1. o o DRY BISCUIT MIX SCREED SYSTEM e e e e o SOLID FLOOR PANELS for finished tiled floor For more information on various floor fixings watch our helpful videos for step by step guidance COM pro Ne Unit 12 Carnival Park Carnival Way Basildon Essex 5514 3WN 201013 DIA
2. X ufh manifold 1 motorised valve motorised valve motorised valve DHW radiators UFH1 Earth wires omitted for Clarity power to boiler amp boiler pump l cc l LEJ 01268 567019 A Schematic for system boiler amp UFH radiators hot water Motorised valves NI A Boiler Boiler pump O not needed on a UHF only Hot water sytsem Schematic for gas combination boiler underfloor heating radiators Motorised valves Combination Boiler ELECTRICAL setuup CLIP RAIL SYSTEM A cost effective solution for installing water underfloor heating into new build properties or new extensions This type of system installation is the most popular and cost effective type on the market today the pipes are incased in screed or concrete meaning that the whole floor warms up like one huge storage radiator This system is normally for new build houses or extensions conservatories Installing water underfloor heating between joists is easy using our different installation solutions
3. ES VE ED PT e APPR DW ED BY PROFESSIONALS INSTALLATION MANUAL gt gt ProWarm Water Underfloor Heating Systems are the ideal choice for homeowners tradesmen wishing to install a premium branded water underfloor heating kit This instruction manual contains important information regarding the safe installation and operation of your underfloor heating system Please read carefully s ja In addition to this manual we have online installation videos that guide you through each stage of process with easy to follow CGi graphics and helpful dialogue Please read through these instructions carefully and check that you have all the components required ProWarm water underfloor heating kits contain everything you need in one box for your water underfloor heating project NB This multi zone system is controlled by multiple thermostats A rated UPS 2 Grundfos pump Pipe rerounding tool PE Xb multilayer pipe to suit area Wiring centre Edging insulation NA for low profile All pipe connections to fix pipe to pump and manifold Manual Thermostat Actuators Pipe Staples Pipe Cutters We use multi layered pipe PE xb a HDPE in all our ProWarm water underfloor heating systems AN INNER LAYER in cross linked polyethylene AN INTERMEDIATE LAYER in aluminium PE Xb crosslinked with silanes alloy butt welded along length of pipe
4. PE Xb Al HDPE Working pressure amp temperature Obar 95 C 100 oxygen impermeable Lifetime warranty TWO BINDING LAYERS of adhesive bind AN OUTER LAYER in cross the metal pipe with the two outer layers in linked polyethylene PE Xb cross linked polyethylene crosslinked with silanes gt cc lt Typical 1 circuit layout Select a suitable location for the pump amp manifold unit and mount on the wall See opposite page for assembly Refer to the typical pipe installation drawings and determine the pipe layout the layout is not critical and can be varied to suit site conditions the important criteria being the pipe spacing see below The pipe is marked every metre by the metre maximum length for any circuit is 110m 70m for low profile 12mm pipe circuit Pipes should be laid 100mm away from walls Do not lay pipe under fixed units Lay the rooms furthest from the manifold and work back do the room with the manifold last Installation for a multiple room multi circuit system Typical 2 circuit layout 8 When pipes to from one area pass through another area the two pipes should be run together the bunches of pipes should then be spaced as If they were one pipe 9 Lay the pipe as planned fixing every 1 0m if ona screeded celotex base and return to the manifold 10 If the pipe is kinked when ben
5. Please note all in joist systems require the pipe spacing to be 200mm apart or less This means you need to select a conservatory style kit or a multiple room kit standard room kits are designed with the pipe spacing at 250mm centers which would mean you would not have enough pipe in the kit e e e e e e Installing water underfloor heating over existing floors is simple using our different installation solutions Our overfloor systems can be installed directly over any solid subfloor such as existing floorboards plywood or concrete screed floors or any solid surface such as existing tiles wooden floors Technical support PLASTIC EGG CRATE SYSTEM CLIPPED DIRECT WITH STAPLES s e Ey gt _ ifi mE a MA ue e e e o
6. iron compression fittings DO NOT APPLY HEAT TO MIXING VALVE FILLING THE MANIFOLD SYSTEM 1 It is IMPORTANT that the underfloor heating 3 Connect hose from a mains pressure cold system is properly filled with water and purged water supply to the hose connection on the top completely of air to ensure correct operation it is flow manifold and another hose from the hose therefore necessary to follow the procedure below connection on the bottom return manifold to a 2 ITIS NOT ADEQUATE TO FILL THE SYSTEM USING THE BOILER FILLING LOOP 4 Ensure that all the black caps on the bottom return manifold are screwed down closing the valves warm Oo kej ab c c c O O O cc LEJ l q e adi e e C A O cc FILLING THE MANIFOLD SYSTEM cont 9 Ensure that the main flow amp return ball valves are closed on the manifold Turn on the water and open the hose connection valve on the top flow manifold Open the first circuit valve by unscrewing the black cap allowing water to flow into the pipe Open the hose connection valve on the bottom return manifold allowing water to flow freely into the drain until the water is clear with no air bubbles Open the second circuit
