Home

SOP

image

Contents

1. Deni initial a width Depth ao 99 pF pat Free iniiba Paint VELOCITY at Mean Mean 33 Cross section field sheets Adopted from MDEQ Sitewide Cross Section and Pebble Count 151 Date Site Visit Code Pac This Farm is used to measure cross sections and a sitewide pebble count calculate 151 Calculate the distance between measurements by dividing rhe bankFull width 11 and rounding down In each Distance cell enter the distance from the starting paint In each Depth cell enter the depth Fr at that paint In each cell enter the length mm of the b asis of the selected particle Transect 1 Distance ft Bep EE B Aziz mmt a ee ee ee Transect 2 Eankfull width Distance JBk j j om __ eee Transect 3 Bankfull width Distance TE 1 i is RENE CREE Transect 4 Eankfull width Distance TF Depth 1 Eris mm Transect 5 Eiankfull width Distance j tio 1 1 Transect 6 Bankfull width Distance
2. Telescoping Leveling Rod GPS camera Cross section monitoring field sheet and pencil Sampling Preparation ie Locate the datum stakes established at each cross section and setup the surveying at this location The instrument should be placed at an elevation higher than the highest feature required for the survey Stretch a measuring tape in ft across the channel and attach to datum stakes on either side with clamps making sure the tape is perpendicular to the direction of the flow Zero side of tape should be hooked to the left bank looking downstream Attach the clamp attachment exactly at the top of a stadia rod such that the side with the laser panel on the clamp is facing away from the numeric gradations on the stadia rod If bankfull is not obvious on both banks locate bankfull on the side that is most obvious place base of the stadia rod at this point and adjust rod height until the sensor intercepts the laser Then move to the opposite bank and walk upslope holding the stadia rod vertical mark bankfull at the point where the sensor again intercepts the laser Determine the distance on the tape between left bankfull and right bankfull Divide this distance by 15 30 to obtain 15 30 equidistant points along the cross section within bankfull use 30 points for larger streams Step by Step Field Procedures l Begin the cross section survey Beginning at left bankfull and moving toward right bankfull positio
3. Step 2 Measure foresight at right bankfull RBF Step 3 Subtract step 2 from step Dmax RBF Step 4 Multiply step 3 by 2 Dmax RBF x 2 Step 5 Subtract step 4 from Step Dmax Dmax RBF x 2 Adjust the stadia rod height to the elevation of the FPA step 5 above Move rod up the bank slope and along the cross section away from the stream channel in both directions until the sensor intercepts the laser Mark the FPA locations on both banks Use a rangefinder or tape to measure the straight line distance between the two FPA locations This 1s the flood prone area width Wfpa width of the channel at an elevation that is 2 times the maximum bankfull depth Post sampling Efforts l Calculate mean depth and the width depth ratio bankfull width mean depth Calculate the entrenchment ratio FPA width Wfpa Bankfull width After ensuring the appropriate sections of the field sheet are filled out return field sheets to BCD office These should be scanned and stored on BCD s Google Drive account and the hardcopies stored in the BCD filing cabinet 26 Juvenile Trout Count Equipment and Supplies e Smith root LR24 Backpack Electrofishing unit e Nets e Length board e Notepad Sampling Preparation Before heading out to field one should familiarize themselves with how to operate the electrofishing unit by reading the user s manual see attachment D Navigate to sampling site locate
4. 20 Post sampling efforts 1 Field calculations should be entered into saved excel master spreadsheet on BCD s Google drive account immediately after sampling This spreadsheet will automatically calculate flow when data 15 entered 2 Once field calculations are complete hardcopies should be stored in the BCD monitoring filing cabinet and scanned and transferred to the Google Drive account see Google drive Filing Instructions folder 3 Atend of field season all flow sampling sites will be visited and data will be downloaded onto OmniLog Data Management Program Ver 1 75 see figure below Continuous staff gauge height data from chart recorders will be collected monthly and stored in the BCD monitoring filing cabinet Instructions for uploaded and exporting TruTrack data can be found at http www trutrack com omnilog usermanual index html mnilog Data Management Program Ver 1 78 Sra Logger Sarl Logger Channel and Probe Setup Alain Gostiona pet Logger tart Downtaad Channel Probe Setup Alam conan WT HR Battery Logger Firrrraiare aT The Legger Sistem screen shove the dan retrieved free the current Sorial Hambar 1402248 cenmecied kapper ini Ore ie cenfgquraten area was dewriepd Pan ia E Lo reread t 7 Log Status Frag Looping Fenod homos GO OO 1 00 Total Bamglos 655 Lael Slarled Ses 22 24312 Log Tene SOO 09 71703 Stat ZXD52
