Home
        SOTM User Manual
         Contents
1.   e   Arduino 1 6 3   o PNT_Control ino  e Visual Studio  o opencvObjectTracking sin     main cpp    Required Documents  e  Assembly docx    Required Equipment  e Acomputer  Windows OS with Arduino Visual Studio programs   e USB to micro USB  Male to Male  cable  e USB to mini USB  Male to Male  cable  e SOTM Box  e Camera    Powering Up and Calibration  The system must first be fully charged and powered on to begin usage  See Charging the System section  for how to fully charge the system      1  Once fully charged  the SOTM box should be placed in vehicle stand  or in a mobile environment  where the GPS antenna has a full view of GPS satellites    2  Pressthe Power switch  blue button located on the front side of the enclosure   and ensure that  this switch is locked in    3  Allow up to 2 minutes for the Geo PNT to initialize and receive its current positioning data    4   Optional  If it is determined that through usage of the SOTM box  the GPS antenna might be  out of view of the GPS satellites at any time during the run  a calibration of the inertial  measurement sensors is required  To perform this calibration  follow these steps    a  Pointthe vehicle due North within 2 degrees    b  Begin driving North and make a 90 degree turn in the West direction  and begin driving  in a square as indicated in Figure 1    c  The next turn should be another 90 degree turn in the South direction  likewise then  another 90 degree turn in the East direction  and finally back to where 
2.   t  will begin the tracking and display the error of the object being tracked on the  input video  Due to the nature of this application  it will need modification for any new video that error  measurement is to be performed on     Charging the System   There are essentially two batteries that require attention in the overall system  There is one  12V   battery that provides power to the Geo PNT  microcontroller  when running inside the enclosure   and  the motorized camera mount  On the backside of the enclosure  there is a charging port  Plug the male  end of the charging adapter into the port  and plug the other end into a standard 120V   wall outlet   Figure 2 shows this connection  and the subsequent charger required     SATCOM On The Move User Manual  Page 5 of 6    Charging Port          Figure 2  Charging Port Location and Required Charger    This 12V   battery should be able to provide the system with enough power for up to 5  hours of  continuous use  The battery status is indicated on the front side of the enclosure in the    window     Full  bars indicate that the system is fully charged  while less than 2 bars indicate the battery is nearly  depleted  Figure 2 shows the battery status indicator  A full re charge of the battery requires 8 hours        Figure 3  Battery Status Indicator    The second battery is within the camera and should be charged based upon the User Manual provided  from the camera manufacturer  Samsung  Model HFX90   It can simply be charged 
3. SATCOM On The Move User Manual    For the SOTM RIT Project       SATCOM On The Move User Manual  Page 1 of 6    Table of Contents     sj amp gero P  eis o a cease scsi CEP  Required  Programs      ied eb ee ened esate to tese eee redeat ee  Required Documents  ecrire ettet aa arde ecc ne Rede 20 sd esu nep edi eere a ea eva edER e Dea gea de ERO a RE dU  Required Equipment           c cccccccesssssssececececesseseaececececeesesaeaeeeeeceseessuaeseseessecsessaaesesecusecseaaeaeceesesseeseaeaeeeeeens   Powering Up and Calibration           ccccccccccccsssssesssecececessesesnsseeeeecsssssesaeaeeeeecessesaaeaeeeeecesseseaaeaeeeeseesseseaaeaeesesens    Gisela c                   M      R    X   Calibrate th   Geo PNT opiriias rom etre tenen n nece peus p ex Pu yt puse en M RE e eu ERES AERE RE e SER RR x E LER Ree etna E aah   Jig e                                                                GPS Loss Error TeSt aiita                            P        Copy Vid  o from Gamie  ra       ete cede a ea aaae aaar ae a EEEE a EE Rd Tn eet   Run Through the Error Measurement Program          ccccssssssccececessesennececececesseseaaeaeceeecesseseaaeaeeeeecesseseeaeeeeeens    Charging the System edite te eve eite ege tvi epit esiti pe eset et epe etes peine vestes    SATCOM On The Move User Manual  Page 2 of 6    Introduction  This document explains the usage of the SOTM box  The purpose of the SOTM box is to direct the mount  to point towards a given ECEF location     Required Programs
