoal amount Then boiler to be loaded like a ramp Coal loading period may not be same because of different type coals have different calorific value Don t use cokes www baymak com tr LINYITOMAT PLUS BOILER TECHNICAL INFORMATION Boiler flue gas temperature could be change between 180 300 C Under normal conditions This value may be a little more at first burning At the minimum power it is 130 180 C according to room temperature e For Linyitomat PLUS LP 20 80 boiler water temperatures was gt limited like shown at the table usage e t is mandatory that the boiler return and out water temperature have to be limits that are given at the table I the return water temperature low than at the table an auxiliary pump have to be used Min Boiler water inlet temperature 50 C C Min Boiler water outlet temperature 60 C 0 C Calculating method of the auxiliary pump flow capacity For LP 80 At 80 60 operating LP 80 93 kW tempearature Operating temparature range 80 60 C At 20 0 5 931000 1 163 X20X 1000 2 00 mh Shunt pump flow capacity In case circulation pump doesn t run flame situation should be checked in the boiler Lev
11. a result of bad combustion e Cleaning of the boiler make your boiler efficiently operate e Clearing of the boiler is very easy to be done using the equipment supplied with the boiler Clearing process of the boiler depends on fuel quality and ash rate of it But the cleaning of the boiler at least should be one time in a week that should be made efficiently operates it e Necessary air for combustion is given into the boiler with the fan An adjustable thermostat command to the fan If the fan is out of order please make an application to the Baymak authorized service Circulation pump and boiler should be serviced end of the every winter season e There is a lot of coal type that loading of the boiler so next loading time could be different But generally the next loading period after first loading is 4 4 5 hour for coal type flues 2 2 5 hour for wood type fuel Amount of the fuel ought to be changed of the calorific value of the fuels e To calculating amount of the coal for 1 hour boiler input power ought to be divided to calorific value of the coal and efficiency of the boiler 63 9810 0293 Rev 00 08 09 2008 33 Wh baymak com tr Fully flue gas box cleaning The cover and control to be done beginning and panel cleaning to be end of the winter season done at every 15 day and or to be done if it and or and when it needs to be depends on required was done the fuel type Smoke pipes and temperature transition surface cleanin
12. boiler was produced in accordance with EN 303 5 Protection against corrosion Caution Combustion air must not contain elements that will cause to corrosion As an example these gases are water steams of solution and cleaning substances or gases in spray boxes Demands related with heating system water To prevent the damages occured as a result of corrosion in installation quality of heating water must be as good as drinking water Unsuitable waters containing chemical additive substances or causing to corrosion must not be used Filling water for boiler and installation should not contain residues contaminates and unwanted solid materials These unwanted materials are very dangerous for the boiler and installation If you have any doubt about the water pureness you should mount a fitler on inlet of the filling valve The degrees of water hardness must not be bigger than 20 1 Calsium carbonade 1 It water Hard water If the degres of water hardness is bigger than 20 L a water softening system absolutely must be used 63 9810 0293 00 08 09 2008 14 In case of boiler failure which be caused by calsification using hard and unsuitable water the boiler will be out of warranty PROPERTIES OF LINYITOMAT PLUS BOILER The boiler body is Easy combustion control covered 50mm thickness 2 with adjustable flue gas flap glass wool with aluminium folio Easy cleaning and Boiler d
13. d the enough coal Otherwise if the coal loaded on the some sunburned coal it causes to be flame turned off e The boiler should be cleaned at list once a week Burning efficiency will get higher when used cleaned boiler e Don t use cokes e Powder coal and a very small with granular coal For the first burning fill to much wood and wood part and ignite them the ash cleaning door should be open e When the flame is grove enough load 5 10 kg coal on the woods Until coal and wood turn into charcoals you should wait 63 9810 0293 Rev 00 08 09 2008 22 63 9810 0293 00 08 09 2008 23 Wait when woods and coal is completely turn to charcoals spread the charcoals in the boiler at list 5 cm from back side Rack up the coal front side more than back side like a ramp Amount of the coal is depending on the calorific value of the coal Water temperature decreases 15 20 C while this operation When the coal begun gas free boiler should be skewered from lover side Coal Front Side The boiler shouldn t be loaded If the coal is not turn to completely charcoal Boiler back side must not be closed Back side air flow definitely should be made Before leaving the boiler asleep at the nights the charcoals should be spread in the boiler and covered up on the charcoals completely All the doors should be closed 442 58 5 Front Side Charcoal
