1. Install the steam generator to hot side of water to reduce heating time unless a water softener is hooked up Water softeners are usually hooked up to hot side Check local utility line voltage and choose appropriate steam generator voltage 208 Volt or 240 Volt Make sure the steam generator is installed in an upright and level position and is in a location that is ACCESSIBLE for Water Level Sensor Probe maintenance Steam generator should never be located where it is exposed to outside weather conditions freezing temperatures near flammable materials or inside the steam room Qe STEAM WHIRL INSTALLATION OPERATION amp MAINTENANCE MANUAL CONFIRM THE CORRECT MODEL HAS BEEN SELECTED Multiply the length x width x height of the steam room enclosure A A Cubic Feet f enclosure walls are constructed of glass marble concrete stone B or slate Copy the Figure from box A to box B Cubic Feet Total A and B for total Cubic Feet C Cubic Feet INCREASE C FOR EACH OF THE FOLLOWING FEATURES OF STEAM ROOM ENCLOSURE Add 15 for an exterior outside wall Add 15 for each additional foot for rooms over 8 high EE G Add 15 for an extra glass panel in addition to the door Add boxes C through F for total Cubic Feet G Select recommended model from the GENERATOR SIZING GUIDE on Page 3 Cubic Feet Certain materials used in the construction of steam rooms may require a larger unit to produce the des
2. 7 e STEAM WHIRL INSTALLATION OPERATION amp MAINTENANCE MANUAL MODELS SW 10 SW 12 and SW 15 COMMERCIAL SERIES GUIDELINES FOR STEAM ROOMS Walls ceiling and floor must be completely covered with waterproof finish tile marble stone or slate Any smooth surface flooring that is used such as tile or marble should include an anti skid finish to avoid slipping and injury Any exposed plaster plasterboard or sheet rock surface must be well sealed with a commercial quality waterproof sealer urethane or epoxy at least 3 coats Use cement board DO NOT use green board Ceiling should be pitched away from the door 1 1 2 per foot or constructed in a gable configuration to prevent condensation from dripping Built in seat should be slightly pitched to allow for condensation run off Steam room must be completely enclosed with walls door floor and ceiling but should not be vapor proof A slight opening of approximately 1 4 is desired to create movement of the steam A standard glass shower door is sufficient a special door is not necessary Make sure there is a floor drain for condensation run off and cleaning Do not install a fan inside steam room Hot steam rises and will escape through flapper Windows that are part of the steam room enclosure should be double paned If using lights inside steam room they must be vapor proof A deionizer or filter hooked up on incoming water line is helpful in hard corrosive water areas
3. avoid strain on Water Solenoid Valve inside generator 5 Install a shut off valve B in Plumbing Diagram on the water supply line as close to the generator as possible DO NOT USE A SADDLE VALVE 6 For best results Install an inline filter between shut off valve and generator 7 For best results steam generator should be higher than the steam head If this is not possible steam line must slope 1 4 per foot minimum to steam room 8 Connect 3 4 copper tubing or 3 4 NPT pipe to steam outlet C in Plumbing Diagram and run to approximately 8 12 off finished floor in shower or just above deck of bathtub on any wall not interfering with user seat bench or shower entrance For areas with acrylic or other non heat resistant floors install steam head 20 30 off finished floor in shower DO NOT PLACE A SHUT OFF VALVE ON STEAM OUTLET LINE ONLY ON WATER SUPPLY LINE WARNING DO NOT PLUMB VALLEYS AND DIPS WHERE WATER FROM STEAM CONDENSATION IN THE LINE COULD COLLECT AND CAUSE BLOCKAGE 9 Leave approximately 1 2 of threads protruding from finished wall Place escutcheon on threads and screw on steam head D in Plumbing Diagram Take care not to scratch the steam head with wrench Rotate steam head until open slot is facing down 10 IMPORTANT Steam head must be installed to prevent users from coming into direct contact with the steam head and the steam coming from it While in use the steam head and steam coming directly from it will b
