Home
Clover 1s Technical Manual
Contents
1. Fill Valve amp Nozzle Hose Outlet Valve Hose Connections RevA Clover 1s Technical Manual 29 Platen amp Brew Group Assembly cont 5 Remove the six hex screws that secure the platen to the ee chassis Use a 5 16 Allen key to loosen the screws Two located next to the front panel The other four screws are located one either side of the rear chassis pillars 6 Lift the front of the platen up from the chassis Use a block for example a small 2X4 block to hold the platen up and remove the serial cable from the rear of the user interface If the unit serial number is 064 see pg 31 7 Lift the platen and brew group straight up until the brew bottom clears the top of chassis Slide the platen and brew group assembly to the left out of the chassis Ensure the wiring harness for the brew group does not catch and break 8 Carefully set the assembly down it can be set down vertically resting on the bottom of the brew motor The assembly will be top heavy so only set the assembly in this manner if there is little chance that the assembly will be knocked over The safer solution is to lay the assembly top down on to a soft surface resting on the nozzle This will make it easier to remove the brew group from the platen Reinstall the platen to the chassis in the reverse of removal It may be necessary to s
2. bit drive is used to remove the inside screw 1122 Solid State Relay SSR WA 11 The SSR is an electronic switch that follows commands from the PCBA to control the boiler heating elements To remove the SSR LA 1 Turn off the machine and disconnect from power 2 Remove the right side panel 3 Remove the SSR and heat sink attached to the chassis with two 10 32 1 Phillips head screws It is easiest to use a stubby screwdriver remove the top fastener and only loosen the lower fastener 4 Remove the cables from the SSR Note that the VDC 9 signal wires are colored the red always goes to positive and the black to the negative A2 on the SSR 2 2 122 12 12 12 SSR Wiring amp Heat Sink Motor Driver The motor driver Gecko Drive translates commands from the PCBA for the motor To remove the motor driver 1 Turn off the machine and disconnect from power Gecko DRIVE 2 Remove the right side panel 3 Remove the motor driver attached to the chassis with two 6 32 x Phillips head screws The motor driver is located above and to the right of the PCBA 4 Carefully remove the motor driver wiring harness do not mix up the terminal sequence Note that there is a ground wire from the motor driver power ground terminal to the 000000000000 chassis To
3. Flow Meter Bracket Screws 26 Clover 1s Technical Manual Plumbing Assembly cont Flow meter The flow meter measures the volume of water going into the coffee chamber to ensure the correct volume of water is dispensed The flow meter measures the water volume by counting the revolutions of the magnets attached to the impeller which spins inside the flow meter body as water is flowing The magnets are counted as pulses by the flow meter field the flow meter top These pulses are read by the PCBA each pulse corresponds to a set volume of water When the correct number of pulses has been counted for the volume desired the PCBA commands the Fill Valve to de energize stopping the water flow into the coffee chamber To check the flow meter field 1 Disconnect the flow meter connector from the PCBA socket J9 2 Set a digital multi meter to ohms and check the reading between the red and green wires at the connector If the reading is 2 2 kilo ohms 10 the flow meter field is good If the flow meter cable is disconnected or broken or if the flow meter field has failed the PCBA will not receive pulse signals from the flow meter When this happens the fill valve will stay open allowing more than the desired volume of water to enter the brew chamber until the fill sequence times out and 206 Water Failure error is displayed If the flow meter field fails it is recommended that the field the impellor and the o
4. Information in this technical manual is subject to change without notice 2006 The Coffee Equipment Company All rights reserved December 2006 P N 010 0012 01 Rev A The hot surface within a triangle alerts you to the presence of a heated area that may be dangerous to the touch The exclamation point within a water droplet indicates that hot water will dispense from the nozzle when the brew button is depressed constituting a burn hazard Rev Introduction The Clover 1s The Clover 1s is the world s first commercial single cup brewer built to meet the demands of today s high quality coffee retailers Clover 1s makes exceptional brewed coffee by the cup in under a minute and opens up new possibilities in a retail environment The Clover 1s brews any coffee fresh and exposes customers to an entire coffee menu It creates a higher value coffee experience for brewed coffee Single origin coffees can be featured easily and cost effectively The Clover 1s gives the barista unprecedented control in achieving the desired result a cup that repeatedly exhibits the same qualities and subtle characteristics found in the 5 cupping room Our innovative technology borrows the best of two time honored brewing techniques the press pot and the vacuum pot Like a press pot Clover 1s mechanizes the filtration process to control contact time independent of dose grind size and filter density And like a vacuum pot Clo
5. Clover 1s Technical Manual This manual 15 intended for use by Certified Clover Technicians Any use by Unauthorized personnel may void warranty and constitute a safety hazard Please contact our service department with questions 866 298 7203 Rev clover Clover 1s Techincal Manual CONTENTS Symbols 4 Introduction 5 Site Requirements 6 First Time Startup 7 Subsequent Startups 10 Machine Views 11 Piston Assembly 17 Boiler Assembly 21 Plumbing Assembly 25 Platen amp Brew Group Assembly 28 Outlet Assembly 33 Right side Components 34 User Interface Information 37 Appendixes 43 4 Clover 1s Technical Manual Symbols Carefully read all text marked with the hazard symbols below for your own safety and to avoid invalidation of the warranty A The exclamation point within a triangle indicates a potential for property damage personal injury or death When visible on hardware this symbol alerts you to the presence of important operating servicing or maintenance instructions in the literature accompanying your Clover 1s The lightning flash with arrowhead symbol alerts you to the presence of uninsulated dangerous voltage within the Clover 1s enclosure that may be of sufficient magnitude to constitute a risk of electric shock This manual also includes notes to expand your knowledge of your machine The pencil symbol highlights information that will help you make better use of your Clover 1s A
6. The boiler must always be filled when the machine is being operated The boiler does not need to be filled every time the Clover is started however if the boiler is drained the boiler must be filled again prior to use See Normal Operation on page 9 in the User Manual revision D Once the Clover has run its startup sequence and begins to heat up it should come to temperature in less than five minutes RevA Clover 1s Technical Manual 9 10 Clover 1s Technical Manual Subsequent Startups Each time the machine is turned on the Clover 1s will display the following prompt Once the First Time Startup procedure has been performed see above the boiler will remain full until it is purposefully drained The boiler does not need to be filled every time the Clover 1s is started In most cases the answer to this prompt will be 4 The boiler must always be full when the machine is being operated If the boiler is drained e g to move the machine it must be filled again prior to use or severe damage will occur If you are aware that the boiler has been drained select 4 the piston is not already at the bottom of the coffee chamber it will begin moving downward and the display will read on Moving Once the piston reaches the bottom of the coffee chamber the fill valve will open and the machine will display the prompt Ts Dispensin Wait until water begins to dispense f
7. 092 O gt gt 2 YAUN TOO 00 40 0 8 RevA 7 Machine Sub States Brew 8 Clean Clover 1s Technical Manual 49 The Error Log contains the date time and a set of numbers representing the machine s state and sub state at the moment the error occurred This log provides valuable information to the technician for troubleshooting purposes For example if an E 1 Piston Failure error were to occur one would see the date and time of the failure as well as the following 01 04 These numbers represent a possible State 01 and Sub state 04 State 01 indicates the machine was somewhere in the process of brewing Sub state 04 indicates that the piston was in a downward motion at the moment the error occurred Brew Sub State Description Determine whether or not to bypass brew cylinder purge Wait for piston move down to valve pulsing position Pulse valves to remove waste from brew cylinder Set valve state and start piston move down to bottom of brew cylinder Wait for motor move down to bottom of brew cylinder Wait for water to reach brew temperature if not there already Pause before dispensing hot water display burn hazard warning Setup hot water dispense Wait for flow meter to reach target volume Wait for brew timer to elapse Wait for brew button press only used if initial filtration is paused Re