7. profile systems circuit at 0m 40 1 5 Fit actuators to valves after connecting the control wiring It is important that the actuators are screwed tightly on to the valve Initially start the system with the thermostatic valve set at min 3570 Increase the setting by 5 per day up to a maximum of 50 for concrete floors max 65 for timber floors The flow amp return from the boiler should be connected to the manifold connections shown using compression couplings 10 NOTE When first starting up the system it may take 12 24 hours for the heating effect to become apparent MAINTE NANCE It is recommended that the following maintenance be carried out annually 1 Check that all actuator nuts are tightened firmly and that actuators are not loose 2 Remove end plug from pump and check that pump rotates when energised 3 Turn up thermostats and check that actuators move into open position also check flow gauges are indicating If not re pressurise manifold remove indicator clean and replace repressurise manifold 01268 567019 Electrical setup Only required for manual Wiring from thermostats to manifold wiring centre should be 1mm 3core earth 6243Y A network system must be wired CAT6 cable The wiring centre has a back entry to avoid surface wiring Where one room has more than one pipe circuit it will be necessary to connect all the circuit actuators to that particular zone on the cont
8. valve black cap and close the first COMMISIONING 1 screed or chipboard flooring should be laid immediately after pipelaying to protect the pipe Concrete screed floors must be cured before any heat is applied a general rule of thumb is to allow 1 day per 2 millimetres of screed Timber floor with drymix infill can have heat applied immediately the drymix must be dried completely before laying the flooring Hardwood timber flooring must be conditioned before fixing It is important to purge the pipework from the boiler to the manifold to avoid air being introduced into the underfloor heating system It is not normally necessary to balance the system but if required follow this procedure The system is balanced by running the pump and adjusting the flow to each zone by turning the Square spigots under the blue caps on the bottom manifold the flow in the respective sight glasses 10 Open the third circuit valve and close the second etc 11 Continue until the last circuit has been purged and close the hose connection valve on the bottom return manifold before closing the last circuit valve black cap 12 While under pressure check manifold amp pipework for leakage 13 Close hose connection valve on the top flow manifold and remove the hoses should be set at a figure calculated by dividing the length of pipe for that zone by 40 Example Circuit 1 85m 40 approx 2 on the scale Low
9. ding the pipe should be straightened and rearranged so that the location of the kink remains in a straight length no other remedial action is required PIPE SPACINGS LOW PROFILE SYSTEM panels are spaced at 150mm centres STANDARD OUTPUT SYSTEM suitable for internal well insulated areas such as a living room kitchen or bathroom Pipe spacings are set at 250mm centres HIGH OUTPUT SYSTEM suitable for areas of high heat loss ideal for conservatories extensions and external buildings Pipe spacings are set at 200mm centres 01268 567019 11 To lay the circuit cut the pipe end squarely using 12 Note also the room to which each circuit applies the plastic pipe cutter re round the pipe end with the tool provided place the nut over the pipe ensure the olive and insert is fully fitted over the end of the pipe and the assembly is attached to the manifold Tighten the nut using an open end spanner Do not over tighten 13 Prevent people from walking on the pipes keep tools etc away from the pipes and use running boards The pipe is very tough but it is better to be safe than sorry PUMP amp MANIFOLD ASSEMBLY Flow meters Wiring centre Mixing valve Flow from boiler TET to UFH circuit L Attach manifold to wall 2 Fit ball valves to manifold the end with the loose nut to manifold remember the washers 3 Assemble pump amp mixing valve as shown 4 Connect supply pipework to mixing valve using 94 male
10. roller controlled by one thermostat Thermostat position in the room is not critical but positions affected by the sun should be avoided mounting height approx 1 5M INTEL 3 1 2 3 systems see Ss UJ a instructions supplied with e wiring centre Heatmiser DS1 DT PRT PRT TS lt For wireless x fe famn I I dial stats EXTERNAL PROGRAMMER manifold actuators 230v AC supply up to 4 per zone connect across room thermostat connections in combination boiler WARNING DO NOT CONNECT 230V FROM manifold THIS CONTROL SYSTEM TO THE BOILER ll TERMINALS OR BOILER MAY BE DAMAGED ww c lt Ca cc Boiler hot water underfloor heating UN hot water programmer refer to wiring centre Earth wires omitted for clarity SLO schematic for these connections 2 X ufh manifold 1 motorised valve motorised valve DHW UFH1 lm i power to boiler amp boiler pump Boiler hot water radiators underfloor heating room thermostat cylinder radiators thermostat hot water radiators programmer _ Supply 11 J refer to wiring centre underfloor heating programmer connections 230V AC al schematic for these all

Download Pdf Manuals

image

Related Search

Related Contents

D-509E  Panduit FXPE3-10M3 fiber optic cable    Manual de Instrucciones Pala cargadora FE EcoLine  Juiceman® Express Jr. Juice Extractor & Food Processor  ZyXEL NSA-220 User's Manual  L`écoprêt pour les économies d`énergie, mode d`emploi  Operating instructions Mode d`emploi Instrucciones de uso  ORT 8890-HD  Ethernet module: Installation and user manual  

Copyright © All rights reserved.
Failed to retrieve file