Home

Vastu Vision Version 02 - User Manual Malayalam

image

Contents

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15. FIND BRE
16. wala COE Uae miano heao Tce ean SRR ales mas
17. amp ealmod
18. 4
19. em A brief scientific explanation amp Position of Trees a in picture 29 POSITION OF ANIMAL HOUS Select 3 Vastu Location gt ition of Animal House f Animal House Animal House
20. 30 On the Dimensions of a Side Enter Length In Meter an Select Month The location for the ing Earth Excavation is shown as Red dot in the picture of the Vastu Purusha Mandala and also t sition of the Vastu Purusha Is also Shown 37 HOUSE STARTING TIME Select 5 Muhoortham 5 Griharambha Muhoortham fe Grihara
21. r Do not show me again Close PTT Enter Username and Password ff User Access INDIA S Pur AUTHENTIC l NAain Miani U 1 310 IVienu wi Main Menu SI No VMPDZ2 101 CE V STU Vv VISION 15 January 2013 13 18 1 Settings ______J 2 vastu Purusha Concept
22. sale eee mnjedgcuomym Lahr On the Dimensions of a Side Box Enter Length in Meter and Sele
23. wmo amag
24. 10 8 LAND SELECTION Click 2 Vastu Details mmm 6 Land Selection fe Land Selection x ol19459J010 Wee McG A190
25. 45 VASTU CORRECTION FOR AN ING BUILDING CALCULATION Select 7 Vastu Correction smn Oo tu Corrections Calculation fi vastu Correction Input is Perimetertmj se creck vastu status clear kol smwerereet 2095 feet seinem gt Matches Summary clear Data and amer mo View Values ayer E Goss 8 Creep
26. A brief explanation of Stone Laying Months is given as shown in above picture 38 36 FIND SUITABLE LOCATION FOR STONE LAYING EARTH EXCAVATION Select 5 Muhoortham 4 Stone Laying Scientific Approach fe Stone Laying Location x Stone Laying Location 4 Dimensions of a Side Length in Meter 5 30 North Fole 4 South Pole B ot meo West
27. exTUlAe
28. cquo fix Plan View Sft Vastu Plans Length Breadth A 38 Direction IS outh Selected Length Breadth 10 62 K x 10 38 K El Chuttu Kol Viral 588
29. A brief scientific explanation of Panchashir ation is given as shown in above picture 40 HOUSE WARMING CER Select 5 Muhoortham mmm By Grihaprevasha Muhoortham Grihaprevesha x H bun i ej el amp 2 aj PUO CTU eho enema AO lal ama loess 00010 000 6G Cn eec MM IT Cee on loss Month Reference MDEMU
30. 21 INTERIOR ARRANGEMENTS Select 3 Vastu Location 6 Interior Arrangements ff Interior Arrangements Interior Arrangements Details
31. 4 VASTU MEASUREMENTS Click 2 Vastu Details mmm 2 Vastu Measurements fi Vastu Measurements Unit of Measurements
32. North 20 30 SON wo mo Select a room from A brief description 19 18 POS
33. South East 2 After Viewing the Information Click X 7 IMPORTANCE OF YONI Click 2 Vastu Details mm 5 wi Importance of Yoni Importance of Yoni
34. aimas BOO 24 onm
35. West let
36. GO
37. som side Bo d Select Go rails Pull down menu e position of the Septic Tank is shown below the diagram On the Dimensions of Enter Length In M Select a room fr A brief descr
38. Select a Room Type from the Room Type Pull down menu A brief description and the position of the Room is shown below the pictorial graph 22 23 22 POSITION OF STAIRCASE Select 3 Vastu Location mmm 7 Staircase ff Staircase Staircase 1
39. 12 Len cro Go6rn 2 72 GOIRI 24 8 Je m 6300 Qq d5o 3 24 6300 72 4
40. omot mom ees morimori mo my pmi mgr Eom amet emma enis mu _
41. Select Details and View the Result After Viewing Click X 6 IMPORTANCE OF DIRECTIONS Click 2 Vastu Details 4 Importance of Directions fex Importance of Directions Importance of Directions North East 8
42. 2 3
43. SGM shoo A brief explanation of House Warming Ceremony is given as shown in above picture Click on Month Reference to view the Month Reference Form Month Reference Form ff Comparative Months Table x Comparative Table for Months Malayalam Era In Malayalam Gregorian Calendar Tamil Calendar 41 AN IDEAL VASTU PICTURE Select 6 Plan development mmm Ideal Vastu Picture f X An Ideal Vastu Picture x An Ideal Vastu Picture North LInclerpresurnd enc Lan Wieter Tank Puja Roam vest d a East E OU G Dettie Foar Tare Soulh 42 42 VASTU PLAN DEVELOPMENT ACCORDING TO THE NEEDS OF USER Select 6 Plan development gt 2 Vastu Plan Development Building Norn east ow eun e 5 i La un South East Prayer Room HHBH H
