Home

GLOBAL LIFT CORP - Swimtown Pool Supplies

image

Contents

1. Prior to installing please make sure you have filled out a Deck Configuration Form to make sure you have the correct lift that fits Your application LIFT CORP New Construction Saw Cut Sleeve DEG 2012 Anchor R 375 EN ROTATIONAL SERIES R 375 SLEEVE ANCHORING SYSTEM INSTALLATION PARTS LIST v l Anchor Sleeve w Base v l Plastic Cap v 1 Binding Screw fa LIFT CORP New Construction Saw Cut Sleeve Anchor R 375 DEC 2012 ANCHORING SLEEVE BASE PLATE amp BINDING SCREW R 375 mm E lt p New Construction Saw Cut Sleeve LIFT CORP DEC 2012 Anchor R 375 ADA GUIDELINES FOR POOL LIFT PLACEMENT ePool Lift Location Pool lifts shall be located where the water level does not exceed 48 inches 1220 mm Seat Location In the raised position the centerline of the seat shall be located over the deck and 16 inches 405 mm minimum from the edge of the pool The deck surface between the centerline of the seat and the pool edge shall have a slope not steeper than 1 48 16 min 408 eClear Deck Space On the side of the seat opposite the water a clear deck space shall be provided parallel with the seat The space shall be 36 inches 915 mm wide minimum and shall extend forward 48 inches 1220 mm minimum from a line located 12 inches 305 mm behind the rear edge of the seat The clear deck space shall have a slope not steeper than 1 48 pool deck EA akon aak l aE hz
2. a ns AED Petree 3 j 48 min 4 eSubmerged Depth The lift shall be designed so that the seat will submerge to a water depth of 18 inches 455 mm minimum below the stationarv water level pool stationery water level JA IL New Construction Saw Cut Sleeve DEC 2012 Aen LIFT CORP ROTATIONAL SERIES SLEEVE ANCHORING SYSTEM Pool Wall Water CAUTION Minimum anchor distance from a vertical obstacle is 13 if Closer The lift will hit while in operation l Actual application Overview Anchor Sleeve 3 Section Detail Anchor Sleeve Cold Pin U Cold Pin Concrete 6 Concrete Binding Screw COMPACT SAND Front of Anchor Sleeve must be 12 to 36 from the water s edge or if an obstacle is present before the water Connect the binding screw to your bonding grid Cold Pin s should be 1 2 rebar 6 to 8 long NOTE Make sure your anchor sleeve is level and square with your pool s edge BI GLOBAL AEN L New Construction Saw Cut Sleeve Dot rd DEC 2012 Anchor R 375 LIFT CORP INSTALLATION STEPS Step 1 Determine the location for installation Make sure all ADA requirements are met NOTE The installation of Global Lift Corp s anchor system s are a guideline of minimum requirements In some states or municipalities they may require additional steps due to their local codes or ordinances Step 2 Make sure that all the parts are present Refer to the parts list v
3. above the control compartment and the battery simply snaps in The battery should be charged for 5 8 hours prior to the 1 use The unit is operated by the 4 button easy to use controls Staff will use the provided key to unlock the lift The lock feature is located on the hand controls or front of the control box Insert the key provided and turn to unlock the unit for use Avoid turning the key farther than 45 degrees as it will damage the key Once unlocked the arrow pointing down will lower the lift when depressed the arrow that points up will raise the unit when depressed and the bottom arrows will rotate the lift from left to right If you hear the low battery indicator tone Do Not Use the Lift Proceed to remove the battery from the unit and place battery on the charging unit RECHARGING THE BATTERY Remove battery from the unit by unclipping from the control compartment Place the battery in the charging unit Cover the contacts on the control box with the rubber contact cover This Rubber Contact Cover is attached to the control box This contact cover protects the contacts from the elements When the battery is placed on the charger the light will change from Green to Red to indicate it is charging Once the light turns back to Green the charger is indicating that the battery is fully charged and is ready for use in your Rotational Series pool lift Dec 2012 Page 5 LIFT CORP ROTATIONAL SERI
