Home
The Concise Cycle Test Method
Contents
1. IEA SHC Task 26 Solar Combisystems 11 e t must be possible to simulate the test In order to be able to simulate the CCT and to finally derive a system performance figure for annual reference conditions it must be possible to simulate a system that is similar to the candidate test system for both the CCT conditions and the annual reference conditions This is one of the reasons why TRNSYS is used to control the collector and building load emulators 6 2 Installation of the system The manufacturer or a designated installer installs the system in a designated area in the indoor test facility Backside and the left hand limit of the installation area consists of an inner wall Except for the collector loop piping system components may be fitted to the inner wall or are set on the concrete floor For the collector loop piping a special rig may be used A number of rules have been set up to make sure that installation of the system is realistic Experience with solar domestic hot water systems has shown that if no such rules exist most installations and particularly the pipe work are specially tuned for testing The rules in German are available from SPF on request Most important rules are e There may be no bend downwards on any pipe connecting the system to the test facility unless this piece of pipe bend down is prefabricated and delivered with the system e The hot water pipe that connects the system to the test facility
2. There were two reasons not to rely on synthetic weather data which is readily available from Meteonorm 3 e Meteonorm overestimates the fraction of diffuse radiation An investigation of data produced with the program led to doubts in the reliability of synthetic data in general e With verification of the proper functioning of the system being one main objective of the test it was desirable to use more dynamic radiation data than the standard hourly data A set of weather data was assembled through selecting months from five recent years of measured data Time resolution of the source data was 10 minutes In the source data solar radiation was provided as global radiation on the horizontal plane The solar radiation processor of TRNSYS was used to calculate radiation values in the collector plane that was defined to be at a tilt angle of 45 oriented south The data were then stored at intervals of 1 32 h A comparison verified that it was safe to use the TRNSYS radiation processor at intervals shorter than 1 hour even though calculations of the solar radiation processor are based on hourly relations The weather file includes the quantities global horizontal solar radiation relative humidity sky diffuse solar radiation wind speed and wind direction even though these quantities are not currently used for system testing or system simulation Unfortunately the weather data file was completed only long after start of the simulation work in
3. the duration per category of occurrences was slightly changed from the original values 3 3 Building load and building load characteristics A single family house was defined to provide the building heat load The house has 200 m of floor area on two stories Its annual heat demand amounts to 12500 kWh a if it is heated to 20 C by an ideal air heater However it is heated via the floor slab dividing the two stories With good settings of the controller to assure 20 C indoor air temperature it consumes about 15500 kWh a The heated floor area is 100 m with roughly half of the heat provided to the lower storey via the bottom surface The two storeys however are modelled as a single thermal zone The building is modelled with TRNSYS type 56 the floor or slab heating is modelled by type 160 floor or hypocaust heating 5 Two circuits are used one of which covers a floor area of 90 m the other the remaining 10 m The first circuit is fitted with thermostatic valves Optionally the second circuit may also be fitted with a thermostatic valve If the combisystem controller or the auxiliary boiler does not permit the flow through the building heat distribution lines to be shut off the second loop may not be fitted or rather simulated with a thermostatic valve With a slab heating area 100 m being smaller than the total floor area 200 m the heating characteristic is that of a marginally designed floor heating system and
4. The auxiliary energy consumption can be used to indicate stand by losses During the stand by loss test the CCT data are checked and disassembly of the system can be prepared 6 The indoor test facility at SPF 6 1 Principles e The test facility should allow for installation and operation of the candidate test system as completely as possible Therefore the system is installed completely with exception of the collector array and the building All controllers including their sensors are installed The auxiliary heater may use either natural gas or fuel oil as its energy source It is intended to expand the test facility to also allow automatic biomass boilers In principle it would be possible to let the system operate with ground source heat pumps as an auxiliary heater However the ground source would have to be emulated e The design of the test facility should be such that there is no or only minimal interference with the system and its operation The system controllers are set up to operate as under normal in field conditions Under normal circumstances there are only two exceptions Because there are no collectors the temperature sensor of the collector loop controller cannot be installed in the collector It is installed in the collector emulator instead The output of the collector loop controller normally connected to the collector loop pump is instead received by the test facility The test facility then controls the collector loop pump