44. e Staircase as shown in the picture 23 POSITION OF GATE Select 3 Vastu Location f Gate Gate Position Road Position of the land Gate Position On the Dimensions Enter Length in Select Directi The positid 8 Gate Positions Dimensions of a Side Length in Meter Details One Padavistaram 13 32 Meter Select Go Road Position of Land Pull down menu 24 24 POSITION OF ROOMS AS PER GOD S LOCATION Select 3 Vastu Location 9 Position of God fet Positions Positions of Gods East Charaki Sharvaskandan Vidhyari Antharee Esanan Parjanyan Jayanthan Indran Adhityan Sathyakan Brushan ERE Agni E E Poosha Dhiti oan S Aryakan Savithran Savithavu Adhiti Apavalsan Vithadh an Pilipinchakan x road Brahmavu Vivaswan Pe North Gandha South Bhalladan rvan T Bhrun Shivan Shivajith Mitrakan d Pushpa Vayu Rogan Shoshan Asuran Varunan dandan Sugreevan Dhwara jiu 1 palan g Paparashasi irom akar Foothanika etai West Detail On the Dimensi
45. mnesmarer MOTs EMOGA TDL Memo centro alo Gedo Gaul ETT seo Maden DT Soa agdal A brief expla
46. asian
47. pes
48. 53
49. NORTH d sP i QU EAST p Z9 SOUTH Detail
50. Sas Vastu Vision Customer Core TV 9259904515 Designed by Sroins Softwore Developments Vastu Final Report Leon Paradise Trivandrum Aneesha Trivandrum Final Printing Options Slope of the Land Direction of Building Perimeter Kitchen Master Bedroom Prayer Room well North East 41 52 South East South West North East Esanukon Kumbham Rasi Note Bad results are not considered in the print report 34 35 On the Final Printing Options Select Slope of the Land Select Direction of the Building Select Perimeter Select Kitchen Select Master Bedroom Select Prayer room Select Well Click Preview to view all the niceties of the selected rooms and direction To save Select PDF To Print the details Select Print Vastu Plan Print Out Page 1 of 4 Final Report
51. 40x60 23 sole som On the Dimensions of a Enter Length in Met Select a Tank Typ A brief descriptio e Details Pull down menu position of the Water Tanks is shown in the pictorial graph on the left side 20 21 20 POSITION OF WELL Select 3 Vastu Location 5 Position of Well f Well Well Dimensions of a Side Length in Meter 30 GASo
52. Boonies mao os OTH OG Lola SaaS ATES Aaya commos dye Gyo Dxpomo scabs Hod Select Shape of the Land and View the Result After Viewing Click X 9 LAND DIVISION Click 2 Vastu Details 7 1 Vastu Khadam Vastu Khandam Wastu Khandam East pensar Quo gejnflsco anos mde 1 Esanukon Agnikon ENGR suave am Gar 4 eo 2 B8 Oecd Dimensions of a Side Length in Meter 100 Square Feet 107600 North eM South Perimeter aon i Cent 247 1 Acre 2 471 Output 100 Square Feet Vayukan Nirurthikon Perimeter West Cent 18 38 Gemwimic 36 2 36 Gerne Moma To pg
53. mU Sams nime Woe veo UMEA onem aan maso koo sequo alfkoroihko TI DDS ocgykrn TEA NA alj amp Po MSM chloe Geen
54. 4 OVE 630 5 PERIMETER CONCEPT Click 2 Vastu Details _ gt 3 Perimete ff amp Perimeter x Perimiter Padhayoni
55. East North Saath West A brief scientific explanation Animal House is given as shown in above picture 29 30 USAGE OF YONI Select 3 Vastu Location mmm 15 Usage of Yoni 30 A Use of Yoni Use of Yoni NORMED
56. North 23 5 North W West 5
57. Olek mot SPE See ao Boe a m Go moumacam i STEP ODc lao ale EEO OTE OTS Soho Coma COOOL esac euwewiasycamcaleemerneasimcso egpkeomus Reg TED qc epe es Ten ons SOI Som lec Macs sme cou aelgmeodeies ccGoneosgiee Sot
58. mo Fitch Land Selection SMO AAS lo ANAM Oo DEON Hee Slo ee EES RS nmn a 1 EEHOODOOSSHIBOGSSOS aaa credula
59. longs nme ap mam 1 2 1 4 x a Vastu Vision Gustomer Cos TM OAS by Broins Software De velgimants ITITC Vastu Plan Print Out Page 4
60. MHLOS 001024019 A brief explanation of Stars for House Starting is given a shown 38 MAIN DOOR INSTALLATION Select 5 Muhoorthan aem 6 Main Stallation fi Main Door Installation Main Door Installation Gc eris e Olay eu 1 eno amem 2 MOMS aI HLAD
61. cocci en nuo ear Siang ool win delO165 molo Meo Met Snag ex cx HE ers IVE Oem Ogg GM boom AoE