4. 1 Does the lift raise or lower NO a Check the battery connection and reconnect b Check hand controls make sure they are connected properly c Check for any lose wires on the control compartment d Check the connection cable for damage e Check to see that the lock on the hand control is in the unlocked position 2 The batteries will not charge Yes a Battery not inserted adequately re insert battery and check position b Check the Display light Along with the main cable for good contact c Check the main cable for damage d Subsequent charging can be restarted by briefly disconnecting the main supply or the battery Dec 2012 Page 8 L LIFT CORP Global Lift Corp Warrantv Information The Commercial Proformance and Rotational series lifts have a Lifetime Limited Warrantv on the metal components of the frame not including the powder coating process The Superior series lift has a 5 vear structural limited warrantv Global Lift Corp warrants to the original retail end user oniv products manufactured bv Global Lift Corp when properlv installed in accordance to the assembly and installation instructions and when the equipment is properly used and maintained be free from material defects and workmanship as stated below Warranty starts from date of original purchase Metal structure not including powder coat Lifetime Limited Commercial Proformance Rotational Series Metal structure not including
5. binding screw connect the binding screw to the bonding grid NOTE Make sure you comply to all local codes and ordinances Step 8 Pour in your concrete make sure you cover the hole on your anchor sleeve with the plastic cap provided so you don t get concrete in the sleeve a minimum of 4 000 psi concrete with reinforcing rod Also make sure that the top of the anchor sleeve is flush with the deck Before you install your lift make sure you let the concrete set up for 48 hours Step 9 After the concrete has set for 48 hours now it s time to install your lift Place your Rotational Series Lift over the anchor sleeve once you have completed the installation please refer to User s Manual for a safe operation ROTATIONAL SERIES R 375 LIFT RETRO FIT SLEEVE ANCHORING METHOD INSTALLATION MANUAL Prior to installing please make sure you have filled out a Deck Configuration Form to make sure you have the correct lift that fits ZN Your application v gt DEC 2012 RETRO FIT Sleeve Anchor R 375 LIFT CORP RETRO FIT SLEEVE ANGHORING METHOD R 375 ROTATIONAL SERIES LIFT PACKING LIST e 1 Anchor Sleeve w Base e 1 Plastic Cap e 1 Binding Screw fe a lt ADA GUIDELINES FOR POOL LIFT PLACEMENT ePool Lift Location Pool lifts shall be located where the water level does not exceed 48 inches 1220 mm Seat Location In the raised position the centerline of the seat shall be located over the deck and 16 inche
6. l Anchor Sleeve w Base v l Binding Screw v l Plastic Cap Step 3 At the determined location for installation chalk out a 3 X 3 area prior to cutting out the concrete Refer to overview the front end of the Anchor Sleeve must be 12 to 36 from the water s edge or if an obstacle is present before the water and 6 deep New Construction the concrete must be 6 deep with a 2 reinforcing rod minimum of an 18 grid NOTE Make sure you comply with all local codes and ordinances Step 4 Once the 3 X 3 area is cut out make sure you drill in the inner wall of all 4 sides of the area refer to the section detail for the purpose of cold pinning the new concrete to the old concrete Use 1 2 rebar 6 to 8 in length LIFT CORP Step 5 Place the Anchor Sleeve in the cut out area make sure that the front of the Anchor Sleeve is 12 min to 36 max from the water s edge or if an obstacle is present before the water refer to overview A key element is to make sure that the Anchor Sleeve is level and square with the pool so that your Rotational Series Lift sits properly on the deck NOTE If you place the anchor sleeve 12 from the pools edge the lift will reach 36 out into the water If you were to place the anchor sleeve 36 from the pools edge or an obstacle the lift will only reach 12 into the water Step 7 Bonding the unit The binding screw is supplied with the Anchor Sleeve locate the
7. manufacturer s instructions e Start pouring into the hole evenly until you fill it up make sure not to overfill the hole so that it does not create more work to scrap excess concrete off e Let the concrete set for 24hrs sand stone to smooth the finish Make sure the anchor sleeve is flush with the concrete e You are now ready to install your Rotational Series Lift LIFT CORP DEC 2012 RETRO FIT Sleeve Anchor R 375 Fixed Anchor Rotational Series R 375 Locate the drop in anchor shown above Place Lift into Anchor and position so anchoring hole is in the desired position Now mark the concrete so you will know where to drill the hole should be centered in the slot Fixed Anchor Installation Instructions 1 Always wear safety goggles 2 Follow the drill manufacturer s safety instructions 9 Use oniv solid carbide tipped bits meeting the ANSI B94 12 tip diameter Use 5 8 dia drill bit Drill the hole perpendicular to the work surface To assure full holding power do not ream the hole or allow the drill to wobble Drill the whole as deep as full length of anchor 2 deep but not closer that two anchor diameters to the bottom opposite surface of the concrete Clean the hole using compressed air and a wired brush A clean hole is necessarv for proper performance Drop anchor in hole and tap flush with surface anchor can be set flush with base material or sub set Using se