8. 65550000206 0000000 e 1904 101035 0000 0000 ves 591136 JYVANYIJ 13538 2 com 58145 40 A 8 a 3 3L3NM014 000 1013 ceg 2 Juve 01 5 Toon 1 oie ooog boon 185 _3uvdS peas a 10000 0000 000 1555 2 2 195 Buiquinig A quassy 1908 maig youMs AOE 0 0 092 0 103014 asny Aejay N s enos 10 9000 669 Toon FI qon t AGH COFFEE COMPANY 5 Pueg Area nno suo1 2 uuo peog S 134019 0116 9339 Rev A 48 Clover 1s Technical Manual Appendix 6 Machine States software version The Error Log contains the date time and a set of numbers representing the machine s state and sub state at the moment the error occurred This l
9. Setup boiler fill ourge cycle 3 Execute boiler fill ourge cycle 3 Display Is Boiler Filled question normal startup screen Wait for response to Is Boiler Filled question Move piston to bottom of brew cylinder Open fill valve and display Is H20 Dispensing question Wait for response to 15 20 dispensing question Show Activating Boiler message Activate heaters and go to startup state 098 RevA
10. 05 03 02 01 04 One way Valve The one way Valve ensures the proper directional flow of water 05 Flow Meter The flow meter regulates the amount of water dispensed The flow meter measures the water volume by counting revolutions of the magnets attached to the impeller within it see pg 26 06 Expansion Valve The expansion valve is set to 60 psi It allows pressurized water to escape from the boiler as necessary See pg 27 07 Copper Tubing Flare fitted copper tubing is used for the expansion valve outlet and boiler inlet fitting 16 Clover 1s Technical Manual Clover 1s Platen amp Brew Group The platen amp brew group are attached and constitute a single unit mounted on the chassis See pg 28 01 Brew Group The brew group consists of the brew motor piston rod piston brew chamber and associated parts See pg 28 See pg 28 02 Limit Switch Bracket The limit switch bracket can be adjusted to change the height limit setting for the piston assembly See pg 19 03 Heat Blanket The heat blanket surrounds the brew chamber providing a set temperature to ensure a stable brewing environment 04 Platen The stainless steel platen incorporates the nozzle and cutouts for the user interface piston and grounds chute 05 Brew Motor Assembly The brew motor assembly consists of the brew motor motor frame piston rod and limit switch bracket It is remova
11. Plumbing Assembly Removal of Plumbing Assembly In general it is best not to remove the plumbing assembly remove it only if a component is broken or if there is a leak that cannot be repaired while it is in place It is necessary to first remove the boiler so that the plumbing assembly can be maneuvered for removal 1 Disconnect the flow meter wiring cable J9 from the PCBA and feed it through the port Disconnect the expansion valve tube from the Plumbing assembly Tee Remove the nut securing the bulkhead adapter to the floor of the chassis Take care not to lose the bulkhead spacer Remove the two Phillips head screws that secure the flow meter bracket to the chassis Now lift the plumbing assembly and out of the chassis Lay the plumbing aside in a safe place it is now ready for repair Reverse the order of the steps above to reinstall the plumbing outlet Be sure to reconnect the flow meter cable to the PCBA RevA Clover 1s Technical Manual 25 FLARE NUT _ COPPER TUBING Disconnecting Expansion Valve from Plumbing Assembly BULKHEAD FLOW METER BRACKET SCREWS 25 8 Plumbing Assembly Bulkhead Nut 1 2 5 O
12. drawn through the upper most grommet on the left side The front panel and the outlet manifold may now be repaired and the main power switch expansion valve and outlet valve discharge are accessible 4 Reinstall in reverse order ensure the outlet tube is fed through the grommet hole on the left side Outlet The outlet is what guides the coffee from the brew chamber into the cup without making an unnecessary mess The outlet is comprised of two sub assemblies the manifold and the nozzle Outlet Manifold The outlet manifold is attached to the splash guard with four 6 32 nylok nuts The coffee enters the manifold from the fitting on top and is distributed by the pressure from the brew chamber and by gravity to the outlet nozzle There is an o ring to seal the gap between the two components this o ring should be replaced every 6 months It is best to use a bit of food grade lube on the o ring when the outlet nozzle is removed from the manifold as this will ease installation and removal Outlet Nozzle The outlet nozzle consists of two main components the outlet and the deflector vent assembly The deflector ensures that the coffee dispenses gently The vent ensures that the coffee is not restricted in its path if the coffee finds restriction in the outlet it will create back pressure into the coffee chamber The deflector is sandwiched between two standoffs with an o ring at the bottom to seal the vent port The outlet nozzle shou
13. interface between the PCBA and the motor See pg 35 RevA 02 01 04 Piston Assembly The piston assembly sits on top of the piston rod Along with the outlet valve and motor the piston assembly is the principal mechanical component respon sible for vacuum creation See pg 17 05 Fuses The fuses protect the PCBA against damage due to overload The lower fuse protects from piston motor electrical system problems 06 Motor Transformer The motor transformer adjusts the incoming voltage to the appropriate level for the Motor 208 to 28VAC 240VAC to 24VAC 230VAC Euro to 36VAC See pg 35 07 Machine Badge The machine badge displays relevant regulatory information and the machine serial number 08 Power Cord The power cord carries power from the wall to the main power switch The main power switch when off allows no power into the machine When the main power switch is in the on position power is allowed through the switch and to the wiring harness See pg 6 14 Clover 1s Technical Manual Clover 1s Rear View The rear panel is secured to the chassis with four 2 Phillips head screws The rear panel mounting screws are only accessible after removing the side panels 05 06 01 Boiler Drain Valve 03 Resistive Thermal Detector RTD The boiler drain valve opens the boil
14. o ring on the screw The o rings help prevent vacuum loss and leaks The Teflon piston seal seals the piston on the cylinder walls Do not scratch the Teflon surface do not use abrasive substances or devices to clean the seal It is best to use a clean bar towel The elastomer seal presses out on the Teflon seal to ensure it is snug against the cylinder walls and provides a seat for the filter so that grounds do not get under the filter Piston Removal If anything is being done to the machine that will involve removing the brew group it is best to remove the piston before shutting the machine off See pg 36 for user interface information 1 Enter the Basic Settings menu find and select Move Piston sub menu RevA Clover 1s Technical Manual 17 18 Clover 1s Technical Manual Piston Assembly cont 2 Find and select lt Eject gt The piston will rise above the platen top Piston A Caution the piston may be very hot 3 Gently turn the piston counter clockwise Once the piston is completely unthreaded from the piston rod lift the piston up and set in a safe place Ensure that the piston is set aside so that the filter and the umbrella valves are not damaged 4 Remove the o ring located on the top of the piston rod set it in a safe place preferably with the piston so it is not lost Reinstallation To reinstall the piston 1 Enter Basic Settings menu 2 Select Move
15. possible State 01 and Sub state 04 State 01 indicates the machine was somewhere in the process of brewing Sub state 04 indicates that the piston was in a downward motion at the moment the error occurred For a full listing of the States and Sub states see Appendixes 6 8 RevA Appendix 1 Suggested Tool List 2 screwdriver 2 PH screwdriver stubby 1 PH screwdriver 3mm flathead screwdriver 5 8 combo wrench 9 16 combo wrench 4 combo wrench 7 16 combo wrench 3 8 combo wrench e 5 16 combo wrench 8 inch adjustable wrench 6 inch adjustable wrench 9 16 flare nut wrench Pliers Needle nose pliers Diagonal cutters Vise grips or equivalent Pliers arc joint Wire stripper wire size 22 10 Wire connector crimper Flashlight Small mirror Dental pick set Teflon tape 1 2 widths RevA Clover 1s Technical Manual 43 Electrical tape 1 4 socket wrench set standard w ratchet driver and extension deep socket would be helpful as well Hex Allen head wrench set standard especially the 5 32 1 1 2 socket and ratchet for heating elements this refers to socket not the driver Small file Fine grade emery cloth Pipe cutter Flare tool Pipe bend tool Level Food grade lubrication Scotch brite Mechanix gloves thermal protection Lint free cloth Snap ring pliers internal and external Thermometer p