62. 2d geal 1085 sing caf aemgmungc zy ay asa oma 22 15 Customer Core Til SHEETS Designed by Broin Sofrwiore Le velas ments Vastu Plan Print Out Page 3 f Final Plan Report Sft ax ENS co Owner s Neme Address Leon Paradise Trivandrum Prepared By Anestha Trivandrum aisian ames ied mao nignna cao quomo and
63. misim ome cel of ame ese la eg msn mond ae Tem co mama Tu anda aam cm Vastu Vision Customer Care TVM 2240804815 De3zned by Brzirs Software Developments 33 VASTU TIMING Select 5 Muhoortham 1 Vastu Timing Vastu Timing Vastu Timing Select Month The Timings for Teeth Cleaning Bathing Poo e and Thamboolam is Shown 34 FIND VASTHU SHUBHA MU Select 5 Muhoortham Muhoortha Calendar TEX Wastu Shuba Muhoortha calendar Wastu Shubha Muhoortha Calendar Search Start Date O2 am 13 End Date al J4 am 4 z Search Dates Available Summary
64. ENEB o Owner s Meme Address Leon Paredise Trivandrum Prepared By Aneecha Trivandrum fsa sled 57 11 romero aisa ommo po aml Tima way go s s mca 20 20 3 EMT TUG yes puse po doy MES mila
65. S rg 157 16 E 5 20 2n PDF On the Conversion Box Enter Length amp Breadth Perimete On the Input Box Select Direction Face fro Yoni is shown Select Perimeter on Select Age Select suitable The result is We can also check Veda On Star Vedha Check Select your Star If Vedha Is good on the Matches Summary box the Star would be in green If there is no match the Star would be red To view the details Select Preview To save Select PDF To Print the details Select Print 15 VASTU CALCULATION ON THE BASIS OF CENT OF THE BUILDING ff Vastu Options Vastu Calculation Vastu Options O Sq
66. o cused QA mas panne
67. Select Project Select Start Date of the Project Click Preview To Print the details Select Print j Contract Schedule Report ffi Project Schedule Contract Schedule Project Name Buiiding for Leon Square Feet Owners N ame Owners Address 1 1 1 13 13 13 13 13 13 13133313 14 14 14 14 14 34 Work Description Dx 00 04 J 5 949 F MAM J Pian amp Approval 28 28 JukF12 Esth Excavstion 01 Aug 12 Basement Foundation 22 Aug 12 Bricks Works 06 Sep 12 Concete 4 25 Deo 12 Plastering 26 Jan 13 Wood Works 24 Aug 12 Electrical 10 Feb 13 Plumbing 13 Feb 12 Flooring 01 Mar 12 Painting 7 Mar 10 Mar 13 Prepared By Sianature 51 47 FLAT VASTU Select 9 Miscellaneous 1 Flat Vastu fex Flat Vastu 48 Flat Vastu
68. E meo 20 moala enue marl lols E anaes Sommo On the Input Box Enter Length Enter Breadth Perimeter Kol Viral Square Feet Feet and Inch is shown To see if the details in the Input box are according to Vastu Click Check Vastu Status The nearest Vastu result is shown in the Matches Summary 46 ESTIMATE amp SCHEDULE THE WORK a Budget Master Select 8 Estimation amp Schedule 1 Budget Master ff Budget Master m x m Budget Master Type Size Category Unit Rate Amoul 1 Mason 1 Main Labour EA 500 2 Mason 2 Assistant 3 Nos Labour EA 350 3 Electrician 1 Main Labour EA 500 4 Electrician 2 Assistant 3 Nos Labour EA 350 3 Helper Main 5 Nos Labour EA 300 6 Supervisor Main Labour EA 800 7 Stone Normal Material LRY 2000 8 Sand River Material LRY 15000 9 Cement Normal Material PKT 250 10 Bricks Normal Material EA 8 11 Metal Chips Normal Material LRY 5000 12 MS Steel Bar Different Dia Material KG 500 13 Wood Jack Fruit Material CUM 200 14 Vitrified Tiles Normal Material SFT 75 15 Ceramic Tiles Normal Material SFT 60 16 Granite Normal Material SFT 100 17 Carpentry Lumpsum Subcontract EA 25000 18 Plumbing
69. 2 Vastu Details 2 Vastu Measurements 3 Vastu Locations 3 Perimeter Concept 4 Vastu Plans 4 Importance of Directions 5 Muhoortham 5 Importance of Yoni 6 Plan Development 6 Land Selection 7 Vastu Correction 7 Land Division Vastu Khandam 8 Estimation amp Schedule 8 Veedhi Calculations 0 Miscellaneous 9 Havavargam Details 10 Exit 10 Square Feet Finder 11 Vastu Calculation pe bb erem Lun r ET al j 1 Copy night Reserved VES 18 Mobile 05 Sass 7355085 4 744865024 h 2 REGISTRATION On the Main Menu Click 1 Settings 1 Address Register ft Address Register Address Register User user Owner s Name Address Leon Paradise Trivandrum Prepared By Aneesha Trivandrum Use Ctrl Enter to locate the second Line Change Owner s Name Address 4 Prepared By N After Changing Click X 3 VASTU PURUSHA CONCEPT Click 2 Vastu Details 1 Va oncept A Vastu Purusha Concept Vastu Purusha Concept East North Pole North South F South Pole West
