Home

Untitled

image

Contents

1. Evocare Ph 07 3355 8000 Fax 07 3355 5043 Email sales evocare com au GB US GH3 Twin Ceiling Hoist Vers 2 00 Guldmann E8E0SS 6002 60 SN 49 uugeup no Guldmann GB US 09 2009 550383 EVOCARE AUSTRALIA PTY LIMITED A B N 98 078 566 604 Trading as EVOCARE and L amp M EQUIPMENT P O Box 1144 Stafford Qld 4053 Ph 07 3355 8000 Fax 07 3355 5043 A Website http www evocare com au Quality E Mail sales evocare com au ISO 9001 workshop evocare com au GH48 Lifting modules version type nomenclature Guldmann Product Load in Number Number of Scale CLM Service User hoisttype line kg of lifting horizontal module module module interface straps drive motors GH3 200 1 1 1 250 1 1 1 250 1 1 1 None 0 None 0 None O Hand Scale 1 CLM 1 Service 1 control 0 300 di 2 2 IR EN 350 1 2 2 Twin 250 2 2 0 500 2 2 0 GH3 X Nf F4 2 Z Q Q Q Q G GH3 Twin Ceiling Hoist Item nos 552xxx 1 00 ens Purpose and use STE ia ls ue ERG ERU ERREUR E EGRE 6 1 01 Manufacturer sisi ss teet dada en RO Rd en Re ga ie 6 MO P r se sen 2 er 6 02000 Important Precautions lt a cese metre eres x RR Rh ween 6 1 04 ocius Load limits orn GH9 system cre PP rude vase ans 7 MODES Unpacking and Preparation 7 TOR 25 0 issu Placing a new GH3 Hoist in an existing rail system 7
2. Guldmann GB US 09 2009 550383 USA and countries outside the EU A Users guide Before using the product read the entire operation manual including all warranties B Warranties The Guldmann lifting equipment is designed to be used for the lifting transferring and transporting of a person with a physical handicap who are not able to physically self transfer or who are temporarily incapacitated by illness anesthesia or other causes This lifting equipment is designed to relieve the users their caregivers and nursing personnel in the task of lifting elderly or disabled people thereby minimizing the risk of back injury during such lifting and transfer operations If the product is used irresponsibly or for any use other than that described above or in the enclosed written instructions the manufacturer s warranty will be nullified and rendered void There are no warranties which extend beyond the description in the enclosed written instructions Guldmann warrants that its lifting equipment is free from defects in materials and workmanship under normal use Guldmann warrants that the lifting equip ment itself will perform substantially in accordance with the specifications set forth in the documentation provided with the equipment The above express warranties are made for a period of 365 days from the date the lifting equipment is delivered to you as the first user The distributor will replace any lifting equipment wh
3. 1 07 2 242 032 Powersupply 23 25 gm ee Rs esu Elo eee ec Qe e 8 A ole Bae Installation of GH3 Cross lifting hanger and Horizontal lifter 9 1 095 ics Lifting Sins 8 2 s re er MER P t ire dur E Rabe beware eee fans 11 2 00 242 Description of functions 12 LO Nas PPICTOGNANN tea TETTE aa PPP 13 2 02 doses Indicator lamps and audio signals 13 2009 tab tas Operation zu 2 ra PAR Sa ste Ras 14 2404 5 ssl Supplementary modules GH3 16 eda de Menu structure Supplementary modules GH3 16 Li dal 16 LOs Configuration of supplementary modules GH3 18 206 A conte Scale module GH3 with integrated scale module 19 2 07 s ged CLM module GH3 with statistical function for management use 22 208 oen Service module GH3 with service module 24 2 09 cies SAfety FUNCHOMS ue erre mete Sup Ra RR eee utm seing E 26 2 10 o penes Gharging conn ction scusare ma benne sb dice dod urs 28 2 511 ca ACCESSONIES A 5 C cur 28 3 00 Transport and storage sen an an i RU ER 29 B00 AP Maintenance and storage 30 4 0 ae Gieaningi a CM CET 30 4 02 ot Slc de we 30 MOB heats an sd How to prevent avoid corrosion 30 4 04 22 The owner s daily mainte
