Home
Primo PX System Raised Flooring User Manual
Contents
1. 22 The laser leveled floor can be dismantled using the same method as described in part 1 Once the adjustable base feet have been returned to their storage boxes use the drill and the short pivot pin to screw the feet back to their original position 19
2. user manual PRIMO PX fiooring system PRIMO TS transport system PRIMO LS leve system PRIMO flooring system user manual PRIMO PX flooring system These instructions provide the information you will need to use the Primo PX flooring system efficiently enabling you to lay down 430 square foot per person per hour The instructions consist of three sections Part 1 Laying and dismantling the PRIMO PX flooring system page 3 7 Part 2 PRIMO TS transport system page 8 9 Part 3 Using the PRIMO LS level system to ensure that the floor is completely level page 10 19 Part 1 Fu kje PRIMO PX flooring system Laying and dismantling the PRIMO PX flooring system The following elements are used in the construction of the PRIMO PX flooring system A floor tiles B adjustable base feet C storage boxes for base feet Construction 1A Determine the desired position of the floor 1B Remove pallets with floor tiles and storage boxes from the work area An ideal place for them is behind you in relation to where you plan to start laying the floor 1A 1B 2A 2B 26 Lay a row of floor tiles along one side of the planned floor area and connect them to each other using the adjustable base feet Ensure that all four pins on the base feet along the outside floor edge are positioned completely under the floor tiles Along inside edges ensure that only two of the pins are po
3. this step so that rows of standing tiles are prepared across the entire work area Each group of three standing tiles is now ready to be laid LE 17 16 Place boxes of adjustable base feet between the rows of standing tiles 19A The first builder will now begin adjusting the height of the first row of tiles Insert the pivot pin into the sockethead cap screw opening in the base foot and use the drill to screw the foot upward 19B The laser eye will signal the drill to stop automatically when it reaches the correct height You will hear a beep when this happens Work from left to right 19A 19B 20A The second builder connects the prepositioned standing tiles to the tiles that have already been adjusted to the correct height 20B This creates a new row of tiles that need to be adjusted to the correct height by the first builder Repeat these steps until the entire floor has been laid level 20A 20B 18 21A At all times ensure that there are no objects or obstacles between the laser beam and the laser eye If contact between the laser beam and the laser eye is obstructed the drill will not automatically stop at the correct height 21B Ifa base foot extends too high press the red button next to your left thumb The drill will ignore the signal from the laser 21C The base foot can be adjusted downwards by changing the rotational direction of the drill Dismantling the floor
4. 12A 12B 138 Insert the pin of the cordless drill into the sockethead cap screw in the base foot 13 15 14 Adjust the laser eye on the drill to the correct height You will hear a beep when the laser is at the correct height Fasten the laser eye 15 Using a base foot and the drill check to ensure that the laser beam can reach the laser eye throughout the entire working area When the drill is used to screw the base foot in and out the beep should be consistently audible Pay particular attention to this at the highest and lowest points of the existing floor Once this step has been completed the floor can be laid level 16A Starting on one edge of the floor lay a row of tiles and connect these using base feet 16A 16B 160 Ensure that two of the raised pins on each adjustable base foot are under the outside edge of the floor This also applies to the outside edges of the floor make sure that two of the pins of the feet are under the floor and two are not The base feet on the outside edges of the floor area will be adjusted last after the entire floor has been laid At this point all four pins should be positioned under the floor tiles 16B 17A 17B 17C 16C At the midpoint of every third tile place three tiles on their sides perpendicular to the tiles already laid on the floor Ensure that the bottom of these tiles is facing to the left and is visible Repeat
5. ire row has been dismantled 8B Remove the stacks of tiles placing them on the pallet Continue in this way until the entire floor has been dismantled 9 Sweep together the base feet and return them to their boxes for storage Part 2 PRIMO TS transport system PRIMO transport system 1 pallet 65 3 cubic foot 1 pallet 12 9 sq foot Tiles 4 x 50 tiles 200 tiles per pallet 400 sq foot Pallet height 5 18 foot 3 93 foot 3 28 foot Boxes 9 boxes 234 base feet Part 3 PRIMO LS level system Using the PRIMO LS level system to ensure that the floor is completely level The following materials are used in laying the Primo PX flooring system to ensure that the floor is completely level A floor tiles B adjustable base feet eo storage box for base feet 10 laser set consisting of ZENACETIOTMO laser tripod pivot pin laser eye cordless drill charger folding ruler short pivot pin spare battery for cordless drill spare batteries for laser spare batteries for laser eye PRIMO LS level system suitcase 11 Construction Before starting do check the electrical charge of the batteries of the cordless drill laser laser eye 1 In the left corner outside the working area place a floor tile on four base feet and lay another floor tile on top of the fir
6. sitioned under the floor tiles SA SB 3C 3D 4A 4B 4A At the midpoint of every third tile place three tiles standing on their sides perpendicular to the tiles already laid out on the floor Ensure that the bottom of these tiles is facing to the left and is visible The first builder repeats this step setting up multiple rows of standing tiles These groups of three standing tiles are ready to be constructed 3D Place boxes of adjustable base feet between the rows of standing tiles The second builder can now proceed with the construction of the floor connecting prepared standing tiles to the previously laid row Work from left to right 5A As much as possible keep your feet in one position and hold several adjustable base feet in your hand at the same time This will reduce any delay to a minimum Ob The first builder besides setting up the standing tiles should also ensure a steady supply of base feet replacing the boxes as they are emptied g hatt DA G By following the steps above it will be possible to lay an average of 40m2 of floor per man hour or 430 square foot per person per hour 6B Repeat the above steps until the floor is fully laid GA 6B Dismantling the floor TA Remove the corner base foot 7B The tile can now be easily removed from the floor 8A Make multiple stacks of three adjacent tiles as they are removed continuing until an ent
7. st N BA Place the laser on top of the two floor tiles outside the working area SB Ensure that the adjustment switches of the laser are perpendicular to the floor 12 4 Using the switches adjust the laser until it is level BA Turn on the laser 5B Position the folding ruler about 20 centimetres in front of the laser 13 A Note the height of the laser on the folding ruler me E o l Se E il _ mi _ g gt E o _ om E A 4 JU i moa n AEE TT TE TI CNN hunnun 3 BA Place the folding ruler at the opposite corner 8B Using the adjustment switches ensure that the laser point is at the same height as before Repeat this step for the other corners gm 1 34 33 EET SO OD Od ery A 3 Y tt dara 32 atuuuh PARADA 31 TE TI AC 8B 8B 9A Attach the cordless drill to the stainless steel pivot pin OB Connect also the cable to the pivot pin for communication with the laser eye n mi i A 9B 10 Using the on off button at the back turn on the laser eye 12A Turn out the screw of an adjustable base foot to extend about one centimeter 12B Position this base foot at a distance of about 20 centimetres in front of the laser
Download Pdf Manuals
Related Search
Related Contents
カタログPDFダウンロード[PDF:261KB] PM 6611 80MHz Universal counter PM 6612 80MHz Counter timer User manual for the optimus sound level meters Slam Service Manual 利用規約に同意する 3Com 3CR17450-91 Two-Way Radio User Manual Navman iCN 520 Windsor LB2000I User's Manual Autoestéreo para disco compacto Copyright © All rights reserved.
Failed to retrieve file