1.  VOLT    GRID FREQ    Yes  O P CUR   Press Display  xxx KWH  O P energy  button  gt 5 Sec  RATING  xx KW  PV Inverter Rating  a pa  M CPU Ver  xxx  Firmware version of Mater CPU   Com  NA M  S CPU Ver  xxx  Firmware version of Slave CPU        Contrast Setting            Display button is        untouched for  gt 5        Press Display       button  gt  5 Sec        Display button is       touched for  gt 5  Press Display        Press button to select  Contrast 1 to Contrast 5       Then press button for over 5 seconds Puo aee    LCD will show    Setting     Contrast setting is OK    Display Freeze  Lock     Press button to select  English or German     Then press button for over 5 seconds    LCD will show    Setting     Language setting is OK     Page 17 of 26    Clenergy SPH Installation and Operation Manual    e Fault condition   The display panel will show the Error Message during fault conditions  The  table shows the full list of messages with an explanation of the fault  See the  Troubleshooting section for further information on fault resolution     Error Message Explanation    mismatch  mismatch   Internal Master Slave grid impedance  mismatch  mismatch   Internal Master Slave grid DC current  mismatch    e Typical display panel messages  The table explains typical display panel messages that occur depending on  the SPH inverter operating status and display panel mode        Page 18 of 26  Clenergy SPH Installation and Operation Manual    Description    Operating con
2.  Verify that the electric grid voltage is 220V to 250V AC single phase at 50Hz  or 60Hz  This information is available from the electricity provider    2  Ensure that the AC supply wire to the inverter is disconnected from the  electric grid  For example  the fuse is removed or the circuit breaker is open   Verify with an AC voltmeter that there is no voltage between the Line and  neutral AC wire and between each AC wire and earth ground    3  The table provided suggests minimum wire sizes for the AC cable  Ensure  the selected wire conforms to local and national wiring codes     Model b  mm  AWG no     1500  2000  3000    4000  5000  6000    4  For SPH15 SPH20 SPH30 SPH40  connect AC wires as follows   e Disassemble the AC output female socket   e Connect AC wires to connection socket as indicated            Female insert  with coupling ring         AC wire    inserting  direction    Pressing  screw       e Strip the wire sheath and conductor insulators the minimum amount  necessary to insert the wires into the connection pins    e Insert Line wire tol L  Neutral wire tol N and Ground    wire to pin   e Fully tighten the wire clamp screws in each connection pin    e Assemble the socket again  Insert the whole socket into the inverter    e Twist the coupling ring to receptacle on inverter  Make sure it is perfectly  matched and tightly fastened     Page 12 of 26  Clenergy SPH Installation and Operation Manual    5  For SPH50  amp  SPH60  connect AC wires as follows   e Disass
3.  technicians can also change the unit setting and  download new firmware via the RS232 interface using    PV_Reflash    software     1  RS232  The SPH inverter is equipped with a 3 wire RS232 interface using a  DB9 socket  This is located under the RS232 cover on the bottom of the unit     The table below defines the connector pin functions  N C  means    No  Onnea    Assignment Description  N C   NG     _Cemmen __    Common       Female  Side       2  Optional communication slot  This slot is a very powerful expansion slot  The  SPH unit can accept a special communication function card in this slot  There  are 2 kinds of cards available now  One is an RS485 card and the other is a  SNMP  Simple Network Management Protocol  card  In the future  other  cards may be developed  For detailed information  please refer to the  instruction manual of the individual card     Page 21 of 26  Clenergy SPH Installation and Operation Manual    6  Troubleshooting    When installed and operated correctly  the SPH inverter will give many years of  trouble free operation  Sometimes fault messages will be displayed due to  abnormal conditions on the PV array or electric grid  These messages will clear  automatically and the unit will restart once the PV array voltage and electric  grid conditions return to the normal ranges  Occasionally you may experience a  fault message that does not clear automatically when the conditions return to  normal  This may be due to a problem with the overall PV i
