Specifications for Atkinson
Contents
1. 5 Dielectric Couplings Galvanized steel coupling with inert and noncorrosive thermoplastic lining threaded ends and 300 psig minimum working pressure at 225 deg F 6 Dielectric Nipples Electroplated steel nipple with inert and noncorrosive thermoplastic lining plain threaded or grooved ends and 300 psig minimum working pressure at 225 deg F Grooved Couplings Where grooved piping is allowed herein grooved piping couplings shall be installed in accordance with ANSI AWWA C 606 CSA B 242 and the manufacturers published specifications Approved manufacturers are Victaulic Grinnell Mechanical Products Anvil or Gustin Bacon The housing shall be ductile iron conforming to ASTM A 536 or malleable iron conforming to ASTM A 47 described as follows 1 Rigid Type Couplings Housing cast with offsetting angle pattern bolt pads to provide rigidity and system support and hanging in accordance with ANSI B31 1 and B31 9 Victaulic Style 07 or Victaulic Style 107 2 Flexible Type Couplings Use in locations where vibration attenuation and stress relief are required Victaulic Style 77 9 The coupling shall be pressure rated as listed below at 200 F a 4 and smaller 500 psi b 5 and larger 450 psi Unions For pipe sizes 2 inches and under unions shall be 150 psig malleable iron unions for threaded ferrous piping and shall be 150psig bronze with soldered joints for copper piping FLANGES Raised face 150 Ib welding neck
2. TESTING ADJUSTING AND BALANCING 15950 2 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 1 9 A B WARRANTY Performance Guarantee 1 Provide one of the following a Provide a guarantee on AABC s National Standards for Testing and Balancing Heating Ventilating and Air Conditioning Systems forms stating that AABC will assist in completing requirements of the Contract Documents if TAB firm fails to comply with the Contract Documents b Provide a guarantee on NEBB forms stating that NEBB will assist in completing requirements of the Contract Documents if TAB firm fails to comply with the Contract Documents Guarantee for either AABC or NEBB shall include the following provisions 1 The certified TAB firm has tested and balanced systems according to the Contract Documents 2 Systems are balanced to optimum performance capabilities within design and installation limits TAB work shall be guaranteed by AABC or NEBB Submit copy of AABC or NEBB National Performance Guaranty when final balance report is submitted If for any reason the TAB agency fails to comply with the specifications with the exception of termination of business by the TAB agency equipment malfunction or inadequacy which prevents proper balancing of the systems the Associated Air Balance Council or NEBB shall provide supervisory personnel to assist the TAB agency to perform work in accordance with AABC
3. A The name address and telephone number of the person providing labor material machinery or equipment B The name and address of each person at whose instance the labor material machinery or equipment is being furnished C The name and the location of the public work and D A description of the labor material machinery or equipment being provided and if known the contract price or anticipated value of the labor material machinery or equipment to be provided or the amount claimed to be due if any It is provided further that nothing contained herein shall limit the right of action to said 90 day period Notice may be served by the depositing of a notice certified mail postage paid duly addressed to the Contractor at any place he maintains an office or conducts his business or his residence in any post office or branch post office or any letter box under the control of the Post Office Department or notice may be served by statutory mail pursuant to O C G A 89 10 12 or in any manner in which the sheriffs of Georgia are authorized by law to serve summons or process Every suit instituted under this section shall be brought in the name of the claimant without Owner being made a party thereof The official who has custody of said bond is authorized and directed to furnish to any person making application thereof who submits an affidavit that he has supplied labor or materials for such work and payment therefore has not been made or th
4. 5 Set system controls so control valves are wide open to heat exchangers or coils 6 Check pump motor load If motor is overloaded throttle main flow balancing device so motor nameplate rating is not exceeded Js Check air vents for a forceful liquid flow exiting from vents when manually operated PROCEDURES FOR HYDRONIC SYSTEMS Measure water flow at pumps Use the following procedures except for positive displacement pumps 1 Verify impeller size by operating the pump with the discharge valve closed Read pressure differential across the pump Convert pressure to head and correct for differences in gage heights Note the point on manufacturer s pump curve at zero flow and verify that the pump has the intended impeller size 2 Check system resistance With all valves open read pressure differential across the pump and mark pump manufacturer s head capacity curve Adjust pump discharge valve until indicated water flow is achieved 3 Verify pump motor brake horsepower Calculate the intended brake horsepower for the system based on pump manufacturer s performance data Compare calculated brake horsepower with nameplate data on the pump motor Report conditions where actual amperage exceeds motor nameplate amperage 4 Report flow rates that are not within plus or minus 5 percent of design Measure pump flow rate and make final measurements of pump amperage voltage rpm pump heads and systems pressures and temperatures including
5. A B 1 4 A QUALITY ASSURANCE Manufacturers All paints stains selected for the coating and finishing system for each type of surface shall be the product of a single manufacturer and as described hereinafter DEFINITIONS Paint Term used in a general sense and has reference to sealers primer stains oils alkyd latex epoxy and enamel type paints Painting Term used in a general sense and has reference to the application of paint without regard to the type of material to an item Back Prime Terms used in a general sense and has reference to the application of paint first coat without regard to the type of material to the back side unexposed to view of an item PRODUCT HANDLING Delivery Deliver the products of this section in manufacturer s original unopened packaging with labels in tact and legible Storage and Protection Store products of this section in a housed dry and ventilated area and protect from damage JOB CONDITIONS Temperature Maintain a constant temperature of not less than 65 degrees F during painting and drying operations PART 2 PRODUCTS 2 1 A B C MATERIALS Manufacturers Materials hereinafter described unless specifically noted otherwise are by the following manufacturers 1 Devoe 2 Sherwin Williams 3 ICI 4 Porter Paints Colors Colors will be selected by the Engineer or Owner Accessory Equipment Ladders scaffolding drop clothes scrapers
6. EXECUTION 3 1 INSTALLATION A Use toggle bolts in hollow masonry plaster or gypsum board partitions and walls expansion anchors in solid masonry walls or concrete surfaces and sheet metal screws on plywood backboards B Do not fasten supports to piping ductwork mechanical equipment or conduit C Do not use powder actuated anchors D Do not drill structural steel members SUPPORTING DEVICES 16190 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia E Fabricate supports from structural steel or steel channel rigidly welded or bolted to present a neat appearance Use hexagon head bolts with spring lock washers under all nuts or double nuts jammed tight F Install surface mounted cabinets panelboards etc with minimum of four anchors END OF SECTION 16190 SUPPORTING DEVICES 16190 2 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 16195 ELECTRICAL IDENTIFICATION PART 1 GENERAL 1 1 RELATED DOCUMENTS A Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section 1 2 WORK INCLUDED A Nameplates B Wire color coding C Panelboard directories 1 3 SUBMITTALS A Submit shop drawings under provisions of Section 16010 B Include schedule for nameplates PART 2 PRODUCTS 2 1 MATERIALS A
7. Field density shall be taken at the rate of 1 for each 50 feet of trench for each 2 feet of fill Cost of test shall be borne by the contractor PAINTING All bare steel piping exposed to view provided under this section of specifications shall be cleaned and painted under the Architectural Painting Section of the specifications Also all exterior piping and piping in the mechanical room shall be painted in accordance with these requirements WATER SYSTEM TREATMENT Chemical Treatment The original company which provided the chemical treatment for the original building shall be hired under this Contract to add chemical treatment to the expanded piping system in accordance with the original specification This shall be a one time treatment which is not required to be repeated during the first year of system operation provided the entire expanded piping system is brought to the proper level of treatment by this initial treatment END OF SECTION 15181 HYDRONIC PIPING 15181 17 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 15185 HYDRONIC PUMPS PART 1 GENERAL 1 1 1 2 1 3 1 4 A RELATED DOCUMENTS Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section SUMMARY This Section includes the following 1 In Line Centrifugal Pumps Base Mounted End Sucti
8. Nameplates Engraved two layer laminated plastic black letters on a white background B Tape Vinyl plastic electrical tape C Paint Flat Enamel PART 3 EXECUTION 3 1 INSTALLATION A Degrease and clean surfaces to receive nameplates B Install nameplates parallel to equipment lines C Secure nameplates to equipment fronts using screws Do not apply with adhesives ELECTRICAL IDENTIFICATION 16195 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 3 2 WIRE IDENTIFICATION A For building wire and cables in sizes 8 AWG and smaller provide with factory insulation to correspond to color code in sizes 6 AWG and larger provide 3 4 colored tape bands in lieu of colored insulation B Color coding for 120 208 volt system shall be as follows Phase A Red Phase B Black Phase C Blue Phase N White Phase G Green ea up asE C Color coding for 277 480 volt system shall be as follows Phase A Brown Phase B Orange Phase C Yellow Phase N Grey Phase G Green Ch eo Sod D Nameplate Engraving Schedule l Provide nameplates to identify all electrical distribution and control equipment and loads served 2 Provide nameplates of minimum letter height as scheduled below 3 Panelboards 1 4 inch identify equipment designation 1 8 inch identify voltage rating 4 Enclosed Switches Circuit Breakers Contactors and Motor Starters 1 8 inch identify l
9. Product data for each type of valve indicated shall be submitted under provisions of Section 15050 QUALITY ASSURANCE ASME Compliance ASME B31 9 for building services piping valves 1 Exceptions Domestic hot and cold water piping valves unless referenced ASME Compliance for Ferrous Valves ASME B16 10 and ASME B16 34 for dimension and design criteria NSF Compliance NSF 61 for valve materials for potable water service STORAGE Use the following precautions during storage 1 Maintain valve end protection 2 Store valves indoors and maintain at higher than ambient dew point temperature If outdoor storage is necessary store valves off the ground in watertight enclosures 15110 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia PART 2 PRODUCTS 2 1 A VALVES SHUT OFF VALVES Shut off valves for the domestic and heating hot water recirculating hot water tempered water cold water condenser water cooling water chilled water and loop water systems shall be 1 Ball Valves 2 and smaller 400 psi WOG standard port 2 pc bronze construction blow out proof stem solder or threaded ends as applicable Provide chrome plated forged brass ball Provide teflon TFE packing and packing nut to allow stem leakage correction O ring seals are not allowed Valve shall conform with MSS SP110 Provide a stem extension on insulated piping Length of extension shall
10. ASTM A53 Grade B for pipe 5 and larger or ASTM A120 for pipe 4 and smaller Schedule 80 black The ASTM number and schedule shall be stamped on each length of pipe Screwed Fittings ANSI ASME B16 3 malleable iron Class 125 ASTM A126 Welded Fittings Class 125 forged steel butt weld type ASTM A234 All Joints Screwed for pipe two inches and smaller national pipe thread reamed and cleared of burrs ANSI AWS D1 1 welded or flanged for pipe two and one half and larger per ANSI B31 3 for pressure piping Steam Flanges Steam flanges shall be 300 pound weld neck flanges with carbon steel bolts full size of bolt holes and hex nuts with washers Gaskets shall meet ANSI B16 21 Standards Steam Fittings Steam fittings and piping components shall be Schedule 80 and rated for 300 pound working pressure HYDRONIC PIPING 15181 10 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 2 1 D 6 A 2 17 A B C Steam Strainers Strainers shall be rated for 250 pound minimum working pressure Provide isolation valves and unions for each strainer The strainer shall be accessible for periodic removal of debris Screen shall be stainless steel Type 304 20 mesh Body to be cast iron STEAM PRESSURE REDUCING VALVE This valve shall be suitable for reducing the indicated flow rate of steam from 150 psi to required pressure of process equipment Contractor shall verify operating
11. FORMS SECTION 7 FORMS FIVE YEAR ROOF AND WALL BOND FIVE YEAR BOND ON ROOFS AND WALLS NOT APPLICABLE STATE OF GEORGIA COUNTY OF Firmly Bound Know all men by these presents that we Contractor as Principal and Name of Surety as Surety are held and firmly bound unto Insert Name of Owner Owner in the sum of Dollars for the payment of which well and truly to be made and done we bind ourselves our executors and administrators our successors and assigns jointly and severally by these presents Condition of Obligation The condition of the above obligation is such that WHEREAS Contractor has entered into a Contract with Owner dated enter date of contract for construction of Project No Warranty WHEREAS the said Contractor warrants with respect to the said work that for a period of five years from the date of the execution of the final certificate of the Design Professional the roofs of the building or buildings and roofs of passages including but not limited to the roof envelope including but not limited to the roof decking deck sheathing material used as a roof base or insulation over which roof is applied roofing materials promenade decks or any other work on the surface of the roof flashing base flashing counter flashing metal work gravel stops or roof expansion joints shall be absolutely watertight and free from all leaks At no expense to the Owner the Contractor will make repa
12. PRODUCTS 2 1 A B C HOT WATER HEATING PIPING ABOVE GRADE Steel Pipe ASTM A53 or A120 Schedule 40 black Fittings ANSI ASME B16 3 malleable iron Class 125 or ASTM A234 Class 125 forged steel butt weld type or malleable iron grooved rate for 450 psi at 200 F Joints Screwed for pipe two inches and smaller ANSI AWS D1 1 welded or roll grooved for pipe two and one half and larger Field wrap all damaged pipe fittings with a double layer half lapped 10 mil polyethylene tape On piping 2 1 2 and larger the contractor has the option of using grooved couplings and grooved fittings Nipples All thread nipples are prohibited Nipples 1 1 2 and smaller in diameter and attached to larger pipes shall be Schedule 80 and shall be attached with the use of threadolets or weldolets Flanges Provide flanged ends on 2 1 2 and larger piping at connection to all valves piping specialties and equipment connections Provide union at piping 2 and smaller HYDRONIC PIPING 15181 2 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 2 2 2 3 2 4 D Elbows Long radius elbows shall be used except where space restrictions absolutely dictate the use of short radius type Mitered piping elbows are prohibited Weldolets and Threadolets Weldolets and Threadolets may be used for side outlet reducing tees only if the branch is more than two pipe sizes smaller than the main Reducers
13. S 13 10 91 b 4 By executing this affidavit the undersigned sub subcontractor verifies its compliance with O C G A 13 10 91 stating affirmatively that the individual firm or corporation which is engaged in the physical performance of services under a contract for name of subcontractor or sub subcontractor with whom such sub subcontractor has privity of contract and name of contractor on behalf of Board of Regents of the University System of Georgia for the use and benefit of Georgia College amp State University Using Agency public employer has registered with is authorized to use and uses the federal work authorization program commonly known as E Verify or any subsequent replacement program in accordance with the applicable provisions and deadlines established in O C G A 13 10 91 Furthermore the undersigned sub subcontractor will continue to use the federal work authorization program throughout the contract period and the undersigned sub subcontractor will contract for the physical performance of services in satisfaction of such contract only with sub subcontractors who present an affidavit to the sub subcontractor with the information required by O C G A 13 10 91 b The undersigned sub subcontractor shall submit at the time of such contract this affidavit to name of subcontractor or sub subcontractor with whom such sub subcontractor has privity of contract Additionally the undersigned sub subcontractor will f
14. This item must be broken down into 2 categories i Building and ii Infrastructure reported by specification section Chillers and HVAC units that serve the facility are to be included as a part of the Building even if they are outside the 5 foot limit Chillers and HVAC units that are outside the 5 foot limit and serve more than one facility such as equipment used in a central plant are to be included in Infrastructure TERN Division 7 Thermal amp Moisture Components of the Roof system should be reported as a separate line item Generally this includes components of Sections 7500 and 7600 26 DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS APPLICATION FOR PAYMENT FORM SUMMARY OF MATERIALS STORED In support Application for Payment No Project No Period Ending Contractor TYPE OF ITEM NO NAME MATERIAL QUANTITY AMOUNT Contractor or Subcontractor Dollars d TOTALS Prepared by Contractor Date and certified by him to be a true and accurate statement Checked By Contract Compliance Specialist 27 DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS SUBCONTRACTOR RETAINAGE RELEASE CERTIFICATE SUBCONTRACTOR RETAINAGE RELEASE CERTIFICATE To be Originated by Subcontractor TO Board of Regents of the University System of Georgia Owner Georgia College amp State University Using Agency RE Project Name and Number Heating Upgrade for Atkinson Hall Georgi
15. Upon issuance of a Proceed Order bidder agrees to commence physical activities on the Site with adequate forces and equipment and to complete to Material Completion all work in 150 consecutive calendar beginning the day after the date of the Proceed Order Bid Bond Enclosed herewith is a Bid Bond NO OTHER FORM ACCEPTABLE in the amount of Dollars being not less than five percent of the Bid Bidder agrees that the above stated amount is the proper measure of liquidated damages that the Owner will sustain by bidder s failure to execute the Contract or to furnish the Performance and Payment Bonds should bidder s bid be accepted Obligation of Bid Bond If this bid is accepted within thirty five days after the date set for the opening of bids and bidder fails to execute the Contract within ten days after Notice of Successful Bid or if bidder fails to furnish both Performance and Payment Bonds the obligation of the Bid Bond will remain in full force and effect and the money payable thereon shall be paid into the funds of the Owner as liquidated damages for such failure otherwise the obligations of the Bid Bond will be null and void Bidder Certification Bip REQUIREMENTS 6 DBB CONSTRUCTION CONTRACT BiD REQUIREMENTS VERSION 07 01 201 1 BID FORM Certification under Oath Under oath certify that am a principal or other representative of the bidder and that am authorized by it to execute the foregoing bid on its behalf and fur
16. apply to this Section 1 2 WORK INCLUDED A Power system grounding B X Electrical equipment and raceway grounding and bonding 1 3 RELATED SECTIONS A X Section 16123 Building Wire and Cable 1 4 SYSTEM DESCRIPTION A Bond together system neutrals service equipment enclosures exposed non current carrying metal parts of electrical equipment metal raceway systems cable tray systems grounding conductor in raceways and cables and receptacle ground connectors B Provide a separate grounding conductor in all flexible and non metal conduits PART 2 PRODUCTS 2 1 MATERIALS A Conductors Soft drawn copper conductor as specified in Section 16123 PART 3 EXECUTION 3 1 FIELD QUALITY CONTROL A Inspect grounding and bonding system conductors and connections for tightness and proper installation END OF SECTION 16170 GROUNDING AND BONDING 16170 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 16180 EQUIPMENT WIRING SYSTEMS PART 1 GENERAL 1 1 RELATED DOCUMENTS A Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section 1 2 WORK INCLUDED A Electrical connections to equipment specified under other Sections or furnished by Owner 1 3 RELATED WORK A Section 16111 Conduit B Section 16123 Wire and Cable C Section 16130 Boxes D Section 16141 Wiring D
17. at installed altitude and environment with indicated operating sequence and without exceeding nameplate ratings or considering service factor Whenever starting requirements exceed operating requirements the motor shall be large enough to start the equipment without overheating As a minimum motors shall be sized at 120 of design BHP requirements Each motor shall be sized to drive the equipment taking into account belt losses BASIC MECHANICAL MATERIALS AND METHODS 15050 10 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia M 1 19 Motors controlled by Variable Frequency Drives All motors that are controlled by a variable frequency drive shall be either premium efficiency type or inverter duty rated Motor windings shall be insulated with Class F insulation or Class H insulation General high efficiency motors and motors with Class B insulation shall not be allowed Motor manufacturer shall certify in writing with motor submittal that motor is compatible with variable frequency drive usage PAINTING All bare steel piping pipe hangers supports and miscellaneous metal exposed to view provided under this section of specifications shall be cleaned and painted under the Architectural painting section of the specifications Supports hangers and accessories exposed to view shall not be electroplated in order to allow them to be painted All bare steel piping pipe hangers supports and
18. dusters and similar items are not required to be new but they shall be safe adequate and acceptable of producing the results for which they are intended 09900 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia D E Application Equipment Brushes rollers spray apparatus and similar application equipment are not required to be new but they shall be capable of producing the required results specified hereinafter Thinners Only those recommended for that purpose by the manufacturer of the material being installed PART 3 EXECUTION 3 1 A B INSTALLATION Surface Preparation 1 General Do not begin painting on any surface until it has been inspected and is in condition to receive the paint as specified herein Should any surface be found unsuitable to produce a proper paint finish the Engineer shall be notified in writing and no material shall be applied until the unsuitable surfaces have been made satisfactory Absence of such notification shall be construed as acceptable of such surface to receive paint Later claims of defects in surfaces prior to painting shall not relieve the Contractor from his responsibility for compliance with the requirements of the Specifications Steel and Iron Remove grease dirt mud rust and scale Touch up any chipped or abraded places on items that have been shop coated Where steel and iron have a heavy coating of scale it
19. flange shall be B Line Model B 3199 or approved equal by C amp P Anvil PHD FNW or Erico Michigan METAL FRAMING CHANNEL Where possible and practical piping shall be supported with trapeze hangers consisting of a metal framing system of channel fittings and hardware as defined in the Metal Framing Manufacturer s Association Standard Publication MFMA 1 Length of trapeze supports shall not exceed 4 feet unless contractor performs and submits calculations which indicate the channel is within the manufacturer s recommendations with a safety factor of 30 added to the load Vertical Pipe Supports Where shown on the drawings vertical routed piping shall be supported and or stabilized by steel channel meeting the requirements for channel as specified herein Channel shall be constructed of 12 gauge steel Nominal width shall be 1 5 8 x 1 5 8 with a 9 16 wide and 7 8 long slot face opening with slots on 2 centers Channel shall be pre galvanized in accordance with ASTM A 653 G90 or have a factory applied electro deposited epoxy finish Pipe clamps shall be sized as follows 1 Non insulated Steel Piping Sized to fit piping 2 Insulated Piping Sized to fit outside of insulation 3 Copper Piping Sized to fit outside of piping plus elastomeric isolation material Approved Manufacturers B Line Model B22SH Elcen Unistrut and Superstrut by Midland Ross HANGER RODS Steel Hanger Rods Continuous threaded rod Size as indi
20. stainless steel trim PTFE seats lever lock standard lever Dezurik HP II Butterfly Valve McCannalok High Performance Butterfly Valves Crane Flowseal Stockham 17A121RTG HD FNW FNWHP ogeocem ELECTRICALLY ACTUATED SHUT OFF VALVES Shut Off valves for water to student tables in Science Labs 1 Water Valves Ball valves shall be as specified herein for water service with electric actuation Actuator shall be 120 volt with NEMA 4 enclosure Valve shall be normally closed STEAM SHUT OFF VALVES Shut off valves for the steam and steam condensate shall be 1 Gate Valves 200 psi WOG non rising stem solid wedge threaded ends and screw in bonnet on sizes 2 and smaller flanged ends and bolted bonnet on sizes 2 1 2 and larger a 2 and Smaller 1 Nibco S 113 and T 113 2 Crane 1320 3 Hammond IB647 4 Stockham B 103 and B 104 5 Milwaukee 115 6 Watts B 3001 7 Kitz 40 8 FNW 1211 b 2 1 2 and Larger 1 Nibco F 619 2 Crane 461 3 Hammond IR1138 4 Stockham G 612 5 Milwaukee F 2882 M 6 Watts F 502 7 Kitz 72 8 FNW 651 15110 3 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 2 4 2 5 VALVES A CHECK VALVES Check Valves 2 to 12 200 psi WOG horizontal swing 2 and smaller regrinding type renewable discs Y pattern solder ends 2 1 2 and larger bolted bonnet renewable seat and discs or aluminum bronz
21. 15050 For each type of product herein include performance curves Shop Drawings Schedule for thermometers and gauges indicating manufacturer s number scale range and location for each Identify the specific ranges for the equipment used on this project for thermometers and gauges Submittals showing thermometers and gauges with multiple sizes ranges materials etc without showing specific sizes ranges materials etc for this project will be rejected Operation and maintenance data shall be submitted under provisions of Section 15051 PART 2 PRODUCTS 2 1 A DIAL TYPE PRESSURE GAUGES General Case constructed of brass or cast aluminum or stainless steel back flange for surface mounting flangeless for remote mounting rattle proof glass or acrylic window held in place with an O ring and screwed ring black scale graduations on a white background and adjustable pointer Socket and tip to be stainless steel or brass threaded 1 4 NPT Bourdon tube to be phosphor bronze or stainless steel with brass movement Gauge to be 4 1 2 diameter Provide pressure snubber and gauge cock for each pressure gauge Units for all gauges shall be in English PSI METERS AND GAUGES 15122 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 2 2 2 3 B Ranges l Pumps Where a specific range is not listed below range selected so that suction pressure is above lower 20 and dis
22. 3 Anvil CT121 4 PHD 552 5 Erico Michigan 511 6 ENW 7023EC 2 3 LOWER PIPE SUPPORTS A Pipe Stand Supports l Steel Pipe Saddle Support Adjustable pipe saddle with factory installed threaded rod and adjustable hex nut Threaded rod size shall be as determined by manufacturer and maximum 8 long and designed for insertion into base stand as scheduled herein Saddle support shall be B Line Model B3096 or approved equal by C amp P Anvil PHD or Erico Michigan HANGERS AND SUPPORTS 15060 3 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 2 4 2 5 2 Steel Base Stand Factory assembled steel base with pre drilled holes for anchoring to floor and with factory installed schedule 40 unthreaded steel pipe sized to mate with steel pipe saddle support previously specified Height of pipe shall be determined by contractor Steel bas stand shall be B Line Model 3088 or approved equal by C amp P Anvil PHD or Erico Michigan Floor Mounted Pipe Supports For Piping 1 1 2 and Smaller Only 1 Upper pipe supports shall be malleable iron extension split pipe clamp with integral 3 8 threaded rod tapping Split pipe clamp shall be B Line Model 3198R or approved equal by C amp P Anvil PHD or Erico Michigan 2 Lower Pipe Support shall be malleable iron ceiling flange with pre drilled holes for anchoring to floor and integral 3 8 threaded rod tapping Malleable iron ceiling
23. COMPENSATING FLOW CONTROL VALVES Provide to the owner a portable read out meter kit by the manufacturer of the pressure compensating flow control valves Meter shall serve to verify that the differential pressure is within the specified spring range which shall indicated whether the valve is underflowing correct or overflowing Actual flow rate gpm shall be verified by a separate meter kit as specified herein for the calibrated venturis and calibrated venturi ball valves The meter shall be housed in a durable case complete with two ten foot color coded hoses with P T adapters and shut off valves at the end that connects to the valves so that water does not drain out between readings Provide bleed valve at gauge manifold Meter shall have a 4 1 2 diameter face Range of meter shall be 0 to 35 psid for 2 32 spring range If alternate spring range is specifically shown on the drawings range of meter shall be 0 to 65 psi for spring ranges up to 60 psi Meter shall be provided with a removable transparent face indicating flow directly in GPM for each size device furnished Meter shall have a forged brass body and a three valve manifold for over range protection Meter shall have a dual scale reading inches and feet W C METERS AND GAUGES 15122 4 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia G Meter for pressure compensating flow control valves shall be manufactured by Flow Des
24. Georgia College amp State University Milledgeville Georgia OPERATIONAL INSTRUCTION VERIFICATION FORM Operation and maintenance procedures for major systems and equipment were thoroughly explained to the Representatives as follows Eoutomention Date Instruction Owner s Representative Owner Representative quip Received Name printed Initial or Signature HVAC Backflow Preventers pO Pumps Oooo Heat Exchangers i Control System a I certify that the operation and maintenance procedures of all the major mechanical systems have been thoroughly explained to the Owner s Representative Company Name Title Signature Date 1 14 EXTRA MATERIALS AND SPARE PARTS A The contractor shall submit a form similar to the one below with a listing of all the spare parts including a description and quantity of each part to the owner for the owner to sign indicating receipt of said parts Wherever this chart indicates that spare filters are required the contractor shall note that these spare filters are beyond any filters necessary to protect the unit during construction start up and beyond the clean filter in the unit when building is turned over to the Owner Contractor shall also include their company name date and signature as outlined below TRANSFER OF EXTRA MATERIALS AND SPARE PARTS Spec Section Total Quantity Owner s Date P Received Rep Initials Received PIPING VALVES amp EQUIPMENT C GERM IDEE
25. Group piping whenever practical at common elevations Install piping to allow for expansion and contraction without stressing pipe joints or connected equipment Provide clearance for installation of insulation and access to valves and fittings Slope water piping and arrange to drain at low points Establish elevations of buried piping outside the building to ensure not less than 2 feet of cover Where pipe support members are welded to structural building framing scrape brush clean and apply two coats of galvanized paint to welding DOMESTIC WATER PIPING 15140 3 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia L M 3 5 3 6 Mitered Fittings and Tapped Pipes Mitered fittings and tapped pipes are not allowed All changes in direction and pipe branches shall be accomplished by the use of fittings Pipe Routing Pipes shall be run level except as required for grading plumb and parallel with the building structure unless otherwise indicated on the drawings Spacing Pipe Maintain 4 minimum clearance between parallel runs of piping after insulating space permitting Coring On new construction pre cast sleeves in all masonry and concrete walls floor and ceiling slab For a limited number of openings contractor may core drill openings in masonry and concrete walls and floor slabs where sleeves were inadvertently not installed as the wall or floor slab was constructe
26. Section when located above ceilings or in chases PART 2 PRODUCTS 2 1 A B 2 2 A B C ACCEPTABLE MANUFACTURERS Certain Teed Owens Corning Johns Manville Armacell IMCOA Nomaco Knauf Pittsburg Corning The Dow Chemical Company Dyplast Foster Childers and Hi Therm Substitutions Under provisions of Section 15010 INSULATION MATERIALS I1 Glass fiber insulation ANSI ASTM C547 k value of 0 24 at 75 degrees F Jacket shall be factory applied all service jacket with self sealing lap ASJ SSL Provide ASJ tape where insulation butts Provide 12 of type I7 insulation at hangers installed on the exterior of the insulation on piping sizes 2 and larger ASJ jacket shall be continuous Provide insulation shield on exterior of insulation at all hangers I2 Preformed flexible elastomeric expanded closed cell pipe insulation having a flame spread rating of 25 or less and a smoke density of 50 or less when tested by ASTM E 84 method Temperature range 40 F to 220 F Insulation shall be CFC and HCFC free and formaldehyde free Thermal conductivity of 0 27 btu in hr sq ft F at 75 F mean temperature All seams and butt joints shall be sealed with factory applied adhesive Provide insulation shield on exterior of insulation at all hangers I3 Blanket Insulation Glass fiber blanket insulation minimum 3 4 Ib density installed R3 5 per inch with FSK facing On ductwork wrap blanket insulation around duct bei
27. Section 15050 Operation and Maintenance Data For heat exchangers submit operation and maintenance data under provisions of Section 15051 QUALITY ASSURANCE Product Options Drawings indicate size profiles performance and dimensional requirements of heat exchangers and are based on the specific equipment indicated Refer to Division 1 Section Product Requirements ASME Compliance Fabricate and label heat exchangers to comply with ASME Boiler and Pressure Vessel Code Section VIII Pressure Vessels Division 1 Registration Fabricate and label shell and tube heat exchangers to comply with the Tubular Exchanger Manufacturers Association s standards Provide all accessories e g guards covers to comply with applicable OSHA requirements PART 2 PRODUCTS 2 1 A SHELL AND TUBE HEAT EXCHANGER STEAM TO HOT WATER General ASME stamped shell and tube type heat exchanger designed to provide heating hot water using steam as the heating medium Tubes shall be U bend type fabricated from 3 4 O D copper pressure tested to 300 PSIG at 375 F Tube bundle shall be removable and provided with steel tube supports Heating hot water shall be conveyed through tubes Shell shall be fabricated from steel pressure tested to 150 PSIG at 375 F Steam shall be HYDRONIC AND STEAM HEAT EXCHANGERS 15710 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia B C conveyed thro
28. Setmark pipe markers or by Brimer or Brady or self adhesive plastic pipe markers with pressure sensitive permanent type self adhesive back or field stenciled if pre made marker is not manufactured Provide arrow identifying direction and system description as listed below Background and letter colors shall be in conformance with latest version of ANSI ASME A13 1 The following piping systems shall be provided with pipe markers 1 Domestic cold water 2 Domestic hot water 3 Domestic hot water return 4 Gas 5 Heating hot water 6 Steam 7 Steam condensate B Height of letters shall be as follows 1 Outside Diameter Outside insulation on insulated piping a 1 2 1 1 4 Letter height shall be 1 2 b 1 1 2 to 2 Letter height shall be 3 4 c 2 1 2 to 6 Letter height shall be 1 1 4 d 8 to 10 Letter height shall be 2 1 2 e Over 10 Letter height shall be 3 1 2 MECHANICAL IDENTIFICATION 15075 2 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia PART 3 EXECUTION 3 1 3 2 A EQUIPMENT IDENTIFICATION Install and permanently fasten equipment nameplates on each major item of mechanical equipment that does not have nameplate or has nameplate that is damaged or located where not easily visible Locate nameplates where accessible and visible Install equipment markers with permanent adhesive on or near each major item of mechanical equipment Data re
29. Subcontractor as appropriate 3 Apply Contractor s stamp signed or initialed certifying that review verification of Products required field dimensions adjacent construction Work and coordination of information is in accordance with the requirements of the Work and Contract Documents 4 Schedule submittals to expedite the Project and deliver to Architect at business address Coordinate submission of related items 5 Shop drawings and data submittals for materials requiring extra long delivery time shall be submitted for approval as soon as possible after execution of contract No substitutions of materials or extensions of contract time will be allowed for contractors failure to order such materials sufficiently in advance of the work 6 Identify variations from Contract Documents and Product or system limitations which may be detrimental to successful performance of the completed Work 7 Revise and resubmit submittals as required identify all changes made since previous submittal 8 Distribute copies of reviewed submittals to concerned parties Instruct parties to promptly report any inability to comply with provisions B Shop Drawings Submit the number of opaque reproductions which Contractor requires plus two copies which will be retained by Architect Engineer C Acceptable Products Where a manufacturer has been listed as being acceptable in the various specification sections hereinafter for a certain product it sh
30. TAB work shall be guaranteed by AABC or NEBB Submit copy of AABC or NEBB National Performance Guaranty when final balance report is submitted If for any reason the TAB agency fails to comply with the specifications with the exception of termination of business by the TAB agency equipment malfunction or inadequacy which prevents proper balancing of the systems the Associated Air Balance Council or NEBB shall provide supervisory personnel to assist the TAB agency to perform work in accordance with AABC or NEBB standards As part of this Performance Guaranty the engineer or building owner may call upon AABC or NEBB to assist him with any technical and or field problems pertaining to the final balanced condition of the systems These services will be made available at no additional charge by the TAB agency or by AABC or NEBB National Headquarters END OF SECTION 15950 TESTING ADJUSTING AND BALANCING 15950 9 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 16010 BASIC ELECTRICAL REQUIREMENTS PART 1 GENERAL 1 1 RELATED DOCUMENTS A Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 01 Specification Sections apply to this Section 1 2 REFERENCES A ANSI NFPA 70 National Electrical Code 2011 1 3 SUBMITTALS A Submit under the following provisions 1 Submittal Procedures Identify Project Contractor and
31. This system shall include all devices specified herein and shall include but is not limited to main DDC panels standalone DDC controllers software graphics package temperature sensors relays switches contactors control valves transformers etc This project includes maintaining the operation and control functions of many existing to remain pieces of HVAC equipment SUBMITTALS Submit shop drawings and product data under provisions of Section 15050 to the Owner and Architect Engineer Each submittal shall contain the following information as appropriate based on this particular project 1 Single line schematics and flow diagrams showing the location of all control devices 2 Points list for each DDC controller with input output schedule 3 Vender s own written description for each sequence of operation 4 Detailed bill of material for each panel 5 Control valve schedule 6 Catalog cut sheets for all equipment used including but not limited to sensors thermostats actuators etc 7 Operator work station data and DDC panel data HVAC INSTRUMENTATION AND CONTROLS 15900 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 1 5 1 6 8 Submittal drawing index sheet with control system legend Controls contractor shall not order material or begin field installation until receiving approved submittals Submit electrical requirements for power supply wiring inc
32. allow identification as a flexible coupling D Pressure Compensating Flow Control Valves 1 1 1 2 and Smaller valves 450 psi 200 F rated threaded ductile iron or forged brass body removable flow cartridge factory preset to maintain water flow at the GPM required by the drawings and or the equipment manufacturer to within 5 accuracy over an operating pressure differential of at least 14 times the minimum required for control 2 32 PSID unless noted otherwise on the drawings Flow cartridge shall have brass body with stainless steel piston and stainless steel spring All moving parts inside cartridge shall be stainless steel Rubber or plastic is not allowed HYDRONIC PIPING 15181 7 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia Provide units complete with pressure temperature ports Pete s Plugs and metal tag denoting equipment number and gpm On insulated piping systems over 1 thick Pete s plugs shall be extended type to clear insulation minimum length of 2 1 2 On any insulated piping system where integral shutoff valve is submitted extended handle option shall be provided Automatic flow control valve shall be Y type to allow flow cartridge removal from the valve body without the use of special tools and without breaking the main piping The internal wear surfaces of the valve cartridge must be electroless nickel or stainless steel The internal flow cartridge shall be p
33. amp Gossett Hydronic Components Inc HCI Griswold or Parts Service Inc HYDRONIC PIPING 15181 8 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 2 10 A 2 11 2 12 BACKFLOW PREVENTER Reduced pressure zone principle bronze body ball valve test cocks replaceable seats with strainer quarter turn valves and manufacturer furnished air gap fitting Watts series 909 S QT or equal by Zurn or Wilkins Single Equipment Applications Watts Series 9 D or equal by Zurn or Wilkins WATER PRESSURE REDUCING VALVES Bronze body nickel alloy seat high temperature resisting diaphragm with stainless steel perforated strainer screen and built in bypass check valve feature to relieve thermal expansion pressure Adjusting screw and cage screws shall be corrosion resistant Provide pressure gauge on both sides of valve For locations or equipment having pressure requirements of 25 75 psi provide Watts 223SB with number 146 spring For make up water station and any other equipment having a pressure requirement for 10 35 psi provide Watts 223SBLP with number 69 spring Equals by TACO B amp G Wilkins or CASE ACME with appropriate springs are acceptable TANGENTIAL PARTICLE SEPARATOR Separator Tangential separator designed to force particles to move in a downward spiral motion into a dirt holding chamber with clean liquid rising through center vortex Separator shall remove
34. and increasers in horizontal piping shall be eccentric type installed with the tops level to facilitate air removal Reducers and increasers in vertical piping shall be concentric type MAKE UP WATER PIPING ABOVE GRADE Copper Tubing ASTM B88 type L hard drawn Fitting ANSI ASME B16 9 pressure pattern wrought copper Joints ANSI ASTM B32 Lead free solder having a composition of 95 5 tin 4 copper and 0 5 silver On piping 2 and larger the Contractor has the option of using grooved couplings and grooved fittings as manufactured by Victaulic In lieu of manufactured copper tee fittings the Contractor has the option of using mechanically formed tee connections Mechanically formed tees shall conform to the following 1 Mechanically extracted collars shall be formed in a continuous operation consisting of drilling a pilot hole and drawing out the tube surface to form a collar having a height of not less than three times the thickness of the tube wall The collaring device shall be fully adjustable as to insure proper tolerance and complete uniformity of the joint 2 The branch shall be notched to conform with the inner curve of the run tube and dimpled to insure penetration of the branch tube into the collar is of sufficient depth for brazing and that the branch tube does not obstruct the flow in the mainline tube Dimples shall be in line with the run of the tube and visible through the braze All joints shall be brazed with BCUP 2
35. and patching of new construction will not be required See also paragraph Sequencing and Scheduling herein The existing building will be occupied during construction The Contractor shall schedule work so as to minimize disruption to the normal operation of the facility in accordance with instructions and schedules provided by the Architect and or Owner SUBMITTALS Submittal data containing manufacturer s data shall be sent to the Architect Engineer and Owner for review Electronic submittal data shall be assembled in Adobe Acrobat s Portable Data Format PDF for review Electronic submittal data shall be assembled in one 1 complete PDF file and shall include an index sheet TOC listing each submittal item by specification number and its content Each file shall also be organized with Bookmarks of each section Submittals that do not have each submittal item referenced by Bookmarks shall be rejected All electronic submittal data for a trade shall be submitted at one time except as noted herein Data not submitted shall have a statement explaining why the data was not submitted Submittals not conforming to any of the above requirements shall be rejected The contractor shall go to each specification section to determine all technical information data required and organize information data using tabs for major headings as follows BASIC MECHANICAL MATERIALS AND METHODS 15050 1 Heating Upgrade for Atkinson Hall Geo
36. and the inherent features of the Basis of Design Submitted products not complying with the explicit requirement of these specifications and drawings and with the features of the Basis of Design will be rejected even if their manufacturer is listed in the specifications DRAWINGS General Both the drawings and specifications shall be considered supplemental to one another so that materials and labor required by one but not the other shall be supplied and installed as though specifically called for by both Where drawings and specification conflict Contractor shall conform to the more stringent or costly of the two requirements Scaling The drawings are diagrammatic only and show generally the location of the equipment ducts and pipes but are not to be scaled All dimensions shall be verified at the building site Prefabrication of work from the drawings shall be at the Contractor s risk Existing Conditions It shall be the Contractor s responsibility to visit the site prior to bidding the project and prior to beginning work to make himself familiar with existing conditions SPACE CONDITIONS AND SERVICE CLEARANCE All equipment and materials shall fit into the available spaces in the building and must be introduced into the building so as not to cause damage to the structure All equipment normally requiring service shall be made readily accessible by not locating it above behind etc piping ductwork conduit or other systems Con
