Home
Installation guide
Contents
1. INTO ROOF INTO ROOF Field Cable Field Cable Field Cable Field Cable Red C21e 7T Red on cable e L T G20 cable eT T Red C216 cable 30 15 30 15 29 14 1o 29 1o 14 8 28 8 18 8 28 13 E LE 27 18 12 5 27 1 1 E 1 lt 4 t4 Y Y 2nd String 1st String Diagram 11 WARNING Ensure that the Field Cables and Return Cables at the top of the installation lie close to each other Part Number 15196 01 18 Eon 6 Completing the Tiling When all the C21e units have been fitted a string check for the system is complete and the Field Cables passed into the loft space the remaining concrete tiles can be laid e Install the concrete tiles on the left side of the C21e units as you would at a verge i e using a whole tile or a tile and a half This will ensure weather tightness and match the grain of the tiles below x pM S I m e Lay a course of conventional tiles on the batten above the C21e units Diagram 12 WARNING The headlap should never exceed 120mm headlap greater than this will cover the PV cells and cause the system to fail invalidating the warranty Part Number 15196 01 19 Roof Installation Guide 6 Completing the Tiling continued e Continue laying the tiles for the remainde
2. Solar Century Holdings Limited 91 94 Lower Marsh London SE1 7AB 020 7803 0180 customerservices Solarcentury com Part Number 15196 01 24 SIN V v0 89 1IV130 ONIXI4 8 LNOAVT TWOIdAL LVINHOH JILL 3120 LO O8E 23 W33HS NH 5NIMVUG aoo sonpoid imuooie os joesneg si Buiweip stu a D E LL P 5 o gt ei ejerouoS 5 ES 1 SIGUSDM Wada smaos 5 SS Duisn l 9122 4203 E eo ON JOOY 2u or 10105 29120 G O injue2iDjos 60 H Dos qum TT Lobed pepueuuooei osxez 484 104 X fumueojejos 2 Lo lt 10 96191 10 96191 JequunN Hed oO N SIN v vO 89 7130 SNIXIH 8 LANOAVT WOIdAL 1VIAHOJ JIL 3120 10 08811 31005 WYN M3lA NV1d sBuymeap speypiy aas jo01 JO EM JO S Ie3ap 404 spn poud fimua ieos aly 51 siu c nd nd N tc JOO BU PUD sel
3. Un Screws are included within each carton of C21e units Field Cables 2 per string The quantities of components vary by system size and layout see Appendix 4 for details Roof Installation Guide 2 Components continued C21e Units Front Screw hole C21e cables E Photovoltaic cell Reverse Junction box C21e cables gt Please note for visual simplicity photovoltaic cells have been removed on subsequent diagrams in this guide Part Number 15196 01 Eon 3 Pre Installation Checks Before you go on to the roof check that e Your roof tiles are compatible with the C21e units See the C21e datasheet available at www solarcentury com for the up to date list of compatible tiles e Your accessories box contains the correct number of parts needed for your system size and layout see Appendix 4 e The C21e units particularly the glass surfaces are undamaged You have all the required tools including the string checker All relevant site requirements have been checked and adhered to including planning permission building control or site rules e The C21e units will be situated on a roof pitch facing south between south east and south west e C21e units will be positioned in an unshaded location e You understand the roof schematic see Appendix 1 e You
4. e Turn the C21e unit the correct way round with the nib resting on the batten as with a normal tile The frame should interlock with the tile to its right Diagram 62 e Use an electric screw driver and the screws provided to fix the C21e unit to the batten through the holes on the C21e frame Diagram 6 Part Number 15196 01 Diagram 6 WARNING Only use the screws and washers supplied These form part of the system designed to provide a weather tight seal and are correctly sized for the C21e units Use the correct number of screws every time Using any other screws will invalidate the warranty WARNING Ensure that there is no risk of the cables being trapped or pierced when the C21e unit is fixed TIP Work from right to left when tightening the screws to ensure the 21 tile fits correctly A WARNING Do NOT use a hammer to fix the C21e Roof Installation Guide 5 C21e Installation continued e Install the right set of roof tiles on the batten above ready for the next C21e unit as explained in 5 2 e Lay the next C21e face down on the batten Firmly connect its black cable to the red cable from the C21e on the course below Diagram 7 e Pass the red cable from this C21e under the batten above ready to connect to the next C21e in the column WARNING Ensure that the C21e cables lay close to the Return Cable A and that the cables are not trapped between the tile and batten when fixing th