8. pre drilled Seat and tube holes As shown Above Once you have the bolts inserted secure the installation With the lock nuts that are provided and tighten down LIFT CORP INSTALLATION STEPS FOOT REST Picture A Picture B Step 5 In picture A slide the foot tube through the foot rest sleeve and line the hole to the Slot In picture B locate the 5 16 x 2 bolt and insert into the pre drilled holes to secure the foot rest to the lift Place the lock nut on the bolt and tighten down Once that is complete you are ready to enjoy your Global Lift Corp pool lift mm MIL LIFT CORP
9. ES POOL LIFT OPERATING INSTRUCTIONS Prior to using the Rotational Series Pool Lift perform a test run of the lift empty Once that is completed and the lift is back to original position make sure that the arm lifts are in the up position and the seatbelt is unbuckled once acknowledged you are ready Once you are in the seat buckle the seatbelt make sure it is snug and lower the arm rails Before you attempt to operate the lift make sure the pathway is clear from any obstacles Once you have the 4 button easy controls in your hand press the Left or Right arrow that specifies which direction you want the lift to move in once over the water press the down arrow to lower the lift into the pool keep in mind you don t have to go to the bottom of the cycle you can stop the lift whenever you deem comfortable to exit the lift However when exiting the pool while on the lift you should complete the cycle back to the top to have a completely safe exit from the pool Once submerged into the pool unbuckle the seatbelt and raise the armrest and slide off of the seat Once you are done with your pool activity make sure the seat is lowered sufficientiv to allow you too easily slide back into the chair Once you are seated buckle the seatbelt and make sure that it is snug lower the armrest Next to raise the lift chair out of the pool make sure you press the button arrow that represents up on the control Apply continuous pressure until the lift
10. GLOBAL LIFT CORP GLOBAL jil lt LIFT CORP i Owner s Manual Rotational Series R 375 684 N Port Crescent Rd Suite C Bad Axe MI 48413 Toll Free 866 712 0606 Fax 989 269 5902 www globalliftcorp com Dec 2012 Page 1 ROTATIONAL SERIES POOL LIFTS R 375 TABLE OF CONTENTS INTRODUCTION ADA GUIDELINES FOR PLACEMENT 24 VOLT BATTERY SYSTEM WITH CONTROLS ROTATIONAL SERIES OPERATING INSTRUCTIONS UNIT MAINTENANCE AND CARE TROUBLESHOOTING TROUBLESHOOTING FLOW CHART WARRANTY INFORMATION WARRANTY REGISTRATION NEW CONSTRUSTION SLEEVE CUT INSTALLATION R 375 RETRO FIT INSTALLATION R 375 FIXED ANCHOR INSTALLATION R 375 OUT OF BOX INSTALLATION SEAT INSTALLATION Dec 2012 ioe ji WL LIFT CORP PAGE 3 PAGE 4 PAGE 5 PAGE 6 PAGE 7 PAGE 8 PAGE 9 10 11 PAGE 12 Page 2 LIFT CORP INTRODUCTION Your Number One Choice for Commercial Pool Access Equipment Global Lift Corp is located in Mid Michigan Global Lift Corp prides itself in manufacturing top of line quality aquatic access equipment Global Lift Corp s key staff has a century of combined industry experience and we take pride in each and every product that we build Our Company is ISO Certified and our products are manufactured in the United States Global Lift Corp uses only the finest materials and processes to provide our customers with the highest quality products while still maint
