Home
        Installation manual Femtogrid Inverter 2400 v1.0
         Contents
1.    femtogrid    www femtogrid com    Inverter    Installation Manual       Femtogrid Solar System  the sunny side of shade    Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    Content  ts JExplanation Of Ine SVMbDOlS USEC reroror E EE ETEO ETEEN ETENE 3  2s  MUOU ON eaea AEAEE AN 4  GSN E E E A wer ee rece re tree Cemeer ete 4  Target orou COC UME assanir e a a indore toidaeanatied 4  Introduction to the Femtogrid Solar System          sssessscesesescesescseceseeceosececosoeececeseeceoeececoseeee 4  Sx  SEVIS UCONN ren anrr E EE ET EE RA 6  Installing the Femtogrid Solar System         ssssesessecesescoscesceeceseecsecesesceoesesosorsceceseeoeoeeeecoeesee 6  High voltages inside the Power Optimizer and the inverter         sssssesesescescseecesesceseseecesesceeeo 6  Femtoerid DC DUS safety WalMNOS er oiorire et NEEE EEEE 6  COMMECTION ARCA eanan a a a aa aa a a 6  4  Schematic Femtogrid Solar System         ssssssssescesseesocescesseesocescesoeesceescesceesoee  7  5s SHOrt installation  SEQUENCE accciicscdddeicsstdcteresedihesaiawecss a eaa a Eaa a 8  6  Mechanical installation of the inverter             sssessesessesessesossesossesoesesoeseseeeos 10  CHECK DANES sevecr vedien EEE E E E EEVEE AETERNE 10  Check TOF damage Or Me DIOCuC  Ss  ecucswacecwtdadsockeswecccutoataesheswascsetoadaashcewescseseadseseceweate 10  CHOOSING  TNE MOUNLING LOCATION sarasin e E ET E E E E E E 10  DIMENSIONS ocenita e e tudes E a E E N E 11  Mounting the inverter onto the 
2.  solar inwerter    Trade name  Femtognd   inverter 2200  Type Model  Solar inverter 22001501  Ratings  Input 390  400 Vide   amp  7 A max  0 2550 W    Output 230 Vac  S0Hz  10 5 A  2400 W max  by  Betronic Solutions BW   Pedro de Medinalaan 11 1085 XK Amsterdam ML    Requirements  NEN EN 5038 2008 Requirements for the connection of microgeneraters im parallel with  public low voltage distibution networks   Interface protection only examined for the following country specie requirements       Belgaum     Germany  meuding requrements defined mn VDEO126 2006 02     Spain  Including requirements defined in RD1803 2000402      France         Kingdom  including requirements defined im G83 1 2003 9         granted on account of an examination by KEMA  the results of which are laid down in a  confidential file no  74100385 ETD 11 0828  d d  29 04 2011    The examination has been camied out on one single specimen of the product  submitted by the manufacturer  The  Attestation does not indude an assessment of the manufacturer s production  Conformity of his with  the specimen tested by KEMA is not the responsibility of KEMA       KEMA  Amhem  date 20 04 2011    y  Mir       Dr  Erik de Jong     Publieien of the Arauan i a Paban fh hel ar i pad amii ee en fn Whee wry a h Gone Sf he bee eee eed api  bi Pa akad haa eee oe Pic Eee ey Sheet eer i fie feet  oe Gp rea bet    KEMA  Quality B W  Uirechiseweg 310  6972 AR Amhem PO  Bor 5105  6602 ED Amhem 1 eiemel  TAH JA F 2 a a cusiomenkema co
3.  the inverter     The installation must be protected by a circuit breaker of 16 A     To ensure good wireless communication for the web monitoring portal it is important to  place the inverter in range of the wireless network of the Power Optimizers  For example   in the loft right under the roof  If this is not possible  there are two ways to enlarge the  range of the wireless network  First mount the Monitoring Box on a strategic place  between the Power Optimizers and the inverter  If this doesn   t work  additional repeaters  are necessary to enlarge the range of the wireless network  For more information on the  monitoring system  see the manual of the Monitoring Box  The inverter and Power  Optimizers do not need the wireless network to convert the energy properly     Rev 2 0   Januari 2012 10 28    Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    Dimensions          197 mm    325 mm    A    647 mm                      Mounting the inverter onto the wall  Choose a place that allows the inverter to conduct its heat  A range of 50 cm above the  inverter must be clear of obstacles           min 500 mm    E   ooo0o  0o0    min min  50 mm 50 mm       YQ ye       min  300 mm    V    Make sure the inverter hangs vertically  Do not place the inverter horizontally     Rev 2 0   Januari 2012 11 28    Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    Mounting instructions  Screws and plugs are not included  Each wall needs different scr