4. 08 240 Load a Heater Tank STEAM WHIRL Classic Mechanical Timer 11 DO STEAM WHIRL INSTALLATION OPERATION amp MAINTENANCE MANUAL COMMERCIAL SERIES WIRING DIAGRAM THREE PHASE SW 10 SW 12 and SW 15 Power Ground Plate Screw x WL 1 OL 3 Gro nd 4 OL 20 Plate Screw Hi sens i L 1 g Grounqe WL 21 O O d Te inal Block Lo gens SES 3 3 3 erminal Bloc T Contactor Fuse Block amp Fuses L 2 FUSE 1 3 q Omo E FUSE 2 Cu FUSE3 Plate Screw E 9 PCB Controller D Ground Terminal Block for Blowdown amp Timer Blowdown Time Clock O 208 240V Timer 208 240 Load oo Heater Tank 27 C 4 Ground Hi Limit Sensor H20 Solenoid Valve w Capacitor Jumper 7 Wire Assy Classic Mechanical Timer 7 e STEAM WHIRL INSTALLATION OPERATION amp MAINTENANCE MANUAL CLASSIC SERIES TIMER INSTALLATION 1 Turn power off at circuit breaker or fuse panel 2 Timer should be located on a wall outside the steam room 5 away 3 Run 14 AWG wire from back of timer 1 NO 1 C to T1 amp T2 on terminal block inside steam generator 4 Insert wired timer into a 2 1 2 min deep wall box with TOP indicated on front cover in proper position 5 Fasten to wall box using the two 2 screws supplie
5. AM WHIRL INSTALLATION OPERATION amp MAINTENANCE MANUAL When installing and using this electrical equipment basic safety precautions should always be followed including the following 1 READ AND FOLLOW ALL INSTRUCTIONS 2 WARNING To reduce the risk of injury do not permit children to use this product unless they are closely supervised at all times amp WARNING To reduce the risk of injury A wet surfaces of steam enclosures may be slippery Use care when entering or leaving B The steam head steam line plumbing and other components become extremely hot 212 F during operation The steam head and plumbing must be installed in a location so that contact by user cannot occur Insulate plumbing lines for additional protection The steam head is hot Do not touch the steam head and avoid the steam near the steam head C After the system is shut down the components will remain hot Do not come into contact with the steam head or components until the system has returned to a normal temperature B Prolonged exposure to steam may cause hyperthermia Hyperthermia occurs when the internal temperature of the body reaches a level several degrees above the normal body temperature of 98 6 F The symptoms of hyperthermia include an increase in the internal temperature of the body dizziness lethargy drowsiness and fainting The effects of hyperthermia include Failure to perceive heat failure to recognize the need to exi
6. M WHIRL STEAM BATH GENERATOR UCTS AN WHIRL PRODU MES BESSY 9118 702 270 2124 21 20 4 Water Supply Line 1 2 Copper Line 1 2 NPT Female Thread Steam Output Line 3 4 Copper Line 3 4 NPT Female Thread Pressure Relief Valve 3 4 Copper Line 3 4 NPT Female Thread Valve Supplied DO STEAM WHIRL INSTALLATION OPERATION amp MAINTENANCE MANUAL COMMERCIAL SERIES WIRING DIAGRAM SINGLE PHASE SW 10 Ground It di OL 10 Ground Plate Screw Terminal Block Fuse Block amp Fuses Plate Screw Terminal Block for Timer Ground Blowdown Time Clock 208 240V Timer 208 240 Load gt Heater Tank die H2O Solenoid Valve w Capacitor Jumper Wire Assy Classic Mechanical Timer DO STEAM WHIRL INSTALLATION OPERATION amp MAINTENANCE MANUAL COMMERCIAL SERIES WIRING DIAGRAM SINGLE PHASE SW 12 amp SW 15 Ground Plate Screw N Plate Screw A Ground sHe H20 Solenoid Valve Ea w Capacitor Jumper Wire Assy Ground Plate Screw CL 2 Lo sens v 4 mi Fuse Block amp Fuses L 2 c amp i PCB Controller Terminal Block for Timer Blowdown Time Clock 208 240V Timer 2