16. re install reverse the sequences above Motor Driver Gecko Drive Rev A 36 Clover 1s Technical Manual Right side Components cont Electrical Components Following is an explanation of the Clover 1s electrical system 1 The Power Cord carries power from the wall to the Main Power Switch The main power switch when off allows no power into the machine When the main power switch is inthe on position power is allowed through the switch and to the wiring harness 2 The wiring harness carries power from the switch to a The PCBA b The heating elements through the solid state relay 3 The PCBA in turn carries power to the majority of the machine s electromechanical components a The motor transformer b The motor driver Gecko Drive c The fill and outlet valves d The RTD e The heat blanket The motor transformer steps the wall voltage from 208 240VAC down to 28VAC for the brew motor 4 The solid state relay receives a 5 VDC signal from the PCBA When the SSR receives this signal from the PCBA it closes completing the circuit from the switch to the heating elements When the circuit is complete the heating elements in the boiler will be energized causing the water to heat 5 The heating elements draw 4 500 watts They should never be activated without the boiler being filled DIP Switch settings DIP switches are used to override normal operation The following four DIP switche
17. ring be replaced Avoid replacing the entire flow meter This requires extensive disassembly of the plumbing assembly increasing the risk of leaks Flow Meter RevA Plumbing Assembly cont Expansion Valve The expansion valve allows an escape route for pressurized water as it is heated The expansion valve is set to 60 PSI It is necessary to remove the front panel to access the expansion valve s fitting The expansion valve is set at the factory and is subsequently Loctited However it may become necessary over the course of a machine s lifetime to reset the expansion valve It is best to have the boiler cold to set the expansion valve If the expansion valve is set too high the fill valve will not open due to excessive pressure holding the fill valve plunger against the valve seat this will result in an 206 Water Failure If the expansion valve is set too low the unit will not heat properly Adjusting the Expansion Valve To adjust the expansion valve 1 Turn the machine off 2 Remove the side panels and the rear panel 3 Locate the boiler drain and remove the barbed fitting 4 Connect a pressure gauge to the ball valve fitting It is necessary to have a two inch nipple to clear the chassis The fittings are 4 NPT Use a pressure gauge the measures at least 80 PSI 5 Open the ball valve 6 Turn the machine on and follow the normal procedures for start up 7 As the machine heats up adjust the
18. the bot tom of the Brew Chamber The Outlet Valve is attached to the Brew Bottom the piston rod runs through it See pg 19 03 Heat Blanket The heat blanket surrounds the brew chamber providing a set temperature to ensure a stable brewing environment See pg 28 04 Platen The stainless steel Platen incorporates the Nozzle and the entire Brew Group The Platen is removable from the Chassis for maintenance See pg 28 05 Outlet Valve The three way outlet valve is an electro magnetic valve that controls the vacuum and dispense elements of the brew cycle See pg 31 06 Brew Chamber Motor The motor drives the piston up and down in the brew chamber See pg 30 07 Waste Outlet The waste outlet allows for coffee water to exit the machine to the appropriate drain See pg 7 RevA Clover 1s Right View Risk of electric shock when dealing with electronic components 04 Clover 1s Technical Manual 13 03 01 Solid State Relay SSR The SSR controls the heating elements in the boiler When the SSR receives a 5 VDC signal from the PCBA it closes completing the circuit When the circuit is complete the heating elements energize heating the water See pg 35 02 PC Board Assembly PCBA The PCBA manages the computing and interfaces with each of the mechanical components See pg 34 03 Gecko Drive The Gecko drive is the
19. 1 Phillips head screws that secure the motor frame to the brew bottom manifold 5 Gently pull the motor straight away from the brew bottom manifold taking care not to damage the self loaded seals Set the motor assembly aside 6 Remove the brew bottom manifold from the platen cylinder by removing the four 10 32 x 1 Phillips head screws Set the brew bottom aside in a safe place The brew bottom manifold is easily damaged if dropped Note the o ring If the piston is in the coffee chamber 7 Remove all 8 screws that secure the motor and the brew bottom to the brew cylinder Removing Outlet Valve from Brew Bottom 8 Gently pull the motor and brew bottom from the cylinder Be sure to pull the assemblies straight away from the cylinder 9 Once the motor assembly brew bottom and piston are removed the piston can be removed from the piston rod and set aside The brew bottom may subsequently be drawn off the piston rod Reassembly may be accomplished in the normal sequence Follow these steps in reverse order for re installation RevA Platen amp Brew Group Assembly cont Outlet Valve The outlet valve like the fill valve is a electromagnetic valve however the outlet valve is a three way valve First the outlet valve closes the exit from the brew chamber creating the vacuum needed for extraction Second this valve links the brew chamber to the coffee outlet Third it allows excess liquid to drain through the
20. Basic Settings Menu by pressing the rotary knob Advanced Settings Menu The Advanced Settings Menu gives you further customization options and control to create the perfect cup of coffee as well as the ability to track use and error codes Enter the Advanced Settings Menu by pressing the rotary knob Exit 1 at any time by pressing and holding the rotary knob Machine Units This parameter allows the Clover 1s operator to view drink sizes and brew water temperatures in metric terms centiliters and degrees Celsius Press the rotary knob then select 4English Foz or Internat C cL by turning and then pressing the rotary knob Wipe Alert Beeper This controls whether the Clover 1s will remind the user to wipe spent grounds from the filter Screensaver Start This parameter allows the barista to turn the screensaver on or off and select how much time elapses before the screensaver starts Dial the time down to zero to turn the screensaver off The factory default is 8 minutes When active the screensaver displays CLOVER Coffee and the current time Cylinder Set point This sets the temperature for the heat blanket that is wrapped around the coffee chamber to maintain heat The temperature is adjustable from 130 to 180 Fahrenheit in 5 degree increments The factory default is 175 F Next Cup Settings This parameter contains the settings for what drink size and brew time will display automaticall
21. Piston 3 Select Eject The piston rod will move to the eject position 4 Replace the o ring 5 Carefully thread the piston on to the piston 5 threaded stud 6 Select Top the piston will move to the top position Disassembly To disassemble the piston assembly 1 Loosen the 6 self sealing screws on the bottom side of the piston 2 Lightly tap the self sealing screws this will break the filter assembly away from the piston base 3 Remove the 6 self sealing screws entirely 4 Remove the filter from the piston base and set aside ina safe place Do not allow the filter to be damaged 5 Pull the seals away from the piston base and set aside safe place Do not allow the seals to be damaged If necessary gently pull the umbrella valve from the piston base Reassembly To reassemble the piston assembly 1 Insert the 3 umbrella valves into the piston base Piston Rod O ring Location RevA Clover 1s Technical Manual 19 Piston Assembly cont 2 Place the Teflon seal around the edge of the piston base 3 Place the elastomer seal between the inside diameter of the Teflon piston seal and the piston base 4 Place the filter on the top of the piston base aligning the threaded inserts on the bottom of the filter with the corresponding depressions on the top of the piston base pressing it down so that it fits snuggly inside the elastomer seal 5 Ensure the elastomer seal is le
22. a starting point for acceptable water However due to the incredible variability of water quality from region to region comprehensive water specification is not possible Generally water must be free of particulate and organic matter Other basic parameters can be tested using commonly available water test strips Verify that the water is free of chlorine Note pH alkalinity and total hardness The following chart shows an acceptable range of total hardness alkalinity for various levels of pH pH 6 8 hardness alkalinity 190 500 pH 7 2 hardness alkalinity 120 300 pH 7 8 hardness alkalinity 90 175 If the water does not test within this range unexpected problems with the water and coffee systems may occur and mineral build up may result It is our experience that water with total hardness between 75 and 150 ppm will produce coffee with the most pleasing flavor profile Substances that may not show up through basic testing but are known to cause problems include but are not limited to silica barium sulfate algae chlorides etc When in doubt the Coffee Equipment Company can provide the names of labs that can conduct more extensive water testing The Coffee Equipment Company does not take responsibility for any damage loss of use or diminished performance resulting from water quality problems Power The Clover 1s requires 208 240VAC single phase 20 amp service It is recommended that the serv
