Home
• The start-up screen will appear indicating the model and firmware
Contents
1. TTT Environmental Instruments and Supplies The preferred source for instrument Rentals Sales Service and Supplies 4201 B Street Anchorage AK 99503 907 770 904 www tttenviro com Quick Start Guide THE EDGE D1 Setup 1 LTWA 90 9 de DOSE 986 2 UL 4s 00 00 00 TH 80 ER 5 CL 90 SLOW A 1 Windscreen amp Microphone 2 LED indicator Red indicates dose has exceeded the alarm level Amber indicates stopped Green indicates measuring Measurement display Up arrow Run Stop key On Off Enter key Down arrow 25420 74th Avenue S Kent WA 98032 253 373 904 info tttenviro com Turning on 1 To turn on the Edge press the on off enter key e The start up screen will appear indicating the model and firmware version Then the measurement view will display Resetting Resetting the dosimeter is performed using QSP II software via the clear tab from the Edge Set up button The Edge may also be reset using the keypad See Chapter 3 and Chapter 4 in the Edge user manual for details Navigating 1 Press the up down arrow key to navigate through measurement values battery condition and run time Setting up the Edge All the Edge parameters are set up via QSP II software SS See Chapter 3 in the Edge user manual for details Calibrating Remove the windscreen Ensure The Edge is turned on and stopped Slide the Edge into the mouth of the cal
2. ibrator ensuring the adapter ring is inserted into the calibrator Turn on the calibrator Ensure the calibrator is set to 114 dB and 1000 Hz e See subsequent steps on backside 5 CAL will flash on the display 6 Press the on off enter to trigger the calibration display 7 To adjust the calibration value on the display repeatedly press the up or down arrow 8 When you have selected the appropriate dB level press the on off enter key e A shaded bar will appear when loading your calibration informa tion Then a summary screen will indicate the date and time Cal screen 9 To return to measurement screen press on off enter amp key Running a study 1 Once the dosimeter is turned on press and hold the run stop key e A 3 2 1 countdown will appear e Then a run indicator will appear on the top right of the display Also the LED indicator will flash green unless you disabled this in QSP II Ending a Study 1 While running a study press and hold the run stop key Turning off 1 Press and hold the on off enter key for the count down Reviewing results Data is downloaded to QSP II for analysis managing file storage and printing See Downloading in the Edge user manual for details Locking and unlocking 1 Turn the dosimeter on and press the run stop key to start measuring To enable lock press run stop Key three consecutive times within one seco
3. nd intervals 7he Lock screen will appear To unlock press the run stop key 3 consecutive times within one second intervals Then press on off enter key Key indicator Indicates dosimeter is locked while Padlock icon Indicates measure ment values are hidden during run QUEST TECHNOLOGIES now part of 3M www questtechnologies com 098 610 Rev D 3 11
Download Pdf Manuals
Related Search
Related Contents
LAF 1251 BR Test CEDIA® Benzodiacepina Fujifilm FinePix 16218221 User's Manual Sun Netra CP3260 Blade Server Product Notes Copyright © All rights reserved.
Failed to retrieve file