70. Tree Detail Tree Positions we oT RTE r mann eo j eGo as i t amecnuymame Caroma emma eR Idee Ie rach ooo aes e T gres eros tes fi sna MICOS Ag Meni MAHB
71. a Ss UU Memos moc 12 amt a jams uola 11 28 AM CT eed Gs oc ess denm uc mee don aiL Cea onore vx ERE oc CO dg I Basi o eee eme Moyes one l06 39 AM Mo 3a onan meme 05 03 PRA Slee OO amp oCOOUoOoGo og UW SS COS S22 Gar 37 Enter Start Date Enter End Date Click Search Subha Dates are shown in the Dates Available Select A date from the Dates Available Summary for the selected date is shown 35 STONE LAYING MONTHS Select 5 Muhoortham 3 Stone Laying Months ff Stone Laying Months x Stone Laying Months
72. ADTH Select 9 Miscellaneous d Breadth fet Find Breadth Select Length m Direction Length Breadth Square Feet Length Details Length m ge Kaumaram Perimeter m Hasta 2 Perimeter H A Breadth Details Breadth m F 94 ge Va rdhakya m Hasta FS 7 If user wants to know the breadth where length is known then Age Result Select Length amp Direction Result will be shown as per the parameter 49 CUSTOMIZED CONVERSION Select 9 Miscellaneous 3 Customized Conversion fi User Defined Conversion 15100 Kol Viral Clear Select Options from st and set the parameter Enter Kol amp Viral t Enter Perimeter pec ve fields and press P Mtr to get the Perimeter ctive field and press Kol Viral to get the Kol amp Viral 52 53 50 EXIT Select 10 Exit gt 1 Exit ff Main Menu SI No VMPD2 101 User User 15 January 2013 15 22 VISION Main Menu 1 Settings 2 Vastu Details 3 Vastu Locations 4 Vastu Plans 5 Muhoortham 6 Plan Development 7 Vastu Correction 8 Estimation amp Schedule 9 Miscellaneous 10 Exit Copy 081 5 Phone Office 9249904615 Mobile 09537356086 09744855024 Change Password
73. Direction Of Length For common Building Rules Select Auto in Update Value Click Calculate Sqft In the Ground Floor Box Direction of Frontage East v Enter Length m 20 Enter Breadth m 18 Direction of Length East Y Made Auto Manual Road Y N East 3 West 2 L North 1 5 a South 15 L Update Value C Auto Manual Calculate Saft Though it is a updated to the building rule measurements it can be manually corrected The result for Square Feet Net Length Net Breadth Perimeter And Cent is shown For future references please remember the measurement shown in the result To update value manually Select Manual In Update Value and enter the Values Manually 13 VASTU CALCULATION ON THE BASIS OF THE SQUARE FEET OBTAINED FROM THE SQUARE FEET FINDER Click 2 Vastu Details mmm 11 Vastu Calculation Vastu Options Vastu Calculation Vastu Options G iSquare Feet Ss ses C2 Le ngth Breadth C Cent In the Vastu Options Select Square Feet And Click Go Vastu Calculation Form Vastu Calculation Square Feet x Conversion Square Feet 1200 Appx Perimeter m 42 24 mm ildi Length m Breadth m Square Feet Sq Ft Clear Details Building v Kol Viral Perimeter m Feet Inch pee r Length Details Direction Face East i E Length m 10 5 Age Kaumaram C
74. Final Plan Report Sft Page I4 4 4 Select 4 Vastu Plans Final Report Owner s Mame Address Prepared By o Owners Neme Address Leon Paradise Trivendrum Prepared By Aneeshe Trivandrum mien amy awlaw OM mew eagle mo a
75. ITION OF SEPTIC TANK Select 3 Vastu Locations gt gt 3 Septic Tank ff Septic Tank Septic Tank Esanukon Dimensions of a Side Length in Meter 9 sos Vayukon Nirurthikon
76. Lumpsum Subcontract EA 45000 19 Electrical Lumpsum Subcontract EA 50000 20 Painting Lumpsum Subcontract EA 30000 21 Aluminium Fabn Lumpsum Subcontract EA 25000 Total 21 te Start T User Manual English fy Vastu Vision Sent Items Microsof Search Desktop 5 D 75 11 01 You can enter the unit or change the details according to your budget 46 b Budget Activity Master Select 8 Estimation amp Schedule mmm 2 Budget Activity Master A Budget Activity Master gt Budget Activity Master Type Size xs Unit Rate Amount 1 Earth work excavation in hard soil for foundation and Unit Rate M3 910 depositing vvith initial lead and lift etc complete 2 Cement concrete 1 4 8 using 40mm Brocken stone for bed Unit Rate M3 2900 Concrete etc complete 3 Random Ruble in cm 1 8 for foundation and basement etc Unit Rate M3 1600 complete 4 Bricks work in c m 1 8 with wire cut bricks of size 22 x 11 Unit Rate M3 2800 x7cm for super structure etc complete 5 Jack wood frames of doors windows and ventilator etc Unit Rate DM3 520 complete 6 Reinforced cement concrete 1 2 4 using 20mm metal for Unit Rate M3 a lintal sunshade Beams etc complete 7 Reinforced cement concrete 1 2 4 using 20mm metal for roof Unit Rate M3 46 slab etc complete 8 Reinforcement for RCC work bend tied and placed in Unit Rate KG 5300 position as for Specifications etc complete 3 Providing 12mm diameter iron Rod for windows and Un