5. TF fe 11 Transect 7 Bankfull width Distance TE Depth ft 9 9 2151112 _ Transect 8 ESE ah Distance ft 1 Transect Eiankfull width Distance TP Depth ft 44 44 Stig ELI Transect 10 SS Fa Distance BT 1 34 STREAM CLASSIFICATION Date Site Visit Code Reach 10 Bankfull Width W kf ft WIDTH af the stream channel at bankfull stage elevation in a rifle section Mean DEPTH d ft Mean DEPTH of the stream channel cross section at banktall stage elevation in a riffle Section AREA of the stream channel cross section at banktull stage elevation in a 5q ft section WidthiDepth RATIO Pv du ft Banktull WIDTH divided by bankfull mean DEPTH in a riffle section Maximum DEPTH 9 merg ft Maximum depth of the channel cross section or distance between the bankfull stage and thalweg elevations in riffle section WIDTH of Flood Prone Area W ft Twice maximum DEPTH ar Z 9 uu the stagelelevation at which Food prone area WIDTH
6. credit Googlemaps Cabin Gulch Navigating to the site The Cabin Gulch site 15 less than a mile downstream of Sulphur Bar located between mile marker 14 and 15 of Highway 12 East From Townsend pull off 15 on the left hand side and 15 indicated by Cabin Gulch road sign Park on the first pull off on the road facing a gated private road and walk up Cabin Gulch road note not the gated road about 50 feet and turn right to access site Measuring cross section is 450 from highway Highlighted bank pins are not located at this site so be sure to located metal fence posts to find established cross A section Stilling well is located Google just downstream of cross section e acm Figure 8 Aerial image of parking spot and navigation to stream site credit Googlemaps Horse Pasture Figure 10 Aerial image of parking spot and navigation to stream site credit Googlemaps Navigating to the site Heading east on Highway 12 the Horse Pasture site is located between mile marker 12 and 13 about a mile below the official Forest Service boundary Watch for wooden fence and take the pull off on the right to park in front of the eate note slow down as soon as you approach fence as it 15 easy to pass this pull off Jump over fence and follow navigate to a poorly worn trail that heads to the left side of the paddock Follow trail to the left hand side of fence and down to stream site You
7. the gravel bar Bubbler and staff gauge attached to bridge and stilling well 15 accessible at the top of bridge Cross section 125 feet from Clopton Lane Bridge Figure 14 Aerial 1mage of parking spot and navigation to stream site credit Googlemaps 12 Stock s Bridge Figure 16 Aerial image of parking spot and navigation to stream site credit Googlemaps Navigating to the site Heading on Highway 12 East from Townsend turn right on Lower Deep Creek Road between mile marker 5 and 6 The pull off is a private road on the left approximately mile down This road is gated and you will need a key to access Head down about mile and as soon as you cross private bridge park on the left Jump the fence to the left and follow established path through the brush to access measuring cross section 50 feet from bridge Above Broadwater Missouri Canal EO jl SL cme e priua Iac vwvernlneemiereeksE Figure 18 Aerial image of parking spot and navigation to stream site credit Goolemaps Navigating to the site Lower Deep Creek Road can be accessed from either Highway 12 or Highway 287 If taking Highway 12 turn right and head down Lower Deep Creek Road If taking Highway 287 from Townsend turn left on Lower Deep Creek Road and head up the road Above BM Canal site is located around the halfway point on Lower Deep Creek Road From Highway 287 pull off to the right and park immediately after y
