SAMSUNG SDI-ESS Quick Installation Manual - Europe

image

Contents

1. Bere SO cable It should be applied to twisted pair cable Ea eps EEE Jumper Wire Connector supplied by Samsung OTOOTO IOIO O lol zr wo nw B 11 ENG Version Revision Date Dec 24th 2014 Document No SDI3 6AIOQMDE_rev1 4 1 Required Preparations before the installation SAMSUNG soi EH Grid connection data Value AC Nominal power 4 6 AC Max apparent power 5 Max allowed fuse i 32 protection current AC Nominal voltage 230 Vac AC Voltage range 184 264 Vac AC grid freguency 50 Feed in phases i 1 1 connection phases Operating temperature 10 40 Storage temperature 20 60 Me enen man Le Eu Q3DA1004 m Unidirection EN EasyMeter Q3DA1024 m Bidirection EI Q3DA1034 TO Unidirection Hager Vertrie ae l e eHZ IW8E2A5L0EQ2P Do Bidirection e ED300L W2ES ON ELO m Bidirection D2 0000002 F50 Q2 er 7 eHZ IW8E2A5WLOEQ2P O Do Bidirection 1 meinen Prison so Biase H CALRO GAVAZZI EM24 DIN AV9 3 X 02 X am Bidirection The meters above are products supplied to Stark Company Germany It is not recommend because of unidirection type L N O O O R 7 012 evision Date Dec Document No SDI3 6AIOQMDE_rev1 4 2 Battery Tray Assembly I SAMSUNG sp HIT 1 Unpack the AIO from its package gt gt 2 Unpack the Battery Tray from its package Caution At least two persons is required for handling of this P
2. FDIN SO PUCH 12 SO PUCH lt ESS system side view gt ENG Version Revision Date Dec 24th 2014 lt Meter side view gt 59 Document No SDI3 6AIOQMDE_rev1 4 10 Energy Meter Smart Meters Install Instruction IV SAMSUNG SDI IH Setting 1 SO Pulse Ratio 1000 000 Impulse kWh 2 SO Pulse Duration 40 ms gt RS MBS fessional 3 75 M Bus vs 3 phase Energy Meter 46317 C EM 138 ve Se i en Ale WET 7 ep La b an 3x230 400V 50Hz CIB 25 55 C 025 5 75A_ e l 3x230 400V SOH2 CIB 25 55 C 025 5 75 A 3 Assignment Output 1 A Assignment Output 3 SO Pulse Output kWh Import SO Pulse Output kWh Export enG X Please refer to the instruction manual to change information Revision Date Dec 24th 2014 23 Document No SDI3 6AIOQMDE_rev1 4 10 Energy Meter Smart Meters Install Instruction V SAMSUNG SDI JH Grid N L L L i J Saum b H H a Sa SE Be a SR Sos e e S0 Meter In i Ean 7 Cee a Purchase Di Nk i sum ans E oo l i Each 2 wire House load lt 3 6kWh AIO System Side View gt S gt PV mg A L A N 90e m Aal PV House Load ENG Version Revision Date Deoa aol 24 Document No SDI3 6AIOQMDE_rev1 4 10 Energy Meter Smart Meters Install Instruction VI SAMSUNG SDI Hl CC cucta m d nta r Connection Di
3. and assemble the washer and the nut to the bolt and use the spanner to fasten the nut 7N m ENG Version 7 Revision Date Dec 24th 2014 Document No SDI3 6AIOQMDE_rev1 4 3 Connections and Configuration I SAMSUNG ap En Home Load amp Electrical Connection Overview aw 3 6kWh All in One wg Digital Energy Meter PV String 1 PV String 2 Distribution Box N CAUTION The PV string 1 and the PV string 2 must be each connected Do not change the PV string 1 and PV string 2 to parallel to be connected y PV connections AC connections ENG Version Q Revision Date Dec 24th 2014 Document No SDI3 6AIOQMDE_rev1 4 3 Connections and Configuration II 1 Connect Energy Meter SAMSUNG SDI INT Refer to the Figure below and the communication description in Chapter 6 to install the energy meter Use either one of the Digiter Energy Meter Table 1 in our list Refer to install manual provieded by Manufacturer of the energy meter you chose Distibution Box Communication Line LAN LAN Jumper connector ENG Version Revision Date Dec 24th 2014 ei SOHPUCH DO Fee in Purchase elas DO Bi Feed In Rotel DO Perchase ep DN SIHPUCH Em SO 2x Feed in 2x Purchase The electrical cable connection and the communication lines of the energy meter Depending on the product there are a one wa