23. best 3 Move Piston This parameter leads to a sub menu where the Clover 1s user can move the piston Press the rotary knob to enter the Piston Move sub menu To exit sub menus press and hold the rotary knob There are five actions that can be taken in this menu View actions by turning the rotary knob then select an action by pressing the rotary knob a To Jog This action moves the piston up or down by turning the rotary knob Turning the rotary knob clockwise will move the piston up turning counter clockwise will move the piston down Use this action to reinstall the piston after ejecting it Press the rotary knob to toggle back to the Piston Move options b Top This action will move the piston to the top position in the coffee chamber where the piston is flush with the platen RevA User interface Information cont Bottom This action moves the piston to the bottom position in the coffee chamber Eject This action moves the piston out of the coffee chamber for piston removal Unscrew the piston counter clockwise to remove After servicing and reinstalling the piston select to return the piston to its flush position Exit This action will exit the user from the Piston Move sub menu Advanced Settings This parameter allows the user to enter the Advanced Settings Menu by pressing the rotary knob See Advanced Settings Menu Exit Settings This parameter allows the user to exit the
24. ble from the brew bottom platen See pg 28 06 Brew Motor The brew motor is not a component serviceable by the technician RevA Piston Assembly Components The piston assembly is made up of the following components 1 Umbrella valves 2 Self sealing screws 3 Piston base 4 Teflon seal 5 Elastomer seal 6 The filter The umbrella valves are a type of one way check valve They have a nub which holds them in place and acts as a plunger limit They mate along the bottom of the piston base when there is no vacuum to draw them away from the piston base surface they maintain a seal allowing no liquid to escape the well in the piston base The piston base is made from stainless steel The bottom side is a flat surface with a threaded hole in the center where it is fastened to the piston rod The top interior has three wells at the bottom of each of these the umbrella valve s ports and mount holes are found The center hole in each well is the mounting hole through which the umbrella valve stem is installed The filter keeps the coffee grounds from entering the cup determines the clarity of cup and affects brew time The factory default filter mesh is a 70 micron filter There are two other mesh sizes of filters the 40 micron tighter mesh and the 100 micron looser mesh The filter is secured to the piston base by six 6 32 x Phillip head self sealing screws These are easily recognizable by the orange
25. both directions to change values and pushes to change selections If the Ul requires maintenance the entire assembly must be replaced On serial numbers 064 forward the UI is mounted similarly to a car stereo face plate To remove the UI 1 Remove the rotary knob from the encoder and locate the locking screw 2 Twist the locking screw counter clockwise 1 1 2 turns to reset the locking mechanism 3 Lift the right side of the UI up 4 Pull the left side spring free of the platen 5 Disconnect the UI ribbon cable Reinstall in reverse order tighten the locking screw until the lock engages securely 01 02 03 5 User Interface RevA Outlet Assembly Front Panel amp Outlet Assembly Removal To remove front panel and outlet assemblies the platen must be removed See pg 28 To remove the front panel assembly 1 Remove the four Phillips screws two on each side that secure the front panel assembly to the chassis One of the screws has a star washer behind it for UL compliance reasons 2 On the early models serial numbers 12 16 there is also nut located behind the outlet manifold that will require removal before front panel assembly can be removed On later models serial number 017 forward the stud for this nut still exists but is not used 3 Once all fasteners have been removed pull the front panel assembly straight forward Note that the outlet tube is
26. e 5 Gently squeeze the chip puller The micro controller will come away from the receptacle 6 Take the new micro controller and insert it into the micro controller receptacle ensure that the notch on the micro controller is aligned with the indent in the receptacle 7 Push the micro controller directly and gently into the receptacle 8 Replace the right side panel on to the Clover 9 Plug the machine in and turn on The unit will beep for 5 seconds after being turned on This is entirely normal Proceed with normal start up 000000000000 PCBA SCEWS PCBA Screw Locations RevA Clover 1s Technical Manual 35 Right side Components cont Motor Transformer The Motor Transformer steps power down for use by the motor Each power configuration will have a specific transformer To remove the motor transformer 1 Remove the platen see pg 28 Without removing the platen it is very difficult to access the inboard fastener and to remove the transformer from the unit 2 Disconnect the motor transformer cable from the PCBA socket J16 3 Remove the transformer it is attached to the chassis floor by two 10 32 x Phillips screws If the platen and brew TRANSFORMER A group assembly is in place it is recommend that a flexible
27. e for spent grounds can be used either as a pass through or as a remov able bucket Grounds are scraped into the chute after each brew cycle See pg 7 06 Brew Button The brew button activates the brew cycle A brew cycle can also be cancelled during the steep by pressing the brew button The brew button also pauses filtration and initiates the cleaning cycle See pg 31 07 Display The display shows the current menu selection All user information is given through the display with the addition of audible cues See pg 32 08 Outlet The outlet dispenses the brewed coffee See pg 33 Dispensed coffee is hot 09 Drain Tray The drain tray drains excess liquid directly into the waste line A boiler and a brew valve also empty into the drain tray please do not adjust either See pg 7 10 Scraper The scraper is used to wipe spent coffee grounds into the grounds chute 12 Clover 1s Technical Manual Clover 1s Left View The side panels are attached to the chassis with four screws each Use a 2 Phillips head screw driver to remove the screws Under one screw for each powder coated part there is one star washer in compliance with UL requirements for electrical grounding of all metal parts 05 04 06 01 Front Panel The front panel can only be removed when the Platen is removed from the Chassis See pg 33 02 Brew Bottom The brew bottom is attached to
28. er The RTD measures the boiler allowing for it to be easily drained temperature and is an integral part of the See pg 22 PID system The RTD cable should only be plugged into RTD 1 socket on the A Boiler water may be hot PCBA See pg 28 04 Fill Valve 02 Boiler The fill valve dispenses water from the The stainless steel boiler contains 108 boiler through the nozzle via the nozzle ounces of water It has two heating hose into the brew chamber elements 4500 Watts in the 208 and See pg 24 240VAC versions See pg 21 05 Thermal Cut Off TCO The TCO sets an upper limit for boiler temperature which when reached will automatically cut power to the heating elements 06 Plumbing Assembly See view on pg 15 RevA Clover 1s Plumbing Assembly The plumbing assembly refers to the components that together regulate the flow of water from the machine s water inlet to the boiler inlet The plumbing assembly regulates the water by restricting the flow ensures water flows only in one direction meters for volume and releases water pressure as the boiler is heated 06 07 Clover 1s Technical Manual 15 01 Water Inlet The water inlet has a 3 8th male com pression fitting See pg 7 02 Strainer The strainer contains a screen to catch large particulates 03 Pressure Regulator The pressure regulator ensures that the upstream pressure does not exceed 40 PSI into the machine RevA
29. er Cleaning Tablet Wait 8 min for cycle to complete C2 Try rinsing between drinks Dial the brew size down to Rinse and presss the Brew button Hold the Brew button and then select Start to begin Use a bar towel to wipe the filter when prompted Wipe Filter then select OK At the Stir In Cleaner prompt stir in a cleaning tablet and select OK Brew a seasoning coffee before serving customers 17 RevA Clover 1s Technical Manual 45 Appendix 3 uado 51 dnoiy sd be E 334409 LE Id 7 aH 0102 Aay ee 6 12849 29315 Jayeay 9 188 uolsuedxy Buiqny 4 ainssalg JOULES asuedsiq 9220 5 134019 116 939 Rev 46 Clover 1s Technical Manual Appendix 4 Heating Element2 Boiler Assembly Heatin