4. 4     15     16     17   18     View the mounting construction and decide where to place the Power Optimizers  on the back of the module  Do not mount the Power Optimizer behind a mounting  beam     Clean the back of the module where the Power Optimizer will be attached  Use  alcohol or naphtha and a soft cloth     Remove the red covers of the double sided adhesive tape and attach the Power  Optimizer to the back of the module     Lead the Femtogrid DC cable through the fingers of the Power Optimizer   Connect the MC4 connectors   Repeat step 2 till 7 for all modules     Lead the longer  custom length  Femtogrid DC cable  inverter cable  into the  house  but do not connect this cable to the inverter     Connect the longest Femtogrid DC cable to the Power Optimizer of the first solar  module that will be mounted  This module is mounted most nearby the inverter     Connect the Femtogrid DC cable that is attached on the module on the remaining  connector of the Power Optimizer     Pull on the remaining cable end of the Femtogrid DC cable that is fitted in the  fingers of the Power Optimizer untill you have the right length to connect it to the  Power Optimizer of the next module and fix the module     Place the next module and connect the Femtogrid cable of the previous module  on the Power Optimizer     Repeat steps 10 and 11 till the last module   Place an end cab on the Power Optimizer of the last module that will be mounted     Mount the inverter inside on a suitable place a
5. DC power   Recommended PV power range   Nominal DC operating voltage   Minimum input voltage for rated output  Maximum DC current   MPP tracker   Isolated transformer    Mains Output  AC    Maximum AC power   tamb 25  C    Nominal AC power   Nominal output voltage range  country specific   Maximum output current  continuous   Maximum efficiency   Efficiency  European related  Euro ETA    Power factor    Frequency  country specific     Standard Compliance  EMC  Immunity  EMC  Emission    Grid connection standards  CE   RoHS WEEE REACH   Safety class   Protection rating  Temperature protection    General   Dimensions  WxLxH   Ambient temperature  Weight   DC connections  Output connections  Area of application    Rev 2 0   Januari 2012    Installation manual Femtogrid Inverter    Single Phase inverter  22001SO1    2550   2400   360 400   380   6 7    PV Power Optimizer    Galvanic separated    2400  2200  184 265  10 5   96   94 6   1   45 55    EN61000 4 2 3 4 5 6 11  EN55022 EN60601 1 2  EN55022 EN61000 3 3   NEN EN 50438 VDE0126 1 1  yes  yes   Class    IP31   gt  80    325x645x203   0 40    38  Femtogrid Wieland  Wieland   Indoor    Dimension    Wp  Vdc  Vdc  Adc    Vac  Aac          Hz    mm  kg    Type  Type    25 28    Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    12  Certificates       ATTESTATION OF CONFORMITY    No  74100365 ETD 11 0829    Issued to  Betronic Solutions B V   Pedro de Medinalaan 11 1085 XK Amster       For the product Femtognd
6. Inverter    Femtogrid inverter    Version 1 0 6    Button function   Back None   Up Display previous value  Down Display next value    Enter Open menu    Main menu  24 hour graph    Software version    Button function   Back Go to previous menu home screen  Up Select the menu item above   Down Select the menu item below    Enter Select menu item       19 28    Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    Push message    When the inverter has an important  message to show to the user  it will use a  push message     In this screen the user is alerted of current  events     To exit the push message press the Enter or  back button     In case of an ongoing blocking event the   user will not be able to exit the push   message   Button function  Back Exit push message  Up None    Down None    Enter Exit push message    Time  amp  date set screen    When the time  amp  date set function is Set time date  selected in the settings menu the user will  be shown a time  amp  date set screen  31 12   2011 13 45 59    AN  At the bottom of the screen an indicator   arrow is displayed indicating the current     a      C   editable number  To raise the value of the   number press the up button  to lower the   value of the number press the down button     To go to the next number press the enter    button  When the last number is already Button function  selected the new time  amp  date will be saved    Back Select previous number exit screen  and the time date inte