5. of Technology Sweden 1993 IEA SHC Task 26 Solar Combisystems
6. to the system performance than it would be in a real year Thus a direct characterisation based on a CCT is not possible This is one reason why the name AC DC Annual Calculation Direct Characterisation is replaced by the more appropriate name Concise Cycle Test CCT The other reason is to make sure that the CCT is not mistaken for the other short test method examined in Task 26 referred to as AC DC in Task 26 and this technical report which might be used for the testing of tanks used for solar combisystems The simulations show that the CCT result is not representative for the annual performance e g the solar fraction is not the same Results may not be calculated by multiplying the CCT results with a factor as simple as 365 12 This is true for both the auxiliary and the parasitic energy consumption A more complex treatment of the CCT results is required to determine the annual performance There are two obvious options for this e Determine a set of functions to convert CCT performance into annual performance by means of preliminary simulations The obvious disadvantages of this option are that a lot of preliminary work has to be done and that there is still no certainty that this work covers properly all the system types and system sizes necessary IEA SHC Task 26 Solar Combisystems 15 e Make a computer model that is able to predict the CCT performance and use this model to predict the systems annual performance The ob
7. used to IEA SHC Task 26 Solar Combisystems verify that energy stored in the tank and more importantly energy stored in the virtual building and its slab heating is nearly equivalent at the beginning and at the end of the core phase Experience has shown that the cycle conditioning phase brings the tank to the wanted temperatures effectively and that influence of the temperatures after initial conditioning is minor However this is true only if at the start of the cycle conditioning phase temperature at any layer in the tank is not much above the auxiliary set point temperature 5 2 UCT a short preliminary test One of the major findings of practical tests is that solar combisystems tend not to work the way they are meant to It would be a pity to run a full CCT only to discover that e g a valve is not working at all Therefore it is advisable to run a short preliminary test The UCT Ultra Concise Test runs at high load and radiation higher mean values than annual cycle or concise cycle There is a relatively small load and moderate solar radiation at the beginning to allow auxiliary heater and solar collectors to bring the tank to normal operating temperatures Next there is a high space heating and DHW load to check extreme conditions like system behaviour at low ambient outdoor temperatures The final phase of the UCT consists of high solar radiation and a low to moderate space heating load to check the system covering its load
8. Subtask C and the file could not support this work 3 2 Domestic hot water load and mains water temperature The single family home draw off file 200 litres per day which was provided by Ulrike Jordan for use in Task 26 4 served as a basis to define the domestic hot water DHW load The original four categories of the draw off were treated separately The category small load volumes was split into two new categories with load volumes less than 1 6 litres per occurrence and more than 1 6 litres per occurrence The occurrences with less than 1 6 litres load volume are considered as volume type draw off Each occurrence of volume type is terminated when the specified volume has left the tap no matter what the temperature at the tap is All other occurrences are considered as energy type draw off These occurrences IEA SHC Task 26 Solar Combisystems are terminated when the specified energy has been removed from the system via the tap The energy is counted only if a threshold temperature is reached As a result of a small survey of the situation in Switzerland the mains temperatures were defined individually for each category of occurrences with each category having its own annual fluctuation Lowest mains water temperature is 8 C and its highest value is 19 C Choosing mains water temperatures different than used for simulations in subtask C is the main reason why the DHW load is not identical to the load assumed in subtask C Moreover