37. be a minimum of 2 1 4 If stem extension is not factory installed contractor shall field install stem extension FNW 421 Milwaukee BA250 BA200 Hammond 8211 8201 Stockham S 255 T 255 Flow Design HB Watts B 6001 B 6000 Kitz 69 68 Apollo 70 200 01 70 100 01 mga monogp Butterfly Valves 2 1 2 to 12 200 psi cwp cold working pressure 200 WOG 230 F maximum temperature lug or grooved style ductile iron body extended neck EPDM liner stainless steel one piece stem bronze or aluminum or electroless nickel coated ductile iron disc lever lock adjustable memory stop All butterfly valves shall have bubble tight shut off at full pressure rating and be suitable for bidirectional dead end service at 200 psi without the need for a downstream flange Butterfly valves shall conform with MSS SP67 Provide gear driven hand wheel for all valves 6 and larger Provide lever lock with adjustable memory stop for valves 5 and smaller Nibco LD 2000 Crane 14 N TL Stockham LD 752 B53 E Hammond 6211 Centerline Series A Victaulic 300 Watts BF03 121 15 Mueller 56ANK6 1 Apollo LD141 Kitz 6122E SSI 125LD FNW 732E Spo po ho ao op 15110 2 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 2 2 2 3 VALVES 3 High Performance Butterfly Valves 2 1 2 and larger Class 150 WOG MSS SP 68 500 F maximum temperature carbon steel body lug style extended neck
38. be installed in accordance with the manufacturer s guidelines and recommendations Grooved ends shall be clean and free from indentations projections and roll marks in the area from pipe end to grove Cut or roll grooves in ends of pipe based on pipe and coupling manufacturer s written instructions for pipe wall thickness Use grooved end fittings and rigid grooved end pipe couplings Grooved coupling manufacturers factory trained field representative shall provide on site training for contractor s field personnel in the proper use of grooving tools application of groove and installation of grooved piping products Factory trained representatives shall periodically inspect the product installation Contractor shall remove and repair any improperly installed products l Use grooved couplings only in accessible locations Provide lubricant furnished or approved by the manufacturer Lubricate the gasket exterior thoroughly including lips 3 Gaskets shall be EPDM having a temperature range of 30 F to 230 F HYDRONIC SPECIALTIES INSTALLATION Install manual air vents at high points in piping at heat transfer coils and elsewhere as required for system air venting HYDRONIC PIPING 15181 14 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 3 6 3 7 B Install automatic air vents at all high points of system piping and elsewhere as required for air venting and as shown on the drawing
39. braze The method shall be provided by T drill7 RELIEF VALVE DISCHARGE AND DRAIN PIPING Utilize same piping material as specified for the medium being discharged UNIONS COUPLINGS AND JOINTS Shouldered Pipe End Couplings Ductile iron housing clamps to engage and lock designed to permit some angular deflection contraction and expansion C shape composition sealing gasket steel bolts nuts and washers galvanized couplings for galvanized pipe in accordance with ASTM A153 Dielectric Connections l Description Combination fitting of copper alloy and ferrous materials with threaded solder joint plain or weld neck end connections that match piping system materials HYDRONIC PIPING 15181 3 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 2 5 2 Dielectric Unions Factory fabricated union assembly for 250 psig minimum working pressure at 180 deg F 3 Dielectric Flanges Factory fabricated companion flange assembly for 150 or 300 psig minimum working pressure as required to suit system pressures 4 Dielectric Flange Kits Companion flange assembly for field assembly Include flanges full face or ring type neoprene or phenolic gasket phenolic or polyethylene bolt sleeves phenolic washers and steel backing washers a Separate companion flanges and steel bolts and nuts shall have 150 or 300 psig minimum working pressure where required to suit system pressures
40. certifications inspection reports releases jurisdictional settlements notices receipts for fee payments judgment and similar documents correspondence and records established in conjunction with compliance with standards and regulations bearing upon performance of the work PART 2 PRODUCTS NOT APPLICABLE PART 3 EXECUTION NOT APPLICABLE END OF SECTION 01095 01095 5 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 02060 DEMOLITION PART 1 GENERAL 1 1 1 2 1 3 A RELATED DOCUMENTS Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section QUALITY ASSURANCE Qualifications of Workmen Provide at least one person who shall be present at all times during demolition operations and who shall be thoroughly familiar with the requirements of this portion of the work and the methods by which the same is accomplished Codes and Standards In addition to complying with all pertinent codes and regulations comply with the requirements of those insurance carriers providing coverage for this work During the period of the construction contract all operations shall comply with the requirements of NFPA 241 Building Construction and Demolition Operations Contractor s Responsibility It shall be the Contractor s responsibility to protect all existing constructio
41. contractor shall be a factory authorized branch office that is regularly engaged in the engineering programming installation and service of the control systems of similar size and complexity The controls contractor shall have a local branch office with a 100 mile radius of the job site Emergency service shall be available on a 24 hour seven day a week basis DELIVERY STORAGE AND HANDLING Factory Mounted Components Where control devices specified in this Section are indicated to be factory mounted on equipment arrange for shipping of control devices to equipment manufacturer System Software Update to latest version of software at Project completion HVAC INSTRUMENTATION AND CONTROLS 15900 2 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 1 7 A 1 8 A B COORDINATION Coordinate location of thermostats humidistats and other exposed control sensors with plans and room details before installation WARRANTY See Section 15051 for warranty information Emergency Service The controls contractor shall restore the control system to proper operating condition within three calendar days after receiving a request for service PART 2 PRODUCTS 2 1 A 2 2 A 2 3 A B MANUFACTURERS Since Georgia College and State University has a campus wide Siemens energy management and control system the Contractor shall provide Siemens controls no
42. date set for the opening of bids time being of the essence 10 Employment of Georgia Citizens and Use of Georgia Products The work provided for in this Contract is to be performed in Georgia It is the desire of the Owner that materials and equipment manufactured or produced in Georgia shall be used in the work and that Georgia citizens shall be employed in the work at wages consistent with those being paid in the general area in which the work is to be performed This desire on the part of the Owner is not intended to restrict or limit competitive bidding or to increase the cost of the work nor shall the fulfillment of this desire be asserted by the Contractor as an excuse for any noncompliance or omission to fulfill any obligation under the contract 11 Trading with the State Statutes Ethics By submitting a bid the bidder certifies that the provisions of law contained in O C G A Sections 45 10 20 to 45 10 71 which prohibit officials and employees of the state from engaging in certain transactions with the state and state agencies and the Governor s Executive Orders governing ethics have not and will not be violated in any respect in regard to this contract and further certifies that registration and all disclosures required thereby have been complied with 12 Georgia Security and Immigration Compliance Act Requirements No bid will be considered unless the Contractor certifies its compliance with the Immigration reform and Control Act of 198
43. for the existence protection and if necessary replacement of the above mentioned materials until the completion of this contract Contractor By Date Title STATEMENT OF THE CONTRACT COMPLIANCE SPECIALIST have checked this Application for Payment and to the best of my knowledge and belief the statement of work performed and statement of materials stored on site by the Contractor are supported by my observations Name Contract Compliance Specialist Date CERTIFICATE OF THE DESIGN PROFESSIONAL certify that have verified this Application for Payment and to the best of my knowledge and belief it is a true and correct statement of work performed and statement of materials stored on site by the Contractor and that the Contractor s certified statement of his account and the amount due him is correct and just further certify that all work has been performed and materials have been supplied in full accordance with the terms and conditions of the Contract Documents and authorized changes thereto Name Design Professional Date 22 DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS APPLICATION FOR PAYMENT FORM SCHEDULE OF CHANGE ORDERS In support of Application for Payment No Project No Period Ending Contractor CHANGE ORDERS ADDITIONS DEDUCTIONS Completed Previous Authorized Authorized Amount Amount this Period Periods Deductions 23 DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 F
44. from inside and outside of pipe and fittings before assembly Soldered Joints Apply ASTM B 813 water flushable flux unless otherwise indicated to tube end Construct joints according to ASTM B 828 or CDA s Copper Tube Handbook using lead free solder alloy complying with ASTM B 32 Brazed Joints Construct joints according to AWS s Brazing Handbook Pipe and Tube Chapter using copper phosphorus brazing filler metal complying with AWS A5 8 Threaded Joints Thread pipe with tapered pipe threads according to ASME B1 20 1 Cut threads full and clean using sharp dies Ream threaded pipe ends to remove burrs and restore full ID Join pipe fittings and valves as follows 1 Apply appropriate tape or thread compound to external pipe threads unless dry seal threading is specified 2i Damaged Threads Do not use pipe or pipe fittings with threads that are corroded or damaged Do not use pipe sections that have cracked or open welds 3 Use threaded pipe only in accessible locations Welded Joints Construct joints according to AWS D10 12 D10 12M using qualified processes and welding operators according to Part 1 Quality Assurance Article Flanged Joints Select appropriate gasket material size type and thickness for service application Install gasket concentrically positioned Use suitable lubricants on bolt threads Grooved Joints Assemble joints with coupling and gasket lubricant and bolts Grooved joint piping systems shall
45. install vibration isolators for equipment as listed below All isolation devices shall be selected for uniform static deflections according to distribution of weight and for the lowest disturbing frequency of the unit Isolator Types 1 Type 3 Isolators Combination spring and fiberglass or neoprene hangers incorporating pre compressed molded fiberglass or neoprene noise and vibration isolation pads coated with a moisture impervious elastomeric membrane in series with springs all encased in welded steel brackets The spring shall have a lateral spring stiffness greater than 0 8 times the vertical stiffness Isolators shall be designed for 50 overload capacity and shall accommodate rod misalignment over a 30 degree arc Isolators shall have a minimum static deflection of 3 4 Piping Isolation Suspended HVAC piping 1 diameter and over in the mechanical equipment rooms shall be isolated from the structure by means of vibration and noise control isolators This shall apply to the first two hangers on either side of the pumps Suspended piping shall be isolated with Type 3 isolators A combination clevis pre compressed isolator is acceptable in lieu of separate clevis and separate Type 3 isolators Manufacturers The vibration isolators shall be manufactured by Peabody Noise Control AVNEC Mason Vibration Isolation Co Inc Amber Booth Vibro Acoustics Vibration Mountings Vibration Eliminator Company Korfund Kinetics or IAC Isolators
46. installed motor characteristics C Motor Data Provide neatly typed label inside each motor starter enclosure cover identifying motor served nameplate horsepower full load amperes code letter service factor and voltage phase rating D Provide nameplates for individual motor starters Nameplates shall be in accordance with Section 16195 END OF SECTION 16480 MOTOR CONTROL 16480 3
47. involved in construction manufacture or employment of labor under the aforesaid Contract by any employee officer or agent of the Owner or any person connected with the State Government of Georgia in any way whatsoever This day of 20 L S Signature Title Firm COUNTY OF STATE OF Personally before me the undersigned authority appeared NAME OF PERSON SIGNING THE AFFIDAVIT who is known to me to be an official of the firm of NAME OF CONTRACTOR and who after being duly sworn stated on his oath that he had read the above statement and that the same is true and correct Notary Public My Commission expires This day of 20 DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS STATUTORY AFFIDAVIT STATUTORY AFFIDAVIT COUNTY OF STATE OF FROM Contractor TO Owner Re Contract entered into the day of 20 between the above mentioned parties for the construction of Project No located at KNOW ALL MEN BY THESE PRESENTS 1 The undersigned hereby certifies that all work required under the above Contract has been performed in accordance with the terms thereof that all Subcontractors Suppliers Trade Contractors mechanics and laborers have been paid and satisfied in full or will be paid and satisfied in full out of the proceeds of this payment as set forth in O C G A 13 10 80 and that there are no outstanding claims of any character inc
48. load less than 1 3 the manufacturers listed allowable working load for tension in 2 000 psi concrete Anchors shall be installed in drilled holes per manufacturer s recommendations Approved manufacturers 1 Hilti 5490000 2 Red Head RM Multi Set II 3 Rawl 6300 Drop In PIPE ATTACHMENT Copper tubing hangers Size hot cold and recirculating water pipe hangers to fit piping inside insulation B Line B3170CT C amp P 800CT Anvil CT 69 Erico Michigan 101 PHD 152 FNW 7015EC QU depo ES Steel Pipe Hangers Size uninsulated steel pipe hangers to fit outside the piping Size insulated steel pipe hangers to fit outside the insulation with insulation shield installed between the hanger and the pipe insulation l For Pipe Sizes 2 and Smaller a B Line B3170 b C amp P 800 C Anvil 70 HANGERS AND SUPPORTS 15060 2 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia d Erico Michigan 100 e PHD 151 2 For Pipe Sizes 2 1 2 and Larger a B Line B3100 b C amp P 100 c Anvil 260 d Erico Michigan 400 401 e PHD 450 451 C Vertical supports shall be l Offset pipe clamp B Line B3148 C amp P 179 Anvil 103 Erico Michigan 700 PHD 535 angg 2 Riser clamp a Steel 1 B Line B 3373 2 C amp P 126 3 Anvil 2612 4 PHD 500 551 5 Erico Michigan 510 6 ENW 7022EP b Copper 1 B Line 3373CT 2 C amp P 126CT
49. manual including revised As Built documents of all materials required under the paragraph SUBMITTALS on this specification 6 Three Operators Manuals two Programmers and two As Built Manuals shall be provided to the Owner ALARMS All alarms specified herein shall send a signal to the host computer s and offsite interface to notify the Owner of an alarm condition DDC CONTROLLER LOCATIONS Controls contractor shall mount DDC controllers in a location acceptable to the Owner SEQUENCE OF OPERATION Overall Building Control Description 1 Time Clock Program Owner shall provide Contractor with the required start stop times for each piece of equipment so the Contractor can program the individual start stop time for each piece of equipment Equipment which shall be start stopped by the time clock program is indicated in later paragraphs All other equipment not started by the time clock program will be started and stopped as described in later paragraphs of this section of specifications HVAC INSTRUMENTATION AND CONTROLS 15900 10 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 2 Override Timer Programs Override timer programs shall override the time clock program during its OFF cycles to re start the equipment in its normal operating mode Room temperature sensors shall be provided with integral pushbutton override to restart equipment in normal operating mode for a preprogr
50. meeting the specification requirements which are engineered and approved by the equipment manufacturer may also be furnished by the equipment manufacturer PART 3 EXECUTION 3 1 A HANGER AND SUPPORT APPLICATIONS Specific hanger and support spacing requirements are specified in Sections specifying piping systems and equipment HANGERS AND SUPPORTS 15060 6 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 3 2 B Use galvanized hangers and supports for piping and equipment that will not have field applied finish Use nonmetallic coatings on attachments for electrolytic protection where attachments are in direct contact with copper tubing Use pipe positioning systems in pipe spaces behind plumbing fixtures to support supply and waste piping for plumbing fixtures HANGER AND SUPPORT INSTALLATION Steel Pipe Hanger Installation Comply with MSS SP 69 and MSS SP 89 Install hangers supports clamps and attachments as required to properly support piping from building structure Trapeze Pipe Hanger Installation Comply with MSS SP 69 and MSS SP 89 Arrange for grouping of parallel runs of horizontal piping and support together on field fabricated trapeze pipe hangers 1 Pipes of Various Sizes Support together and space trapezes for smallest pipe size or install intermediate supports for smaller diameter pipes as specified above for individual pipe hangers 2 Fiel
51. not lay atop ceiling Where physical damage is possible mechanical protection shall be used All splices or connections shall be made at equipment served Where communication loops are run terminations shall be at terminal strip on equipment No splices in field shall be allowed The use of snap in bushings or connectors is required where cable is entering a knockout or equipment housing All penetrations through wall sleeves shall be sleeved with conduit with bushings on both ends 6 Contractor shall provide a conduit location plan and submit to the Architect for review prior to installing conduit and control devices Conform to requirements of Architect concerning patching of existing walls Cutting of molding crown molding base molding etc and any other items determined by the Architect shall be prohibited FIELD QUALITY CONTROL Manufacturer s Field Service Engage a factory authorized service representative to inspect test and adjust field assembled components and equipment installation including connections and to assist in field testing Report results in writing ADJUSTING Calibrating and Adjusting 1 Calibrate instruments Make three point calibration test for both linearity and accuracy for each analog instrument Calibrate equipment and procedures using manufacturer s written recommendations and instruction manuals Use test equipment with accuracy at least double that of instrument being calibrated Control Sys
52. obtain the best results 2 Where availability of space is limited coordinate installation of different components to assure maximum accessibility for required maintenance service and repair 3 Make adequate provisions to accommodate items scheduled for later installation Where necessary prepare memoranda for distribution to each party involved outlining special procedures required for coordination Include such items as required notices reports and attendance at meetings l Prepare similar memoranda for the Owner and separate Contractors where coordination of their Work is required Administrative Procedures Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and ensure orderly progress of the Work Such administrative activities include but are not limited to the following Preparation of schedules Installation and removal of temporary facilities Delivery and processing of submittals Progress meetings Project Close out activities x E Ed v E m 01040 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 1 3 D A w m Conservation Coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy water and materials l Salvage materials and equipment involved in performance of but not actually incorporated in the Wo
53. on concrete foundation Disconnect coupling before setting Do not reconnect couplings until alignment procedure is complete Base mounted pumps shall be bolted to concrete base and shimmed to level in both directions Couplings shall be aligned Piping shall be inspected for alignment prior to bolting to pumps Pump base coupling etc for outdoor mounted pumps shall be painted with a weatherproof enamel specifically designed for outdoor usage Motor shall be totally enclosed ALIGNMENT Align pump and motor shafts and piping connections after setting on foundation grout has been set and foundation bolts have been tightened and piping connections have been made Piping shall be inspected for alignment prior to bolting to pumps Comply with pump and coupling manufacturers written instructions for alignment Adjust pump and motor shafts for angular and offset alignment by methods specified in HI 1 1 1 5 Centrifugal Pumps for Nomenclature Definitions Application and Operation After alignment is correct tighten foundation bolts evenly but not too firmly Completely fill base plate with non shrink nonmetallic grout while metal blocks and shims or wedges are in place After grout has cured fully tighten foundation bolts HYDRONIC PUMPS 15185 4 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 3 3 F CONNECTIONS Install piping adjacent to machine to allow service and main
54. on this bond after one year from the date of Final Completion as determined pursuant to Article 6 2 2 SIGNED AND SEALED THIS DAY OF 20 ATTEST NAME OF Contractor By Secretary President SURETY TITLE Please apply seal of Corporation over Secretary s Signature Please apply seal of Surety and arrange for countersignature by a Georgia Licensed Agent of Surety pursuant to O C G A 33 23 5 Kindly show title of the aforesaid agent as Georgia Licensed Agent Attach Power of Attorney DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT S GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT S Contractor in the following Affidavits shall mean General Contractor Contractor for the purpose of compliance with O C G A 13 10 91 b For the purpose of completing the attached Affidavits please insert the following e Name of Public Employer shall mean Board of Regents of the University System of Georgia Owner for the use and benefit of Georgia College amp State University Using Agency e Name of Project shall mean Project No Heating Upgrade for Atkinson Hall DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT S Contractor Affidavit under O C G A 13 10 91 b 1 By executing this affidavit the
55. or NEBB standards As part of this Performance Guaranty the engineer or building owner may call upon AABC or NEBB to assist him with any technical and or field problems pertaining to the final balanced condition of the systems These services will be made available at no additional charge by the TAB agency or by AABC or NEBB National Headquarters PART 2 PRODUCTS Not Applicable PART 3 EXECUTION 3 1 A EXAMINATION Examine the Contract Documents to become familiar with Project requirements and to discover conditions in systems designs that may preclude proper TAB of systems and equipment Provide Contract Documents Examination Report to report on acceptability and or deficiencies in Contract Documents 1 Contract Documents are defined in the General and Supplementary Conditions of Contract 2 Verify that balancing devices such as test ports gage cocks thermometer wells flow control devices balancing valves and fittings and manual volume dampers are required by the Contract Documents Verify that quantities and locations of these balancing devices are accessible and appropriate for effective balancing and for efficient system and equipment operation TESTING ADJUSTING AND BALANCING 15950 3 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 3 2 3 3 3 4 B C Examine approved submittal data of HVAC systems and equipment Examine system and equipment in
56. or other parties concerning the status of payments for labor materials or services furnished in the prosecution of the work 4 No right of action shall accrue on this bond to or for the use of any person or corporation other than the Owner named herein or the legal successors of the Owner DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS PERFORMANCE BOND 5 For the purposes of this bond the name and address of the responsible official of the Surety s claims department to whom correspondence and telecommunications may be addressed and or with whom business concerning this bond may be conducted will be as follows NAME TITLE ADDRESS CITY STATE ZIP CODE TELEPHONE 6 Further this bond shall be the Performance Bond furnished under O C G A 13 10 2 13 10 20 and shall be subject to increase in the penal amount of the bond pursuant to such statutes and Article 1 5 1 of the Contract 7 No action can be instituted on this bond after one year from the date of Final Completion as determined pursuant to Article 6 2 2 SIGNED AND SEALED THIS DAY OF 20 ATTEST NAME OF Contractor By Secretary President SURETY TITLE Please apply seal of Corporation over Secretary s Signature Please apply seal of Surety and arrange for countersignature by a Georgia Licensed Agent of Surety pursuant to O C G A 33 23 5 Kindly show title of the aforesaid agent as Geo
57. pay the Contractor for the performance of the contract subject to additions and deductions provided by approved change orders in current funds the Contract Sum as follows base bid less Deductive Alternate 1 AND 100 DOLLARs 3 The Material Completion and Occupancy Date shall be achieved within Days consecutive calendar days beginnin the date specified in the Proceed Order 4 The agreed daily amount for Liquidated Damages is per day CONTRACT 1 DBB FORM OF CONTRACT PROJECT NUMBER ACRONYM VERSION 07 01 201 1 XX XX XXXX CONSTRUCTION CONTRACT 5 The agreed daily amount for Time Dependent Overhead Costs is per day 6 Notice All notices in accordance with Section 1 1 5 shall be given to the following addresses CONTRACTOR LEGAL GC Firm Name Physical Address NO P O Boxes City State Zip Attention CM POC Title Phone Number CM POC Phone Facsimile Number CM POC Fax Email CM POC Email address OWNER Board of Regents of the University System of Georgia 270 Washington Street SW 6 Floor Atlanta Georgia 30334 Attention Jim James Vice Chancellor for Facilities Phone Number 404 962 3155 Facsimile Number 404 962 3188 OWNER S REPRESENTATIVE Board of Regents of the University System of Georgia 270 Washington Street SW 6 Floor Atlanta Georgia 30334 Attention Choose One Phone Number BOR PM Phone Facsimile Number 404 962 3188 Email Choose Appropriate Email USING AGENCY Institution Instituti
58. pressure of equipment Valve shall have NPT or flanged connections 250 psi cast iron body stainless steel seats springs stems and guides Provide and pipe downstream pressure sensing pipe with tap a minimum of 10 diameters downstream of valve Spirax Sarco Model No 25 or ITT Hoffman STEAM TRAPS Float and thermostatic steam traps shall be of the mechanical lever ball float type having an SG ductile iron body with horizontal in line screwed connections and shall incorporate a balanced pressure thermostatic air vent Valve mechanism shall be stainless steel and attached to a removable cover for easy maintenance Cover shall be 180 degrees reversible to permit flow in either direction See drawings for capacities Thermodynamic steam traps shall be all stainless steel thermodynamic disc type with connections on a common center line which can be installed in position Integral seat design with hardened disc and seating surfaces Approved manufacturers Spirax Sarco Armstrong and ITT Hoffman PART 3 EXECUTION 3 1 A B C D PIPING INSTALLATIONS Drawings show the general arrangement layout and location of piping appurtenances etc but do not show all required fittings and offsets that may be necessary to connect piping to equipment etc offset around obstructions and to coordinate with other trades Fabricate and install piping appurtenances etc based on field measurements Provide all necessary fittings a
59. provided at each Y strainer at the heat exchanger inlet piping connections These shall be cleaned frequently during start up and after piping system is completely clean start up strainers shall be removed and replaced with piping specified mesh media END OF SECTION 15710 HYDRONIC AND STEAM HEAT EXCHANGERS 15710 3 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 15900 HVAC INSTRUMENTATION AND CONTROLS PART 1 GENERAL 1 1 1 2 1 3 1 4 A RELATED DOCUMENTS Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section SUMMARY This Section includes control equipment for HVAC systems and components including control components for equipment not supplied with factory wired controls WORK INCLUDED Complete control system for all heating ventilating and air conditioning HVAC systems and exhaust systems including all integral and field mounted devices and control wiring All control components shall be provided under this section of the specifications unless specifically provided elsewhere A complete and fully operational control system shall be provided for all mechanical systems furnished under Division 15 to achieve the sequence of control specified 1 herein 2 in other specification section or 3 as required to achieve proper operation of the equipment
60. required 3 RES Revise and Resubmit a Indicates item is not presently acceptable as submitted but may be accepted provided additional information and or changes are made b Contractor shall revise and resubmit item to Engineer with additional information indicating compliance with Contract Documents prior to proceeding with work 4 PSD Provide Submittal Data a Indicates submittal data was not provided for this item or section b Contractor shall provide submittal data meeting the explicit requirements of the plans specifications and all addenda BASIC MECHANICAL MATERIALS AND METHODS 15050 4 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 1 5 1 6 1 7 M Shop drawings and data submittals for materials requiring extra long delivery time shall be submitted for approval as soon as possible after execution of contract All items shall be submitted for approval in a timely manner prior to other submittals if necessary so they may be properly incorporated in the building s structure Allow a minimum of three weeks for review No substitutions of materials or extensions of contract time will be allowed for Contractors failure to submit or order such materials sufficiently in advance of the work REGULATORY REQUIREMENTS All work installed under Division 15 shall conform to the current adopted Edition of Building Mechanical Codes and their appropriate amendments
61. same sheet shall have an arrow or other marker to identify the specific product submitted Also submittals for a single product that have options shall have an arrow or other marker to identify that the specified options are being provided Submittals that include products not specified for this project or that include several products on one sheet without being marked or that do not show options selected shall be rejected Variations from specifications shall be explained Submittal preparer s name and telephone number shall be listed on the index sheet BASIC MECHANICAL MATERIALS AND METHODS 15050 3 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia J Piping Submittals Submittal data required for piping systems shall consist of a single sheet of paper with the type of piping systems on this project and the corresponding piping the contractor intends to provide For example Cooling Water Piping Above Grade Schedule 40 black steel Cooling Water Piping Below Grade Class 52 Ductile Iron Contractor shall not submit manufacture s data sheets on piping Review Corrections or Comments made on the Submittals do not relieve the Contractor from compliance with the requirements of the Drawings Specifications and Addenda Contract Documents By entering into this Contract the Contractor agrees that the purpose of submittals is to demonstrate to the Engineer that the Contractor un
62. shall be installed by a state licensed contractor s and all work shall be done by state certified technicians All wiring systems shall be color coded and conductors shall be tagged at all junctions and terminals Label cables identification numbers as directed by Owner The Engineer and Owner reserves the right to move any device fifteen 15 feet without additional costs before the device is installed All wiring and conduit shall be installed in accordance with Division 16 Electrical 2 All wiring shall be installed in conduit except for plenum rated cable as specified below 3 All conduit shall be concealed except in mechanical electrical rooms 4 On existing construction areas surface metal raceway will be allowed 5 All control wiring above suspended ceiling not made inaccessible by equipment ductwork or structure may be plenum rated cable with flame spread of 25 or less and smoke development of 50 or less as tested by ASTM E84 This plenum rated HVAC INSTRUMENTATION AND CONTROLS 15900 7 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 3 4 3 5 cable is not required to be installed in conduit but shall be run in a workmanlike manner parallel to the building lines properly supported at regular intervals and not draped over conduit piping and ductwork Attach cable above ceiling to structure using appropriate fasteners for type of construction involved Cable shall
63. shall be removed by de scaling or wire brushing to produce a smooth surface for painting Masonry Masonry surfaces to be painted shall be prepared by removing all dirt dust oil and grease stains mortar droppings and efflorescence Exposed pipes and conduit shall be cleaned using mechanical cleaning and or solvents mineral spirits or other paraffin free solvents having a flash point no higher than 100 degrees F and shall be painted in accordance with the Painting Systems Schedule Hardware hardware accessories lighting fixtures switch and outlet plates in place and not to be painted shall be removed prior to surface preparation and painting operations or protected Following completion of painting of each space removed items shall be reinstalled Application and Instructions 1 The proportions of all ingredients in all paints and stains mixed on the site shall be in accordance with the recommendations of the paint manufacturer printed on the container applicable to the particular use for which the specific mixture is intended No thinner or flattening oil will be used in the last coat Screen out all lumps and impurities during mixing using clean containers and protect against dirt or trash entering the mix Stir until uniform consistency is procured During the actual application and drying of the paint and until normal occupancy of the building occurs a minimum temperature of 65 degrees F shall be maintained This temperature s
64. system and randomly check measurements to verify that the system is operating according to the final test and balance readings documented in the Final Report Randomly check the following for each system a Measure airflow of at least 10 percent of air outlets Measure water flow of at least 5 percent of terminals c Measure room temperature at each thermostat temperature sensor Compare the reading to the set point Verify that balancing devices are marked with final balance position e Note deviations to the Contract Documents in the Final Report B Final Inspection 1 After initial inspection is complete and evidence by random checks verifies that testing and balancing are complete and accurately documented in the final report request that a final inspection be made by Owner TAB firm test and balance engineer shall conduct the inspection in the presence of Owner Owner shall randomly select measurements documented in the final report to be rechecked The rechecking shall be limited to either 10 percent of the total measurements recorded or the extent of measurements that can be accomplished in a normal 8 hour business day If the rechecks yield measurements that differ from the measurements documented in the final report by more than the tolerances allowed the measurements shall be noted as FAILED If the number of FAILED measurements is greater than 10 percent of the total measurements checked during the final inspecti
65. that shown on the Electrical drawings Two speed motor winding arrangement shall match the starter type specified by Division 16 Electrical Characteristics The horsepowers voltages and phases shown on the drawings and specified herein are the estimated power requirements of all equipment furnished herein and is the basis of the design shown on the electrical drawings If the Contractor provides equipment from the Basis of Design manufacturer or from other approved manufacturers with larger horsepowers different voltages different phases or ampacity he shall coordinate with other trades to provide any additional wiring circuitry starters breakers transformers etc as required at no additional cost to the Contract MOTORS General This paragraph is applicable to all Division 15 specification sections Motors less than 250 watts and used for intermittent service may be manufacturer s standard Motor Enclosures Motor enclosure shall be appropriate for the environment that the motor will be in In the absence of specifically identified motor enclosure style the following requirements shall apply Motors located in exterior locations wet air streams etc shall be totally enclosed fan cooled TEFC Motors located in interior locations in mechanical rooms in dry air streams etc shall be open drip proof ODP Motors Efficiency Each motor 1 hp and above shall have a guaranteed minimum efficiency complying with the Energy Indepen
66. the existing work which is ascertainable by inspection The schedule shall be prepared in four counterpart originals each of which shall be F 1 F 06 F 07 F 08 F 09 dated and signed on behalf of each party to the joint inspection An executed and dated counterpart original shall be filed with a the Architect b the Contractor c the Using Agency and d Owner It is agreed that the preparation of the schedule is for the benefit of the Contractor and is intended to enable him to have the protection afforded by record of such existing damage as is visually ascertainable The Contractor shall have no responsibility to repair any damage which shall appear on the above mentioned schedule nor shall he be responsible for repairing any existing damage which is not ascertainable by visual inspection or which was not a result of negligence on his part Subsequently to the signing of the abovementioned schedule the Contractor shall be responsible for repairing any damage except as noted The Contractor shall perform a Pre Construction walkthrough with the Owner to discuss interior finish colors SANITARY FACILITIES Use only facilities designated by the Owner INDOOR AIR QUALITY A If the building or any portion of the building will be in use and occupied during construction the Contractor shall schedule work and provide temporary ventilation and or isolation to insure that fumes from welding other construction tasks an
67. the most recent literature provided to the Engineer from the Manufacturer s Representative The Contractor may substitute equal and approved equipment from the basis of design manufacturer or manufacturers listed in this specification or set forth in an addendum provided said equipment has all features which are inherent with the Basis of Design equipment meets all requirements of the plans and specifications has like electrical characteristics e g same voltage phase ampacity fusing circuit breaker requirements single or multiple points of connection as indicated on the electrical drawings and will properly fit in the available spaces in the building If the Contractor chooses to provide equipment which meets all of the aforementioned requirements but has different characteristics from that shown on the Contract Electrical Drawings he shall bear all costs associated with that substitution Electrical costs include but are not limited to materials breakers fuses disconnects wiring conduits panels starters contactors and the like installation costs and re engineering All electrical connections shall be coordinated with the Engineer and with the electrical subcontractor Other costs may include but are not limited to additional structural support for heavier equipment than basis of design Prior Approval Substitutions of specified items will be considered only if written request has been submitted for review at least ten d
68. undersigned contractor verifies its compliance with O C G A 13 10 91 stating affirmatively that the individual firm or corporation which is engaged in the physical performance of services on behalf of Board of Regents of the University System of Georgia for the use and benefit of Georgia College amp State University Using Agency public employer has registered with is authorized to use and uses the federal work authorization program commonly known as E Verify or any subsequent replacement program in accordance with the applicable provisions and deadlines established in O C G A 13 10 91 Furthermore the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the information required by O C G A 13 10 91 b Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows Federal Work Authorization User Identification Number Date of Authorization Name of Contractor Heating Upgrade for Atkinson Hall Name of Project Board of Regents of the University System of Georgia For the use and benefit of Georgia College amp State University Name of Public Employer hereby declare under penalty of perjury that the
69. 0 Taco 409 Wheatley AR050 John Wood JHAV 63 075 Qn dms ae HYDRONIC PIPING 15181 5 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 2 9 C Diaphragm Type Expansion Tanks Vertical or horizontal as indicated partial acceptance diaphragm type tank with steel shell designed and constructed in accordance with ASME Section VIII Bladder shall be fabricated from heavy duty butyl rubber and shall separate air charge from system water to maintain required expansion capacity Tank shall be ASME stamped for working pressure of 125 psig with the ASME U symbol stamped on the air separator or nameplate and maximum operating temperature of 240 F Provide schraeder valve for charging purposes Expansion tanks shall be manufactured by Taco Armstrong Amtrol Thrush Wood Wheatley or Bell and Gossett Tangential Type Air Separators Combination tangential type air separator and system strainer Non tangential in line deceleration type air separators are not allowed Units to have internal perforated stainless steel air collector tube to direct released air into the high capacity automatic air vent A blow down connection shall be provided for routine cleaning Units shall be constructed in accordance with ASME and stamped for 125 1b working pressure with the ASME U symbol stamped on the air separator or nameplate Provide factory installed support brackets welded to shell Air separators s
70. 0 F melting temperature of between 410 F and 440 F maximum to protect valve seat material Solder shall conform to ASTM B 32 and shall be applied in conformance with ASTM B 828 Flux shall conform to ASTM B 813 Solder shall be manufactured for the HVAC industry not circuit board industry Solder shall be Taramet Sterling Lead Free as manufactured by Taracorp Dutch Boy Silver as manufactured by Taracorp or Lenox Sterling Lead Free BRAZING ALLOY Brazing alloy shall be copper and phosphorous with minimum 1546 silver minimum melting temperature of 1190 F Brazing alloy shall meet AWS BcuP 5 classification AIR CONTROL DEVICES Automatic Air Vents Bronze or cast iron body with all brass internal part construction with ball check to prevent air re entry Suitable for pressures to 75 psig and temperatures to 240 degrees F Provide 1 4 NPS discharge connection Hoffman No 79 American Tube 706 Armstrong 1 AV Metraflex Metravent Flow Design No 1 4AA Maid O Mist QUA Aeon hb High Capacity Automatic Air Vents Cast iron or brass construction with stainless steel brass EPDM and silicone rubber internal components Provide float action pilot operation for instant venting of air Suitable for pressures to 150 psig and temperatures to 250 degrees F High capacity type automatic air vents must have a published air removal capacity of 10 scfm at 15 psig Provide 1 8 tapping for drain connector Bell amp Gossett No 107 Amtrol 72
71. 6 IRCA D L 99 603 and the Georgia Security Immigration Compliance Act OCGA 13 10 91 et seg The Contractor shall execute the Georgia Security and Immigration Compliance Act Affidavit as found in Section 7 of the Construction Contract Contractor also agrees that it will execute any affidavits required by the rules and regulations issued by the Georgia Department of Audits and Accounts If the Contractor is the successful bidder contractor warrants that it will include a similar provision in all written agreements with any subcontractors engaged to perform services under the Contract 13 Owner s Policy Statement The policy of the Owner is that minority business enterprises shall have the maximum opportunity to participate in the Owner s purchasing process The Owner encourages all minority business enterprises to compete for win and receive contracts for goods services and construction In addition Georgia law provides a state income tax credit available to any business that subcontracts with a minority owned business See O C G A 48 7 38 and O C G A 50 5 130 See also Executive Order of the Governor No A 11 0002 1992 For more information please contact the Board of Regents Office of Business Development by e mail at BusinessDevelooment usg edu Any questions regarding statements contained hereunder should be directed to Name Address and Telephone Number of Designee as described in the box below Bip REQUIREMENTS 3 DBB CONSTRU
72. 61 Address Bids must be physically on the table in the Bid Room by Two o clock p m at the time legally prevailing in Milledgeville Georgia on July 30 2013 for the construction of Heating Upgrade for Atkinson Hall located in Milledgeville Georgia At the time and place noted above the bids will be publicly opened and announced Bidders are cautioned that acquisition of Bidding Documents through any source other than the office of the Design Professional or Georgia College and State University is not advisable Acquisition of Bidding Documents from unauthorized sources places the bidder at risk of receiving incomplete or inaccurate information upon which to base a bid There will be a pre bid conference held on Tuesday July 16th at 2 00 p m at Georgia College Facilities Management 2nd Floor Conference Room Miller Court 302 North Wayne Street Georgia College amp State University Milledgeville Georgia 31061 Attendance at this conference is MANDATORY for any Contractor intending to bid on this project Others may attend if they so desire Bid documents are available at no charge and may be downloaded from the internet by visiting the State Purchasing website at Georgia Procurement Registry Upon reaching the Georgia Procurement Registry Search Engine under Government Type select State Government under Government Entity select Georgia College and State University and then search for this solicitation Bidder should check the web site da
73. Bidder In the event a responsive and responsible bids are in excess of the budget the Owner in its sole and absolute discretion and in addition to the rights set forth above reserves the right either to i supplement the budget with additional funds to permit award to the lowest responsive and responsible bid or ii to negotiate with the lowest responsive and responsible bidder after taking all deductive alternates only for the purpose of making changes to the Project that will result in a cost to the Owner that is within the budget as it may be amended 18 Contract Forms The contract forms including the payment and performance bonds shall be as set forth in the General Conditions Section 7 Forms Remainder of Page Intentionally Left Blank Bip REQUIREMENTS 5 DBB CONSTRUCTION CONTRACT BiD REQUIREMENTS VERSION 07 01 201 1 BID FORM BID REQUIREMENTS BID FORM To OWNER Re Project Name and No Bid Date THE BID Bid Having carefully examined the Specifications entitled PROJECT NO DESIGN PROFESSIONAL insert Project name and number and the Bidding Documents and Addendum a No s A1 as well as the Site and conditions affecting the Work bidder hereby proposes to furnish all services labor materials and equipment called for by them for the entire Work in accordance with the aforesaid documents for the sum of Dollars which sum is hereinafter called the Bid The Bid shall be th