5. Detail 25 2 2 The Roof Accessories Appendix 2 String Layouts 27 Appendix 3 String Checker 3 Pre Installation Checks 5 User 28 Appendix 4 Component List 4 Roof Preparation 6 and Roof Dimensions 29 4 1 General Recommendations 6 4 2 Marking the Area for the C21e 7 4 3 Positioning the Cables 8 5 C21e Installation 9 5 1 Laying the Bottom Section of Roof 9 5 2 Laying the Right Section of Roof 10 5 3 Fitting the First C21e COUM a Pr 11 5 4 Checking the C21e Cable COFInecllons sec sepe eee 15 5 5 Laying the Remaining C21e COMMING teers 16 5 6 Completing the Cabling 17 6 Completing the Tiling 19 Part Number 15196 01 i C215 1 Health and Safety 1 1 General Guidance e Construction Design and Management Regulations 2007 CDM and general construction site training must be followed e Safe working at heights training should be adhered to e Anyone handling photovoltaic PV modules should be trained in correct manual handling practice e All appropriate Health and Safety regulations should be followed correctly e Avoid installing the system in poor weather c
6. the absence of proof of purchase from the date of manufacture A Materials and Workmanship 10 years The Product shall be free from defects in materials and workmanship in manufacture for a period of 10 years B Power Output 25 years 1 The power rating of the Product will remain at 9096 or more of its Peak Power rating for 10 years and 2 The power rating of the Product will remain at 8096 or more of its Peak Power rating for 25 years If a Product fails to meet the standard guaranteed and the conditions below are met then Solarcentury will in its sole discretion a repair or replace the defective Product with an equivalent product or b refund the purchase price of the Product or c provide the owner with additional PV modules required to make up the power lost or provide to the owner compensation for power lost up to a maximum value of the purchase price of the Product such loss in power having been proved to have been suffered by the owner of the Product and determined by Solarcentury in its sole and absolute discretion to be due to defects in materials or workmanship Notwithstanding the above if the Product is used in any non land based applications any Power Output warranty claims must be made within 10 years 1 this context the power rating of the Product will be that measured by or on behalf of Solarcentury under Standard Test Conditions irradiance of 1000W m2 light spectrum AM 1 59 and a cell temperat
7. 7 21 C21e Tile 111 7 TT MERI m ELLE iiid 2 Trid For new builds and re roofing with C21 On completion please return type M50 S38 this guide to the Commissioning Electrician eee solarcentury Eon Installation Details Please complete the information below Once the installation has been completed this guide should be passed to the Electrician who will be responsible for commissioning the system Installation Address String voltage checks taken at Date Time Checks taken by Company Name Last Name First Name Contact Number Notes e Within this guide the illustrations show a 60 unit C21e system laid broken bond The C21e solar electric roof tile will be referred to as C21e or a C21e unit throughout Part Number 15196 01 Roof Installation Guide Contents ae aa RR Page 1 Health and Safety 1 7 accent cis 21 1 1 General Guidance 1 1 2 Electrical Hazards 1 8 Warranty 22 1 3 Preparation for C21e 2 Appendices eere 25 Appendix 1 C21e Tile Schematic 2 Components sse 3 Typical Layout amp 2 1 Equipment Required 3 Fixing
8. 9125 ej 2 9JOUM 1509 I yo SHON Uoo fUnjueoJejos funjueoJejos sell 9122 JO 1509 Part Number 15196 01 2 lar til C21 Appendix 2 String Layouts For all standard layouts individual columns are connected in exactly the same way using the Return Cables The length of the Return Cable will correspond to the layout selected at the time of ordering Final connection of the columns to form the String or Strings should follow the guidance in Appendix 4 Single String Systems 12 to 36 48 and 54 units For these system sizes all of the 21 units are connected together to form a single String as shown in the example below ___ ROOF _ Field Cable Field Cable Red C21e Red C216 Red C21e Red C21e cable cable cable cable Red C21e 77 477 ETR cabe ht x 30 24 18 12 1 6 T T 1 1o 29 1 23 1 17 11 5 S Te 28 22 16 S 10 9 4 s s 5 TS I5 27 pug 21 P 15 P 9 POS 1 26 20 14 8 2 1 1 1 i 24 e 19 13 7 1 30 C21e unit example Two String Systems 42 and 60 to 80 C21e units For these system size