77. ORTHA STONE LAYING MONTHS FIND SUITABLE LOCATION FOR STONE LAYING EARTH EXCAVATION HOUSE STARTING TIME 38 39 40 41 42 43 44 45 46 47 48 49 50 MAIN DOOR INSTALLATION PANCHASHIRASSU FIVE HEAD INSTALLATION HOUSE WARMING CEREMONY AN IDEAL VASTU PICTURE PLAN DEVELOPMENT ACCORDING TO THE NEEDS OF THE USER CUSTOMIZED VASTU PLAN DEVELOPMENT VASTU CORRECTION FOR AN EXISTING BUILDING INFORMATION VASTU CORRECTION FOR AN EXISTING BUILDING CALCULATION ESTIMATE AND SCHEDULE THE WORK Budget Master Entry Category Budget Activity Entry Actvity Contract Schedule Master Entry Budget Details Entry Category Estimate Report Category First Page Estimate Report Category Last Page Budget Details Entry Activity Estimate Report Activity First Page Contract Schedule Report Form j Contract Schedule Report FLAT VASTU FIND BREADTH CUSTOMIZED CONVERSION m 50 moop EXIT 1 OPENING OF VASTU VISION To open click Vastu vision Icon from the Desktop nn VASTU VISION E Landi j INDIA S FIRST AUTHENTIC VASTU CALCULATING SOFTWARE b Introduction of Vastu EL Introduction
78. Perimeter azo Sqr Ft 1186 3 BHK D 5O0 amp 2 BR with AT 3 BHK STR SO0 amp 2 BR with AT 2 BHE PR D SO amp 1 BR with AT 2 BHK STR SO amp 2 BR with AT B Bedroom STR Study Room Stair H Hall DR Drawing Room K Kitchen OR Office Room PR Poola Room SR Store Room D Dining Room C Common Toilet CP Porch Carporch AT Attached Toilet SC Sit out 1BR 1Bed Room 31 On the Length Breadth box Select Direction Select Selected Length And Breadth On the Plan Selection Box Select the Rooms required by the User The full form for the abbreviated letters are shown below By selecting the rooms an already installed plan is shown in the Plan View To view the details Select Preview To save Select PDF To Print the details Select Print Vastu Plan Print Out Page 1 fi Final Plan Report Sft EON 1 2013 ENEB 7 Owner s Meme Addresz Leon Paradise Trivandrum Prepared By Aneesha Trwa ndrum pisces Mens 10 5 10 383 4 weet 58 8 aged qo mg erae rimma fred 185 k ti Vision Customer Cores TV Designed by Broin Softmwore De valgrments Page 1 k 8 MK Na Filter Vastu Plan Print Out Page 2 A Final Plan Report Sft EEN oo cee Owner s Nema Address Leon Paradise Trivandrum Prepared By Aneesha Trivandrum
79. R s d a E AE S Ae J E J mn po o E i 3 North East 0 25 m sew ze Gaja Update to Plan Length Details auvanam Breadth Details Yauvanam A On the Input Box Select Detail Select Length Select Length Breadth Select Position Click Update to Plan Mm A Summary for the selected l ngth and breadth is shown Repeat this process wh A picture for the p the preview Vastu Plan SSE SC Meio Sinem lt coee asx aoz Fray T sce 233 se eo Moth S37 Sets from Nonb fmt Comer zoi Years Sets from Noth Seat Comer Vastu Vision Customer Care TVM 9249900615 Cesgned by Er zins Software Developments To print Select Print Select Length m Length Breadth 19 5 K x14 46 Y 2 4 38 K x 3 9 B erm East Face Vrishabha 5 E W N S Face West Face Dwaja 1 WFace North Face Simha 3 N W Face South Face Gaja 7 S W NFace Perimeter m Perimeter H A Age Kauma ram Square Feet Direction Note Wall thickness 24 cm is considered for plan development Vyaya Aya Select Length Breadth Summary of the building is shown 44 44 VASTU CORRECTION FOR AN EXISTING BUILDING INFORMATION Select 7 Vastu Correction 1 Vastu Corrections Information fiX Vastu Corrections Vastu C