9. The Concise Cycle Test Method a Twelve Day System Test A Report of IEA SHC Task 26 Solar Combisystems November 2002 Peter Vogelsanger AN INTERNATIONAL ENERGY AGENCY Solar Heating amp Cooling Programme The Concise Cycle Test method a twelve day system test by Peter Vogelsanger A technical report of Subtask B SPF re SPF Institut fur Solartechnik CH 8640 Rapperswil Oberseestrasse 10 Switzerland Contents 7 8 3 1 3 2 3 3 4 1 4 2 5 1 SUMMARY BACKGROUND AND MOTIVATION REFERENCE CONDITIONS FOR ANNUAL CALCULATION Climate Domestic hot water load and mains water temperature Building load and building load characteristics THE CCT TEST CONDITIONS Climate DHW load ADDITIONAL AND PRELIMINARY TESTS Conditioning before running the core CCT 5 1 1 Initial conditioning 5 1 2 Cycle conditioning 5 2 5 3 5 4 5 5 5 6 6 1 6 2 6 3 6 4 6 5 6 6 UCT a short preliminary test Hot water temperature test Hot water performance test Adjusting and testing the space heating controller Standby loss test THE INDOOR TEST FACILITY AT SPF Principles Installation of the system Collector emulation Building load emulation DHW conditioning and control Measurements 6 6 1 Auxiliary energy consumption natural gas or fuel oil 6 6 2 Temperatures 6 6 3 Flow rates 6 6 4 Parasitic energy THEORETICAL INVESTIGATIONS PRACTICAL EXPERIENCES IEA SHC Task 26 So
10. by using stored heat and solar input The UCT is a good method to check the fitness of the test facility since it as well as the candidate test system runs under high load conditions during the UCT The UCT is modified for specific needs and for different initial states of the system It is not at all used to derive a system performance figure 5 3 Hot water temperature test As a rule the hot water mixing valve is installed with the system and needs adjustment For the series of tests in process at time of writing it had been prescribed that the hot water temperature shall be between 50 C and 55 C under normal conditions Repeated testing may be necessary to adjust the valve and verify correct setting and functioning 5 4 Hot water performance test It is advisable to avoid settings that impede the system from covering the DHW load imposed during the CCT To do this another preliminary test is used After conditioning the tank using the same procedure and criteria described above as initial conditioning before the CCT a series of draw offs at different flow rates are scheduled The energy removed during each draw off is prescribed The test resembles the procedure described in 6 However recovery times between draw off occurrences are longer and the auxiliary heater is normally enabled during part of the test This hot water performance test may be modified depending on the system s programmed modes of operation Particularly the enable ti
11. cal heater E F flow meter Ti To inlet and outlet temperature sensors T is the system temperature sensor In a real installation it would normally be located at the outlet of the collector array At the same position there is another temperature sensor of the test facility to control the temperature at T 6 4 Building load emulation Emulation of the building load is to a high degree identical to emulation of the collector Here an outlet temperature not power is transferred from the TRNSYS simulation to the test facility controller and used as a set value The system controller normally determines the supply temperature to the building heat distribution based on ambient outdoor air temperature Optionally indoor air temperature may be used too The outdoor air temperature which the system shall assume is generated in a small box The system s sensor is located in that box during the test Another box serves to optionally accommodate a sensor for the indoor air temperature However no system has been tested using the indoor air temperature for space heating control yet Ti Figure 2 Simplified schematic of the building load emulator The basic design is similar to the collector emulator see Figure 1 V is a motorised variable valve Its purpose is to simulate a thermostatic valve Position of the valve is a function of the virtual indoor air temperature IEA SHC Task 26 Solar Combisystems 13 6 5 DHW conditioning and con
12. ipation was explicitly restricted to systems that were or rather should have been beyond the prototyping stage of development A typical problem is that the manufacturer or his designated installer cannot determine the desired controller setting In many cases the manufacturer of the solar system had to call on the manufacturer of the controller or boiler to identify the setting that assured correct operation In one case a logic board of the auxiliary heater had to be reprogrammed by the boiler manufacturer and sent to the test institute for replacement All problems were associated with boiler operation or with controller functions being inappropriate in conjunction with other controllers or in conjunction with the system design and schematics None of these problems would have been identified if the boiler and its controller were not installed and tested together with the other components Conclusions e It can hardly be overemphasized at this point that primary objective of a combisystem test should be to verify the correct operation of the system To evaluate system performance is a second order priority Even though much care was taken to make sure that the heating curve was adjusted correctly there were great differences in space heating consumption between the systems The relative difference is nearly 20 which is much more than had been expected Of the four systems all had space heating enabled at all times no nightly reduction of the