4. ay a 100 e 12 Click Operating Test ENG Version 11 Revision Date Dec 24th 2014 Document No SDI3 6AIOQMDE_rev1 4 5 Operating Test SAMSUNG SD EI 1 Turn on PV SIM System Install Manager for AIO system 2 Check Check item list is Ok 3 Operating mode TEST Operating Test Monitoring relveshafter6 53 Operating mode test Grid Charge test 1 Target Power OD we A x nn 1 Ta Cs Power a z naini in EV information TNV information FCS information Click GRID Charge Check the NOP STOP Bessi Oow Power oom value of INV information Power EEE I The value could be different with ae Target Power Click NOP STOP BEE ei Fe b keng I SCH Discharge en a F PV Only E GRID information BAT information BMS information i e EC soc 91 0 Pa ick BAT Discharge Check the BAT Discharge www 20 6 0 J Das 3 value of INV information Power i oe a S Targen ELF ILAD a ET na 2 st A The value could be different from E Powers ates EES ge SE Ee System Information FC System Information F1 LN Status PV Only test Warning BMS a Select 1 Target Power 4000W geg Warning Meter b Click PV Only gt Check the value Ee Warning3 Server of INV information Power See art Meise Statud OK PV Operati N PCS Disetfarge Statud OK The value could be different from EMS S W V03 06 Charge SS IRA CI _ IR Target P
5. AC connection O Ring crimped terminals are highly recommended Observe the minimum clearance on the installation spot see fig 1 If possible fix the AIO to the floor with the recommended screws If not possible apply other method to fix AIO Screw Lle Doll Drill depth Max tensile Max shear namee used m E SE EECHER zu INVERTER ASSY SJ94 00108A Zu pn TRAY ASSY ELPT362 00031 BER 1 SCREW M4xL16 SJ81 01146 2 EXTENTION WIRE 3901 000819 3 EXTENTION WIRE 3901 000820 4 EXTENTION WIRE nn 5 CABLE TIE A B 6 JUMPER WIRE Fig3 Packing List o euiek Guide mans ave nn WIRE may not be needed depending on Battery Tray type ENG Vers 2 Revision Sr Dec 24th 2014 Document No SDI3 6AIOQMDE_rev1 4 1 Required Preparations before the installation SAMSUNG soi EH O Ring terminal and Cover 6 6 6SQ wire 6pi bolt hole Crimping tool of Ring terminal Hammer Drill Drill Bit 17mm for Concrete Anchor Punch Fig 2 Hammer B 3 Distribution Box of Grid B 4 NFB 230Vac 32A 10KA B 5 Wirestinper gt O Monkey Spanner Phillips head driver No 2 for tray side cover grounding Flat head driver for front cover knob larger than 10mm Moving equipment for AlO Ex Fork Lifter B 6 Drill maxtorque 30Nmor more I 8 9 NFB FUSE 700Vdc 20A or more I B 1 B 1 2i Digital Energy Meter Table 1 UTP RJ45 LAN cable RS232 extended cable DO to RS232 cable
6. Document No SDI3 6AIOQMDE_rev1 4 3 6 kWh All in One AlO Quick Guide i Specification of the product can be modified without any notice to customers to improve the system SAMSUNG SDI JH Contents 1 Required Preparations before the installation 2 Battery Tray Assembly 3 Connections and Configuration 4 Install Setting 5 Operating Test 6 Installer Account 7 User Account 8 System Commissioning 9 Contact Information Model ELSR362 00001 10 Energy meter Install Instruction This manual is for 3 6kW All in One product ELSR362 00001 of Samsung SDI You can download the manuals for product from Notice in the monitoring web page ENG Version 1 Revision Date Dec 24th 2014 Document No SDI3 6AIOQMDE_rev1 4 1 Required Preparations before the installation SAMSUNG soi EH x The installation procedure particularly the Battery Tray Assembly shall be carried out by at least qualified technicians Before installing the units items specified below shall be observed Neither DC Disconnect switch nor AC Circuit Breaker are embedded inside the AIO Those are mandatory parts that should be installed in installation step AC Circuit Breaker 230Vac 32A 1OKA DC Disconnect Switch 650Vdc or more 15A or more III Energy meter selected from among those listed in Table 1 shall be prepared in advanced Internet connection via LAN cable shall be available For the
