Home
Case study - Civil & Environmental Engineering
Contents
1. 11 Assignment Using the MACRO model provided evaluate some of the structural and operational alternatives to further reduce SSOs and CSOs assuming you have a limited capital investment budget of 250 million The problem can be stated as Minimize SSOs CSOs or some combination of the two Subject to l ISS storage capacity Zs Pumping capacities from ISS to WWTPs 3 Treatment capacities at WWTPs 4 Siphon capacity at JIWWTP 5 Budget limit for capital investment 250 million Consider the capital investment and operational alternatives listed in Table 1 Table 1 Capital investment and operational options for reducing SSOs and CSOs Measure Input notes Increase tunnel ISS volume 15 ft Line 13 of Command file Increase pumping capacities 45 cfs pump costs 5 Lines 20 and 22 Jones Island and from ISS to WWTPs million South Shore respectively Increase siphon capacity at Each siphon costs 12 Lines 33 and 34 JIWWTP million to upgrade to 400 cfs Increase treatment capacity at 1 million cfs Need to change values on lines JIWWTP 36 and 38 and corresponding limit on line 37 Blending at JIWWTP is limited by permit to 94 cfs Evaluate alternative designs by running the MACRO model with the 1940 2004 hydrologic record To modify input parameters for the model you will change the Command file MITCHELL CMM Use the mitfld PLT and VRSSI_zero inp files as the other input files Select the metric s by which y
2. and those contracted with MMSD Wastewater flows to the local systems are collected by the District s intercepting system and then conveyed to MMSD s two wastewater treatment plants Jones Island and South Shore Shafer 2005 The main components of MMSD s combined sewage conveyance system are the Metropolitan Interceptor Sewer MIS System the Inline Storage System deep tunnels and the Central Control System The MIS is network of sanitary sewers that intercept wastewater from local sanitary and combined sewer systems within the MMSD service area This system is divided into seven subsystems for purposes of flow monitoring analysis and system control Flows can be diverted between the subsystems for conveyance to either the Jones Island or South Shore treatment facilities or to the District s Inline Deep Tunnel Storage System where they can be stored until the plants have available capacity for treatment Senior Engineer CDM Smith 12357 Riata Trace Parkway Austin TX 78727 E mail LoucksED cdmsmith com Professor Department of Civil and Environmental Engineering Michigan Technological University Houghton MI 49931 Associate Professor Department of Civil Engineering P O Box 400742 The University of Virginia Charlottesville VA 22904 The Deep Tunnel Storage System shown in Figure 1 consists of 19 4 miles of tunnels 300 feet below ground that temporarily stores peak wastewater flows that exceed treatment plant or
3. Combined Sewer Overflows in the Milwaukee Metropolitan Sewerage District Conveyance and Treatment System Eric Loucks David Watkins Theresa Culver Background Many older cities across the United States rely on combined sewers to convey both stormwater runoff and sanitary sewage Combined sewer overflows CSOs containing untreated sewage occur during extreme wet weather when the capacity of these combined sewer systems is exceeded Across the U S CSOs pose a serious threat to water quality in thousands of lake river and coastal ecosystems In addition to harming the natural environment they may be a threat to human health and have adverse economic consequences e g beach closings reduced aesthetics tourism impacts U S EPA 2011 Several large cities in the United States including Boston Chicago and Milwaukee have addressed the problem of CSOs by constructing large underground storage systems In Milwaukee Wisconsin a large tunnel system has been constructed to contain up to 405 million gallons 54 million ft or 1 54 million m of wastewater and stormwater runoff to reduce CSOs discharging to Lake Michigan In addition to this tunnel system the Milwaukee Metropolitan Sewerage District MMSD operates an extensive system of sanitary sewers to collect and convey wastewater originated by local sewer systems in a 420 mi service area Local systems are operated and maintained by municipalities within the District