4.  verify that the electric grid is stable      7  If inverter works normally  the LCD display panel will show    Working mode     and power is delivered to the electric grid  If there are any problems refer to  the Troubleshooting section for possible resolutions    8  The installation test is complete     t Do not connect the AC power at this stage  Page 14 of 26  Clenergy SPH Installation and Operation Manual    4  Inverter status    The SPH Inverter is designed to be user friendly  The status of the inverter can  be easily understood from the display panel     Display information  e LED lamps  There are 2 operating status LED lamps on the unit   Power LED  Blue   Lit when the unit is working and  transferring power   Dark when the unit is shutdown or in fault  mode   Status LED  Red   Lit when the unit is in fault or failure mode    See the display panel for more details     Dark in normal or shutdown operation     e LCD display panel  o Normal operation  The display panel will show    Working Mode    during normal operation     In    Working Mode     press the display button to enter    Meter Mode     In    Meter  Mode    the display panel shows operating information  Each time the display  button is pressed  the value changes to the next item     O P WATT     PV VOLT     PV CUR     GRID VOLT     GRID FREQ     O P CUR     xxx KWH  O P energy    RATING  xx KW  PV Inverter Rating    M CPU Ver  xxx  Firmware version of Mater CPU    S CPU Ver  xxx  Firmware version of Slave CP
5. 26  Clenergy SPH Installation and Operation Manual       1 2  SPH40                                                                                                                                                             LC      o O  IT m  External protective earth  PE  terminal  Front view Bottom view    Display information switch    Operation LED      Blue  Working Mode   Operation LED  Red      fault status    S    LCD Display  Showing the    inverter status                           AC connector OAT r N TAL  UW WANA Solar panel input  Optional communication ee   USB RS232  slot  SNMP and RS485  Display and connections  Page 6 of 26    Clenergy SPH Installation and Operation Manual    1 3  SPH50  amp  SPH60                                                                            USB      ere  ele  90080 000068 00000  C0O9090  90008000  9008000 9003000    0G90008090    089000600_ 0089000600 0609000600 0089000900  B9OQQO00BD   SO0000000 6900000090 990000060 o  QOTOQOQOL  8dOO0000QO 090000000 800000009  QOOQQOQOQO 900000090 000000060 000000060  DOSCOOSDOH 0090008900 006000800 009000800  O906006 0908009 0006006 09006006  00086 90069 Q0099 YOWES                            External protective earth  PE  terminal       Bottom view    Front view    LCD Display  Showing the        inverter status    Solar panel input   DC     Display information switch    Operation LED   Blue  Working Mode       Operation LED  Red     fault status    AC connector    Optional communication  slo
6. SPH Grid PV inverter             Installation and Operation Manual    SPH MODELS  INCLUDED IN THIS MANUAL    6 SPH15 1500W  6 SPH20 2000W  6 SPH3O 3000W  6 SPH40 4000W     SPH50 5000W  6 SPH60 6000W    ya    Ct Ses Beit Y    ENDLESS ENERGY SOLUTIONS    N305 WeiYe Building  Pioneer Park XiaMen China 361006  Tel   86 592 5781288  Fax   86 592 5782298  Website  www clenergy com cn    Page 1 of 26  Clenergy SPH Installation and Operation Manual    Important Safety Information    AN Warning   Risk of Electric Shock    Failure to comply with these warnings and instructions can result in  damage to property  risk of fire  serious injury or death     e Do not remove the covers  The unit contains no user serviceable parts   Hazardous voltage is present inside the unit from both DC and AC sources   Hazardous voltage remains inside the unit even when disconnected     e The photovoltaic  PV  array supplies hazardous voltage when exposed to  light  even at very low intensity  Even ungrounded photovoltaic arrays  present an electric shock hazard through ground capacitance     e The unit is designed to supply power to the electric grid  AC utility  only  It  must not be connected to other AC electric generators or power supplies   This may cause permanent damage to the unit and or AC power supply     e The earth connection of the electric grid  AC utility  to the inverter should be  firm and visible     e Connection to the electric grid  AC utility  typically requires a permit or  interconn
7. U     1  If the display panel button is untouched for over 5 seconds  the display  panel will return to    Working Mode        Page 15 of 26  Clenergy SPH Installation and Operation Manual    2  If the display panel button is pressed and held for over 5 seconds  the  display will    Freeze     Lock  at the selected display screen    3  The display screen    Freeze     Lock  is released when the display button is  pressed again and held for over 5 seconds     In    Working Mode     press the display button and hold for over 5 seconds to  enter    Settings Mode     The display panel will then show    Setting     Each time  the display button is pressed  the setting changes to the next item     Contrast setting  gt  Press button for over 5 seconds to enter  Press button to select  Contrast 1 to Contrast 5  Then press button for over 5 seconds  LCD will show    Setting     Contrast setting is OK     Language setting  gt  Press button over 5 seconds to enter  Press button to select  English or German   Then press button for over 5 seconds  LCD will show    Setting     Language setting is OK     4  If the display panel button is untouched for over 5 seconds  the display  panel will return to    Working Mode        Page 16 of 26  Clenergy SPH Installation and Operation Manual    LCD Display Panel Setting    LCD Normal       Working Mode       Yes    O P WATT ves    Yes    Press Display        button  lt 5sec       Press Display        button  gt 5Sec           PV VOLT  PVCUR    GRID