8. this site will be monitored in place of Stocks Bridge other monitoring parameters will be optional from 2020 onward ume uy f august september October November LOW Flow Photopoint Flow Photopoint Photopoint Photopoint Photopoint Photopoint Photopoint Photopoint Temperature Temperature Temperature Temperature Temperature Temperature Cross sections and photopoints once annually Beaver dam redd count Macroinvertebrate sampling Juvenile Count Out migrant trout count Spring runoff period Resident Trout Population Estimate Spring or Fall Assessment TBD 16 Sampling Methods The following section describes the proper filed methods and data collection protocols for each of the monitoring parameters included in this study For each monitoring parameter the following elements will be addressed Equipment and supplies sampling preparation step by step field procedures post sampling efforts and equipment maintenance and calibration if applicable All protocols should be followed as instructed to ensure accuracy and consistency of the data collections 17 Stream Flow Equipment and Supplies 100 reel type tape measure 2 clamps Flow meter Marsh McBirney FLO mate or Hach 950 Measuring rod Flow monitoring field sheet and pencil GPS Camera Sampling Preparation Before heading to the field one should familiarize themselves with how to o
9. Team SAP see SAP references Equipment and Supplies Needed Required GPS camera Photo log data sheets Whiteboard Dry erase marker Rag to erase white board Topographic and or road map Timepiece Optional Aerial photos if available Extra batteries for camera Ruler for scale on close up views of streams and vegetation Steel fence posts for dedicating fixed photo points in the absence of available fixed landmarks Step by Step Field Procedures 1 First and foremost ensure that the date and time in the camera are set correctly If they are not correct and you cannot figure out how to reset them make a note of the incorrect time in the field remarks section of the photopoint field form The first photograph should be of a whiteboard that displays the information about the site see figure below The wipe off sheet should be photographed before any site photos are taken and again after all photos are taken at the site to facilitate data management Locate flow cross section monitoring sites by referencing the description contained within the station location guide and by finding existing cross section markers highlighted rebar pins or metal stakes Use GPS waypoints in Sampling Location table above if needed Secure tape across cross section before taking photographs Take AT LEAST three field photographs including 1 cross section view 2 upstream view 3 and downstream view Walk approximately 20 feet upstream and
10. downstream of 23 tape to ensure the enough to get the stream banks are completely including in those photographs Cross section view should also be from the right bank and should also be taken approximately 20 feet back form the tape Also include a shot of the staff gauge at flow monitoring sites 5 Once all photos have been taken update the wipe off sheet with the end time and the number of photos taken jpeg numbers and photograph the board example below Record all applicable JPEG numbers on this whiteboard photo A photo of the wipe off sheet should be the first and last photograph taken at each site 6 Record ALL JPEG numbers and fill in field remarks section on photopoint field form Post sampling efforts Photos should be transferred off of the camera immediately after they are collected Transfer photos to BCD Google Drive account under the appropriate Images folder nestled in each site folder Tune 30 2015 H Kreiney Start 5 30pm Figure 28 Example of whiteboard photopoint image 24 Cross sections BCD will follow the Laser Level Cross section Method protocol established in DEQ s Field Procedures for Water Quality Assessment Monitoring manual section 7 2 1 see SAP reference The following procedures are adapted from that section The location of these sites are TBD Equipment and Supplies Sokkia model B30 Automatic Level 100 reel type tape measure 2 clamps Sokkia Tripod Crain 20
11. is determined riffle section Entrenchment Hatio ft The ratio of flood prone area WIDTH divided by bankfull channel WIDTH lw IL J ee ee Channel Materials Particle Size Index 050 mm The 050 particle size indes represents the median diameter of channel materials as sampled fram the channel surface between the bankFull stage and thalweg elevations Water Surface SLOPE 5 Channel slope rise over for a reach approximately 20 30 bankfull channel widths in length with the riffle to riffle water slope representing the gradient at banktull stage Channel SINUOSITY fin office is an indes channel pattern determined fram a ratio of stream length divided by valley length SL IL or estimated tram ratio of valley slope Existing Hosgen Channel Type Potential Hozgen Channel 35 Photopoint field sheet Photo Point Field Form Site ID Team Member s Description JPEG Number s _ Staff gauge view if applicable 36 Attachment A Hach 950 Handheld Pro Flowmeter user s manual Attachment B Marsh McBirney FLO mate 2000 user s manual Attachment C Hobo Water Temp Pro V2 user s manual Attachment D LR 24 Electrofisher user s manual Attachment E A Biological Assessment of Sites on Deep Creek Broadwater 2003 37 38