30. expansion valve until it drips slowly at 60 PSI on the pressure gauge 8 Twisting the expansion valve clockwise will increase the set pressure counter clockwise will decrease the set pressure 9 Turn the machine off 10 Shut the drain s ball valve 11 Remove the pressure gauge 12 Reinstall the barbed fitting 13 Reinstall the panels The machine will now be ready for use RevA Clover 1s Technical Manual 27 Expansion Valve 28 Clover 1s Technical Manual Platen amp Brew Group Assembly CYLINDER HEATER OUTLET VALVE 5 CYLINDER RTD Platen Removal j The platen and the brew group are attached to one another and cannot be removed individually The side and rear panels must be removed prior to removing the platen and brew group from the chassis 1 Turn off the machine and disconnect from power 2 Remove the connectors for the outlet valve the blanket heater the blanket heater RTD motor wiring and the motor limit cable 3 Remove the nozzle hose from the boiler Cut the heat resistant zip tie that holds the hose on to the fill valve outlet Pull the hose from the fill valve fitting some water may run out of the hose which is normal and is of no consequence 4 Remove the outlet brew tube from the brew bottom outlet fitting and the waste tube from the waste port on the outlet valve
31. g Elemen Plumbing Inlet Flowmeter 20 0 158 15117 eae m uann A 81135 WAR 1353 lenne E mo 18 ooo 0000 Motor Driver 16 15 1 12 punoip I SPARE OUTLET HEATER oj 2 5 13 008 caret Transformer Brew Limits Brew Group Actuator Encoder Rocker Switch User Interface Clover 1s Wiring Diagram RevA Clover 1s Technical Manual 47 By 0201 1 5 Xa gt 5 3 g 1441 5664 sisseyo
32. gt Max Speed 600 Plumbing Loss 0 75 2 Fill Rate 166 Boiler Timeout 480s Cal Filter Moves sub menu Cal Dispense Moves sub menu 10 Reset Service Log sub menu 1 i Are You Sure command prompt window il lt Yes gt the service log and the error log are cleared The unit will display Service Logs Cleared and then return to Reset Service Log sub menu iii lt Cancel gt the service logs will not be reset unit will return to Reset Service Log sub menu 1 Drain Boiler 12 Exit Tech Settings Up One Level RevA Clover 1s Technical Manual 41 42 Clover 1s Technical Manual User interface Information cont Error Codes When an error code occurs it will be shown on the display It is also stored in the Error Log in the Advanced Settings menu see below Error codes E 1 E 7 are all fatal and will require you to power cycle the machine Error code E 8 is a warning and does not require the machine to be turned off Machine States amp Sub States The Error Log contains the date time and a set of numbers representing the machine s state and sub state at the moment the error occurred This log provides valuable information to the technician for troubleshooting purposes For example if an E 1 Piston Failure error were to occur one would see the date and time of the failure as well as the following 01 04 These numbers represent a
33. he display will read Quickly push the rotary knob located to the right of the display The display will then read Open the water supply and momentarily press the rotary knob The display will read The boiler will begin to fill until the air and water pressure in the boiler equalize with the water supply After approximately two minutes the Clover 1s will purge the remaining air from the boiler It will do this by opening the fill valve allowing the pressurized air to escape through the nozzle When all the air has escaped water will be dispensed into the coffee chamber from which it will be purged To ensure the boiler is completely full the Clover will run three purge cycles The display will read AutoFill Cycle 2 and AutoFill Cycle 3 will automatically follow At the end of each purge cycle the piston will move up and then down to remove any water that may have been dispensed RevA First Time Start up cont After filling in the third cycle the Clover 1s display will read A If no water has been dispensed into the coffee chamber turn the machine off and ensure your water supply is turned on and that there is sufficient pressure before restarting this sequence If water has dispensed properly the Clover 1s boiler will begin heating and the display will read CLOVER 1 Starting After running a brief startup sequence the Clover 15 will reach the Brew Menu
34. hift the platen to line up the threaded holes so the screws can be started Be sure to reconnect the nozzle hose to the fill valve the outlet tube to the brew chamber outlet and the waste tube to the outlet valve Platen amp Brew Group in Safe Resting RevA 30 Clover 1s Technical Manual Platen amp Brew Group Assembly cont Brew Group Removal To remove the brew assembly from platen 1 Remove the platen from the chassis to access the brew group assembly MOTOR FRAME SCREWS fal 3 Ensure that the brew piston is removed prior removing the brew group from the platen It is possible to remove the brew 1 group from the platen without first removing the piston but this ies procedure is more difficult and should be avoided see steps 5 7 9 below for this procedure 2 Lay the platen down on a soft surface so that the assembly is lying on the nozzle and the right edge of the platen 3 Remove the outlet valve from the brew bottom by disconnecting the outlet valve cable from the PCBA J2 Remove the waste tube from the barbed fitting on the Motor frame Screws Attaching to Platen bottom of the valve and then unscrew counter clockwise the valve body from the brew bottom The outlet valve may be removed from the unit without complete disassembly 4 Supporting the motor remove the four 10 32
35. ice be a dedicated line Line voltage under load must lie within the specified range If you fail to follow these guidelines the result may be diminished performance and machine malfunction The Coffee Equipment Company is not responsible for malfunctions damage loss of use or diminished performance resulting from power that is out of specification Drain You will need an external waste drain The Clover 1s comes with 4 5 feet of 1 inch OD flexible hose It is necessary that the hose be routed such that gravity will allow waste water to flow down to the appropriate drain DIMENSIONS inches SIDE BACK 227 112 RECOMMENDED INSTALLATION FOOTPRINT WASTE PASS POWER THRU CUTOUT WASTE WATER 2 11 25 WATER WASTE 4 5 45 POWER CUTOUT 15 5 22 0 RevA Clover 1s First Time Start up Instructions AN Failure to follow start up instructions may result in damage to the Clover which will not be covered under warranty Be sure to follow these instructions carefully Recommended Hardware A Stainless steel braided hose with 3 8F compression fitting for the Clover The Clover 1s is shipped with a 3 8 male compression fitting for the plumbing inlet L6 30R 250 VAC 30 Ampere Receptacle the Clover 1s is shipped with a NEMA L6 30 plug Tools see the recommended tools list Appendix 1 Installation Water Connection Connect the water supply
36. ite hot 6 Do not forget to return DIP Switch 4 to the off position and to reconnect the SSR input RevA Clover 1s Technical Manual 21 mm 69 _ DIP SWITCH 4 0110 SSR CONNECTOR Switch amp SSR Input Heating Element Plug 22 Clover 1s Technical Manual Boiler Assembly cont Draining the Boiler To drain the boiler 1 Turn the machine off 2 Disconnect the SSR DC input from the board J12 or disconnect the heating element plug to the right of the plumbing assembly on the left if facing the rear of the machine This will reduce the likelihood of mistakes later 3 Connect a flexible 3 8 inch ID hose to the barbed fitting on the drain found on the bottom of the boiler and lead the drain hose to a drain 4 Close the main water supply 5 Open the boiler s drain Note that no water will drain from the boiler at this point 6 Power the machine on The machine will read 7 Select lt No gt and press the rotary knob This will open the fill valve which will allow the water to drain from the boiler freely 8 Once the boiler is drained power off the machine and disconnect the machine from power Warning if the machine is powered up and the machine ac
37. ld be cleaned periodically depending on usage RevA Clover 1s Technical Manual 33 OUTLET TUBE FRONT PANEL SCREWS Outlet Manifold amp Nozzle 34 Clover 1s Technical Manual Right side Components PC Board Assembly PCBA The use of an anti static grounding device is recommended for any work done with electronic components The PCBA contains the computing and electronic controls of the machine To remove the PCBA 1 Turn off the machine and disconnect from power 2 Remove the right side panel 3 Disconnect all cable terminals from the PCBA sockets 4 Remove the four 6 32 x Phillips head screws that attach the PCBA to the chassis 5 After removing all the fasteners gently pry the PCBA from the two snap standoffs Ensure that the board is safe from moisture dust static discharge and other damage To reinstall the PCBA follow the steps above in reverse order Software The machine s software is contained on the CPU chip The software is updated by replacing the CPU chip 1 Turn off the machine and disconnect from power 2 Remove the right side panel 3 Locate the PCBA and the micro controller in the upper right quadrant of the PCBA The designation 06 is directly left of the micro controller receptacle 4 Insert the chip puller s part number CEC 9015 mandibles into the slots on the lower left and upper right corners of the micro controller receptacl