9. cker to the OFF position 9 You can now disconnect the test leads and 2 1 continue with the C21e installation following the COM input V O input C21e On Roof Installation Guide connector connector Please refer to the user manual for full operating instructions String checkers with touch proof test leads are available to order from Solarcentury Part Number 15196 01 28 Part Number 15196 01 Eon Appendix 4 Component List and Roof Dimensions 29 C21e System Size ME Standard Roof Components Provided Number of Return Cables Qty Pairs of C21e Units xLength m __ Screws 12 1 6 2 12 1 8 4 6 2 ojo 2 3 6 5 5 6 3 0 2 5 18 2 9 4 6 6 3 2 2 8 20 4 4 x 10m 5 2 320 8x4 5m gt 1 Additional layouts may be possible for some system sizes but will require additional Return Cables to those provided in the Standard Systems 2 The components provided in each system will support the layouts as shown a small quantity of spare screws are provided 3 One Return Cable is provided per C21e column The Cable length is dependent on the number of C21e rows in the layout Notes 4 The dimensions stated are for guidance and are based on the C21e Design Rules for the compatible tiles listed on the datasheet Please refer to the C21e Tile datashe
10. e C21e units e Turn the C21e unit the correct way round with the nib resting on the batten as with a normal tile e Fix the C21e to the batten using the screws provided WARNING The lower edge of the C21e frame should sit on the frame A of the C21e below but should never extend more than 20 mm onto the glass surface or the cells will be shaded voiding the warranty e Lay the remaining C21e units in the column following the same method 14 Part Number 15196 01 Eon 5 C21e Installation continued 5 4 Checking the C21e Cable Connections e At the top of each column ensure that the C21e cables are left in an accessible position They will be connected later in the installation Solarcentury recommends that a string check is carried out for each column to check the cable connections Diagram 8 e To carry out a string check follow the instructions in Appendix Part Number 15196 01 Diagram 8 WARNING Always use safety leads with the string checker Never use standard meter probes to avoid risk of electrocution 15 Roof Installation Guide 5 C21e Installation continued 5 5 Laying the Remaining C21e Columns Start the next C21e column and follow the same method as described in 5 3 e Lay the C21e face down and pass both C21e cables under th
11. e Ensure all cable connectors are dry and free of dirt before making connections e Ensure no cable ends are left exposed to the weather during work breaks or after completion of works Keep the C21e units in a weatherproof environment before installation e Carry the C21e units with both hands by the frame and avoid scratching the glass e Only load as many C21e units onto the roof as you expect to install during the session e Secure or remove any uninstalled units before leaving the roof to avoid possible wind damage Do NOT walk on the glass surface of the C21e units While robust extreme point pressure may cause the toughened glass laminate to shatter e Do not leave tools or unsecured materials above the C21e installation area to avoid potential damage to the units Part Number 15196 01 Part Number 15196 01 2 Eons 2 Components 2 1 Equipment Required e Standard roofing tool kit e C21e specific tools Screwdriver with pozi drive head String checker with specialist touch proof test leads to check cable connections available to order from Solarcentury 2 2 The Roof Accessories Box When ordered as a complete system the accessories box will contain the following components required for the on roof installation of the C216 units Components included in the standard accessories box Return Cables C21e Self Tapping Screws layout dependent 1 5 X 45 Countersunk per column
12. e batten e Firmly connect the black C21e cable to a Return Cable ensuring no gap in connection e Run the Return Cable to the top of the column e the C21e unit the correct way round with the nib resting on the batten as with a normal tile e Ensure the frame of this tile links with the frame of the C21e to its right e Fix the C21e to the batten using the screws provided e Complete the column and out a string check as described in 5 4 e Fit any remaining columns following the method above Diagram 9 5 2 C24 solar tiles amp Slates 5 C21e Installation continued 5 6 Completing the Cabling When all the C21e units are fixed in place the cables at the top of each column must be connected together to complete the string or strings The following example explains how to connect a two string 60 C21e unit system For single string systems please refer to Appendix 2 Consult Appendix 4 to confirm the number of strings for the system size you are installing For all two string systems you should consider the C21e units as two separate arrays with an equal number of C21e units in each array For example a system of 60 C21e units should be split evenly into two strings each with 30 C21e units See Diagram 10 for details Field Cable Roofing membrane Field Cable 1872 oes 8 Z a Diag