14. el of coal should be check if the coal level is enough for increasing of the water temperature In that case measure must be taken Fuel loading mouth measurements LINYITOMAT 20 PLUS 330 203 LINYITOMAT 40 PLUS 430 210 LINYITOMAT 60 PLUS 430 220 B LINYITOMAT 80 PLUS 530 250 63 9810 0293 00 08 09 2008 24 Capacities Model KW LP 20 20 000 18 23 LP 40 40 000 32 46 LP 60 LP 80 80 000 75 93 Power The capacities of the pumps used in Linyitomat plus boiler and the required capacity of open expansion vessels are as follows Capacity DAB MODEL kcal h Circulating Pump Open Expansion Vessel PUMP TECHNICAL DETAILS MODEL STEP CURENT CAPASITOR Installation Electricity VV connection connection 1x230 V 1 1x230 V 1 G A 50 180 1 230 XM 50 Hz A 56 180 gt 1x230 2658 1 00 8002 XM 63 9810 0293 00 08 09 2008 25 MAU com tr A Height mm B Width mm 590 690 690 790 C Depth mm Volume Lt Circulating Pump DAB VA 35 130 VA 65 130 A 50 180 XM A 56 180 XM Weight Kg Max Operating Pressure 3 3 Bar Test Pressure Bar Necessary Draught mbar Flue Gas Temperature at 0 02641 0 03307 0 04188 0 08433 nominal heat output kg s Flue gas mass flow at minimum heat output kg s Mean content of CO at 10 0 585 0 642 0 734 0 764 _ resistance mbar N
15. ews 63 9810 0293 Rev 00 08 09 2008 17 waw baymak com tr Socket head screw Boiler left hinge Flue gas cleaning door Boiler right hinge e According to the replacement of the boiler to a boiler room you can switch the opening direction of the door with the changing process right and left hinges by loosening socket head screws The opening direction is adjusted clockwise direction at the factory e You can shake the ashes on the grids by pulling and pushing ash shaking arm little by little on the right side of the boiler By pulling the arm to yourself you can discharge the ashes into the ash tray or combustion chamber 63 9810 0293 Rev 00 08 09 2008 18 a The arm is at normal position b The arm is at ahead position The arm is at back position e You can discharge the ash from the boiler and load the coal into the fire room with the ash tray which be put into bottom of the combustion chamber Coal loading Ash discharging e The fan assembly you must be sure that no air leakage by fixing the gasket between fan you will find the fan in the combustion chamber when you unpacked the boiler and the door with screws electricity connection must be comply with the electrical scheme 63 9810 0293 Rev 00 08 09 2008 19 Whi baymak com tr 1 The fan connection bolts 2 The fan box gasket For the assembly of the fan and control panel the cable channel amp plate is used Please
16. g technical specifications determined in DIN 4705 and built according to DIN 18160 Much slanted furnished much slanted without roof tile with roof tile roof root Away from roof furnished with roof tile roof little slanted roof 63 9810 0293 00 08 09 2008 10 Both boiler back pressures and boiler pressures must be in consideration at chimney calculations lf the waste gas heat is under 160 C continuous operating it is forbidden to use an ordinary chimney Mount the flue gas connection pipe on to the chimney with ascending slope The flue gas pipe must have min 1 one m height and if necessary elbow pipe should be used after this height It must have min 10 towards the chimney and its length never passes the 0 25 x height of the chimney min 4m k I I I I LI max 2 mete LI EA 111 Linyitomat Plus Boiler Chimney Connection Example Electricity and fan connection 63 9810 0293 Rev 00 08 09 2008 11 waw Daymak com tr Linyitomat Plus Boiler Model LP 20 LP 40 LP 60 LP 80 Flue Gas Pipe Connection Diameter mm 8130 8150 8180 2200 Chimney must be isolated well to increase the combustion quality You may use maximum two elbows between chimney and flue gas box Installation You must take measures against rain or water consisted as a result of condesnsing waste gases
17. g to be done once a week or more Flue gas box cleaning necessary once 15 days or and when it required was done Cleaning door has to be opened and all coal residue to be taken Inner boiler cleaning away to be done daily and when it required was done Ashes and coal remnant to be taken away e To cleaning of the combustion chamber in the boiler room the smoke pipes cleaning door top door should be opened and the turbulators taken out holding from the tubes After that pipes to be cleaned using brush and brush cover the dirt coal remand and ash should be cleaned from flue gas box side After that all process should be repeated cleaning lid and turbulator should be assembled and the top door should be closed e Use some soft cleaning material in order to not cause a damage on the boiler cover surface e Cleaning process of the warm surface and control panel should be made by only Baymak authorized services 63 9810 0293 Rev 00 08 09 2008 34 Trouble Shutting Case There is some water leak on the boiler Circulation pump doesn t work The fan doesn t work Check if there is any electrical power If Electrical power was gone 63 9810 0293 00 08 09 2008 35 Action Apply to a Baymak authorized service Check the electrical connection Check the circulation switch If doesn t work please don t load the fuel and call the Baymak authorized service Check the electrical connectio