7. NTS AND SEPARATE 430 TIMER INSTRUCTIONS TO PROGRAM TIME SET POINTS 15 9 9 STEAM WHIRL INSTALLATION OPERATION amp MAINTENANCE MANUAL MAINTENANCE warnine ELECTRICAL SHOCK HAZARD POWER MUST BE DISCONNECTED AT THE MAIN ELECTRICAL SUPPLY BEFORE PERFORMING ANY MAINTENANCE 1 The steam generator is designed for unattended operation and requires little maintenance 2 Water Level Sensor Probe maintenance is as follows NOTE Shut off main electrical breaker Open drop down door in front panel of generator enclosure and with a volt meter test that there is not voltage on power side of the Terminal Block L1 and L2 See DIAGRAMS on Pages 10 11 and 12 On left side of heater tank locate the Water Level Sensor Probe and disconnect red and black wires from the top Carefully unscrew Water Level Sensor Probe Sand off any calcium build up or debris on sensor tips DO NOT CUT OR TRIM SENSOR WIRES Apply white teflon tape around thread Carefully screw Water Level Sensor Probe back in Reinstall red and black wires to top of sensor Turn on main electrical breaker WATER LEVEL SENSOR PROBE This maintenance is suggested for any service specialist Iron content in local water will determine the frequency of probe service Start out at least once a month and if the probe is clean and not coated then try every two months etc More frequent servicing of the probe may be needed if the unit is in an extremely hard water area or t
8. TIONS FOR OPTIONAL TC 2 TEMPERATURE CONTROLLER AND 24 HR 7 DAY TIMER TC 2 Temperature Sensor Probe Optional 24 Hr 7 Day Timer for TC 2 mg Optional TC 2 60 Min Water Supply Line Power Box Power Disconnect Pressure Gauge 24 H Timer Blowdown F2 Site Glass Y C jm gt ES Steam Diverter 1 Z s T 7 e STEAM WHIRL INSTALLATION OPERATION amp MAINTENANCE MANUAL PLUMBING IMPORTANT All plumbing should be done by a qualified plumber and must conform to all local and national plumbing codes warnine ELECTRICAL SHOCK HAZARD POWER MUST BE DISCONNECTED AT THE MAIN ELECTRICAL SUPPLY BEFORE MAKING ANY CONNECTIONS 1 Use copper or brass fittings only DO NOT use galvanized or black iron DO NOT USE PLUMBERS PUTTY ON ANY WATER CONNECTIONS 2 A union must be installed close to the generator to facilitate easy removal if necessary 3 Tap off any existing water supply line hot or cold with 1 2 copper tubing or 1 2 NPT pipe If hot water line is used temperature should not exceed 160 F The maximum water pressure should not exceed 120psi 4 Flush at least 1 gallon of water to clear line prior to connecting to the 1 4 compression water inlet fitting A in Plumbing Diagram on generator When tightening this fitting use two wrenches to
9. d 6 Fasten the wall plate to the timer using the two 2 screws supplied with the plate The screws must be self tapped into the timer body and will require gentle inward pressure while firmly turning the screw 7 Position small plastic timer dial so that OFF is in the up position Install the hex nut and tighten 8 Push knob onto timer shaft handle facing down Dual Hook Up T1 amp T2 from both units hook up to single timer SYSTEM INITIALIZATION 1 After connections are completed make sure power and water on 2 on timer and allow sufficient time for unit to react 3 Timer can be turned off manually before set time has elapsed DO STEAM WHIRL INSTALLATION OPERATION amp MAINTENANCE MANUAL TC 2 TEMPERATURE CONTROL to 60 MIN TIMER WIRING DIAGRAM TEMPERATURE CONTROL 90 4325 CLASSIC 60 MIN MECHANICAL TIMER PART NO C9360NONC Li BE z ofo TERMINAL BLOCK ON STEAM UNIT FOLLOW SEPARATE TC 2 INSTALLATION and OPERATING INSTRUCTIONS TO PROGRAM TEMPERATURE SET POINTS 14 Do STEAM WHIRL INSTALLATION OPERATION amp MAINTENANCE MANUAL TC 2 TEMPERATURE CONTROL TO TIME CLOCK WIRING DIAGRAM TEMPERATURE CONTROL 4320 TIMER 24HR 7DAY 208 240V TIMER 208 240V LOAD l COM NO NC jojo e NENNEN NI S 0 0 TERMIAL BLOCK ON STEAM UNIT FOLLOW SEPARATE TC 2 INSTALLATION and OPERATING INSTRUCTIONS TO PROGRAM TEMPERATURE SET POI