7. P address automatically Use the following IP address IP address Subnet mask Default gateway af R 23 255 255 224 0 Ws Fh EA 2 10 Docul A Install Setting gor cr BA amp je Kara i Single Zar rum j hoe Behr GS cax CS Ed rou system Install Manager for AIO system i E RB dh P Sam ER r 1 Click here 3 3 Select the closest city Install Setting Menu to your location Th Arm ome ls ma Ea BA a a in be A Safe Bb ik Bebe Sab Ei oll Sx SS Regon nn Moe e installed PV 1 Power una W Range 0 3300 W installed PV 2 Power gi WI Range 0 3300 W E 4 Max power per String Feed In Limit percentage UMM Server JE cc IP qi2106 12 149 5 Do NOT change RHM e S zech Meter Selec 6 Select a energy meter ype DO Bi Direction Lei lt type SO or DO 7 If DO select the relevant Feed In and Purchage EMS S W V03 06 Sep 1 2014 EMS HW V6 S0 Pulse Cont mer kWh kWh Pulse Count aT to Click here 8 If S0 Select the sample rate of the energy meter 9 Set the current local time and date Tiste iene Fettes ER 1 After clicking SAVE and ReSTART on the top of the indow a message saying Wait for 1 Minute and press F5 ill appear gt follow the essage Ste w i SS Ve AOS Ss So
8. S List Add New ESS Maintenance List Event List Check Communication 13 6 Input AIO information installation information and owner information Document No SDI3 6AIOQMDE_rev1 4 6 Installer Account I 7 Click Submit button Add New ESS ESS Information Serial No Device Type Battery No Product Model Capacity kWh Installation Information Building Type Building Name Country Building Name is Mandatory Country City Address Address2 Utility Name Tariff Name Installer Name Installer Contact Installation Company Installation Date Add New ESS Add New ESS Tariff Name Installer Name Installer Contact Installation Company Installation Date Remark Owner Info Owner Name Owner Contact Owner Address E SUBMIT B BACK ms ml 8 If it is saved successfully you can see a success message It could take for 5 10 minutes to login ESS List ESS List Add New ESS Maintenance List Event List Check Communication Revision Date Serial No i OGDATE 20 Dec 24th 2014 Check Communication STATUSO 0 777 2 80 17 ESSUID TESTBED 0009 RAW DAIA a STATUS Login Success SAMSUNG SDI IH A LOGDATE 2014081203180577 STATUSCD 0 IP 21t 17018017 ESSUID TESTBED 0009 14 Document No SDI3 6AIOQMDE_rev1 4 7 User Acc
9. agram EEE WEDER gees er CS SO FDIN 32 Twisted lt ESS System Side View gt SO FDIN 31 ie SO PUCH 42 e SO PUCH 41 Weg lt Meter side view gt Kl 7 d ENG Version Revision Date Dec 24th 2014 25 Document No SDI3 6AIOQMDE_rev1 4 10 KE Meter cain weie Install Instruction VII SAMSUNG SDI IH Setting Meter datasheet http www datasheet gavazzi com pdf UK EM23DINDS pdf umar Application 2 SELECTOR 1 04 2 02 3 02 Loc 04 3 3P n lt Meter LCD view gt SYS This means 3 Phase unbalanced with neutral State No 7 A o tg 1 A out Ler cui ac LESE Pull Tuig 19 5 FiLtEr S 2 7 diG outl PuLS 0 001 30 no KE Zeg kk PUL nEG 2 8 diG out2 nEG 0 001 30 no m wee 9 EnE t rES no ENG Version Revision Date Dec 24th 2014 26