12. will see field instruments just in front of fence Measuring cross section bank pins are located just above fence which 1s accessed most easily by wading under fence 10 North Fork Figure 11 Standing at measuring cross section looking downstream Navigating to the site The North Fork road turn off is a left hand turn between mile marker 11 12 on Highway 12 East As soon as you go over Deep Creek take a right onto Log Cabin Road and follow that road for several hundred yards until you reach a conspicuous pull off on the right see figure 11 Find a path through the woods just to the left of the parking space and walk 100 feet down to the still well site Measuring cross section and highlighted bank pins are located about 30 feet upstream of still well Site is 900 feet upstream from highway auper y 2 Lu 5 EZ uL zi Figure 12 Aerial image of parking spot and navigation to stream site credit Googlemaps 11 BU a Ud E A Fu Clopton Lane Navigating to the site Head east on Highway 12 Clopton Lane Road is located on the right hand side between mile marker 7 8 Follow the road down and park on the right just before the bridge over Deep Creek see figure 13 To access the site cross over the barbed fence to the left of the road and walk down to stream Highlighted bank pin for measuring cross section visible in
13. 015 22 30 00 Stop Set Last Started by CmniLog Var 1 75 Logger id Factory Default Reset on zB IX 7014 Ha Alarm Cond Figure 26 Depiction of OmniLog software download page mp HS Equipment Maintenance and Calibration A zero check will be performed for the Hach 950 or Marsh McBirney flow mate 2000 monthly before use in the field TruTracks will be calibrated immediately before deployment in the field and upon retrieval Calibration and maintenance procedures will be followed according to the appropriate manuals listed below see attachments A B C TruTrack water data logger http www trutrack com omnilog usermanual index html Hach 950 www hachflow com pdf FH950_ds pdf Marsh McBirney 2000 www hachflow com pdf Model 2000 Manual pdf 21 Stream Temperature Equipment and Supplies Figure 27 Hobo data logger e Hobo Water Temp Pro V2 loggers PM Metal Casing A Bi e Metal wire Sampling Preparation All five Hobo data loggers will be deployed at the beginning of every field season when conditions are safe enough to wade sometime in May Each Hobo will be placed in a metal casing see picture below to prevent damage during operation and will be attached to a sturdy wire pinned to the appropriated temperature specific rebar pin in place at each site marked by pink flagging tape It 1s critical Hobos are attached to these pins to ensure Hobos collect temperature from
14. GLIS 1 X 1 1 i i i i 209 j i TA FT DEPTH i LU l T B DEPTH is 27 F TOTAL x B e SENSOR ul GALGE LI ROD Figure 22 and 23 Depiction of measuring rod and close up of foot scale 19 Step by step Field Procedures Figure 24 Cross section set up 1 Locate the cross sections at each monitoring site which are pre determined and marked with a set of highlighted stakes and or metal rebar pins 2 Stretch a tape measure across the channel to establish the cross section The beginning of the tape should be hooked to the rebar stake on the left bank facing downstream 3 Spacing intervals for flow measurements at each site are listed in Table 3 below If spacing interval procedures are not available be sure to collect at least 20 flow measurements To do this measure the wetted width and divide into 20 even intervals taking a flow measurement at each Measurements should be made in tenths of a foot for easier calculations Sand just below the tape at the left wetted edge of the 5 channel Observe Left Edge of Water LEW and record the tape measurement at that location with a zero depth Continue measuring depths across the channel at your determined interval You should finish on the opposite wetted edge with a zero measurement recorded as Right Edge of Water REW Figure 25 Depiction of cross section subsections