13. e units No responsibility is assumed by Solarcentury for any infringement of patents or other rights of third parties that may result from use of the C21e units No license is granted by implication or otherwise under any patent or patent rights Solarcentury reserves the right to make changes to the Product the specifications or this guide without prior notice Incorrect and or faulty installation operation use or maintenance may be dangerous and may invalidate any warranty which may apply to the C21e units End users should remember that the C21e units require professional installation using special tools and expert know how No part of this guide may be reproduced in any form by any means without Solarcentury s express written consent Roof Installation Guide 8 Warranty Product Warranty C21e solar electric roof tiles in United Kingdom and Ireland Model number 21 Interlocking Tile 50 538 This warranty applies to the Solarcentury Modules with the model numbers listed above which were purchased from Solarcentury or an authorised distributor installer or reseller an Authorised Distributor and purchased and installed in the territory indicated above In this warranty Product means each of the listed Modules individually In addition to your statutory rights which are unaffected Solarcentury guarantees that from the date of original purchase from Solarcentury or its Authorised Distributor or in
14. et for full specification details Dimensions of C21 Array Total Recommended Roof Dimensions Required C21e System Size C21e Layout Option laid broken bond excluding including the tile border for compatible tiles border with a 90mm headlap 1 i 8 J 2 12 3 E 4 j 6 i e E En EM ojo a a 18 1 9 2 6 3 3 6 2 9 1 18 12 2 8 3 6 4 4 6 3 8 2 12 2 3 5 6 0 5 2 4 6 2 E 18 068 2159 2199 2903 2 31 7 23 297 7 83 23 26 0 99 16 67 1 65 TE 28 50 e os 16 325 2 97 ie 23 5 63 ds 83 28 42 0 99 21 39 1 65 21 99 36 28 Hn 55 356 e ac 13 7s 535 m 5 lo 8 4 2 6 72 3 60 9 8 6 12 4 18 6 2 72 40 793 4 00 20 4 6 6 4 87 7 26 5 47 39 71 0 8 9 59 3 96 10 19 40 35 Part Number 15196 01 Eon Notes Part Number 15196 01 31 Roof Installation Guide Notes Part Number 15196 01 32 i C215 String Check Results Use the tables below to record the String voltages Once completed this installation guide should be passed to the Electrician who will be responsible for com
15. have been detected 23 Roof Installation Guide 8 Warranty continued If any of the above conditions are not met then Solarcentury shall have no obligations under this guarantee and no rights shall accrue as a result of this warranty Procedure for making a claim Before making a claim you should review the Product Guide to make sure that you have followed all the guidance If after reviewing the Product Guide you are still concerned that the Product is not performing as it should please contact your installer or maintainer in the first instance If your installer or maintainer considers the Product is not performing according to the warranty please together with the assistance of your installer or maintainer provide Solarcentury with the details below so that we can consider your claim marking your correspondence for the attention of the Solarcentury Customer Services Please include e Confirmation that you have reviewed the Product Guide but the results indicate that the Product may be failing to perform to the guaranteed standard e Confirmation that conditions to k above are met e detailed description of the Product failure including supporting images e Adequate documentation of proof of purchase including details of purchase receipts e Products serial number and e Details of when and by whom the Product was purchased and installed and the address of the property at which it was installed
16. laid column by column This allows the C21e cables to be connected and tested as you go The first column of C21e units should begin on the lowest batten in the marked area and sit flush with the concrete tiles on the right e ay the first C21e face down as shown in Diagram 5 and pass both C21e cables under the batten e Firmly connect the black C21e cable to the end of the Return Cable Diagram 5a e Pass the Return Cable from the C21e tile under the battens to the top of the column TIP The longer Field Cables that enter the roof space look similar to the Return Cables To help distinguish between them the Return Cables have a red tag and the Field Cables are marked with one of the following symbols 6 WARNING Make sure there is no gap between any connectors as this will cause the system to fail 54 TIP To ensure firm connection push the connectors together until they click Part Number 15196 01 a a Roof Installation Guide 5 C21e Installation continued Return cable Diagram 5 A WARNING Ensure that there are no upstanding nails that could damage the glass surface of the C21e WARNING Make sure that when you lay the Return Cables and A C21e cables up the roof they lie close to each other This is important throughout the installation to prevent electrical interference Part Number 15196 01 12 2 C24 solar tiles amp Slates 5 C21e Installation continued