7. crew terminal with label    Blue     D e HOT conductor on screw terminal with label    Red   e Neutral conductor on the screw terminal with label O  Black     Ensure that the wires are connected properly  COLD HOT  Snap the rear part of the socket onto the socket insert     Tighten the screwed cable gland          SSi   lt   Click     lt        NEUTRAL       Rev 2 0   Januari 2012 16 28    Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    8  Commissioning    Determine correct AC cable   To avoid unnecessary disconnection from the grid  the conductor cross section should be  dimensioned such that cable losses do not exceed 1   at nominal power  We advise to use  cables with a diameter of 2 5 mm  or 4 mm        Select a proper cable according national and or local regulations     Start up  The user will follow the next steps after starting up the first time     e Start the inverter   e adjust the language   e adjust the country of installation     e adjust the time     Setting country  The first time the inverter is connected to the grid  The display of the inverter will show a  selection menu where you can select the country of installation     Select the correct country to start the inverter  After a selection is made  these settings  cannot be changed anymore     It   s important to select the right country to fulfill the regulations of the country where  the inverter is installed  If no country is selected the inverter stays in standby mode  and does n
8. ews and plugs to ensure a  solid fixation     Take the weight of the inverter in account when choosing the appropriate mounting  material  The weight of the inverter is  38kg     1  Use the mounting plate to mark the drill holes on the wall        2  Attach the mounting plate to the wall using appropriate screws and washers     3  Place the inverter on the mounting plate        Rev 2 0   Januari 2012 12 28    Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    4  Check if the inverter is correctly aligned on the mounting plate     Minimal  12 cm       5  Use the inverter to mark the drill hole on the wall     6  Lock the inverter with a screw on the bottom        Rev 2 0   Januari 2012 13 28    O      Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    7  Connection area    Do not open the inverter during the installation     Do not switch on the AC power before finishing the installation   The safety switches of the Power Optimizer are activated when the AC power is  switched on  The DC bus can be charged to a potentially dangerous voltage     Use of the special Femtogrid cable is prescribed for this installation  This cable is  specified for outdoor use     Materials  According to T  V 2 Pfg 1169 08 2007   Insulation   Special XL HFFR compound     Conductor  Tinned copper conductor according to class 5 of IEC 60228     The inverter has two connection points     The connectors that fit on these connection points are delivered with the 
9. ge  English  Nederlands  Deutsch  Espagnol  Italiano  Francais    e Country   Netherland  3   Belgie  3   Deutschland  3   Espagnole  3   France  3    Italia  3    United Kingdom  3     e Edit installer PIN  2        Femtogrid  2      Connected devices      Wind  Solar  Battery  External source 1  External source 2  External source 3   e Femtogrid consumers   e Priority level       Earth Monitor  2   Ground voltage  Set high limit   Set neutral limit  Set low limit   Set response time  Retry on    e AC Grid  2    Pmax   Frequency   Phase   Supply to AC Grid  Draw from AC Grid  Pmax from AC Grid  Island detection  Generator backup       Software versions  e System selftest  1      1  Only visible when country is set to Italy   2  Requires installer PIN code  editable by installer      3  Requires manufacturer PIN code  contact Femtogrid Energy Solutions BV     Rev 2 0   Januari 2012    Installation manual Femtogrid Inverter    22 28    Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    Error codes and warning messages  Error codes and or warning messages  If the display presents an error code or warning  message  please check the website www femtogrid com for references     24h energy graph  The inverter shows a graphical presentation of the energy that is generated in the last 24  hours  This is only possible if the inverter is active for more than 24 hours     Software versions  This menu item shows the software version of the inverter  Our Customer serv