15. Horse Pasture P T 6 4 T 80 Above BM Canal Data Source Kreiner GPS 1 2 4 6 8 Prepared by Holly USGS Hydrography ESRI Kreiner Broadwater CD Upper Deep Creek Google e Figure 4 Aerial image of parking spot and navigation to stream site credit Googlemaps Navigating to the site To get to the Upper Deep Creek site head east on Highway 12 from Townsend through Deep Creek canyon The pull off to the Upper Deep Creek site 1s marked by the Thomason property entrance on the left hand side and between mile marker 19 and 20 Park just left of the shed head right and cross over fence to get to the stream see figure 3 Monitoring site can be located by highlighted bank pins 175 upstream of highway and a 1 inch diameter stilling well housing for the TruTrack logger Navigating to the site From Townsend take Highway 12 East up Deep Creek Canyon Sulphur Bar pull off 15 located between mile marker 15 and 16 and 15 the first right turn past the Sulphur Bar sign Drive over the bridge and park on the left just before the Forest Service gate and next to the stream see figure 5 Monitoring site can be located by highlighted bank pins and a 1 inch diameter stilling well housing for the TruTrack logger just downstream of Forest Service gate 350 feet from highway Figure 6 Aerial image of stream site parking spot immediately adjacent
16. Montana Ditch syphon It will take at least 5 people to move screw trap and position it properly Attach screw trap to head gate structure with rope to secure it in place Step by Step Field Procedures Fish trap should be visited at least two times a day morning and afternoon during the high flow season so that debris jams can be removed if present Once flows have gone down visits can reduce to once a day During the sampling period trap should be visited and fish recorded at least 5 days week pe De Use a net to catch all fish caught in the trap and move to gallon bucket Record the species and length of trout on notepad Record the number of non game fish species Record stream conditions including both staff gauge height turbidity and any other field remarks Place thermometer in stream for at least 10 minutes and record temperature Perform periodic efficiency check To perform this check mark portion of captured fish with fin clips record their number on the appropriated field notes for the day and re release up stream On the following day make note of how many marked fish were re captured and record the percent efficiency of the fish trap for that sampling day Note efficacy check needs to be performed at least once and again if stream conditions change 28 Post Sampling Efforts Field sheets will be collected and stored together at the FWP office over the sampling period At the end of this samp
17. Standard Operating Procedures for the Deep Creek Watershed Restoration 2015 Sampling and Analysis Plan Prepared by Holly Kreiner 2015 Big Sky Water Corps Member Broadwater Conservation District 415 So Front Street Townsend MT 59644 Additional Contributors Adam Sigler MSUEWQ Alli Bratton 2014 Big Sky Watershed Corps Member Page intentionally left blank Introduction This document serves as field sampling procedures manual for the Deep Creek watershed restoration monitoring program The Deep Creek watershed is located just east Townsend MT and flows roughly 30 river miles from the West slope of the Big Belt Mountains to its confluence with the Missouri River The monitoring program will focus on the lower watershed containing the Deep Creek WRP project reach which includes about 20 7 river miles from the United States Forest Service USFS boundary to the Missouri see figure 1 This monitoring plan will serve two purposes First it will provide project partners the ability to draw conclusions about the effectiveness of the Deep Creek watershed restoration project and assess whether targets outlined in the Watershed Restoration Plan WRP are being achieved Second it will build upon the efforts of previous monitoring assessments allowing for trends in the condition of Deep Creek to be evaluated over time See the Sampling and Analysis plan for a thorough explanation of the Deep Creek Watershed Restoration Plan Thes