80. USER MANUAL VASTU VISION VERSION 2 MALAYALAM 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 3 VEEDHI CALCULATIONS NAVAVARGAM MAHAMARMAM DETAILS SQUARE FEET OF THE BUILDING ACCORDING VASTU CALCULATION ON THE BASIS OF THE S CONTENTS OPENING OF VASTU VISION a Opening Video b Introduction of Vastu c Password Access d Main Menu REGISTRATION VASTU PURUSHA CONCEPT VASTU MEASUREMENTS PERIMETER CONCEPT IMPORTANCE OF DIRECTIONS IMPORTANCE OF YONI LAND SELECTION LAND DIVISION E FEET OBTAINED FROM THE SQUARE FEEI FINDER VASTU CALCULATION ON THE BASIS O VASTU CALCULATION ON THE BASIS O POSITON OF MAIN ROOMS POSITON OF TOILET amp BATH ROO POSITON OF SEPTIC TANK t POSITON OF WATER STO POSITION OF WELL ND BREADTH F THE BUILDING INTERIOR ARRANG POSITION OF STA POSITION OF POSITIONS O AS PER GOD S LOCATION POSITIONS YAM AS PER GOD S LOCATION POSITIO HOOMS AS PER RASI POSIT F THULASITHARA amp MULLATHARA POSITION OF ANIMAL HOUSE POSITIONS OF TREES USAGE OF YONI OBTAIN PLANS FURNISHED IN THE SOFTWARE 2000 VASTU PLANS AVAILABLE OBTAIN THE FINAL REPORT OF THE BUILDING VASTU TIMING FIND VASTU SUBHA MUHO
81. ches Summary Select Length and Breadth for your building which we obtained from the Square Feet Fin Square Feet Length details Breadth Details is obtained We can also check Veda On Star Vedha Check Select your Star If Vedha Is good on the Matches Summary box the Star would be i would be 8 To view the details Select Preview To save Select PDF To Print the details Select Print To view plans click View Plan Please refer Contents there were no match the Star 14 VASTU CALCULATION ON THE F LENGTH AND BREADTH y Vastu Options Vastu Options In the Vastu Options Select Length And Breadth And Click Go 15 ff s astu Calculation Length Breadth x Length m 12 Breadth m 10 Perimeter m 44 00 Details Building v Appx Vastu Perimeter m 43 76 Square Feet 1291 Go f Input Length Details Direction Face East v E Length m 10 5 Age Kaumaram Yoni Vrishabha Hasta 14 Angula 14 Perimeter m 43 v Age Kaumaram v r Breadth Details Matches m cm 41 52 v Breadth m 10 26 Age Balyam Length Breadth m 10 5 K x 10 26 B v Hasta 14 Angula 6 Square Feet 1159 Matches Summary Star Vedha Check 57
82. ct Go The position of Well is shown insidecth m with a green square box A brief scientific explanation amp i Mullathara Details nc of Thulasi plant as shown in the picture f Mullathara Mullathara 42212 64 28 POSITION OF TREES Select 3 Vastu Location 13 Position of Trees fi
83. i 19 POSITION OF WATER STORAGE TANKS Select 3 Vastu Locations 4 Position of Water Tanks ff Water Storage Water Storage Dimensions of a Side Length in Meter Detail
84. it Rate KG 58 ventilator etc complete 10 Flooring with cement concrete 1 4 8 75mm thick using Unit Rate M3 3200 40mm metal etc complete 11 Plastering with cm 1 3 9mm thick under side of RCC slab etc Unit Rate M2 1050 complete 12 Plastering with cm 1 4 12mm thick in and outside wall etc Unit Rate M2 1350 complete 13 Plastering with cm 1 4 12 mm thick over to roof slab etc Unit Rate M2 1600 complete 14 Jack vvood fully panneled shutters for Doors etc complete Unit Rate DM2 530 Total start T Wiser Manual English RB sent Items Microsof Vastu Vision You can change the works and rates of the project underta c Contract Schedule Master Select 8 Estimation amp Schedule 3 Contract Schedule Master fet Contract Schedule Master gt Contract Schedule Master NNNM 1 Work Description Pian amp Approval Earth Excavation i 3 Basement Foundation 4 Bricks Works 5 Concrete e Plastering um aod works Electrical 3 Plumbing IO Flooring tT Fainting You can add or delete the works described in the Work Description d Budget Details Entry Category Select 8 Estimation amp Schedule 4 Estimation amp Schedule fi Budget Details Project Master Project Details Owner Details Project Mo B 0001 Owner Name Leon Project Name Building for Leon Owner Add
85. leaf Data Yoni Vrishabha Hasta 14 Angula 14 Perimeter m 41 v Age Kaumaram 4l Plan Available Breadth Details Matches m cm 41 52 v l Breadth m 10 26 Age Balyam s Length Breadth m 10 5 K x10 26 B a View Plan Hasta 14 Angula 6 Square Feet 1159 g Matches Table 57 16 Direction Selection East Face Vrishabha 5 E W N S Face 5 West Face Dwaja 1 WFace x North Face Simha 3 N W Face Ee T 20 South Face Gaja 7 S W NFace r 0 enun ane star Vedha Check 3 20 lg om 14 On the Details Pull down menu Select the building or the rooms required for the calculation On the Conversion Box Enter Square Feet Appx Perimeter is shown On the Input Box Select Direction Face from the pull down menu Yoni is shown Select Perimeter on the basis of the Appx Perimeter obtained from the Conversion Box Select Age Select suitable Matches m cm according to the perimeter required The result is shown on the Mat
