1. Note AFTER CT s HAVE BEEN INSTALLED THE SHORTING LINKS MUST BE OPENED LID GROUNDED FOR THE METER TO OPERATE TO INTERIOR THIS UNIT IS SHIPPED WITH JUMPERS IN CLOSED POSITION FOR SAFETY DURING INSTALLATION na te Pickering Ontario L1W 9 Phone 905 839 9199 TXA1200102 600V Ej 839 9198 800 Innovative Metering Solutions ntellimeter on ca
2. 1125 Beach Road Pickering Ontario L1W 3T9 Phone 905 839 9199 Fax 905 839 9198 intellimeter on ca Project Name Distributor o Een 22 A 2 Pulse output to Automation unit 1 2005 _ 10000000 12 12 6 ENCLOSURE Note AFTER CT s HAVE BEEN INSTALLED THE SHORTING LINKS MUST BE OPENED FOR THE METER TO OPERATE THIS UNIT IS SHIPPED WITH JUMPERS IN CLOSED POSITION FOR SAFETY Drawing DURING INSTALLATION TX3470103 TX 2005A METERING SYSTEM LAYOUT TYPICAL XXX AMP CIS o00V 50 5 L1 LZ E 20 X16 X6 ENCLOSURE B GROUNDING LUGS 2 e 0 POTENTIA RANSF 120V MUST BE BONDED TO SYSTEM GROUND SHORTING LINKS NI 2 22 2 Pulse output to el 9 Automation unit TX 2005A
3. ntellimetei nte CANADA INC service intellimeter on ca Innovative Metering Solutions intellimeter on ca TX 2005A Series Meters Installation Manual Copyright 2013 1125 Squires Beach Road Pickering Ontario L1W 3T9 Phone 905 839 9199 Fax 905 839 9198 Revision 5 0 2013 06 24 Part PMID C M 3 1 Measurement Canada Requirements un 3 Part TWO sassa 4 2 Metering Rules REDE EE E 4 nM Mv 5 3 Installation EE 5 Ree 6 E 6 C E NU AE 7 5 CT Wiring and Lengths 7 MM Tv TEC 8 6 RERO 8 Tr 9 Z ele E 9 E 10 B Pr Sit Visit Cheek E 10 10 Typical Layout TA 2005A ER pap ER aep 11 INSTALLATION INSTRUCTIONS FOR TX 2005A Meters Copyright 2013 Intellimeter Canada Inc 2 of 16 Revision 5 0 2013 06 24 1 Measurement Canada Requirements Measurement Canada Notice to all Electrical Contractors and Owners Applies to milli Amp type CT s only This is to inform the electrical contractors who are installing any static type metering system that Current Transformers CT
4. D Distributor TX 2005A L3 L2 L1 N VOLTAGE REFERENCE Contractor aad aad Date pT SS e Rev L C TO PULSE P TRACKER OUTPUT 20 Turn CT s TX 2005A MENFE SYSTEM LAYOUT TYPICAL CANADA INC Innovative Metering Solutions C00 AMP CT 120 208V 20 AW L1 L2 Es N GROUNDING LUGS Fax 905 839 9198 intellimeter on ca N Pulse output to Automation unit TX 2005A _ 12 X12 X6 ENCLOSURE TXA1202003 TX 2005A METERING SYSTEM LAYOUT TYPICAL CANADA INC Innovative Metering Solutions XXX 5 CT W 120 208V 34 L1 L2 ES GROUNDING LUGS SHORTING LINKS 9 DIN RAIL EN N Distributor S 55 22 Pul tput ti TX 2005A ontractor 10000000 1125 Beach Road Pickering Ontario L1W 3T9 Phone 905 839 9199 Fax 905 839 9198 intellimeter on c
5. 120 240 Line 1 2 CT1 Line 2 CT2 Network Two Phase Three Wire 120 208 3 sets Typical Colour Code Line 1 2 A phase Red Line 2 CT2 B phase Black amp Line 1 2 C phase Blue Line 2 2 2 A phase Red amp Line 1 2 B phase Black Line 2 CT2 C phase Blue If the load is on B amp C phase Line 1 CT1 is on B phase and Line 2 CT2 is on C phase This staggering of phasing is to match the typical three phase four wire distribution panel for 2 phase loads kkkkk Three Phase Meter Typical 120 208 277 480 347 600 Colour Code Continued on next page INSTALLATION INSTRUCTIONS FOR TX 2005A Meters Copyright 2013 Intellimeter Canada Inc 6 of 16 Revision 5 0 2013 06 24 Line 1 A phase Red Orange Line 2 CT2 B phase Black Brown Line 3 CT3 C phase Blue Yellow 5 CT Wiring and Lenqths Current Transformers CT s are directional gt An arrow points to the load or H1 indicates Line Side Typical Install CT1 on Line 1 Red CT2 on Line2 Black and CT3 on Line3 Blue LINE LOAD Refer to Service Types above for your system External Current Transformers CT s Twisted Pair 18 14 stranded colour code 1 Intellimeter CT s White 200A Yellow Black 2 Intellimeter CT s Yellow Black trace 400A Black Yellow 3 Instrument Transformers CT s White X1