17. ll be located on the roof Design Rules The area that the C21e system will cover on the roof has been calculated using the following design rules Diagram 2 These rules exist to ensure a weathertight installation e Allow a minimum of one conventional tile between the edge C21e units and the verge or equivalent obstruction e Allow at least one course of conventional tiles below the C21e area and at least one course of conventional tiles above the C21e area e C21e tiles broken bond to match the fixing specification of the conventional tiles e The system is central to the roof and not close to any vents See Appendix 4 for more detail of required space for each C21e system size Consult the Site Manager or System Designer if the drawings do not conform to the above design rules The example C216 system in this guide uses 4 columns of 15 rows Roof Installation Guide 4 Roof Preparation continued e When the layout and location of the C21e system has been identified mark this area on the roof Minimum start distance from ridge eaves 1 concrete tile course At least 1 concrete tile width from each verge h y Diagram 2 4 3 Positioning the Field Cables Before fixing the C21e units you must consider how the cables are connected and where they enter the roof space e Refer to the string diagram for an overview of cable positions and connections Appendi
18. missioning the system String Checker Voltage Measurement Table Voltage per string Voltage string System Size total Number of Number or C21e on Sunny Day on Overcast Day number of C21e Strinas Slates in each units in the system 9 String SUN CLOUD CY 12 1 12 137 109 18 1 18 205 164 24 1 24 274 219 30 1 30 342 274 36 1 36 205 164 42 2 21 239 192 48 1 48 274 219 54 1 54 308 246 60 2 30 342 274 66 2 33 376 301 72 2 36 410 328 78 2 39 445 356 80 2 40 456 365 Your recorded measurements Weather conditions please tick SUN xx CLOUD C5 String 1 String 2 5 91 94 Lower Marsh d Waterloo _ For Customer Service support London SE1 7AB please contact Solarcentury 8 44 0 20 7803 0100 on 020 703 0180 4 0 20 7803 0101 a F 5 O rc e n t u ry WWNW Solarcentury com customerservicesGsolarcentury com
19. onditions including strong wind rain ice or snow e tile courses should be layed according to British Standard 5534 2003 Code of practice for slating and tiling including shingles unless told otherwise e Install all components as specified within this guide to ensure weather tightness 1 2 Electrical Hazards You must be aware of the following WARNING PV modules produce a DC voltage whenever exposed to light This voltage cannot be switched off WARNING Care must be taken not to cut or damage cable insulation or expose bare wire gt e PV modules are pre wired with touch proof connectors to prevent an electrical shock during general handling e PV modules do not present a risk as long as appropriate safety practices are followed at all times during installation e All work must be carried out with the C21e system disconnected from the mains electrical supply latest at time of print Part Number 15196 01 Roof Installation Guide 1 Health and Safety continued 1 3 Preparation for 21 Installation Follow the guidance below to ensure the C21e units are installed and handled correctly e Use this installation guide alongside your system design guide and roof schematic see Appendix 1 to determine the location and layout of the C21e system on the roof Use this installation guide alongside the string diagram see Appendix 2 to understand how to connect the C21e cables together