10. ecome extremely hot 212 F The installation of a Steam Diffuser is recommended This device will enable the user to move comfortably around the steam shower and may help prevent burning or scalding J in Installation Diagram 11 Connect 3 4 copper tubing or NPT pipe to the pressure relief valve E in Plumbing Diagram and 1 2 copper tubing or NPT pipe to the Blowdown F in Plumbing Diagram Both of these items must be installed with a union and plumbed to drain to an approved location DO NOT PLUMB THE PRESSURE RELIEF VALVE OR BLOWDOWN LINE TO THE STEAM LINE OR INTO THE STEAM ROOM CHECK WITH LOCAL PLUMBING CODES FOR RECEPTOR TRAP OR VENTING REQUIREMENTS 9 9 STEAM WHIRL INSTALLATION OPERATION amp MAINTENANCE MANUAL PLUMBING DIAGRAM Water Supply Line G H Classic Timer Pressure Gauge CN 3 5 LL F2 24Hr Timer uu for Blowdown lt Sue WHIRL TOR m em 222 NY o y Site Glass A 7 X ee 7 e STEAM WHIRL INSTALLATION OPERATION amp MAINTENANCE MANUAL ELECTRICAL IMPORTANT All wiring should be done by a qualified electrician and must conform to all local and national electrical codes Awarnine ELECTRICAL SHOCK HAZARD POWER MUST BE DISCONNECTED AT THE MAIN ELECTRICAL SUPPLY BEFORE MAKING ANY CONNECTIONS 1 Supply wiring sh
11. he water is supplied by a well NO STEAM WHIRL TROUBLE SHOOTING GUIDE If there is a problem with your unit please check the following before continuing on to the troubleshooting steps 1 Double check the correct size generator and breakers size were installed See page 3 in your installation instructions Before calling the factory or a service technician please know the answers to the following questions 1 What model generator do you have and what is the serial number This information can be found on the last page of the installation instructions on your original invoice or on the silver label on the side of the generator 2 Do you have a classic blue or standard red unit See the bottom of page 3 in your installation instructions 3 Is your unit equipped with automatic blowdown 4 If you have a Standard unit which timer set up do you have Standard Deluxe or Combo SYMPTOM DIAGNOSIS ACTION Light on Timer comes but Sensor Probe Needs to be cleaned Follow sensor probe cleaning directions These generator does not turn on can be found in your installation instructions NENNEN Sensor Probe too corroded to clean Order new probe call 800 232 7832 Cleaned probe but stil does not Send unit to factory for repair or call a Service work Heater may be bad Center No Light on Timer when button pushed Heater may be bad Send unit to factory for repair or call a Service Center Moisture inside of Timer Do visual check uninsta
12. hour time clock F2 in Plumbing Diagram wired in series with the automatic blowdown The 24 hour timer allows the business establishment to regulate when the blowdown function is performed It is recommended to set the timer to operate for 15 minutes when the steam room is not in high demand 3 The automatic blowdown feature removes the water from the tank every time the generator shuts off This keeps stagnant water from sitting in the tank between uses giving the generator a longer life and reducing the amount of required maintenance DO NOT PLUMB THE BLOWDOWN TO THE STEAM LINE OR INTO THE STEAM ROOM CHECK WITH LOCAL PLUMBING CODES FOR RECEPTOR TRAP OR VENTING REQUIREMENTS PRESSURE GAUGE AND SITE GLASS 1 The Pressure Gauge H in Plumbing Diagram is factory installed and requires no on site plumbing or electrical connections The purpose of the Pressure Gauge is to detect that the unit is not building up any pressure on the steam line ie no crimps or obstructions that would create a blow back The Pressure Gauge should never read above 13 psi 2 The Site Glass lin Plumbing Diagram is factory installed and requires no on site plumbing or electrical connections The Site Glass is to ensure that the water level is above the heating element when the unit is in use the water should fill the Site Glass more than half way 8 9 9 STEAM WHIRL INSTALLATION OPERATION amp MAINTENANCE MANUAL GENERATOR DIAGRAM STEA