4. he  Upload Done   message at the end of the process  the microcontroller can  be disconnected  Reconstruct the Box starting at section 2 1 39 according to the Assembly procedure     Calibrate the Geo PNT   The Geo PNT has very specific requirements as a startup sequence  This calibration procedure requires a  perfectly rectangular section of road that lines up with North  South  East  and West  It must be fairly  large and it helps if sections of the road are sloped     1   2   3     Place the Geo PNT into the vehicle according to section 3 3 3 of the Assembly procedure   Drive the vehicle to point North at the South East most point in the rectangle    Start the Geo PNT and wait 15 20 seconds for the Geo PNT to finish its internal start up  procedures     SATCOM On The Move User Manual  Page 4 of 6    4  Begin to drive the vehicle and drive clockwise through the rectangle in a N E S W pattern   a  Continue the pattern for 7   10 loops  depending on the size of the rectangle   5  At this point the system should be fully calibrated and pointing in the right direction     Error Test   Start the camera by pushing the On Off button and open the lens by toggling the lens cover switch   Once it has finished turning on  indicated by a live display of the camera   s point of view   push the red  record button  Drive around the focus point until there is sufficient video from which to extract data   Stop the camera recording by pushing the red record button again  Turn off the camera b
5. via standard USB to    Mini USB cable  Plug the Mini USB cable end into the camera  and the standard USB end into a  5V wall  charger     SATCOM On The Move User Manual  Page 6 of 6    
6. y pushing the  On Off button and toggle the lens cover switch to protect the lens     GPS Loss Error Test    Start the camera by pushing the On Off button and open the lens by toggling the lens cover switch   Once it has finished turning on  indicated by a live display of the camera   s point of view   push the red  record button  Disconnect the GPS antenna and indicate when the disconnection happened on the video  for reference  Drive around the focus point until there is sufficient video from which to extract data   Stop the camera recording by pushing the red record button again  Turn off the camera by pushing the  On Off button and toggle the lens cover switch to protect the lens     Copy Video from Camera   Connect the camera to the computer using the mini USB cable  Once the drivers have completed  installing  the video files are readily available from the    My Computer    folder  Open the camera storage  and find the latest videos  Copy them from the camera to the computer and delete them from the  camera     Run Through the Error Measurement Program    Load up the OpenCV error handling environment in Visual Studio  Load the custom developed error  tracking tool  opencvObjectTracking sIn   Modify line 126 which states  capture open  movieFile mp4     and change    movieFlle mp4    to the video file you wish to test  Then run the error measurement  program through the debug tool  shortcut f5   Pressing  d  will open 3 4 tracking windows and other  information  Pressing
7. you started with  a final 90 degree turn in the North direction    d  Continue this square pattern through 4 to 6 loops to ensure the queue within the IMUs  is filled with valid N W S E data     SATCOM On The Move User Manual  Page 3 of 6              Southi       REYNOLDS DRIVE                      Figure 1  Example Square to be Driven  RIT Campus Parking Lot H     Choosing a Point    There are many ways to choose a point  It must be in ECEF for the Arduino program to use and the  microcontroller must be reprogrammed     1   2   3     Choose a point in ECEF   Open the PNT Control ino file with the Arduino program   Edit line 27 to set the variable  focus  to the point at which to direct the mount  a  Ex  double focus      996455   4557908  4334643      Ellingson Estimation  b  Alternatively  comment out the line  place      in front  and copy over a new line like  the one above to save those coordinates for later use   Remove the Serial shield from the microcontroller while it is not powered  Connect the microcontroller  the programming port is the one closest to the power connector   to the computer and install the drivers if it is the time connecting  Set up the Arduino programmer to connect to the microcontroller  a  Click  Tools      Board      Arduino Due  Programming Port    b  Click  Tools   gt   Port   gt  COM    where    stands for the com port the Arduino is  connected to   Click  File      Upload  to transfer the program onto the microcontroller  After receiving t
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
2 - University of Phoenix  カタログ<表> (PDF形式ファイルをダウンロードします  Manual de instalação Pivo Quad  取扱説明書(基本編)|カメラ付 お留守番チェッカー  取扱説明書 - 日東工業株式会社 N-TEC  DUSK-TO-DAWN METAL HALIDE LIGHT  8.26MB - Kyosho  aCMM-2000 - powerbridge.de    Centrosolar Powerstocc XXXX Excellent Indoor Installation Manual    Copyright © All rights reserved. 
   Failed to retrieve file