4. 2009 550383 Lifting sling with undivided leg straps Sit On sling It is an advantage to position the lifting sling with the narrow side facing the user Hook the back straps on the hoist onto the hooks closest to the user and the leg straps to the hooks farthest away from the user Horizontal lifter foldable 28444 The horizontal lifter is a lifting device which is used together with a hoist and rail systems to move people in a horizontal position It can be stored completely or partially folded in order to minimise space requirements or it can hang ready to use in the hoist The horizontal lifter may be used only for horizontal relocation of people lying on a level horizontal surface The person must be lying on a Guldmann sling or on another suitable sling A level surface can be for example a bed a stretcher or the floor Batteries NiMH Battery 24V 2800mAh Guldmann type number 550574 Transformer Transformer Class 1 Guldmann item number 550391 Transformer Class 2 Guldmann item number 550388 EU 550387 US CAN 3 00 Transport and storage Guldmann recommends that the GH3 is always transported and stored in the original packaging Key to symbols on the GH3 packaging orn 10 gt 40 C 30 70 700 1060hPa 14 104 F The GH3 should be stored at Temperatures between 10 and 40 C 14 and 104 F A relative air humidity of between 30 and 70 An air pressure of between 700 and 1
5. GB US 09 2009 550383 Guldmann GB US 09 2009 550383 Remove the side covers Then release the hoist s motor by turning Emergency lowering function electric If the GH3 fails the electrical emergency lowering function is used to lower the user safely The emergency lowering function is operated by a constant pull on the red strap that is used for the emergency stop When releasing the red strap the emergency lowering function will be replaced by the emergency stop Emergency lowering function mechanical If the electrical emergency lowering function in the GH3 fails the emergency lowering can be done mechanically This must be done on the leader hoist and follower hoist Release the side covers from the top of the hoist by means of a gentle push on the fixing points on each side The covers are tipped free of the hoist and can be removed the handle bearing the words EMERGENCY DOWN This handle is located immediately behind the side cover and must be turned clockwise 27 2 10 2 11 3 When the brake s has have been released the user will be lowered slowly If the total weight of the user and the lifting accessories is low e g less than 100 kg 220 Ibs it may be necessary to help the user down by turning the large belt wheel located on the opposite side of the handle and in the direction of arrow marked on the belt wheel Warning After the mechanical emergency lowering functio
6. UP for more than 2 seconds The load on the lifting strap is registered as being within the range 15 kg Recommended load kg 33 Ibs Recommended load Ibs Total includes the number of lifts performed after the lifting module was first taken into use Number of heavy lifts total A heavy lift is registered automatically when the following events are registered simultaneously Hand control is activated Direction UP for more than 2 seconds The load on the lifting strap is registered as being within the range 150 kg Recommended load kg 330 Ibs Recommended load Ibs Total includes the number of heavy lifts performed after the lifting module was first taken into use Number of lifts last week The total number of lifts performed within the last seven calendar days Average number of lifts per Average number of lifts per week performed after week the lifting module was first taken into use The data for Number of lifts last week and Average number of lifts per week can if necessary be reset using a PDA Net Book 22 Guldmann GB US 09 2009 550383 Guldmann GB US 09 2009 550383 Operation CLM 1 5 CLM 2 5 CLM 3 5 CLM 4 5 CLM 5 5 Lifetime Lifetime Last week Lifts per total lifts heavy lifts total lifts week avg Hoist ID 987 232 60 72 Holst 1 5 2 5 3 5 4 5 5 5 Number Number Number Average Hoist ID of lifts of heavy lifts of lifts last week numbers total total of lifts per