13. imited to repair or replacement of products that have been determined to be defective in either materials of workmanship by an agent or representative of Steam Whirl Products If repair or replacement cannot be made on the premises by such agent or representative then the product should be sent to the service facility Technical Service STEAM WHIRL PRODUCTS 3775 W Teco Ave 5 Las Vegas NV 89118 6827 800 232 7832 Products being sent to the service facility need to have prior approval and an RMA RETURNED MERCHANDISE AUTHORIZATION assigned The products are to be packed in a well padded box include RMA name return address and daytime phone number along with a short description of problems Mail or ship the unit prepaid to the above address If the product is returned for a defect other than in materials or workmanship a reasonable charge will be made for parts labor and shipping This warranty shall be void and or does not cover the following 1 Charges for parts or labor incurred before delivery of product to the address above 2 Any damage or defect caused by the installer Service company user or any other person 3 Installation is not in accordance with the installation instructions provided with the product and or installation by a person other than a licensed electrician or plumber 4 Deterioration due to normal wear and tear 5 Misuse accident incorrect operation lack of proper maintenance acts of G
14. ired conditions Consult an Architect Designer Contractor or the factory to determine all factors necessary to build a suitable and safe steam room Larger Generators are available Steam Whirl s revolutionary LED self analysis system in the Standard Series generator simplifies installation and monitors for proper electrical and water feed at all times All stainless steel tanks and components Extensive factory testing for all conditions 6 year limited manufacturing warranty Factory assistance provided from blueprint to finished product DO STEAM WHIRL INSTALLATION OPERATION amp MAINTENANCE MANUAL GENERATOR SIZING GUIDE MAXIMUM CUBIC BREAKER MODEL FEET VOLTS PHASE AMPS SIZE CAPACITY SW 10BD SW 10 3BD 57 SW 10 8BD 400 10 0 SW 10 83BD SW 12BD SW 12 3BD SW 12 8BD pus SW 12 83BD SW 15BD SW 15 3BD SW 15 8BD SW 15 83BD BD Blowdown Factory Installed 208 gt om C om spe om Tel on gt pe om gt pe om OPTION Wire two units in tandem to accommodate up to 1300 Cubic Feet capacity Commercial Series models contain 1 Steam Generator w Pressure Gauge and Site Glass 1 Automatic Blowdown w 24Hr Time Clock Probe Maintenance Instructions and Installation Instructions New Installations must also installan Accessory Kit in choice of finish Replacement Installations Accessory Kit is optional 7 e STE
15. ll and check for mois ture damage Visual check OK Send Timer to factory for testing or call a Ser vice Center Unit Comes on by Itself Moisture inside of Timer Do visual check uninstall and check for mois ture damage Visual check OK Send Timer to factory for testing or call a Ser vice Center Unit comes on for a couple of minutes and Bad Capacitor Send unit to factory for repair or call Service then shuts off Center Has Nylon Elbow been removed or tam If the Nylon Elbow has been over tightened pered with to the water solenoid the solenoid may break Call factory or Service Center 17 OO STEAM WHIRL SYMPTOM DIAGNOSIS ACTION Wateriscoming out ofsteamhead More than 2 1 2 gallons per hour Shut off unit check ground and incoming plumbing Less than 2 1 2 gallons per hour Machine ok all units drip a little water Machine is smoking Heater may be bad Send unit to factory for repair or call a Service Center Machine will not fill with water Check water supply Make sure water is on and there are no obstructions in the water line solenoid valve Deluxe Timer does not shut Timer not installed inside steam shower Deluxe Timer must be installed inside the off at settemp steam room order to detect the temperature If the Deluxe Timer is installed outside the shower a remote temperature sensor must be purchased and factory installed on the timer Moisture Damage D