6. All 00 Type Black X2 The maximum length the CT leads can be extended is 400 feet for 1 amp 2 and 50 feet only for 3 1 twisted pair wire only for each CT Intellimeter CT s lt 50ft 18 minimum gt 50 to lt 150ft 16 minimum 2150 to 250ft 14 minimum 2250 to 400ft 12 minimum Instrument CT s 14 minimum Identify the polarity and the phase the CT is installed on for proper termination Always identify all wires Refer to installation drawings and terminal labels for polarity and connection INSTALLATION INSTRUCTIONS FOR TX 2005A Meters Copyright 2013 Intellimeter Canada Inc 7 of 16 Revision 5 0 2013 06 24 6 LED Indicators telimeter Dir LEDs When OFF it indicates CT is installed correctly When ON Orange CT is installed backwards majority of load is in the negative direction or phasing is incorrect Re verify the installation LOAD LEDs Under load this LED Red will pulse proportion to load The more load the meter measures the faster the pulsing Refer to attach label for pulse rate Ks POWER This LED Green indicates power is ON Accuracy test Referring to the LOAD LED pulse The TX meter has a LOAD LED Red that will allow the meter to register a pulse at attached label for pulse rate Ks This will enable you to determine the accuracy of the meter with a radian standard or to mathematically determine the time between puls
7. s are assigned to a specific meter and are required to stay with that meter Any CT s that are not installed on the meter assigned and sealed with will void the meters seal and be considered a non legal billing meter On the side of the CT s the serial number of the meter and the potential line is indicated as a guide for the contractor FOLLOW THE INSTALLATION DRAWINGS Match the CT s with the meter and install them on the correct line to the correct phase If there are any differences with the drawings compared to your distribution panel CALL US IMMEDIATELY CAUTION Phasing and CT installation are very important If the metering system is not installed according to the installation drawings the system will not work and any cost in correcting the installation by Intellimeter will be charged back to the installer developer Copyright 2013 Intellimeter Canada Inc 3 of 16 Revision 5 0 2013 06 24 INSTALLATION INSTRUCTIONS FOR TX 2005A Meters 2 Metering Rules 1 Current Transformers are directional Z2 Voltage references must be in phase with the load being metered and from the same source Z3 CT s milli Amp are certified to an assigned meter and to the meters assigned phase Rule 1 If the CT s are mounted in the opposite direction the polarity of the CT will be opposite The arrow on the CT indicates the direction from LINE to LOAD LINE LOAD Similarly the 1 is on
8. a Project Name Note AFTER CT s HAVE BEEN INSTALLED 1 2 x 1 2 X6 THE SHORTING LINKS MUST BE OPENED FOR THE METER TO OPERATE E N L R E THIS UNIT IS SHIPPED WITH JUMPERS IN U CLOSED POSITION FOR SAFETY Drawing DURING INSTALLATION 1200103 TX 2005A METERING SYSTEM LAYOUT TYPICAL CANADA INC Innovative Metering Solutions 7 600V 20 AW a Fax 905 839 9198 intellimeter on ca GROUNDING LUGS 9 DIN RAIL Pulse output to Automation unit TX 2005A 12 X12 X6 ENCLOSURE TX3472003 TX 2005A METERING SYSTEM LAYOUT 7 600 209 AW TYPICAL CANADA INC KRAI AMP Innovative Metering Solutions GROUNDING LUGS SHORTING LINKS C 9 DIN RAIL