11. ITY OR A DULY APPOINTED DISTRIBUTOR S LOCATION OR AT A GLOBAL LIFT CORP S DESIGNATED LOCATION IN NO EVENT SHALL GLOBAL LIFT CORP LIABILITY EXCEED THE ENTIRE AMOUNT PAID TO GLOBAL LIFT CORP BY THE ORIGINAL PURCHASER IN REGARDS TO THE DEFECTIVE OR FAILED PRODUCT NO REPRESENTATIVE OF GLOBAL LIFT CORP SUCH AS AGENTS DISTRIBUTORS AND DEALERS HAS THE AUTHORITY TO ALTER IN ANY FASHION THE TERMS OF THIS WARRANTY AND GLOBAL LIFT CORP IS NOT RESPONSIBLE FOR REPRESENTATION UNDERTAKING OR WARRANTY MADE BY ANY OTHER PERSON BEYOND THE WARRANTIES EXPRESSED SET FORTH IN THIS WARRANTY Dec 2012 Page 10 Warranty Procedure Warranty Claims shall be submitted to Global Lift Corporation by the distributor which originated the sale with Global Lift Corporation All RGA Return Goods Authorization documents shall be requested by and issued only to the distributor which originated the sale Global Lift Corporation shall determine warranty coverage validation and replacement parts or repair shall be directed to the distributor which originated the sale Warranty claims received from end users by Global Lift Corporation shall be re directed to the distributor which originated the sale with Global Lift Corporation Dec 2012 Page 11 LIFT CORP GLOBAL LIFT CORP WARRANTY REGISTRATION PURCHASED BY Company Name Contact City State Zip Phone DEALER Name Phone Number City State Zip Phone Model Serial Number Color Pu
12. aining a price competitive edge Dec 2012 Page 3 ADA GUIDELINES FOR POOL LIFT PLACEMENT 1 Pool Lift Location Pool lifts shall be located where the water level does not exceed 48 inches 1220 mm 2 Seat Location In the raised position the centerline of the seat shall be located over the deck and 16 inches 405 mm minimum from the edge of the pool The deck surface between the centerline of the seat and the pool edge shall have a slope not steeper than 1 48 water mm A pool deck 716 min 3 Clear Deck Space On the side of the seat opposite the water a clear deck space shall be provided parallel with the seat The space shall be 36 inches 915 mm wide minimum and shall extend forward 48 inches 1220 mm minimum from a line located 12 inches 305 mm behind the rear edge of the seat The clear deck space shall have a slope not steeper than 1 48 4 Submerged Depth The lift shall be designed so that the seat will submerge to a water depth of 18 inches 455 mm minimum below the stationary water level To make sure the lift has enough clearance the lift should be installed at a location with 48 of Water depth Stationery water level Dec 2012 Page 4 24 VOLT BATTERY SYSTEMS WITH CONTROLS All of Global Lift Corp s Rotational Series Lifts are equipped with a sealed 24 volt battery that is rechargeable Along with a charging unit hand held controller and control compartment The 24 volt battery mounts right
13. comes to a complete stop at the end of the complete up cycle and then press the left or right arrow to return to the pool deck You now can unbuckle the seatbelt and raise the arm rest and exit the unit Staff will turn the key on the hand control or front of the control panel to relock the lift when the pool is not in operation Dec 2012 Page 6 IL LIFT CORP Maintenance Regular servicing will help prolong the life of vour lift Routine maintenance and cleaning is verv important The following is a routine maintenance vou should follow Dailv o Check and charge battery o Test for normal operations o Inspect your lift o Clean and dry the lift and seat with clean water o Cover lift after use Weekly Overview Daily Checklist Wipe away any surface rust with household spray cleaner Clean tough stains with a Scotchbrite pad and wipe clean Cycle the lift to keep all parts moving freely O O O O Monthly o Inspects all connections frame seat etc o Clean battery and controller connections o Clean metallic surfaces with a wax cleaner The maintenance provision of the ADA states that a public accommodation shall maintain in operable working condition those features of facilities and equipment that are required to be readily accessible to and usable by persons with disabilities Dec 2012 Page 7 LIFT CORP TROUBLESHOOTING GUIDE Before any troubleshooting commences make sure the battery has a full charge
14. icture 6 Step 4 Attach actuator to Part B beam into the actuator holder location Picture 4 Step 5 Attach Part B beam to the Part C seat bar tube using the bolts that are in the tube Picture 5 amp Picture 6 e 1 3 Al Al bi id Step 6 LIFT CORP Continue to seat assembiv instructions GLOBAL LIFT CORP CUSTOM SEAT INSTALLATION MANUAL R Series Lifts Series Lifts En y WEL LIFT CORP _ GLOBAL LIFT CORP CUSTOM SEAT INSTALLATION MANUAL PARTS LIST gt 1 Seat gt 1 Foot Rest gt 2 Arm Rests gt 1 Seat Belt amp Buckle gt 3 5 16x 3 Attaching Pin with lock nut gt 1 5 16 x 2 Foot Rest attaching bolt w nut gt 1 2 Round cap gt 1 1 Round cap WEL LIFT CORP INSTALLATION STEPS Picture A Step 1 Unpack your custom seat picture A Loose Items will consist of e Foot Rest and Tube e 3 5 16 x 3 Bolt with Lock nut LIFT CORP INSTALLATION STEPS Picture A Picture B Step 2 Align your custom seat Picture A With 3 pre drilled holes as shown Step 3 Once you have the seat in place take one 5 6 x 3 bolt and slide it through the pre drilled Holes Picture B Once you have inserted the bolt all the way through apply the locking nut supplied and tighten down GLOBAL fill WE LIFT CORP INSTALLATION STEPS Step 4 Locate the other 2 5 16 x 3 securing bolts supplied insert the bolt through the