10. he installation   The safety switches of the Power Optimizer are activated once the AC power is  switched on  The DC bus is then charged to a potentially dangerous voltage     Rev 2 0   Januari 2012 6 28    Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    4  Schematic Femtogrid Solar System    The schematic overview presented below shows all parts of the Femtogrid Solar System          Femtogrid Solar System E  KE   Femtogrid  1  PV Module  backside view     2  Power Optimizer  4   3  Femtogrid DC cable  3 core 2 5mm   custom length   4  Inverter  5  Monitoring Box  6  Femtogrid DC cable  3 core 2 5mm    length 2 or 3m    c      7  Power Optimizer with end cap    3     All Power Optimizers are connected in parallel with the special Femtogrid DC cables   which have 3 wires  These 3 wires enable the parallel network  as shown in the  schematic overview displayed below  The data communication is wireless using a  Zigbee network and has no influence on the power generation                       q  Monitoring box    Power Optimizer i   Power Optimizer l      u       Power Optimizer     Power Opti mizer li         S        Power Optimize   Power Optimizer a i  E a        AC    Rev 2 0   Januari 2012 7 28    Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    5  Short installation sequence    To ensure a safe  quick and easy installation  we advise to follow the following installation  sequence     1     a ee ee    10     11     12   13   1
11. ice can ask  for this version number during a service call     Settings   In this menu item several settings can be changed  This includes time and date  Zigbee  network  language  country and device settings and information    The country settings can only be set the first time the inverter is installed  This can only  be changed with a pin code in the factory or by an authorized person     Time date  Set here the time and date  This is important for data logging and warranty     Zigbee Network  In this menu information and commands for the zigbee network can be given     Edit installer PIN  If you have the installer PIN code you can change it here to avoid unauthorized access to  the setting     Femtogrid  With the installer pin code it is possible to view details and edit settings of connected  devices on the Femtogrid     In normal use  it is not necessary to enter this menu and mainly used for trouble shooting     Earth Monitor  With the installer pin code it is possible to view details and change settings of the earth  monitoring protection  This is only allowed by qualified personnel     AC Grid   With the installer pin code it is possible to view details and change settings of the AC grid  monitoring circuit  This is only allowed by qualified personnel and with permission of the  grid operator     System selftest   When this inverter is installed in Italy  the inverter has to perform a self test before it  connects to the grid  This menu item is only visible if the co
12. ings menu   gt  Zigbee  network   gt  node list     It should show the appropriate number of Power Optimizers  one monitoring box  and the number of inverters minus one  it does not see it self      Rev 2 0   Januari 2012 9 28    Oo       OO  gt     Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    6  Mechanical installation of the inverter    Check parts    Inverter   Mounting bracket   User manual   Installers manual   Femtogrid connector    Used to connect to DC Femtogrid   6  Wieland connector    Used to connect to AC grid     oh wn           Check for damage of the products  Check the DC cables for damage  Cuts in DC cables or broken DC connectors can cause  malfunctioning of the Femtogrid Solar System and may cause dangerous situations   Check the inverter  If damaged  contact your supplier     Choosing the mounting location  DANGER to life due to fire or explosion     Despite careful construction  electrical devices can cause fires    e Do not mount the inverter on flammable construction materials    e Do not mount the inverter in areas where highly flammable materials are stored   e Do not mount the inverter in areas with a risk of explosion     The inverter is only suitable for indoor placement  It is not allowed to place the  inverter outside where it is exposed to rain and other weather conditions     If more inverters are installed be sure that the inverters are not placed above each  other  This has a bad influence on the heat dissipation of
13. inverter     Rev 2 0   Januari 2012 14 28    Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    Assemble the AC cable connector    Connect the AC cable socket with a flexible cable according to EN60309 2 VDE 0623   Strands with a cross section of minimal 2 5 mm  to maximal 4 mm  can be connected        Pai J Screw connection   7 g tightening torque typically  0 8     1 0 Nm    Push the rear part of the socket over the cable  N L1  Press wire end sleeves onto the stripped strands     Connect the individual wires as follows   e Protective earth conductor PE  with the screw terminal with earth symbol  D e Neutral conductor N on screw  terminal with the label N  e Phase L on screw terminal  with the label L       Ensure that