13. ition system and passed on to the TRNSYS simulations 6 6 4 Parasitic energy Parasitic energy consumption is measured If the system permits the measurement is split up between the type of usage auxiliary heater building load distribution and collector loop operation 7 Theoretical investigations Simulations of the test and annual simulations for the same system have shown that performance assessed during the CCT is not directly representative for the system s annual performance There is a difference of a few percent in mean auxiliary power There is a difference of about 15 depending on system type and sizing in mean collector power The CCT overestimates energy gained by the collectors This is due to the share of the collector loop in operation being longer during the simulation of the CCT compared to the simulation of an annual cycle During the annual cycle collector loop is out of operation during much of the summer period because of excessive solar energy The concise cycle is too short to heat up the tank and leave the collector loop out of operation for a long time Depending on the system and its controller settings the stage of solar overheating will not be reached at all However a relatively high temperature will be reached and throughout the 12 days the tank will go from fully discharged at the beginning to nearly fully charged and be discharged again This means that it will be used more intensively and contribute more
14. lar Combisystems S Oo 9 Oo oN N o CO CO Co 10 10 10 11 11 12 13 13 13 13 14 14 14 15 9 10 8 1 Building and operating the test facility 8 2 Running tests OUTLOOK REFERENCES IEA SHC Task 26 Solar Combisystems 16 16 17 17 1 Summary A test cycle for laboratory testing of solar combisystems including auxiliary heat sources was designed A test facility was built and a small number of systems were tested Conclusions from theoretical and practical work are e The CCT does not provide a direct indication of annual system performance e An investigation of the auxiliary heater and controller s through measurements is indispensable as most and many problems are associated with these components e The emphasis of the test must lie in the investigation of system operation e To derive objective figures for annual system performance is a complex task 2 Background and motivation Laboratory testing of solar thermal systems is justified only if the system to be tested will be produced and installed many times Otherwise information gained through testing will not justify time and money spent The only kind of solar combisystem that may be produced in sufficient numbers are small units destined for single family homes and produced as fixed sets with a high degree of prefabrication factory made systems that may be fitted with a variable number of collector modules Solar combisy
15. m the CCT and presentation of test results Publication of the test results is subject to the manufacturer s consent Therefore no prediction may be made about the number and release dates of publications Test institutes are encouraged to explore the field of solar system testing following the principles outlined above SPF will readily support such work 10 References 1 2 3 4 5 6 CEN European committee for standardization European Pre standard ENV 12977 2 Thermal systems and components Custom built systems Part 2 Test Methods Bales C Thermal Store Testing Evaluation of Test Methods Chalmers University of Technology Department of Building Services Engineering G teborg Sweden 2002 Meteotest Meteonorm Berne www meteotest ch Jordan U and K Vajen Influence of the DHW load on the fractional energy savings a case study of a solar combisystem with TRNSYS simulations Solar Energy Vol 69 Suppl pp 197 208 2000 Fort K Type 160 Floor heating and hypocaust Transsolar Stuttgart 1998 Dr ck H and S Bachmann Hot water performance of solar combistores Description of a test method and experience gained with application on three different IEA SHC Task 26 Solar Combisystems 18 types of combistores Technical report IEA SHC Task 26 ITW Stuttgart Germany November 2002 7 Isacson P and L O Eriksson MFC Matched Flow Collector Model user s manual Royal Institute
16. may not be insulated e No insulation may be added to the system or any pipe Excluded from that rule is the piping that supplies and returns water to and from the test facility for space heating 6 3 Collector emulation The collector array is emulated using an electrical heating element and a plate heat exchanger for cooling The matched flow collector model 7 is used to model the collector power However this component model may be replaced with any other collector model suitable and compatible with TRNSYS TRNSYS predicts the power for one simulation time step based on inlet temperature and flow rate from measurements and ambient temperature and radiation from a file Calculated collector output power is then transferred to the test facility and used as set value Special TRNSYS components have been programmed to exchange information between TRNSYS and the computer program which controls the test facility The simulation time step is 1 32 hour which is equivalent with the time interval at which data is provided from a file A glycol water mixture is used in the collector loop It is always of the same brand quality and concentration It is identical to the fluid used for collector testing at SPF IEA SHC Task 26 Solar Combisystems 12 Figure 1 Simplified schematic of the collector emulator PT is a pump on the cold side of heat exchanger HX P2 assures a high and constant flow rate through the heat exchanger HX and the electri