4. MIS capacities The deep tunnel system can hold up to 405 million gallons of flow and was designed to eliminate overflows from the separated sewer area and to greatly reduce overflows in the combined sewer area When the system became fully operational in 1994 it substantially reduced the number of annual average overflows from about 50 down to two or three KEY O County Boundary S5 _ South Shore Water Reclaimation Facility JI Jones Island Water Reclaimation Facility Deep Tunnel Milwaukee West Milwaukee Figure 1 MMSD s Deep Tunnel In line Storage System Used with permission http v3 mmsd com deeptunnellocation aspx At the Central Control System flows are monitored using continuous and intermittent monitors Continuous monitors are permanently installed in more than 300 locations and use telephone lines and a wireless communication system to transmit data back to the Central Control System Intermittent monitors are temporarily installed and rely on field crews to retrieve the data Along with monitoring flow data the Central Control System allows remote operation of the conveyance system with the goal ensuring that treatment plant and conveyance capacity is utilized in the most efficient manner Figure 2 illustrates operation of the combined wastewater and stormwater conveyance and treatment system during wet weather and extreme wet weather events In the separated sewer area storm sewer flow is discharged di
5. RE SEWER a SEWER SEWER AREA COMBINED DROPSHAFT SEWER SERVICE AREA DEEP TUNNEL Figure 2 Operation of the combined sanitary and stormwater conveyance and treatment system under a wet weather conditions and b extreme wet weather conditions Used with permission http v3 mmsd com deeptunnelhowitworks aspx Inflow and infiltration I amp I in sanitary sewer systems is a national problem It is the result of poor construction aging systems needing repair and or illicit stormwater connections Shafer 2005 8 In the combined sewer area sanitary sewage travels into local combined sewers where it mixes with stormwater from runoff Flow from the combined sewers empties into the MIS to be conveyed to the plants for treatment and excess flow is bypassed to nearby waterways at combined sewer outfalls If the plants are not able to handle excessive infiltration and inflow excess flow is diverted to the deep tunnel If the deep tunnel is filled excess flow is discharged to local waterways Description of the MACRO Model The MACRO model was developed to evaluate the operation of the MMSD conveyance and storage system Reference Written in the Fortran programming language MACRO is a routing model that simulates movement of flow through the MIS subsystems to the wastewater treatment plants South Shore and Jones Island the Inline Storage System and system overflow outfalls separate and combined sewer overflows Flow continuity i
6. cy 2011 Combined Sewer Overflows http cfpub epa gov npdes home cftm program_id 5 Accessed 2 May 2011 13
7. e minimum value on line 14 MACRO generates four output files Figure 5 The Report file RPT lists summary data for the entire simulation run including annual ISS and CSO SSO summaries The Event Summary file DAT provides output from each ISS 10 event in the simulation The Detailed Output file OUT lists detailed hourly output Finally the Remote Storage summary provides summary data for remote storage Only the Report and Summary files will be used in this exercise Unit File Runoff MACRO Remote pl Storage Summary Figure 5 MACRO model input and output files adapted from CDM 2005 MACRO is used to evaluate various structural and operational alternatives to prevent SSOs and CSOs There are three basic ways to prevent overflows 1 Operate the treatment and storage in the system more efficiently 2 Increase treatment blending capacity at the treatment plants including flow capacity to the plants if that is a limiting factor and 3 Increase storage capacity in the ISS Operating decisions include the following e Adjusting VRSSI dynamically or specifying VRSSImin e Increasing blending requires a permit also need to increase chlorination limit e Diverting more less to South Shore WWTP Capital investment options include the following e Increase tunnel ISS volume e Increase pumping capacities from ISS to WWTPs e Increase siphon capacity at JIW WTP e Increase treatment capacity at JIWWTP
8. ou will compare the various alternatives One additional suggestion for running MACRO is to turn off treatment plant averaging by setting line 10 of the Command file to 1 MACRO runs about 20 times faster if you turn off the treatment plant averaging as there is a lot of overhead 12 tracking the average inflows over the past 24 48 72 and 720 hours Other lines of the Command file not mentioned here should remain unchanged Please see the MACRO User s Manual CDM 2005 for a complete description of the model and input and output files A sample input file is also provided in the Instructor s Notes Appendix References Bicknell B R Imhoff J C Kittle J L Jr Donigian A S Jr and Johanson R C 1997 Hydrological Simulation Program Fortran User s manual for version 11 U S Environmental Protection Agency National Exposure Research Laboratory Athens Ga EPA 600 R 97 080 755 pp CDM Inc 2005 MACRO 2004 Documentation and User s Guide draft prepared for the Milwaukee Metropolitan Sewerage District Milwaukee Wis Crawford H H and Linsley R K 1966 Digital Simulation in Hydrology Stanford Watershed Model IV Technical Report No 39 Dept of Civil Engineering Stanford University Stanford CA 210 pp Shafer K L 2005 Sewer Overflows in Milwaukee What is the Real Problem and How Do We Solve It Water Resources Impact 7 5 13 15 U S Environmental Protection Agen