10. in real time Examples of operation modes Refer to User Manual Clause 4 1 7 2 for more information in detail PV Auto Mode I PV Auto Mode II PV Auto Mode III PV Only Mode I PV Only Mode I Batt Discharge Mode Errors ERROR checking status If an ERR code appears on the display please check the ERROR code at our website https myess samsungsdi com If there is no description available please contact our Customer Service see page 17 When the All in One is disconnected from the energy meter or the power conversion system is disconnected from the EMS energy management system the All in One system enters into the Stand Alone Mode The system operates in a PV only mode gt Check the energy meter Operating Test page 9 The display is OFF gt please check the power connection AC and DC Measure the voltage if possible at the AC and DC sources LCD OFF Revision Date Dec 24 2014 17 Document No SDI3 6AIOQMDE_rev1 4 9 Contact Information Customer Service Samsung SDI Europe Gmbh Oskar Messter Str 29 85 37 Ismaning Germany E Mail esseuservice samsung com Or you can send us a message on our website after log in https myess samsungsdi com ENG Version Revision Date Dec 24th 2014 SAMSUNG SDI JH Contact Us Contact Samsung SDI Europe GmbH Oskar Messter Strasse 29 85737 Ismaning Email esseuservice samsung com el indicate fields required t
11. o complete this transaction Name Email address Telephone Preferred contact time Issue Comments 18 Document No SDI3 6AIOQMDE_rev1 4 10 Energy Meter Smart Meters Install Instruction SAMSUNG SDI HIP E Bi S Maker CARLO GAVAZZI Model Name EM24 DIN AV9 3 X 02 X Interface SO Direction Bidirection Need Qty 1 ea Change Setting when install Need Calculation time 2000W 10 30 sec lt EM24 gt lt EMU gt ENG Version Revision Date Dec 24th 2014 EMU Elektronik Professional 3 75 Stark MBS SO Bidirection 1 ea Do not need 10 20 sec 1 Calculation time Connect with AIO 3 6kWh System It is taken time that AIO system calculate Power W When Power Line is change to 2000W 19 Document No SDI3 6AIOQMDE_rev1 4 10 Energy Meter Smart Meters Install Instruction I SAMSUNG SDI IH Connection Diagram SO Meter gt 50 Meter Purchase g House load Each 2 wire ENG Version Revision Date Dec 24th 2014 20 Document No SDI3 6AIOQMDE_rev1 4 10 Energy Meter Smart Meters Install Instruction II Connection Diagram L1 Output Input L2 Output L3 Input Input Output ENG Version Revision Date Dec 24th 2014 SAMSUNG SDI JH 21 Document No SDI3 6AIOQMDE_rev1 4 10 Energy Meter Smart Meters Install Instruction II SAMSUNG SDI IS Connection Diagram SO FDIN SO
12. ount SAMSUNG sp EI 7 IE a Login On your browser ee https myess samsungsdi com ao Forgot your id or password New Account All the blanks marked with shall be filled in ESS serial no Enter the AIO Serial Number ee Name Click Check there may appear red warnings or messages if either one of the necessary items to be filled in is missing ID s Email address EA Select the language Password Re enter password ID username check conditions Username shall be longer than 6 em characters Telephone Email address Your address Your address2 Password twice ainiai Post ZIP Code Optional Info ENG Version 15 Revision Date Dec 24th 2014 Document No SDI3 6AIOQMDE_rev1 4 SAMSUNG SDI IH 8 System Commisioning I There is a LCD display on the front cover where you can check the general operation and status of the AIO Operating PV Generation Stand by Battery Pointing up gt Batt is being discharged Error or A S Pointing down gt Batt is being recharged Connected House load Here we can check the voltage power SOC or the current from the PV Battery Grid or the house comsumption Grid The arrow indicates whether the Product is feeding or purchasing ENG Version 16 Revision Date Dec 24th 2014 Document No SDI3 6AIOQMDE_rev1 4 8 System Commisioning II SAMSUNG SD BI The EMS decides an appropriate operating mode or the energy flow