18. ler will be out of warranty The diameter of the open expansion tank connection pipe must be same with the boiler connection 5 The open expansion tank connection pipes must be steel installation pipe not plastic The usage of the plastik installation pipe on expansion tanks is very dangerous and in this case the boiler will be out of warranty To fill and drain water to the boiler you must mount a valve You should isolate all the installation pipes to prevent heat loss Make the boiler electricity connection to the grounding plug In case of power cut never load coal to the boiler Mount the circulating pump on the inlet pipe of the boiler and connect the cable to the electrical terminal of the pump Mount the circulating pump as the below The vertical assembly of the pump shaft causes wearing of rotor bearing rapidly So the vertical assembly of the pump shaft must nt make TOP VIEW www baymak com tr 63 9810 0293 Rev 00 08 09 2008 13 There must be absolutely a bypass line on the inlet pipe of the boiler case of the power cut can secure the safety of the boiler and lt is closed in normal situation it should be opened in case of power installation cut Circulating pump Physical life of the boiler is 10 years according to related laws This period contains service and providing 1 required spare part duration for executing the functions The
19. n Check the circulation switch If it doesn t work don t load the fuel and call the Baymak authorized service If there is any damaged cable shut of the electrical power Discharge the boiler To have made electrical connection by authorized service Open the by pass valve immediately Close all the doors and chimney clamp of the boiler To be sure if the return and out security lines are open expansion tank is not empty If the boiler water temperature doesn t decrease despite of the opening by pass valve pour some sand and ash over the coal Don t fill cold water to the boiler while it is working www baymak com tr Product Warranty Conditions related to the Consumer Attention Issues Total product warranty was given by 5 15 not include if the faults and damage occur operating the boiler in abnormal conditions According to this issue please look at following clauses 4 2 10 11 12 13 Please to have approved to the warranty certificates by the sales office where you bought the boiler lf the warranty certificate wasn t approved there are some scrape erasion it or if original serial number was erased and destroyed the product will be out of warranty in these conditions The product should be used as defined as at the user manual The fault was accrued due to not appropriate usage that product will be out of warranty The occurred damage during the transport is o
20. ominal heat output for 4615 69 22 93 11 Heat output range for 18 23 32 46 50 69 75 93 coal kW Boiler efficiency class Boiler efficiency 75 72 78 86 78 21 78 87 nominal heat output for coal h temperature C temperature controller C Rated voltage V Rated frequency Hz 63 9810 0293 00 08 09 2008 26 10 m gt LC q gt BIS I I 9 IV SS NAT ac SEN TEUA gt a V gt gt ru AN IA OEL 2 II I lt pe fa ere 8 5 58 45 40 35 1 5 KEN ZZAN AAN EL NN EEN m 1 5 A 50 180 XM P kPa m 50 5 40 30 150 200 2507 100 tan limin En 100 120 140 160 M T 50 56 80 25 35 55 65 VA 65 130 50 180 56 180 www baymak com tr 27 63 9810 0293 00 08 09 2008 FUNCTIONS OF THE CONTROL PANEL The temperature adjust thermostat circulating pump working lamp Boiler water Fan Pump Manual 0 Automatic temperature starts starts Selection switch button button The boiler can be operated whether automatically within electronic thermos
21. oors with double 4 maintenance with the side opening hinge ba demountable flue gas box system High insulation and low heat loss by the rock wool in back casing Full sealing easy opening closing loading discharging due to the 3 doors with the latch system High efficiency by water distributing plate between inlet pipe and combustion chamber Easy coal loading and ash L i discharging with two f Easy cleaning by ash aimed ash tray shaking and ash discharging with moveable grid system The fan is mounted on Linyitomat Plus boiler to make combustion easy The fan and pump are controlled two ways Automatic and manuel mode At manual mode the control of fan is maked by adjusting thermostat on control panel The fan works until the boiler water temperature reaches the selected temperature by adjusting thermostat When it reaches to adjusted temperature the fan stops automatically and when the boiler water temperature decreases 5 C the fan starts working again When the boiler water temperature reaches the selected temperature again the fan stops and the cycle goes like this When you select the automatic mode the electronic thermostat activates the fan at the start www baymak com tr 63 9810 0293 Rev 00 08 09 2008 15 of the working When the temperature reaches 40 C the pump starts working When the boiler water temperature decreases and become 40 C the control panel stops the pump and reaches