17. mes of the auxiliary heater may be extended or restricted For example if during the CCT the auxiliary heater shall always be enabled to supply heat for DHW preparation and storage then the auxiliary heater may be enabled throughout the hot water performance test too IEA SHC Task 26 Solar Combisystems 10 5 5 Adjusting and testing the space heating controller Generally supply temperature to the space heating is controlled by the system controller as a function of the ambient outdoor temperature heating curve Thus the space heating load is determined not only by the test facility but also by the system For example if the system supplies fluid hotter than expected into the space heating more heat will be removed by the test facility and the temperature inside the virtual building will be higher than would normally be expected To minimize differences in space heating consumption between systems it is advisable to adjust the space heating controller as carefully as possible Simulations were used to define a desired heating curve as function of the fluid flow rate If possible the controller is then adjusted accordingly 5 6 Standby loss test After completion of the CCT stand by heat losses or rather stand by energy consumption of the system is determined Immediately after the CCT the system s auxiliary heater is left enabled for DHW preparation It was found that the systems reach steady state quickly often within one day
18. nnual conditions The CCT DHW load file gained through the selection of days from the annual file was not further manipulated for fine tuning with two exceptions e f occurrences of different categories were to take place simultaneously the time of one occurrence was shifted to a time nearby e The minimum flow rate is limited to 250 litres per minute 5 Additional and preliminary tests A series of tests are useful to adjust controller settings and setting of the domestic hot water mixing valve before running the CCT 5 1 Conditioning before running the core CCT Two phases are used to condition the tank before starting the core phase of twelve days i e initial conditioning and cycle conditioning 5 1 1 Initial conditioning During the initial conditioning phase both auxiliary heated upper part and lower part of the tank should be brought to reasonable temperatures before the cycle conditioning starts This may be achieved by a conditioning the tank at 25 30 C followed by b enabling the auxiliary heater to heat the upper part of the tank to its auxiliary set temperature Alternatively a UCT see below may be run Else if a CCT has been attempted and aborted during the first three days the cycle conditioning may be started immediately 5 1 2 Cycle conditioning Final 18 hours of the CCT core phase is added before beginning of the core phase These 18 supplementary hours are called the cycle conditioning phase Simulations were
19. ow auxiliary consumption In a simplified view one would say it is a well performing system It is possible but far from sure that the system performs well in many practical applications If the house is well suited to the system or rather its controller in terms of passive gains thermal inertia and thermal zoning good performance is highly probable In other applications however it might be an under performing system if there are a few days of the year with insufficient heating the user will be inclined to lift the heating curve By doing this the energy consumption will increase throughout the heating season It is difficult to make an objective judgement of the system It is not simple to decide about the principles to use for calculation of the annual performance Because the findings of the testing are complex there is also the problem of their presentation In the case described above it might be possible to tell the manufacturer that his system had been energy efficient but did not perform well However it is useless to make such a statement to the public e g to a potential buyer of the system Outlook There will be a series of at least ten tests within this and the next year 2003 Throughout these tests the CCT is likely to remain unmodified The tests will reveal more problems requirements positive and negative aspects of the CCT method Decisions will have to be taken regarding derivation of an annual performance figure fro
20. pleted for four systems The systems were selected from applications This initial set of measurements of solar combisystems at SPF was partially sponsored by the Swiss Confederation Bundesamt f r Energie Participation was restricted to systems that are to a very high degree factory made They are fixed IEA SHC Task 26 Solar Combisystems 16 combinations of tanks solar collectors auxiliary heat source oil or gas and controllers Most important restriction was that there may only be one or two subassemblies e g a tank and a subassembly which includes the auxiliary heater and all valves controllers etc Most systems are to be fitted with tanks of around 700 litres in volume and tested as being equipped with between 10 and 15 m of gross collector area 8 1 Building and operating the test facility The main lesson learnt is that building the test facility is time consuming and expensive The facility should operate without major malfunction during a relatively long period In order to achieve this a high degree of reliability is required Much more time and money than anticipated was spent in three fields e Software of the test facility e Measurement of natural gas consumption e Boxes for simulated outdoor and indoor temperatures 8 2 Running tests Out of the four combisystems for which measurements were taken to date none worked precisely as was intended by the manufacturer This is even more surprising as the partic