9. e CT s to be installed on the load feeders 7 One feeder at a time install the CT s so the arrow is pointing towards the load Confirm on the drawing the installed CT corresponds to the correct phase of the suite Continue until all CT s are installed INSTALLATION INSTRUCTIONS FOR TX 2005A Meters Copyright 2013 Intellimeter Canada Inc 5 of 16 Revision 5 0 2013 06 24 8 Supply a voltage reference from the distribution panel Depending on the configuration minimum is a 15A breaker and the number of phases should match what is required on the drawing 9 If the system is automated a CAT 5 4 pair 24 Network cable is required to be pulled from one metering panel to the next until it reaches the communication cabinet that is usually mounted in the communication room or main electrical room Refer to single line drawing 10 Attached is a checklist that is to be completed verified and faxed back to Intellimeter before commissioning is scheduled NOTE The electrical contractor will provide an electrician for the duration of the commissioning for inspection and for any modification re work required Intellimeter is not liable to work on the electrical distribution and will only be terminating the communication lines All deficiencies will be recorded and sent to the electrical contractor for correction before returning to site 4 Service Types Single Phase 2Wire 120 Line 1 2 CT1 Single Phase 3 Wire
10. es for a given load Voltage Phase to Neutral Amperage SUM of all currents 1 Voltage x Amperage Ks 3600 seconds per pulse This is the time in seconds between pulses in test mode Unless you have a fixed load this is an approximate value Troubleshooting LOAD LED NOT No load on service Apply some load ON or PULSING CT s installed incorrectly Refer to above wiring Phasing out of sequence Correct the install CT s and phasing should be matched CT1 on Line1 CT2 Line2 and CTS on Line3 INSTALLATION INSTRUCTIONS FOR TX 2005A Meters Copyright 2013 Intellimeter Canada Inc 8 of 16 Revision 5 0 2013 06 24 DIR LED ON Indicates the majority of the Correct the CT installation load is in the negative Refer to above installation direction CT is installed directions backwards phasing is not correct POWER LED Power not connected or not Verify the voltage reference NOT ON ON Line1 and Neutral is energised required to power the meter 7T Communication Cable Refer to the enclosed sheet for communication cable pathway connection and termination configuration between all automation TX 2005A typically is used with PT2000 Refer to the PT2000 connection drawing for termination and specifications PT 2000 Serial Numbers range from 5000 A For any additional installation and troubleshooting questions plea
11. lowing the installation drawing that was designed for that particular distribution Follow the Installation Drawing If there is a discrepancy with the drawing in comparison to your distribution panel call us for assistance For all 5Amp type Instrument Transformers make sure you identify the phase that it was installed on for proper connection at the meter terminal block PLEASE CALL IF ANYTHING IS NOT CLEAR IT IS DIFFICULT TO CORRECT ERRORS ONCE INSTALLATION HAS BEEN COMPLETED Technical Assistance 905 839 9199 Part Three 3 Installation Instructions These installation instructions are generic for both types of multi customer sub metering systems Again call before you install if you require additional information on this process If any of these steps incorrect call for assistance 1 Confirm the drawings that were sent with the metering system are accurate Verify the type of panel and that the distribution is the same It is important that all assigned breaker phasing is correct 2 Assign the proper panel to the identified distribution 3 Verify the number of loads is the same as the number of meters 4 Verify the type of system is the same as the meters supplied Ex 120 208V 100A or 200A 3 phase 4 wire single phase 3 wire network system etc 5 Mount the panel as indicated by the drawing Call to inquire if a different mounting configuration would work better 6 Refer to the drawings to sort out th
