1. not selected from the AIM Graphics Library When we performed a verification of the course in the Electronic Classroom by exporting the course to SCORM and importing it into Elite we found that none of the imbedded graphics were included in the SCORM output zip file In place of each graphic was the state ment Inserted graphic is unavailable The following is a statement by Steve Kramek GDAIS who investigated the problem AIM I 2007 001 looked at the problem of Elite not being able to dis play graphics from the E4200 1 4 Topic Here s what I ve learned The E4200 1 4 XML file SCORM output contains approximately 72 instances of the phrase In serted graphic is unavailable The E4200 1 4 XML file does not contain references to the graphic files This problem only manifests in Elite Elite is the only appli cation that uses the output from the AIM SCORM mod ule The suspect graphics ARE viewable from within AIM via Print Preview Based on past experience with an Elite failure to dis play TG graphics this is what think recommend the suspect graphics be reinserted into the TG as described in the AIM User The AIM I software does not allow simultaneous modi fication of the TCCD COI and LP TG modules Since the advent of Central Site AIM I a new problem has arisen When all the work was done in standalone installations of AIM I there was no problem with lock ing and unlocking the TCCD because each AIM Admin istrator controlled al
2. attached to This can become a problem if you need to delete the RIA or resequence the DP or RIA Sometimes users attach notes to the incorrect RIA The placement of the note on the DDA page may be correct because the attached it before one RIA but they should have attached it after the preceding RIA recommend adding text in the No Column following the word NOTE or CAUTION or WARNING that indi cates which RIA it is attached to For example make the Number column read NOTE RIA 8 a The ability to move courses or TPC s from one manag ing document to another would enhance the developer s efforts to fix mistakes of the past If a course was devel oped under the wrong TPS in the past and a developer now wants to put it into the correct TPS AIM 1 2000 005 reorganize the TPS they can add the course to the course list of the new TPC but cannot remove it from its originating TPC Instead of designating a TPC as the originating TPC it could be designated as the master TPC and that desig nation could be changed by a system administrator TPS s and TCP s could be reorganized when necessary If a TPC could be moved from one TPS to another it would further assist in the reorganization of troublesome TPS s when required FRB Prioritized AIM ACR Low Pri List Provide the ability to copy an entire AIM course and supporting data More info When a course is copied the user MUST select a new CIN TPS options Link to current TPS
3. automatically sort the RIAs to this order Provide the ability to save graphics in their native file format vs converting before saving in the graphics li brary would like the ability to define the location for backup databases generated during the AIM I 2001 016 repair database and up date processes This has become an issue a number of times at SSC I d like to see an editable line added to the ini file AIM I 2001 012 B1 is linked to S as opposed to B2 To use properly AIM needs to link S to B2 and the developer has to know the distinction of bloom s verbs cognitive domain of learn ing for B1 and B2 B1 would cover knowledge verbs and B2 selection would cover comprehension verbs TLO output would have to be modified since the PPP line item only uses one verb A help feature pop up box that lists the applicable verbs would facilitate this effort Another option would be to do away with B2 But then the question might be why have a background table at all if it is structured like a T F table As it is now peo ple are joining B1 and B2 and typically using the verb that comes with the PPP table which is usually a knowl edge level verb from Bloom s i e describe This means we re skipping the comprehension part and going right to the skill just like we do with T F It s a lot of extra effort to join B1 and B2 if one level would suffice With the changing technology please add Compact Discs to the questionnaire under the eee Oe Do
4. FRB Prioritized AIM ACR Low Pri List If the approval process were changed from the TPS level to the individual TPC s within the IM I 2000 003 TPS maintenance could be performed on each course or pipeline without having to submit the entire TPS This would further push the TPS towards its intended use of managing an entire rate or group of TPC s instead of each TPC be longing to an individual A Exercise controller Guides are currently not developed in AIM I If ECG s were incorporated into the AIM program it would ensure consistence in format and us age as well as encourage developers to explore the op tion of using an ECG to support their AIM I 2000 004 course recom mend that the ECG become an option for development following the development of the TCCD This way the ECG could support the LP or stand alone as guidance for the instructor and it would also ensure consistency of the learning objectives throughout curriculum It would require an additional module in AIM to parallel the LP module because both the LP and ECG are dependent upon the same foundations When IMPORTING a TPS or Course AIM 1 checks the contents of included PPP tables with tables currently in the database GOOD Well Done excellent validity check However whenever a difference is detected the import process terminates with the error message Line items differ for PPP lt name gt Rev _ Change _ cannot import Determining where what the difference is c