74. C PIPING 15181 6 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 4 Strainer Screens On strainers serving devices with 1 5 gpm or less provide 40 mesh wire screen strainer On strainers upstream of plate and frame heat exchangers provide 40 mesh wire strainer screen liner in addition to perforated screen On all strainers greater than 1 5 gpm provide a 20 mesh wire start up screen liner On strainers 2 to 5 provide 1 16 perforated screen On strainers 6 and larger provide 1 8 perforated screen All screens shall be type 304 stainless steel Contractor shall remove start up strainer liner after approximately 60 hours operating time unless a different time is specified in Pipe Flushing and Cleaning paragraph Install strainers with chamber facing down to prevent air binding of the housing Install strainer so cover and screen are easily removable Provide full size blow down ball valve with hose connection and cap on strainers 2 1 2 and larger Blow down opening on cover shall be on bottom of cover Strainers shall be manufactured by Griswold Anvil Mueller Hoffman Metraflex Keckley Flow Design Hydronic Components Inc HCI Victaulic or Wheatley equal to the basis of design Watts model specified herein Strainers may not be field fabricated Combination Y strainer and ball valves shall be manufactured by Flow Design Pro Hydronics Nexus Bell and Gossett Griswold or Parts Serv
75. CONSULTING AHeP ENGINEERS 250 Charter Lane Charter Lane Suite 100 Macon GA 31210 HEATING UPGRADE FOR ATKINSON HALL GEORGIA COLLEGE amp STATE UNIVERSITY MILLEDGEVILLE GEORGIA Andrews Hammock amp Powell Inc Telephone 478 405 8301 Fax 478 405 8210 June 25 2013 DESIGN BID BUILD CONSTRUCTION CONTRACT BETWEEN CONTRACTOR AND OWNER TO BE USED WITH BOARD OF REGENTS OF THE UNIVERSITY SYSTEM OF GEORGIA S DESIGN PROFESSIONAL ARCHITECTURAL CONTRACT BETWEEN LEGAL GC FIRM NAME CONTRACTOR AND BOARD OF REGENTS OF THE UNIVERSITY SYSTEM OF GEORGIA OWNER For the Use and Benefit of GEORGIA COLLEGE amp STATE UNIVERSITY UsiNG AGENCY INSTITUTION PROJECT NO HEATING UPGRADE AT ATKINSON HALL INCLUDES Executive Summary of Contents Preface Form of Contract Contract 1 to Contract 3 Bid Requirements pp 1 13 Table of Contents pp i to iv General Conditions pp 1 to 74 Forms Forms 1 to Forms 29 Supplementary General Conditions DBB CONSTRUCTION CONTRACT VERSION 07 01 2011 EXECUTIVE SUMMARY OF CONTENTS FORM OF CONTRACT BID REQUIREMENTS GENERAL CONDITIONS SECTION 1 GENERAL Part 1 General Part 2 Contractor s General Responsibilities and Duties Part 3 Owner s General Responsibilities and Rights Part 4 Protection of Persons and Property Part 5 Bonds Indemnity and Insurance Part 6 Hazardous Conditions and Materials Part 7 Miscellaneous Provisions SECTION 2 PRE COMME
76. CT CONSTRUCTION CONTRACT BETWEEN CONTRACTOR AND OWNER THIS CONSTRUCTION CONTRACT hereinafter the Contract made this Date day of Month Year hereinafter the Effective Date by and between the BOARD OF REGENTS OF THE UNIVERSITY SYSTEM OF GEORGIA hereinafter the Owner for the use and benefit of _ INSTITUTION NAME hereinafter the Using Agency or Institution LEGAL GC Firm Name hereinafter the General Contractor Contractor whose address is _ MUST be a physical address NO P O Boxes Phone XXX XXX XXXX Fax XXX XXX XXXX a Contractor s FEIN or Tax Identification Number b Contractor s Georgia License Type and Number c Contractor s Federal Employment Verification Certification The Contractor is registered with authorized to use is using and will continue to use the federal work authorization program throughout the term of the contract and holds the following authorization User Identification Number Date of Authorization Date WITNESSETH that the Contractor and the Owner for the consideration set forth herein the adequacy and sufficiency of which is hereby acknowledged by each party agree as follows Project No Project Number Project Name and Description PROJECT NAME AND DESCRIPTION hereinafter the Project 1 Existing Documents The Contractor has reviewed and taken into consideration the Bidding Documents in preparing his bid 2 The Contract Sum The Owner shall
77. CT SECTION 7 FORMS SECTION 7 FORMS PERFORMANCE BOND PERFORMANCE BOND Bond No Project No _Heating Upgrade for Atkinson Hall KNOW ALL MEN BY THESE PRESENTS That as principal hereinafter referred to Legal Name and Address of the Contractor as Contractor and as surety hereinafter referred to Legal Title and Address of Surety as Surety are held and firmly bound unto the Board of Regents of the University System of Georgia as Obligee hereinafter referred to as Owner in the amount of and No 100 Dollars 00 to which payment Contractor and Surety bind Themselves their heirs executors administrators successors and assigns jointly and severally firmly by these presents WHEREAS the above bounden Principal has entered into a contract with the Owner bearing date of _ Month Day Year for Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia in accordance with drawings and specifications prepared by Andrews Hammock amp Powell Inc which said contract is incorporated herein by reference and made a part hereof and is hereinafter referred to as the Contract NOW THEREFORE THE CONDITION OF THIS OBLIGATION is such that if the Contractor shall promptly and faithfully perform and comply with the terms and conditions of said contract and shall indemnify and save harmless the Owner against and from all cost expenses damages injury or loss to which said O
78. CTION CONTRACT BID REQUIREMENTS VERSION 07 01 201 1 INSTRUCTIONS TO BIDDERS 14 Bids a Bid Opening Bids will be opened and announced as stated in the Invitation to Bid b Bid Submission All bids must be submitted on the Bid Form as attached hereto and must be signed notarized and sealed by a notary public All blanks for information entry in bid forms submitted to Owner should be filled Blanks left unfilled constitute irregularities in the bid and place the bidder at risk of having the bid rejected unless the Owner rules the irregularity to be an informality or technicality that the director can waive as is made clear in Paragraph 16 of these Instructions to Bidders and on the Bid Form Numbers shall be written in English words and in Arabic numerals The inclusion of any condition alternate qualification limitation or provision not called for shall render the bid nonresponsive and shall be sufficient cause for rejection of a bid c Bid Security Bids must be accompanied by a Bid Bond made payable to the Owner in an amount not less than five percent of the Bid Bid Bonds should be furnished on forms accepted as standard by the insurance industry but shall be substantially in accordance with the Bid Security Form attached hereto d Delivery of Bids Bids are to be addressed to the Owner at the address and room number shown in the Invitation to Bid Bids must be enclosed in an opaque sealed envelope marked with the Bid Dat
79. E UNIVERSITY BOARD OF REGENTS OF THE UNIVERSITY By By Print Name Title Print Name Title Date approved by Using Agency Date approved by Owner 20 DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS CHANGE ORDER FORMAT FINAL COST AMENDMENT TO CHANGE ORDER NO 1 A memorandum is attached showing cost breakdown of labor and materials by unit and quantities as prepared by the Contractor and checked by the Contract Compliance Specialist and Program Manager if any 2 We have verified the quantity and quality of all materials shown on the memorandum We have verified that all prices are reasonable and do not exceed current costs for like services or materials and we have verified that the quality of the materials meets the requirements of the Contract Documents 3 The contractor shall be allowed additional calendar days for completion The Material Completion and Occupancy date is 4 The Contract Sum shall be increased decreased by on account of this change 5 The payment and extension of time if any provided by this Change Order constitutes compensation in full to the Contractor and its Subcontractors Suppliers and Trade Contractors for all costs and markups directly and indirectly attributable to the changes ordered herein and for all delays or time related costs thereto and for any acceleration costs for performance of changes within the time stated and to be completed by the Material Completion and
80. Hammond IB 415 Crane 88 Milwaukee 600 Stockham B 64 Treice 735 2 Brass Weksler AV 34 Weiss 25NVBR FNW NVB 0B 200 cel OS SO DO METERS AND GAUGES 15122 2 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 2 4 25 2 6 2 7 A STEM TYPE THERMOMETERS General Adjustable angle industrial type constructed of brass or cast aluminum no plastic allowed case rattle proof glass window black scale graduations and red reading mercury tube Stem to be constructed of brass or stainless steel with 3 4 thread for use with separable socket well Scale to be 7 long with 3 1 2 long stem Ranges 1 Condenser Water 30 to 130 F in 1 divisions 24 Chilled Water 0 to 100 F in 1 divisions 3 Domestic and Heating Hot Water 30 to 240 F in 2 divisions 4 Cooling Water 0 to 100 F in 2 divisions 3 Loop Water 0 to 100 F in 2 divisions 6 Steam 30 to 300 F in 2 divisions Manufacturers Stem type thermometers shall be manufactured by Ashcroft Trerice Weksler FNW Weiss Palmer or Moeller SEPARABLE SOCKET WELLS Provide for all thermometers and control bulbs mounted in piping Wells shall be constructed of brass or stainless steel be furnished complete with screwed cap and shall have lagging extension Wells shall be suitable for 3 1 2 stems Where wells are installed in straight runs of pipe smaller than 2 1 2 increase pipe size to 2 1 2
81. ILL ALL PIPING Excavate trenches to the elevation required by the pipe Trench shall not be undercut unless the trench bottom is in rock or hard strata cinders organic soils or injurious materials Under cut shall be a minimum of 6 below the invert of the piping and shall be refilled with inorganic soil or sand tamped in place Contractor shall furnish all labor materials and equipment to keep the excavation free of water either from surface sources or from underground sources or from both When underground water is encountered undercut the trench 6 and backfill with graded aggregate base type C crush and run gravel The selections of the equipment and method of the removal of the water shall be the responsibility of the Contractor The Contractor shall be and is responsible for all damage incurred in handling water conditions The present provision supersedes and replaces all other provisions relating to the removal of water from the site After piping has been tested inspected and approved trenches shall be backfilled to the first 12 inches over the pipe in 4 inch lifts and hand tamped HYDRONIC PIPING 15181 16 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia D 3 9 3 10 After the first 12 inches lifts shall not exceed 8 inches The backfill in all trenches shall be compacted to 95 of the maximum dry density determined by the standard Proctor Compaction Test ASTD D 698
82. Life Safety Code NFPA 101 International Building Code with Georgia Amendments International Mechanical Code with Georgia Amendments Standard for the Installation of Air Conditioning and Ventilating Systems NFPA 90A International Plumbing Code with Georgia Amendments International Gas Code with Georgia Amendments National Fuel Gas Code NFPA 54 City of Milledgeville and Baldwin County Codes Requirements of the State of Georgia Fire Marshall s Office 0 GA State Minimum Standard Energy Code Bus CO ON Materials and Equipment included in Underwriters Label Service shall bear that label Electrical equipment shall be UL approved as installed and bear the UL label unless noted otherwise herein All fans shall be AMCA certified and bear that label for performance and sound All air conditioning equipment shall be ARI certified and bear that label Where requirements of these specifications differ from specified codes and ordinances conform to the more stringent requirements PROJECT SITE CONDITIONS Install Work in locations shown on Drawings unless prevented by Project conditions Shift or relocate equipment or systems to avoid conflicts with other trades Modifications to the work required to accommodate project conditions encountered in the field shall be made at no additional cost to the contract Prepare drawings showing proposed rearrangement of Work to meet Project conditions including changes to Work specified in other Secti
83. MAILING ADDRESS IF DIFFERENT FROM ABOVE Telephone Number AREA CODE NUMBER The full names of persons and firms interested in the foregoing bid as principals are as follows 1 Circle One President Partner Owner Other 2 Circle One Vice President Secretary Partner Other 3 Circle One Vice President Secretary Partner Other Note If incorporated The names of both the President and Corporate Secretary must be indicated If a partnership all partners must be indicated Social Security Number or FEIN Contractor s Georgia License Type and Number Contractor s Federal Employment Verification Certification Must include completed Contractor Affidavit as found in Section 7 of the Contract The Contractor is registered with authorized to use is using and will continue to use the federal work authorization program throughout the term of the contract and holds the following authorization User Identification Number Date of Authorization State Where Organized or Incorporated Plan of Organization Circle One Proprietorship Corporation Partnership Joint Venture Other Describe Years Engaged in Construction Contracting in Present Firm Organization years Bip REQUIREMENTS 8 DBB CONSTRUCTION CONTRACT BiD REQUIREMENTS VERSION 07 01 201 1 STATEMENT OF BIDDER S QUALIFICATIONS Bidder Hereby Certifies that bidder a Has never refused to sign a contract at the original bid on a public works
84. Milledgeville Georgia Flexible pipe connectors Backflow preventers Water Pressure Reducing Valves Tangential Particle Separators Pressure compensating flow control valve Pressure relief valves Pre insulated piping system Steam pressure reducing valve mo Bg os 7 Section 15185 Hydronic Pumps a Base Mounted End Suction Centrifugal Pumps b Pump Specialty Fittings 1 Suction Diffusers 2 Triple Duty Valves 8 Section 15710 Hydronic And Steam Heat Exchangers a Shell and Tube Heat Exchangers 9 Section 15900 HVAC Instrumentation and Controls a Control Product Data b Sequence of Control 10 Section 15950 Testing Adjusting and Balancing a TAB Agent NEBB or AABC Certificate Do not submit samples of TAB forms 11 Letter from Contractor stating submittals have been checked and comply with the Contract Documents 12 Certification that all items are furnished under this contract are free of hazardous materials e g asbestos PCBs I Manufacturer s data sheets shall be marked to clearly indicate the manufacturer model number size color accessories required clearances field connection details weight loading electrical characteristics capacities etc being submitted Submittals shall only include the products relevant to this specific project Submittals shall not include other products produced by the manufacturer which are not specified on this project Submittals containing several products on the
85. N Provide one 1 readout meter kit for use with Pressure Compensating Flow Control Valves Provide a separate readout meter kit for with calibrated venturi ball valves and venturis I certify that the above list of spare parts and materials have been turned over to the Owners Representative Company a ts l Name pu uu Title Signature Date pe END OF SECTION 15051 MECHANICAL CLOSEOUT DOCUMENT REQUIREMENTS 15051 5 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 15060 HANGERS AND SUPPORTS PART 1 GENERAL 1 1 A 1 2 1 3 1 4 1 5 RELATED DOCUMENTS Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section SUMMARY This Section includes the following hangers supports and accessories for mechanical system piping and equipment Coatings Upper attachments Pipe attachment hangers and clamps Lower pipe supports Metal framing channel Hanger rods Pipe positioning systems Insulation shields Sleeves 0 Synthetic seals for sleeves 1 Vibration isolators FN UU IN Gn coc Bas rs PERFORMANCE REQUIREMENTS All supports utilized under Division 15 shall meet the sizing criteria specified herein No support shall be loaded to more than 20 of its yield strength thereby providing a safety factor of 5 All support sizes specified herein fo
86. N FINISH Service Location Pipe Duct Fitting Thickness Pipe Duct Fitting PIPING Hot Cold amp Recirculating Water Piping Exposed Il P1 I Space Heating Hot Water Piping Exposed Inside 1 2 to 1 Il P1 1 2 F2 P1 Exposed Inside 1 1 4 to 2 I P1 1 F2 P1 Exposed Inside 2 1 2 and up Il P1 1 1 2 F2 P1 Steam and Steam Condensate Piping Exposed Outdoors D D 2 Fl Fl Steam and Steam Condensate Piping Underground Pre insulated Piping System Expansion Tank Piping Serving Hot Water System Same as Hot Water Piping System EQUIPMENT Mechanical Equipment Shall have factory installed insulation to prevent condensation or excessive heat loss gain Hot Water Expansion Tanks One inch of type I4 with F1 finish Hot Water Air Separators One inch of type I4 with F1 finish Shell amp Tube Heat Exchangers I9 1 1 2 with F3 finish END OF SECTION 15080 MECHANICAL INSULATION 15080 5 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 15110 VALVES PART 1 GENERAL 1 1 A 1 2 1 3 1 4 1 5 VALVES RELATED DOCUMENTS Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section SUMMARY This Section includes the following general duty valves 1 Ball valves 25 Butterfly valves 3 Ball valves with electric actuation 4 Gate valves 5 Check valves SUBMITTALS
87. NCEMENT PHASE Part 1 Pre commencement Phase Services Part 2 Construction Documents and Site Plan SECTION 3 CONSTRUCTION PHASE Part 1 Construction Phase Services Part 2 Changes to the Work Part 3 Time Part 4 Correcting the Work Inspections Covering and Uncovering Work Part 5 Subcontractors Trade Contractors and Suppliers SECTION 4 COMPENSATION Part 1 General Part 2 Payments Withheld Part 3 Liens SECTION 5 CONTRACT ADJUSTMENTS DISPUTES AND TERMINATION Part 1 Owner s Right to Suspend Work Part 2 Contract Adjustments and Disputes Part 3 Termination SECTION 6 PROJECT COMPLETION Part 1 Material Completion Part 2 Final Completion Part 3 Inspections for Completion of the Work Part 4 Final Documents Part 5 Payment for Material Completion and Final Payment Part 6 Correction of the Work after Final Completion SECTION 7 FORMS Performance Bond Payment Bond Georgia Security and Immigration Compliance Act Affidavit s Non Influence Affidavit Statutory Affidavit Five Year Bond on Roofs and Walls Specimen Certificate of Manufacturer Certificate of Insurance Bond to Discharge Claim Change Order Forms Application for Payment Form Subcontractor Retainage Release Certificate Final Certification of Costs SUPPLEMENTARY GENERAL CONDITIONS BOARD OF REGENTS DESIGN BID BUILD CONTRACT GENERAL CONDITIONS VERSION 07 01 201 1 EXECUTIVE SUMMARY OF CONTENTS CONSTRUCTION CONTRA
88. NNEL Refer to each specification section for additional requirements the manufacturer shall provide under the provisions of this specification Upon completion of the equipment installation the Contractor shall obtain the services of the factory authorized and trained representative at no additional cost to the owner to perform a start up of the piece of installed equipment The factory authorized and trained representative shall submit a certificate or letter stating the equipment has been successfully started adjusted and tested in accordance with the manufacturer s recommendations Contractor shall refer to each specification section to determine which equipment systems require start up by factory authorized personnel Some representative equipment systems which require start up are listed below 1 Controls O amp M INSTRUCTION FORM Contractor shall provide instruction to operating personnel for the minimum hours specified in each specification section Contractor shall coordinate a schedule of start up operation and maintenance instruction meetings between the Owner s representatives various subcontractors and manufacturer s representatives Submit the following completed form Some representative systems and equipment are included in the form below but contractor shall customize the form based on the specific systems and equipment on this project MECHANICAL CLOSEOUT DOCUMENT REQUIREMENTS 15051 4 Heating Upgrade for Atkinson Hall
89. O SHALL APPEAR ON THE CERTIFICATE Certificate of Insurance Name Address and Telephone Number of Producing Agent PROJECT NO HEATING UPGRADE FOR ATKINSON HALL PROJECT NAME Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia Name and Address of Insured Contractor Contractor Certificate Holder Owner Board of Regents of the University System of Georgia 270 Washington Street SW 6 Floor Atlanta Georgia 30334 Attn Director of Contracts amp Services Office of Facilities Type of Insurance Policy No Company Affording Policy Expiration Limits Coverage Date Commercial General Liability 1993 Each Person 1 000 000 00 iia Farmer vs Each Occurrence 1 000 000 00 Includes XCU Coverage Products Co Op Agg 1 000 000 00 Personal amp Adv injury 1 000 000 00 Contractual 1 000 000 00 General Aggregate 2 000 000 00 Commercial Business Automobile Bodily Injury 1 000 000 00 Property Damage 1 000 000 00 Combined Single Limit 1 000 000 00 Commercial Umbrella Liability Each Occurrence 2 000 000 00 Aggregate 4 000 000 00 Liability Workers Compensation o wm T o 7j W C Statutory Limits Employers Liability Each Accident 1 000 000 00 Disease Each Employee 1 000 000 00 BI Disease Aggregate 1 000 000 00 Builders Risk written on 1991 Cause of Loss Special Form or its equivalent Cost of Project OR Installation Floater for other than new construction
90. ORMS APPLICATION FOR PAYMENT FORM WORK PERFORMED TO DATE In support of Application for Payment No For the period from through inclusive Project No Name and location of Project Contractor s Name and Address WORK INCLUDED IN ORIGINAL CONTRACT DETAILED ESTIMATE WORK PERFORMED TO DATE CSI Category and Description Number Amount Earned Value of Percent Item No and Designation amp Kind Unit Price Estimated to Date Incomplete Complete 1 of Units 3 Cost 6 Work 8 2 4 7 A Contracting Requirements a b C 1 Division 1 General Requirements a b c 2 Division 2 Site Construction i Building opw Infrastructure i om Division 3 Concrete a b c Division 4 Masonry i Building a b C Infrastructure i eof 5 Division 5 Metals a b C 24 DBB CONSTRUCTION CONTRACT SECTION 7 FORMS 6 Division 6 Wood and Plastics a b C 7 Division 7 Thermal amp Moisture a b C Roof 8 Division 8 Doors amp Windows a b C 9 Division 9 Finishes a b c 10 Division 10 Specialties a b 11 Division 11 Equipment i Fixed or Built in ii Moveable a b C 12 Division 12 Furnishings i Fixed or Built in i a b c ii Moveable a b c 13 Division 13 Special Construction op C 14 Division 14 Conveyi
91. Occupancy Date and for any Claims related thereto against the Owner and the Design Professional and design consultants APPROVED AND AGREED BY CONTRACTOR RECOMMENDED FOR OWNER S ACCEPTANCE LEGAL GC Firm Name DESIGN PROFESSIONAL Andrews Hammock amp Powell Inc By By Print Name Title Print Name Title Date approved by Contractor Date approved by Design Professional APPROVED AND AGREED BY USING AGENCY APPROVED AND AGREED BY OWNER GEORGIA COLLEGE amp STATE UNIVERSITY BOARD OF REGENTS OF THE UNIVERSITY By By Print Name Title Print Name Title Date approved by Using Agency Date approved by Owner 21 DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS APPLICATION FOR PAYMENT FORM APPLICATION FOR PAYMENT APPLICATION FOR PAYMENT NO PROJECT NO CERTIFICATE OF THE CONTRACTOR OR HIS DULY AUTHORIZED REPRESENTATIVE To the best of my knowledge and belief certify that all items units quantities and prices of work and material shown on this Application for Payment No are correct that all work has been performed and materials supplied in full accordance with the terms and conditions of the Contract Documents between Owner and dated Contractor and all authorized changes thereto and that the following is a true and correct statement of the contract account up to and including the last day of the period covered by this Application and that no part of the amount due this Application has been recei
92. PS 2 Identify piping as specified in Division 15 Section Mechanical Identification Provide chrome plated escutcheon plates for all piping penetrations through walls exposed to view Provide non conducting dielectric connections wherever jointing dissimilar metals HYDRONIC PIPING 15181 12 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia W X 3 2 3 3 3 4 Install piping to allow for expansion and contraction without stressing pipe joints or connected equipment Mitered Fittings and Tapped Pipes Mitered fittings and tapped pipes are not allowed All changes in direction and pipe branches shall be accomplished by the use of fittings Where flanged connections are provided to connect butterfly valves to other flanged piping components the contractor shall provide spool pieces as necessary to allow the disc to extend to the fully open position STEAM PIPING INSTALLATION The steam piping shall be installed tested and insulated in accordance to contract documents as a minimum and industry standards The steam piping system shall be purged from air and hydrostatically tested to 200 PSIG and shall hold said test pressure for a period of 4 hours without a drop in pressure HANGERS AND SUPPORTS Hanger support and anchor devices are specified in Division 15 Section Hangers and Supports Comply with the following requirements for maximum spacing of supports Insta
93. The insured contractor has provided the contract provisions concerning insurance to the Undersigned and the Undersigned had reviewed the insurance coverages required for the project referenced above and makes the following certifications which shall serve to bind the various insurance carriers as follows 1 Such insurance as is herein certified i are written in accordance with the company s regular policies and endorsements subject to the company s applicable manuals or rules and rates in effect ii have been issued to the insured named above and iii are in force at this time 2 With the exception of the Workers Compensation policy the Officers Members Agents amp Employees of the Owner and the State of Georgia are included as additional insureds as their interests may appear and a copy of the additional insured endorsement s is attached hereto The undersigned certifies that he has so notified each Insurer that Georgia law requires that the Attorney General of Georgia shall represent and defend the state entities and Indemnities named herein remains in full force and effect and is not waived by issuance of any policy of insurance Disease Each Employee 1 000 000 00 BI Disease Aggregate 1 000 000 00 3 Each policy either provides or has been endorsed to meet Georgia law that the policy shall not be canceled changed allowed to lapse or allowed to expire for any reason ani miny 30 days 10 days for non payment of premium after the Cert
94. UCTURE 3 FURNISHINGS AND EQUIPMENT TOTAL Notes Contractor must insure costs from all Change Orders are apportioned and included in each line item above Building Include totals from Items A 1 3 5 6 7 8 9 10 13 14 15 and Building portions of Items 2 4 and 16 Infrastructure Include totals from the Infrastructure portions of Items 2 4 and 16 Furnishing and Equipment Include totals from only the moveable portions of Items 11 and 12 RK certify to the best of my knowledge and belief that all of the amounts set forth on this Certificate are true and correct and are supported by the financial records for this project on file with the Contractor Contractor By Date Title CERTIFICATE OF THE DESIGN PROFESSIONAL certify to the best of my knowledge information and belief that the amounts certified by the Contractor are consistent with the estimates provided in my final Statement of Probable Cost for the Project that the Building Improvement contains a footprint based upon a line 5 feet outside the building structure of square feet a total of gross square feet and contains floors including basements The building fire protection system is include type of system The Certificate of Occupancy was issued on further certify that the design intent for this project is that the Building and Building Improvements are of Building Construction Class and ISO Occupancy Type s a
95. University Milledgeville Georgia B Warranties Provide manufacturer s equipment warranties prior to final inspection See other paragraphs in other sections of specifications for specific additional equipment warranties END OF SECTION 16010 BASIC ELECTRICAL REQUIREMENTS 16010 3 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 16060 ELECTRICAL DEMOLITION PART 1 GENERAL 1 1 RELATED DOCUMENTS A Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section 1 2 SECTION INCLUDES A Electrical demolition PART 2 PRODUCTS 2 1 MATERIALS AND EQUIPMENT A Materials and equipment for patching and extending work As specified in individual Sections PART 3 EXECUTION 3 1 EXAMINATION A Verify field measurements and circuiting arrangements are as shown on Drawings B Demolition Drawings are based on casual field observation and existing record documents Report discrepancies to Engineer before disturbing existing installation C Beginning of demolition means installer accepts existing conditions 3 2 PREPARATION A Provide temporary wiring and connections to maintain existing systems in service during construction When work must be performed on energized equipment or circuits use personnel experienced in such operations B Existing Electrical Services Maintain exist
96. a College amp State University Milledgeville Georgia Certificate Regarding Subcontractor s Completed Work and Retainage Release 1 This is to certify that our work is one hundred percent complete for our subcontract number Our retainage is due in accordance with the contract documents Our scope of work included the The total amount of retainage now due is 2 The Subcontractor hereby certifies that all work required under the above contract has been performed in accordance with the terms thereof that all materialmen subcontractors mechanics and laborers have been paid and satisfied in full and that there are no outstanding claims of any character including disputed claims or any claims to which the subcontractor has or will assert any defense arising out of the performance of the contract which have not been paid and satisfied in full except as listed hereinbelow which exceptions apply only to the release in Paragraph 5 below 3 The Subcontractor further certifies that to the best of his knowledge and belief there are no unsatisfied claims for damages resulting from injury or death to any employees subcontractors or the public at large arising out of the performance of the contract or any suits or claims for any other damage of any kind nature or description which might constitute a claim or lien upon the property of the Owner 4 The Subcontractor has received final payment in full settlement of all claims against the Owner ari
97. ady for unloading unpacking assembly installation etc as applicable in each instance Install Except as otherwise defined in greater detail term install is used to describe operations at project site including unloading unpacking assembly erection placing anchoring applying working to dimension finishing curing protecting cleaning and similar operations as applicable in each instance 01095 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 1 2 I Provide Except as otherwise defined in greater detail term provide means furnish and install complete and ready for intended use as applicable in each instance Installer The entity person or firm engaged by the Contractor or its subcontractor or sub subcontractor for the performance of a particular unit of work at the project site including installation erection application and similar required operations It is a general requirement that such entities Installers be expert in operations they are engaged to perform Testing Laboratory An independent entity engaged to perform specific inspections or tests of the work either at project site or elsewhere and to report and if required interpret results of those inspections or test FORMAT AND SPECIFICATION EXPLANATIONS Specification Production None of these explanations will be interpreted to modify substance of requirements Portions of these specificat
98. aggered Install insulation with tight longitudinal seams and end joints Bond seams and joints with adhesive recommended by insulation material manufacturer Keep insulation materials dry during application and finishing Install insulation with least number of joints practical Where vapor barrier is indicated seal joints seams and penetrations in insulation at hangers supports anchors and other projections with vapor barrier mastic Type F3 Cut insulation in a manner to avoid compressing insulation more than 75 percent of its nominal thickness Repair damaged insulation facings by applying same facing material over damaged areas Extend patches at least 4 inches 100 mm beyond damaged areas Adhere staple and seal patches similar to butt joints On insulated piping with vapor barrier insulate fittings valves unions flanges strainers flexible connections and expansion joints On insulated piping without vapor barrier and piping conveying fluids 140 degrees F 60 degrees C or less do not insulate flanges and unions at equipment but bevel and seal ends of insulation with mastic Type F3 at such locations For above ambient service do not install insulation to vibration control devices testing agency labels nameplates or cleanouts ASME stamps etc MECHANICAL INSULATION 15080 4 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 3 4 INSULATION SCHEDULE INSULATIO
99. all be understood that the manufacturer has been approved as being capable of producing this product This does not necessarily constitute approval of his producing this product This does not necessarily constitute approval of his standard product His product shall still comply with all of the requirements and standards of this specification and not necessarily his standard specification to the extent that it might require special manufacture to meet the requirement and standards of this specification BASIC ELECTRICAL REQUIREMENTS 16010 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia D Product Data 1 Submit the number of copies which the Contractor requires plus two copies which will be retained by the Architect Engineer 2i Mark each copy to identify applicable products models options and other data Supplement manufacturers standard data to provide information unique to this Project E Proposed Products List Include Products specified in the following Sections 1 Section 16111 Conduit 2 Section 16123 Building Wire and Cable 3 Section 16195 Electrical Identification 4 Section 16440 Disconnect Switches 5 Section 16480 Motor Control F Submit shop drawings and product data grouped to include complete submittals of related systems products and accessories in a single submittal Submittal shall be tabbed indexed and bound in a minimum 1 three ring bin
100. all solids 50 microns in size and all particles heavier than 1 2 specific gravity Separator shall have threaded or flanged connections as scheduled and shall be ASME certified for 150 psig working pressure Unit shall be constructed of 10 gauge carbon steel with welded steel support legs Unit shall be hydrostatically tested at the factory Unit shall have 1 4 NPT female for pressure gauge at outlet and shall have purge outlet on bottom with manual valve Unit shall have no moving parts and shall have a five year warranty Automatic Blow Down Controller Panel shall be NEMA 1 lockable designed for 120 VAC power input Panel shall be provided with solid state automatic purge controller timer Controller shall be capable of purging as often as every 30 minutes or as long as 36 hours Purge duration shall range between 4 and 36 seconds Controller shall be equipped with purge duration setpoint adjustment knob cycle timer adjustment knob power on off switch and reset button Unit shall include 24 VAC transformer and open close factory provided full size solenoid valve Manufacturers Tangential particle separator and controller shall be manufactured by Griswold Process Efficiency Lakos or prior approved equal HYDRONIC PIPING 15181 9 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 2 13 A 2 14 2 15 PRESSURE RELIEF VALVES Bronze or brass body for protection of pressure wi
101. alve Valve shall be ball valve with two access pressure ports Pete s plugs for direct gpm read out Valve shall have a calibrated venturi with a minimum flow signal of two feet of head at the design flow with the valve in the wide open position Venturi shall be a true venturi with one static pressure tap at the inlet section and the second static pressure tap at the throat section and a static regain recover section The permanent pressure loss at design flow shall not exceed two feet of head in the wide open position Orifice type measuring devices shall not be allowed Provide submittal data for each valve showing permanent pressure drop and flow signal The valve shall have a memory stop to allow complete shut off and return to set position without losing the set point On insulated piping systems over 1 thick Pete s plugs shall be extended type to clear insulation minimum length of 2 1 2 On any insulated piping system extended handle option shall be provided Venturi shall be precision machined brass and valve body shall be brass or bronze with blowout proof stem teflon seats brass stem and packing nut and steel handle Valves shall be factory leak tested at 100 psi air under water Rated 400 psig at 250 F Cataloged accuracy shall be 3 of full scale The venturi ball valve shall have inherent built in section of straight pipe required to achieve 3 full scale accuracy Valve shall be manufactured by Flow Design Nexus Pro Hydronics Bell
102. ammed one hour adjustable duration Night Setback Programs Night setback temperature programs shall override the time clock program during its off cycles when the space temperature drops below setpoint 55 F adjustable to restart the respective equipment to satisfy the room temperature night setback setpoint as sensed by the respective room temperature sensor Morning Warm Up and Cool Down Programs During morning hours prior to building occupancy equipment as specified in later paragraphs shall operate until space temperature sensors reach 75 F adjustable Control system shall learn the time required to perform this function and shall adjust the start time to bring the equipment on at the appropriate time optimum start During morning warm up equipment as specified in later paragraphs to remain off shall not operate Power Outage Recovery Control In the event of a power outage the control system shall be restored to its last state prior to power outage as quickly as possible after power has been restored Setpoints shall not be lost during power outages B Sequence of Operation for Hot Water Plant with Shell and Tube Heat Exchanger 1 2 General Hot water will be required when outside temperature is below 65 F adjustable Hot Water Pump Start Stop The hot water pump shall run when the outside air temperature is below 65 F adjustable and when the control system s time clock program is in the occupied mod
103. at he is being sued on any such bond a copy of such bond and the contract for which it 4 DBB CONSTRUCTION CONTRACT SECTION 7 FORMS 6 7 SECTION 7 FORMS PAYMENT BOND was given certified by the official who has custody of said bond and contract shall be admitted in evidence without further proof Applicants shall pay for such certified statements and such fees as the official fixes to cover the cost of preparation thereof but in no case shall the fixed fee exceed the fees that the clerks of the superior courts are permitted to charge for similar copies It is expressly agreed by the Principal and the Surety that the Owner if he desires to do so is at liberty to make inquiries at any time of subcontractors laborers materialmen or other parties concerning the status of payments for labor materials or services furnished in the prosecution of the work For the purposes of this bond the name and address of the responsible official of the Surety s claims department to whom correspondence and telecommunications may be addressed and or with whom business concerning this bond may be conducted will be as follows NAME TITLE ADDRESS CITY STATE ZIP CODE TELEPHONE Further this bond shall be the Payment Bond furnished under O C G A 13 10 1 13 10 60 et seq and shall be subject to increase in the penal amount of the bond pursuant to such statutes and Article 1 5 1 of the Contract No action can be instituted
104. ating pressure shall be O to 150 psig Switch s setpoint shall be adjustable externally Enclosure shall be NEMA 4 DIRECT DIGITAL CONTROL DDC SYSTEM GENERAL PRODUCT DESCRIPTION General Control contractor shall provide a complete and fully distributed DDC control system for control and monitoring of the HVAC systems The DDC system shall perform the sequence of operation specified herein The DDC architecture shall consist of a main DDC panel application specific controllers ASCs general purpose controllers local area network LAN wiring sensors and all other DDC components necessary for the sequence of control and as required by Owner Host Computer Operator Station Software 1 Provide a complete graphics package to be installed in the existing host computer which would allow an untrained operator to fully configure change program etc all control parameters by use of real time graphical representations of the entire HV AC control system by means of a mouse with minimal if any keystrokes When the user clicks through a series of ever increasingly detailed floor plans and graphical equipment control representations he will be able to obtain individual room equipment graphics to change all setpoints schedules etc Detailed graphics of the HVAC systems showing all control parameters shall be provided Prior to final graphical programming a conference between the Contractor Owner and the Engineer shall be held to determine al
105. ations from the recommendations of the manufacturer and stating what remains to be done in order to bring the work into strict compliance with the recommendations of the manufacturer Prior to calling upon the representative of the manufacturer for performance of the services necessary to enable him to execute a certificate in accordance with this specimen it is the obligation of the Contractor to have installed the work in strict compliance with the recommendations of the manufacturer See Article 2 2 4 of the Contract and it is likewise the obligation of the Contractor to have put the equipment in good operating condition in absolute and final readiness for the start up testing and placing into operation as defined herein below by the representative of the manufacturer Date Insert name and address of Owner Re Certificate of JOHN DOE CORPORATION that equipment or components furnished by it has or have as the case may be been installed in strict compliance with its recommendations and is or are as the case may bel operating property at PROJECT NOL L 1 L a E Gentlemen 1 We certify through our duly authorized and acting agent that the following item or items as the case may be furnished by us to the Project named in the caption was or were as the case may be started up tested and placed in operation by our authorized field representative on enter the date on which the field representative performed the start
106. awings Provide herein all relays and contactors necessary for the proper operation of all Division 15 equipment 2 All electrical disconnects for equipment specified in Division 15 shall be provided under this section of the specifications unless explicitly shown furnished by Electrical on the Electrical Drawings 3 Control Relays and Contactors Relays for control purposes shall be the plug in type with plastic enclosure surrounding the relay with contacts rated for a minimum of 110VAC and 24VDC Relay shall operate properly over 25 C to 55 C ambient Relay shall be UL recognized Pick up voltage shall be a maximum of 80 of nominal and drop off voltage shall be a maximum of 3096 of nominal Contact rating in rush current number of poles coil voltage etc shall be appropriate for the application Provide neon or LED ON indicator lamp E HVAC Shutdown Relay An HVAC shutdown relay shall be provided by Division 16 and shall be located near the DDC panel Certain HVAC equipment shall be wired through this HVAC Shutdown Relay to achieve the control sequence specified herein All noted equipment in Part 3 Execution shall shutdown in the event of closure of this HVAC shutdown relay which is activated by the main fire alarm panel F Control Transformer Provide transformers at all equipment as necessary to power control system Provide at each piece of equipment with a field mounted DDC controller a field mounted 24V control transforme
107. ays prior to the receipt of bid proposals Each request shall include a description of the proposed substitute the specification page and line number where it is referenced the name of material or equipment for which it is to be substituted drawings cuts performance and test data for an evaluation and a statement from the equipment manufacturer s representative that the items to be substituted meet or exceed the specification of the item substituted for Addenda If the substitution is allowed such approval will be set forth in an Addendum Costs All costs incurred by the acceptance of substitutions shall be borne by the contractor BASIC MECHANICAL MATERIALS AND METHODS 15050 6 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 1 9 1 10 Acceptable Products Where a manufacturer has been listed as being acceptable in the various specification sections or addenda hereinafter for a certain product it shall be understood that the manufacturer has been approved as being capable of producing this product This does not necessarily constitute approval of their standard product The manufacturer s product shall still comply with all of the requirements and standards of this specification and not necessarily their standard specification to the extent that it might require special custom manufacture to meet the requirements and standards of this specification the requirements of the drawings
108. be 6 5 mils PART 3 EXECUTION 3 1 A PREPARATION Surface Preparation Clean and dry surfaces to receive insulation Remove materials that will adversely affect insulation application MECHANICAL INSULATION 15080 3 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 3 2 3 3 COORDINATION Coordinate with contractor to confirm based on contractor s preference which sections of piping will be welded and which sections of piping shall be grooved See Part 3 Execution herein for additional insulation requirements specific to grooved piping system Coordinate insulation installation with the trade installing heat tracing Comply with requirements for heat tracing that apply to insulation Coordinate with trade installing piping to verify all piping has been pressure tested prior to application of insulation COMMON INSTALLATION REQUIREMENTS Install insulation fitting materials finish materials and accessories in accordance with manufacturer s installation requirements and recommendations Install insulation materials accessories and finishes with smooth straight and even surfaces free of voids throughout the length of equipment ducts and fittings and piping including fittings valves and specialties Install insulation with longitudinal seams at top and bottom of horizontal runs Install multiple layers of insulation with longitudinal and end seams st
109. be manufactured by Bell amp Gossett Taco Armstrong Paco Mepco or Aurora HYDRONIC PUMPS 15185 2 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 2 2 2 3 A B IN LINE CENTRIFUGAL PUMPS The pumps shall be the in line close coupled single stage type of Class 30 cast iron body with bronze fitted construction with 175 psi working pressure rating Provide gauge tappings on flanges and drain and vent parts All internal components requiring service shall be accessible without disturbing pipe connections A standard mechanical seal with ceramic seat shall be used The impeller shall be the enclosed type dynamically balanced at the factory and keyed with locking screw to the shaft with flexible coupling at the motor shaft Pumps shall be manufactured by Bell amp Gossett Taco Armstrong Paco Mepco or Aurora PUMP SPECIALTY FITTINGS Suction Diffusers l Flanged angle type body with inlet vanes and combination diffuser strainer orifice cylinder with 3 16 diameter openings for pump protection Inlet vanes shall be constructed of stainless steel on open cooling tower systems Provide a removable permanent magnet in the flow stream and disposable fine mesh strainer to be removed after system start up Provide adjustable support foot to carry weight of the piping Provide at suction inlet to each base mounted pump Provide cast iron body rated for 175 psig Provide orifice