7. appears in the display Then select Start When the sling and the user are at rest and hanging freely the current weight can be read on the display The weight can be read to an accuracy of 1 decimal place Select Exit to return to the main menu Note The display in the hand control switches off automatically after use approx 8 min 21 2 07 CLM module GH3 with statistical function for management use The GH3 with CLM module option includes a management tool that saves important information on the use of the lifting module and which can be used to evaluate the system s efficiency and utilisation as well as to optimise its use and hoist name location The following data can be shown on the hand control s display number of lifts number of heavy lifts number of lifts in last week average number of lifts per week As an additional option by connecting a PDA Net Book to the hand control it is possible to gain access to a number of other saved data e g the number of lifts since the last strap change number of critically low battery readings number of weighings total lifting time etc This information can be downloaded and used for further analysis PDA Net Book readouts requires a PDA Net Book with Guldmann Service and Information consol Number of lifts total A lift is registered automatically when the following events are registered simultaneously Hand control is activated Direction
8. kg 550 lbs hr there eee ee aad 4 hours SWL 500 kg 1100 Ibs 4 hours Operating temperature 10 C 35 C 50 F 95 F Degree of protection against harmful ingress of liquids water HOISE een oa REA P IP 20 Hand CONTO 22e sided wih ra ico IP 44 R mote cohttol 12 sspe daa e ei IP 20 Transforme i oid a dere ot bdo e dead IP 20 37 9 00 EC Declaration of conformity CE Guldmann EC DECLARATION OF CONFORMITY Manufacturer V Guldmann A S Graham Bells Vej 21 23A DK 8200 Aarhus N EAN country code 57 EAN distribution No 07287 Phone 45 8741 3100 Fax 45 8741 3131 Representative Company Address Country Phone Hereby declare that Product GH3 Twin incl lifting hanger suspension and charging system Type No GH3 Twin Y ZZZ QQQQ Y X See GH3 lifting modules version type nomenclature was manufactured in conformity with the provisions in according to the Council Directive 93 42 EEC of 14 June 1993 Class 1 EN ISO 10535 2006 Hoists for the transfer of disabled persons requirements and test methods IEC EN 60601 1 2 Medical electrical equipment 2001 A1 2006 Part 1 General requirements for safety 2 Collateral standard Electromagnetic compatibility Skejby 01 09 2009 Place and day of issue 22 7 f Product responsible Technical Manager 38 Guldmann GB US 09 2009 550383
9. 060 hPa This side up 29 4 00 Maintenance and storage 4 01 Cleaning Clean the GH3 with a damp cloth and mild handwash detergent Do not use strong acids bases or alcohol to clean the GH3 Never clean GH3 in an autoclave 4 02 Storage See 3 00 For long therm storage disconnect the battery plugs 4 03 How to prevent avoid corrosion When the GH3 is mainly used in an corrosive environment e g swimming pool the hoist must be ordered with a special corrosion preventive surface treatment 4 04 The owner s daily maintenance duty Check the lifting sling for wear and damage before use Do not use the lifting sling if it is damaged or defective Do not use the GH3 if the lifting strap is damaged or defective Contact your supplier and order a new lifting sling or a replacement of the lifting strap Replacement of the lifting strap must only be performed by the Guldmann Service Team or by a qualified technician in accordance with Guldmann s instructions 4 05 Disposal of the GH3 including batteries Local and national regulations on environmentally correct recycling must be observed Batteries type NiMH must always be delivered to an approved recycling point 30 Guldmann GB US 09 2009 550383 Guldmann GB US 09 2009 550383 5 00 Service and lifetime 5 01 Lifetime The GH3 has an expected lifetime of 15 years on the condition of coorect use and correct service inspections see section 5 02