the wires are connected properly   Snap the rear part of the socket onto the socket insert and tighten the screwed cable  gland        Rev 2 0   Januari 2012 15 28    Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    Assemble the Femtogrid DC cable connector    Connect the Femtogrid DC cable socket with the special Femtogrid DC cables  Strands with  a cross section of minimal 2 5 mm  to maximal 4 mm  can be connected        Screw connection   tightening torque typically  0 8     1 0 Nm    Push the rear part of the socket over the DC cable   Press wire end sleeves onto the stripped strands     Use the Femtogrid DC cable and connect the individual 3 wires with the insert in turn as  follow     e Cold conductor on the s
14. m    The installation of the Femtogrid Solar System must be carried out by authorized  installers and performed in accordance to local and national regulations  e g  the  regulations for the Netherlands are covered by the NEN1010      Do not connect the inverter to the DC grid before the total system is installed  The DC  grid may be charged up to 400 Vdc when it is connected to the inverter  Do not touch  the inside of the connectors    High voltages inside the Power Optimizer and the inverter    Do not open the housing of the inverter or the Power Optimizer  This is not needed for  installation and should only be done by authorized installers  Warranty will be void  after opening the housing of the Power Optimizer or the inverter     Femtogrid DC bus safety warnings    If the Femtogrid female DC connector is disconnected from the inverter  the power of  all equipment of the bus  DC grid  will be disconnected  However  if the DC cables or  connectors are damaged  it is possible to get electrical shocks     Place a protection or end cap on the    OUT     female DC  on open connectors of Power  Optimizers  Normally it is not possible to directly touch the high voltage  but without  an end cap  water can get into the connector and can cause malfunction of the system     CAUTION  DOUBLE POLE   NEUTRAL FUSING IN  4   4 N    Connection area  Do not open the Power Optimizer  Dangerous voltages can be inside this device     Do not switch on the inverter  AC power  before finishing t
15. m WW kera cm Regeiered Amhem 090c5396       Rev 2 0   Januari 2012 26 28    Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    oe  s    a  A       oO    CERTIFICATE    ELECTROMAGNETIC COMPATIBILITY    Applicant   Betronic Solutions BY  Contact person   Mr  Peter van der Hoek  Address  Z Pedro de Medinaiaan 11  Postal code  Place   1086XK Amsterdam  Country 2 The Netherlands    Electrical apparatus   Solar inverter  Trademark  gt  Femtogrid   inverter 2200  Type designation   Solar inverter 22001801       Environment   Residential VHH   EN 50438 2008 reer ne ncn meget n pwe at pinne o i    EN  amp 1000 6 3 2007 Generic emission standart SN SCR and MANAN    tal e   EN 55022 2006 Emission   Class 5 ARIPI LGIA IAHT iy    A1 2007 ILAIJA  Yi Af  H H YY   EN    61000 3 2 2006   Harmonic current emissions PIII ALLEL ELLE    A1 2005   42 2009 BIIIH j j HIHIHI   EN 61000 3 3 2008 Limitation of voltage fuictuations is  HEIL   EN 61000    1 2007 Generic immunity standard tor resident cemrra ana gra onments il    EN    1000 4 2 2009 meendeepedragee draglorenap s AIII CELETTE ii   A1 2008   If LEE LTT    A1 2010   PEEEPELELLT LS LLLLT ES    EN 61000 4 5 2006 Surge transient immunity  EN 61000 4 6 2009 Conducted Radio Frequency disturbances many  EN    1000 4 8 2010 Power frequency magnetic feid mmmuntty   j       i  HITI  ii iy Ti    The undersigned declares that the described product meets the essential EMC requirements of fhe standard ENS0433 and  the essential requi
16. nd connect the Femtogrid DC cable   see manual inverter for detailed instructions      If a blue monitoring box is delivered  Activate the monitoring box  by pressing the  button with a small pointy object  e g  toothpick  for 5 seconds during power up     Assemble the delivered female AC connector and connect the inverter to the  mains     Enter date  select language and country     When a monitoring box is installed  wait till the question    search for network      appears  Do not answer    Yes    directly  but first execute step 19     If no monitoring box is installed  answer    No    and go to step 21     Rev 2 0   Januari 2012 8 28    Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    19     20     21     22     Press the button of the Monitoring Box shortly  The green led will start to blink  for 50 seconds  During this time Power Optimizers and the inverters can enter the  network of the Monitoring Box  The Power Optimizers will join automatically to this  network  The inverter needs a conformation to join the network     Select    yes    at the inverter  question    search for network      during the time the  monitoring box has a green blinking led  The inverter will search and answer that  it has joined the network     Now the system is installed  Press two times the up button of inverter to check  on the display if power is converted  to be sure that the system works properly     To check if the wireless data network is installed  go to  sett