110. bmission of this Change Order for consideration was authorized by letter from the Owner dated 20_ Incumbrance Record No i 2 The changes hereinafter described are applicable to the Contract for the construction of the above referenced Project and amend the Contract Documents 3 Description of Change 4 This Change Order is deemed necessary and originated with the Design Professional Owner Contractor Using Agency Indicate applicable entity 5 This Change Order is necessary to 6 The amount of the Change Order was determined by 7 A memorandum is attached showing cost breakdown of labor and materials by unit and quantities as prepared by the Contractor and checked by the Contract Compliance Specialist and Program Manager if any 8 We have verified the quantity and quality of all materials shown on the memorandum We have verified that all prices are reasonable and do not exceed current costs for like services or materials and we have verified that the quality of the materials meets the requirements of the Contract Documents 9 The contractor shall be allowed additional calendar days for completion The Material Completion and Occupancy Date is 10 The Contract Sum shall be increased decreased by on account of this change DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS CHANGE ORDER FORMAT 11 The payment and extension of time if any provided by this Change Order constitutes compensation i
111. by Hubbard or equal by Erico Michigan INSULATION SHIELD Provide insulation shields at all pipe hangers installed on the exterior of the insulation and at all pipe clamps and trapeze supports Shields shall be fabricated from minimum 18 gauge galvanized steel Shields at pipe hangers shall be 12 long with a 180 degree arc Shields at pipe clamps shall cover entire pipe Contractor may utilize the following shields 1 B Line B3151 2 C amp P 265P 3 Anvil 167 4 Erico Michigan 121 5 PHD 170 6 FNW 7750 HANGERS AND SUPPORTS 15060 5 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 2 8 2 9 A A B G D SLEEVES Pipe Sleeves 1 Pipe sleeves thru floors shall be fabricated from schedule 10 minimum steel pipe and shall extend 1 inch above floor Pipe sleeves thru walls shall be fabricated as shown on mechanical drawings Sleeve shall be flush with both sides of walls unless noted otherwise on drawings Sleeves on copper piping through slab on grade shall be Schedule 40 PVC minimum Omit sleeves on sanitary waste and vent and storm drain pipe penetrations thru slabs on grade 2 Pipe sleeves for refrigerant piping thru walls shall be fabricated of 20 gauge galvanized sheet metal size approximately 3 1 2 x 3 1 2 or wider if necessary to match brick coursing Sleeve shall be flush with both sides of walls VIBRATION ISOLATORS General Furnish and
112. by a locking cap screw The liquid cavity shall be sealed at the pump by an internally flushed single mechanical seal with carbon seal ring and ceramic seal seat suitable for continuous operation at 225 F Pumps shall be 1750 rpm with drip proof motor direct connected to the pump through a center drop out design flexible coupling complete with OSHA approved coupling guard Pumps intended for variable speed duty shall be provided with an EPDM material or other material specifically designed for variable speed applications Pump and motor shall be factory aligned and shall be realigned by contractor after installation Motors for pumps controlled by variable frequency drives shall be premium efficiency or inverter duty rated See Section 15010 for motor efficiency required The motor shall be securely bolted to a steel saddle of not less than 3 16 thickness Base plate shall be of structural steel or fabricated steel channel with fully enclosed sides and ends and securely welded cross members Rolled steel and C channel base plates are not allowed The minimum base plate stiffness shall conform to ANSI HI 1 34 1997 for Horizontal Base Plate Design standards Grouting area shall be fully opened Each pump shall be factory tested per Hydraulic Institute Standards and painted with machinery enamel prior to shipment Volute shall have vents at high points and drain plugs at low points and gauge tappings on suction and discharge flanges Pumps shall
113. cal Demolition Atkinson Mechanical Room Mechanical amp Electrical New Work Atkinson Mechanical Room Mechanical Details Mechanical Legend Schedules amp Piping Schematic All drawings are dated June 25 2013 G 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 01040 PROJECT COORDINATION PART 1 GENERAL 1 1 1 2 A SUMMARY This Section specifies administrative and supervisory requirements necessary for Project coordination including but not necessarily limited to Coordination Administrative and supervisory personnel General installation provisions Cleaning and protection SUM Sire Progress meetings coordination meetings and pre installation conferences are included in Section Project Meetings Requirements for the Contractor s Construction Schedule are included in Section Submittals COORDINATION Coordination Coordinate construction activities included under various Sections of these Specifications to assure efficient and orderly installation of each part of the Work Coordinate construction operations included under different Sections of the Specifications that are dependent upon each other for proper installation connection and operation 1 Where installation of one part of the Work is dependent on installation of other components either before or after its own installation schedule construction activities in the sequence required to
114. cated in individual piping specification sections HANGERS AND SUPPORTS 15060 4 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 2 6 2 7 Rods supporting trapeze hangers shall be 1 2 unless actual loads dictate a larger rod Rods supporting mechanical equipment shall be sized in accordance with the manufacturer s installation instructions If no size is given rod size shall be minimum 3 8 unless actual load dictates a larger rod No support shall be loaded to more than 20 of its yield strength thereby providing a safety factor of 5 Rod couplings shall be 1 B Line B3220 2 C amp P 167 3 Anvil 136 136R 4 Erico Michigan 26 5 PHD 100 105 PIPE POSITIONING SYSTEMS Definition A combination of straps brackets and clips designed to correctly locate pipes in walls relative to fixtures or equipment Metal Components Metal components of the system must be pre galvanized steel ASTM A446 Grade A or better Metal parts in contact with copper pipe shall be copper plated steel ASTM A611 Grade C or better All metal components must be stamped with the manufacturer s name and part number and the UPC certification mark Plastic Components Plastic components shall be made of polypropylene or Lexan 141 with a flame retardant rating UL94V2 or better All plastic parts must be stamped with the manufacturer s name and part number Manufacturers B Line RufflinJ Holdrite Corp
115. charge pressure is below upper 20 of scale Both suction and discharge scale ranges shall match Condenser Water Pumps 30 in Hg vacuum to 60psig Chiller Water Distribution Pumps 0 to 100 psi Chiller Water Chiller Pumps 0 to 60 psi Hot Water Pumps 0 to 100 psi Chilled Water Pumps 0 to 100 psi Loop Water Pumps 0 to 100 psi g Cooling Water Pumps 30 in Hg vacuum to 60psig ogRocP 2 Bladder Expansion Tank Range shall be 0 to 60 psig 3 Pressure Reducing Valves on Domestic Water and at Make up Water Station Range shall be 0 to 150 psig 4 Steam Range shall be 0 to 100 psig 5 Tangential Particle Separator 0 to 100 psig 6 Basket Strainer Range shall be 30 in Hg vacuum to 2 psig Manufacturers Dial type pressure gauges shall be manufactured by Ashcroft Trerice Weksler FNW Weiss Palmer or Moeller PRESSURE SNUBBER Brass or stainless steel with threaded 1 4 NPT connection designed to prevent shock to gauge with porous corrosion resistant metal pressure filler Provide porous disc for steam or water service as appropriate Trerice Model No 872 1 or 872 4 air and gases or Model No 872 2 or 872 5 water and steam Weis Model PSN FNW Model PSB Ashcroft Model 25 or equal by Palmer or Weksler Model BW 42 or SW 42 GAUGE COCKS 200 SWP 400 WOG threaded ends threaded bonnet bronze body needle point bronze stem and bronze seat hand wheel handle gland packed Size shall be 1 4 Nibco T 256 AP
116. coil circuit includes the fully open control valve pressure drop the coil pressure drop and all coil piping accessory components pressure drops including strainers elbows tees and shutoff valves Coil circuit is defined as the components between supply shut off valves and return shut off valve Controls contractor shall verify approved coil pressure drops at scheduled gpm and calculate beta and list beta in submittal Controls contractor may use two feet 2 head as estimated pressure drop of coil piping accessory components in lieu of detailed pressure drop takeoff if desired Valves for isolation not modulating control duty shall be line sized In no event shall valves be more than two pipe sizes smaller than their connecting pipe size line size For each hydronic system valves shall operate open close against a differential pressure equal to 120 of the maximum pressure capable of being generated by the particular pump the Contractor chooses to furnish Valves shall have minimum 125 psi rating Valves shall be pneumatic electronic spring or reversible motor return as scheduled on the drawings capable of receiving an input signal suitable for open close or modulating control as indicated on the drawings and designed to accept the appropriate actuator Valve components shall be suitable for temperature range valve will experience Valves shall be 2 way or 3 way as indicated on the drawings brass or cast iron body and designed specificall
117. contract except as allowed under Georgia law b Has never been terminated for cause on a public works contract c Has had no criminal or felony convictions suspensions or debarments of the bidder its officers or its principals for building code violations bid rigging or bribery in the last ten years d Is not and its organization or its principals are not debarred suspended declared ineligible or otherwise excluded by any Federal or State department or agency from doing business with the Federal Government or a State e Has insurance required by the Contract Documents in place or has arranged to obtain it from an insurer authorized to do business in the State of Georgia f Has sufficient bonding capacity to obtain a payment and performance bond from a surety meeting the requirements of the Contract Documents and authorized to do business in the State of Georgia g Has sufficient cash flow to perform this Project Remarks or explanations of the above paragraphs a through g Bidder Certification Certification under Oath Under oath certify that am a principal or other representative of the bidder and that am authorized by it to execute the foregoing Statement of Bidder s Qualifications is true and correct including any explanation above and submitted under oath BY Authorized Signature BLUE INK PLEASE Printed Name Title Sworn to and subscribed before me this Day of 20 Notary Public M
118. cylinder with length of flow straightening vanes equal to 2 1 2 times the diameter of the system pump suction connection Provide removable cast iron cover with EPDM reusable O ring seal Suction diffusers shall be designed for rear strainer pullout bottom strainer pullout will not be allowed Suction diffusers shall be manufactured by Bell amp Gossett Thrush Armstrong Mueller Amtrol Wheatley or Taco 2 Grooved end with inlet vanes and combination diffuser strainer orifice cylinder shall be of type 304 stainless steel with 3 16 diameter holes Start up pre filter shall be bronze 16 mesh screen Maximum working pressure of 300 psi a 1 1 4 pipe support base drain plug and gauge taps shall be provided Gasket grade shall be EPDM for temperature range 30 F to 230 F continuous service Basis of design is Victaulic style 731 G Approved equal model by Grinnell Mechanical Products Anvil or Gustin Bacon will be allowed Triple Duty Valves 1 125 psi ANSI flanged straight type or angle type body as indicated with combination non slam type check valve isolating valve balancing valve Provide external operating stem with memory stop for balancing purposes Provide cast iron body brass seat bronze disc with EPDM seat brass or stainless steel stem stainless steel spring and brass read out valves Provide calibrated nameplate and position indicator to show from 0 to 100 percent open in 10 percent increments Valves shall be rated at 175 psi
119. d scheduled and specified are used in lieu of indicated it is for purpose of helping reader located cross reference and no limitation of location is intended except as specifically noted Directed Requested etc Where not otherwise explained terms such as directed requested authorized selected approved required accepted and permitted mean directed by Architect requested by Architect etc However no such implied meaning will be interpreted to extend Architect s responsibility into Contractors area of construction supervision Approve Where used in conjunction with Architects response to submittals request applications inquiries reports and claims by Contractor the meaning of term approved will be held to limitations of Architect s responsibilities and duties as specified in General and Supplementary Conditions In no case will approval by Architect be interpreted as a release of Contractor from responsibilities to fulfill requirements of the Contract Documents Project Site The space available to Contractor for performance of the work either exclusively or in conjunction with others performing other work as part of the project The extent of project site is shown on the drawings and may or may not be identical with description of the land upon which project is to be built Furnish Except as otherwise defined in greater detail term furnish is used to mean supply and deliver to project site re
120. d Also see pipe sleeve detail on the mechanical drawing On existing construction sleeve openings must be core drilled Grooved Where specified herein piping shall be grooved in accordance with ANSI AWWA C 606 CSA B 242 and the manufacturers published specifications Provide lubricant furnished or approved by the manufacturer Lubricate the gasket exterior thoroughly including lips Install Schedule 40 steel sleeve with water stop and mechanical sleeve seal at each service pipe penetration through foundation wall Select number of interlocking rubber links required to make installation watertight Sleeves and mechanical sleeve seals are specified in Division 15 Section Basic Mechanical Materials and Methods JOINT CONSTRUCTION General Joints shall be determined by the equipment connections or by the valve or fitting specified herein Threaded All threads shall be National Pipe Thread Apply a commercial grade compound to the male threads only Ream cut ends and remove all burrs Soldered Joints Use ASTM B 813 water flushable lead free flux ASTM B 32 lead free alloy solder and ASTM B 828 procedure unless otherwise indicated Grooved Joints Assemble joints with grooved end pipe or grooved end tube coupling housing gasket lubricant and bolts according to coupling and fitting manufacturer s written instructions Extruded Tee Connections Form tee in copper tube according to ASTM F 2014 Use tool designed for copper tub
121. d balanced Prepare a separate report for each system and each building floor for systems serving multiple floors CERTIFIED FINAL TAB REPORT General Typewritten or computer printout in letter quality font on standard bond paper in three ring binder tabulated and divided into sections by tested and balanced systems TESTING ADJUSTING AND BALANCING 15950 6 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia B Include a certification sheet in front of binder signed and sealed by the certified testing and balancing engineer 1 Include a list of instruments used for procedures along with proof of calibration General Report Data In addition to form titles and entries include the following data in the final report as applicable Title page Name and address of TAB firm and telephone number Project name Project location Architect s name and address Engineer s name and address Contractor s name and address Report date Signature of TAB firm who certifies the report 0 Table of Contents with the total number of pages defined for each section of the report Number each page in the report 11 Summary of contents including the following E 50700 c guum qct 9r a Indicated versus final performance b Notable characteristics of systems 12 Nomenclature sheets for each item of equipment 13 Data for terminal units including manufacturer type size and fi
122. d destination only is indicated determine exact routing and lengths required 1 8 COORDINATION A Determine required separation between this and other work B Determine routing to avoid interference with other work PART 2 PRODUCTS 2 1 MANUFACTURERS BUILDING WIRE AND CABLE A Only product of domestic manufacturer will be accepted B Manufacturers Allied American Insulated Carol Pirelli Rome Southwire or Triangle C Substitutions Engineer approved equals 2 2 BUILDING WIRE AND CABLE A Description Single conductor insulated wire B Conductor Copper no exceptions Solid conductor for 10AWG and smaller stranded for 8AWG and larger C Insulation Voltage Rating 600 volts D Insulation ANSI NFPA 70 Type XHHW insulation for feeders and branch circuits 6 AWG and larger Type THHN THWN insulation for feeders and branch circuits 8 AWG and smaller At the Contractors option type THHN THWN insulation may be utilized throughout for all feeders and branch circuits 2 3 WIRING CONNECTORS A Solderless Pressure Connectors 3M Scotch loks or Ideal Wing Nut for 10 AWG and smaller B Compression Connectors Burndy Hydent or Thomas and Betts Color Keyed for 8 AWG and larger C Terminal Lugs Thomas and Betts STA KON for 10 AWG and smaller Thomas and Betts Color Keyed for 8 AWG and larger BUILDING WIRE AND CABLE 16123 2 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Ge
123. d fabricate from ASTM A 36 A 36M steel shapes selected for loads being supported Weld steel according to AWS D1 1 Hanger Shield Installation Install shield in pipe hanger or shield for insulated piping Install hangers and supports complete with necessary inserts bolts rods nuts washers and other accessories Install hangers and supports to allow controlled thermal and seismic movement of piping systems to permit freedom of movement between pipe anchors and to facilitate action of expansion joints expansion loops expansion bends and similar units Install lateral bracing with pipe hangers and supports to prevent swaying Install building attachments within concrete slabs or attach to structural steel Install additional attachments at concentrated loads including valves flanges and strainers 2 1 2 and larger and at changes in direction of piping Install concrete inserts before concrete is placed fasten inserts to forms and install reinforcing bars through openings at top of inserts Load Distribution Install hangers and supports so piping live and dead loads and stresses from movement will not be transmitted to connected equipment Pipe Slopes Install hangers and supports to provide indicated pipe slopes and so maximum pipe deflections allowed by ASME B31 1 for power piping and ASME B31 9 for building services piping are not exceeded HANGERS AND SUPPORTS 15060 7 Heating Upgrade for Atkinson Hall Georgia Col
124. d forms from AABC s National Standards for Testing and Balancing Heating Ventilating and Air Conditioning Systems or NEBB s Procedural Standards for Testing Adjusting and Balancing of Environmental Systems Instrumentation Type Quantity and Accuracy As described in AABC s National Standards for Testing and Balancing Heating Ventilating and Air Conditioning Systems or NEBB s Procedural Standards for Testing Adjusting and Balancing of Environmental Systems Section II Required Instrumentation for NEBB Certification Instrumentation Calibration Calibrate instruments at least every six months or more frequently if required by instrument manufacturer 1 Keep an updated record of instrument calibration that indicates date of calibration and the name of party performing instrument calibration OCCUPANCY DURING TAB PROCEDURE Owner Occupancy TAB agent shall verify if Owner will occupy completed areas of building before Substantial Completion Cooperate with Owner during TAB operations to minimize conflicts with Owner s operations COORDINATION Notice Provide seven days advance notice for each test Include scheduled test dates and times Test and Balance Agent shall contact Engineer and Owner 48 hours prior to test and balance work to allow but not require Engineer and owner to be present during TAB work Perform TAB after leakage and pressure tests on air and water distribution systems have been satisfactorily completed
125. d out gassing from construction materials do not migrate to occupied areas UTILITIES A The Owner agrees to provide at no cost to the Contractor electrical and water service utilities as they presently exist on the site for use during construction of this Project The Contractor is required to protect Owner s utilities and equipment and to replace same if they become damaged or broken at no cost to the Owner STORAGE A The Owner will designate specific areas for staging and storage of Contractor materials Contractor shall coordinate exact location of storage area with Owner prior to bringing materials to the site The area shall be left clean and restored to the same conditions as when accepted by the contractor at the completion of the job F 2 F 10 F 11 F 12 F 13 F 14 PARKING A The Contractor s employees will only be allowed to park in areas designated by the Owner Any extra parking or storage space needed must be discussed with the Owner for designation of additional space TRASH DISPOSAL A The Contractor shall allow no trash to accumulate and shall remove same from the site at the close of each working day All trash shall be disposed of off College property The use of GC amp SU waste facilities or containers is prohibited Burning of any material on site is not permitted at any time ACCESS TO PREMISES A Ingress and egress shall be limited to the most direct access to the subject work a
126. damages and costs including but not limited to attorney s fees arising out of or in any way connected with the use of modification of misinterpretation of misuse of or reuse by others of computer aided design CAD information and data provided on the above referenced project The foregoing information applies without limitation to any use of the project information on this project other projects for additions to this project or for any changes to this project by others company name also acknowledges that the drawings prepared by Andrews Hammock and Powell Inc is schematic in nature and is not intended as a shop drawing dimensional drawing or fabrication drawing Any dimensional information extracted from the CAD data by company name is done purely at their own risk company name agrees to insure that any use of the above referenced CAD information without the expressed written authorization for any other projects other than referenced project is hereby prohibited Signing on behalf of company name Signature Print Name Date BASIC MECHANICAL MATERIALS AND METHODS 15050 15 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 15051 MECHANICAL CLOSEOUT DOCUMENT REQUIREMENTS PART 1 GENERAL 1 1 1 2 1 3 1 4 A w me m g A T Q l RELATED DOCUMENTS Drawings and general provisions of the Contract including General and Supplementary C
127. dence and Security Act of 2007 EISA and as specified below and a minimum power factor of 82 5 Multi speed motors do not have to comply with these efficiencies Each motor s NEMA nominal efficiency shall be shown on the motor nameplate Efficiency and losses shall be determined in accordance with the latest revision of IEEE Standard 112 Method B using Accuracy improvement by segregated loss determination including stray load loss measurement Motors shall meet BASIC MECHANICAL MATERIALS AND METHODS 15050 9 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia the minimum NEMA premium motor efficiency as outline in MG1 Table 12 12 which is higher than the EPACT efficiency Each submittal shall show that motor meets this guaranteed minimum efficiency and that efficiency was measured according to this specification Minimum efficiencies for 4 pole 1750 rpm motors are listed below 1 Motor HP 1 Minimum Premium Efficiency 85 5 2s Motor HP 1 5 to 2 Minimum Premium Efficiency 86 5 3 Motor HP 3 to 5 Minimum Premium Efficiency 89 5 D Motor Service Factor Motor service factor for all equipment 1 8 hp and above shall be 1 15 for ODP motors and 1 0 for totally enclosed motors E Motor Speed Maximum 1800 rpm Single phase ODP motors shall be equipped with speed controllers as specified on plans P Motor Thermal Overload Protection All single phase motors shall be provided with in
128. der Submittals received piece mail will be returned without review G Mark dimensions and values in units to match those specified 1 4 REGULATORY REQUIREMENTS A Conform to applicable Building Code for City of Milledgeville and Baldwin County Georgia B Electrical Conform to NFPA 70 C Obtain permits and request inspections from authority having jurisdiction 1 5 PROJECT SITE CONDITIONS A Install Work in locations shown on Drawings unless prevented by Project conditions B Prepare drawings showing proposed rearrangement of Work to meet Project conditions including changes to Work specified in other Sections Obtain permission of Architect Engineer before proceeding 1 6 GUARANTEE AND WARRANTIES A Guarantee All equipment and materials furnished and all work performed under this section of specifications shall be guaranteed to be free of defective materials and workmanship for a period of one year unless a longer period is specified elsewhere after final acceptance of the work by the Owner Upon notice from the Owner of failure of any part of the guaranteed equipment during the guarantee period the affected part or parts shall be promptly replaced with new parts by the Contractor at no additional cost to the Owner All labor required to perform guarantee shall be included as part of the complete guarantee warranty BASIC ELECTRICAL REQUIREMENTS 16010 2 Heating Upgrade for Atkinson Hall Georgia College amp State
129. der this section Remove all surplus materials and debris resulting from the work included herein C Painting System Schedule All trade names and numbers listed hereinafter are in the following order unless specifically shown otherwise Devoe Sherwin Williams ICI Porter 1 Exterior Including all existing painted surfaces unless specifically noted otherwise on drawings See 3 1 1 8 a Ferrous Metals Not pre painted 1 1 coat 13101 Kromik Primer 4160 Series 2 1 coat 70XX B 54 Series 4308 Series Industrial Enamel b Galvanized Metals except where specifically noted not to be painted 1 1 coat 13201 Galvite HS 4160 2 2 coats 70XX 5 54 4308 Series Industrial Enamel c Pre primed Metals Mechanical equipment where noted on drawings to be painted 1 1 coat 11XX Kem Kromik Undercoat 4160 Primer 2 2 coats 70XX Industrial Enamel 4308 Series Industrial Enamel END OF SECTION 09900 09900 3 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 15050 BASIC MECHANICAL MATERIALS AND METHODS PART 1 GENERAL 1 1 1 2 1 3 1 4 A RELATED DOCUMENTS Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section RELATED WORK All Division 15 sections WORK SEQUENCE Install mechanical piping duct controls equipment and accessories as construction progresses so cutting
130. derstands the design concept and that he demonstrates his understanding by indicating which equipment and material he intends to furnish and install and use Review of shop drawing will be general only for basic conformance with the design concept The review of such drawings schedules or cuts shall not relieve the Contractor from the responsibility for correcting all errors of any sort contained in the submittals The Contractor is responsible for confirming and correlating all quantities and dimensions selecting proper fabrication processes construction methods and installation techniques coordinating this work with that of all other trades and performing all work in a safe workmanlike and satisfactory manner Below are the submittal item codes that will be used when reviewing the submittal data These codes show up on the Submittal Review sheet Only one copy of the submittal review sheet is returned upon completion of the review for each trade 1 RNE Reviewed No Exceptions Noted a Indicates the information provided has been reviewed and no exceptions are taken Contractor must still comply with the contract documents b No corrective action required at this time 2 FNC Furnish with Noted Corrections a Indicates the contractor shall insure that all necessary or noted corrections are incorporated into equipment furnished to the project b Contractor shall incorporate items requested in review comments but re submittal not
131. dicated Flanges may be used on aboveground piping unless otherwise indicated Grooved joints may be used on aboveground grooved end piping Fitting Option Extruded tee connections and brazed joints may be used on aboveground copper tubing Install unions downstream of valves and at equipment or apparatus connections VALVE APPLICATIONS Drawings indicate valve types to be used Where specific valve types are not indicated the following requirements apply 1 Shutoff Duty Use ball valves for piping NPS 2 and smaller Use butterfly valves with flanged ends for piping NPS 2 1 2 and larger 2 Hot Water Piping Balancing Duty Balancing valves 3 Drain Duty Hose end drain valves Cast iron grooved end valves may be used with grooved end piping DOMESTIC WATER PIPING 15140 2 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia C 3 4 Install shutoff valve close to water main on each branch and riser serving plumbing fixtures or equipment on each water supply to equipment and on each water supply to plumbing fixtures that do not have supply stops Use ball valves for piping NPS 2 and smaller Use butterfly valves for piping NPS 2 1 2 and larger Install drain valves for equipment at base of each water riser at low points in horizontal piping and where required to drain water piping 1 Install hose end drain valves at low points in water mains risers and branches 2 Ins
132. e Bid Time Bid Number Name of Project and identified with the words Bid for Construction Bids must be placed in the hands of the Owner at the specified location by not later than the hour and date named in the Invitation to Bid After that time no bids may be received It is the sole responsibility of the bidder to ensure the delivery of the bids to the required address e Alternates A bid must be submitted for all alternates Failure to so may render the bid nonresponsive and be sufficient cause for rejection of a bid f Withdrawal of Bids Bids may be withdrawn by bidders prior to the time set for official opening After time has been called no bid may be withdrawn for a period of thirty five days after the time and date of opening except as provided in O C G A Section 13 10 22 appreciable error in calculation of bid Negligence or error on the part of any bidder in preparing his bid confers no right of withdrawal or modification of his bid after time has been called except as provided by Georgia law 15 Contract Award Award shall be made on a lump sum basis to the lowest responsive and responsible bidder The lowest bid will be the bid whose price after incorporating all accepted alternates is the lowest responsive bid that was received from a responsible bidder No bid may be withdrawn for a period of thirty five days after time has been called on the date of opening except in accordance with the provisions of law 16 Owner s R
133. e amp State University Milledgeville Georgia 25 Excessive weathering 26 Unprotected storage 27 Improper shipping or handling 28 Theft 29 Vandalism END OF SECTION 01040 01040 4 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 01095 DEFINITIONS REFERENCE STANDARDS amp ABBREVIATIONS PART 1 GENERAL 1 1 A DEFINITIONS General Explanation A substantial amount of specification language constitutes definitions for terms found in other Contract Documents including the drawings which must be recognized as diagrammatic in nature and not completely descriptive of requirements indicated thereon Certain terms used in the Contract Documents are defined generally in this article Definitions and explanations of this section are not necessarily either complete or exclusive but are general for the work to extent not stated more explicitly in another provision of the Contract Documents General Requirements The provisions or requirements of Division 1 sections General Requirements apply to entire work of Contract and where so indicated to other elements of work which are included in the project Indicated The term Indicated is a cross reference to details notes or schedules on the drawings to other paragraphs or schedules in the specifications and to similar means of recording requirements in the Contract Documents Where terms such as shown note
134. e drill pilot hole form collar for outlet dimple tube to form seating stop and braze branch tube into collar HANGER AND SUPPORT INSTALLATION Pipe hanger and support devices are specified in Division 15 Section Hangers and Supports Install supports according to Division 15 Section Hangers and Supports DOMESTIC WATER PIPING 15140 4 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 3 7 3 8 C D Support vertical piping and tubing at base and at each floor Install hangers for copper tubing with the following maximum horizontal spacing and minimum rod diameters NPS 3 4 and Smaller 60 inches with 3 8 inch rod NPS 1 and NPS 1 1 4 72 inches with 3 8 inch rod NPS 1 1 2 and NPS 2 96 inches with 3 8 inch rod NPS 2 1 2 108 inches with 1 2 inch rod NPS 3 to NPS 5 10 feet with 1 2 inch rod NPS 6 10 feet with 5 8 inch rod NPS 8 10 feet with 3 4 inch rod DIN ee Install supports for vertical copper tubing every 10 feet CONNECTIONS Drawings indicate general arrangement of piping fittings and specialties Install piping adjacent to equipment and machines to allow service and maintenance Connect domestic water piping to exterior water service piping Use transition fitting to join dissimilar piping materials Flush water piping prior to placing in service FIELD QUALITY CONTROL Inspect domestic water piping as follows 1 Do not enclose co
135. e override timer program is enabled night setback program is enabled or morning warm up program is enabled The control system shall alternate from lead to lag pump every seven 7 days to equalize pump wear The control system shall switch to automatic back up in the event of lead hot water pump failure Automatic back up pump shall be started in the event that lead pump flow is not proven within 15 seconds of start signal by differential pressure switch and auxiliary starter contact An alarm shall be sent to Owner s on site if specified and off site host computer advising of pump failure Steam To Hot Water Heat Exchanger Control Two position steam control valve upstream of steam temperature regulating valve shall open via signal from DDC system whenever hot water pump is operating Self contained steam temperature regulating valve shall then modulate steam flow as required to maintain hot water supply temperature setpoint of 140 F When hot water pumps stops two position control valve shall close END OF SECTION 15900 HVAC INSTRUMENTATION AND CONTROLS 15900 11 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 15950 TESTING ADJUSTING AND BALANCING PART 1 GENERAL 1 1 A 1 2 1 3 1 4 RELATED DOCUMENTS Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections apply to this Secti
136. e amount of the Contract Sum executed between the Owner and the Contractor unless Alternates are accepted Alternates None Errors or Revisions Prior to the bid opening date and hour errors may be stricken or revisions may be made and corrections entered on this proposal form or on the bid envelope with sufficient clarity to be easily understood All such annotations shall be binding on the bidder No Withdrawal For and in consideration of the sum of 10 00 the receipt of which is hereby acknowledged bidder and Owner agree that this bid may not be revoked or withdrawn after the time set for the opening of bids except as provided in Georgia law but is an irrevocable offer that shall remain open for acceptance for a period of thirty five days following the time set for the opening of bids Execution of the Contract If bidder is notified in writing by statutory mail of the acceptance of this bid within thirty five days after time set for the opening of bids bidder agrees to execute within ten days the Contract for the Work for the above stated Bid as adjusted by the accepted Alternates and at the same time to furnish and deliver to the Owner a Performance Bond and a Payment Bond on forms shown in Section 7 of the General Conditions of the Contract both in an amount of equal to 100 percent of the Contract Sum Commencement and Completion of Work Upon the Effective Date of the Contract bidder agrees to commence all Preconstruction Activities
137. e engaged for performance of those units of work These must be recognized as special requirements over which Contractor has no choice or option These assignments must not be confused with and are not intended to interfere with normal application of regulations union jurisdictions and similar conventions One purpose of such assignments is to establish which party or entity involved in a specific unit of work is recognized as expert for indicated construction processes or operations Nevertheless final responsibility for fulfillment of entire set of requirements remains with Contractor Trades Except as otherwise indicated the use of titles such as carpentry in specification text implies neither that the work must be performed by an accredited or unionized tradesperson of corresponding generic name such as carpenter nor that specified requirements apply exclusively to work by tradesperson of that corresponding generic name Abbreviations The language of specifications and other Contract Documents is of the abbreviated type in certain instances and implies words and meanings which will be appropriately interpreted Actual word abbreviations of a self explanatory nature have been included in texts Specific abbreviations have been established principally for lengthy technical terminology and primarily in conjunction with coordination of specification requirements with notations on drawings and in schedules These are frequently defined i
138. e or EPDM coated ductile iron disc with PPS coated or welded on nickel seat flanged ends l 2 and Smaller a Apollo 161S or 161T b Nibco S 413 or T 413 c Crane 34 d Hammond IB 912 e Stockham B 319Y and B 309Y f Victaulic g Anvil h Kitz 23 i Milwaukee 509 and 1509 j FNW 1241 2 2 1 2 and Larger Apollo 6SC 10X 910F Series Nibco F 918 Crane 373 Hammond IR 1124 Stockham G931 Victaulic 716 Anvil Kitz 78 Milwaukee F 2974 FNW 671 So ge ho ao op Check Valves 14 and Larger 125 psig 200 degrees F maximum temperature twin disc wafer style silent type aluminum bronze disc cast iron body Buna N Seat stainless steel spring actuated horizontal or vertical swing Nibco Model W 920 W or equal by Crane Mueller Hammond Stockham WG 970 or Victaulic BALL VALVE WITH TAMPER SWITCH 2 and Smaller Bronze body U L listed F M approved Full Port Ball Valve NIBCO T 505 4 or equal by Crane or Hammond Tamper switch shall be built in to the valves U L Listed F M Approved l Switch designed for installation on indicator valves with cased aluminum housing with red finish U L Listed F M Approved Notifier Simplex or equal 15110 4 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia PART 3 3 1 w 2 A m 3 2 3 3 A EXECUTION VALVE INSTALLATION Install valves with unions or flanges a
139. e provisions of Division 16 END OF SECTION 16060 ELECTRICAL DEMOLITION 16060 2 GDC 107 GDC 13 012 AUT SP Underground Hot Water Loop Retrofit at Autry State Prison Mitchell County Georgia SECTION 16111 CONDUIT PART 1 GENERAL 1 1 RELATED DOCUMENTS A Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section 1 2 SECTION INCLUDES A Metal conduit B Flexible metal conduit C Liquidtight flexible metal conduit D Electrical metallic tubing E Fittings and conduit bodies 1 3 RELATED SECTIONS A J Section 16130 Boxes B Section 16170 Grounding and Bonding C Section 16190 Supporting Devices D Section 16195 Electrical Identification 1 4 REFERENCES A ANSI C80 1 Rigid Steel Conduit Zinc Coated B ANSI C80 3 Electrical Metallic Tubing Zinc Coated C ANSI NEMA FB 1 Fittings Cast Metal Boxes and Conduit Bodies for Conduit and Cable Assemblies D ANSI NFPA 70 National Electrical Code E NECA Standard of Installation CONDUIT 16111 1 GDC 107 GDC 13 012 AUT SP Underground Hot Water Loop Retrofit at Autry State Prison Mitchell County Georgia 1 5 DESIGN REQUIREMENTS A Conduit Size ANSI NFPA 70 1 6 SUBMITTALS A Submit under provisions of Section 16010 1 7 PRODUCT DATA A Provide for metallic conduit flexible metal conduit liquidtight flexible metal condui
140. e subcontractor with the information required by O C G A 13 10 91 b Additionally the undersigned subcontractor will forward notice of the receipt of an affidavit from a sub subcontractor to the contractor within five business days of receipt If the undersigned subcontractor receives notice that a sub subcontractor has received an affidavit from any other contracted sub subcontractor the undersigned subcontractor must forward within five business days of receipt a copy of the notice to the contractor Subcontractor hereby attests that its federal work authorization user identification number and date of authorization are as follows Federal Work Authorization User Identification Number Date of Authorization Name of Subcontractor Heating Upgrade for Atkinson Hall Name of Project Board of Regents of the University System of Georgia For the use and benefit of Georgia College amp State University Name of Public Employer hereby declare under penalty of perjury that the foregoing is true and correct Executed on 20 in city state Signature of Authorized Officer or Agent Printed Name and Title of Authorized Officer or Agent SUBSCRIBED AND SWORN BEFORE ME ON THIS THE DAY OF 20 NOTARY PUBLIC My Commission Expires DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT S Sub subcontractor Affidavit under O C G A
141. e work provided for in said Contract then this obligation shall be void otherwise it shall remain in full force and effect subject however to the following conditions 1 The said Surety to this bond for value received hereby stipulates and agrees that no change or changes extension of time or extensions of time alteration or alterations or addition or additions to the terms of the contract or to the work to be performed thereunder or the specifications or drawings accompanying same or the exercise of the Owner s right to do work pursuant to Articles 1 3 7 1 7 8 or 5 3 5 or Paragraphs 3 4 1 4 or 5 3 2 3 shall in any way affect its obligation on this bond and it does hereby waive notice of any such change or changes extension of time or extensions of time alteration or alterations or addition or additions to the terms of the contract or to the Work or to the specifications or drawings In addition the Surety to this bond for value received hereby agrees to the provisions of Article 1 5 1 including Paragraph 1 5 1 3 for increases in the penal amount of this bond and waives notice from the Owner of any such changes 2 A claimant is defined as any subcontractor and any person supplying labor materials machinery or equipment in the prosecution of the work provided for in said contract 3 Every person entitled to the protection hereunder and who has not been paid in full for labor or materials furnished in the prosecution of the work re
142. eb based access should be integral to the control system the need to bolt on a separate piece of hardware to achieve this is not acceptable PART 3 EXECUTION 3 1 A B 3 2 3 3 EXAMINATION Verify that power supply is available to control devices and operator workstation Verify that duct pipe and equipment mounted devices are installed before proceeding with installation INSTALLATION Install software in control units and operator workstation s Implement all features of programs to specified requirements and as appropriate to sequence of operation Connect and configure equipment and software to achieve sequence of operation specified Install labels and nameplates to identify control components according to Division 15 Section Mechanical Identification Install hydronic instrument wells valves and other accessories according to Division 15 Section Hydronic Piping Install an 11 x 17 set of control drawings in the main mechanical room in a hinged wall mounted cabinet Each drawing shall be laminated and drawings shall be bound together with a single metal ring Provide bakelite label on cabinet cover engraved with Control Drawings ELECTRICAL WIRING AND CONNECTION INSTALLATION Install all systems in accordance with manufacturer s installation instructions NFPA 70 and NFPA 90A Installation of Conduit and Wiring 1 All wiring and conduit installed under this section of the specifications
143. ed Contractor may obtain electronic copies based on the following rates 25 per sheet with minimum 200 per project Contractor shall mail a copy of the check to AH amp P payable to AH amp P and shall sign the enclosed indemnification letter and send this letter to AH amp P along with requested sheets If time is of essence a copy of the check and indemnification may be faxed as evidence of the Contractor s intent to mail said documents Upon receiving the check or faxed copy and signed indemnification letter electronic copies of requested sheets shall be provided AH amp P reserves the right to alter the electronic copies by removing Professional Engineering Stamp title block information company logo and similar information that is not relevant to the Contractor s needs Contractor shall indicate the desired format for CAD drawings DWG or DGN END OF SECTION 15050 BASIC MECHANICAL MATERIALS AND METHODS 15050 14 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia Andrews Hammock and Powell Inc 250 Charter Lane Macon GA 31210 Re Letter of Indemnification Project Name Gentlemen By hereby executing this Letter of Indemnification on behalf of itself and its subcontractors and suppliers company name agrees to hold harmless and indemnify Andrews Hammock and Powell Inc and the project architect and the consultants from and against all claims liabilities losses
144. eferenced project NOW THEREFORE in consideration of these premises the undersigned Principal and Surety do hold themselves firmly bond unto as Claimant in the total amount of dollars representing double the amount of the claim The condition of this Bond to Discharge Claim is such that should the undersigned Principal or Surety pay to the Claimant the sum that may be found to be due to the Claimant upon the trial of any action that may be filed by said Claimant or if Principal or Surety pay to the Claimant a sum agreeable to Claimant and Claimant accepts such payment then this Bond shall be void otherwise to remain in full force and effect The penal amount of the Primary Bond is conditionally reduced by the amount of this Bond to Discharge Claim and upon payment of any sums to the Obligee under this Bond to Discharge Claim the penal amount of the Primary Bond is reduced instanter by the amount of such payment No action can be instituted on this bond after one year from the date of Final Completion as determined pursuant to Article 6 2 2 of the Contract IN WITNESS WHERECF the said Principal and Surety have set their hands and seals this day of 20 Principal by Surety by Attorney in Fact Type Name Above DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS CHANGE ORDER FORMAT CHANGE ORDER FORMAT Lump Sum CHANGE ORDER No Project Name Project Number Owner 1 Su
145. emain keep in service and protect against damage during demolition operations 1 Do not interrupt existing utilities serving occupied or used facilities except when authorized in writing by Owner s representative Provide temporary services during interruptions to existing utilities as acceptable to governing authorities Environmental Controls Use water sprinkling temporary enclosures and other suitable methods to limit dust and dirt rising and scattering in air to lowest practical level Comply with governing regulations pertaining to environmental protection 1 Do not use water when it may create hazardous or objectionable conditions such as ice flooding and pollution PART 2 PRODUCTS 2 1 A B MATERIALS Barricades Use only new and solid lumber and plywood of utility grade or better for the construction of all temporary barricades Miscellaneous All other materials not specifically described but required for the proper execution of the work of this section shall be selected by the contractor subject to approval by the Architect PART 3 EXECUTION 3 1 A SCHEDULE Submit schedule indicating proposed methods and sequence of operations for selective demolition work to Owner s Representative for review prior to commencement of work Include coordination for shut off capping and continuation of utility services as required together with details for dust and noise control protection 02060 2 Hea