10. 550383 Guldmann GB US 09 2009 550383 Electromagnetic compatibility EMC In case of electromagnetic interference between the GH3 hoist and other products these must not be used together 1 04 Load limits on GH3 system Read the label which indicate the maximum load limits for each component The components e g lifting hanger lifting sling etc labelled with the lowest load limit determines the maximum load limit for the entire system This maximum load limit must not be exceeded Please note that the max load may change when different components are used such as lifting hangers lifting slings etc 1 05 GH3 hoist leader GH3 hoist follower Transformer Connector bar and cable Manual not illustrated Label for rail system amp ND Unpacking and Preparation Visual check of the GH3 If the GH3 is thought to be damaged upon reception the GH3 must not be used before it has been checked and approved by a qualified person or the Guldmann Service Team Contents of the box amp Hand control ES not illustrated LE 1 06 Placing a new GH3 Hoist in an existing rail system Please notice placing a new GH3 hoist in an existing rail system it must be ensured that The rated max load of the rail system must be equal or higher than the max load of the new hoist If there is no max load mentioned on the rail system the rai
11. 9 2009 550383 Next service 2008 04 22 Setup Language English Language 1 8 Language 4 8 Italianio Language 5 8 Espanol Language 2 8 Deutsch Language 3 8 Svenska Language 6 8 Francaise Language 7 8 Portuguese BR Language 8 8 English 17 2 05 Configuration of supplementary modules GH3 Before the GH3 is put into use the hoist must be configured Configuration covers language Scale module CLM module Service module and the unit for specification of weight Scale module Factory setting Language English UK Unit of weight kg Configuration of supplementary modules takes place from the GH3 hand control Setting the language Next service Scale Statistics Language English 2008 04 22 Press any key on the GH3 hand control to activate the hoist When the hoist is activated the display on the hand control is switched on and the Guldmann logo G appears Select Menu using the function key located immediately below the display and then select until the Setup menu appears in the display Select Setup and then until the Language menu appears in the display Select Change until the preferred language appears in the display and confirm the selection by pressing OK Then return to Setup Select to return to the start menu G
12. B A E Output 33V AC 2 5A Prod date yyyy mm dd Serial no xxxxx C IP20 www guldmann com Guldmann Barcode 128C Type DK 13992 Input 230V AC 50 60 Hz 0 5A B A x Output 33V AC 2 5A Prod date yyyy mm dd Serial no xxx C 1620 www guldmann com Cure Lifting hanger max xxx kg xxx Ibs Part no 20000 Edition XXX Prod date yyyy mm dd Serial no XXXXX Barcode 128C V Guldmann A S www guldmann com 33 Hand control Part no xxxxxx Edition xxx Date XXXX XX XX IP44 V M M 7 00 Certificates EN ISO10535 HMI No 08 494 09 14A 09 15A 8 00 Technical specifications Lifting modules version type nomenclature Guldmann Product Load in Number Number Number of Scale M Service User hoist type line kg of lifting of lifting horizontal module module module interface straps motors drive motors i i E AA GH3 200 1 1 1 250 1 1 1 250 1 1 1 None 0 None 0 None 0 Hand Scale 1 CLM 1 Service 1 control 0 300 1 2 2 IR pai 350 1 2 2 Twin 250 2 2 0 500 2 2 0 GH3 X y Z Z Q Q Q Q Example GH3 350 122 1000 GH3 350 1 2 2 1 0 0 0 Hand control w o Service module w o CLM module Scale module 2 horizontal drive motors 2 lifting motors 1 lifting strap Safe Working Load SWL Ceiling hoist type GH3 34
13. Guldmann GB US 09 2009 550383 Guldmann GB US 09 2009 550383 Functions Lifting capacity SWL 250 kg 550 Ibs 500 kg 1100 Ibs Operation se rias een e Hand control IR Sound level cotorra anda ederet e eet dye eid 52 dB A GH3 Twin Lifting speed 85 kg 187 Ibs load 60 mm sec 2 4 inch sec 150 kg 330 Ibs load 60 mm sec 2 4 inch sec Max capacity load SWL 55 mm sec 2 2 inch sec Max 5 kg 11 Ibs load 100 mm sec 3 9 inch sec Weight and materials SW ipae eee db Pete oe 250 kg 550 Ibs 500 kg 1100 Ibs Owniwelght su pp rt o rr EE ur ein 19 2 kg 42 3 lbs Covers Impact resistant UL 94 V 0 flame retardant recyclable plastic Digital Scale Specifications Non medical Optional for GH3 Twin Capaciy reena CURE 500 kg 1100 Ibs ACCUFACY een a er 0 1 at max load Display resolution d 0 1 kg 0 22 Ibs Repeatability lt 0 1 kg at 0 250 kg 0 22 Ibs at 0 550 Ibs lt 0 2 kg at 0 500 kg 0 44 Ibs at 0 1100 Ibs Minimum weight 5 kg 11 Ibs Display type ede e erbe eet eg eacus LCD in Hand Control 35 Dimensions Bo osse bdo 1800 mm 70 9 inch EET 700 mm 27 6 inch Ge css dedi cts eth p Doe doge dua d ttt els 156 mm 6 1 inch D stas shes Ra eras aoc dad e MR Pe eee des 184 mm 7 2 inch E LATIO ER ER eee ae he ETUR E REDE 194 mm 7 6 inch A L