9. rectly to local waterways through local storm sewers while sanitary sewage normally travels into local sanitary sewers the MIS and treatment plants In extreme wet weather events when local sanitary sewers or MIS cannot handle excessive inflow and infiltration into the sanitary sewer system excess flow is either bypassed overflows to nearby waterways or it may be diverted to the deep tunnel where it is stored until the plants have capacity to treat it WET WEATHER FLOW ATE v ALLLLELLLET gt fssiiss i D INTERCEPTING A Fi uu eaten STRUCTURE J a m enamn t m CATCH BASIN J 7 _Ourrat ms T m STORM SEWER Lo TE oura owversion __ _ LOCAL SANITARY SEWER TR E ENT MANHOLE LOCAL COMBINED i ee N SEWER METROPOLITAN INTERCEPTOR SS SEWER N g METROPOLITAN INTERCEPTOR R DIVERSION SEWER SEPARATED STRUCTURE SEWER SEWER AREA COMBINED DROPSHAFT SEWER SERVICE AREA DROPSHAFT DEEP TUNNEL EXTREME WET WEATHER FLOW F zz uz h 68 ajil sails zz ae iil gt z ma Pa INTERCEPTING fi m ms Hau es a STRUCTURE oe CATCH BASIN i az zz E ct ag STORMSEWER f l TE aay ee DARE 7 loutFaLL DIVERSION TR i LOCAL SANITARY SEWER MANHOLE LOCAL COMBINED z TRUCTURE O P at SEWER x METROPOLITAN INTERCEPTOR f e SEWER RO METROPOLITAN INTERCEPTOR SEPARATED STRUCTU
10. rious user options This is the file that users can change to test different system alternatives e g expanding the in line storage capacity or treatment plant capacities The HSPF Input file contains hourly runoff values for the system as computed by the Hydrologic Simulation Program Fortran Crawford and Linsley 1966 Bicknell et al 1997 using precipitation and temperature data for the period 1940 2004 The VRSSI file VRSSTHINDCAST INP contains daily or hourly values of storage to be reserved for separate sewage inflow to the Inline Storage System These values have been calculated as the best values dynamically adjusted to minimize SSOs over the historical record As an alternative to this perfect hindsight the user may specify a dummy VRSSI file and a constant minimum volume of storage to reserve for separate sewage inflow VRSSImin for more realistic simulation results The value of VRSSImin may be adjusted from O to the total volume of the tunnel MMSD has slowly increased it over the years from 40 million gallons to the current 250 million gallons 5 35 to 33 42 million ft The file VRSSTHINDCAST INP contains perfect hindcasts of the best value to use in each historical storm Perhaps a poorer set of values should be used because these are difficult to improve upon The minimum VRSSI on line 14 will have some effect though Perhaps students could use a dummy VRSSI file provided Then VRSSI is controlled only by th
11. s maintained throughout each hourly time step of the simulation and the volume of separate sewage and combined sewage present in the ISS is tracked A schematic of the MACRO network system is shown in Figure 3 EWWE Q56TO1 SSPUMP a S S56 gt i PUMPISS SSPUMP OISSCM JIPUMP QCOLHL Collectors JIWWTP Disinfection Total Jl Overflow Flow Input Overflow Outflow Convevance gt Figure 3 MACRO system schematic showing the main MIS subsystems the Inline Storage System ISS and the wastewater treatment plans SSWWTP and JIWWTP adapted from CDM 2005 The MACRO model also simulates blending at the Jones Island plant Blending is a process in which a certain portion as allowed by permit of the total plant inflow bypasses primary and secondary treatment and is blended with the treated flow prior to chlorination and discharge This process shown in Figure 4 effectively increases the capacity of the treatment plant which otherwise would be limited by the secondary treatment capacity JiPump QJI JIBLND QJIPRI JIBLND JIBLND Figure 4 Blending at Jones Island Wastewater Treatment Plant JIWWTP adapted from CDM 2005 There are three input files needed to run MACRO Figure 5 The Command file contains the parameters controlling the simulation including input and output file names system capacities limits the start and end dates of the simulation and va
Download Pdf Manuals
Related Search
Related Contents
Istruzioni per l`uso I Omnia II qsg.indd FMCE Flange Mounted Clutch Guide technique des produits 2014 Bedienungsanleitung NR 2021 NR 2022 Hochleistungs Operator`s Manual - Manuals FR - De`Longhi - ARIA DRY Compact DDS 30COMBI VARIO line - Lohberger Heiz Istruzioni d`uso VEGAFLEX 82 Copyright © All rights reserved.
Failed to retrieve file