146. equal as the sole manufacturer and installer of the control system for all work specified herein in Section 15900 These controls including field installed microprocessors at each piece of HVAC equipment WIRING All control wiring including but not limited to control interlock sensor thermostat etc shall be provided under this section of these specifications If 120 volt AC power for control devices is required and if Division 16 electrical drawings do not indicate 120 volt AC is provided to control devices the control contractor is responsible for providing 120 volt AC as specified herein CONTROL COMPONENTS AND THEIR FUNCTION Cabinets Provide and install control cabinets constructed of heavy gauge steel or aluminum and consisting of a one piece rectangular or square ring a sub panel and a door with continuous hinge and quick turn latch with keyed lock Unless otherwise specified all controllers and other equipment furnished as part of the control system which are not required to be mounted on mechanical equipment shall be cabinet mounted All wiring connections shall be made inside the cabinet All electrical devices shall be wired to a numbered terminal strip No field wiring shall be required within the cabinet except to the terminal strip Conduit and Raceway Provide and install under this section 1 Refer to Division 16 Electrical for material requirements for conduit and flexible conduit Conduit sleeves with bushing
147. ermanently marked with the GPM and spring range Flow control valves that contain an integral shutoff valve will be allowed but this integral valve will not be allowed as a substitute for the separate shutoff valve shown on the drawings unless the combination valve has a published lifetime warranty by the manufacturer Each flow control cartridge shall be factory flow tested and calibrated Valve body size shall be as a minimum the size shown on the schedule on the drawings Also valve body size shall be provided such that flow rate is not greater than 90 of the maximum published flow rate For example if manufacturer s maximum flow rate for the valve at specified operating differential pressure range is 12 gpm the maximum allowable flow rate by this contract is 10 8 gpm 2 2 and Larger valves Shall be similar to above with 200 psi 250 F maximum temperature flanged iron body complete with pressure temperature ports Pete s Plugs and metal tag denoting equipment number and gpm Other requirements are similar to smaller valve specified above 3 Manufacturers The pressure compensating flow control valve or combination pressure compensating flow control valve and ball valve shall be manufactured by Griswold Nexus Tour amp Anderson with bypass arrangement Parts Service Inc Pro Hydronics Hydronic Components Inc HCD Bell amp Gossett or Flow Design 4 See Section 15051 for warranty information E Calibrated Venturi Ball V
148. es in the drawings and specifications if any that must be made in other work in order to permit the use and installation of the proposed product in accordance with the recommendations of the manufacturer of the Bip REQUIREMENTS 2 DBB CONSTRUCTION CONTRACT BID REQUIREMENTS VERSION 07 01 201 1 INSTRUCTIONS TO BIDDERS product The application to the Design Professional for approval of a proposed substitute product must be accompanied by a schedule setting forth in which respects the materials or equipment submitted for consideration differ from the materials or equipment designated in the Bidding Documents c Burden of Proof The burden of proving acceptability of a proposed product rests on the party making the submission Therefore the application for approval must be accompanied by technical data that the party requesting approval desires to submit in support of its application The Design Professional will consider reports from reputable independent testing laboratories verified experience records showing the reputation of the proposed product with previous users evidence of reputation of the manufacturer for prompt delivery evidence of reputation of the manufacturer for efficiency in servicing its products or any other written information that is helpful in the circumstances The degree of proof required for approval of a proposed product as acceptable for use in place of a named product or named products is that amount of proof necessary t
149. es of specification sections in Contract Documents Page Numbering Numbered independently for each section recorded in listing of sections Index or Table of Contents in Project Manual Section number is shown with page number at bottom of each page to facilitate location of text in Project Manual Line Numbering Provided on each page either margin strictly for purpose of facilitating subsequent references to specific text for addenda purchasing subcontracting modifications change orders and similar references Specification Content Because of methods by which this project specification has been produced certain general characteristics of content and conventions in use of language are explained as follows 1 Specifying Methods The techniques or methods of specifying to record requirements varies throughout text and may include prescriptive open generic descriptive compliance with standards performance proprietary or a combination of these The method used for specifying one unit of work has no bearing on requirements for another unit of work Overlapping and Conflicting Requirements Where compliance with 2 or more industry standards or sets of requirements is specified and overlapping of those different standards or requirements establishes different or conflicting minimums or levels of quality most stringent requirement which is generally recognized to be also most costly is intended and will be enforced u
150. evices PART 2 PRODUCTS NOT USED PART 3 EXECUTION 3 1 INSPECTION A Verify that equipment is ready for electrical connection wiring and energization 3 2 PREPARATION A Review equipment submittals prior to installation and electrical rough in Verify location size and type of connections Coordinate details of equipment connections with supplier and installer 3 3 INSTALLATION A Do not make improper connections to equipment B Use wire and cable with insulation suitable for temperatures encountered in heat producing equipment C Make conduit connections to equipment using flexible conduit Use liquidtight flexible conduit in damp or wet locations EQUIPMENT WIRING SYSTEMS 16180 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia D Provide suitable strain relief clamps for cord connections to equipment connection boxes E Make wiring connections in control panel or in wiring compartment of pre wired equipment in accordance with manufacturer s instructions Provide interconnecting wiring where indicated F Install disconnect switches controllers control stations and control devices such as limit switches etc as indicated Make connections to and through these devices with conduit and wiring as indicated G Where line voltage control devices are utilized for HVAC equipment specified under Division 15 make wiring connections to and through freezestats fire sta
151. evices and switching and overcurrent protective devices 1 5 OPERATION AND MAINTENANCE DATA A Include spare parts data listing source and current prices of replacement parts and supplies and recommended maintenance procedures and intervals 1 6 DELIVERY STORAGE AND HANDLING A Store in a clean dry space Maintain factory wrapping or provide plastic cover to protect units from dirt water construction debris and traffic MOTOR CONTROL 16480 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia B Handle in accordance with manufacturer s written instructions Handle carefully to avoid damage to motor control components enclosure and finish 1 7 SPARE PARTS A Overloads Furnish 3 each size to Owner PART 2 PRODUCTS 2 1 ACCEPTABLE MANUFACTURERS MOTOR STARTERS A Acceptable Manufacturers Square D Cutler Hammer Siemens or General Electric 2 2 MANUAL MOTOR STARTERS A Motor Starting Switch NEMA ICS 2 AC general purpose Class A manually operated 2 pole full voltage controller for fractional horsepower induction motors without thermal overload unit B Enclosure NEMA ICS 6 type 1 toggle style with handle lock accessory 2 3 MAGNETIC MOTOR STARTERS A Magnetic Motor Starters NEMA ICS 2 AC general purpose Class A magnetic controller for induction motors rated in horsepower w Full Voltage Starting Non reversing type unless scheduled or noted otherw
152. exible conduit shall not exceed 2 0 in length unless specified otherwise END OF SECTION 16111 CONDUIT 16111 4 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 16123 BUILDING WIRE AND CABLE PART 1 GENERAL 1 1 RELATED DOCUMENTS A Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section 1 2 SECTION INCLUDES A Building wire and cable B Wiring connectors and connections 1 3 RELATED SECTIONS A Section 16111 Conduit B Section 16130 Boxes C Section 16195 Identification 1 4 REFERENCES A ANSI NFPA 70 National Electrical Code 1 5 SUBMITTALS A Submit under provisions of Section 16010 1 6 REGULATORY REQUIREMENTS A Conform to requirements of ANSI NFPA 70 B Furnish products listed and classified by Underwriters Laboratories Inc suitable for purpose specified and shown 1 7 PROJECT CONDITIONS A Verify that field measurements are as shown on Drawings B All conductors shall be copper BUILDING WIRE AND CABLE 16123 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia C Routing shown on Drawings is approximate unless dimensioned Route wire and cable as required to meet Project Conditions Include wire and cable lengths within 10 feet of length shown D Where routing is not shown an
153. ferred to in said bond before the expiration of a period of ninety 90 days after the day on which the last of the labor was done or performed by him or materials or equipment or machinery was furnished or supplied by him for which claim is made shall have the right to sue on such payment bond for the amount or the balance thereof unpaid at the time of the commencement of such action and to prosecute such action to final execution and judgment for the sum or sums due him provided however that any person having direct contractual relationship with a subcontractor but no contractual relationship express or implied with the Contractor furnishing said payment bond shall have a given written notice to said Contractor within ninety 90 days from the day on which such person did or performed the last of the labor or furnished the last of the materials or machinery or equipment for which such claim is made stating with substantial accuracy the amount claimed and the name of the party to whom the materials were furnished or supplied or for whom the labor was performed or done and b if the Contractor has filed a Notice of Commencement in accordance with the requirements of O C G A 13 10 62 and Articles 4 3 2 of the contract given to said contractor a written Notice to Contractor within 30 days from the filing of the Notice of Commencement or 30 days following the first delivery of labor materials machinery or equipment whichever is later setting forth
154. flanges with carbon steel bolts full size of bolt holes and hex nuts with washers Install flanges in horizontal lines with bolt holes straddling vertical and horizontal pipe center lines Install flanges in vertical lines with bolt holes straddling lines parallel to equipment center lines and building lines Gaskets shall be 1 16 gray black ring type compressed non asbestos ANSI B16 21 Flat face 150 pound welded slip on flanges with carbon steel bolts full size of bolt holes and hex nut with washers with 1 8 inch red rubber full face gasket shall be used when connecting steel water piping to PVC piping flanges HYDRONIC PIPING 15181 4 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 2 6 2 7 2 8 C Flange Adapter for Grooved Piping Ductile iron housing conforming to ASTM A536 with pressure responsive synthetic rubber gasket grade to suit the intended service 1 For Copper Tubing For direct connection to ANSI Class 125 or 150 flanged components Victaulic Style 641 2 For AWWA Ductile Iron Pipe For direct connection to ANSI Class 125 flanged components Victaulic Style 341 3 For IPS Steel Piping For direct connection to ANSI Class 125 or 150 flanged components Victaulic Style 741 SOLDER Solder shall be lead free having composition of minimum 94 tin 4 to 5 copper and 0 4 to 0 2 silver or selenium Solder shall have a minimum tensile strength of 6 900 psi at 7
155. for minimum 4 either side of well Wells shall be installed at 45 degrees or greater above horizontal and be filled with SAE 10 W oil PRESSURE TEMPERATURE PLUGS Pressure temperature plugs shall be solid brass having a double Nordel seat suitable for temperatures of 275 F and 500 PSL each plug shall have a color coded cap retainer for easy identification Yellow for Nordel Blue for Neoprene Provide extended neck type on insulated piping Plugs shall be 110 1 4 or 710 2 Pete s Plug II as manufactured by Peterson Equipment Co Superseal Model by Flow Design or equal by Nexus FNW Palmer or Weksler STEEL VENTURIS Carbon steel venturi with high signal low loss design with ASTM A 120 body rated at 400 psig at 250 F with three port averaging throat signal grooved or Schedule 40 welded ends with two 1 4 Schrader type brass access ports with caps Accuracy shall be 3 of full scale Venturi shall be installed with manufacturer s required pipe diameters upstream and downstream but as a minimum shall have five pipe diameters upstream of venturi Venturis shall be manufactured by Flow Design Inc Pro Hydronics Barco Preso Hydronic Components Inc HCI Griswold or Garand Venturi shall be utilized with read out meter kit specified to directly measure gpm or with differential pressure transmitter to send gpm signal METERS AND GAUGES 15122 3 Heating Upgrade for Atkinson Hall Georgia College amp State University Mil
156. foregoing is true and correct Executed on 20 in city state Signature of Authorized Officer or Agent Printed Name and Title of Authorized Officer or Agent SUBSCRIBED AND SWORN BEFORE ME ON THIS THE DAY OF 20 NOTARY PUBLIC My Commission Expires DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT S Subcontractor Affidavit under O C G A S 13 10 91 b 3 By executing this affidavit the undersigned subcontractor verifies its compliance with O C G A 13 10 91 stating affirmatively that the individual firm or corporation which is engaged in the physical performance of services under a contract with name of contractor on behalf of Board of Regents of the University System of Georgia for the use and benefit of Georgia College amp State University Using Agency public employer has registered with is authorized to use and uses the federal work authorization program commonly known as E Verify or any subsequent replacement program in accordance with the applicable provisions and deadlines established in O C G A 13 10 91 Furthermore the undersigned subcontractor will continue to use the federal work authorization program throughout the contract period and the undersigned subcontractor will contract for the physical performance of services in satisfaction of such contract only with sub subcontractors who present an affidavit to th
157. full force and effect 3 WITNESS WHEREOF the parties hereto have caused this instrument to be duly executed this day of WITNESS Principal By TITLE WITNESS Surety By TITLE Attach Power of Attorney Instructions for execution by Contractor a If the firm is a partnership all members of the partnership must execute b If the firm is a corporation the president must sign the secretary must attest and the Seal of Corporation must be affixed c If the firm operates as a sole proprietorship the proprietor must execute 13 DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS CERTIFICATE OF MANUFACTURER SPECIMEN CERTIFICATE OF MANUFACTURER INSTRUCTIONS FOR PREPARATION OF CERTIFICATE To be acceptable the certificate must be prepared in the form indicated by this specimen on the official letterhead of the manufacturer No portions of the certificate may be omitted Attached is a copy of the Contract provision under which the certificate is required The Authority needs only one copy of the certificate If equipment of a manufacturer is not installed in strict compliance with the recommendations of the manufacturer or if in the design of the work the equipment is not applied in strict compliance with the recommendations of the manufacturer a letter from the manufacturer should be forwarded to the Contractor with copies to the Design Professional and the Owner setting forth a list of the devi
158. g Insulation 6 Inches and Larger Self adhesive pipe markers Use color coded self adhesive plastic tape at least 1 1 2 inches wide lapped at least 3 inches at both ends of pipe marker and covering full circumference of pipe Stenciled Pipe Marker Option Stenciled markers may be provided where manufactured pipe markers are not available Install stenciled pipe markers with painted color coded bands or rectangles complying with ASME A13 1 on each piping system l Identification Paint Use for contrasting background 2 Stencil Paint Use for pipe marking MECHANICAL IDENTIFICATION 15075 3 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 3 3 3 4 3 5 C A Locate pipe markers and color bands as follows 1 Near each valve and control device Near each branch connection excluding short takeoffs for fixtures and terminal units Where flow pattern is not obvious mark each pipe at branch 3 At access doors manholes and similar access points that permit view of concealed piping 4 Near major equipment items and other points of origination and termination 5 At 25 feet intervals on all straight runs of pipe 6 On both sides of walls or floors where pipe passes through walls or floors VALVE TAG INSTALLATION Install tags on valves and control devices in piping systems except check valves valves within factory fabricated equipment units plumbing fixture supply s
159. g maximum working pressure at 250 K CV rating shall be provided at every 10 increment Triple duty valves shall be manufactured by Bell amp Gossett Armstrong Mueller Amtrol Taco or Wheatley HYDRONIC PUMPS 15185 3 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 2 Grooved end triple service valves shall consist of Victaulic Series 300 Master Seal butterfly valve in conjunction with series 779 venturi check valve Triple service valves shall provide shut off throttling and balancing with reverse flow protection at 300 psi working pressure Approved equal model by Grinnell Mechanical Products Anvil or Gustin Bacon will be allowed PART 3 EXECUTION 3 1 3 2 PUMP INSTALLATION Install in accordance with manufacturer s instructions Install pumps with access for periodic maintenance including removal of motors impellers couplings and accessories Provide no less than minimum as recommended by the manufacturer Independently support pumps and piping so weight of piping is not supported by pumps and weight of pumps is not supported by piping Install continuous thread hanger rods and vibration isolators of sufficient size to support in line pump weight Install pumps with motor and pump shafts vertical Hanger and support materials and vibration isolators are specified in Division 15 Section Hangers and Supports Lubricate pumps before start up Set base mounted pumps
160. h intended function or design are encountered investigate and measure both nature and extent of the conflict Submit report to Owner s Representative in written accurate detail Pending receipt of directive from Owner s Representative rearrange selective demolition schedule as necessary to continue overall job progress without delay DISPOSAL OF DEMOLISHED MATERIALS The contractor shall be responsible for removing all debris rubbish and other materials resulting from his demolition operations from building site including removal of materials resulting from new construction work which shall be the Contractor s responsibility l Burning of removed materials is not permitted on project site CLEAN UP AND REPAIR Upon completion of demolition work remove tools equipment and demolished materials from site Remove protections and leave interior areas broom clean 02060 3 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia B Repair demolition performed in excess of that required Return structures and surfaces to remain to condition existing prior to commencement of selective demolition work Repair adjacent construction or surfaces soiled or damaged by selective demolition work END OF SECTION 02060 02060 4 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 09900 PAINTING PART 1 GENERAL 1 1 A 1 2 A 1 3
161. hall be manufactured by Bell and Gossett Taco Amtrol Thrush John Wood Wheatley or Armstrong Air Purgers Air purger shall operate on decreased velocity principle with air collecting in top of scoop In line air purger shall be cast iron or steel construction with minimum 125 psi working pressure complete with vent tapping and drain tapping with flanged or threaded connections Maximum pressure drop at scheduled flow shall be 4 feet pressure drop Air purger shall be manufactured by Bell and Gossett Armstrong Amtrol Taco or Thrush Manual Air Vents Brass body Coin operated style Knurled slotted handle blowout proof needle style valve side vent 1 8 to 1 4 NPT Provide extended neck on insulated piping Vent shall be rated minimum 150 psig at 250 F Bell and Gossett Model 4V Flow Design Model AV or Griswold Model 738 01 HYDRONIC PIPING SPECIALTIES Strainers 1 Y Type 2 1 2 and Smaller Threaded or soldered connections cast bronze 200 psi WOG at 150 F Basis of design is Watts 777 2 Y Type 2 1 2 and Larger a Flanged connections cast iron body Class 125 200 psi WOG at 150 F ASTM A 126 Class B Basis of design is Watts 77F D b Grooved connections ductile iron body 300 psi at 230 F basis of design is Victaulic Style 732 3 Basket Type Flanged connections removable bolted cover cast iron body and cover Provide machined seat for basket alignment Basis of design is Watts 97FB CIB HYDRONI
162. hall be held as constant as possible to prevent condensation Do not apply exterior paint in damp rainy weather or until the surface has dried thoroughly from the effects of such weather Surface to be stained or painted shall be clean dry and smooth Each coat of paint shall be smoothly applied worked out evenly and allowed to dry before the subsequent coat is applied 09900 2 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 3 6 Enamel or varnish undercoats on wood surfaces and on steel surfaces shall be sanded smooth prior t recoating Undercoats on steel and iron shall be dusted prior to recoating Finished work shall be uniform and of the specified color It shall completely cover be smooth and free from runs sags clogging or excessive flooding Make edges of paint adjoining other materials or color sharp and clean without overlapping Where high gloss enamel is used lightly sand undercoats to obtain a smooth finish coat Correction of improper or damaged work may be by spot touching except that in final coat corrections a re coating of the entire surface between corners or breaks will be required without additional charge Exposed piping conduit duct work and hangers in finished spaces shall be painted a color as directed by the Engineer Cleaning At completion of the work clean all paint coatings oil and stain spots from all surfaces not required to be painted un
163. hazardous or friable substance or material which must be disturbed during the course of his work Contractor shall promptly notify Owner and Architect Unless otherwise provided in these specifications Owner shall make all arrangements regarding testing and removal or encapsulation of asbestos material if present Friable material is any material which can be crumbled pulverized or reduced to a powder by hand pressure when dry There has been a study of the site and any existing building to locate asbestos or other hazardous waste A copy of the report may be viewed by contacting the Owner F 16 LAND FILL RECEIPTS A Contractor will provide to the Owner land fill receipts or other appropriate disposal certificates for all material removed from GC amp SU property F 17 SAFETY A The Contractor is expected to visit the job site to review the conditions under which his crew will work Electrical hazards shall be noted OSHA rules and Regulations shall apply The Contractor shall not allow any crew member to operate power equipment without proper training The Contractor shall designate a responsible member of the Contractor s organization at the site whose duty shall be the prevention of accidents This person shall be the Contractor s Superintendent unless otherwise designated by the Contractor in writing to the Owner F 4 TI MEI ME2 ME3 MEA SECTION G SCHEDULE OF DRAWINGS Title Sheet Mechanical amp Electri
164. ic water piping uncovered and unconcealed until it has been tested and approved Expose work that was covered or concealed before it was tested Cap and subject piping to static water pressure of 150 psig Isolate test source and allow to stand for four hours Leaks and loss in test pressure constitute defects that must be repaired Repair leaks and defects with new materials and retest piping or portion thereof until satisfactory results are obtained Prepare reports for tests and required corrective action 3 9 ADJUSTING A Perform the following adjustments before operation 1 3 A 7 Close drain valves hydrants and hose bibbs Open shutoff valves to fully open position Adjust balancing valves in hot water circulation return piping to provide adequate flow a Manually adjust ball type balancing valves in hot water circulation return piping to provide flow of hot water in each branch b Adjust calibrated balancing valves to flows indicated Remove plugs used during testing of piping and plugs used for temporary sealing of piping during installation Remove and clean strainer screens Close drain valves and replace drain plugs Remove filter cartridges from housings and verify that cartridges are as specified for application where used and are clean and ready for use Check plumbing specialties and verify proper settings adjustments and operation END OF SECTION 15140 DOMESTIC WATER PIPING 15140 6 Heating U
165. ice Inc B Spherical Rubber Flexible Connectors 1 Spherical connector for pump isolation shall be constructed of neoprene and nylon with bias ply tire cords complete with steel plate flanges tapped or drilled to mate with 150 Ib flanges Connectors shall be capable of controlling compression elongation lateral and angular movement Provide flexible connector tie rods to prevent connector failure Temperature range 20 F to 240 F Braided steel or bronze flexible connectors shall not be allowed Flexible pipe connectors shall be manufactured by Metraflex Flex hose Keflex Belmont Garlock Twin City Hose Southeastern Hose or Wheatley A grooved pipe three flexible coupling arrangement will be allowed in lieu of spherical flex connectors at equipment hookups on pumps 10hp and smaller This arrangement shall provide allowances for controlled pipe movement expansion contraction deflection absorbing noise and vibration as well as movement from thermal changes and setting Flexible couplings shall be Victaulic style 75 77 or 791 and number shall be stamped on coupling to allow identification as a flexible coupling as opposed to a rigid coupling Couplings do not have to be in series but shall be in close proximity to the device C Flexible Couplings Provide flexible coupling arrangements in noted sections of piping as indicated on the drawings Coupling shall be Victaulic style 75 77 or 791 and number shall be stamped on coupling to
166. ific pieces of equipment as specified in the individual specification sections herein Provide signed O amp M Instruction Verification Form as specified in later paragraph certifying instructions have been received Training See each specification section for specific training requirements OPERATING AND MAINTENANCE O amp M MANUALS Operating and maintenance manuals shall comply with Division 1 Section Operation and Maintenance Data Three bound and indexed Operating and Maintenance Manuals shall be prepared by the Contractor and be submitted for approval prior to delivery to operating personnel Binders shall be 3 ring commercial grade complete with inside storage pockets sheet protectors spine and front cover labels Each Manual shall contain the following information data and drawings 1 HVAC a List of Contents Insert under clear front cover of binder b Contractors one 1 year guarantee c Manufacturer s equipment warranties provide a warranty for each piece of equipment d Copy of O amp M Instruction Form showing Contractor has instructed designated personnel in the proper operation of all Division 15 systems e Installation operating and maintenance instructions for each item of equipment Provide trouble shooting checklist guide f Manufacturers list of renewal parts for each item of equipment with recommended stock items and quantities indicated g Copy of approved submittals shop drawings showing lay
167. ificate holder has received written notice thereof as evidenced by return receipt of certified or overnight letter Authorized Representative Typed Name 15 DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS BOND TO DISCHARGE CLAIM THIS FORM IS FOR OPTIONAL USE TO RELEASE TO THE CONTRACTOR FUNDS WITHHELD FROM A PAY APPLICATION IN THE EVENT A SUBCONTRACTOR FILES A CLAIM AGAINST THE CONTRACT BALANCE HELD BY THE OWNER THAT REMAINS UNRESOLVED THIS IS A SUBORDINATE DOCUMENT TO THE PAYMENT BOND FOR THE PROJECT AND IS CALCULATED AGAINST THE PENAL AMOUNT OF THAT PAYMENT BOND THERE ARE OTHER METHODS THAT MAY BE USED TO REMEDY SUCH SITUATIONS HOWEVER THIS FORM IS EFFECTIVE WHEN NONE OF THE PARTIES ARE ABLE TO REACH AGREEMENT UPON THE CLAIM BOND TO DISCHARGE CLAIM WHEREAS hereinafter referred to as Claimant has filed a claim against the Contractor hereinafter referred to as Principal on the following contract WHEREAS the undersigned Principal and Surety have issued Payment Bond No the Primary Bond to the Owner as Obligee on the Contract dated for Project WHEREAS the undersigned Principal and Surety dispute the Claimant s entitlement to all or part of the claim and expressly reserve all rights and defenses available at law in connection therewith WHEREAS as Principal and as Surety desire to continue to receiving payments from the Owner for work done on the above r
168. ights Concerning Award The Owner reserves the right in its sole and complete discretion to waive technicalities and informalities The Owner further reserves the right in its sole and complete discretion to reject all bids and any bid that is not responsive or that is over the budget as amended In judging whether the bidder is responsible the Owner will consider but is not limited to consideration of the following a Whether the bidder or its principals are currently ineligible debarred suspended or otherwise excluded from bidding or contracting by any state or federal agency department or authority b Whether the bidder or its principals have been terminated for cause or are currently in default on a public works contract c Whether the bidder can demonstrate sufficient cash flow to undertake the project as evidenced by a Current Ratio of 1 0 or higher d Whether the bidder can demonstrate a commitment to safety with regard to Workers Compensation by having an Experience Modification Rate EMR over the past three years not having exceeded an average of 1 2 and e Whether the bidder s past work provides evidence of an ability to successfully complete public works projects within the established time quality or cost or to comply with the bidder s contract obligations Bip REQUIREMENTS 4 DBB CONSTRUCTION CONTRACT BiD REQUIREMENTS VERSION 07 01 201 1 INSTRUCTIONS TO BIDDERS 17 Owner s Right to Negotiate with the Lowest
169. ign Nexus Hydronic Components Inc HCI Griswold or Tour amp Anderson PART 3 EXECUTION 3 1 3 2 3 3 w Q J pi A A B INSTALLATIONS Install direct mounting thermometers and adjust vertical and tilted positions Install direct mounting pressure gauges in piping tees with pressure gauge located on pipe at most readable position Install gauge cock and pressure snubber fitting in piping for each pressure gauge Install pressure temperature plugs in tees in piping or in weldolets or threadolets Install flow indicators in accessible positions for easy viewing in piping systems All gauges flow meters venturis etc shall be installed in accessible locations in accordance with manufactures instructions CONNECTIONS Install meters and gauges adjacent to machines and equipment to allow service and maintenance for meters gauges machines and equipment ADJUSTING Calibrate meters according to manufacturer s written instructions after installation Adjust faces of meters and gauges to proper angle for best visibility END OF SECTION 15122 METERS AND GAUGES 15122 5 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 15140 DOMESTIC WATER PIPING PART 1 GENERAL 1 1 A 1 2 A 1 3 A 1 4 A B 1 5 A B RELATED DOCUMENTS Drawings and general provisions of the Contract including General and Supp
170. ily for updates addenda and any other additional information Contract if awarded will be on a lump sum basis No bid may be withdrawn for a period of thirty five days after time has been called on the date of opening except in accordance with the provisions of Georgia law Bids must be accompanied by a Bid Bond made payable to the Owner in an amount equal to not less than five percent of the Bid Both a performance bond and a payment bond will be required each in an amount equal to 100 percent of the Contract Sum prior to execution of contract The Owner reserves the right in its sole and complete discretion to waive technicalities and informalities The Owner further reserves the rights in its sole and complete discretion to reject all bids and any bid that is not responsive or that is over the budget The Owner anticipates that the contract will be awarded to the responsive and responsible bidder who provides the lowest bid within the budget In judging whether the bidder is responsible the Owner will consider but is not limited to the following e Whether the bidder or its principals are currently ineligible debarred suspended or otherwise excluded from bidding or contracting by any state or federal agency department or authority e Whether the bidder or its principals have been terminated for cause or are currently in default on a public works contract e Whether the bidder can demonstrate sufficient cash flow to undertake the project as e
171. ing systems in service during construction Disable systems only to make connections and change over to new service Obtain permission from Owner at least 14 days before partially or completely disabling any existing system Minimize outage duration 3 3 DEMOLITION AND EXTENSION OF EXISTING ELECTRICAL WORK A Demolish and extend existing electrical work under provisions of this Section ELECTRICAL DEMOLITION 16060 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia B Remove relocate and extend existing installations to accommodate new construction C Remove abandoned wiring to source of supply D Remove exposed abandoned conduit including abandoned conduit above accessible ceiling finishes Cut conduit flush with walls and floors and patch surfaces E Disconnect abandoned outlets and remove devices Remove abandoned outlets if conduit servicing them is abandoned and removed Provide blank cover for abandoned outlets which are not removed F Repair adjacent construction and finishes damaged during demolition and extension work G Maintain access to existing electrical installations which remain active H Extend existing installations using materials and methods as specified 3 4 CLEANING AND REPAIR A Clean and repair existing materials and equipment which remain or are to be reused 3 5 INSTALLATION A Install relocated materials and equipment as noted on drawings under th
172. ions have been produced by Architect s standard methods of editing master specifications and may contain minor deviations from traditional writing formats Such deviations are normal result of this production technique and no other meaning will be implied or permitted Format Explanation The format of principal portions of these specifications can be described as follows although other portions may not fully comply and no particular significance will be attached to such compliance or non compliance 1 Sections and Divisions For convenience basic unit of specification text is a section each unit of which is named and numbered These are organized into related families of sections and various families of sections are organized into divisions which are recognized as the present industry consensus on uniform organization and sequencing of specifications The section title is not intended to limit meaning or content of section nor to be fully descriptive of requirements specified therein nor to be an integral part of text a Each section of specifications has been subdivided into 3 or less parts for uniformity and convenience Part 1 General Part 2 Products and Part 3 Execution These do not limit the meaning of and are not an integral part of text which specified requirements Subordination of Text Portions of specification text are subordinated to other portions in the following traditional manner lowest level to highes
173. ior to placement of brick concrete block or cast in place concrete Piping and Conduit Penetrations through Non rated Walls or Floors Pack space between pipe or conduit and sleeve with fiberglass batts and with a minimum of 1 inch thick non sagging caulking material on one side Caulk material is not required to be fire rated but shall comply with Architectural caulking specification section Install chrome plated steel escutcheons at finished surfaces for piping Division 15 Contractor shall furnish the General Contractor with the clear opening dimensions and elevations and locations of all penetrations through walls and floors so that the General Contractor may provide appropriate wall and floor openings for these penetrating items Penetrating items include but are not limited to ducts and piping Clear opening dimensions and elevations and locations shall be furnished in a timely manner to allow General Contractor to frame openings during wall and floor construction and to prevent the need for removing new work Contractor is warned that the project may contain shear walls which require steel reinforcing framing around perimeter that must be installed during the construction of the wall and which can not be installed after the wall is constructed without significant demolition of the wall and reconstruction of the wall Coordinate with General Contractor to determine location of shear walls HANGERS AND SUPPORTS 15060 8 Heating Upg
174. irs to any defects that may develop in the work including but not limited to blisters exposed felts ridges wrinkles splits warped insulation and loose flashing in a manner compatible to the system and acceptable under industry standards and in accordance with the construction specifications The Contractor also warrants that for the same five year period the walls of the building or buildings and building envelope including but not limited to vertical and or horizontal expansion joints below and or above grade waterproofing below and or above grade damp proofing thru wall flashing damp course flashing and waterproofing of joints at openings in walls including but not limited to door perimeters window perimeters vents and pipe openings shall be absolutely watertight and free from all leaks seepage or dampness and that he shall at no expense to the Owner make repairs to any defects that may develop in the work in a manner compatible to the system and acceptable under industry standards and in accordance with the construction specifications Provided however That the following are excluded from the warranty a Defects or failures resulting from abuse by the Owner upon presentation of competent evidence of same by the Contractor b Defects in design that the said Contractor shall produce competent evidence of having had provided clear written notice in writing to the Owner prior to commencing installation of the Work except however
175. ise C Coil Operating Voltage 120 volts 60 Hertz from separate source D Size NEMA ICS 2 size as shown on Drawings E Overload Relay NEMA ICS 2 ambient compensated bimetal F Enclosure NEMA ICS 6 Type 1 G Combination Motor Starters Combine motor starters with motor circuit protector disconnect in common enclosure H Auxiliary Contacts NEMA ICS 2 two normally open field convertible contacts in addition to latching contact Selector Switches NEMA ICS 2 HAND OFF AUTO in front cover of all combination starters J Indicating lights NEMA ICS 2 Transformer base pilot device with 9 volt lamp GREEN motor run in front cover K Overload Reset Externally operable in front cover MOTOR CONTROL 16480 2 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 2 4 OVERCURRENT PROTECTION AND DISCONNECTING MEANS A Molded Case Thermal Magnetic Circuit Breakers non motor loads NEMA AB1 circuit breakers with integral thermal and instantaneous magnetic trip in each pole Minimum 65 kAIC device B Motor Circuit Protector NEMA AB 1 circuit breakers with integral instantaneous magnetic trip in each pole Provide auxiliary contact for disconnection of starter control circuit s PART 3 EXECUTION 3 1 INSTALLATION A Install motor control equipment in accordance with manufacturer s instructions B Select and install heater elements in motor starters to match
176. it does not operate properly contractor is not responsible for unit operation Some existing to remain for reuse equipment may be specified with a baseline TAB or functional test to verify proper operation Contractor is not responsible for correcting any deficiencies revealed by the testing Provide weather protection for all interior portions of the building during demolition work Where existing wall mounted or roof top or other equipment is being removed and expose the building to the elements have materials and workmen ready to install adequate temporary covering of the exposed area ASBESTOS ALERT FOR EXISTING CONSTRUCTION General The Owner has indicated that all known asbestos containing materials ACMs have been removed from this facility however some ACMs may remain Accordingly the Contractor shall use caution during all demolition procedures It shall be the Contractor s responsibility to see that all his personnel and that all of his subcontractors personnel are made aware during demolition or any similar work or in the process of connecting to or working adjacent to existing equipment or materials that at any time any workman encounters any suspect asbestos containing materials ACMs all work in that area shall be stopped immediately and the suspect spaces kept cleared until a testing and or abatement by a properly qualified firm selected by the Owner has been accomplished In the event the suspect material proves to be asbes
177. ite In undertaking the work under this Contract the Contractor acknowledges that he has visited the Project Site and has taken into consideration all observed conditions that might affect his work 3 Surety and Insurance Companies The Contract provides that the surety and insurance companies must be acceptable to the Owner Only those sureties listed in the Department of Treasury s Listing of Approved Sureties Department Circular 570 are acceptable to the Owner At the time of issuance all insurance and bonds must be issued by a company licensed by the Georgia Insurance Commissioner to transact the business of insurance in the State of Georgia for the applicable line of insurance Such company shall be an insurer or for qualified self insurers or group self insureds a specific excess insurer providing statutory limits with an A M Best Financial Strength Rating of A or better and with an A M Best Financial Size Category of Class V or larger 4 Bidding Documents The Bidding Documents comprise the Construction Documents the Invitation to Bid the Instructions to Bidders the Bid Form and all Addenda upon which the bidder submits a bid 5 Addenda All Addenda issued prior to bid date adjust modify or change the drawings and specifications as set forth in the Addenda No Addenda will be issued within five days of the date set for opening bids without an extension of the bid date All such Addenda are part of the contract 6 Interpreta
178. l requirements for the graphical interface between the DDC system and the Owner s personnel 2 ALL normal user programmable points shall be accessible through graphical interface at the Owner s host computer Owner shall have the ability to graphically view the status of the points e g water temperatures outdoor air temperature supply temperature setpoint space temperature etc and graphically change temperature setpoint Owner shall have the ability to graphically view status of equipment points and graphically change appropriate set points schedules etc with a mouse by clicking on the icon on the monitor Off Site Interface Control Contractor shall reprogram modify upgrade the Owner s existing off site remote control center and software to allow full control and monitoring of this building off site Web Based Access Requirements 1 Access to system by up to 5 concurrent authorized users from any computer with an Internet connection and Microsoft Internet Explorer installed 2i Full Graphical interface 3 Ability to manage and restrict authorization levels of each user 4 The need for the FMS manufacturer to install any proprietary software is not acceptable The system should be accessible from any computer connected to the owners LAN system using a standard web browser HVAC INSTRUMENTATION AND CONTROLS 15900 6 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 5 The W
179. lation fitting inserts covered with PVC fitting covers PVC fitting covers shall have a flame spread of 25 or less and a smoke development of 50 or less Nominal 0 75 Ib density K factor maximum 0 32 at 75 F for temperatures 20 F to 450 F Type P2 Precut cellular glass insulation fitting inserts with vapor barrier INSULATION FINISH MATERIALS F1 Two coats of Armacell Armaflex finish or equal F2 Pre molded PVC jacket maximum permeance of 0 09 PVC jacketing shall be minimum 0 02 thick 20 mils F3 Fungus Resistant white or gray vapor barrier mastic with 10 x 10 glass cloth or polyester reinforcing membrane to develop 37 mil dry film thickness Foster Vapor Safe 30 80 AF conforming to ASTM D 5590 with 0 rating and Chil Glas 10 reinforcing mesh or prior approved equals ACCESSORIES Insulation Bands for Cellular Glass 3 4 inch wide 0 015 inch thick aluminum Metal Jacket Bands 1 2 inch wide 0 015 inch thick aluminum Adhesives Compatible with insulation materials jackets and substrates and for bonding insulation to itself and to surfaces to be insulated unless otherwise indicated Insulation Shields Provided in accordance with Section 15060 Mastics Materials shall be compatible with insulation materials jackets and substrates Tapes FSK foil face vapor retardant type tape matching factory applied jacket with acrylic adhesive complying with ASTM C1136 and UL listed Width shall be three inches thickness shall
180. le lockable in OFF position Enclosures NEMA type as indicated on Drawings DISCONNECT SWITCHES 16440 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia C Acceptable Manufacturers Square D Cutler Hammer Challenger General Electric Westinghouse or Siemens ITE PART 3 EXECUTION 3 1 INSTALLATION A Install disconnect switches where indicated on Drawings B J Provide nameplates in accordance with Section 16195 END OF SECTION 16440 DISCONNECT SWITCHES 16440 2 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 16480 MOTOR CONTROL PART 1 GENERAL 1 1 RELATED DOCUMENTS A Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section 1 2 WORK INCLUDED A Manual motor starters B Magnetic motor starters C Combination magnetic motor starters 1 3 RELATED WORK A J Section 16195 Electrical Identification Nameplates B REFERENCES C ANSI NEMA ICS 6 Enclosures for Industrial Controls and Systems D NEMA AB 1 Molded Case Circuit Breakers E NEMA ICS 2 Industrial Control Devices Controllers and Assemblies 1 4 SUBMITTALS A Submit shop drawings and product data under provisions of Section 16010 B Provide product data on motor starters and combination motor starter relays pilot d
181. ledgeville Georgia 2 8 2 9 READ OUT METER KIT FOR CALIBRATED VENTURIS AND CALIBRATED VENTURI BALL VALVES Provide to the owner a portable read out meter kit by the manufacturer of the calibrated venturis and venturi shut off valves Meter shall serve to verify flow rate gpm Unless specifically shown otherwise on the drawings flow rate shall be automatically set by the pressure compensating flow control valves If pressure compensating flow control valve is over flowing ball valve may be used to reduce flow to scheduled gpm otherwise valve shall be in the fully open position The meter shall be housed in a durable case complete with two ten foot color coded hoses with P T adapters and shut off valves at the end that connects to the venturi and venture ball valves so that water does not drain out between readings Meter shall have a six inch diameter face and 1 75 full scale accuracy Range of meter shall be 0 to 300 inches w c 0 to 25 feet Meter shall be provided with a removable transparent face indicating flow directly in GPM for each size device furnished Meter shall have a forged brass body and a three valve manifold for over range protection Meter shall have a dual scale reading inches and feet W C Meter for calibrated balancing venturi ball valves shall be manufactured by Flow Design Griswold Nexus Hydronic Components Inc HCI Bell amp Gossett or Tour amp Anderson READ OUT METER KIT FOR PRESSURE