20. r of the roof using standard practice Diagram 13 A WARNING Take care not to drop tools or materials on the C21e units vA NOTE Please remember to dispose of all unused materials safely and recycle where possible Part Number 15196 01 20 Part Number 15196 01 Eon 7 Disclaimer of Liability 21 Instructions given in this guide are general guidelines only for the design installation and use of the C21e units together with any associated components Due to the wide variety of materials equipment and sites which an installation may involve this guide cannot consider the individual technical requirements relevant to every individual project and or site If you have detailed questions about any specific project and or site please contact Solarcentury Before installing the C21e units contact the appropriate authorities to determine the permissions consents approvals licenses installation and inspection requirements which apply to the site and the installation Solarcentury accepts no responsibility or liability in this respect This guide is based on Solarcentury s knowledge and experience and is believed to be reliable but the guide does not constitute a warranty express of implied Solarcentury does not assume responsibility and expressly disclaims liability for any loss damage or expense arising out of or in any way connected with incorrect handling installation operation use or maintenance of the C21
21. ram 10 WARNING Each String in an array should always have the same number of C21e units Uneven Strings will cause the system to fail and invalidate the warranty Part Number 15196 01 17 Roof Installation Guide 5 C21e Installation continued For the first String e Start at the top of the first right C21e column and connect the Return Cable to a Field Cable marked with one of the symbols r e At the top of each other column in this String connect the Return Cable to the spare red C21e cable from the previous column e At the final C21e column connect the remaining red C21e cable to a Field Cable see Diagram 10 _ Bring the Field Cables together above this column and carry out a String 2 check the completed String by following the instructions provided 6 Appendix 2 Record the results on the reverse of this guide Use cable tie or equivalent fasten the cables the battens Securing the cables will avoid potential stress if they are pulled from within the loft space during the electrical installation e Take the ends of the Field Cables and push them through a lap in the membrane at the top of the last column in the String and into the loft space For the second String e Repeat the steps above starting at the top of the next column e You should be left with two identical arrays with an equal number of C21e units in each string as shown in Diagram 11 below
22. s 2 strings are needed irrespective of the physical roof layout as shown in the worked example in this guide Section 5 6 WARNING The number of strings is dependent on the System Design for the size of the C21e array This should not be changed See Appendix 4 for more details 27 Appendix 3 String Checker User Guide 1 Connect the red test lead to the V O input connector 1 and the black test lead to the COM input connector 2 2 From the off position turn the centre dial one place in an anti clockwise direction The Function Range is now set to 600Vac 3 3 Connect the opposite ends of the test leads to the output strings of the C21e units Note the connectors will only connect one way 4 The display will now read the DC voltage produced by the C216 Units 3 600Vdc 5 The voltage will vary according to the amount of daylight falling on the C216 Units Please refer to the table on the back page as an approximate guide to the measurement 6 If the value displayed on the String Checker Screen is below the figure for an overcast day then there is an error with the installation and string connection 7 In this situation retrace the string connection through from the start ensuring the connectors are pushed firmly together with no gaps and that MAX EE FA Ve the C21e Units follow the Stringing Diagram for the given layout 8 Once the reading is correct switch the String Che
23. understand the string layout see Appendix 2 You have read this guide in full Part Number 15196 01 Roof Installation Guide 4 Roof Preparation 4 1 General Recommendations A standard roof build up is suitable for use with C21e tiles however we make the following recommendations e Use a breathable roofing membrane or similar e Use 50mm x 25mm Tanalised battens nailed to rafters not exceeding 600mm centres in accordance with BS 5534 2003 Space the battens following the fixing specification for the conventional roof tiles with a gauge no less than 300mm and no more than 345mm Refer to the C21e Solar Electric Roof Tile datasheet for the full specification WARNING For warm roofs eaves to ridge ventilation or equivalent should be provided to ensure adequate air flow behind the C21e units Roof battens Nx 300 345mm Diagram 1 WARNING Make sure there are no upstanding nails that could break the glass on the C21e or damage the cables Part Number 15196 01 Part Number 15196 01 2 C24 solar tiles amp slates 4 Roof Preparation continued 4 2 Marking the Area for the C21e System To make sure the C21e system is installed in the correct position on the roof you must mark the area out before you begin Diagram 2 e Refer to the Appendices and your Architect s drawings to understand which layout to use and where the system wi