15. ont of the anchor sleeve See picture B NOTE The installation of Global Lift Corp s anchor systems are a guideline of minimum requirements In some states or municipalities they may require additional steps due to their local codes or ordinances DEC 2012 RETRO FIT Sleeve Anchor R 375 LIFT CORP R 375 Front edge of anchor sleeve or an Obstacle ure Distance to make it s 12 minimum 36 maximum from the r s edge or if an acle is present before ater Picture A Picture B Step 2 You will need a 5 diameter core drilling bit e Make sure you have accurately marked your hole location to be drilled After drilling your hole picture A it must be 6 deep and flat on the bottom of the hole shown above Also double check your measurements they should be Place your anchor sleeve in the hole and make sure the front edge of the sleeve is in between 12 minimum distance and 36 maximum distance from pools edge or if an obstacle is present before the water picture B Then connect the binding screw to the bonding grid Please check your local codes and ordinances are met DEC 2012 RETRO FIT Sleeve Anchor R 375 LIFT CORP R 375 STEP 3 Cementing the anchor sleeve in the concrete e You will need 10 lbs of Quick dry Anchoring Cement Commercial Grade Quikrete Exterior Use Anchoring Cement to complete the installation You can purchase at any hardware store in your area Read the label and follow
16. powder coat 5 year limited structural warranty Superior Series Actuator and controls 2 years from date of purchase then 2 years prorated Actuator and controls 3 years 50 coverage Customer is responsible for 50 of replacement cost Actuator and controls 4 years 30 coverage Customer is responsible for 70 of replacement cost Battery 1 year from date of purchase This warranty does not cover damages to ANY of our lifts due to accident abuse negligence misuse damage by improper use of chemicals fading ice damage fire rust beyond structural damage does not cover cosmetic rust exceeding the weight capacity for model purchased failure to install or to assemble the product in accordance with the installation and assembly instructions normal wear and tear from day to day use not maintained properly if unit is altered or repaired without written approval of Global Lift Corp All Warranties are Void Dec 2012 Page 9 To commence the warranty claim process of a Global Lift Corp product in writing provide place of purchase along with the product name and description date of installation and a detailed description of the defect along with a photo of the entire product and claimed defect Prior to a 30 day period after receiving the written warranty claim by Global Lift Corp and barring any unforeseen delays the claimant will be notified of Global Lift Corp s decision regarding the claim If the request made b
17. rchase Price Date Purchased have read and accept the warranty terms Signature Date This card must be completed and returned to Global Lift Corp within 30 days of purchase date to assure coverage Please mail to Global Lift Corp 684 N Port Crescent Suite C Bad Axe MI 48413 Dec 2012 Page 12 R375 Troubleshooting Guide Turn key to on position Check to make sure outlet supplies power if Is Lift Component Is key turned so Replace Replace to on Charger Component visually damaged position Replace Battery When charging Does the Does the lift move Are all does light battery have up and down or components change a charge 1 left to right plugged in colors 2 properly Yes Yes Plug in components firmly Yes Won t go up and down Does the lift make a Switch motor Yes clicking sound when and actuator handset is pressed plugs same results Replace Actuator 2 starts green Yes Won t go side to side Replace Motor No changes to red or orange then 1 Check battery with Yes Replace Handset back to voltage meter and if no No green charged Did this reading reverse the test correct the Replace Control Box leads and retry problem Check for working Lift at each Blue correction Finished ROTATIONAL SERIES R 3 5 LIFT NEW CONSTRUCTION amp SAW CUT SLEEVE ANCHORING SYSTEM INSTALLAT ION MANUAL