16. ny such warranties or representations Steam Whirl Products has not made and does not make any warranty either expressed or implied about the condition merchantability design or operation of the product or its fitness for any particular use or purpose or the quality of the materials or workmanship in the product or any other representation or warranty beyond the terms of this warranty Steam Whirl Products shall not be liable for the user s incidental or consequential damages User acknowledges that the price of the product would be higher if Steam Whirl Products were liable for consequential or incidental damages Some states do not allow the exclusion or limitation in whole or in part of warranties or the exclusion of consequential or incidental damages therefore the above limitation or exclusions may not be applicable to you Steam Whirl Products warranty obligation shall be discharged upon tender of repair or replacement User s refusal to accept the tender terminates Steam Whirl Products warranty obligation LISTED 16K3 STEAMBATH C us EQUIPMENT LISTED FOR TECHNICAL ASSISTANCE CALL 800 232 7832 E MAIL techsupport steam whirl com STEAM WHIRL
17. o visual check uninstall and check for mois ture damage Visual check OK Send timer to factory for testing or call a Ser vice Center TC 2 Timer does not shut off at set temper Temperature sensor installed in a bad loca Verify that the temperature sensor inside the ature FOR COMMERCIAL APPLICATIONS tion steam room is NOT installed near the door or ONLY a window The senor needs to be in a location that it will not be affected by constant changes such as a door opening and closing Temperature sensor has been tampered Verify that the temperature sensor has not been moved or altered It is common for se nors to be pushed into the wall removed or covered by foreign objects 7 Visual check OK Send timer to factory for testing or call Service Center STEAM WHIRL 3775 W Teco Ave 5 702 270 2124 Las Vegas NV 89118 800 232 7832 www steam whirl com swsales steam whirl com 18 Qe STEAM WHIRL INSTALLATION OPERATION amp MAINTENANCE MANUAL MODEL DESCRIPTION SERIAL WATER SENSOR PROBE MAINTENANCE SCHEDULE 1st Cleaning Suggested 2nd Cleaning Check 3rd Cleaning Check WARRANTY Steam Whirl Products warranties its products to be free of defects in workmanship and material under normal use and maintenance for a period of 6 years from the date of original purchase Steam Whirl Products liability under this warranty shall be l
18. od 6 Chemical corrosion 7 Alteration of product in any way 8 Exposure to outside weather conditions or temperatures 9 Contact shows evidence of short circuit 10 Damage incurred in transit The user or installer must examine the product immediately on delivery before installation and report any damage to the carrier and the seller 11 Shipping costs to or from warranty service facility unless required by applicable law 12 Repair or replacement of any installation materials including but not limited to tiles marble etc or costs relating to obtaining access for repair removal or reinstallation of the product or a replacement product It is the responsibility of the user installer or contractor to provide access for service and removal of the product if necessary Steam Whirl Products is not responsible for any costs relating to accessing the product or its removal The dealer distributor and or installer is responsible for knowing the applicable building codes and the dealer and or distributor should notify the installer of same or confirm that the installer is aware of the applicable building codes Building codes vary from location to location and Steam Whirl Products cannot be responsible for knowledge of such codes No other company or person has any authority to make any warranties or representations concerning Steam Whirl Products or the products Accordingly Steam Whirl Products is not responsible for a