18. d just upstream of Hahn s Ranch flow cross section Step by Step Field Procedures 1 Set appropriate voltage and wave form on electrofishing unit 200 volts 30 hertz 2 Perform a single upstream pass sampling for a duration of 1000 2000 seconds one person holding unit another person netting fish 3 Count and measure total of all fish captured and record on notepad 4 Record exact time in seconds of sampling effort on notepad 5 Make note of sampling conditions including turbidity and flow patterns and other field remarks Post Sampling Efforts After sampling the catch per unit effort for each individual species observed should be calculated A qualitative assessment of how sampling conditions might have effected sampling efficiency should be included in analysis Equipment Maintenance and Calibration Calibration of electrofishing unit will be performed immediately proper to use in the field Procedures for maintenance and calibration can be found the user s manual see attachment D http www smith root com images smith root downloads 70 07288 005_Ir 24 electrofisher manual pdf 21 Out migrant Trout Count Equipment and Supplies 5 diameter rotary screw trap Net Gallon buckets Length board Fish ID book Notebook and pencil Thermometer Sampling Preparation To perform this assessment the screw trap needs to be installed in the creek immediately downstream of concrete head gate structure above the
19. e monitoring efforts will be implemented over the next ten years with the support of data collectors Jim Beck Associate Supervisor and monitoring volunteer for Broadwater Conservation District s BCD Ron Spoon Fisheries Biologist for MT Fish Wildlife and Parks Natural Resource Conservation Service NRCS Townsend Field office employees and present and future Big Sky Watershed Corps BSWC members and or MSU interns If local volunteer s sign up for this project and are properly trained in data collection methods in future years their efforts may be included in this study The techniques described herein depict the methods for data collection for each monitoring parameter addressed in the SAP AII who collect data for the Deep Creek Watershed Monitoring Program are encouraged to use this as a reference during sampling events Creek Watershed N Data Source USGS 0 25 5 10 Prepared by Holly i B A Hydrography ESRI M IBI Kreiner roadwater CD ide S Figure 1 Deep Creek watershed and depiction of project reach Sampling Sites A total of 25 on going monitoring locations have been chosen for the Deep Creek monitoring project The locations of each sampling site is provided below An entire page is dedicated to each flow monitoring site to aid in navigation to these sites The flow sampling sites will be listed from the upper most to the lowest location for easier navigation to each site within this d
20. field form 18 Using the Measuring Rod Because stream velocities differ at various depths within the channel an accepted method for determining mean velocities of flow in a section is to measure the velocity at 60 0 6 of the depth from the top of water To use the measuring rod one should familiarize themselves with how to read stream depth and set the flow sensor to the proper 0 6 ft depth Below are instructions to do this once the interval has been located 1 Once rod 15 placed in its proper distance interval note the height the water at the depth gauge rod Each single mark represents 0 10 foot each double mark represents 0 50 foot and each triple mark represents 1 00 foot Depth measurements should be recorded to the closest tenth of an inch e g depth 1 14 instead of rounding down to 1 1 A trick to obtaining the most accurate depth measurement is to line up one s finer with the height of the water as it approaches the rod and place the tip of the finger on the rod that best represents this height 2 Once a depth is observed line up the foot scale on the all 0 7 1 2 FT sliding rod with tenth scale top of the depth kin gauge rod to put the sensor at 0 6 ft down from the height of the water If for example the total depth of the SLIDING ROT LE H water is 2 70 feet then line up the 2 on the foot scale with the 7 on the tenth scale see figure below mim EN
21. ling total fish movement will be calculated using number of fish observed and percent efficiency Only data from complete trap nights e g no debris jams observed the following morning will be used to calculate the total number of trout Resident Fish Population Estimate This assessment will be performed following the same procedures outlined in the 1991 Initial Effects of Stream bank Stabilization on a Small Trout Stream study performed by Water Virgil McClure Macroinvertebrate Sampling This assessment will be conducted in accordance to procedures used by Hydrotech Inc personnel in the 1997 and 2003 macroinvertebrate assessments on Deep Creek See attachment E below for the final report of this assessment which includes detailed description of the protocols used to collect and analyze macroinvertebrate data Revegetation Assessment BCD is currently in the process of hiring a contractor to create a revegetation design for Deep Creek Methods to monitor these sites post implementation will be conducted according to recommendations established in this revegetation plan The protocol for monitoring revegetation will be added to the next modified version 29 Beaver and Redd Counts Equipment and Supplies Notebook and pencil Sampling Preparation Walking entire reach takes several hours and this should be anticipated before heading out into the field If planning on doing the whole length in a single day start early and a