21. s used for solar combisystems SERC and other institutes have investigated the possibility to extend the test method in order not only to compare different tanks against each other but also to be able to determine the performance under standard reference conditions SPF has developed a longer test cycle to assess the performance of solar combisystems as a whole There is a large variety of combisystem designs which tend to be complex and difficult to simulate in detail In Switzerland most systems are installed in the same climatic region Therefore the primary results of the test should be IEA SHC Task 26 Solar Combisystems e to gain information about the correct or incorrect functioning of the system and e to permit the derivation of a performance figure for one single set of reference conditions i e one climate and one load 3 Reference conditions for annual calculation Because the CCT is likely to indicate the system performance for only one single climate and load it is important to choose a representative set of annual reference conditions The conditions were evaluated to be as representative as possible for single family homes in Switzerland Much effort was spent defining these conditions for the hot water load and the mains water temperatures the building load and its characteristics and the climatic conditions Once established the annual conditions were used as a basis to define the conditions of the CCT 3 1 Climate
22. similar to that of a generousiy designed home with radiators The design supply temperature to the slab heating is about 39 C at a design ambient temperature of 10 C and a flow rate of 550 litres per hour With both its mass and its window areas being moderate the house benefits moderately from passive solar gains 4 The CCT test conditions Core of the CCT consists of 12 days that were composed of days selected from the annual reference conditions Different days were selected for climate and DHW load 4 1 Climate The days were selected to correspond with the annual conditions in this order e Solar irradiation on the collector plane e Fluctuation of the daily solar irradiance on the collector plane e Ambient temperature IEA SHC Task 26 Solar Combisystems After selection of the days the ambient temperature was modified at the beginning and end of each day in order to get a gradual transition from one day to the other Also the temperature was smoothed throughout the test to obtain a very continuous function of time 4 2 DHW load The days were selected to correspond with the annual conditions in this order e Total energy of energy type occurrences e Fluctuation of daily sums of energy type occurrences e Include at least one day with a rather difficult to meet load profile e Reflect the seasonal fluctuation No care was taken to assure that the sum of the DHW volume of volume type occurrences corresponds to the a
23. stems in Switzerland are most often fitted with an auxiliary heat source other than a simple electrical auxiliary heating element The auxiliary heater is most often a boiler fired by natural gas oil or biomass or alternatively a heat pump The auxiliary heater covers the major part of the heat load It is by far the most important component for the performance of the solar combisystem In addition the auxiliary heater s performance efficiency is not a constant but depends on interaction with other system components Thus an isolated test of the auxiliary heater is likely not to reveal the boilers efficiency when integrated into the system Neither would a test of the system without the auxiliary heater yield a good indication of the overall system performance For this reason auxiliary heat source and its controller should be considered as part of the system when testing solar combisystems The CTSS method 1 would be extremely time consuming and expensive if for solar combisystems the auxiliary heater and its controller would be measured and modelled as separate components in order to derive the overall system performance A faster and less expensive test method for small solar combisystems including auxiliary heater and all controllers was desired The CCT method is intended to fulfil this requirement It was inspired by the work conducted at SERC Sweden 2 There a short cycle has been used to compare the performance of a variety of tank