8. Voltage maximum limit  SOOVDC         Abnormal Grid Impedance    Inverter failure  The readings of 2 microprocessors  are not consistent  It is probably  Fault or a  caused by CPU and or other circuit  Mismatch l  malfunction       DC Bus High    DC Bus Low  PC BUS voltage too high or too low   Device failure Device Fault The device is unable to return to  normal status     Temperature too high    Over  The internal temperature is higher    Page 19 of 26    Master Slave CPU Consistency Consistent    failure       Clenergy SPH Installation and Operation Manual    ae Description    message    Temperature  than the permitted operating  range     Firmware Update    Operating conditions       Updating Master CU mare   aster Rash Master CPO tough RSSA  Updating Master CPU firmware Master Flash  Master CPU through RS232  interface   The internal program is updating  interface        Page 20 of 26  Clenergy SPH Installation and Operation Manual    5  Communication interfaces    The SPH inverter is equipped with an RS232 and USB communication interface  as standard  A communication slot is also provided for advanced  communications options     The status of the inverter can be monitored via the communications interfaces  using a PC with the monitoring software    Solar control     The software is free     The software will be downloaded from www clenergy com au download php     Download the    SPH   Monitoring Software V1 26    and install in your computer     Installation and service
9. cm clear space above and below the unit  This is  to allow for proper air circulation and convection cooling    3  Mark the 4 mounting hole positions required using the mounting backplate  as a template        Mn  Screw holes on wall 4pcs      M4 Screw  4pes  SPH15 SPH20 SPH30 SPH40 SPH50  SPH60       4  Select appropriate mounting hardware for the type of mounting surface and  drill mounting holes of the appropriate size    5  Fix the mounting backplate to the mounting surface using the selected  hardware at each of the 4 mounting holes    6  Fix four screws with spacer on the four corners of the mounting back plate    7  Hang the inverter unit onto the mounting back plate and press down     Page 10 of 26  Clenergy SPH Installation and Operation Manual       Screw for hanging the  Inverter unit onto the    Mounting backplate                                                    Wall                                                                                                                               WW WW WU WW                   ili       8  Attach the    fix screws    to the bottom sides of the unit to securely attach the  inverter to the mounting plate        2 xX M3 x 16L Screw    9  Check the unit is securely mounted  Try to lift up the inverter at the bottom  to test that it is firmly attached  If not  adjust the mounting as necessary        Page 11 of 26  Clenergy SPH Installation and Operation Manual    Step2  Prepare the electric grid  AC utility  connection   1 
10. ditions    Display  message  Normal working status    cain ee SET    Standby INV Standby  90V lt  Input voltage  lt   100V     PV input voltage range 100V to  Initialization  amp  waiting INV Waiting  150V during start up  Inverter is  waiting for feeding to grid   l   When PV voltage gt  150V  inverter is  Ciera tesung checking grid conditions   Normal operation  MPPT Working Mode  Inverter is supplying power to grid     Monitoring parameters    a grid output power in Watts   eco wh supe energy which has been  Accumulated energy information   xxxxx KWh  supplied to the grid since the  inverter was installed   Grid voltage Vor xy Grid  rms  voltage in Volts   VOLT xxx xV  Grid frequency e ete  tid frequency in Hertz   FREQ xx xHz    O P  Grid output current CUR xx xA Grid  rms  current in Amps   PV  PV panel voltage VOLT xXxx XV PV panel DC voltage in Volts     System fault    l   I Earth fault of the PV panels or  Isolation failure Isolation Fault       failure of surge voltage protection   GFCI     Ground Fault Current Ground I Fault AEN ON E OENE E OANE aS    Interrupter  active too high     Grd failure Grid Fault Grid measured data is beyond the  specification  voltage  amp  frequency      impedance 1 Grid impedance higher than limit   P 2 Grid impedance change is faster  Fault ee  than limit     l a a 1 Inverter is not connected to grid  No grid utility voltage No Utility 2 Grid voltage is not present   g   PV Over DC Input voltage is higher than the  Pe put MONGGOH ign 