22. pay attention to door opening side when you connect the cables 1 Cable pass plate 2 Cable gland fan power supply connection cable The door is opening from the left to right on picture So the fan connection is maked from the right cable pass plate In case of the door opening direction from right to left side the fan connection should be maked from the left side cable pass plate e Control panel assembly All the sensors on the control panel should be mounted correctly in the sensor beehives that are located backside of the boiler 63 9810 0293 Rev 00 08 09 2008 20 That is important and necessary for operating safely of the boiler sure if the sensors mounted to correct place and fixed properly 1 Boiler Thermostat Sensor 2 Boiler Thermometer Sensor Control 3 Boiler Safety Thermostat Sensor Panel 4 Fasten sensor clip 63 9810 0293 Rev 00 08 09 2008 21 MAAN com tr LINYITOMAT PLUS BOILER BURNING INSTRUCTION e Burning method changes according to size of coal Coal quality and the characteristics of the burning affect to the burning method and efficiency of the boiler e Normal sized coals Orange size For first burning fill some wood and wood part and ignite from lover side This time the fan should be closed position and the ash cleaning door should be fully open the other doors should be closed After igniting the ash cleaning door should be closed and loading door opened
23. rm Red Sr fellow Green Khy 30 30 EJ Mir Black 300 T CI SFI CURVE SHEATH 2 mier 4 uL ele Khy 35 cm 2 5 mre CONNECTORS gt 2 S ine Pl aide MM 2 mm FV kablo Siyah cm 76 kablo VENTILATOR Khu Live Notr 30 63 9810 0293 00 08 09 2008 z gt 2 24 5 VIII LU 2 5 gt adid 5 UE 5 0 8 ic adid 99 C 5 C 19IIII ICI5VIC0X I C adid 991C uoisuedxg E T EL S u 5 5 5 A MI 5 1 5 nn L adid YUP UOISUETXJ adid jals uoIsuedxg Boiler installation scheme adid 2215 Janno uoisuedxa WW OL Ul 63 9810 0293 Rev 00 08 09 2008 31 www baymak com tr HALA pinoys 1 910155910 Jayem BU 10 c o 51 ainssald Ajddns Jayem II 104 ww I18168 104 2 5 Buenas 2 se ne 1911 AIA HUEJ uorsuedxg 19114 5
24. s water and it causes failure and damage Al of them will be got the product out of warranty 63 9810 0293 Rev 00 08 09 2008 36
25. tat control or manually with user control 1 For automatic control Switch the manuel 0 Otomatik button to otomatik position The electronic thermostat control is enabled in this position It controls the fan and pump according to the water temperature At the start up the electronic thermostat control make the works When the water temperature is 40 C the pump starts working When the water temperature starts to decreasing it stops the pump at 40 C and stops the fan at 30 C IMPORTANT In automatic working position minimum one of the pump button or the fan button must be closed 0 to have a good working 2 For working manual operating Switch the manuel 0 Otomatik button to manuel position In this position the fan and the pump are controlled theirself buttons In both position manual or automatic the temperature adjustment is maked with the adjust thermostat If the water temperature is over the set temperature the adjust thermostat stops the fan 63 9810 0293 00 08 09 2008 28 MANUEL AUTOMATIC _ Electronic Control Manuel Automatic Control 63 9810 0293 Rev 00 08 09 2008 29 AY baymak com tr NWE CIRCULATING Krm 4 LAMP CH 8 IT 12 LV 15 Erm 8 cm 91 Mw 15 em Black 50 2 0 i mm cable Black 140 Ehv Br owm Syh Black K
26. ut of warranty after delivering date of the product to the user There must not be any intervention outside of the authorized service staff maintenance and repairing or another reason This of fault is out of warranty If the fault accrued from user didn t make the necessary periodic maintenance and control The responsibility of delivering of the warranty certificate to user belonging to who sold the goods to user whose are seller supplier agency or representative Faulty installation faulty pipe connections faulty selection of capacity more than 3 Bar installation pressure inadequate chimney systems low or high voltage safety thermostat thermometer Faulty central heating system outer physical and chemical agents transport and storage conditions will be malfunction of the device using not appropriate fuel burning make the product out of warranty The repair or changes are out of warranty what were not be done by Authorized service team IL the installation pressure more than working pressure and there are some leakage of the system in that case responsibility belongs to user Cleaning process of the coal remnant and damaged material are out of warranty that was effected from the fuel II the boiler and installation frozen boiler will be out of warranty The boiler water and or return water temperature is low from 50C condensing may be occured and it causes failure and damage Using over 20 F toughness on calcareou
Download Pdf Manuals
Related Search
Related Contents
OXYGEN SENSOR USER MANUAL Volet emploi, insertion, développement Manuale Utente - Sena Technologies, Inc. ICC ICMPP0245E patch panel Guía del usuario HP Network Router 85027 A User's Manual Invacare® I-Fit™ Shower Chair General Cleaning After Use Goodram 1GB PC-5300 Click here to NoteBurner User Manual Copyright © All rights reserved.
Failed to retrieve file