19. ould be sized in accordance with the voltage and amps of the unit and suitable for 90 2 Aseparate circuit breaker must be installed and sized according to the GENERATOR SIZING GUIDE Page 3 is not required however if generators quick disconnect is going to be located in a damp or moist area then a protected breaker is recommended 3 Locate the electrical supply line knockout on top of generator enclosure If this knockout is not going to be used DO NOT drill a knockout on the left side of the enclosure drop down door facing out Running a electrical supply line through the left side of the enclosure could potentially damage the low voltage circuit board 4 Strip 1 2 insulation from the two 2 power wires and the one 1 ground wire 5 Bring the two 2 incoming electrical supply wires to L1 and L2 and the one 1 ground wire to the ground terminal 6 Ifunitisa 3 Phase bring the three 3 incoming electrical supply wire to L1 L2 and L3 and the one 1 ground wire to the ground terminal 7 Install a power disconnect near unit 8 Install Timer G in Plumbing Diagram according to Timer Installation Instructions AUTOMATIC BLOWDOWN 1 All commercial series generators are equipped with factory installed automatic blowdown F1 in Plumbing Diagram a two position spring return valve designed to electronically drain the water from the heating tank 2 Also installed with all commercial generators is a 24
20. s and phase of the generator Awarnine ELECTRICAL SHOCK HAZARD 3 installations and service must be performed by a qualified electrician and or plumber and conform to all local and national codes The generator must be installed and operated according to the instructions Failure to do So will void the warranty and could lead to injury or death due to the live electrical components involved with installation 4 Physical size of the unit and accessibility for plumbing service and Water Level Sensor Probe maintenance must be considered INSTALLATION 1 Place the steam generator optional Thermostat Controller TC 2 and optional 24 Hr 7 Day Timer in a location NOT ACCESSIBLE TO CLIENTS but that is ACCESSIBLE TO MAINTENANCE and not more than 40 from steam room All steam generators are suitable for operation in ambient not exceeding 60 C 140 F ALL steam generators require maintenance 2 The steam generator should never be located where it is exposed to outside weather conditions or freezing temperatures near flammable materials inside the steam room or where access cannot be gained to Water Level Sensor Probe for maintenance 3 Install in an upright and level position 4 The serial number label should be visible and accessible for service 5 Aminimum of 2 of open unobstructed space must be left around the top and sides of the generator to allow for heat dissipation and accessibility for service SEE SEPARATE INSTRUCTIONS INSTALLA
21. t the steam room unawareness of impending risk fetal damage in pregnant women physical inability to exit the steam room and unconsciousness E Excessivetemperatures have ahigh potential for causing fetal damage during the early months of pregnancy Pregnant or possibly pregnant women should consult a physician regarding correct exposure F Obese persons and persons with a history of heart disease low or high blood pressure circulatory system problems or diabetes should consult a physician before using a steambath G Persons using medication should consult a physician before using a steambath since some medication may induce drowsiness while other medications may affect heart rate blood pressure and circulation The use of alcohol drugs or medication can greatly increase the risk of hyperthermia Some aroma therapy oils may cause an allergic reaction USE WITH CAUTION J The installation of a Steam Diffuser is recommended This device will enable the user to move comfortably around the steam shower and may help prevent burning or scalding K Always shut electricity off at the main breaker panel 4 SAVE THESE INSTRUCTIONS 9 e STEAM WHIRL INSTALLATION OPERATION amp MAINTENANCE MANUAL PRE INSTALLATION 1 Verify correct model has been sized for the cubic feet and type of steam room using the GENERATOR SIZING GUIDE on Page 3 2 Check that the electrical power supply available is adequate for the voltage amp

Download Pdf Manuals

image

Related Search

Related Contents

CERTIFICAT D`EXAMEN DE TYPE  Alliance Laundry Systems 70400401R2 User's Manual  Oracle Flexcube Universal Banking Testing Workbench User Manual  Candy CDB 854DN  Abocom WR104 User's Manual  DeLOCK 2m HDMI  

Copyright © All rights reserved.
Failed to retrieve file