182. lege amp State University Milledgeville Georgia 3 3 3 4 3d A PIPE HANGER ADJUSTING Hanger Adjustments Adjust hangers to distribute loads equally on attachments and to achieve indicated slope of pipe Trim excess length of continuous thread hanger and support rods to 1 1 2 inches PAINTING Touch Up Cleaning and touchup painting of field welds bolted connections and abraded areas of shop paint on miscellaneous metal are specified in Division 9 Painting Section Galvanized Surfaces Clean welds bolted connections and abraded areas and apply galvanizing repair paint to comply with ASTM A 780 In areas that are to be painted and also are exposed to view in public areas supports for piping and equipment hangers and accessories including but not limited to bolts nuts washers rod angle iron beam clamps etc shall be plain steel with a coat of rust inhibiting primer Primer shall be applier prior to installation of supports Supports hangers and accessories exposed to view shall not be galvanized or electroplated in order to allow them to be painted in accordance with the Architectural painting section Areas that are to be painted but that are not exposed to view to the public such as mechanical rooms shall be galvanized as required above SLEEVES AND PENETRATIONS Provide pipe sleeves for all piping and conduit penetrations through floors and walls Set sleeves in position during construction of walls or floors pr
183. lementary Conditions and Division 1 Specification Sections apply to this Section SUMMARY This Section includes domestic water piping inside the building SUBMITTALS Product Data For pipe tube fittings and couplings shall be submitted under provisions of Section 15050 QUALITY ASSURANCE All piping and fittings shall be new and of domestic USA manufacturer The ASTM number and schedule shall be stamped on each length of piping Comply with NSF 61 Drinking Water System Components Health Effects Sections 1 through 9 for potable domestic water piping and components DELIVERY STORAGE AND HANDLING Deliver products to site under provisions of Section 15050 Store and protect products under provisions of Section 15050 PART 2 PRODUCTS 2 1 A B 140 F HOT 120 F HOT COLD AND RECIRCULATING WATER PIPING ABOVE GRADE Copper Tubing ASTM B88 type L hard drawn Fitting ANSI ASME B16 9 pressure pattern wrought copper Joints 2 and smaller ANSI ASTM B32 Lead free solder having a composition of 95 5 tin 4 copper and 0 5 silver Joints over 2 Braze using AWS A 58 BCUP 4 silver minimum 5 8 filler metal Backing with solder melting temperature less than 1 100 F is prohibited On piping 2 and larger the Contractor has the option of using grooved couplings and grooved fittings as manufactured by Victaulic Anvil and Grinnell DOMESTIC WATER PIPING 15140 1 Heating Upgrade for Atkinson Hall Ge
184. ll hangers for steel piping with the following maximum spacing and minimum rod Sizes NPS 1 2 and NPS 3 4 Maximum span 6 feet minimum rod size 3 8 inch NPS 1 and NPS 1 1 4 Maximum span 6 feet minimum rod size 3 8 inch NPS 1 1 2 Maximum span 8 feet minimum rod size 3 8 inch NPS 2 Maximum span 8 feet minimum rod size 3 8 inch NPS 2 1 2 Maximum span 10 feet minimum rod size 1 2 inch NPS 3 Maximum span 10 feet minimum rod size 1 2 inch NPS 4 and NPS 5 Maximum span 10 feet minimum rod size 5 8 inch psi gv pA uS Install hangers for drawn temper copper piping with the following maximum spacing and minimum rod sizes NPS 3 4 Maximum span 5 feet minimum rod size 3 8 inch NPS 1 Maximum span 6 feet minimum rod size 3 8 inch NPS 1 1 4 Maximum span 6 feet minimum rod size 3 8 inch NPS 2 Maximum span 8 feet minimum rod size 3 8 inch Mq Install a hanger within 12 inches of each horizontal elbow PIPE JOINT CONSTRUCTION Join pipe and fittings according to the following requirements and Division 15 Sections specifying piping systems Joints shall be determined by the equipment connections or by the valve or fitting specified herein Ream ends of pipes and tubes and remove burrs Bevel plain ends of steel pipe HYDRONIC PIPING 15181 13 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 3 5 C Remove scale slag dirt and debris
185. lledgeville Georgia 1 13 equipment with service clearances equal to the basis of design equipment The contractor shall submit a detailed sketch and description of any modifications to install the particular manufacturer s equipment that he chooses to demonstrate that the equipment will fit and have the manufacturer s service clearances The sketch is not submitted for review or approval or for confirmation that it is correct only to certify that the contractor has completely considered the installation of substitute equipment MOISTURE INTEGRITY Wall All wall penetrations shall be sealed and caulked watertight NOISE AND VIBRATION When in operation all systems included in this section of specifications shall be free from objectionable or abnormal noise and vibration See Section 15060 of the specifications for specific vibration isolation requirements PROTECTION OF MATERIALS AND EQUIPMENT Delivery Storage and Handling Deliver products to site in factory fabricated protective containers with where appropriate factory installed shipping skids and lifting lugs Store in clean dry place and protect from weather and construction traffic Handle carefully to avoid damage to components enclosures and finish Maintenance of Strainers The Contractor shall be responsible for maintaining all liquid strainers until Architect s Final Certificate No air system shall be operated at any time without air filters and filters shall not be allo
186. luding disputed claims or any claims to which the Contractor has or will assert any defense arising out of the performance of the Contract which have not been Instructions to Contractor ENTER THE WORD NONE OR LIST THE NAMES OF CLAIMANTS 2 The undersigned further certifies that to the best of his knowledge and belief there are no unsatisfied claims for damages resulting from injury or death to any employees Subcontractors or the public at large arising out of the performance of the contract or any suits or claims for any other damage of any kind nature or description which might constitute a lien upon the property of the Owner 3 The undersigned makes this affidavit for the purpose of receiving final payment in full settlement of all claims against the Owner arising under or by virtue of the contract and acceptance of such payment is acknowledged as a release of the Owner from any and all claims arising under or by virtue of the contract This day of 20 L S Signature Title Firm COUNTY OF STATE OF Personally before me the undersigned authority appeared NAME OF PERSON SIGNING THE AFFIDAVIT who is known to me to be an official of the firm of i NAME OF CONTRACTOR and who after being duly sworn stated on his oath that he had read the above statement and that the same is true and correct Notary Public My Commission expires This day of 20 DBB CONSTRUCTION CONTRACT SECTION 7
187. luding wiring diagrams for interlock and terminal to terminal control wiring clearly indicating factory installed and field installed wiring associated with all equipment Wiring diagrams shall show all point to point wiring connections between all components of the control system No devices conduit or wiring shall be installed until Contractor has received approved shop drawings from the Architect Engineer Field quality control test reports Operation and Maintenance Data For HVAC instrumentation and control system submit under the provisions of Section 15051 QUALITY ASSURANCE Installer Qualifications Automatic control system manufacturer s authorized representative who is trained and approved for installation of system components required for this Project Electrical Components Devices and Accessories Listed and labeled as defined in NFPA 70 Article 100 by a testing agency acceptable to authorities having jurisdiction and marked for intended use Comply with ASHRAE 135 for DDC system components Complete control system and submittal data for this system shall be prepared and provided by a factory authorized representative of the Control System Manufacturer with a minimum of five 5 years experience in control systems of similar size and complexity The control system manufacturer must be able to demonstrate 5 similar projects with control systems operating successfully in the field for a minimum of five years The control
188. luid flow rate and air patterns at the terminal equipment such as to reduce fan speed or adjust a damper Balance To proportion flows within the distribution system including submains branches and terminals according to indicated quantities TAB Testing adjusting and balancing Test A procedure to determine quantitative performance of systems or equipment Testing Adjusting and Balancing TAB Firm The entity responsible for performing and reporting TAB procedures TESTING ADJUSTING AND BALANCING 15950 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 1 5 1 6 1 7 1 8 A SUBMITTALS Qualification Data Within 45 days from Contractor s Notice to Proceed submit 4 copies of evidence that TAB firm and this Project s TAB team members meet the qualifications specified in Quality Assurance Article Sample Report Forms Submit four sets of sample TAB report forms Contract Documents Examination Report Within 45 days from Contractor s Notice to Proceed submit 4 copies of the Contract Documents review report as specified in Part 3 Certified Final TAB Reports Submit four copies of reports prepared as specified in this Section on approved forms certified by TAB firm QUALITY ASSURANCE TAB Firm Qualifications Engage a TAB firm certified by either AABC or NEBB Test and balancing by non AABC or non NEBB firms is not allowed TAB Report Forms Use standar
189. measurements are as shown on Drawings B Electrical boxes are shown on Drawings in approximate locations unless dimensioned Install at location required for box to serve intended purpose Include installation within 10 feet of location shown BOXES 16130 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia PART 2 PRODUCTS 2 1 OUTLET BOXES A Sheet Metal Outlet Boxes ANSI NEMA OS 1 galvanized steel B Luminaire and Equipment Supporting Boxes Rated for weight of equipment supported include 1 2 inch male fixture studs where required C Cast Boxes NEMA FB 1 Type FD cast feralloy Provide gasketed cover by box manufacturer Provide threaded hubs 2 2 PULL AND JUNCTION BOXES A Sheet Metal Boxes NEMA OS 1 galvanized steel PART 3 EXECUTION 3 1 INSTALLATION A Install electrical boxes as shown on Drawings and as required for splices taps wire pulling equipment connections and compliance with regulatory requirements B Mounting heights as specified in other sections shall be to the bottom of the outlet C Install electrical boxes to maintain headroom and to present neat mechanical appearance D Install pull boxes and junction boxes above accessible ceilings and in unfinished areas only E Install boxes to preserve fire resistance rating of partitions and other elements F Align adjacent wall mounted outlet boxes for switches thermostats and similar devices
190. midification requirements and 70 F for heating requirements for areas occupied by the Owner ROOM NUMBERS The room numbers indicated on the Contract Documents were provided by the Architect to assist in identifying spaces during construction These room numbers may not necessarily be the Owner s final choice of room numbers The contractor shall obtain from the Owner the final choice of room numbers and shall use these numbers wherever required For example room numbers are used in programming of control systems and shall match the Owner s final choice CONTRACTOR REQUESTS FOR ELECTRONIC COPIES OF CAD DRAWINGS If the Contractor requests to obtain electronic copies emailed files or disc files of CAD drawings from Andrews Hammock amp Powell Inc AH amp P this paragraph shall describe the conditions for this action to take place 1 The Contractor must obtain written permission from the Architectural client that the Architect does not object to providing electronic copies when AH amp P is hired by an Architect to perform Engineering services 2 If AH amp P is prime party i e not hired by an Architect but hired by the client directly Contractor must obtain permission of AH amp P to obtain electronic copies BASIC MECHANICAL MATERIALS AND METHODS 15050 13 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 3 If approval by Architect or Engineer as noted above is obtain
191. miscellaneous metal in the mechanical room s shall be cleaned and painted under the Architectural Painting Section of the specifications In the event that there is no Architectural painting section painting shall be done under this division of the specifications in accordance with the requirement of ANSI A13 1 81 CLEANING The Contractor shall maintain the site reasonably clean and free of excessive debris and leftover materials at all times All trash and debris shall be hauled from the job site on a daily basis for disposal Prior to testing and adjusting equipment shall be clean and free of any construction debris and litter Contractor shall meet all contractual requirements as related to site cleanliness including dust control HAZARDOUS MATERIAL ALERT FOR NEW MATERIALS Contract Materials which are scheduled to be incorporated into the work under this Contract shall first either be certified by the Manufacturer to be free of hazardous materials or be inspected and tested by accredited laboratories and certified to be free of hazardous material content e g Asbestos PCBs lead etc in accordance with OSHA EPA and AHERA Rules and 1982 School Rules GENERAL DEMOLITION General Demolition shall include the wrecking and removal of certain mechanical components See drawings for extent of demolition Disposal All equipment shall be carefully removed during demolition and stored in location as directed by Owner Contractor shall
192. n section at first instance of use Trade association names and titles of general standards are frequently abbreviated Singular words will be interpreted as plural and plural words will be interpreted as singular where applicable and where full context of the Contract Documents so indicates Refer to abbreviations at the end of this section DRAWING SYMBOLS General Except as otherwise indicated graphic symbols used on drawings are those symbols recognized in the construction industry for purposes indicated Where not otherwise noted symbols are defined by Architectural Graphic Standards published by John Wiley amp Sons Inc seventh edition Graphic symbols used on mechanical electrical drawings are generally aligned with symbols recommended by ASHRAE supplemented by more specific symbols where appropriate as recommended by other recognized technical associations including ASME ASPE IEEE and similar organizations Refer instances of uncertainty to Architect for clarification before proceeding INDUSTRY STANDARDS General Applicability of Standards Applicable standards of construction industry have same force and effect and are made a part of Contract Documents by reference as if copied indirectly into Contract Documents or as if published copies were bound herewith l Referenced standards referenced directly in Contract Documents or by governing regulations have precedence over non referenced standards which are recognized in i
193. n designated to remain and to provide for the public safety during all demolition operations All requirements of this specification apply only to the Contractor unless specifically noted to apply to the Owner Contractor shall transport all equipment indicated to be removed and all associated debris to an approved waste facility Contractor shall pay all fees associated with the disposal of removed equipment and debris Damage to Existing Construction In the event of damage to any construction and or equipment not scheduled to be demolished or removed the Contractor shall immediately make all repairs and replacements necessary to the approval of the Architect and at no additional cost to the Owner Burning On site burning will not be permitted Asbestos It is the Owner s responsibility to detach from the building and remove from the site all materials containing asbestos in areas where it is disturbed under this contract Should the Contractor find that the Owner has not removed adequate amounts within the contract area or previously unknown asbestos containing materials he shall cease work immediately in that area and notify the Owner The Owner will make provision for its removal before the Contractor continues the work JOB CONDITIONS Occupancy Owner will be continuously occupying areas of the building immediately adjacent to areas of demolition Conduct demolition work in manner that will minimize need for disruption of Owner s normal
194. n full to the Contractor and its Subcontractors Suppliers and Trade Contractors for all costs and markups directly and indirectly attributable to the changes ordered herein and for all delays or time related costs thereto and for any acceleration costs for performance of changes within the time stated and to be completed by the Material Completion and Occupancy Date and for any claims related thereto against the Owner and the Design Professional and design consultants APPROVED AND AGREED BY CONTRACTOR RECOMMENDED FOR OWNER S ACCEPTANCE LEGAL GC Firm Name DESIGN PROFESSIONAL Andrews Hammock amp Powell Inc By By Print Name Title Print Name Title Date approved by Contractor Date approved by Design Professional APPROVED AND AGREED BY USING AGENCY APPROVED AND AGREED BY OWNER GEORGIA COLLEGE amp STATE UNIVERSITY BOARD OF REGENTS OF THE UNIVERSITY By By Print Name Title Print Name Title Date approved by Using Agency Date approved by Owner 18 DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS CHANGE ORDER FORMAT CHANGE ORDER FORMAT Force Account or Indeterminate Units CHANGE ORDER No Project Name Project Number Owner 1 Submission of this Change Order for consideration was authorized by letter from the Owner dated 20_ Incumbrance Record No 2 The changes hereinafter described are applicable to the Contract for the construction of the above referenced Project and amend the Contrac
195. nd have an expected useful life of years from the date of this Certificate and that my observations of the construction confirm these expectations See Exhibit J of Design Professional Contract Name Design Professional Date CERTIFICATE OF THE USING AGENCY OR OWNER I certify that to the best of my knowledge information and belief that the cost of the real property covered by this project to the boundaries on the final Site Plan was and the cost of additional government supplied furnishings and equipment acquired for this Project was Name Title Date 29 DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SUPPLEMENTARY GENERAL CONDITIONS SUPPLEMENTARY GENERAL CONDITIONS None at time of Contract Execution SECTION F Special Conditions F 01 OWNER A Wherever the term Owner appears in these specifications it shall mean Georgia College amp State University Agent for the Board of Regents of the University System of Georgia 270 Washington Street S W Atlanta Ga 30334 F 02 OWNERS REPRESENTATIVE ON CAMPUS A The Owners representative on campus is Mr John Webb Assistant Director of O amp M Plant Operations Georgia College amp State University Milledgeville Ga or whomever said shall so designate for project F 03 ARCHITECT A Wherever the term Architect appears in the contract documents it is intended to identify the firm or individual responsible for the design a
196. nd offsets at no additional cost to the Owner Coordinate with other trades existing building conditions etc for space available and relative location of piping appurtenances etc Pipe appurtenances etc locations shown on drawings shall be altered by Contractor where required to avoid interference and clearance difficulties Install piping in concealed locations unless otherwise indicated and except in equipment rooms and service areas Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls Diagonal runs are prohibited unless specifically indicated otherwise Route piping in an orderly manner Install piping above accessible ceilings to allow sufficient space for ceiling panel and lay in light fixture removal Install piping to conserve space and not interfere with use of space HYDRONIC PIPING 15181 11 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia E F T Q Fa Install piping to permit valve servicing Install piping at indicated slopes Install piping free of sags and bends Install fittings for changes in direction and branch connections Install piping to allow application of insulation Select system components with pressure rating equal to or greater than system operating pressure Install groups of pipes parallel to each other at common elevations spaced to permit applying ins
197. nd or contract administration of the work called for in the contract documents The work performed under this contract does not require the services of a registered architect therefore wherever the term Architect appears in the contract document it shall mean Mr John Webb Assistant Director of Plant Operations Georgia College amp State University Milledgeville Ga or whomever said shall so designate for project F 04 BUILDING AND GROUNDS PROTECTION The contractor shall confer with the Director of Plant Operations for Georgia College and State University for the location of any existing utilities Damage to existing utilities or sidewalks will be repaired at the Contractor s expense if broken by wheeled equipment Ruts in grassed areas shall be filled in and new grass replanted Shrubs walls windows and any permanent structure that is damaged by equipment or material shall be replaced or repaired to original condition before job is considered complete F 05 INSPECTION OF EXISTING FACILITIES PRIOR TO COMMENCING WORK A The contractor shall give notice in writing to the Architect prior to commencing work for the purpose of arranging for a joint inspection by a the Architect b the Contractor c the Using Agency and d the authorized representative of the Owner during the course of which inspection the three parties to the joint inspection shall prepare a schedule identifying and showing the location of any damage to
198. nd the Owner has terminated the Contractor s right to complete the Contract the Surety shall promptly perform this bond agreement in accordance with its terms and conditions If Surety chooses to investigate Owner shall cooperate with the Surety in its investigation and shall make all public project records available for inspection by Surety at no cost to Owner It shall be the duty of the Surety to give an unequivocal notice in writing to the Owner within twenty five 25 days after receipt of such a declaration of default of the Surety s election to either remedy the default or defaults promptly or to perform the Contract promptly time being of the essence In said notice of election the Surety shall indicate the date on which the remedy or performance will commence and it shall then be the duty of the Surety to give prompt notice in writing to the Owner immediately upon completion of a the remedy and or correction of each default b the remedy and or correction or each item of condemned work c the furnishing of each omitted item of work and d the performance of the contract The Surety shall not assert its Principal as justification for its failure to give notice of election or for its failure to promptly remedy the default or defaults or perform the Contract 3 It is expressly agreed by the Principal and the Surety that the Owner if he desires to do so is at liberty to make inquiries at any time of subcontractors laborers materialmen
199. nduct of the parties nor by custom of the trade No changes to this Contract will be binding on either party hereto unless such change is properly authorized in writing in accordance with Section 3 Part 2 of the General Conditions Remainder of Page Intentionally Left Blank Signatures Begin on Next Page CONTRACT 3 DBB FORM OF CONTRACT PROJECT NUMBER ACRONYM VERSION 07 01 201 1 XX XX XXXX CONSTRUCTION CONTRACT IN WITNESS WHEREOF the parties hereto have executed this Contract the day and year first written above LEGAL GC FIRM NAME Contractor ATTEST L S By L S SECRETARY PRESIDENT SEAL OVER SIGNATURE If not a corporation signature must be notarized APPROVED USING AGENCY By PRINT NAME AND TITLE INSTITUTION NAME WITNESS PRINT NAME TITLE BOARD OF REGENTS OF THE UNIVERSITY SYSTEM OF GEORGIA OWNER BY L S JIM JAMES VICE CHANCELLOR FOR FACILITIES WITNESS SHEREE WILDER SRADER DIRECTOR OF CONTRACTS amp SERVICES Attachments 1 General Conditions and Forms 2 Supplementary General Conditions CONTRACT 4 DBB FORM OF CONTRACT PROJECT NUMBER ACRONYM VERSION 07 01 2011 XX XX XXXX BID REQUIREMENTS INVITATION TO BID BID REQUIREMENTS INVITATION TO BID The Owner will receive sealed bids from Contractors in Georgia College Facilities Management 2nd Floor Conference Room Miller Court 302 North Wayne Street Georgia College amp State University Milledgeville Georgia 310
200. ndustry for applicability to work 2 Non referenced standards recognized in the construction industry are hereby defined except as otherwise limited in Contract Documents to have direct applicability to the work and will be so enforced for performance of the work 01095 4 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 1 5 1 6 B Publication Dates Except as otherwise indicated where compliance with an industry standard is required comply with standard in effect as of date of Contract Documents Copies of Standards Provide where needed for proper performance of the work obtain directly from publication sources If the Contractor observes any acronyms or abbreviations in the Contract Documents of which he is not positively sure of their meaning contact Architect for explanation PRIOR TO BIDDING GOVERNING REGULATIONS AUTHORITIES General The procedure followed by Architect has been to contact governing authorities where necessary to obtain information needed for the purpose of preparing Contract Documents recognizing that such information may or may not be of significance in relation to Contractor s responsibilities for performing the work Contact governing authorities directly for necessary information and decisions having a bearing on performance of the work SUBMITTALS Permits Licenses and Certificates For the Owner s records submit copies of permits licenses
201. ng careful not to compress it more than 25 at the corners butting insulation and overlapping facing jacket 2 minimum at all joints Two inch 2 thick insulation shall have a minimum R5 3 at 25 compression Where scheduled provide 3 thick insulation with installed R8 0 Staple the overlap with outward clinching staples a maximum of 3 on centers For ducts over 30 wide additionally support insulation on bottom of horizontal ducts and sides of vertical ducts with rows of welded or adhered clips and washers on not more than 18 centers Seal all joints and clips with pressure sensitive FSK tape Seal all penetrations such as at duct supports and all terminations of insulation with pressure sensitive FSK tape When blanket insulation is used on storm drain system blanket shall cover roof drain body vertical pipe from roof drain body to horizontal piping and all horizontal piping Install similar to duct systems MECHANICAL INSULATION 15080 2 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia D 2 3 A B 2 4 A 2 5 A I7 Cellular Glass Insulation Molded rigid sectional 8 Ib minimum density cellular glass insulation Seal all joints with flexible joint sealer Secure insulation with 3 4 wide aluminum bands Finish insulation with white vapor barrier coating reinforced with glass cloth ANSI ASTM C552 FITTING INSULATION MATERIALS Type P1 Precut fiberglass insu
202. ng Systems a b 15 Division 15 Mechanical i Building a b C Infrastructure i oop 16 Division 16 Electrical i Building oom 25 DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS APPLICATION FOR PAYMENT FORM SECTION 7 FORMS APPLICATION FOR PAYMENT FORM ii Infrastructure 17 Division 17 Special Inspections i Building a b c ii Infrastructure iii Documents B Plus or minus total previously approved C O s incl NOTES The following breakdowns must be accomplished in order to comply with Government Accounting requirements Upon completion of the Project the final Application for Payment must show all divisions and sections and a Final Certification of Costs for Capital Asset Accounting completed and submitted with the Application for Final Payment z Report Items in each division by CSI division and such other breakdown as is useful to the Contractor or Contract Compliance Specialist EN These items must be broken down into 2 categories i Building and ii Infrastructure reported by specification section Infrastructure for these purposes is defined as everything outside a line five feet from the building footprint iro These items must be broken down into 2 categories i fixed equipment amp furnishings and ii Moveable equipment amp furnishings and reported by specification section KEU Division 15 Mechanical
203. nless specifically detailed language written into the Contract Documents not by way of reference to an industry standard clearly indicates that a less stringent requirement is to be fulfilled Refer apparently equal but different requirements and uncertainties as to which level of quality is more stringent to Architect for a decision before proceeding Contractor s Options Except for overlapping or conflicting requirements where more than one set of requirements are specified for a particular unit of work option is intended to be Contractor s regardless of whether specifically indicated as such Minimum Quality Quantity In every instance quality level or quantity shown or specified is intended as minimum for the work to be performed or provided Except as otherwise specifically indicated actual work may be either comply exactly with that minimum within specified tolerances or may exceed that minimum within reasonable limits In complying with requirements indicated numeric values are either minimums or maximums as noted or as appropriate for context of requirements Refer instances of uncertainty to Architect for decision before proceeding 01095 3 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 1 3 1 4 M Specialist Assignments In certain instances specification text requires or at least implies that specific work be assigned to specialist or expert entities who must b
204. ntifies each system e g cold water piping supply duct etc and the submitted material thickness and finish for each system Submit proof of three years minimum experience in insulation installation QUALITY ASSURANCE Insulation and related materials shall meet the requirements of NFPA 90A Fire Test Response Characteristics Insulation and related materials shall have fire test response characteristics indicated as determined by testing products per ASTM E 84 Factory label insulation and jacket materials and adhesive mastic and cement material containers with appropriate markings of applicable testing and inspecting agency l Insulation Installed Indoors Flame spread index of 25 or less and smoke developed index of 50 or less 2 Insulation Installed Outdoors Flame spread index of 75 or less and smoke developed index of 150 or less Applicator Company specializing in insulation application with three years minimum experience MECHANICAL INSULATION 15080 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 1 5 A B GENERAL INSULATION NOTES Any HVAC equipment which is factory insulated and which has sweating condensation forming on the equipment while operating under design conditions shall be replaced or field insulated by the contractor until the condensation is eliminated Piping and ductwork is considered concealed for purposes of this Specification
205. ntrol positions valve position indicators fan speed control levers and similar controls and devices to show final settings Take and report testing and balancing measurements in inch pound IP units SAFETY CONTROLS DATA Provide unit designation or location with description of device and setpoint Activate and verify operation of all safety devices Smoke detectors shall be activated with smoke Test button activations is not acceptable GENERAL PROCEDURES FOR HYDRONIC SYSTEMS Prepare test reports with pertinent design data and number in sequence starting at pump to end of system Check the sum of branch circuit flows against approved pump flow rate Correct variations that exceed plus or minus 5 percent Prepare schematic diagrams of systems as built piping layouts Prepare hydronic systems for testing and balancing according to the following in addition to the general preparation procedures specified above 1 Open all manual valves for maximum flow TESTING ADJUSTING AND BALANCING 15950 4 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 3 5 3 6 3 7 2 Check expansion tank pre charge pressure 3 Check makeup water station pressure gage for specified pressures 4 Set differential pressure control valves at the specified differential pressure Do not set at fully closed position when pump is positive displacement type unless several terminal valves are kept open
206. o convince a reasonable person beyond all doubt To be approved a proposed product must also meet or exceed all express requirements of the Contract Documents d Issuance of Addenda f the Design Professional approves the submittal an addendum will be issued to all prospective bidders indicating the approval of the additional product s Issuance of an addendum is a representation to all bidders that the Design Professional in the exercise of his professional discretion established that the product submitted for approval is acceptable and meets or exceeds all express requirements If a submittal is initially rejected by the Design Professional but determined to be acceptable to Design Professional after a conference with the Owner an addendum covering the said submittal will be issued prior to the opening of bids The successful bidder may furnish no products of any trade names brand names or manufacturers names except those designated in the Contract Documents unless approvals have been published by addendum in accordance with the above procedure Oral approvals of products are not valid e Conference with the Owner Any party who alleges that rejection of a submittal is the result of bias prejudice caprice or error on the part of the Design Professional may request a conference with a representative of the Owner provided that the request for said conference submitted in writing shall have reached the Owner at least six days prior to the
207. oad served E Panelboard Directories 1 For all existing panelboards provide neatly typewritten directory of each device usage 2 Locate directory inside panelboard door Protect directory with clear plastic 3 Existing panelboard directories shall be utilized to identify loads in new panel schedules END OF SECTION 16195 ELECTRICAL IDENTIFICATION 16195 2 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 16440 DISCONNECT SWITCHES PART 1 GENERAL 1 1 A 1 2 A B C 1 3 A 1 4 A B 1 5 A 1 6 A RELATED DOCUMENTS Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section WORK INCLUDED Disconnect switches Fuses Enclosures RELATED WORK Section 16195 Electrical Identification Nameplates REFERENCES ANSI UL 198E Class R Fuses NEMA KS 1 Enclosed Switches SUBMITTALS Submit product data under provisions of Section 16010 SPARE PARTS Fuses Furnish three of each size and type to Owner PART 2 PRODUCTS 2 1 A B DISCONNECT SWITCHES Nonfusible Switch Assemblies NEMA KS 1 Type HD quick make quick break load interrupter enclosed knife switch with externally operable handle interlocked to prevent opening front cover with switch in ON position Cover interlock shall be defeatable Hand
208. on SUMMARY This Section includes TAB to produce design objectives for the following Hydronic Piping Systems Steam systems Verifying that automatic control devices are functioning properly Reporting results of activities and procedures specified in this Section E pas SUBCONTRACTOR COORDINATION Testing Adjusting and Balancing TAB work shall be performed by NEBB AABC agent as described in this section of the specifications however all devices that the TAB agent will be required to perform work on described in this section shall be provided by the Contractors s Division 15 mechanical sub contractor s These devices include but are not limited to balancing dampers Petes plugs re insulation of ductwork after duct test holes are drilled by TAB agent adjustable sheaves pulleys belts balance valves etc and the labor to install these devices Sub contractor s providing the Division 15 HVAC systems must provide labor to support the TAB Agent The mechanical systems shall be fully operational and ready for TAB work to begin a minimum of four weeks prior to the Contractual date of Substantial Completion Additionally the Division 15 Contractor s shall furnish a qualified technician s mechanic s to assist the TAB agent in the performance of his duties until all work specified herein is accomplished The Division 15 sub contractor s shall correct all deficiencies found by the TAB agent DEFINITIONS Adjust To regulate f
209. on the testing and balancing shall be considered incomplete and shall be rejected TAB firm shall recheck all measurements and make adjustments Revise the final report and balancing device settings to include all changes and resubmit the final report Request a second final inspection If the second final inspection also fails Owner shall contract the services of another TAB firm to complete the testing and balancing in accordance with the Contract Documents and deduct the cost of the services from the final payment TESTING ADJUSTING AND BALANCING 15950 8 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 3 13 ADDITIONAL TESTS A Provide field test of non CTI towers in accordance with CTI towers in accordance with CTI ATC 105 See previous paragraph Cooling Towers in the section and also see Section 15714 of the specifications B Seasonal Periods If initial TAB procedures were not performed during near peak summer and winter conditions perform additional testing inspecting and adjusting during near peak summer and winter conditions 3 14 REPORT A Provide four copies of the Test and Balance report to the Architect Engineer by the earlier of the following two dates l A minimum of 48 hours prior to the semi final on site project construction site review by the Architect Engineer 2 Four weeks prior to the date the facility is scheduled to be turned over to the Owner B
210. on Centrifugal Pumps 3 Pump Specialty Fittings a Suction Diffusers b Triple Duty Valves SUBMITTALS Product Data Include certified performance curves and rated capacities operating characteristics dimensions furnished specialties final impeller dimensions motor efficiency and insulation winding classification and accessories for each type of product indicated Indicate pump s specified operating point on curves For all pumps that are used in variable speed applications insure motor is submitted showing Class F winding insulation and insure coupling is submitted with a statement by the manufacturer that is rated for variable speed duty Submit data on pump specialty fittings Submit under provisions of Section 15050 Operation and Maintenance Data For pumps submit operation and maintenance data under provisions of Section 15051 Minimum Flow Data Pump manufacturer shall indicate the minimum allowable flow rate GPM for loop water pumps in the submittal so the control Contractor can maintain this flow rate when programming VFD QUALITY ASSURANCE Source Limitations Obtain hydronic pumps through one source from a single manufacturer Product Options Drawings indicate size profiles and dimensional requirements of hydronic pumps and are based on the specific system indicated Refer to Division 1 Section Product Requirements HYDRONIC PUMPS 15185 1 Heating Upgrade for Atkinson Hall Georgia College amp State Unive
211. on Hall Georgia College amp State University Milledgeville Georgia 1 4 1 5 B A B C D A B Operation and Maintenance Data for Air Control Devices And Hydronic Specialties Submit operation and maintenance data under provisions of Section 15051 QUALITY ASSURANCE Steel Support Welding Qualify processes and operators according to AWS D1 1 D1 1M Structural Welding Code Steel Welding Qualify processes and operators according to ASME Boiler and Pressure Vessel Code Section IX 1 Comply with provisions in ASME B31 Series Code for Pressure Piping Contractor shall certify that each welder has passed AWS qualification tests for welding processes involved and that certification is current 3 Conform to applicable state labor regulations ASME Compliance Comply with ASME B31 9 Building Services Piping for materials products and installation Safety valves and pressure vessels shall bear the appropriate ASME label Fabricate and stamp air separators and expansion tanks to comply with ASME Boiler and Pressure Vessel Code Section VIII Division 1 All grooved joint couplings fittings valves and specialties shall be the product of a single manufacturer Grooving tools shall be of the same manufacturer as the grooving components DELIVERY STORAGE AND HANDLING Deliver products to site under provisions of Section 15050 Store and protect products under provisions of Section 15050 PART 2
212. on Name Physical Address NO P O Boxes City State Zip Attention Project POC Title Phone Number Project POC Phone Facsimile Number Project POC Fax Email Project POC Email Address DESIGN PROFESSIONAL LEGAL DP Firm Name Physical Address NO P O Boxes City State Zip Attention DP POC Title Phone Number DP POC Phone Facsimile Number DP POC Fax Email DP POC Email Address 7 Scope Of The Work The Contractor shall furnish all the materials perform all of the Work and do all things required by the Contract Documents 8 Schedule and Completion The Pre commencement Phase Services to be performed under this Contract shall commence upon the Effective Date of the Contract and be completed within 60 days thereafter Activities on the Site shall commence on the date specified in the Proceed Order and shall be materially complete in accordance with established Milestones and not later than the Material Completion and Occupancy Date 9 Periodic Progress Payments The Owner shall make progress payments less retainage as set forth in Section 4 of the General Conditions 10 Payment for Material Completion The Contractor may request payment of the remaining contract balance including retainage less amounts credited the Owner or incurred as liquidated damages and less amounts withheld for CONTRACT 2 DBB FORM OF CONTRACT PROJECT NUMBER ACRONYM VERSION 07 01 2011 XX XX XXXX CONSTRUCTION CONTRACT the Punchlist by reason of Min
213. on the Contract Drawings Give particular attention to concealed elements that would be difficult to measure and record at a later date 1 Mark record sets with red erasable pencil use other colors to distinguish between variations in separate categories of the work 2 Mark new information that is important but was not shown on Contract Drawings or Shop Drawings 3 Note related Change Order numbers where applicable 4 Organize record drawing sheets into manageable sets bind with durable paper cover sheets and print suitable titles dates and other identification on the cover of each set 5 As builts shall be submitted to the architect engineer for review of the mechanical plumbing and fire protection as installed upon completion of the work Changes on as builts are to be shown using standard engineering drafting practices Freehand drawn changes will not be accepted CONTRACTOR GUARANTEE All equipment and materials furnished and or installed under this section and all work performed under this section of specifications shall be guaranteed to be free of defective materials and workmanship for a period of one year unless a longer period is specified elsewhere after date of substantial completion Upon notice of failure of any part of the guaranteed equipment during the guarantee period the affected part or parts shall be promptly replaced with new parts by the Contractor at no additional cost to the Owner All labor required
214. onditions and Division 1 Specification Sections apply to this Section SECTION INCLUDES Mechanical Closeout Document Requirements which are specifically applicable to all Division 15 Sections in addition to the requirements of Division 1 General Requirements Individual Plumbing Fire Protection and HV AC Closeout document requirements Record Document Submittals As Builts Contractor Guarantee Manufacturer Warranties Operating Instructions and Training Operation and Maintenance O amp M Manuals Maintenance and Service Completion of Work Service Contracts Manufacturer s Field Services and Start up by Factory Authorized Personnel O amp M Instruction Form Spare Parts RELATED WORK All Division 15 sections RECORD DOCUMENT SUBMITTALS AS BUILTS The contractor shall be required to maintain a clean undamaged set of blue or black line white prints of contract drawings and shop drawings MECHANICAL CLOSEOUT DOCUMENT REQUIREMENTS 15051 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 1 5 1 6 B The mechanical contractors plumbing HVAC and Fire Protection shall mark the set to show the actual installation where the installation varies substantially from the work as originally shown Mark whichever drawing is most capable of showing conditions fully and accurately where Shop Drawings are used record a cross reference at the corresponding location
215. ons Obtain permission of Architect Engineer before proceeding Install items so that there are no obstructions e g pipes conduits etc blocking service panels of the equipment or preventing the removal of the equipment SEQUENCING AND SCHEDULING Contractor shall coordinate work so as to avoid conflicts with other work in progress BASIC MECHANICAL MATERIALS AND METHODS 15050 5 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 1 8 B Work shall progress in a manner that will not interfere with other trades The Division 15 Contractor shall have coordination meetings with all other Contractors to insure that all systems installed in share areas e g ceiling plenums mechanical rooms etc are coordinated and installed to insure proper fit and access All costs required for the coordination of the work between trades shall be borne solely by the Contractor Contractor shall provide confirmation letters from the factory not from the contractor to the Owner that long lead items have been ordered Long lead items are defined as items having longer than six week fabrication schedules See Section 01100 Summary for additional requirements Phasing Contractor shall conform to phasing plans as stated in the Architectural contract documents ACCEPTABLE PRODUCTS Basis of Design Model numbers indicated herein or shown on the drawings are the Basis of Design and are based on
216. oop Retrofit at Autry State Prison Mitchell County Georgia H Route exposed conduit parallel and perpendicular to walls I Route conduit installed above accessible ceilings parallel and perpendicular to walls J Do not install conduits in slab K Maintain adequate clearance between conduit and piping L Maintain 12 inch clearance between conduit and surfaces with temperatures exceeding 104 degrees F M Cutconduit square using saw or pipecutter de burr cut ends N Bring conduit to shoulder of fittings fasten securely O Use conduit hubs to fasten conduit to sheet metal boxes in damp and wet locations and to cast boxes P Install no more than equivalent of four 90 degree bends between boxes Q Avoid moisture traps provide junction box with drain fitting at low points in conduit system R Provide insulating bushings on all RGS and IMC conduits entering wireways pullboxes cabinets panelboards etc S Use Push Pennies to protect installed conduit against entrance of dirt and moisture T Ground and bond conduit under provisions of Section 16170 U Where connections to free standing equipment in excess of 18 from structure are required a vertical minimum size 3 4 rigid conduit secured to ceiling and floor shall be utilized with wiring into this conduit by means of a rigid connection to a conduit body and wiring from this conduit by means of a conduit body with a flexible conduit connection to equipment V Fl