17. op  It is also a great step forward in terms of rooftop  optimization     Moreover  the Femtogrid Solar System has a big advantage for solar systems at places  where PV modules are partly shaded  Here  the power output for shaded PV modules can  be higher than for traditional systems using a serial system approach due to smart  electronics and a parallel system approach used  As a result  benefits up to 30  can be  realized     Validation document    This document is only valid for inverters with the following nameplate  Keep this guide in a  convenient place for future reference     id Femtogrid Energy Solutions BV  I i tog ri Pedro de Medinalaan 11  energy sSuriana 1086 XK Amsterdam    The Netherlands    Femtogrid   Inverter FG 12200 001  PD  YYWW   MacZigbee  11 22 33 44 55 66 77 88  Serial Number  YADDVPNNNN    Rev 2 0   Januari 2012    DC input power    DC input voltage    DC Max input current    AC Nom  operating voltage   AC Nom  operating frequency   AC Nom output power     AC Max  output power   AC Max  output current   Power factor   Operating temp range   Product Code   Enclosure    Type    Safety Class     VDE 0126 1 1   Dual power supply  Single phase    0 2550 Watt  360 V  400 Vdc  6 7A   230 V   50 Hz  2200 W   2400 W  10 5A    gt 0 95   10  C   40  C  729450   IP 31  FG 12200 00 1    CE X J   RoHS       5 28    ooo 22 8 8       Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    3  Safety instructions    Installing the Femtogrid Solar Syste
18. ot convert energy     Rev 2 0   Januari 2012 17 28    Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    9  User Menu    Menu manual    Boot screen    The boot screen is displayed during the Femtogrid inverter  startup sequence of the inverter  When the  inverter finished its startup sequence the    display will show the home screen  Version 1 0 6    Button function    Back None  Up Display previous value    Down Display next value       Enter Open menu    Rev 2 0   Januari 2012 18 28    Femtogrid Energy Solutions BV    Homescreen    The home screen is the default screen the  inverter will always return to     The home screen can display several values  such as  status of the inverter  total energy  generated  energy generated today and  current power     To switch between values use the up down  buttons  To enter the menu of the inverter  press the Enter button in the home screen     Menu screen    The inverter screen is equipped with a  graphical menu interface in which various  settings and functions can be accessed     At the top of the screen the title of the  menu is displayed regardless of the scroll  position in the menu     Below the menu title the menu items are  displayed  The selected menu item is  displayed with an inverted background  color     At the right of the screen the scrollbar  indicates the position of the selected menu  item in regard to all the items in the  current menu     Rev 2 0   Januari 2012    Installation manual Femtogrid 
19. rements of me EMC directve 2004 108 EC  based on a nantepuireni Sanaa Fe Sah tenie are  recorded In the KEMA test report with reference 74100365 ETD 11 0828        DEKRA Certification B V    Noted 5ody EMC   Amhem  12 April 2011    ing A T  wan der Meliden  Certification Manager EMC Certificate nr  2143652 0551 EMC    Integra    publication of Ts certificate and associated reports may De used in ts original form ory   All testing  Inspection  suciing and cerificaton activities of the former KEMA Qualty sre an ntega part of me DEXRA Cerificaton Group     DEKRA Cerification 5 V  Urechtseweg 310  6512 AR Amnem PO Box 5185  6802 ED Amnem  The Netherlands  T  31 26 356 2000 F  31 26 3525800 www derrscertiicaion com Chamber of Commerce nr  09065356    Rev 2 0   Januari 2012 27 28    Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    13  Company information    Femtogrid Energy Solutions BV  Pedro de Medinalaan 11     1086 XK Amsterdam  The Netherlands   T  31  0 20 5672140  F  31  0 20 5672159    www femtogrid com    Mail  info femtogrid com    Rev 2 0   Januari 2012 28 28    