38. ld the rotary knob The Basic Settings Menu allows the Clover 1s operator to adjust the brew water temperature move the piston and change workflow settings Turn the rotary knob to move between menu options 1 Boiler Set point This parameter displays the current temperature in the lower left hand corner of the screen and the target temperature in the lower right hand corner of the screen The temperature range is 180 Fahrenheit to 210 Fahrenheit adjustable in one degree increments To change the target temperature press the rotary knob which will shift the from the parameter selection TEMP to the temperature value Twist the rotary knob to increase or decrease the value Press the rotary knob to select the desired target temperature value If the target value was increased the temperature will begin to increase immediately If the value was decreased the heaters will not be switched on until the temperature falls below the target value 2 Wipe Workflow This parameter allows the Clover 1s user to select whether the machine will dispense the drink then allow the spent coffee puck to be scraped into the spent grounds chute 4Wipe After or if the machine will brew the coffee but not dispense until the spent grounds are scraped away Wipe Before For busy cafe environments the 4Wipe Before workflow is best For slower environments the Wipe After workflow maintains coffee chamber temperature and brew consistency
39. ll dispense very hot water onto the piston which will be flush with the platen surface Rev Boiler Assembly Cooling the Boiler It is always easier to work on a coffee machine that is not hot it is safer and more comfortable While it is not always possible or necessary to cool the boiler it is easy and fairly quick to do so 1 Remove the right side panel locate the dip switches on the PCBA Slide dipswitch number 4 to the on position When this dip switch is in the on position the Clover is able to brew regardless of it s temperature Disconnect the SSR DC input from the board J12 or disconnect the heating element plug to the right of the plumbing assembly on the left if facing the rear of the machine This will prevent the boiler from heating Turn the machine on and go through the startup screen Once the machine has initiated and is at the brew menu select a size of 160z and a time of 10 seconds for coffee production Run about 10 cycles with these settings using no coffee This will lower the temperature in the boiler to a point where it can be touched Ensure that the temperature is below 90 degrees Fahrenheit after running ten cycles according to the instructions above If the boiler is still too hot to be safely handled continue running cycles until the boiler can be handled Be cautious around the boiler end plates they retain more heat than the boiler side walls and may still be qu
40. n this position is signaled the CPU knows that the piston 01 is at the bottom position The top limit switch signals to the C CPU that the piston is at the top position The eject limit switch signals the CPU that the Piston is above the platen surface so that it may be removed Limit Switches amp Limit Switch Bracket may be necessary to adjust the limit switches after the brew group has been repaired i e the piston is not flush with the platen surface when in the top position Rev A 20 Clover 1s Technical Manual Piston Assembly cont Adjusting Limit Switches To adjust the limit switches 1 Remove left side panel 2 Loosen the two 6 32 x PH screws that secure the limit switch bracket to the motor frame 3 Move the bracket up or down as necessary 4 Test the accuracy using the Piston Move sub menu in the Basic Settings menu A It is important that the ribbon cable for the limit switches are plugged in when operating the Clover If the cable is not connected the PCBA assumes that the piston is in the right position Note that when the ribbon cable is disconnected from the PCBA that all the indicator LEDs are lit Thus if the piston is in the top position when the ribbon cable is unplugged and the machine is commanded to brew the piston will not move down The machine assuming that the piston is at the bottom the appropriate LED D17 being lit along with all the others wi
41. o reinstall the valve 1 Thread the valve into the brew bottom 2 Tighten hand tight and then tighten 9 turn more with channel lock pliers 3 Route the valve cable to the PCBA and plug into socket J2 marked OUTLET 4 Connect the discharge tube to the barbed fitting on the bottom of the outlet valve RevA Clover 1s Technical Manual 31 MANIFOLD O RING PLUNGER PLUNGER SPRING STEM O RING Outlet Valve Assembly COFFEE FLOW DISPENSE SEALING SURFACE WHEN OPEN ON PLUNGER IS DOWN SEALING SURFACE WHEN CLOSED OFF PLUNGER IS 9 le 21 WASTE FLOW 32 Clover 1s Technical Manual User Interface UI The UI is the input for commands from the user to the PCBA and in turn it displays information about the machine state back to the user The UI consists of three main components 1 The brew button 2 The display 3 The rotary knob The brew button activates the brew cycle It also cancels the brew cycle if pressed prior to extraction Once extraction has started pressing the brew button will pause filtration Pressing and holding the brew button initiates the cleaning cycle The display provides the user with information regarding the machine s settings and current state The rotary knob turns in
42. og provides valuable information to the technician for troubleshooting purposes For example if an E 1 Piston Failure error were to occur one would see the date and time of the failure as well as the following 01 04 These numbers represent a possible State 01 and Sub state 04 State 01 indicates the machine was somewhere in the process of brewing Sub state 04 indicates that the piston was in a downward motion at the moment the error occurred State Idle Menu Brew Basic Settings Filter Move Settings Dispense Move Settings Next Cup Settings Counters in Settings Beeper Settings PID Parameter Settings Advanced Settings Temp Probe Offset Settings Tech Settings Startup Sequence purges water in brew group Piston Move Mode in Settings Confirm Action Piston Moving Error Dispensing Water not used during brewing Enter Tech Settings Password Status Message Setting Clock Viewing Error Log Clean Initial rinse Clean Waiting for barista wipe Clean Filling for soak cycle Clean Waiting for barista to insert cleaner Clean Soaking Clean Soak cycle dispense Clean Wash cycles 3 Clean Complete Confirm Start Clean Boiler Heater Timed Out Message Boiler Fill Drain Boiler Display Is Boiler Filled question normal startup screen Display Welcome To Clover message initial startup screen 098 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
43. over coffee The Brew Menu has two adjustable items the drink SIZE Rinse 6 to 16 ounces in 2 ounce increments the brew TIME 10 to 300 seconds and one reading the current brew water temperature To make changes to brew parameters within the Brew Menu time Switch between the parameters by pressing and releasing the rotary knob Change the setting by turning the rotary knob Once you have set the parameter values the example here shows 1202 and 40s which is a 12 ounce drink with a 40 second brew time press the brew button drop in the ground coffee stir and watch the Clover 1s magic happen To run aclean cycle press and hold the brew button The display will prompt Clean Cycle Start Select Start See page 15 Cancel the clean cycle before it starts by selecting Cancel and pressing the rotary knob or just wait the clean cycle prompt will time out and return to the Brew Menu RevA Clover 1s Technical Manual 37 38 Clover 1s Technical Manual User interface Information cont A screensaver will appear if the user interface is not used for a period of time The screensaver will display the model name and a clock To exit the screensaver mode simply turn or press the rotary knob or press the brew button Basic Settings Menu To enter the Basic Settings Menu from the Brew Menu press and hold the rotary knob until Boiler Set point is displayed To exit a settings menu at any time press and ho
44. referably digital Digital multi meter one that reads ohms up to 5 kilo ohms volts to 600 VAC 60 VDC it would also be helpful if it came with an amp clamp for reading VAC amps Service cart Heated ultrasonic cleaner optional but very helpful for cleaning parts up Peter Paul spanner wrench 44 Clover 1s Technical Manual Appendix 2 1 Power Up the Clover See manual for install instructions 2 Grind Coffee Fresh Measure the coffee and grind Quick Start Guide 3 Dial Brew Settings Choose the drink size and steep time Unless Clover was moved or just installed answer Yes when asked Is Boiler Filled Try dosing 30 g for a 12 oz drink Ze paper filter grind size 17 is a good starting point 1 2 5 Turn knob to change value Push knob to change selection gt A Begin Brew Cycle Quickly press the Brew button 5 Add Coffee Grounds Pour grounds into the coffee chamber 6 Stir Coffee Grounds Ensure complete wetting of grounds Accidentally holding the Brew button will raise a cleaning cycle prompt Use the knob to cancel Pour in the grounds as the piston drops The piston may pause to purge the brew group Use a non abrasive stirrer 7 Wipe Away Grounds First use the wiper then a bar towel Begin a Cleaning Cycle Clean at least once each day C1 Stir in a Clov