14. PDA Netbook x Accessories to CLM module see Supplementary modules GH3 section 2 04 Guldmann GB US 09 2009 550383 Guldmann GB US 09 2009 550383 Using tilt function on GH3 The GH3 has a tilt function This function can only be used with a horizontal lifter See section 2 03 for positions of hand control buttons 1 When the buttons 1 or 2 are pressed both hoists will lift or lower the horizontal lifter 2 When the button 3 is pressed only the leader hoist lifts the horizontal lifter 3 When the button 4 is pressed only the leader hoist will lower the horizontal lifter 2 04 Supplementary modules GH3 There are various supplementary modules for the GH3 Scale module GH3 with integrated scale m CLM module GH3 with statistical function for management use Service module GH3 with Servi Menu structure Supplementary modules GH3 ce module i Detailed description follows in sections 2 05 2 09 Ad Pop ups Next Service date service exceeded 2008 04 22 call service OO off of I O CLM O Y Low battery Critical low battery No charging Fault hoist O O OO O O C 1 5 Lifetime gt total lifts 987 CLM 2 5 Lifetime heavy lifts 232 CLM 3 5 Last week total lifts Hoist ID Hoist 1 Guldmann GB US 09 2009 550383 Guldmann GB US 0
15. Replacement of components Replacement of batteries PCBs and lifting straps must be performed by a qualified service technician or the Guldmann Service Team 5 02 Safety service inspections In accordance with international standard EN ISO 10535 Hoist for the transfer of disabled persons Requirements and test methods an inspection should be performed on the hoist at least once a year Guldmann recommends that regular safety service inspection is performed at least once a year with regard to the pattern of usage Inspection of the GH3 must be performed by a qualified service technician or the Guldmann Service Team In connection with the purchase of the GH3 Guldmann may offer a service agreement for this inspection NB The GH3 with service module may only be serviced by the Guldmann Service Team or by a qualified service technician with access to the PDA Net Book with Guldmann Service and Information consol During the safety service inspection a report must be prepared on what was checked and replaced Parts that are worn or defective must be replaced with new parts from Guldmann Spare parts drawings and documentation can be obtained from the manufacturer or supplier Documentation checklist regarding safety service inspection can be obtained from the manufacturer or supplier 31 5 03 6 00 M M lt P gt Bom Troubleshooting The GH3 does not respond to the hand control s keys Check the emergency stop
16. control is switched on and the Guldmann logo G appears Select Menu using the function key located immediately below the display Then select until the Next service menu item appears in the display Read off the date of the next safety service inspection Year Month Date 24 Guldmann GB US 09 2009 550383 Guldmann GB US 09 2009 550383 Pop Up s for Service module supplementary module There are two different Pop Up s brief messages on the display on the GH3 with Service module These pop up s notify the user of upcoming and exceeded dates for service inspections Both Pop Up s appear immediately after the hand control has been Switched on Pop Up s before and after Service Date Next service Next service Service done 2008 04 22 2009 04 22 Pop Up 30 days The next service inspection must be undertaken within 30 days Select OK to return to the main menu returns automatically after approx 5 seconds Next service SU PI ervice date If service is not performed s exceeded call service 2008 04 22 Pop Up Service date exceeded The date of the service inspection has been exceeded contact the Guldmann Service Team Select Exit to return to the main menu returns automatically after approx 5 seconds Attention If the service date is exceeded by more than 60 days the hoist makes an acoustic signal at any button act