5. TPC If any TLA was developed using a Task Function PPP developed to DOD HDBK 292 standards this option CANNOT be selected be cause the new TLA must use NAVEDTRA 131 stan dards Link to current TPS but different or new TPC within that TPS Same restriction as first option if different TPC is selected If anew TPC is selected the status of the TPS MUST be other than Approved Link to other existing TPS TPC Same restriction as first option Link to other existing TPS but new TPC Same re strictions as first and second options The program should check for any unfulfilled training requirements and copy only fulfilled training require ments to new other TPS TPC The program should check for unlinked TLOs The program should then list the unlinked TLOs and query the user as to keep or delete When the TPP is created it should be backfilled from the TCCD The program should check for unused RRL items and remove them from the Course RRL AIM l 2000 020 Change the import function to check to see if importing course exists in existing database EARLIER IN THE PROCESS On a large import it can take as much a 5 minutes to determine that the course to be imported al ready exists in the database AIM I 2000 032 Provide a thumbnail view capability of all or selected graphics in the database AIM I 2000 025 AIM 1 2000 033 Agreement reached that structured order of RIA activi ties should be Display Refer to Reference AIM should
6. an be a time consuming and somewhat frustrating process but has to be performed if the difference is to be cor rected Have the error message changed to include the location for example the line item AIM I 2000 014 number where the difference was detected Additionally the import process should continue comparing line items until either the end of the PPP table or differences in 10 line AIM I items have been de tected and then 1 terminate the import process and 2 display the expanded error message Without the change we must continue current methods of operation Whenever a PPP Line Item difference is detected while importing a TPS Course the time re quired to locate the problem will remain high There is the possibility that an erroneous line item entry in a IM I 2001 022 When creating a new course TPP the fields for current and planned course information are both accessible Suggest blocking the entry of current data for new courses created Change 1 to a course to place the curriculum in Maintenance then deleted the AIM I 2001 028 first topic from Section 1 There were NO system or user maintenance flags gen erated anywhere in the course There should have been a multitude of them because of all the resequencing There were originally six topics in Section 1 am developing a course and have hit a limitation in the TPP Manpower Data need to AIM 1 2002 004 enter a list which will not fit in the field Number Type of Bi
7. as the equip ment use tapes disks or diskettes as an option AIM I 2002 001 Add the capability to add the statement Confidential when filled in to the Lesson Plan and Trainee Guide AIM I 2001 019 FRB Prioritized AIM ACR Low Pri List ACR DESCRIPTION AIM I 2003 002 AIM l 2004 005 AIM I 2004 006 AIM I 2004 007 AIM l 2004 009 Location AIM I gt HTML output Narrative of Problem When an LP HTML output is generated for any course in AIM I the RRL OAC and FAL do not print with the Reference Material only the Answer Sheet prints recommend adding the RRL OAC and FAL to the Reference Material printout of the LP HTML output Location AIM I gt Utilities gt Reporting Narrative of change request AIM I currently contains the report Keyword Search in the Utilities module This report searches for keywords only in the titles of PPPs TPSs Courses Topics recommend expanding this report to include the entire AIM database The user should be able to search any PPP TPS TPP or Course or the Site RRL These items should come up selected as default but should be able to be removed from the search criteria The user should be able to search all selected or one PPP TPS TPP or Course AIM does not currently have the ability to print the TG to PDF Need this capability Location AIM I gt Site Resource Requirements List gt IMI Narrative of change request request that AIM pro gramming be modified t
8. em believe that the way AIM is programmed is not correct for selection of an instruction sheet in one topic that was created in another topic created a test course in AIM to test the way this selec tion works created three information sheets in topic 1 of the LP then edited these sheets in the TG to add the appropriate text then went back to the LP to topic 2 and selected these three information sheets in the RIAs in this topic AIM added these three sheets with new numbers specific AIM I 1998 008 to topic 2 then printed the TG The TG contained six information sheets the first three being identical to the second three except for the in struction sheet number then edited one of the informa tion sheets in topic 2 and checked the same information sheet in topic 1 The same modifications were made there Apparently each of the duplicated information sheets is a single database entry with separate numbers assigned for each use The following is an example of why believe that AIM should not be programmed in this manner FRB Prioritized AIM ACR Low Pri List When you use the Delete Proposed Training Material option to delete an unapproved course the program automatically deletes the associated unapproved TPS s and PPP s if they are not used by any other element in the AIM I database This deletion should NOT be automatic There are times when the use of this option is advantageous because of the deletion
9. l work locally However with Cen tral Site AIM I this has changed As it has always been when the AIM I 2008 002 TCCD is unlocked no one can edit either the COI or the LP TG module I m currently working on A 121 0031 FCS Mk 98 Mod 6 Missile Technician Re placement and it is very large and all the THCs have some responsibilities for it This means that quite often when want to edit the TLOs or the DPs RIAs or the TG can t because someone is working in the TCCD or the LP TG module There have been times that have been locked out of being able to do my work for a full day or more This has happened several times and it is severely hampering my ability to process the course in a timely manner AIM I 2008 003 eae of LP over 2 500 pages gives runtime error Workaround is to print to PDF The LO Module does not contain the Developing Au thorities functionality that is contained in the TCCD Module AIM I 2008 004 This functionality would provide the same advantages e g more granular levels of permissions locking out unauthorized users from making modifications in the LO Module that is currently in the TCCD Module therefore recommend adding this functionality to the LO Module