11. ection agreement with the electricity provider  Contact your  electricity provider for more information     e All local and national codes and regulations for installation  wiring and  inspection of electrical equipment must be complied with     e Installation and troubleshooting of this unit must only be performed by  properly trained electricians or installation technicians  qualified to install or  service PV inverters     e Incorrect installation  troubleshooting by unqualified persons or modification  of the electrical wiring poses a safety risk to the installers  home facility  occupiers and other users operators of the electric grid  AC utility      Page 2 of 26  Clenergy SPH Installation and Operation Manual    e Both AC and DC voltage sources are terminated inside this equipment  The  unit must not be opened until both AC and DC circuits have been individually  disconnected for at least 3 hours   Due to risk of electric shock from energy  stored in capacitors       e Please take out the unit from the packaging box carefully  Check if there is  any obvious damage  Do not install the unit  if it is damaged  Please contact  your local dealer for a replacement     e The SPH inverter is the latest transformer less design  Please check the  requirements for your country regarding earthing regulations     Page 3 of 26  Clenergy SPH Installation and Operation Manual    Before you start       Thank you for purchasing the SPH Grid PV Inverter  This is a highly reliable  produc
12. emble the AC output female socket   e Connect AC wires to connection socket as indicated         Female insert  with coupling ring        Pressing           AC wire  inserting  direction        e Strip the wire sheath and conductor insulators the minimum amount  necessary to insert the wires into the connection pins    e Insert Line wire to 1  Neutral wire to N  and Ground wire to pin S   e Fully tighten the wire clamp screws in each connection pin    e Assemble the socket again  Insert the whole socket into the inverter    e Twist the coupling ring to receptacle on inverter  Make sure it is perfectly  matched and tightly fastened     Do not connect the AC power at this time          Step 3  Connect to the PV array  DC    1  Make sure the maximum open circuit voltage  Voc  of each PV string is less  than 550V UNDER ANY CONDITION for SPH15  SPH20  amp  SPH40 and 600V  for SPH50  amp  SPH60    2  Ensure that the DC supply wires to the inverter are disconnected from the  PV strings  We recommend that a disconnect switch or optional Solar  Concentrator with disconnect is fitted between the PV array and the inverter   When making connections to the PV array outputs  the PV panels must be  completely covered with shade material and the outputs must be shorted  together and to earth ground  Always follow local and national codes and  regulations for installation work on PV panels    3  Verify with a DC voltmeter that there is no voltage between the positive and    Page 13 of 26  Cle
13. nd  earth ground  The impedance must be larger than  8MQ  If the impedance is low a ground fault may exist in  Isolation the PV array or wiring  Contact your PV array service  Fault provider or electrician   2 If above actions do not fix the problem  the isolation  detection circuit may be faulty  Contact your inverter  service representative   1 This is caused by too high ground current   2 Disconnect the inverter from the grid power  Check the  AC wiring and connectionsystem   Ground I  3 After the cause is cleared  reconnect the grid power   Fault Check the status of the inverter   4 If above actions do not fix the problem  the GFCI circuit             No Utility    System   Impedance  fault Fault    may be faulty  Contact your inverter service  representative     Page 23 of 26  Clenergy SPH Installation and Operation Manual      Fault   Display   Possible actions   1 The internal temperature is higher than specified normal  value    2 Reduce the ambient temperature by shading o  ventilation improvements or move inverter to cooler  place    3 If this is not effective  a temperature sensor may be  faulty  Contact your inverter service representative     Over  Temperature    1   Check the PV open circuit voltage  This should be  less than 500VDC     PV Over 2    Voltage If the PV voltage is much less than 500VDC  e g      lt 430V   measure the DCV by multi meter  compare  the readings on meter and LCD   If the readings differ by  gt 5   contact your inverter  service represe
14. nd outdoor usage  For best performance and  service life  outdoor installations should be sheltered from direct exposure to  rain and water    e The unit can operate with an ambient temperature of  25  C to  55  C  For  best performance and service life  the unit should be operated with an  ambient temperature of O  C to  40  C  Above this temperature  the power  output may be reduced  It is recommended to shade the unit from direct  exposure to sunlight to prevent increased operating temperature    e The electric grid must be 220V to 250V  50Hz or 60Hz single phase    e Connection to electric grid must be approved by the electricity provider     e The installation must be done by a certified electrician     e The unit must be installed vertically in the orientation shown     If 25cm Space                                                                                                                            I 25cm Space    Page 9 of 26  Clenergy SPH Installation and Operation Manual    Step1  Mount SPH inverter to the wall or other vertical   surface   1  Select a solid wall or vertical surface to mount the unit  The mounting  Surface must have sufficient strength to carry the weight of the unit  Given  in the specification   In areas of seismic activity  additional support or  restraint may be necessary  It is recommended that the inverter is installed  at a height that provides comfortable viewing and operation of the display  and controls    2  There must be at least 25