217. operations Provide minimum of 72 hours advance notice to Owner of demolition activities which will severely impact Owner s normal operations There are personnel in this building who require use of the elevator to access their offices Contractor shall work over school break to make elevator functional before faculty returns 02060 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia B C D E Partial Demolition and Removal Items indicated to be removed but of salvageable value to Contractor may be removed from structure as work progresses Transport salvaged items from site as they are removed l Provide protective measures as required to provide free and safe passage of Owner s personnel students vendor s and general public around the work area 2 Protect from damage existing finish work that is to remain in place and becomes exposed during demolition operations Traffic Conduct selective demolition operations and debris removal in a manner to ensure minimum interference with roads streets walks and other adjacent occupied or used facilities 1 Do not close block or otherwise obstruct streets walks or other occupied or used facilities without written permission from authorities having jurisdiction Provide alternate routes around closed or obstructed traffic ways if required by governing regulations Utility Services Maintain existing utilities indicated to r
218. or Items or Permitted Incomplete Work See Paragraph 6 5 3 2 Payment for Material Completion shall be made by a check payable jointly to the Contractor and Surety and shall be mailed to the Surety 11 Final Payment Final Payment shall be made within ten days of receipt of the final payment application as set forth in Section 6 Part 2 of the General Conditions provided that all other requirements of the Contract shall have been met in full 12 The Contract Documents This Contract together with the Bidding Documents and the Bid shall constitute the Contract Documents for the Project 13 Bonds The Contractor shall furnish both a performance bond and a payment bond and shall pay the premiums thereon as a Cost of the Work The Performance Bond shall guarantee the full performance of the Contract 14 Full Performance The Owner and the Contractor hereby agree to the full performance of the Contract Documents 15 Applicable Law This Contract and all rights privileges and responsibilities shall be interpreted and construed according to the laws of the State of Georgia 16 No Conflict Of Interest The Contractor covenants that it presently has no interest and shall not acquire any interest direct or indirect that would conflict in any manner or degree with the performance required under this Contract The Contractor further covenants that in the performance of this Contract it shall neither contract with nor employ any person having any
219. orgia PART 3 EXECUTION 3 1 EXAMINATION A Verify that conduit systems are complete B Verify that mechanical work likely to damage wire has been completed C Verify that construction has been protected from weather 3 2 PREPARATION A Completely and thoroughly swab raceway before installing wire 3 3 WIRING METHODS A Use wiring methods as specified and indicated on Drawings 3 4 INSTALLATION A Install products in accordance with manufacturers instructions B Use conductor not smaller than 12 AWG for power and lighting circuits C Pull all conductors into raceway at same time D Use suitable wire pulling lubricant for building wire 4 AWG and larger E Protect exposed cable from damage F Neatly train and lace wiring inside boxes equipment and panelboards using Thomas and Betts Ty raps G Clean conductor surfaces before installing lugs and connectors H Make splices taps and terminations to carry full ampacity of conductors with no perceptible temperature rise I Where compression connectors are used for conductor splices and taps tape uninsulated conductors and connector with electrical tape to 150 percent of insulation rating of conductor J Use terminal lugs for connecting all conductors and for all multiple connections to terminals 3 5 INTERFACE WITH OTHER PRODUCTS A Identify wire and cable under provisions of Section 16195 BUILDING WIRE AND CABLE 16123 3 Heating Upgrade for Atkinson Hall Geo
220. orgia College amp State University Milledgeville Georgia C In lieu of manufactured copper tee fittings the Contractor has the option of using mechanically formed tee connections Mechanically formed tees shall conform to the following 1 Mechanically extracted collars shall be formed in a continuous operation consisting of drilling a pilot hole and drawing out the tube surface to form a collar having a height of not less than three times the thickness of the tube wall The collaring device shall be fully adjustable as to insure proper tolerance and complete uniformity of the joint 2 The branch shall be notched to conform with the inner curve of the run tube and dimpled to insure penetration of the branch tube into the collar is of sufficient depth for brazing and that the branch tube does not obstruct the flow in the mainline tube Dimples shall be in line with the run of the tube and visible through the braze All joints shall be brazed with BCUP 2 braze The method shall be provided by T drill7 PART 3 EXECUTION 3 1 A B C 3 2 A w Q D 3 3 A B PREPARATION Ream pipe and tube ends Remove burrs Remove scale and dirt on inside and outside before assembly Prepare piping connections to equipment with flanges or unions PIPE AND FITTING APPLICATIONS Transition and special fittings with pressure ratings at least equal to piping rating may be used in applications below unless otherwise in
221. orward notice of the receipt of any affidavit from a sub subcontractor to name of subcontractor or sub subcontractor with whom such sub subcontractor has privity of contract Sub subcontractor hereby attests that its federal work authorization user identification number and date of authorization are as follows Federal Work Authorization User Identification Number Date of Authorization Name of Sub subcontractor Heating Upgrade for Atkinson Hall Name of Project Board of Regents of the University System of Georgia For the use and benefit of Georgia College amp State University Name of Public Employer hereby declare under penalty of perjury that the foregoing is true and correct Executed on 20 in city state Signature of Authorized Officer or Agent Printed Name and Title of Authorized Officer or Agent SUBSCRIBED AND SWORN BEFORE ME ON THIS THE DAY OF 20 NOTARY PUBLIC My Commission Expires DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS NON INFLUENCE AFFIDAVIT NON INFLUENCE AFFIDAVIT COUNTY OF STATE OF do solemnly swear on my oath that as to the Contract dated 20 1 between NAME OF CONTRACTOR and the Owner have no knowledge of the exertion of any influence or the attempted exertion of any influence on the firm on behalf of which this affidavit is made in any way manner or form in the purchase of materials equipment or other items
222. outdoor air temperature PROCEDURES FOR STEAM SYSTEMS Measure and record upstream and downstream pressure of each piece of equipment Measure and record upstream and downstream steam pressure of pressure reducing valves Check the setting and operation of automatic temperature control valves self contained control valves and pressure reducing valves Record the final setting Check the settings and operation of each safety valve Record settings Verify the operation of each steam trap TEMPERATURE CONTROL VERIFICATION Record thermostat sensor controller settings and note variances between set points and actual measurements TESTING ADJUSTING AND BALANCING 15950 5 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia B 3 8 3 9 Check free travel and proper operation of control devices such as damper and valve operators Check the sequence of operation of control devices Note the speed of response to input changes Note operation of electric actuators using spring return for proper fail safe operations HYDRONIC BALANCE PERFORMANCE REQUIREMENTS Measurements Flow meters venturis balancing valves or pressure compensating flow control valves with flow taps shall be used to balance water flows Where these items are not installed flow rated shall be obtained by pressure drop across valves or equipment using factory provided Cy data known pressure drops vs flow curves thro
223. outs and construction details h Copy of inspection report by Georgia Department of Labor for inspection of boilers COMPLETION OF WORK At the completion an on site construction review shall be made and the entire system shall be shown to be in specified working condition Contractor shall also have all cleanout plugs removed from wall cleanouts floor cleanouts and outside cleanouts and placed on the ground adjacent to cleanout for inspection The following shall be available during the inspection 1 Contractor representative MECHANICAL CLOSEOUT DOCUMENT REQUIREMENTS 15051 3 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 1 10 1 13 Mechanic with hand tools Test and Balance Report Complete specifications and drawings with all addenda and revisions Control person who can demonstrate the complete sequence of control ie UBUES MAINTENANCE AND SERVICE Maintenance The Contractor shall provide any necessary services for all systems installed under these contract specifications for one year from date of substantial completion Parts and Labor Provide repair parts and all labor during maintenance periods EXTENDED SERVICE CONTRACTS Refer to each specification section to determine if an extended beyond 1 year service contract is to be provided for the piece of equipment listed in the specifications MANUFACTURER S FIELD SERVICES AND START UP BY FACTORY AUTHORIZED PERSO
224. pgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 15181 HYDRONIC PIPING PART 1 GENERAL 1 1 A 1 2 1 3 RELATED DOCUMENTS Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section SUMMARY This Section includes pipe and fitting materials joining methods and piping specialties as described below 1 Hot water heating piping 2 Makeup water piping 3 Blow down drain piping 4 Automatic air vent piping 5 Pressure relief valve inlet and outlet piping 6 Automatic air vents T High capacity automatic air vents 8 Diaphragm type expansion tank 9 Tangential type air separators 10 Air purgers 11 Strainers 12 Flexible pipe connectors 13 Pressure compensating flow control valves 14 Calibrated venturi ball valves 15 Backflow preventers 16 Water Pressure Reducing Valves 17 Tangential Particle Separators 18 Pressure relief valves 19 Manual air vents 20 Pre insulated steel steam and condensate piping below grade 2 Steam and steam condensate piping 22 Steam traps 23 Steam pressure reducing valves SUBMITTALS Product data for each of the following shall be submitted under provisions of Section 15050 l Hydronic piping material 2 Air control devices 3 Hydronic specialties HYDRONIC PIPING 15181 1 Heating Upgrade for Atkins
225. procedure so that valve and damper is 0 50 and 100 percent closed 10 Provide diagnostic and test instruments for calibration and adjustment of system 11 Provide written description of procedures and equipment for calibrating each type of instrument Submit procedures review and approval before initiating startup procedures Adjust initial temperature and humidity set points Occupancy Adjustments When requested within 12 months of date of Substantial Completion provide on site assistance in adjusting system to suit actual occupied conditions DEMONSTRATION Engage a factory authorized service representative to train Owner s maintenance personnel to adjust operate and maintain HVAC instrumentation and controls TRAINING Provide training of Owner s personnel in accordance with provisions of Section 15051 Training Course Content For guidance in planning the required instruction the contractor shall assume that attendees will have a high school education or equivalent and are familiar with HVAC systems The training course shall cover all of the material contained in the Operating and Maintenance Instructions the layout and location of each HVAC control panel the layout of one of each type of unitary equipment and the locations of each the location of each control device external to the panels preventive maintenance troubleshooting diagnostics calibration adjustment commissioning tuning and repair procedures Typical s
226. quired for markers may be included on signs and markers may be omitted if both are indicated 1 Letter Size Minimum 1 4 inch for name of units if viewing distance is less than 24 inches 1 2 inch for viewing distances up to 72 inches and proportionately larger lettering for greater viewing distances Include secondary lettering two thirds to three fourths the size of principal lettering 2 Data Equipment tag 3 Locate markers where accessible and visible The following pieces of equipment located above ceilings shall be identified with bakelite label equipment markers attached to the ceiling grid in a location approved by the Owner near the equipment Each group of piping isolation valves for heating hot water and domestic water systems PIPING IDENTIFICATION Install manufactured pipe markers indicating service on each piping system Install with flow indication arrows showing direction of flow 1 Pipes with OD Including Insulation Less Than 6 Inches Pre tensioned pipe markers Use size to ensure a tight fit 2 Pipes with OD Including Insulation Less Than 6 Inches Self adhesive pipe markers Use color coded self adhesive plastic tape at least 3 4 inch wide lapped at least 1 1 2 inches at both ends of pipe marker and covering full circumference of pipe 3 Pipes with OD Including Insulation 6 Inches and Larger Shaped pipe markers Use size to match pipe and secure with fasteners 4 Pipes with OD Includin
227. r adequately sized for the DDC controller and other controls required for proper unit operation Transformers shall be protected with in line fuses on both the primary and secondary sides in accordance with Table 450 3 B of the National Electric Code unless the following primary current conditions apply Transformers with a primary current less than 2 amperes shall be permitted to be fused on the primary side only provided the fuses do not exceed 300 of the transformer s rated primary current Transformers with a primary current less than 9 amperes shall be permitted to be fuse protected on the primary side only provided the fuses do not exceed HVAC INSTRUMENTATION AND CONTROLS 15900 4 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 167 of the transformer s rated primary current If control contractor intends to utilize any on board transformer provided by the HVAC equipment manufacturer he shall provide signed statement from the equipment manufacturer indicating the allowable additional VA load that is available for additional devices G Water Control Valves Water control valves shall be properly sized for the application with a minimum valve authority beta or B for modulating valves greater than or equal to 0 50 Valve authority is defined as pressure drop across fully open control valve divided by the pressure drop of the entire coil circuit The pressure drop across the entire
228. r hanger rods trapeze hangers pipe attachments etc are minimum sizes required Contractor shall utilize larger size supports where actual loads dictate a larger support SUBMITTALS Submit product data under provisions of Section 15050 Submit product data on roof equipment curbs and supports upper attachments pipe attachments lower pipe supports pipe positioning systems and vibration isolators WELDING REQUIREMENTS Welding Requirements All welding performed to support Mechanical piping and equipment shall comply with AWS D1 1 Structural Welding Code Steel Welders shall be qualified per AWS and welding certificates shall be posted at the jobsite HANGERS AND SUPPORTS 15060 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 1 6 PART 2 2 1 2 2 A B A COATINGS All supports for piping and equipment hangers and accessories including but not limited to bolts nuts washers rods beam clamps etc shall be galvanized except as indicated in the following paragraphs Hangers and supports in direct contact with copper piping shall be copper plated PRODUCTS UPPER ATTACHMENT Poured in Place Concrete Contractor may install concrete inserts or drill concrete anchors Inserts shall be B Line B 2500 C amp P 75 Anvil 281 Erico Michigan 355 PHD 950 951 ee aN pL Concrete Anchors Anchors shall be expansion drop in type with an actual
229. r has the option of reusing the upper support system i e supplemental angle iron supplemental channel beam clamps if the upper support system allows proper installation of new WSHP Proper installation includes meeting manufacturer s installation requirements not blocking access panels and allowing rods to drop vertically downward with no angular installation If proper installation is not possible provide new upper supports END OF SECTION 15060 HANGERS AND SUPPORTS 15060 9 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 15075 MECHANICAL IDENTIFICATION PART 1 GENERAL 1 1 A 1 2 A 1 3 A 1 4 A 1 5 A B C RELATED DOCUMENTS Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section SUMMARY This Section includes the following mechanical identification materials and their installation 1 Equipment nameplates 2 Equipment markers 3 Pipe markers 4 Valve tags SUBMITTALS Product data for each type of product included herein shall be submitted under provisions of Section 15050 QUALITY ASSURANCE ASME Compliance Comply with ASME A13 1 Scheme for the Identification of Piping Systems for letter size length of color field colors and viewing angles of identification devices for piping COORDINATION Coordina
230. r shutoff and to isolate equipment to isolate systems and vertical risers JOINT CONSTRUCTION Grooved Joints Assemble joints with keyed coupling housing gasket lubricant and bolts according to coupling and fitting manufacturer s written instructions Soldered Joints Use ASTM B 813 water flushable lead free flux ASTM B 32 lead free alloy solder and ASTM B 828 procedure unless otherwise indicated ADJUSTING Adjust or replace valve packing after piping systems have been tested and put into service but before final adjusting and balancing Replace valves if persistent leaking occurs END OF SECTION 15110 VALVES 15110 5 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 15122 METERS AND GAUGES PART 1 GENERAL 1 1 1 2 1 3 A A A B C RELATED DOCUMENTS Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section SUMMARY This Section includes the following meters and gauges for mechanical systems 1 Pressure gauges 2 Pressure snubbers 3 Gauge Cocks 4 Stem type thermometers 5 Separable socket wells 6 Pete s P amp T plugs 7 Steel venturis 8 Read out meter for Venturis 9 Read out meter for pressure compensating flow control valves SUBMITTALS Product data shall be submitted under provisions of Section
231. rade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 3 6 A SUSPENDED EQUIPMENT DUCTWORK AND PIPING SUPPORTS Provide steel drop rod supports or angle iron supports secured spot welded or clamped in bar joist areas to building main structural components for all suspended mechanical equipment ductwork and piping Supplemental angle iron framing shall be provided where required between bar joists and shall be minimum 3 x 3 x 1 4 for equipment and large piping 4 and larger and minimum 2 x 2 x 1 4 for large ductwork small equipment and small piping and 2 x 2 x 1 8 for small ductwork and refrigerant and condensate drain piping 1 5 8 x 1 5 8 x 12 gauge channel may be used to span bar joist in lieu of 2x 2 x 1 4 angle provided that previous paragraph Performance Requirements are met Contractor shall note that supplemental angle sizes are minimum Contractor shall provide larger size supplemental angle iron framing as appropriate to safely and appropriately support equipment Provide vibration isolation where specified Coordinate all mechanical equipment duct and pipe supports with steel fabricator erector and do not overload any building structural members or supplemental framing members Provide securely tightened lock nuts on all drop rod supports and connections For suspended water source heat pumps being installed in a location where water source heat pump was removed during demolition the contracto
232. reas No vehicles or material shall be located even temporarily so as to hinder normal college functions Parking at the site is limited to areas as indicate by the Owner Any debris dropped or tracked outside of immediate work area shall be cleaned up immediately The buildings in which the work shall be accomplished will be occupied while work is in progress Please follow all safety regulations to prevent injury or accident or student personnel Access to buildings or areas will be given by the Owner CONDUCT A During construction it is likely that your employees will come into contact with many members of the college community It is expected that your employees and the employees of any sub contractor employed by your firm will conduct themselves with a high degree of morality and conduct behavior In the event of any inappropriate behavior any individual may be required to leave College property and not be allowed to return to the job site The decision of the College in this regard is final with no appeal on the part of the Contractor There shall be no boisterous or obscene language and conversational noise among crew members shall be kept to a minimum DELIVERIES A The Contractor shall schedule deliveries to the job when a working crew is present The Director Plant operations or his staff will not accept deliveries on behalf of the contractor F 3 F 15 HAZARDOUS MATERIALS A If the Contractor observes the existence of any
233. red to wrap mechanical equipment ductwork and piping that is not suspended with two layers of 4 mil polyethylene BASIC MECHANICAL MATERIALS AND METHODS 15050 8 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia F Prior to Final Construction Review All materials and equipment shall be cleaned Chipped or scraped paint shall be retouched to match All dents and sags in ductwork and equipment casings shall be straightened or replaced Equipment Painting Equipment which has been damaged beyond the point of retouching or has been retouched not to match the original finish shall be repainted in accordance with the Architectural painting section ELECTRICAL General Motors controls relays and switches required for proper operation of equipment covered under this section shall be furnished and installed under this division of the specifications Wiring All control and interlock wiring shall be furnished and installed under Divisions 15 Mechanical Power wiring through the disconnect and starter and to the motor shall be furnished and installed under Electrical Section All control wiring and conduit shall conform to the material and installation requirements of Division 16 Electrical Connections Voltage phase ampacity and connection arrangement e g single or multiple point of each item of electrically driven equipment provided under this section of specifications shall conform to
234. rgia College amp State University Milledgeville Georgia H HVAC Submittal Data 1 Section 15060 Hangers and Supports oce Upper attachments Pipe attachment hangers and clamps Lower pipe supports Vibration isolators Section 15075 Mechanical Identification a Pipe markers Section 15080 Mechanical Insulation Rocme Insulation Product Information Jackets and Accessories Product Information Proof Of Insulation Contractor s Three Years Experience System sheet for each system identifying material thickness and finish for each system Section 15110 Valves ogeonocem Ball valves Butterfly valves Gate valves Check valves Extended neck option for ball valves on insulated piping Section 15122 Meters and gauges wmoaoge Pressure gauges Gauge Cocks Stem type thermometers Pete s P amp T plugs Steel venturis Read out meter for Venturis Read out meter for pressure compensating flow control valves Section 15181 Hydronic Piping a mo ho aos Single sheet indicating piping system and application and the pipe material intended to be used Do not submit data sheets on piping Automatic air vents High capacity automatic air vents Manual air vents Diaphragm type expansion tank Tangential type air separators Air purgers Strainers BASIC MECHANICAL MATERIALS AND METHODS 15050 2 Heating Upgrade for Atkinson Hall Georgia College amp State University
235. rgia College amp State University Milledgeville Georgia 3 6 FIELD QUALITY CONTROL A Inspect wire for physical damage and proper connection B Measure tightness of bolted connections and compare torque measurements with code recommended values C Verify continuity of each branch circuit conductor END OF SECTION 16123 BUILDING WIRE AND CABLE 16123 4 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 16130 BOXES PART 1 GENERAL 1 1 RELATED DOCUMENTS A Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section 1 2 SECTION INCLUDES A Wall and ceiling outlet boxes B Pull and junction boxes 1 3 RELATED SECTIONS A Section 16141 Wiring Devices Mounting heights of wiring device outlets B Section 16180 Equipment Wiring Systems 1 4 REFERENCES A ANSI AEMA FB 1 Fittings and Supports for Conduit and Cable Assemblies B ANSI NEMA OS 1 Sheet steel Outlet Boxes Device Boxes Covers and Box Supports C ANSI NFPA 70 National Electrical Code D NEMA 250 Enclosures for Electrical Equipment 1000 Volts Maximum 1 5 REGULATORY REQUIREMENTS A Conform to requirements of ANSI NFPA 70 B Furnish products listed and classified by Underwriters Laboratories Inc as suitable for purpose specified and shown 1 6 PROJECT CONDITIONS A Verify field
236. rgia Licensed Agent Attach Power of Attorney DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS PAYMENT BOND PAYMENT BOND Bond No Project No _Heating Upgrade for Atkinson Hall KNOW ALL MEN BY THESE PRESENTS That as Principal hereinafter referred to as the Legal Title and Address of the Contractor Principal and as Surety hereinafter referred Legal Name and Address of the Surety to as Surety are held and firmly bound unto the BOARD OF REGENTS OF THE UNIVERSITY SYSTEM OF GEORGIA as Obligee hereinafter referred to as Owner for the use and benefit of claimants defined hereinafter in the amount of Dollars to which payment Principal and Surety bind themselves their heirs executors administrators successors and assigns jointly and severally firmly by these presents WHEREAS the above bounden Principal has entered into a contract with Owner dated Month Day Yearfor Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia in accordance with the drawings and specifications prepared by Andrews Hammock amp Powell Inc which contract is incorporated herein by reference and made a part hereof and is hereinafter referred to as the Contract NOW THEREFORE THE CONDITION OF THIS OBLIGATION is such that if the Principal shall promptly make payment to all claimants as hereinafter defined for all labor and materials supplied in the prosecution of th
237. ring handling and installation clean and protect construction in progress and adjoining materials in place Apply protective covering where required to ensure protection from damage or deterioration at Architect s Final Certificate Clean and maintain completed construction as frequently as necessary through the remainder of the construction period Adjust and lubricate operable components to ensure operability without damaging effects Limiting Exposures Supervise construction activities to ensure that no part of the construction completed or in progress is subject to harmful dangerous damaging or otherwise deleterious exposure during the construction period Where applicable such exposures include but are not limited to the following Excessive static or dynamic loading Excessive internal or external pressures Excessively high or low temperatures Thermal shock Excessively high or low humidity Air contamination or pollution Water or ice Solvents Chemicals 10 Light 11 Puncture 12 Abrasion 13 Heavy traffic 14 Soiling staining and corrosion 15 Bacteria 16 Rodent and insect infestation 17 Combustion 18 Electrical current 19 High speed operation 20 Improper lubrication 21 Unusual wear or other misuse 22 Contact between incompatible materials 23 Destructive testing 24 Misalignment 19 00 ON tA dec papa ES 01040 3 Heating Upgrade for Atkinson Hall Georgia Colleg
238. rk SUBMITTALS Coordination Drawings Prepare and submit coordination Drawings where close and careful coordination is required for installation of products and materials fabricated off site by separate entities and where limited space availability necessitates maximum utilization of space for efficient installation of different components Show the interrelationship of components shown on separate Shop Drawings Indicate required installation sequences Comply with requirements contained in Section 15050 Basic Mechanical Requirements Refer to Division 16 Section Basic Electrical Requirements for specific coordination drawing requirements for mechanical and electrical installations Staff Names Within 15 days of Notice to Proceed submit a list of the Contractor s principal staff assignments including the Superintendent and other personnel in attendance at the site identify individuals their duties and responsibilities list their addresses and telephone numbers PART 2 PRODUCTS Not Applicable PART 3 EXECUTION 3 1 A D GENERAL INSTALLATION PROVISIONS Inspection of Conditions Require installer of each major component to inspect both the substrate and conditions under which work will be performed Do not proceed with the work until unsatisfactory conditions have been corrected in a manner acceptable to installer Manufacturer s Instructions Comply with manufacturer s instructions and recommendations to extent
239. rsity Milledgeville Georgia C D 1 5 A 1 6 A Electrical Components Devices and Accessories Listed and labeled as defined in NFPA 70 Article 100 by a testing agency acceptable to authorities having jurisdiction and marked for intended use UL Compliance Comply with UL 778 for motor operated water pumps DELIVERY STORAGE AND HANDLING Store pumps in dry location Retain protective covers for flanges and protective coatings during storage Protect bearings and couplings against damage from sand grit and other foreign matter Comply with pump manufacturer s written rigging instructions COORDINATION Coordinate size and location of concrete bases Cast anchor bolt inserts into bases Concrete and reinforcement requirements are specified in Section 15060 Hangers and Supports PART 2 PRODUCTS 2 1 A B BASE MOUNTED END SUCTION CENTRIFUGAL PUMPS Pumps shall be single stage end suction based mounted flexible coupled design of Class 30 cast iron volute with integrally cast pedestal support foot and bronze fitted construction Internal parts requiring service shall be serviceable without disturbing motor and volute shall be foot mounted to allow servicing of the impeller and bearing assembly without disturbing piping connections Pump shall be rated for a minimum of 175 psi working pressure Impeller shall be cast bronze or brass enclosed type dynamically balanced keyed to the shaft and secured
240. s Install tangential air separator upstream of pump suction Install blow down piping with full port ball valve extend full size to nearest floor drain or cap as shown on drawings Vent and purge air from hydronic system and ensure expansion tank is properly charged with air to suit system Project requirements TERMINAL EQUIPMENT CONNECTIONS Sizes for supply and return piping connections shall be the same as or larger than equipment connections Install ports for pressure gages and thermometers at coil inlet and outlet connections according to Division 15 Section Meters and Gages FIELD QUALITY CONTROL Prepare hydronic piping according to ASME B31 9 and as follows 1 Leave joints including welds uninsulated and exposed for examination during test Coordinate pressure tests of piping with phasing as described in phasing plan 3 Flush hydronic piping systems as described in paragraph Pipe Flushing and Cleaning 4 Isolate equipment from piping If a valve is used to isolate equipment its closure shall be capable of sealing against test pressure without damage to valve Install blinds in flanged joints to isolate equipment 5 Install safety valve set at a pressure no more than one third higher than test pressure to protect against damage by expanding liquid or other source of overpressure during test Perform the following tests on hydronic piping l Use ambient temperature water as a testing medium unless there is ri
241. s Enterprise For more information please contact the Board of Regents Office of Business Development by e mail at BusinessDevelopment 2usg edu NEITHER DESCRIPTION APPLIES TO YOUR COMPANY Bip REQUIREMENTS 10 DBB CONSTRUCTION CONTRACT BID REQUIREMENTS VERSION 07 01 201 1 BID REQUIREMENTS BID SECURITY FORM NOTE TO CONTRACTOR Use of Surety s E Bid Bond form is acceptable as long as it substantiall KNOW ALL BY THESE PRESENTS That we Insert Contractor s Legal Name and Address as Principal hereinafter called the Principal and Insert Legal Name and Address of Surety a corporation duly organized under the laws of the State of Insert State of Corporate Organization as Surety hereinafter called the Surety are held and firmly bound unto OWNER Attention Phone Number Facsimile Number as Obligee hereinafter called the Obligee in the sum of Not less than five percent of the Bid Dollars for the payment of which sum well and truly to be made the said Principal and the said Surety bind ourselves our heirs executors administrators successors and assigns jointly and severally firmly by these presents WHEREAS the Principal has submitted a Bid for Heating Upgrade for Atkinson Hall NOW THEREFORE if the Obligee shall accept the Bid of the Principal and 1 the Principal shall enter into a Contract with the Obligee in accordance with the terms of such Bid and the Principal shall execute
242. s are received 9 Trade Names Specifications a No Restriction of Competition When reference is made in the Contract Documents to trade names brand names or to the names of manufacturers such references are made solely to indicate that products of that description may be furnished and are not intended to restrict competitive bidding If it is desired to use products of trade or brand names or of manufacturers names that are different from those mentioned in the Bidding Documents application for the approval of the use of such products must reach the hands of the Design Professional at least ten days prior to the date set for the opening of bids see 9 b below This provision applies only to the party making a submittal prior to bid If approved by Design Professional the Design Professional will issue an addendum to all bidders This provision does not prevent the Owner from initiating the addition of trade names brand names or names of manufacturers by addendum prior to bid b Request for Approval of Substitute Product All requests for approval of substitution of a product that is not listed in the Bidding Documents must be made to the Design Professional in writing For the Design Professional to prepare an addendum properly an application for approval of a substitute product must be accompanied by a copy of the published recommendations of the manufacturer for the installation of the product together with a complete schedule of chang
243. s terminated the Contractor s right to complete the remedy the Surety shall 12 DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS FIVE YEAR ROOF AND WALL BOND be notified in writing and shall promptly perform this bond agreement in accordance with its terms and conditions If Surety chooses to investigate Owner shall cooperate with the Surety in its investigation and shall make all public project records available for inspection by Surety at no cost to Owner It shall be the duty of the Surety to give an unequivocal notice in writing to the Owner within twenty five 25 days after receipt of such notice of the Surety s election to either remedy the leaks and defects promptly time being of the essence In said notice of election the Surety shall indicate the date on which the remedy or performance will commence and it shall then be the duty of the Surety to give prompt notice in writing to the Owner immediately upon completion of the remedy and or correction of the leaks or defects The Surety shall not assert its Principal as justification for its failure to give notice of election or for its failure to promptly remedy the leaks or defects Full Force and Effect NOW THEREFORE the condition of this obligation is such that if the Contractor_ shall in all things promptly and faithfully perform and comply with the terms and conditions hereinbefore set forth then this obligation shall be null and void otherwise it shall remain in
244. shall be provided at all control wiring penetrations through walls 2 Outlet Boxes Refer to Division 16 Provide and install under this section Conductors l 50 to 600 volts Refer to Section Division 16 for requirements HVAC INSTRUMENTATION AND CONTROLS 15900 3 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 2 Below 50 volts Minimum size for individual conductors is AWG No 18 Minimum conductor sizes for multiconductor cables is AWG No 22 Provide shielded cable as required to avoid EMI where conduits natural shielding effect is insufficient Conductors shall be sized within acceptable voltage drop parameters 3 Plenum Rated Cable Plenum rated cable with flame spread of 25 or less and smoke development of 50 or less as tested by ASTM E84 Conductor Insulation TFFN unless noted otherwise Taps and Joints Mechanically and electrically sound Tape Per Division 16 Provide and install under this section Lacing Per Division 16 Provide and install under this section Lubricants Per Division 16 Provide and install under this section Color Code All low voltage control conductors shall be color coded by factory or provided with numbered ends Dope cy D Contactors and Disconnects 1 All contactors for equipment specified in Division 15 shall be provided under this section of the specifications unless explicitly shown furnished by Electrical on the Electrical Dr
245. sing under or by virtue the contract and acceptance of such payment is acknowledged as a release of the Owner from any and all claims arising under or by virtue of the contract This release includes any claims set forth or excepted in Paragraph 2 above 5 Strike out if not applicable The Subcontractor has received final payment in full settlement of all claims against the Contractor arising under or by virtue the contract and acceptance of such payment is acknowledged as a release of the Contractor from any and all claims arising under or by virtue of the contract except as set forth in Paragraph 2 above 6 Payments pursuant to this certificate shall in no way diminish change alter or affect the rights of the Owner under the contract documents SUBCONTRACTOR By Date CONTRACTOR By Date DESIGN PROFESSIONAL By Date NOTICE OWNER MUST RECEIVE A COPY WITH ALL ORIGINAL SIGNATURES 28 DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS FINAL CERTIFICATION OF COSTS FORM FINAL CERTIFICATION OF COSTS FOR CAPITAL ASSET ACCOUNTING Date To Owner The following accounting of costs for Project No Project Name at is submitted as follows with the breakdown of costs as specified in the Final Pay Request attached hereto and incorporated herein for the purposes of capital asset accounting pursuant to GASB 34 Accounting Statements 1 BUILDING AND BUILDING IMPROVEMENTS 2 INFRASTR
246. sk of damage due to freezing 2 While filling system use vents installed at high points of system to release air Use drains installed at low points for complete draining of test liquid 3 Isolate expansion tanks and determine that hydronic system is full of water 4 Subject piping system to hydrostatic test pressure of 150 psig Test pressure shall not exceed maximum pressure for any vessel pump valve or other component in system under test Verify that stress due to pressure at bottom of vertical runs does not exceed 90 percent of specified minimum yield strength or 1 7 times SE value in Appendix A in ASME B31 9 Building Services Piping 5 After hydrostatic test pressure has been applied for at least 10 minutes examine piping joints and connections for leakage Eliminate leaks by tightening repairing or replacing components and repeat hydrostatic test until there are no leaks Test pressure shall be maintained for four hours There shall be no drop in pressure during the test All copper pipes shall have the joints struck during the test HYDRONIC PIPING 15181 15 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 3 8 6 Piping systems shall be subjected to constant inspection and final approval of the Owner Engineer and Code Authorities having jurisdiction Contact Architect Engineer and all code authorities 48 hours before making any pressure tests Tests in addition to
247. ssure gauges with shut off cocks and thermometers in thermometer wells on all pipe connections CONNECTIONS Piping installation requirements are specified in other Division 15 Sections Drawings indicate general arrangement of piping fittings and specialties Maintain manufacturer s required clearances for service and maintenance As a minimum provide 1 5 times plate width on one side for plate removal Install piping connections to allow service and maintenance of heat exchangers Install shutoff valves at heat exchanger inlet and outlet connections Install relief valves on shell and tube heat exchanger heated fluid connection and install pipe relief valves full size of valve connection to floor drain Install vacuum breaker at heat exchanger steam inlet connection HYDRONIC AND STEAM HEAT EXCHANGERS 15710 2 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia F Install hose end valve to drain shell 3 4 FIELD QUALITY CONTROL FOR SHELL AND TUBE HEAT EXCHAGER A Test and adjust controls and safeties Replace damaged and malfunctioning controls and equipment 3 5 CLEANING A After completing system installation including outlet fitting and devices inspect exposed finish Remove burrs dirt and construction debris and repair damaged finishes 3 6 START UP STRAINERS A To prevent any debris from entering the plate and frame heat exchangers fine mesh strainer media shall be
248. stallations to verify that they are complete and that testing cleaning adjusting and commissioning specified in individual Sections have been performed Examine HVAC system and equipment installations to verify that indicated balancing devices such as test ports gage cocks thermometer wells flow control devices balancing valves and fittings and manual volume dampers are properly installed and that their locations are accessible and appropriate for effective balancing and for efficient system and equipment operation Report deficiencies discovered before and during performance of TAB procedures GENERAL PROCEDURES FOR TESTING AND BALANCING Perform testing and balancing procedures on each system according to the procedures contained in AABC s National Standards for Testing and Balancing Heating Ventilating and Air Conditioning Systems or NEBB s Procedural Standards for Testing Adjusting and Balancing of Environmental Systems and this Section Cut insulation ducts pipes and equipment cabinets for installation of test probes to the minimum extent necessary to allow adequate performance of procedures After testing and balancing close probe holes and patch insulation with new materials identical to those removed Restore vapor barrier and finish according to insulation Specifications for this Project Mark equipment and balancing device settings with paint or other suitable permanent identification material including damper co
249. such interest 17 Transactions With State Officials Ethics The parties hereto certify that the provisions of law contained in the Act prohibiting full time appointive officials and employees of the State from engaging in certain transactions affecting the State as defined in O C G A 8845 10 20 26 and the Governor s Executive Orders governing ethics have not and will not be violated in any respect in regard to this contract and further certifies that registration and all disclosures required thereby have been complied with 18 No Assignment This Contract and the proceeds of this Contract may not be assigned or sublet as a whole nor may the performance thereunder be assigned without the prior written consent of the Owner 19 No Waiver The failure of the Owner at any time to require performance by the Contractor of any provision hereof shall in no way affect the right of the Owner thereafter to enforce any provision or any part of the Contract nor shall the failure of the Owner to enforce any breach of any provision hereof to be taken or held to be a waiver of such provision or as a waiver modification or rescission of the Contract itself 20 Full Agreement The Contract Documents supersede all prior negotiations discussion statements and agreements between Owner and Contractor and constitute the full complete and entire agreement between Owner and Contractor There can be no changes to this Contract by oral means nor by course of co
250. t 1 Indented from left margin paragraphs and lines of text are subordinate to preceding text which is not indented or which is indented by a lesser amount 2i Paragraphs and lines of text are subordinate to sub article titles which are printed in upper lower case lettering 3 Sub articles are subordinate to article titles which are printed in upper case lettering 4 Subordination if any of certain sections or portions of sections to other sections is described within those sections Underscoring Used strictly to assist reader of specification text in scanning text for key words in content for quick recall No emphasis on or relative importance of text is intended where underscoring is used 01095 2 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia E Imperative Language Used generally in specifications Except as otherwise indicated requirements expressed imperatively are to be performed by Contractor For clarity of reading at certain locations contrasting subjective language is used to describe responsibilities which must be fulfilled indirectly by Contractor or when so noted by others Section Numbering Used to facilitate cross references in Contract Documents Sections are placed in Project Manual in numeric sequence however numbering sequence is not complete and listing of sections at beginning of Project Manual must be consulted to determine numbers and nam
251. t metallic tubing fittings and conduit bodies 1 8 PROJECT RECORD DOCUMENTS A Accurately record actual routing of conduits larger than 2 inches 1 9 REGULATORY REQUIREMENTS A Conform to requirements of ANSI NFPA 70 B Furnish products listed and classified by Underwriters Laboratories Inc as suitable for purpose specified and shown 1 10 DELIVERY STORAGE AND HANDLING A Accept conduit on site Inspect for damage B Protect conduit from corrosion and entrance of debris by storing above grade C Provide appropriate covering 1 11 PROJECT CONDITIONS A Verify that field measurements are as shown on Drawings B Verify routing and termination locations of conduit prior to rough in C Conduit routing is shown on Drawings in approximate locations unless dimensioned Route as required to complete wiring system PART 2 PRODUCTS 2 1 CONDUIT REQUIREMENTS A Minimum Size 1 2 inch unless otherwise specified EMT shall be used in sizes 1 1 4 inches and smaller only B Outdoor Locations Above Grade Use rigid steel conduit or intermediate metal conduit CONDUIT 16111 2 GDC 107 GDC 13 012 AUT SP Underground Hot Water Loop Retrofit at Autry State Prison Mitchell County Georgia C Wet and Damp Locations Use rigid steel conduit or intermediate metal conduit D Dry Locations Use rigid steel conduit intermediate metal conduit or electrical metallic tubing E Metal Conduit 1 Rigid Steel Condui
252. t ANSI C80 1 2 Intermediate Metal Conduit IMC Rigid steel F Fittings and Conduit Bodies ANSI NEMA FB 1 material to match conduit G Flexible Metal Conduit l Description Interlocked steel construction 2 Fittings ANSI NEMA FB 1 H Liquidtight Flexible Metal Conduit 1 Description Interlocked steel construction with PVC jacket 2 Fittings ANSI NEMA FB 1 I Electrical Metallic Tubing EMT l Description ANSI C80 3 galvanized tubing 2 Fittings and Conduit Bodies ANSI NEMA FB 1 insulated throat steel compression type Set screw or indenter type are unacceptable J Acceptable Manufacturers Acceptable manufacturers of conduit products specified herein are as follows Allied Triangle Wheatland LTV or Carlon PART3 EXECUTION 3 1 INSTALLATION A Install conduit in accordance with NECA Standard of Installation B Arrange supports to prevent misalignment during wiring installation C Support conduit using coated steel or malleable iron straps lay in adjustable hangers clevis hangers and split hangers D Fasten conduit supports to building structure and surfaces under provisions of Section 16190 E Do not support conduit with wire or perforated pipe straps Remove wire used for temporary supports F Do not attach conduit to ceiling support wires G Arrange conduit to maintain headroom and present neat appearance CONDUIT 16111 3 GDC 107 GDC 13 012 AUT SP Underground Hot Water L