10. llet The field has a limitation of 240 characters The recommended method in the user manual is not enough information to explain manning requirements The size of the field is 22 characters across and 18 1 2 row before you hit the 240 limit Please make this a memo field FRB Prioritized AIM ACR Low Pri List Location AIM I gt Site Resource Requirements List Narrative of change request When need to update an approved Site RRL IMI item must create a new IMI item and replace the one that is currently linked to a course If that IMI item is used in multiple locations must use the RRL Graphics Location Tool or the Dis play Related Materials option in the Site RRL to deter mine where the IMI item is used AIM I 2004 003 There is a more efficient way to do this Add the ability to create changes to Site RRL items When a change to a Site RRL item is created the program would propagate system flags to any unapproved course that uses the item These flags should be propagated to courses that are currently approved when a change or revision is cre ated If a user forgets to run the Location Tool to deter mine if the RRL item is used in multiple locations the system flags would key them Request AIM software be updates so that user receives warning anytime he she attempts to approve a course associated with an unapproved TPS The user should not be allowed to approve a course with an unapproved PPP table 1 The user should receive a
11. o automatically assign the type of application and plug in necessary to open an IMI based on the extension of the filename and that the names of the application and plug in be added to the meta data under a new tab labeled Technical The subsection Format of this new tab should be the loca tion where this information is assigned and the informa tion should be stored in separate fields under this sub section Refer to the SCORM 2004 Meta Data Ap plication Profile Requirements for the different subcate gories of the Technical tab The database should be filled in with the filename exten sions and their associated applications and plug ins us ing the information in Table 1 but the AIM Adminis trator should have the ability to edit or delete existing information and add new information This would be a baseline for configuration but would not limit future modifications and additions Security requirements dictate classification and handling caveats be imbedded into the electronic document as well as printable in hardcopy Recommendations Allow header and footer regions for each page of curriculum to be user configurable Impact of Non implementation Work arounds pre printed paper or non AlIM based curriculum develop ment may have to be considered FRB Prioritized AIM ACR Low Pri List ACR DESCRIPTION Narrative of Problem GDAIS created A 121 0083A CH 10 and added three information sheets that con tained imbedded graphics
12. of associated materials e g agencies graphics and sites However the PPPs may need to re main in the database because of relinking AIM I 1999 046 considera tions e g Select Later TLA This option should be modified so that you are prompted to confirm deletion of the TPS s and PPP s in the same manner that agencies sites RRL items etc are cur rently selected for deletion A window should be pre sented listing the TPS s that the course is attached to as long as the TPS s is are not used by any other course The administrator should then be able to select one sev eral or all TPSs for deletion Then another window should be presented listing the PPP s that are attached to the TPS s as long as the PPP s is are not used by any other TPS PPPs may be listed in this window if they are us When a note caution warning is added to an RIA the user has the option of adding it before the RIA or after the RIA Once the note warning caution has been added there is no way to determine which RIA it is attached to In the attached screen print the note that precedes RIA 8 could be attached to RIA 8 before or RIA 7 b 4 after The only reason know it is attached to RIA 8 is be cause attached it to this RIA and the text of the note indicates this Many times it is difficult to determine which RIA it is attached to by just AIM I 1999 047 reading the text Also there is no indication on the screen to inform the user which RIA it is
13. warning if he she attempts to approve a course associated AIM I 2007 005 with an unapproved TPS 2 The user should be prohibited from approving a course associated with an unapproved PPP table 3 The user should be prohibited from approving a TPS associated with an unapproved PPP table LSO Dahlgren recommends adding a selection in the build RIA field to include a drop down menu in Refer ences for Administer Test Types The Build RIA would state Administer Test in the before text and then a drop down would show choices of which type of test you plan on assigning i e Knowledge Test Practical Test Quiz Final Exam LSO wishes to add testing time for these tests either within the RIA or in the Topic Time option for each individual topic End result would be an automatic entry into the AOIT for AIM I 2008 001 testing within each applicable topic that contains testing Rather than an overall testing time for the entire course This would also transfer to the CMS as the AOIT does now but it would contain the hours for testing as well as Class Lab times Easy fix would be just to add a testing time right under class lab times within each topic that would trans fer to AOIT then to CMS when updated This option does not need to occur if the Build RIA portion can have a time box for Administer Test RIA with the test drop down choices but this would need to automatically populate the AOIT with testing for each topic through the t Narrative of Probl
Download Pdf Manuals
Related Search
Related Contents
HPI Racing The Savage Flux HP ダウンロード(PDF 2.17 MB) Mazda CX-9 Owner's Manual Hardware User`s Manual Passive avoidance box E A S Y T E N S FIND-R-SCOPE UV-SCOPE OPTICAL RELAY User`s Manual triflex IC-F33/F34/GT/GS SERVICE MANUAL Istruzioni per l`uso e per il montaggio 16/08 7082530 - 02 Pride Mobility 3 Ultra Mobility Aid User Manual Copyright © All rights reserved.