15. nergy SPH Installation and Operation Manual    negative DC wires and between each DC wire and earth ground    4  Attach MC  Multi contact   or Tyco  solar type connectors to the PV array DC  positive and negative wires  Use red connectors for the positive DC wires  and black connectors for the negative DC wires   5  Connect PV array DC positive wire s  to the positive     terminal s  of the  inverter  Connect the PV array DC negative wire s  to the negative      terminal s  of the inverter  Each DC terminal on the SPH inverter is rated for  a maximum of 20A DC current  Ensure that the maximum short circuit  current of each PV string does not exceed 20A DC        SPH15  SPH20  amp  SPH30   1 pair SPH40  SPH50  amp  SPH60   3pairs    When connecting the DC terminals  ensure that the polarity is  correct  Incorrect connection may permanently damage the unit     Step 4  Test the installation   1  Remove any protective short circuits applied to the PV array output    2  Remove any shade material from the PV panels and ensure that the PV  array is illuminated by sunshine    3  Turn on the external DC switch  if fitted     4  After connecting the Dc     the message sequence on the LCD display should  be    INV Waiting           No Utility    and the RED fault LED keeps on    5  Fit any fuses removed from the AC supply  Close the AC breaker or switch  and apply AC power to the inverter    6  Verify that the inverter starts to work after a short delay   This may take a  few minutes to
16. nstallation  or an  internal fault of the SPH inverter     If the inverter continues to show a fault message then you may perform the  visual inspection and procedure ONLY    If you are a qualified solar inverter Maintenance technician you may be able to  perform other tests as below     Do not remove the covers  Warning   Risk of Electric Shock  Please follow the  below instructions    Visual Inspection   1 Check the staus of the Inverter to AC utility connection switch or MCB  Off On   2 Check the status of the Inverter to Solar panel connection switch or MCB  Off On   3 Check the status of the RED LED on the Inverter Off On   4 Check the status of the BLUE LED on the Inverter Off On   5 Check the error message on the LCD display on the Inverter   6 Check the samrtmeter been insatlled    Failure Verification   1 Turn on the external DC switch   2 After connecting the DC   Check the message sequence on the LCD display  Should be    INV Waiting           No Utility    andthe RED fault LED keeps on    3 Turn on AC switch or MCB to power on the inverter    4 Verify that the inverter starts to work after a short delay   This may take a  few minutes to verify that the electric grid is stable      5 If inverter works normally  the LCD display panel will show    Working mode     and power is delivered to the electric grid  Otherwise the LCD display an error     Page 22 of 26  Clenergy SPH Installation and Operation Manual    6 The failure verification test is complete     Some comm
17. ntative    1 This is caused by an inverter malfunction    2 Disconnect PV     or PV     from the input  start the unit   Device Fault   again    3 If it does not work  contact your inverter service  representative    1 This is caused by inconsistent values between the main   master  and redundant  slave  controllers of the inverter    2 Disconnect PV     or PV     from the input  start the unit  again    3 If this does not work  contact your inverter service  representative     Inverter  failure    Consistent or  Mismatch  Fault       Page 24 of 26  Clenergy SPH Installation and Operation Manual    7  Specification     Model SPH15 SPH20 SPH30   SPH40 SPH50   SPH60    Output Power  Output Power             PV Input  Nominal DC 360 VDC  voltage  MPPT range 150 to 500VDC 150 to 600VDC  oe 100 to 500VDC 100 to 600VDC  Range  Max PV Open  circuit voltage 550V DC 600VDC   Voc   Max  input  current at 360V 7 5A DC 10A DC 15A DC 20A DC 25A DC 30A DC  C    Max  input    Max  input     8 77ADC   11 57ADC   17 36ADC   20A DC 25A DC 30A DC  moe pur 1755W 2315W 3470W 4580W 5205W 6250W  power    Grid Output  190VAC to 270VAC       Operational  voltage   Operational  frequency 47  53 Hz   57  63 Hz  auto selection    Current distortion  lt  3   Power factor  gt  0 99    The Maximum 0 2830    0 2830     Grid Impedance NA NA NA NA 0 240 j0 15QO   0 240 4 j0 150  Applicable   cficleney  max     gt 94   A  gt 93     Environment                               IP65  Operation  0 to 95   non conden
