Home
Split Shot Cutters®
Contents
1. wpa eo wea pal wre 200 F to 325 F 13 250 91 4 13 250 91 4 11 000 75 8 11 000 75 8 93 C to 163 C 325 F to 400 F 11 800 81 4 11 800 81 4 9 850 67 9 9 850 67 9 163 C to 200 C Pressure Ratings are based on 1 hour exposure For durations exceeding 1 hour please contact Owen Engineering Refer to the Time vs Temperature Chart for Explosives for allowable operating temperatures 2 MAN REC SSC R09 2007 2015 Owen Oil Tools All rights reserved Core Lab 1 375 2 000 in Split Shot Cutters ITEM 1 D C C C DESCRIPTION MAGNETIC TOP SUB DETONATOR 18 LONG ASSY 24 LONG ASSY 48 LONG ASSY 1 3 8 OD 600gr ft SSC 1375 005 DET 3050 O0O9LS or 2 300750 1 SSC 1375 311 3 6 Segments SSC 1375 321 4 6 Segments 1 3 8 OD 900gr ft SSC 1375 005 DET 3050 O0O9LS or 2 300750 1 SSC 1375 312 6 3 Segments SSC 1375 322 8 3 Segments SSC 1375 342 16 3 Segments 2 OD 1200gr ft SSC 2000 010 DET 3050 O0O9LS or 2 300750 1 SSC 2000 312 6 3 Segments SSC 2000 322 8 3 Segments SSC 2000 342 16 3 Segments 2 OD 2000gr ft SSC 2000 010 DET 3050 O0O9LS or 2 300750 1 SSC 2000 311 9 2 Segments SSC 2000 321 12 2 Segments SSC 2000 341 24 2 Segments A q We SSO RSS SP SShs SON W SS L Wi S Z
2. WH SN La Wi LL pa CALLE Le a a PZI JN a4 SZ __ ares 7 AH EA Ta Y 2007 2015 Owen Oil Tools All rights reserved LL BL R Z e Top Sub and Detonator must be ordered separately from Split Shot Assembly e Magnetic Top Sub may be used more than once e HMX Split Shots are available by special order Parts should be ordered by replacing the 3 with a 4 ie SSC XXXX 4XX NOTE Split Shots can be run using Safe Detonator System or Owen Green DET as a replacement to the DET 3050 009LS Please Reference Safe Ignition Systems Section WARNING Use of Owen equipment contrary to manufacturer s specifications may result in property damage serious injury or fatality If you are not trained in the handling and use of explosive devices do not attempt to assemble any Owen Perforating Systems or Owen Firing Devices For Technical Assistance Please Contact Owen Oil Tools 12001 County Road 1000 Godley TX 76044 Tel 817 551 0540 Fax 817 551 0795 http www corelab com owen MAN REC SSC R09 3 Ma 1 375 2 000 in Core Lab Split Shot Cutters 1 0 Assembly of Split Shot Cutters except SSC 2000 311 SSC 2000 321 and SSC 2000 341 ae Figure 1 Split Shot Cutter Assembly with Trough Exploded View 1 1 1 Unpack the hardware and explosive Segments The Segments will be numbered in sequential order for assembly 1 2 Remove the Screw item 6 sec
3. 4 Core Lab Split Shot Cutters 1 375 inch 2 000 inch MAN REC SSC ROQ OWEN OIL TOOLS 12001 Cr 1000 Godley Texas 76044 USA Phone 1 817 551 0540 Fax 1 817 551 1674 www corelab com owen Warning use of owen equipment contrary to manufacturer s specifications or operating instructions may result in property damage serious injury or fatality If you are not trained in the handling and use of explosive devices do not attempt to use or assemble any owen perforating systems or owen firing devices This technology is regulated by and if exported was exported from the united states in accordance with the export administration regulations EAR Diversion contrary to U S Law is prohibited Export and or re export of this technology may require issuance of a license by the bureau of industry and security BIS U S Department of Commerce Consult the BIS the EAR and or Owen Compliance Services Inc To determine licensing requirements for export or re export of this technology This document contains confidential information of Owen Oil Tools LP Owen and is furnished to the customer for information purposes only This document must not be reproduced in any way whatsoever in part or in whole or distributed outside the customer organization without first obtaining the express written authorization of owen This document is the property of owen and returnable upon request of Owen 2007 2015 Owen Oil Tools All rights reser
4. Spring and between the Charge Rails with the inner angle facing outward see Figure 4 2 8 Repeat installation of Segments with the consecutive number Segment in a linear direction until the all the Segments are in the Charge Rails All of the Segments should fit tightly in Charge Rails without gaps 2 9 Insert the assembly into the Housing Be careful to line up the explosive Segments with the different colored window on the Housing Secure the Housing to the Bottom Sub with the Screw item 6 gos 3 Figure 4 6 MAN REC SSC R09 2007 2015 Owen Oil Tools All rights reserved Ma 1 375 2 000 in Core Lab Split Shot Cutters 3 0 Arming Split Shot Cutters STOP Warning Only use DET 3050 009LS or 2 300750 1 Warning Always follow API RP 67 guidelines when arming electrical detonators TOP SUB DET eu lied wa Figure 5 Split Shot Cutter Method of Arming 3 1 Remove the detonator from its package 3 2 Insert the detonator into a safety shield 3 3 Measure the resistance of the detonator between the two lead wires with a blaster s multimeter Please refer to the User Manual specific to the detonator being used to determine what the resistance value should read 3 4 Remove the O rings item 7 from their package and visually inspect them for cuts or cracks Lightly lubricate the O rings with grease and install them onto the Top Sub 3 5 Insert the detonator lead wires through the hole in th