45. rom the nozzle and then select Yes by pressing the rotary knob A Do not leave Clover 1s unattended while this prompt is displayed Though it may take a minute or more to fill the boiler once it is full water will dispense from the fill nozzle until the user selects Yes Selecting Yes will close the fill valve activate the boiler and begin the startup sequence Once this process completes the Brew Menu will be displayed RevA Clover 1s Front View 01 Power Switch 02 Rotary Knob 03 Nozzle 04 Brew Chamber 05 Grounds Chute 06 Brew Button 07 Display 08 Outlet 09 Drain Tray 10 Scraper 05 06 07 Clover 1s Technical Manual 11 08 09 01 Power Switch The power switch has two positions on and off When you first turn on your Clover 1s follow the startup instructions shown on the display See pg 8 02 Rotary Knob The rotary knob allows you to adjust parameters by turning in both directions and to make a selection by pressing the knob Further menus can be entered or exited by holding down the knob see pg 32 03 Nozzle The nozzle dispenses water into the coffee chamber at the temperature indi cated on the display See pg 28 A Dispensed water is hot Rev A 04 03 A 2222 2222 02 01 04 The brew chamber incorporates both the brew cylinder and the piston assembly See pg 17 28 05 Grounds Chute The chut
46. s 0 0 28 56 1 1 29 57 2 2 30 58 3 3 31 59 4 4 32 60 5 5 33 61 6 6 34 62 7 7 35 63 8 8 36 64 9 9 37 65 0 10 38 66 1 11 39 67 2 12 40 68 3 13 41 69 4 14 42 70 5 15 43 71 6 16 44 72 7 17 45 73 8 18 46 74 9 19 47 75 20 20 48 76 21 21 49 77 22 22 50 78 23 23 51 79 24 24 52 80 25 25 53 81 26 26 54 82 27 27 55 83 28 28 56 84 50 Clover 1s Technical Manual Appendix 8 Machine Sub States Boiler Fill The Error Log contains the date time and a set of numbers representing the machine s state and sub state at the moment the error occurred This log provides valuable information to the technician for troubleshooting purposes For example if an E 1 Piston Failure error were to occur one would see the date and time of the failure as well as the following 01 04 These numbers represent a possible State 01 and Sub state 04 State 01 indicates the machine was somewhere in the process of brewing Sub state 04 indicates that the piston was in a downward motion at the moment the error occurred Boiler Fill Sub State Description not used in 092 Display Welcome To Clover message initial startup screen Move piston to bottom of brew cylinder Display Open Water Supply message Setup timers for boiler pressurization Setup boiler fill ourge cycle 1 Execute boiler fill ourge cycle 1 Setup boiler fill ourge cycle 2 Execute boiler fill ourge cycle 2
47. s are used 1 yes skip startup option ON enabled OFF disabled 2 If ON entering tech settings sets next startup to not Is Filled 3 brew cylinder overtemp error ON disabled OFF enabled 4 OFF normal operation ON disables waiting for hot water during brew DIP Switches 5 8 not used at this time RevA User interface Information Menus This is where you will learn to adjust all of the Clover 1s brew parameters and machine settings The user interface is easy to manipulate during normal use and can also be used for maintenance and troubleshooting There are three menu levels available to the Clover 1s user Brew Menu Basic Settings and Advanced Settings Key to Settings Menus It will be helpful to understand these basic keys to the Clover 1s display These carets appear within the display around text or numbers and denote that a selection with the rotary knob is possible Press the rotary knob to move the carets change between parameters Turn the rotary knob to change values within the carets sub menu This text signals that a sub menu 15 accessible from the current parameter by pressing the rotary knob The asterisk found in front of a value denotes that the displayed value is not a default A default value will not have an asterisk Brew Menu The Brew Menu 15 what appears on the display when you about to make your Cl
48. sts inside the valve stem The solenoid surrounds the valve stem The valve plunger and spring lie inside the valve stem the plunger rests on the valve seat to close the valve path If there is a constant leak from the nozzle that only disappears when the water main is shut off the fill valve s plunger seal has failed This may be due to build up sediment or to the failure of the seal material It is necessary to replace the fill valve plunger Replacing the Fill Valve Plunger To replace the fill valve 1 Turn off the machine and disconnect from power Shut off the water Remove the side panels and the rear panel 2 3 4 Remove the boiler from the chassis see above 5 Remove the nut that secures the solenoid to the valve 6 Remove the solenoid and set aside 7 Use the spanner wrench to remove the valve stem from the valve body 8 Remove the old plunger and spring from the valve stem and discard Discard the valve seat o ring 9 Clean the valve body and the valve stem 10 Install the new plunger and spring in the valve stem 11 Install the new o ring in the valve body 12 Reinstall the valve stem to the valve body tighten with the spanner wrench 13 Reinstall solenoid to valve Reinstall boiler see above and test for proper operation Fill Valve Location MANIFOLD O RING PLUNGER SPRING g STEM A WASHER Fill Valve Assembly Rev
49. sume paused filtration motor move manual pause before pause point Wait for motor move up to filtration pause point Set filtration pause timer Wait for filtration pause timer to elapse Wait for brew button press only used if secondary filtration is paused Resume paused filtration motor move manual pause after pause point Wait for motor move up to top of brew cylinder secondary filtration Wait for filtration complete timer to elapse Wait for brew button press to start dispense if in Wipe Before workflow Setup motor move for initial dispense Wait for motor move to dispense pause point to complete Wait for dispense pause timer to elapse Setup motor move to bottom of brew cylinder if brew cancelled and in Wipe Before Dispense workflow Wait for secondary dispense motor move to bottom of brew cylinder Wait for timer to elapse before returning piston to top of brew cylinder Setup motor move up to top of brew cylinder Wait for motor move up to top of brew cylinder Return to Idle Menu Cleaning Sub State Descriptions all versions The majority of the cleaning sub states correlate to brew sub states as shown above Only the soaking state has unique sub states as seen below Clean Soaking 098 state 25 092 state 29 Sub states 0 3 6 9 setup piston move Sub states 1 4 7 10 wait for piston move to complete Sub states 2 5 8 wait for soak timer to elapse RevA All Clean Versions Substate
50. tivates the boiler heating elements when there is no water in the boiler severe damage may result 9 Do not forget to close the boiler drain valve when finished Removing the Boiler To remove the boiler 1 Cool and drain the boiler see above Warning The boiler be extremely hot 2 Disconnect RTD 1 thermostat connector J10 and the fill valve connector J1 from the PCBA and feed them through the grommet ports 3 Disconnect the boiler heater wiring harness plug from the wiring receptacle located on the right inner bulkhead 4 Disconnect the boiler inlet tube from the flare fitting at the plumbing tee 5 Disconnect the fill nozzle tube from the fill valve outlet DRAIN VALVE Boiler Drain amp Hose FILL VALVE Fill Valve amp RTD1 Connections RevA Clover 1s Technical Manual 23 Boiler Assembly cont 6 Remove the four Phillips head screws located on the left side of the unit that secure the boiler to the chassis 7 Lift the boiler up slightly and pull the boiler out from the back of the chassis ensuring that the wiring harness does not catch on the chassis BOILER TO CHASSIS Now the boiler may have any necessary repairs performed MOUNT SCREWS Removing the Heating Elements To remove the heating elements 1 Remove boiler see above 2 Disconnect the heating element wires from the heating elemen
51. to the machine water inlet using the stainless steel braided hose with a shut off valve installed between the water supply and the hose The Clover s water inlet is located underneath the machine next to the right rear leg The water inlet is a 3 8 compression male fitting Do not over tighten the fittings The inlet is brass and can crack A or strip if over tightened Drain Hose Connection Connect the drain hose and route the hose so the hose is not kinked and there is a downward slope You connect the drain hose underneath the machine just to the right of the left front leg Be sure to secure the drain hose to the Clover s drain pipe with the hose clamp using either a flat head screwdriver or a 5 16 nut driver Grounds Chute Bucket Install the grounds chute or bin If the Clover came with pass through chute ensure the path is clear to the spent grounds bin under the counter Electrical Connection Ensure you have the appropriate receptacle The machine 15 sent with an L6 30P to connect with an L6 30R RevA Clover 1s Technical Manual 7 Water Supply Inlet 3 8 Compression Electrical Connection L6 30P amp L6 30R 8 Clover 1s Technical Manual First Time Start up cont Main Power Switch Flip the main power switch to the on position by pressing up The main power switch is located on the front panel below and to the right of the display On the initial start up of a Clover t