12. se call and ask for technical help 905 839 9199 Technical Support INSTALLATION INSTRUCTIONS FOR TX 2005A Meters Copyright 2013 Intellimeter Canada Inc 9 of 16 Revision 5 0 2013 06 24 Part Eight 8 Pre Site Visit Check List Description of Work Yes No Tech 1 All loads been identified confirmed at the distribution panels Suite to Breaker Verification 2 The installation drawings are accurate 3 All metering equipment installed 4 The voltage reference to metering board disconnect is pulled connected and energised 5 The voltage reference is in phase with the loads being metered A is A B is B amp is etc All CT installation has been completed and confirmed that 6 they are installed the correct direction and installed accordingly to the installation drawing 10096 7 All suites or loads have been documented on the installation drawings 8 All communication cables if applicable pulled accordingly to the single line drawing CAT5 cable 9 In each metering cabinet the communication cable is identified and has enough length for proper termination 10 The communication cabinet is mounted in designated area and a 120VAC 15 circuit is assigned to it A communication cable CAT5 from the communication 11 cabinet to an internet connection is supplied for remo
13. te communication 12 The metering panels are all energised and working There should be no ORANGE light illuminated This would 13 indicate a reverse load and would need to be investigated Page 10 Job Name Job Date Company Office Number Forman Site Number Signature Date Requesting for Site Visit Intellimeter Canada Service Department Phone 905 839 9199 Fax 905 839 9198 INSTALLATION INSTRUCTIONS FOR TX 2005A Meters Copyright 2013 Intellimeter Canada Inc 10 of 16 Revision 5 0 2013 06 24 WIRING DIAGRAM FOR INSTRUMENT CURRENT TRANSFORMER SHORTING BLOCK AND TX 2005A METER CANADA INC Innovative Metering Solutions O LINE SIDE LINE SIDE EG 20005 EG 20005 EG 20005 A LINE1 LINEe LINES BLACK WHITE LINE SIDE WHITE WHITE BLACK A Gel e ez IS S 27 2 AFTER CT s HAVE BEEN INSTALLED THE SHORTING LINKS MUST BE OPENED FOR THE METER TO OPERATE RIOT e S Zuel IS e 2 Hey el e e E SHORTING LINKS 1125 Squires Beach Road Pickering Ontario L1W 3T9 Phone 905 839 9199 Fax 905 839 9198 intellimeter on ca Project Name CO
14. the LINE SIDE All Intellimeter s milli Amp current transformers 200 0 1A 2000 1 and 400 0 1A 4000 1 have self shorting protection built into the device They can safely be open circuited while under load All 5 Amp X00 5A Type Instrument Transformers Do Not Have This Protection And Are Required To Be Shorted Together While Under Load At All Times Rule 2 Check to verify that the voltage potential used as a reference voltage is the same phasing as the loads being metered ABC is ABC not CBA The reference voltage must come from the same source Voltage reference from another transformer is incorrect and causes inaccurate readings Connect the voltage reference to the meters disconnect or terminals making sure it is the same phase sequence Usually Line 1 Red or A phase Line 2 Black or B phase Line Blue or phase Neutral White INSTALLATION INSTRUCTIONS FOR TX 2005A Meters Copyright 2013 Intellimeter Canada Inc 4 of 16 Revision 5 0 2013 06 24 Rule Z3 Intellimeter milliamp current transformers 200 0 1A and 400 0 1A only When the metering system was tested at the factory the CT s were assigned to a meter and to a specific element of that meter Under Measurement Canada regulation for electronic static sub metering the CT s must be installed and used only with the meter and element that it was certified with We have identified each CT so it can be easily installed fol

Download Pdf Manuals

image

Related Search

Related Contents

Colorature, Mrs Jenkins et son pianiste  Plantronics Voyager Legend CS    CCH Products YPO6-08C Use and Care Manual  Hans Grohe 37200 User's Manual    MODE 3.1 Installation Instructions  

Copyright © All rights reserved.
Failed to retrieve file