5. bly of Split Shot Cutters only SSC 1375 322 SSC 2000 311 SSC 2000 321 and SSC 2000 341 Da 1 oo 9 5 Figure 3 Split Shot Cutter Assembly with Rails Exploded View 2 1 Unpack the hardware and explosive Segments The Segments will be numbered in sequential order for assembly 2007 2015 Owen Oil Tools All rights reserved MAN REC SSC R09 5 1 375 2 000 in Core Lab Split Shot Cutters 2 2 Remove the Screw item 6 securing the Housing item 1 to the Bottom Sub item 2 Remove the Bottom Sub and attached assembly from Housing 2 3 Remove the Cap Screw item 9 and Washer item 10 from the Detonator Sub item 4 Note Skip this step if you are using the 48 system as these parts are not present 2 4 Remove the Flat Head Screws item 8 that secure the Charge Rails item 3 to the Bottom Sub 2 5 Remove the O rings item 7 from their package and visually inspect them for cuts or cracks Lightly lubricate the O rings with grease and install them onto the Bottom Sub item 2 2 6 Re install the Charge Rails onto the Bottom Sub securing it in place with the Flat Head Screws Caution Make sure to install the Charge Rails in the same orientation as they were before they were removed or a misfire could result 2 7 Start with Segment 1 install the Segment item 5 into the Charge Rails with the inner angle first until it contacts the internal step The Segment should fit next to the
6. e Top Sub 3 6 Electrically connect the detonator leadwires to the wireline or toolstring 3 7 Mechanically connect the Top Sub to the wireline toolstring 3 8 Insure the wireline is shunted through the shooting panel 3 9 Remove the detonator from the safety shield 2007 2015 Owen Oil Tools All rights reserved MAN REC SSC R09 7 Ma 1 375 2 000 in Core Lab Split Shot Cutters 3 10 Insert the detonator output end first into the detonator Sub item 4 inside the Housing 3 11 Secure the detonator in place with a Cap Screw item 9 and Washer item 10 Note Skip this step if you are using the 48 system 3 12 Insert the Top Sub into the Split Shot Housing Secure the Housing to the Bottom Sub with the Screw item 6 Caution Be careful installing the Top Sub so as not to chafe pinch or break the detonator lead wires 3 13 The tool is armed and ready to run in hole 8 MAN REC SSC R09 2007 2015 Owen Oil Tools All rights reserved
7. uring the Housing item 1 to the Bottom Sub item 2 Remove the Bottom Sub and attached assembly from Housing 1 3 Remove the Cap Screw item 9 and Washer item 10 from the detonator Sub item 4 Note Skip this step if you are using the 48 system as these parts are not present 1 4 Remove the Screws item 6 that secure the Charge Trough item 3 to the Bottom Sub 1 5 Remove the O rings item 7 from their package and visually inspect them for cuts or cracks Lightly lubricate the O rings with grease and install them onto the Bottom Sub item 2 1 6 Re install the Charge Trough onto the Bottom Sub and secure it in place with the screws 4 I MAN REC SSC R09 2007 2015 Owen Oil Tools All rights reserved he 1 375 2 000 in Split Shot Cutters Core Lab 1 7 Starting with Segment 1 install the Segment item 5 into the Charge Trough The Segment should fit next to the Spring and down into the Charge Trough with the inner angle facing outward see Figure 2 3 Figure 2 1 8 Repeat installation of Segments with the consecutive number Segment in a linear direction until the all the Segments are in the Charge Trough All of the Segments should fit tightly in the Charge Trough without gaps 1 9 Insert the assembly into the Housing Be careful to line up the explosive Segments with the different colored window on the Housing Secure the Housing to the Bottom Sub with the Screw item 6 2 0 Assem
8. ved Ly 1 375 2 000 in Core Lab Split Shot Cutters Description Owen s Split Shot Cutter was designed for use where traditional jet cutters were not effective or could not be used The Split Shot Cutter is run in a linear configuration adjacent to any collar or connection and positioned by inline magnets After detonation the collar or connection is split allowing the pipe to be freed for easy removal Benefits Capabilities e Air shippable at Class 1 4S Conforms to API RP 67 e Can be run through heavy mud paraffin collapsed tubing and reduced restrictions e Can be run 4X faster than conventional jet cutters e Must be run decentralized to maximize effectiveness of tool If shooting in a connection with a premium thread i e VAM Hydril etc please contact your local Owen representative for recommendations Patents United States Patent 5 720 344 Method of longitudinally splitting a pipe coupling within a wellbore Specifications TOOL 1 3 8 IN 2 IN Explosive Load Load 600 600 graintt 900 900 grain ft 1200 1200 grain ft 2000 2000 grain ft Minimum Running 1 775 in 45 1 mm 1 775 in 45 1 mm 2 625 in 66 7 mm 2 625 in 66 7 mm Restriction Recommended 2 375 to 2 875 in 2 875 to 4 500 in 3 500 to 7 000 in 5 500 to 16 000 in Tubing Casing f 60 3 to 73 0 mm 73 0 to 114 3 mm 88 9 to 177 8 mm 139 7 to 406 4 mm Applications Maximum Pressure pei wpe pa
Download Pdf Manuals
Related Search
Related Contents
User Manual Feuille G1 — RAPPEL SUR LES GROUPES Mode d`emploi. Tout Jabra BTE4 Bluetooth Headset User Manual Hotpoint SE1032X Oven User Manual fichier 6 - CRDP de Montpellier Cuestionario para la compra de un vehículo usado connection1 [更新済み] Loxit 8507 NOTICE TECHNIQUE ODESSA HP et MODULYS TA Thomson 42" LCD TV Hi-Pix 2 HD Ready 42" Copyright © All rights reserved.
Failed to retrieve file