20. rface will be exited  P    Up Raise value  To select the previous number or to exit the P    time  amp  date screen press the back button  Down Lower value    Enter Select next number save and exit       Rev 2 0   Januari 2012 20 28    Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    Value edit screen    To enter or modify a value on the display  screen the user is presented with an value  edit interface  Value name    123456 Volts    N    In this screen the title of the value is  displayed in the upper left corner of the  screen  The actual value is displayed in the  center of the screen optionally with its  unit     Below the value an indicator arrow is  displayed the indicator arrow points to the  current editable digit  To change the digit   s  value use the up down keys     To select the next digit press the enter  button  When the last digit is already  selected and the enter button is pressed  the interface will save the value and exit     To select the previous digit press the back  button  When the first digit is already  selected the interface will return     Button function   Back Select previous digit exit screen  Up Raise value   Down Lower value    Enter Select next digit save value and exit       Rev 2 0   Januari 2012 21 28    Femtogrid Energy Solutions BV    Menu map    e 24h energy graph    e Settings      Time date   e ZigBee Network      Network state   Nodelist  Step Up Power Optimizers off  Search network  Leave network    e Langua
21. rrent  lt  10 A    4  Designing and installing the Femtogrid Solar System is easier than for conventional string  systems  No need to worry about how many modules to connect in a string to be in range  of the inverters MPP range or what the routing must be  Technical  it does not matter how  the Power Optimizer are connected to each other  parallel system   however  for safety  reasons pay attention with wiring  you should end with a female DC connector  Therefore  we only include the end cab of a female connector and ask the installer to take notice how  to connect prewired cables     5  The Femtogrid Solar System is easy to expand  Of course the best value for money is to  design your system around the maximum of the inverter but our system is designed to work  wide power range and works also efficient in the lower power range  This gives the  possibility to start with a small system and expand when the price of solar modules has  dropped or if new products are available  The inverter can be used in a wide working range  from 400W till 3000W  If you like to expand even more it is possible to connect two or  more inverters in parallel on the DC Femtogrid side  They can be configured to work in a  Smart way to saves energy   higher efficiency  by switching on and off inverters   depending on the amount of energy that needs to be converted     Rev 2 0   Januari 2012 24 28    Femtogrid Energy Solutions BV    11  Specifications    Femtogrid    Type    Solar Input  DC    Maximum 
22. teussanasoreseseteeesacan ons 26  s Company MOMAN e gesan E a E O eeneas 28    Rev 2 0   Januari 2012 2 28    Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    1  Explanation of the symbols used    To ensure optimal usage of this document  we start by explaining the symbols used in this  installation manual for the inverter     LL This symbol indicates an example     This symbol indicates a note  which  if ignored  will make the procedure or  operation more difficult        This symbol indicates a fact  which  if not observed  could result in damage to  components or represents danger to persons  Read these passages carefully     Rev 2 0   Januari 2012 3 28    Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    2  Introduction    General   Thank you for buying this product and helping the world to be a greener place by adding a  sustainable energy system to our planet  Your photovoltaic  PV  system produces grid   ready solar energy that contributes to the global reduction of CO  emission and stimulates  the transition from conventional fossil energy sources to renewable energy sources in our  demand for energy     Target group document   Authorized installers must install this product  In addition  the installer must follow the  regulations of the local grid operator  The installer must read this installation guide  carefully and must ensure compliance with all prescribed safety regulations  the  technical connection requirements of 