24. supply temperature was programmed e Space heating controls tend not to work predictably There is an important problem for fair comparison of system performance because there are important differences in the load It had been anticipated that there should be a correction for different systems supplying more or less energy for space heating There is little doubt that a correlation can be established based on simulations of the test However the difficulty is to decide whether or not such a correction is useful For example assume the space heating controller of a system performs well at the design temperature it supplies 35 C at an ambient outdoor IEA SHC Task 26 Solar Combisystems 9 17 temperature of 10 C According to the heating curve programmed in the system controller it should supply 30 C at 0 C ambient temperature But measurements show that supply temperature is then much lower barely above 25 C whenever the system supplies solar heat from the tank to the space heating Thus the system heats the building to a lower temperature than it would have done if the controller had performed according to expectations The virtual building indoor temperature may still be within acceptable comfort limits mainly because the low supply temperatures occur simultaneously with passive solar gains On the one hand the system does not perform the way it is meant to On the other hand due to the load being low it will have a l
25. trol Mains water is conditioned to the temperature specified in the file The flow rate is also controlled 6 6 Measurements 6 6 1 Auxiliary energy consumption natural gas or fuel oil Measurement of auxiliary energy consumption is the primary quantity used to characterise the system performance The auxiliary heater will most often cover between 65 and 95 of the heat load but the purpose of testing is to obtain information on the remaining 5 to 35 which is covered by the solar collectors For achieving a reasonably accurate judgement of solar performance assessment of auxiliary energy consumption must be accurate to within 1 In case of a gas boiler as auxiliary heater natural gas from the line is used It is difficult to meet the required accuracy then The measurement is complex and expensive The volume flow is measured by a drum type flow meter The assessment of the calorific value of the fuels cannot be done in house which tends to increase the inaccuracies and uncertainties An unpleasant thing about the measurements you take yourself is that you too often find out they are wrong The unpleasant thing about relying on measurements taken by others is that they may be worse but you do not find it out Two alternatives to using natural gas from the line were evaluated but rejected e Liquefied propane butane from bottles This does not have the same properties as natural gas and some boilers cannot be operated on this type of f
26. uel e Pure pressurised methane from bottles This option is too expensive An alternative to the drum type gas meter would be to compress natural gas from the line alternating into two or more bottles and use scales to determine the amount of gas used Fuel oil consumption is measured by means of a scale 6 6 2 Temperatures The points at which the system has to be hydraulically connected to the test facility are clearly defined and are identical for each system to be tested Thus they are not necessarily as close as possible to the system For instance the manufacturer installs the pipe that connects cold water supply to the tank This pipe is considered to be part of the system The temperature is measured at the facility near the point where the system i e this pipe is joined to the facility The same is true for temperature measurements used to determine collector gain and building load It is slightly different for measurement of the hot water outlet temperature There the test facility uses a pipe to mimic hot water distribution piping The pipe has a defined geometry The hot water temperature for DHW energy calculation is measured at the outlet of this pipe IEA SHC Task 26 Solar Combisystems 14 6 6 3 Flow rates Fluid flow rates are measured within each loop building collector and draw off Since TRNSYS models use constant fluid properties specific heat and density capacitance rate is calculated by the data acquis
27. vious disadvantage of this option is that there will be extensive treatment of the measured data modelling parameter identification etc before the annual performance is found If the model needs to be precise the CCT is certainly not the best possible measurement because in this case the CTSS method comes very close and there is enough experience with that method to know that there are better test sequences than the CCT to determine the system parameters The best solution lies in using a CCT that is representative enough for the annual performance to be derived from the test It should be possible to use either correlations or only a few simulations or a combination of the two to find the annual performance Oconcise cycle E annual cycle mean power kW Auxiliary heater Space heating Collector Hot water Solar rad m2 Figure 3 A comparison of the concise cycle and annual cycle mean power based on simulations The system simulated is a typical combisystem with 12 m of flat plate collectors and 800 litres of tank volume There are non negligible differences for the collector 80 W 15 3 and the auxiliary heater 85 W 5 Differences in the space heating consumption hot water load and solar radiation per square metre on the collector plane are negligible and mostly due to the design of the concise cycle 8 Practical experiences At time of writing measurements have been com
Download Pdf Manuals
Related Search
Related Contents
Zanussi FJ1224/A Instruction Manual EasyLink User Manual Samsung 204TS Kullanıcı Klavuzu SYNCRO 96C SYNCRO 96C PCU002 Rescue Pro A4 User Manual v2 8M0061614 - Brunswick Marine in EMEA Center Samsung SMH6150WB User's Manual CarottAge Windows pour les données Ter Copyright © All rights reserved.
Failed to retrieve file