86. mbham House Starting Muhoortham 004 00900 0 I an02 6 q0T0o MTOM MOAI Dj aD100mnegpme e Gne eq looo cese LIN oHa dir o Gee oqulosas ASEM Ma Al aN
87. n on the Matches Summary Select Length and Breadth for your building which we obtained from the S Square Feet Length details Breadth Details is obtained We can also check Veda On Star Vedha Check Select your Star If there is no match the Star If Vedha Is good on the Matches Summary box the Star w would be red To view the details Select Preview m A To save Select PDF To Print the details Select Print Select 3 Vastu Locations gt Main Rooms Dimensions of a Side 2815415212201 18 On the Dimensions of a Side Box Enter Length In Meter and Select Go Select a room from the Details Pull down menu A brief description and the position of the room is shown in the pictorial graph on the left side 17 POSITION OF TOILET amp BATHROOM Select 3 Vastu Location m 2 Position of Toilet amp Bathroom x Positions Toilet Toilet Bathroom East 10 20 30 Dimensions of a Side Length in Meter
88. nation of Days amp Stars for Main Door Installation is given as shown in above picture 39 PANCHASHIRASSU FIVE HEADS INSTALLATION Select 5 Muhoortham 7 Panchashiirassu Scientific Approach Tex Panchashirassu Panchashirassu East South West
89. ons of a Side Box Enter Length in Meter and Select Select Room Type from the Det The position of Room is shov 25 Dimensions of a Side Length in Meter 30 One Padavistaram 3 33 Mtr Padhvistaram Starting 0 1Padam 13 33 2 Padam pue 3 Padam 2 39 2 Padam 13 32 5 Padam 116 65 6 Padam 19 98 7 Padam 23 31 B Padam 26 64 9 Padam inside the diagram as a green square box as selected 26 25 POSITION OF NIVEDYAM AS PER GOD S LOCATION Select 3 Vastu Location 10 Position of Nivedyam fx Poisions of Nivedyam Nivedyam East Dimensions of a Side Charaki Sharvaskandan vidhyari Antharee ramen etn bete indran Adhityan Sathyakan Brushan shan Aryakan Savithran Savithavu Adhiti Apavalsan Vithadh an Padhvistaram Arggallan Starting 1Padam Pilipinchakan 2 Padam Bhubruth Brahmavu Vivaswan North South 3Padam Bhalladan rvan 4 Padam Bhrun 5 Padam Shivan Shivaiith Mitrakan 6 Padam d oo Nagan 8 Padam One Padavistaram 13 33 Mtr 11111 Pushpa Pi Vayu Rogan Shoshan Asuran Varunan dandan Sugreevan Dhwara ned 9 Padam palan kal Paparashasi jrumbakan Poothanika West Detail Esanan v On the Dimension
90. orrections
91. ress m Trivandrum Project Start Date 01 Jul 12 Project End Date 30 Jun 13 Square Feet Mem Mode Activity Mode Labour Material Sub Contract Schedule Material Type Size Unit Rate Qty Cost v Normal v Normal v Normal v Different Dia Wood w Jack Fruit Vitrified Tiles v Normal Ceramic Tiles v Normal Record 4 lofi 1 HK 47 In this all the detail ject is shown To change the details which have been changed before Click on the select the item the change is shown wn Load to Word amp PDF and Save the details of the project items pull down m We can Previe e Estimate Report Category First Page ff Building Estimate mAn BUILDING ESTIMATE Trade Mason 1 Mason 2 Electrician 1 Electrician 1 Electrician 2 Helper Supervisor f amp Building Estimate Painting Building for Leon 1200 Leon Paradise Trivandrum Building for Leon 1200 Leon Paradise Trivandrum Aluminium Fabn Total in Words Category Main Assistant 3 Nos Main Main Assistant 3 Nos Main 5 Nos Main Type Size Normsl River Estimate Report Categor BUILDING ESTIMATE c amp EA EA EA EA EA EA EA Total Amount Grand Totat 20000 25000 175000 1825340 Indian Rupees Eighteen Lakh Twenty Five Thousand Three Hundred Forty only 49 g Budget Details Entry Activi