23. the local grid operator and any other applicable  provisions     Introduction to the Femtogrid Solar System  The Femtogrid Solar System consist of the following parts     e PV modules   e Power Optimizer for every PV module   e Inverter 2200   e DC Cables  amp  Connectors   e Monitoring  wireless monitoring system  consisting of a Monitoring Box and a  Monitoring Portal    Together with the PV modules and its mounting material the Femtogrid Solar System forms  a complete PV system that due to its innovative features has some important benefits over  the traditional PV systems     One of the distinguishing features of the Femtogrid Solar System is the fact that it is now  possible to connect  in one PV system to the grid  PV modules of different quality in terms  of     e type of module  e g  mono  or polycrystalline    e power output  e g  185 Wp or 235 Wp    e power tolerance  e g   5 Wp    10 Wp    e open circuit voltage   e g  30 Voc or 40 Voc    e cell technology and number of cells   e manufacturer   e aging of the module   e output variation in response to temperature variation   e angle to the sun  e g  azimuth and the angle of the rooftop used     Rev 2 0   Januari 2012 4 28    Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    Another important feature of the Femtogrid Solar System is the fact that it   s plug  amp  play   safe and efficient  This is a major advantage and increases the flexibility for installers to  install a PV system on a rooft
24. untry Italy is selected  In the  Italian installation manual this self test is described in detail     Rev 2 0   Januari 2012 23 28    Femtogrid Energy Solutions BV Installation manual Femtogrid Inverter    10  Practical notes    1  The maximum solar DC input to be connected without energy losses to the Inverter 2200  is 2550 Wdc  There is no risk to add more power to the inverter than its rating  the smart  Femtogrid grid can handle powers up to the maximum of the cables used  If more power is  connected it shut down some Power Optimizers to meet the power than the inverter can  convert  For example  if 20 modules produce 150 W each total power is 3000 W  In this  case the smart Femtogrid will turn off 3 modules and leave on 17 to convert  17 x 150W   2550 W  When the solar power for each module drops to 100 W  the smart grid will turn on  all Power Optimizers again and the power of all solar modules will converted to the  inverter  20 x 100W   2000W   In most European countries modules almost never reach  their maximum power and it is very interesting to add more power than the inverters  maximum     2  We recommend to use 3 core Femtogrid DC cable 2 5 mm    for solar installations up to 4  kWp and 3 core Femtogrid DC cable 4 mm  for installations up to 8 kWp     3  Power Optimizers are suitable for almost all solar modules  Our first version is suitable  for modules that have a     e Maximum power output  lt  300 Wp  e Maximum open circuit voltage  lt  42 V    e Maximum cu
25. wall          sssessssesesessscsseeceoeserossesososseecosoeseecosseeosoreeeceeeee 11  MOUNEING  MSrUcCHONS reeni E E ET EEE ETE EE E EET E E 12  7x    CONNECUION Areas cutscene eet eee 14  ASSEIMDIE LNG AG Caple  CONNEClON eaoin Oost evel wecsesdsducnareieemser ti aal 15  Assemble the Femtogrid DC cable COMNECtOr             ceeccccnscccncccceescceescceeeccesesccessccesescees 16  8s    COMMISSIONING eidcsesetiecureuiitcscleceles acca E A NT E A 17  Determine   Correct AG CIDE siete t icles EEEE EE EE EE CE E EEE EE OE ONERE 17  Dea CUD PEE EES E E E E A E EEE T T EE T EE E EEPE T T 17  Settne COUNTY ivexcevecrienchutuandeteeutecereesaus tees eaceaeeyeae teas AN 17  Ge  USET MENU neeesa ccs leciaeea yy ateea E a acta ateta arenas 18  MENU Mantal cis dots Goes atie ie eeu dae E we ead meatier Menten uaws jemeueus den cueetdememaneus 18  Mena maD Jit boutstnc se atveat tel r T ean caue cece T A T E thea T TRA 22  Error COdES ANd Warning MESSAGES          ceccccccccccescceesccceescceeesceeesceeesscesescesesceeeecceseccess 23  PANCENCVOV  GAD eercieieeenste eho iee E E E mee cael hues a EE 23  BOI Wale VEIS IONS ica sitet enee sacs Seana E teed dat lea EEEE 23  DELEINGS aieru EEE tasaoeintan gation TEE EET Hees neers aeeu aemeenseecee nomneneanecest 23  10     PRACTICAL Notes yeqaeus sais acansieeeen stave aa te anes w uae she wear wieanaa S 24  Tile  ae LOM S a aa a A wees tre ares rosie eee a ee oe ee A 25  12  COCOS  lt  opie cuxsegiasnxacdvacosateqacnsasguacavatewssntanteeanra
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
AP32287 - XMC1000/XMC4000 - Capture Compare Unit 4  User Manual of Extension of IISFM Project to De  NEC NP-UM330Xi-WK User's Manual  Soundmaster SCD5200GR CD radio  HーTACHー  Origin Storage 512GB MLC SATA  MimioClassroom User Guide  Kustom GROOVE 410H User's Manual  HP 34401A User's Guide  GBC CombBind Spines    Copyright © All rights reserved. 
   Failed to retrieve file