22. n the surveying rod on the stream substrate at each of the distances on the tape calculated in the previous step Collect cross section measurements at each calculated distance as well as major breaks in bed elevation and key features such as 25 right bankfull RBF right water s edge RWE Thalweg THL left water s edge LWE and left bankfull LBF At each distance point station hold stadia rod vertical with the base on the substrate and adjust the rod height by extending or collapsing rod segments until the laser clamp indicates it 1s level with the laser level on the tripod beeping will stop and high pitched tone will remain constant Record the station distance on the tape ft and the corresponding foresight elevation ft at each station on the Channel Cross Section Laser Form Include notation indicating right bankfull RBF right water s edge RWE Thalweg THL left water s edge LWE and left bankfull LBF Note It may be easiest to have one field crew member read the measurements off and the other record the information Flood prone area calculations e Calculate in column Height Depth or Elevation Line 1 Subtract RBF from itself 0 Lines 2 X Subtract RBF from each subsequent foresight measurement e Calculate the average of all values in the Height column average elevation e Calculate the elevation of the flood prone area FPA Step 1 Measure foresight at Max Depth Dmax
23. nticipate taking a full day between 6 9 hours depending on physical prowess to do this assessment Step by Step Field Procedures Enter the stream at the at either the Highway 12 E bridge site and walk downstream to Clopton Lane bridge or vice versa Redds and beaver dams observed should be recorded for the entire length of this reach Post Sampling Efforts Following this assessment data should be transferred to ongoing beaver dam redd excel spreadsheet which computes data to a graph for reporting purposes T C oS TR Tor s Pi een REF E in LL Pid Pe cf Figure 29 Beaver dam on Deep Creek 30 Blank Field Data Sheets Flow field sheet nt VELOCITY LOGIT Y E i 373 iraa Discharge Depth unt BROADWATER CONSERVATION DISTRICT DISCHARGE MEASUREMENT NOTES Sta No _ Comp by Ss Checked by Date 20 Party Area Vel GH Disc Width Depth No Sec Method Method coef Horiz angle Susp Meter Rating for rod or suspension Meter above bottom of weight Tags checked or at established meas section _ Cross section Fw Other Weather Mi F Water temp gt Record removed Remarks at zero flow _ _ 22 5 T bun ggs 36 65
24. ocument Deep Creek Sampling Locations Table On going monitoring sites and their respective monitoring parameter and coordinates Site ID Site Name Latitude Longitude Monitoring Parameter DC U Upper Deep 46 34894 111 13592 Flow Photopoint Creek DC SB Sulphur Bar 46 33049 111 20977 Flow Photopoint DC HP Horse 46 33297 111 26112 Flow Temperature Photopoint Pasture DC CL Clopton 46 3268 1 111 36844 Flow Temperature Photopoint Lane Above 46 29708 111 46201 Flow Temperature Photopoint Broadwater Missouri Canal DC HR 5 46 28514 111 50617 Flow Temperature Photopoint Ranch DC XS 1 TBD TBD Cross section Photopoint DC XS 2 TBD TBD Cross section Photopoint DC X 3 TBD TBD Cross section Photopoint DC X5 4 TBD TBD Cross section Photopoint DC XS 5 TBD TBD Cross section Photopoint DC X5 6 TBD TBD Cross section Photopoint DC XS 7 TBD TBD Cross section Photopoint DC XS 9 TBD TBD Cross section Photopoint DC XS 10 TBD TBD Cross section Photopoint DC CL HWY12 46 32669 111 36868 Redd Beaver dam count Redd Beaver reach through 46 32465 111 29332 DC HR FISH 46 28479 111 51181 Juvenile Out migrant trout Above Montana Ditch count DC R FISH Reiders 46 30334 111 44510 Resident trout count Table 2 HUC codes for all streams included in this study Figure 2 Location of Deep Creek flow monitoring sites Deep T Upper Deep Creek