18. s 405 mm minimum from the edge of the pool The deck surface between the centerline of the seat and the pool edge shall have a slope not steeper than 1 48 pool deck 16 min 408 eClear Deck Space On the side of the seat opposite the water a clear deck space shall be provided parallel with the seat The space shall be 36 inches 915 mm wide minimum and shall extend forward 48 inches 1220 mm minimum from a line located 12 inches 305 mm behind the rear edge of the seat The clear deck space shall have a slope not steeper than 1 48 pool deck EA akon aak l aE hz a ns gg 3 j l 48 min 4 eSubmerged Depth The lift shall be designed so that the seat will submerge to a water depth of 18 inches 455 mm minimum below the stationarv water level Stationery water level DEC 2012 RETRO FIT Sleeve Anchor R 375 LIFT CORP R 375 CAUTION Minimum anchor distance from a vertical obstacle is 13 if Closer The lift will hit while in operation Front Edge of Anchor Sleeve Picture A Picture B STEP 1 Locate the retro fit anchoring sleeve as shown above picture A e Once you determine where your lift is going to be located at your pool place the anchor sleeve down so you can mark a circle around the base on the concrete where you will need to drill the hole NOTE From the pools edge or if an obstacle is present before the water the minimum distance is 12 and the maximum is 36 from the fr
19. tting tool set the drop in with several sharp hammer blows until expansion plug bottoms out in hole Setting tool shown Position the lift and align hole in base 10 Insert bolt and tighten GLOBAL LIFT CORP INSTALLATION MANUAL Out of Box R Series Lifts Series Lifts ey JA WEL LIFT CORP _ WEL LIFT CORP GLOBAL LIFT CORP INSTALLATION MANUAL Out of Box PARTS LIST gt 1 Part A Main Unit with Motor gt 1 Part B Horizontal Dual Bar Beam gt 1 Part C Seat Bar gt 1 Part D Seat gt 1 Part E Foot Rest Tools Needed gt 2 inch wrench gt 2 9 16 inch wrench gt 2 34 inch wrench gt 1 Rubber Mallet LIFT CORP INSTALLATION STEPS Picture 1 Step 1 Unpack your items picture 1 Loose Items will consist of e Part A Main Beam with Motor e Part B Horizontal Dual Bar Assembly e Part C Seat Bar e Part D Seat e Part E Foot Rest and Tube e 3 5 16 x 3 Bolt with Lock nut INSTALLATION STEPS Picture 2 Picture 3 Step 2 Insert Main Beam with Motor Into the Anchor Sleeve Picture 2 Sleeve Anchor Pre Installed Prior to Installation Step 3 Attach Part B to Part A by removing bolts from Part B which are already inserted Attach Part B to Part A and tighten bolts DO NOT OVERTIGHTEN All bolts need to be tightened to approximately 20 Ibs of torque at end of assembly Picture 3 LIFT CORP INSTALLATION STEPS Picture 4 Picture 5 P
20. y Global Lift Corp for the product to be returned to its factory or distributor of choice for inspection and or repair purchaser will be liable for Freight Prepaid Global Lift Corp at its option will replace or repair the defective item and deliver the repaired product or replacement to the buyer of the product freight prepaid by the purchaser to the destination on file in regards to the original order Parts and Products returned for replacement to Global Lift Corp shall remain the property of Global Lift Corp under this limited warranty A new warranty period shall not be established for any repaired or replaced products Replaced or repaired products will remain under warranty only for the remainder of the original warranty period for the original product purchased No person or organization is authorized to make any other specific or implied warranties on behalf of Global Lift Corp THE WARRANTIES ARE IN LIEU OF ALL OTHER WARRANTIES EXPRESSED OR IMPLIED WHICH ARE HEREBY DISCLAIMED AND EXCLUDED INCLUDING WITHOUT LIMITATION ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE OR USE INNO EVENT SHALL GLOBAL LIFT CORP BE LIABLE FOR ANY INCIDENTAL CONSEQUENCIAL INDIRECT SPECIAL EXEMPLARY OR PUNITIVE DAMAGES OR LOST PROFITS FROM ANY BREACH OF THIS LIMITED WARRANTY THE SOLE AND EXCLUSIVE REMEDY OF THIS WARRANTY IN REGARDS TO GLOBAL LIFT CORP S PRODUCT SHALL BE LIMITED TO REPLACEMENT OR REPAIR AT A GLOBAL LIFT CORP S FACIL

Download Pdf Manuals

image

Related Search

Related Contents

AAR Intermodal Interchange Rules  USER MANUAL  BiliBed - Medela  Pyle Car Speakers User Manual  Samsung UN78HU9000F 78" 4K Ultra HD 3D compatibility Smart TV Wi-Fi Black  Manual - Fire Caddy  Imation USB Flash 2.0 Drive 1 Gb  

Copyright © All rights reserved.
Failed to retrieve file