52. top line of the display will show the new date and time to be programmed into the Clover 1s b Month This is the first setting that will be selected Make adjustments by turning the rotary knob and confirm by pressing and releasing it c Day Change the day of the month in the same manner as the Month setting values from 01 to 31 may be selected Please remember that February has 28 days except in leap years d Year Adjustments to the year can be set from 2006 to 2021 e Time The hours and minutes of the clock setting may also be adjusted After these settings are entered the Clover 1s will ask Press and release the rotary knob to exit the clock Select 4 Cancel to exit the clock settings without saving any changes RevA User interface Information cont Technician Settings hese settings accessed by pressing and holding the brew utton while in the advanced settings A password is required Currently that password is DCAB T 1 OO SN 1 2 0 he following are the Tech Settings Temp Offsets sub menu i lt Boiler 1 Offset gt OF ii lt Boiler 2 Offset gt OF ili lt Cylinder Offset gt OF iv lt Exit Temp Offsets gt Up One Level PID Parameters sub menu i BoilerPID P 0 60 ii BoilerPID 0 25 iii BoilerPID D 2 0 iv BoilerPID Max 2 5 v BoilerPID I Min 0 0 vi Exit PID Params Up One Level Absorption lt 5 5
53. ts 3 Use a 1 5 inch socket to remove the heating elements they are threaded normally counter clockwise to remove 4 When installing heating elements tighten to hand tight risa Chasse Mount Screw then with socket breaker bar tighten 1 3 turn more Reinstall the boiler in reverse order Be sure to use a high temperature cable tie to secure the fill nozzle tube to the fill valve outlet Removing Heating Elements SPACER ELEMENT GASKET Heating Element Components Rev A 24 Clover 1s Technical Manual Boiler Assembly cont Fill Valve The fill valve is located on top of the boiler this valve a two way valve is used to dispense water from the boiler into the brew chamber via the nozzle hose Line pressure is used to push the water from the boiler through the fill valve and out the nozzle It consists of a solenoid and the valve The solenoid is an electromagnet which is used to move the plunger inside the valve When the solenoid is energized a magnetic field is created drawing the plunger away from the valve seat and allowing water to flow through the valve The valve consists of three discrete pieces The valve body and valve seat This is where the water flows in and out The valve plunger rests on the valve seat to close the flow of water The valve stem this piece screws into the valve body the valve plunger re
54. valve s exhaust port At rest the valve is closed to the outlet i e when the solenoid is not energized the valve plunger rests against the valve seat This is due to the pressure from the spring that surrounds the valve plunger inside the valve stem There is subsequently no path from the brew chamber through the brew manifold valve inlet ports and through the valve When the solenoid is not energized the valve is closed to the outlet however the plunger allows a path from the outlet tube down the stem through the valve exhaust and into the drain tray When the solenoid is energized the valve plunger is pulled away from the valve seat by the magnetic field created by the solenoid coil This action creates a pathway from the brew chamber through the brew manifold valve inlet ports through the valve and then back up through the brew manifold outlet ports to the outlet tube While excess coffee from the brew process left in the outlet tube will flow back through the valve exhaust any coffee or water left in the brew chamber would remain there until the next brew cycle For this reason the Clover is programmed to energize the valve at certain times after a brew cycle This allows the liquid to go through the valve and thus to be discharged This process 15 noticeable when the valve clicks after a brew cycle The valve screws into the left underside of the brew bottom manifold There are two o rings that seal the mating surface T
55. vel and not twisted or buckled underneath the filter If the filter will not sit properly in the seals it may help to place the seals around the filter before setting the filter onto the piston base 6 Carefully flip the piston over Lie it down on a soft non abrasive surface 7 Fasten the filter to the piston base with the 6 self sealing screws Tighten in a cross pattern Do not over tighten over tightening will warp the filter tighten to 10 inch pounds maximum Limit Switches The limit switches or piston position switches are optical sensors that are triggered when a flag on the piston rod actuator plate passes through a light beam cast from an LED inside the 04 sensor light beam is read sensed by a photosensitive cell opposite it These switches are normally closed switches and 03 are installed on the limit switch bracket When triggered the voltage going through the switch is CRO interrupted which in turn signals the CPU where the piston is depending upon which limit switch has been triggered 1 Bottom Limit Switch 4 02 2 Limit Switch Bracket 3 Top Limit Switch 4 Eject Limit Switch There are three limit switches the bottom limit switch the top OO OO limit switch and the eject limit switch The bottom limit switch signals that the piston is at the bottom of the brew chamber Whe
56. ver 1s filters using a vacuum ensuring complete extraction and no waste Finally Clover 1s uses PID an advanced process control technology to maintain water temperature and a volumetric sensor to accurately dose water The heart of Clover 1s the Vacuum Press brew group allows rapid extraction while preserving the characteristics of your most subtle coffees PID thermal control and an intuitive user interface allow the barista to control every aspect of the brew process independently Simply dose the coffee grind and place the grounds in Clover s brew chamber Use Clover s user interface to adjust brew parameters cup size contact time etc and press Brew Clover doses water brews filters and then dispenses A quick wipe cleans off the permanent filter and Clover is ready for the next cup We designed the Clover 1s for baristas in the busiest retail environments and built it to brew excellent coffee quickly With minimal training a barista can dose grind and brew a complete beverage in just about a minute The boiler heats water immediately and the intuitive digital user interface enables rapid changes of brew parameters with every cup RevA Clover 1s Technical Manual 5 6 Clover 1s Technical Manual Site Requirements Water Water is a vital component to good coffee hence water quality control is key All installations will require some form of water treatment We are providing he following guidelines as
57. y after startup and after each drink Press the rotary knob to enter Next Cup Defaults This setting allows you to decide whether the Clover 1s will remain at the drink settings seen on the Brew Menu display after each coffee production Last Cup or if the drink settings will revert to the defaults after each coffee production Default F Clover 1s Technical Manual 39 40 Clover 1s Technical Manual User interface Information cont b Default Size This setting allows the Clover operator to choose which drink size will appear when the machine powers on and after each coffee production if Default is selected in the Next Cup Defaults setting The factory default is 12 ounces c Default Brew Time The Clover 1s operator can change the default brew time The Clover will default to this time when it is powered on or after each coffee production if Default is selected in the Next Cup Defaults setting The factory default is 35 seconds d Exit Next Cup Up One Level Selecting this feature will return you to the Advanced Settings Menu 6 Set Clock These settings change the time and date for the CPU clock Not only is the screen saver clock based on this data but more importantly it records the date and time of all logged errors which can be helpful for the service provider The factory default will be the current date and the current time for the Pacific time zone All dates are shown in U S format mm dd yy a The
Download Pdf Manuals
Related Search
Related Contents
Haier HPRD12HC5 User's Manual Altec Lansing A6 Series User's Manual Lire la suite. Du Cirque MANUAL DE INSTRUCCIONES ルフレ153≫カタログ Magnese MA-101540 User`s Manual - VVV System sro Brancard Prime Zoom Modele 1125 JVC GR-SXM760A Camcorder User Manual Copyright © All rights reserved.
Failed to retrieve file