24. ure of 25 degrees Celsius and may not equate to that produced by the Product under other conditions The relevant Peak Power is defined in Solarcentury s Datasheet at the time of shipment 22 Part Number 15196 01 Part Number 15196 01 Eon 8 Warranty continued Solarcentury shall have no liability for any other costs or losses howsoever arising and for the avoidance of doubt this guarantee does not include the costs of labour or transport or any other associated costs including without limitation costs involved in removing or returning the Product to Solarcentury or its re installation Any Product or parts replaced shall become the property of Solarcentury and the replacement Product shall only have the warranty cover for the remainder of the original warranty period The conditions a The Product is properly installed in a suitable location in accordance with Solarcentury s Datasheets and instructions for design installation operation and maintenance of the Product together the Product Guide and in accordance with all applicable laws and standards as updated and applicable at the date of installation whether or not those standards are identified in the Product Guide 0 The Product has not been removed from the location in which it was first installed nor connected to or used with any unapproved device c The Product has not in Solarcentury s absolute judgment been damaged during transportation deliver
25. x 2 e Identify where the Field Cables will need to enter the roof at a suitable lap in the membrane Part Number 15196 01 i C215 5 C21e Installation 5 1 Laying the Bottom Section of Roof Tiles e the bottom courses of conventional roof tiles using standard practice from the eaves up to the area marked for the C21e system 74 TIP Before fixing the course of roof tiles below the marked area check the spacing Each C21e replaces four roof tiles they should be laid broken bond to match the roof tiles see Diagram 3 below In some situations you may need to adjust the shunt of the roof tiles Diagram 3 Part Number 15196 01 Roof Installation Guide 5 C21e Installation continued 5 2 Laying the Right Section of Roof Tiles e Install roof tiles to the right side of the C21e area as you would at a verge i e using a whole tile or a tile and a half This will ensure weather tightness and match the grain of the tiles below SS Diagram 4 WARNING Make sure there is at least one roof tile between the edge of the C21e area and the verge of the roof or equivalent obstruction Part Number 15196 01 10 Eon 5 C21e Installation continued 5 3 Fitting the First C21e Column It is advised that the C21e units are
26. y storage handling or installation d The Product has not in Solarcentury s absolute judgment suffered damage caused by extraneous causes such as structural movement of the roof accident an impact of significant force fire lightning flood severe weather interference by animals insect and pest infestation or other Acts of God or other events howsoever caused reasonably beyond Solarcentury s control e The Product has not been subject to misuse neglect abuse alteration or improper application The Product has not been exposed to conditions including where applicable excessive levels of pollution or wind speeds at the property where it was installed which are more adverse than those which the Product is designed to withstand as stated in the Product Guide g The Product has been operated and maintained in accordance with the Product Guide h The labels serial numbers or barcodes on the Product or any of its components have not been altered removed or made illegible i Any alleged defect in materials is not merely cosmetic or due to normal and reasonable wear and tear of the Product Solarcentury has been paid in full for the Product k Acclaim is notified i in accordance with the procedure set out below and as Set out in the Product Guide ii within the applicable warranty period set out above and iii within two months of the first date on which problems with the Product were detected or ought to
Download Pdf Manuals
Related Search
Related Contents
PAYLINE-Guide d`integration de iDEAL-FR Sharp PN-L702B touch screen monitor manuale - MAIR systems Jabra GO™ 6470 78K0S/KU1+, 78K0S/KY1+, 78K0S/KA1+, 78K0S/KB1+ Usage Graphical user interface system for steam turbine operating conditions LGCII User`s manual (English) Istruzioni per l`uso WD1245 - Ridgid Philips N Coffee maker HD7546/20 Copyright © All rights reserved.
Failed to retrieve file