18. on fault messages and resolutions are explained below  If the  resolution procedure does not resolve the problem  contact your equipment  installer or supplier for assistance  Actions shown in bold letters should only  be performed by a qualified electrician or electrical technician     Fault   Display Possible actions     No grid voltage  Check the grid voltage by  multi meter   2 Check grid connection  such as wire and connector to the  inverter   3 Check breaker between inverter and grid  if it is tripped   DO NOT CLOSE again  get an electrician to check the  wiring and inverter    Wait for grid power to return to normal  If the grid returns  to normal  the inverter will start again automatically  within 5 minutes    Check the grid voltage and frequency by  Grid Fault multi meter  Make sure grid voltage and frequency meet  the specifications    Contact your inverter service representative to discuss  adjusting the operating range  if permitted by the  electricity provider   1 The grid impedance is higher than the permissible value   2 Wait for grid power to return to normal  If the grid returns  to normal  inverter will start again automatically within 5  minutes   3  Check the wires between inverter and grid  For high  impedance  Connections get an electrician to increase the wire size   4  Contact your inverter service representative to discuss  adjusting  The operating range  if permitted by the electricity  provider   1 Check the impedance between PV      amp  PV     a
19. sing  Convection  Acoustic noise  lt 40dB A weighted   fe PC    Communication  amp  features  RS232 standard  USB  SNMP  amp  RS485 optional  Yes  via RS232    Technology    Mechanical  362x312x131   362x312x131  14 14      The product   s specifications are subject to change without notice     Page 25 of 26    Clenergy China    N305 WeiYe Building  Pioneer Park  Xiamen  China  361006   Tel   86 592  5781288   Fax   86  592  5782298    www clenergy com cn    Clenergy Europe     including Italy   France and Germany     An der Welle 4   60322 Frankfurt   Tel   49 69 7593   8499  Fax   49 69 7593   8200    www clenergy de de    Clenergy Australia   including the US and Pacific     18 20 Duerdin St   Clayton VIC 3168  Tel   61 3 9017 6688  Fax   61 3 9017 6668    www clenergy com au    Clenergy SPH Installation and Operation Manual    Page 26 of 26    
20. t  SNMP and RS485    USB RS232    Display and connections    Page 7 of 26    Clenergy SPH Installation and Operation Manual    2  PV installation system diagram    SPH Inverter          Utility                                                                                                                              PV Array       LASS  E      wy ft Disconnect                Switch    Connection System    e PV array  Provides DC power to the SPH inverter  A DC  Disconnect Switch or optional Solar Concentrator is usually  fitted between the PV array and the SPH inverter    e SPH inverter  Converts DC power from the PV array into AC power  The AC   Alternating Current  power is supplied to the electric grid  AC  utility   The SPH inverter uses Maximum Peak Power Tracking   MPPT  to optimize the PV array operation and deliver  maximum power to the electric grid    e Connection  The    interface    between the SPH inverter and the   System Grid usually consists of an electrical breaker or fuse and  terminals for connection  It may also contain a disconnect  switch  For proper safety  this part must be designed by a  qualified electrician or electrical installation technician    e Utility  The electricity supply from the main electric grid  system must be single phase 220V to 250V  50Hz  or 60Hz     Page 8 of 26  Clenergy SPH Installation and Operation Manual    3  Installation   Before starting installation please check the following items    e This unit is suitable for indoor a
21. t due to innovative design and precise quality control  When installed and  operated correctly  it will give many years of trouble free operation     This manual contains important information for the safe and effective  installation and operation of the SPH Grid PV Inverter  Be sure to read this  manual carefully before using the product     If you encounter any problem during the installation or operation of the unit   please check this manual first before contacting your local dealer or  representative  Most of the problems you may encounter can be solved by  following the instructions inside the manual     Please keep this manual in a safe place for later use     Page 4 of 26  Clenergy SPH Installation and Operation Manual    1  SPH inverter overview and connections  1 1  SPH15  SPH20  amp  SPH30                                                                                                    a    External protective earth  PE  terminal                                                                                                                                                                      w    Front view Bottom view    LCD Display  Showing the       Display information switch    inverter status    Operation LED   Blue  Working Mode    Operation LED  Red     fault status        AC connector    ATES   4 a        lt    Sn      ayy    sJ N  V  USB a    Solar panel input    Optional communication   DC     slot  SNMP and RS485    Display and connections    Page 5 of 
    