13. ower Click NOP STOP Aug 2014 EMS HW V6 4 Once the Operating Test is done Power OFF AC grid and PV OFF Remove the jumper connector supplied by Samsung Disconnect the LAN Cable from your laptop and connect the AIO to the Internet Router Power ON AC grid and PV ON p EE IE IE Oe ee IE IE EE EE EE EE E RE EE NEE IE ee SEE IE EE ae IE IE EE EE a EE IE IE EE a Re I X Turn On Sequence AC Breaker turn on DC disconnect switch turn on I T Off Sec uence DC disconnect switch turn off AC Breaker turn off I The powe on off sequence must be carried out as above Otherwise an error E903 may occur I 12 I evision ate Der Please turn off and on as a normal sequence when an error E903 occurs i Document No SDI3 6AIOQMDE_rev1 4 6 Installer Account I 1 Open your mobile browser 2 Input URL https myess samsungsdi com engineer main do or https 112 106 12 149 engineer main do 3 Input ID and password for engineers New account can be provided by Wholesaler 4 You can see the list of ESS 5 Click the icon on the right to Add New ESS ENG Version Revision Date Dec 24th 2014 SAMSUNG SDI IH ESS List Do e V S ch e L o Me ck F Sertal No Status City aA D i TESTBED 0009 weg Cheongju AROO4560036Z21147 jun Cheong 23001 omm Fai Welcome SAMSUNG SDI Energy Storage System ESS List ES
14. roduct The tray weight is 42 65kg Be careful of the position of the power cable Write Down the Battery Tray Serial Number the middle one This number will be used for installer remark ex ET361A14717 X ENG Version 5 Revision Date Dec 24th 2014 Document No SDI3 6AIOQMDE_rev1 4 2 Battery Tray Assembly II SAMSUNG soi En 1 Below is a simplified illustration for assembling the battery tray Refer to Install Manual Clause 5 3 5 5 for any detailed information Caution take care of the grounding and LCD cables connecting the cover and the AIO during installation ea ir r _ ENG Version 6 Revision Date Dec 24th 2014 Document No SDI3 6AIOQMDE_rev1 4 SAMSUNG SDI IH 2 Battery Tray Assembly II 1 Connect the Voltage and Temperature measurement cables between BMS on the top inside the enclosure and Tray 4 longe longe short short con nections cable cable cable cable 2 Connect the power cables between PCS and Battery Tray BATT A Connector on the BDC side BATT B Connector on the battery side 1 Close the front case cover enclosure and then connect the ground cable and the LCD Display communication cable 2 Fix the front cover by using screws 1 Select the appropriate drill for drilling 2 Remove dusts from the hole and separate the nut and the washer to insert only the bolt and the cap 3 Place the Product
15. y meter and a two way bidirectional meter and for the one way meter two lines must be connected in series for use For the two way meter one line can be used Must do SO Meter case Feed in 2 wire must be connected to the SO A Purchase 2 wire must be connected to the SO B DO Meter Case Two way meter The meter cable must be connected to the DO A One way meter Feed in Meter Cable must be connected to the DO A Purchase Meter Cable must be connected to the DO B X Please refer to contents 10 p 19 26 for details Document No SDI3 6AIOQMDE_rev1 4 3 Connections and Configuration 1 Set on your laptop Panel Control Network and Sharing Center Change Adapter Settings Local Area Connector Properties Internet Protocol Version 4 TCP IP IP address 17 91 23 xx Subnet mask 255 255 224 0 Default gateway 17 91 1 2 2 Connect the jumper to the connector Install Jumper is required Install 3 Connect LAN cable between the AIO and Laptop 4 Power On AC grid turn On 5 SIM System Install Manager access http 17 91 23 196 8000 ENG Version Revision Date Dec 24th 2014 SAMSUNG SDI JH Internet Protocol Version 4 TCP IPv4 Properties r eral mas You can get IP settings assigned automatically if your network supports this capability Otherwise you need to ask your network administrator for the appropriate IP settings Obtain an I

Download Pdf Manuals

image

Related Search

Related Contents

Télécharger la brochure  中継機説明書  AFB5010.0P [更新済み].ai  Senseo Senseo HD7811  

Copyright © All rights reserved.
Failed to retrieve file