253. t Documents 3 Description of Change 4 This Change Order is deemed necessary and originated with the Design Professional Owner Contractor Using Agency Indicate applicable entity 5 This Change Order is necessary to 6 The Maximum Allowable Cost of the Change Order was estimated by DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS CHANGE ORDER FORMAT 7 A memorandum is attached showing the estimated cost breakdown of labor and materials by unit and quantities as prepared by the Contractor and checked by the Contract Compliance Specialist and Program Manager if any 8 The Maximum Allowed Cost for this Change Order is and is established as Incumbrance Record No This Maximum Allowed Cost may be amended by the Owner in the event the actual costs are expected to exceed the Maximum Allowed Cost provided that Contractor shall give written notice of such fact prior to incurring actual costs in excess of ninety percent of the Maximum Allowable Cost In no event shall actual costs be incurred in excess of the Maximum Allowed Cost as it may be amended APPROVED AND AGREED BY CONTRACTOR RECOMMENDED FOR OWNER S ACCEPTANCE LEGAL GC Firm Name DESIGN PROFESSIONAL Andrews Hammock amp Powell Inc By By Print Name Title Print Name Title Date approved by Contractor Date approved by Design Professional APPROVED AND AGREED BY USING AGENCY APPROVED AND AGREED BY OWNER GEORGIA COLLEGE amp STAT
254. t each piece of equipment arranged to allow service maintenance and equipment removal without system shutdown Locate valves for easy access and provide separate support where necessary Install valves in horizontal piping with stem at or above center of pipe Install valves in position to allow full stem movement Install Swing Check Valves in horizontal position with hinge pin level Install triple duty valves and check valves 5 pipe diameters minimum downstream from pump discharge or elbows to avoid flow turbulence For horizontal applications valves shall be installed with disc hinge pin in vertical position Provide minimum companion flange bore to allow proper operation of disc Where flanged connections are provided to connect butterfly valves to other flanged piping components the contractor shall provide spool pieces as necessary to allow the disc to extend to the fully open position Install valves with stems upright or horizontal not inverted All butterfly valves 6 inches and larger shall be provided with gear driven hand wheels All valves manually operated 6 inches and larger located 12 feet or more above the finished floor elevation in the mechanical room shall be installed with their spindles horizontal and provided with chain wheels Chains shall loop within four 4 feet of the finished floor Provide holding clips to secure chains when the valve is not being used Use ball valves or butterfly valves as specified fo
255. table Products TEMPORARY HVAC PROVISIONS The Owner is occupying the building during construction and the Contactor shall maintain the heating ventilating and air conditioning systems at all times in areas that the Contractor is not working in whether occupied or not Contractor shall provide temporary heating in areas he is working in for freeze protection and shall maintain a minimum 60 F temperature inside Contractor is not required to provide temporary air conditioning in areas he is working in Since this project involves the replacement of the central WSHP heating and cooling plant Contractor shall not perform demolition work on the entire central plant at one time unless means are provided to supply loop water flow and temperatures equal to the central plant capacity Contractor shall stagger pump demolition to maintain one loop and cooling water pump and coordinate equipment demolition and new work installation with the Owner to meet the Owner s schedule No equipment may be removed until new replacement equipment is on site Temporary cooling and dehumidification and heating systems shall be provided by the Contractor in all areas outside the Contractor s work area if Contractor s work affects these other areas Contractor shall submit proposed methods and equipment for temporary systems and shall submit to Owner for approval Contractor shall maintain maximum 80 F dry bulb and 50 relative humidity for air conditioning and dehu
256. tall stop and waste drain valves where indicated Install balancing valve in each hot water circulation return branch and discharge side of each pump and circulator Set balancing valves partly open to restrict but not stop flow Use ball valves for piping NPS 2 and smaller and butterfly valves for piping NPS 2 1 2 and larger Balancing valves are specified in Division 15 Section Domestic Water Piping Specialties PIPING INSTALLATION Drawings show the general arrangement layout and location of piping appurtenances etc but do not show all required fittings and offsets that may be necessary to connect piping to equipment etc offset around obstructions and to coordinate with other trades Fabricate and install piping appurtenances etc based on field measurements Provide all necessary fittings and offsets at no additional cost to the Owner Coordinate with other trades existing building conditions etc for space available and relative location of piping appurtenances etc Pipe appurtenances etc locations shown on drawings shall be altered by Contractor where required to avoid interference and clearance difficulties Provide chrome plated escutcheon plates for all piping penetrations through walls exposed to view Provide non conducting dielectric connections wherever jointing dissimilar metals Route piping in orderly manner and maintain gradient Install piping to conserve building space and not interfere with use of space
257. te installation of identifying devices with completion of covering and painting of surfaces where devices are to be applied Coordinate installation of identifying devices with location of access panels and doors Install identifying devices before installing acoustical ceilings and similar concealment PART 2 PRODUCTS 2 1 A NAMEPLATES General Provide nameplates for all equipment and panel mounted controls Location shall be accessible and visible MECHANICAL IDENTIFICATION 15075 1 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia B Equipment Nameplates Metal with data engraved or stamped permanently attached to equipment As a minimum nameplate shall include manufacturer model number serial number and electrical data 2 2 EQUIPMENT MARKERS A Markers shall be Contractor fabricated to have equipment tag or number e g EF 1 AHU 2 etc on marker B Designation l Equipment tag shall be etched in 1 4 maximum 1 8 minimum height letters and mounted on or adjacent to device cover or attached to the item of equipment For items above ceiling marker shall be attached to ceiling on t bar grid in location approved by Owner 2 Type White core black bakelike secured with epoxy glue or screws unless otherwise noted 2 3 IDENTIFICATION OF PIPING A Piping shall be labeled with pre tension pre coiled semi rigid plastic snap on pipe markers equal to Seaton
258. tegral overload protection Internal protection shall automatically open power supply circuit to motor when winding temperature exceeds a safe value calibrated to temperature rating of motor insulation Thermal protection device shall automatically reset when motor temperature returns to normal range G Bearings Single Phase Motors Ball type for belt connected motors and other motors with high radial forces on motor shaft sealed pre lubricated sleeve type for other single phase motors H Bearings Three Phase Motors Double shielded pre lubricated ball bearings suitable for radial and thrust loading I Motor Nameplate Provide on all motors 1 4 hp and above a permanent visible engraved nameplate indicating horsepower RPM voltage phase amps cycles full load amps locked rotor amps frame size service factor power factor and efficiency J Motor Type All single phase motors shall be provided with motor type suitable for starting and operating torque Shaded pole motors shall be allowed on 1 20 hp or less motors only Split phase capacitor start permanent split capacitor and capacitor start capacitor run shall be provided on all single phase motors above 1 20 hp based on specific torque requirements K Duty Continuous duty at ambient temperature of 105 deg F and at altitude of 3300 feet above sea level L Capacity and Torque Characteristics Sufficient to start accelerate and operate connected loads at designated speeds
259. tem Inputs and Outputs a Check analog inputs at 0 50 and 100 percent of span b Check analog outputs using milliampere meter at 0 50 and 100 percent output c Check digital inputs using jumper wire d Check digital outputs using ohmmeter to test for contact making or breaking e Check resistance temperature inputs at 0 50 and 100 percent of span using a precision resistant source Flow a Set differential pressure flow transmitters for O and 100 percent values with 3 point calibration accomplished at 50 90 and 100 percent of span b Manually operate flow switches to verify that they make or break contact HVAC INSTRUMENTATION AND CONTROLS 15900 8 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 3 6 3 7 6 Pressure a Calibrate pressure transmitters at 0 50 and 100 percent of span b Calibrate pressure switches to make or break contacts with adjustable differential set at minimum T Temperature a Calibrate resistance temperature transmitters at 0 50 and 100 percent of span using a precision resistance source b Calibrate temperature switches to make or break contacts 8 Stroke and adjust control valves and dampers without positioners following the manufacturer s recommended procedure so that valve or damper is 100 percent open and closed 9 Stroke and adjust control valves and dampers with positioners following manufacturer s recommended
260. tenance Install suction and discharge pipe sizes equal to or greater than diameter of pump nozzles Decrease from line size to pump size with reducers Install triple duty valve on discharge side of pumps Maintain minimum 5 pipe diameter between discharge of pump and triple duty valve Install suction diffuser and shutoff valve on suction side of base mounted end suction pumps Provide temporary start up strainer at suction diffuser and remove after start up service and replace with standard screen Install line size not pump connection size flexible connectors on suction and discharge sides of base mounted pumps between pump casing and valves Install pressure gages on pump suction and discharge at integral pressure gage tapping END OF SECTION 15185 HYDRONIC PUMPS 15185 5 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 15710 HYDRONIC AND STEAM HEAT EXCHANGERS PART 1 GENERAL 1 1 A 1 2 A 1 3 A B 1 4 A B e D RELATED DOCUMENTS Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section SUMMARY This Section includes shell and tube heat exchangers SUBMITTALS Product Data Include rated capacities operating characteristics furnished specialties and accessories Product data shall be submitted under the provisions of
261. th pressure setting as indicated on drawings Maximum temperature of 250 F Pressure relief valve shall be ASME Section IV certified Manufacturer Watts Model 174A Model 790 or 1170 by Bell amp Gossett or equal by Zurn PRE INSULATED STEEL STEAM AND CONDENSATE PIPING BELOW GRADE Pre insulated steam and condensate piping system Carrier Piping Carrier piping shall be ASTM A120 for pipe 4 and smaller schedule 80 black Joints shall be welded Insulation Insulation shall be rigid 90 to 95 closed cell polyurethane with 1 9 to 2 1 pounds per cubic foot density and a coefficient of thermal conductivity K of 0 14 BTU hr sq ft F in at 73 degrees F Jacket Jacket shall be fiberglass FRP with a minimum thickness of 0 55 and directly applied on insulating foam Fittings Fitting shall be butt weld steel fittings Insulate per manufacturer s recommendation Installation contractor shall provide each worker installing this piping with a minimum of 4 hours training from a factory trained and authorized service instructor The factory authorized service representative shall inspect the installation and pressure test and provide written certification on the manufacturer s letterhead that the installation complies with the manufacturer s written installation instructions Manufacturers Piping system shall be manufactured by Perma Pipe Urecon Thermacor or Rovanco STEAM AND STEAM CONDENSATE AND STEAM VENT PIPING Steel Pipe
262. that the Contractor shall not be responsible insofar as liability under this bond is concerned for bringing to the attention of the Owner defects in design involving failure of only the following three structural elements 1 Structural Frame 2 Load bearing walls 3 Foundations nor shall the Contractor be responsible for correction of leaks resulting from said failure c Damage caused by fire tornado hail hurricane acts of God wars riots or civil commotion upon presentation of competent evidence of same by the Contractor d The Contractor is not an insurer nor is he a guarantor of the design Any other provisions of this bond to the contrary notwithstanding the Contractor shall not be required to remedy any errors or omissions of design Leaks or Defects WHEREAS the said Contractor agrees that should any leaks or defects occur in the roof envelope or wall envelope of the said Name and Number of Project the said Contractor will promptly remedy the said leaks or defects and pay for any damage to other work of said Project resulting therefrom except however that when this instrument is executed by a Trade Contractor this Contract shall insofar as the Trade Contractor is concerned extend only to the work executed by said Trade Contractor Notice to Surety If the Contractor shall have been given notice to remedy leaks or defects pursuant to the Contract Documents and has been declared in default by the Owner and the Owner ha
263. the Contract and give such bond or bonds as may be specified in the Bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof or 2 in the event of the failure of the Principal to enter such Contract and give such bond or bonds and the Principal shall pay to the Obligee the difference not to exceed the difference hereof between the amount specified in said Bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said Bid then this obligation shall be null and void otherwise to remain in full force and effect Signed and sealed this Day of 20 Name of Contractor Principal Witness By Seal Title Name of Surety Surety Witness By Seal Attach Power of Attorney Bip REQUIREMENTS 1 1 DBB CONSTRUCTION CONTRACT BID REQUIREMENTS VERSION 07 01 2011 SECTION 7 FORMS SECTION 7 FORMS FORMS INDEX Performance Bond Payment Bond Georgia Security and Immigration Compliance Act Affidavit s Non Influence Affidavit Statutory Affidavit Five Year Bond on Roofs and Walls Specimen Certificate of Manufacturer Certificate of Insurance Bond to Discharge Claim Change Order Forms Application for Payment Form Subcontractor Retainage Release Certificate Final Certification of Costs DBB CONSTRUCTION CONTRA
264. then contact Owner prior to disposal of any and all mechanical equipment removed during demolition work Owner shall retain any such equipment at his discretion and Contractor shall store retained equipment on site as directed by Owner Equipment not retained shall become property of the Contractor and shall be lawfully removed from site Some specific equipment e g has been BASIC MECHANICAL MATERIALS AND METHODS 15050 11 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 1 20 specifically noted to be retained by the Owner Equipment shall become property of the contractor and shall be lawfully removed from site With regards to the salvage value of property that is to be demolished Owner shall not be responsible for condition of or loss of or damage to such property after award of contract Existing work to remain shall be protected by temporary covers supports etc during demolition work Should any item that is to remain be damaged during demolition work it shall be repaired to its original condition or replaced with new Some existing equipment piping and ductwork may be shown to remain for reuse The contractor is not responsible for the condition of or proper operation of any existing equipment piping or ductwork that is being reused See above paragraph for exception when contractor damages item that is to remain For example if air conditioning unit is being reused and un
265. ther that am a principal person of the bidder with management responsibility for the construction for the bidder and as such am personally knowledgeable of all its pertinent matters further certify that this bid is made without prior understanding agreement or connection with any corporation firm or person submitting a bid for the same services materials labor supplies or equipment and is in all respects fair and without collusion or fraud Bidder and its principals understand that collusive bidding is a violation of state and federal law and can result in fines prison sentences and civil damage awards Bidder agrees to abide by all conditions of this bid BY Authorized Signature BLUE INK Printed Name Title Sworn to and subscribed before me this Day of 20 Notary Public My commission expires SEAL NOTE THE NOTARY SEAL MUST BE APPLIED UNDER GEORGIA LAW WHETHER OR NOT THE LAW OF THE STATE WHERE EXECUTED PERMITS OTHERWISE Bip REQUIREMENTS 7 DBB CONSTRUCTION CONTRACT BID REQUIREMENTS VERSION 07 01 201 1 STATEMENT OF BIDDER S QUALIFICATIONS STATEMENT OF BIDDER S QUALIFICATIONS To be subscribed and sworn to before a notary public The bidder submits the following statement of bidder s qualifications for consideration by the Owner Bidder s Name LEGAL NAME OF BUSINESS Bidder s Address LEGAL BUSINESS ADDRESS NO P O BOX MUST BE PHYSICAL ADDRESS CITY STATE ZIP
266. these are more explicit or more stringent than requirements indicated contained in Contract Documents Inspect materials or equipment immediately upon delivery and again prior to installation Reject damaged and defective items Provide attachment and connection devices and methods necessary for securing work Secure Work true to line and level Allow for expansion and building movement Visual Effects Provide uniform joint widths in exposed Work Arrange joints in exposed Work to obtain the best visual effect Refer questionable choices to the Architect for final decision Recheck Measurements and dimensions of the work before starting each installation 01040 2 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 3 2 G Install each component during weather conditions and project status that will ensure the best possible results Isolate each part of the completed construction from incompatible material as necessary to prevent deterioration Coordinate temporary enclosure with required inspections and tests to minimize necessity of uncovering completed construction for that purpose Mounting Heights Where mounting heights are not indicated install individual components at standard mounting heights recognized within the industry for particular application indicated Refer questionable mounting height decisions to the Architect for final decision CLEANING AND PROTECTION Du
267. those included in this section required to show compliance shall be performed as directed at no additional cost Ds Prepare written report of testing Contractor shall at the completion of the project bleed all air out of the piping system using manual and automatic air vents This shall occur at a minimum at all locations where air is suspected to have accumulated at all high spots and where specifically shown Perform the following before operating the system Open manual valves fully Inspect pumps for proper rotation Set makeup pressure reducing valves for required system pressure Inspect air vents at high points of system and determine if all are installed and operating freely automatic type or bleed air completely manual type Set temperature controls so all coils are calling for full flow Inspect and set operating temperatures of hydronic equipment such as boilers chillers cooling towers to specified values 7 Verify lubrication of motors and bearings Ee prr NM Training For grooved piping a factory trained representative direct employee shall provide on site training for contractor s field personnel in the use of grooving tools application of groove and product installation Application For grooved piping a factory authorized representative shall periodically visit the job site and review installation Contractor shall remove and replace any improperly installed products EXCAVATION AND BACKF
268. ting Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 3 2 3 3 3 4 3 5 3 6 B Provide detailed sequence of demolition and removal work to ensure uninterrupted progress of Owner s on site operations Coordinate with Owner s continuing occupation of portions of building INSPECTION Prior to commencement of demolition work inspect areas in which work will be performed Inventory existing conditions with Owner s Representative to verify condition of structure surfaces equipment or surrounding properties which could be misconstrued as damaged resulting from selective demolition work PREPARATION Locate identify stub off and disconnect utility services that are not indicated to remain Provide by pass connections as necessary to maintain continuity of service to occupied areas of building Provide minimum of 72 hours advance notice to Owner if shut down of service is necessary during change over DEMOLITION Perform selective demolition work in a systematic manner Use such methods as required to complete work indicated on Drawings in accordance with schedule and governing regulations 1 Demolish concrete and masonry in small sections Cut concrete and masonry at junctures with construction to remain using power driven impact tools 2 Provide services for effective air and water pollution controls If unanticipated mechanical electrical or structural elements which conflict wit
269. tions No oral interpretation will be made to bidders as to the meaning of the drawings and specifications Requests for interpretation of drawings and specifications must be made in writing to the Design Professional not later than six days prior to the date set for receipt of the bids Failure on the part of the successful bidder to request clarification shall not relieve him as Contractor of the obligation to execute such work in accordance with a later interpretation by the Design Professional All interpretations made to bidders will be issued in the form of Addenda to the plans and specifications and will be sent to all plan holders of record Acknowledgement of receipt of such Addenda shall be listed in the Bid Form by the Contractor 7 Alternates Unless otherwise stipulated all alternate bids are deductive It is in the best interest of the public and the intent of the Owner is that the entire Project be constructed within the funds allocated in the Project budget The acceptance of any deductive alternate will be utilized as a last resort to accomplish the Project without requiring a redesign and rebidding of the Project Any alternate or alternates if taken will be taken in numerical sequence to the extent necessary 8 Sales Tax Unless otherwise provided for in the Contract Documents the Contractor shall include in his bid all sales taxes consumer taxes use taxes and all other applicable taxes that are legally in effect at the time bid
270. to perform guarantee shall be included as part of the complete guarantee warranty MANUFACTURER S WARRANTIES Provide as a minimum a one 1 year manufacturer s equipment warranty against defective components for each piece of equipment and its components installed under their respective specification section prior to final inspection in accordance with each of the trades listed below Equipment warranties shall commence on the date of Substantial Completion as established in the Certificate of Substantial Completion issued by the Architect Contractor shall note that there may be more than one certificate of Substantial Completion and date of Substantial Completion for this contract Any parts which fail during the first year shall be replaced by the Contractor at no additional cost to the Owner HVAC Each piece of equipment and its components furnished shall carry a minimum one 1 year warranty for replacement of parts and the labor required to complete such warranty work MECHANICAL CLOSEOUT DOCUMENT REQUIREMENTS 15051 2 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 1 7 1 8 1 9 A OPERATING INSTRUCTIONS AND TRAINING Instructions Instruct operating personnel as required but a minimum of 16 hours in operation and maintenance of all systems included in this Division 15 of the specifications In addition there shall be the quantity of dedicated instruction for certain spec
271. tops faucets convenience and lawn watering hose connections and HVAC terminal devices and similar roughing in connections of end use fixtures and units List tagged valves in a valve schedule Valve Tag Application Schedule 1 Valve Tag Size and Shape All tags shall be 2 round 2 Valve Tag Color Natural brass ADJUSTING Relocate mechanical identification materials and devices that have become visually blocked by other work CLEANING Clean faces of mechanical identification devices to an as new condition immediately prior to Architect s Final Certification END OF SECTION 15075 MECHANICAL IDENTIFICATION 15075 4 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 15080 MECHANICAL INSULATION PART 1 GENERAL 1 1 A 1 2 1 3 1 4 RELATED DOCUMENTS Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section SUMMARY This Section includes mechanical insulation for duct equipment and pipe including the following 1 Insulation materials 2 Fitting materials 3 Insulation finish materials 4 Accessories SUBMITTALS Product data shall be submitted under provisions of Section 15050 for each type of product indicated identify thermal conductivity thickness and jackets both factory and field applied if any Provide a sheet that ide
272. tos all affected areas shall be kept isolated until all such asbestos material has been removed and the spaces affected duly approved for normal use It is to be noted that only Owner authorized and approved personnel shall be allowed to participate in any manner whatsoever either in the search of or the removal of asbestos suspect material See also the notes on the drawings Asbestos Containing Materials to Remain The Owner may elect not to remove ACMs which are not anticipated to conflict with new work or demolition required in this contract and will therefore remain undisturbed If during demolition or new work procedures the Contractor determines that he must disturb any suspect ACM that the Owner intended to leave undisturbed he shall stop work until the Owner s Abatement Firm can properly remove the Asbestos BASIC MECHANICAL MATERIALS AND METHODS 15050 12 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 1 21 A 1 22 1 23 1 24 STRUCTURAL COORDINATION The party responsible for the installation of the system furnished under Division 15 shall provide the General Contractor with the weight of all mechanical equipment and ductwork and piping and the exact location General Contractor shall then insure all structural members are properly sized and all mechanical penetrations are properly framed to support the full perimeter of the equipment See also paragraph Accep
273. tractor shall also provide access by means of access panels doors etc to be provided under this section of specifications where required or specified Provide sufficient space to allow service e g filter removal of all new and existing equipment Coordinate with all trades to insure accessibility and service of all equipment Equipment located above lift out ceilings shall be considered to be accessible Equipment located above hard unremovable ceilings shall be considered to be unaccessible and access panels shall be provided as specified herein The contractor shall be responsible for verifying that the particular manufacturer s equipment that he chooses will fit in the available space and shall verify prior to submitting equipment that the service clearances that the manufacturer requires are available and shall not submit equipment that will not allow the manufacturer s service clearances During construction the contractor shall install the equipment such that the manufacturer s service clearances are provided by reading the installation instructions The contractors shall bear all costs associated with providing equipment that requires service clearances different from the basis of design equipment If the manufacturer s service clearances are not provided the contractor shall remove the equipment and provide BASIC MECHANICAL MATERIALS AND METHODS 15050 7 Heating Upgrade for Atkinson Hall Georgia College amp State University Mi
274. ts thermostats and other devices as required H The motor horsepowers voltages and phases shown on the drawings are the estimated power requirements of all equipment furnished under other sections of these specifications If equipment with larger horsepower different voltages or phases is selected by the Contractor then the Contractor is responsible for the circuits wire and conduit and protective devices circuit breakers switches and starters to be changed for the ampacity voltage and phase actually to be installed This coordination shall be accomplished between trades at no additional cost to the contract END OF SECTION 16180 EQUIPMENT WIRING SYSTEMS 16180 2 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 16190 SUPPORTING DEVICES PART 1 GENERAL 1 1 RELATED DOCUMENTS A Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section 1 2 WORK INCLUDED A Conduit and equipment supports B Fastening hardware 1 3 QUALITY ASSURANCE A Support systems shall be adequate for weight of equipment and conduit including wiring which they carry 1 4 RELATED SECTIONS A X Section 16195 Electrical Identification Color coding of Equipment Backboards PART 2 PRODUCTS 2 1 MATERIAL A Support Channel Galvanized steel B Hardware Corrosion resistant zinc plated PART 3
275. ttings 14 Notes to explain why certain final data in the body of reports varies from indicated values 15 Testconditions for pump performance forms Final Report Contents In addition to certified field report data include the following Pump curves Manufacturers test data Field test reports prepared by system and equipment installers Other information relative to equipment performance but do not include Shop Drawings and Product Data pU System Diagrams Include schematic layouts of air and hydronic distribution systems Present each system with single line diagram and include the following l Water and steam flow rates 2 Pipe and valve sizes and locations 3 Position of balancing devices All Electric Motors Data To Be Tabulated With Equipment Driven By Motor 1 Manufacturer 2 HP nameplate 3 Phase voltage amperage nameplate actual TESTING ADJUSTING AND BALANCING 15950 7 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia coU de RPM Service factor if applicable Starter size rating heater elements if applicable Motor winding insulation class G Shell And Tube Heat Exchanger 1 2 Hot water gpm entering and leaving water temperature and pressure drop Steam flow Ib hr entering and leaving water temperature and pressure drop 3 12 INSPECTIONS A Initial Inspection 1 After testing and balancing are complete operate each
276. ugh heat exchanger If no provision is available for actual flow measurements as listed above balancing shall be performed by the temperature differential method but the temperature differential method shall be performed only after specified air balancing has been completed Pump flow rates shall be measured by flow meters balancing valves with flow taps or differential pressure measurements Adjustments All hydronic circuits shall be adjusted by the use of the specified balancing valves All balancing valves shall be permanently marked after balancing is completed so they may be returned to the correct position if disturbed TOLERANCES Set HVAC system airflow and water flow rates within the following tolerances 1 Heating Water Flow Rate Plus 10 percent to minus 10 percent REPORTING Initial Construction Phase Report Based on examination of the Contract Documents as specified in Examination Article prepare a report on the adequacy of design for systems balancing devices Recommend changes and additions to systems balancing devices to facilitate proper performance measuring and balancing Recommend changes and additions to HVAC systems and general construction to allow access for performance measuring and balancing devices Status Reports As Work progresses prepare reports to describe completed procedures procedures in progress and scheduled procedures Include a list of deficiencies and problems found in systems being tested an
277. ugh shell Cast iron head shall be bolted to shell Steam connection to shell shall be flanged and water supply and return connections to head shall be threaded or flanged Steam condensate connections to shell shall be threaded or flanged Provide anodic protection as recommended by the manufacturer Control Provide a self powered steam control valve furnished by the shell and tube heat exchanger manufacturer The hot water supply temperature shall be maintained at 140 Manufacturers Steam to water heat exchanger shall be manufactured by Bell and Gosset Thrugh Armstrong or Taco PART 3 EXECUTION 3 1 A 3 2 A 3 3 A D EXAMINATION Examine areas for compliance with requirements for installation tolerances and for structural rigidity strength anchors and other conditions affecting performance of heat exchangers 1 Proceed with installation only after unsatisfactory conditions have been corrected HEAT EXCHANGER INSTALLATION Install in accordance with manufacturer s instructions For plate and frame heat exchangers install to permit removal of plates with minimum disturbance to installed equipment and piping Install OSHA splash guard For shell and tube heat exchangers support heat exchangers on welded steel pipe and angle floor stand anchored to concrete pad Pitch shell to completely drain Install minimum 3 4 hose bibb drain valves with cap on bottom of lower pipe connections 2 each Provide pre
278. ulation and servicing of valves Maintain four inch minimum clearance between parallel runs of piping after insulating space permitting Install drains consisting of a tee fitting NPS 3 4 ball valve and short NPS 3 4 threaded nipple with cap at low points in piping system mains and elsewhere as required for system drainage Establish inverts and install piping at a uniform grade of 0 2 percent upward in direction of flow for non gravity systems Reduce pipe sizes using eccentric reducer fitting installed with level side up Install branch connections to mains using tee fittings in main pipe with the branch connected to the bottom of the main pipe In mechanical corridors branch connections shall be out of the main at an angle 45 degrees below horizontal For up feed risers connect the branch to the top of the main pipe Install valves according to Division 15 Section Valves Install unions or grooved joint couplings in piping NPS 2 and smaller adjacent to valves at final connections of equipment and elsewhere as indicated Install flanges in piping NPS 2 1 2 and larger at final connections of equipment and elsewhere as indicated Install strainers on inlet side of each control valve pressure reducing valve solenoid valve in line pump and elsewhere as indicated Install NPS 3 4 nipple and ball valve in blowdown connection of strainers NPS 2 and larger Match size of strainer blow off connection for strainers smaller than N
279. up test and placing into operation and is or are as the case may be operating properly List the item or items furnished to the job Show catalogue number or numbers 2 We certify further that the aforesaid equipment was installed in strict compliance with our recommendations as published by us in the following document or documents as the case may be Insert the date name or other positive means of identifying the exact document or documents in which the recommendations for installation and use of the item or items are published 3 A copy of the aforesaid document s is are attached hereto This day of 20 JOHN DOE CORPORATION By Authorized Representative The date must be shown See Article 6 4 1 2 5 DEFINITIONS Start up is defined as putting the equipment into action 2 Testing is defined as performing such testing as is stipulated in the Contract Documents to be performed 3 Placing into operation is defined as operating the equipment for a sufficient period of time for the determination to be made that it is performing properly DBB CONSTRUCTION CONTRACT SECTION 7 FORMS SECTION 7 FORMS CERTIFICATE OF INSURANCE INSTRUCTIONS TO PRODUCING AGENT COMPLETE THE SHADED PORTIONS OF THIS CERTIFICATE OR SIMILAR FORM AND RETURN TO THE INSURED WITH ADDITIONAL INSURED ENDORSEMENTS ATTACHED NO CONDITION TERM QUALIFICATION LIMITATION EXCEPTION EXEMPTION MODIFICATION OR PROVIS
280. ved a Total amount earned for work in place original contract b Total amount earned for work in place Change Orders c Value of materials stored at site d Total amount earned a plus b plus c e Amount retained 10 f Total earned less retained percentage d minus e g Total previously approved h Amount due THIS ESTIMATE f minus g i Retainage payment to Subcontractors per Paragraph 4 1 2 5 of the General Conditions j AMOUNT DUE Contractor h minus i further certify that all claims outstanding against the undersigned Contractor for labor materials and expendable equipment employed in the performance of said contract have been paid in full in accordance with the requirements of said contract except such outstanding claims as are listed below or on the attached sheet which statement contains all claims against the Contractor which are not yet paid including all disputed claims and any claims to which the Contractor has or will assert any defense further certify that all of the materials indicated on this Application for Payment as being stored on the Site but not yet incorporated into the building have been purchased delivered and are now stored on the Site for future incorporation into the building and until so incorporated the title to same is upon payment of this statement vested in the Owner Furthermore the undersigned Contractor assumes full responsibility
281. ver or put piping into operation until it has been inspected and approved by authorities having jurisdiction 2 During installation notify authorities having jurisdiction at least 24 hours before inspection must be made Perform tests specified below in presence of authorities having jurisdiction a Roughing in Inspection Arrange for inspection of piping before concealing or closing in after roughing in and before setting fixtures b Final Inspection Arrange final inspection for authorities having jurisdiction to observe tests specified below and to ensure compliance with requirements 3 Re inspection If authorities having jurisdiction find that piping will not pass test or inspection make required corrections and arrange for re inspection 4 Reports Prepare inspection reports and have them signed by authorities having jurisdiction Test domestic water piping as follows l Fill domestic water piping Check components to determine that they are not air bound and that piping is full of water 2 Test for leaks and defects in new piping and parts of existing piping that have been altered extended or repaired If testing 1s performed in segments submit separate report for each test complete with diagram of portion of piping tested DOMESTIC WATER PIPING 15140 5 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 3 3 6 Leave new altered extended or replaced domest
282. videnced by a Current Ratio of 1 0 or higher e Whether the bidder can demonstrate a commitment to safety with regard to Workers Compensation by having an Experience Modification Rate EMR over the past three years not having exceeded an average of 1 2 and e Whether the bidder s past work provides evidence of an ability to successfully complete public works projects within the established time quality or cost or to comply with the bidder s contract obligations In the event all responsive and responsible bids are in excess of the budget the Owner in its sole and absolute discretion and in addition to rejecting all bids reserves the right either to supplement the budget or to negotiate with the lowest responsive and responsible bidder after all deductive alternates are taken but only for the purpose of making changes to the project that will result in a cost to the Owner that is within the budget as it may be supplemented BOARD OF REGENTS OF THE UNIVERSITY SYSTEM OF GEORGIA GEORGIA COLLEGE AND STATE UNIVERSITY BY MARK MEEKS DIRECTOR OF MATERIALS MANAGEMENT AND CENTRAL SERVICES Bip REQUIREMENTS 1 DBB CONSTRUCTION CONTRACT BiD REQUIREMENTS VERSION 07 01 201 1 INSTRUCTIONS TO BIDDERS BID REQUIREMENTS INSTRUCTIONS TO BIDDERS 1 Basis of Contract Contract if awarded will be on a lump sum basis and will be substantially in accordance with the Contract shown on pages Contract 1 to Contract 4 2 Examination of S
283. wed to become overloaded with dust and dirt For throwaway filters new clean filters shall be installed Strainer media shall be cleaned During Construction Pipe openings shall be closed with caps or plugs All open duct shall be sealed tight with polyethylene All equipment and material shall be stored in accordance with manufacturer s recommendations No equipment ductwork piping or materials shall be stored inside or outside the building unless it is properly protected from the weather The Engineer reserves the right to reject any items furnished under Division 15 which have been damaged or are not in like new condition Existing facilities shall be protected Any existing items damaged during construction shall be replaced or restored to their original condition by the Contractor at no cost to the contract Suspended Ductwork Suspended Equipment and Suspended Piping Installation of suspended HVAC ductwork in areas where the roof is not dried in is only acceptable if the Contractor coats each joint of the supply return outdoor air and exhaust duct with duct sealant as specified Contractor is also required to wrap suspended ductwork equipment and piping on three sides with a minimum 4 mil thickness polyethylene taped to the bottom of the ductwork equipment and piping Polyethylene covering is required to protect from the weather water dirt roof tar concrete etc Non Suspended Ductwork Equipment and Piping Contractor is requi
284. with each other G Use flush mounting outlet boxes in finished areas H Secure flush mounting box to interior wall Accurately position to allow for surface finish thickness I Install flush mounting box without damaging wall insulation or reducing its effectiveness J Use adjustable steel channel fasteners for hung ceiling outlet box K Do not fasten boxes to ceiling support wires L Support boxes independently of conduit except cast box that is connected to two rigid metal conduits both supported within 12 inches of box M Use gang box where more than one line voltage device is mounted together Do not use sectional box BOXES 16130 2 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia N Use separate boxes for low voltage systems Do not install line voltage and low voltage devices within same outlet O Use4 inch square box with plaster ring for single device outlets P Use cast outlet box in exterior locations exposed to the weather and wet locations 32 ADJUSTING A Install knockout closure in unused box opening END OF SECTION 16130 BOXES 16130 3 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia SECTION 16170 GROUNDING AND BONDING PART 1 GENERAL 1 1 RELATED DOCUMENTS A Drawings and general provisions of the Contract including General and Supplementary Conditions and Division 1 Specification Sections
285. wner may be subjected by reason of any wrongdoing including patent infringement misconduct want of care or skill default or failure of performance on the part of said Principal his agents subcontractors or employees in the execution or performance of said contract then this obligation shall be null and void otherwise it shall remain in full force and effect 1 The said Surety to this bond for value received hereby stipulates and agrees that no change or changes extension of time or extensions of time alteration or alterations or addition or additions to the terms of the contract or to the work to be performed thereunder or the specifications or drawings accompanying same or the exercise of the Owner s right to do work pursuant to Articles 1 3 7 1 7 8 or 5 3 5 or Paragraphs 3 4 1 4 or 5 3 2 3 shall in any way affect its obligation on this bond and it does hereby waive notice of any such change or changes extension of time or extensions of time alteration or alterations or addition or additions to the terms of the contract or to the Work or to the specifications or drawings In addition the Surety to this bond for value received hereby agrees to the provisions of Article 1 5 1 including Paragraph 1 5 1 3 for increases in the penal amount of this bond and waives notice from the Owner of any such changes 2 If pursuant to the Contract Documents the Contractor shall be declared in default by the Owner under the aforesaid Contract a
286. y commission expires SEAL NOTE THE NOTARY SEAL MUST BE APPLIED UNDER GEORGIA LAW WHETHER OR NOT THE LAW OF THE STATE WHERE EXECUTED PERMITS OTHERWISE Bip REQUIREMENTS 9 DBB CONSTRUCTION CONTRACT BiD REQUIREMENTS VERSION 07 01 201 1 STATEMENT OF BIDDER S QUALIFICATIONS Statistical Information This request is made for statistical purposes only PLEASE INDICATE BELOW WHICH OF THE FOLLOWING DESCRIPTIONS APPLY TO YOUR COMPANY MINORITY BUSINESS ENTERPRISE MBE One of the following statements describes this business a Owned by a member of a minority race or b a partnership of which a majority of interest is owned by one or more members of a minority race or c a public corporation of which a majority of the common stock is owned by one or more members of a minority race A member of a minority race is defined as a person who is a member of a race that comprises less than fifty percent of the total population of the State of Georgia For recordkeeping purposes this includes but is not limited to persons who are Black Hispanic Asian Pacific American Native American or Asian Indian American GEORGIA MINORITY BUSINESS ENTERPRISE GMBE Business meets the definition of a minority owned business and in addition meets the following criteria a was organized in the State of Georgia or b reports income from the business for Georgia Income Tax purposes or c minority stockholders report earnings for Georgia Minority Busines
287. y for its application Flow characteristics of hot water valves and chilled water valves shall be equal percentage type Provide stainless steel trim or bronze trim as required to achieve maximum differential pressure rating Valve schedule Contractor submits shall be arranged as follows 1 Valve Tag 1 2 3 etc 2 Equipment Served AHU 1 FCU 1 etc 3 Service Heating Cooling etc 4 Fail Position Bypass Coil 5 Valve Model No 6 Size 1 4 inch 1 2 inch etc T CV 8 Valve Authority Beta 9 Approved Coil Pressure Drops 10 Capacity Gpm 11 Differential Pressure Rating PSI 12 Valve Pattern 3 way 2 way etc 13 Pressure Drop At Rated Flow PSI 14 Flow Control 2 position Modulating etc 15 Actuator Type 24 volt 120 volt etc 16 Required Differential Rating PSI 1 2 x maximum pump D P H Steam Control Valve Steam control valves shall be properly sized for the application with a maximum 2 psi drop Two position steam valves shall be line sized HVAC INSTRUMENTATION AND CONTROLS 15900 5 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 2 4 I Hydronic Differential Pressure Switch Differential pressure switch shall be used to sense differential pressure across hydronic devices in order to verify flow or to prove pump status Switch shall be snap acting SPDT with 10 million cycle mechanical contact life System oper
288. ystems and similar systems may be treated as a group with HVAC INSTRUMENTATION AND CONTROLS 15900 9 Heating Upgrade for Atkinson Hall Georgia College amp State University Milledgeville Georgia 3 8 instruction on the physical layout of one such system The results of the performance verification test and the calibration adjustment and commissioning report shall be presented as benchmarks of HVAC control system performance by which to measure operation and maintenance effectiveness MANUALS The following manuals shall be provided 1 An Operators Manual with graphic explanations of operator functions Although operator functions are to be self instructional and menu interactive from the keyboard terminal this manual shall be for off line study and refresher use 2 A Programmer s Manual with graphic descriptions of functions required for software modifications and development Although high level languages such as PASCAL are required to be usable on the system full PASCAL type manuals and training are not required The use and installation of PASCAL type programs shall be included in this manual This programmer s manual shall include computer generated listings of all DDC programs 3 Computerized printouts of all NCP data file construction including all point processing assignments physical terminal relationships scales and offsets command and alarm limits etc 4 A user manual for the integrated spreadsheet package 5 A
Download Pdf Manuals
Related Search
Related Contents
Fujitsu PRIMERGY TX120 S3P Philips 3000 series LCD TV 22PFL3606H Manuel d`utilisation Pachette 3 (English, 12/03/10) Manual del ProPietario Bedienungsanleitung - CONRAD Produktinfo. VCHO-15SDHF型 屋外用カメラハウジング 製品仕様書 KS505M 取扱説明書 Certificat de Préposé au Tir (CPT) PIS super dilac Copyright © All rights reserved.