92. s of a Side Box Enter Length in Meter and Sel ail Pull down menu de the diagram as a green square box as selected Select Room Type from the The position of Room IS 26 POSITION OF ROOMS AS PER RASI Select 3 Vastu Location 11 Position Rasi it Positions Rasi Positions Rasi Length in Meter On the Dimensions of a Sid il Pull down menu and Press Go n inside the diagram as a green square box as selected 27 28 27 POSITION OF THULASITHARA amp MULLATHARA Select 3 Vastu Location 12 Position of Thulasithara Mullathara fex Thulasithara m Thulasithara Fast Length in Meter 30 Go 3 15 North South 225 1X 1 West Mullathara LaJjO0DOCDAGIOGTT
93. seesaw eg cubCceiesmexs 4 ues DBBODlosierrernugo gc Acre Grumodexierniueeowledgye I antes CDSGOWOODOPMMCCOMDROGTI Meera NTA Sao DSS Otel omy Enter Length In Meter and Select Go Will receive the Input Data and Output Data 11 10 VEEDHI CALCULATIONS Click 2 Vastu Details 8 Veedhi Calculations A Veedhi Veedhi Calculation Pishachu Deva Veedhi Measurement 25 Anganam 1 67 Note The Orange marked Veedhi s are not good for construction On the Dimensions of a Side Box Enter Length In Meter and Select Go On the Details Box d AA Veedhi Measurement and Anganam is shown 11 NAVAVARGAM MAHAM DETAILS Click 2 Vastu Details m Details fe Mavavargam x Navavargham North South 2 99 X 8 95 Meter 999 X 19 98 Meter 19 98 x 19 098 Meter 19 98 X 9 88 Meter On the Dimensions of a Side Box Enter Length In Meter and Select Go On the Details Box One Padavistaram and Mahamarmam is shown 12 12 SQUARE FEET OF THE BUILDING ACCORDING TO BUILDING RULES Click 2 Vastu Details 10 Square Feet Finder t Square Feet Finder Square Feet Calculation Front im PSEA IKI TI Lu R L J IN LJ F R8 LU H 12378 1 1 5m 17 Side N 18 E 18 Side c i546 2m 20 W Back On the Land De Select
94. t f Budget Details gt Project Master Project Details Chwner Details Project No Owner Name Leon Project Name Owner Address Paradise Trivandrum Project Start Date Project End Date Square Feet 1200 Activity Schedule Activity Description Earth work excavation in hard soil for foundatic rd Unit Rate Unit Rate Unit Rate fx Building Estimate BUILDING ESTIMATE Project N am e Building for Leon Square Feet 1200 Owners Name Leon Owners Address Paradise Trivandrum Description Type Earth work excavation in hard soil for foundstion and depositing with initial lesd and Unit Rate lift etc complete Cement concrete 1 48 using 40mm Brocken stone for bed Concrete etc complete Unit Rate Random Ruble in cm 1 8 for foundation and basement etc complete Bricks work in cm 1 8 with wire cut bricks of size 22x 11 x7om for super structure etc complete Jack wood frames of doors windows snd ventilator etc complete Reinforced cement concrete 1 2 4 using 20mm metal for lintslsunshsde Beams etc Unit Rate complete Prepared By Signature Date i Contract Schedule Report Form Select 8 Estimation amp Schedule 5 Contract Schedule Report Project Schedule E Schedule Report Project No Schedule Start Date 01 Jul 12 Record 14 4 10f1 bob fk No Filte Search The progress of each project is obtained
95. uare Feet Le neth Breadth In the Vastu Options Select Cent And Click Go ft Vastu Calculation Cent Conversion Cent Appx Perimeter m Length m Breadth m cent Details Building Direction Face East v Length Details Yoni Vrishabha Length mj 10 5 Age peacmaram Perimeter m 43 w Hasta Age Kaumaram we Breadth Details bd Matches m cm 41 52 Breadth m 10 26 Length Breadth m Hasta 14 Square Feet i Matches Summary cu ARAM PDF 16 POSITION OF MAIN ROOMS 17 In the Vastu Options Select Cent And Click Go On the Details Pull down menu Select the building or the rooms required for the calculation On the Conversion Box Enter Cent Appx Perimeter is shown On the Input Box Select Direction Face from the pull down menu Yoni is shown Select Perimeter on the basis of the Appx Perimeter obtained from the Conversion Box Select Age Select suitable Matches m cm according to the perimeter required The result is Show

Download Pdf Manuals

image

Related Search

Related Contents

取扱説明書 - ノイズ研究所  KX-VC300 KX-VC500 Manuel d`utilisation du NAT Traversal Service  Whirlpool MAX 38 SL  Samsung 400UXn User Manual  User Manual VIA20  Trendnet TK-V200S video splitter    TECNOLOGÍAS ALTERNATIVAS - CREMASCHI  INSTRUCTION MANUAL  

Copyright © All rights reserved.
Failed to retrieve file