25. ou pass the FIRST bridge crossing Walk down to stream and measuring cross section should be immediately visible just below the bridge 14 Figure 19 Standing bellowing stilling well and measuring cross section looking upstream Figure 20 Aerial image of stream site parking spot immediately adjacent credit Goolemaps Navigating to the site The Hahn Ranch site is located off of Highway 287 heading south away from Townsend The pull off is about 2 miles from town and is the FIRST left turn after Deep Creek is crossed note watch for sign and slow down road is inconspicuous Follow road down either left or right for about mile Park parallel to the first gate you see and head through that gate to access site Measuring cross section about 100 feet above conspicuous stillingwell site in green wooden box 15 Sampling Schedule 2015 2020 Flow will be monitored at all nine flow sites and temperature at priority sites HP CL BM and HR at monthly intervals during the field season Cross sections at 10 sites TBD and beaver dam redd counts will be completed once annually All three fish assessments will be completed at least twice and the macroinvertebrate assessment at least once 2020 2015 Flow and temperature measurements will continue to be collected monthly at two priority sampling sites CL BM and HR flow monitoring at the Horse Pasture site is abandoned by Forest Service
26. perate both the flow meter and measuring rod Below are simple instructions for using this equipment Operation of FLO Mate A Marsh McBirney FLO Mate or Hach950 flow meter will be used to measure stream velocity at the established flow cross sections These units work by taking instantaneous velocity measurements and averaging them over a Set period of time When you receive the unit the averaging time should be set to 40 seconds If flow sensor 15 not already attached to measuring rod secure it on to the bottom of rod This measuring rod will accurately place the sensor at the proper depth within the stream for accurate collection The procedures for using the meter are shown below followed by the step by step procedures for operating the meter with the measuring rod pg 24 aA A A SOFTWARE x VERSION DRS PLAY LOW BAT SEC IB bie H H PIS HEHCRY Tes CON LOST M s DISPLAY PERIOD VELOCITY OUT PUT FTS DISPLAY PERIOD Figure 21 Depiction of Marsh McBirney FLO mate screen Hit the ON C button once to turn on or clear meter during use The unit display will immediately begin averaging by showing the horizontal time bar under the velocity output The time bar provides an indication as to the amount of time left until the display is updated At the end of the averaging period record the value indicated in the velocity column on the
27. the same location in the stream each year In addition the Hobos should be placed so that they are maintained in the main flow of the stream and lie in an area shaded by vegetation Detailed instructions on deploying and protecting the Hobo data loggers can be found in the Onset Hobo Temp Pro V2 manual and will be followed for the duration of this monitoring program http www onsetcomp com files manual_pdfs 10366 F MAN U22 001 pdf Step by Step Field Procedures Hobo data loggers collect data continuously and thus do not require field data collection See the section below for how to retrieve data from Hobo units Post Sampling Efforts Data will be downloaded from Hobo data loggers at least once annually at the end of the field season Retrieving and downloading data will be done according to protocols laid out in the Onset Hobo Temp Pro V2 manual above Equipment Maintenance and Calibration Hobo data loggers will be calibrated immediately before deployment in the field and upon retrieval following the procedures listed in the Onset Hobo Temp Pro V2 manual above 27 Photopoints Photopoints at will be taken in conjunction with flow monitoring and cross section assessments It is essential that photos are taken according to the procedures listed below to ensure that they exactly replicate previous photographs for drawing comparisons The following procedures are adapted from the Standard Operating Procedures of the Madison Stream

Download Pdf Manuals

image

Related Search

SOP sophia learning sophie cunningham sophos sophia loren sophie turner sophie raine sop meaning sophia bush sopranos sophie thatcher sophia hutchins sophie nyweide sophisticated sophomore sophos central sophia rain sopranos cast sophie raine spiderman sophia learning login sophie cunningham wife sophos connect sophie cunningham injury update sophie raine spiderman full video sophisticated backpacks sophisticated core

Related Contents

Chief Manufacturing CTA-225 User's Manual  Cisco UCS C200 M1 High-Density Rack-Mount Server  

Copyright © All rights reserved.
Failed to retrieve file