17. ea aan 630 mm 24 8 inch EM 3130 mm 98 4 inch 3 NK das ai ee E 473 mm 18 6 inch EE 620 mm 24 4 inch dns d pee uadit a eat ss qe en dct 790 mm 28 3 inch Hu 490 mm 19 3 inch MC Tp 473 mm 18 6 inch Depth ofh lst ran Ree PELEAS Referees 205 mm 8 1 inch Safety Emergency stop Yes mechanical and electrical Emergency lowering device Yes Gontrol of liftimg Strap sarei Ea ea Yes Cut off angle 45 along the rail 10 across the rail B 9 Dro e P 36 Guldmann GB US 09 2009 550383 Guldmann GB US 09 2009 550383 Electronics Ono tear erae Automatic when used Soft start stop Overload protectlori 5 2 22 lia REI EE REV Automatic Low Battery protection iusserat Automatic Power Supply eh mena evum rr Ea rar San 33V AC 2 5 A Supply voltage transformer 115 230V AC 50 60 Hz BARON soe ones AN dd i 24V NiMH SWL 250 kg 550 Ibs 500 kg 1100 Ibs 5 6 Ah Continuous operation with short time loading with 3 hours without recharging 10 90 2 min operation 18 min pause Max number of lifts in series with 85 Kg 187 IDS direi Rr nom 55 1000 mm 39 4 inch SWL 250 kg 550 Ibs 500 kg 1100 Ibs 28 1000 mm 39 4 inch Max charging time at 25 C SWE 250
18. ice Team The transformer supplied must always be used Safety concerning static electricity ESD Service technicians and installers must use an ESD safety package consisting of a mat a ground wire and a bracelet The technician installer connects the mat to a grounding point The technician installer must then put on the bracelet and connect it to the mat If it is not possible to find a grounding point the mat and the bracelet must be used as a minimum If the Service technician is using a ladder it is important that the mat is placed on the same step that the service technician stands on Only then is it allowed to work with the PCB Board or components where it is possible to come into contact with the PCB Board Guldmann GB US 09 2009 550383 Guldmann GB US 09 2009 550383 1 08 Installation of GH3 Cross hanger and Horizontal lifter Lifting hangers from other manufacturers Guldmann shall not be liable for faults or accidents that may occur as a result of using lifting hangers made by other manufacturers If there is any doubt about the selection or use of a lifting hanger please contact your supplier The lifting hanger can be installed to the lifting strap without the use of any tools Installation of GH3 Cross hanger 1 Start with the installation of the GH3 lifting beam and place the groove on one of the eyes on the lifting beam on one of the strap attachment Fig 1 and 2 2 Turn
19. ich proves defective in materials or workmanship without additional charge on an exchange basis The distributor will either replace or repair without additional charge any Guld mann lifting equipment that does not perform in substantial accordance with the specifications of the document Guldmann does not warrant that the functions contained in the lifting devices will meet your requirements or that the operation of the services will be unin terrupted or error free The warranty does not cover any of the part of the lifting equipment which has been subject to damage or abuse by you The warranty does not cover any part of the lifting equipment which has been altered or changed in any way by you or others Guldmann is not responsible for problems caused by changes in the operating characteristics of the opera ting system which are made after the delivery of the lifting equipment Any implied warranties including any warranties of merchant ability or fitness for a particular purpose are limited to the term of the express warranties 39 Guldmann shall not in any case be liable for special incidental consequen tial indirect or other similar damages arising from any breach of these warranties even if Guldmann or its agent has been advised of the possibility of such damages You must call Guldmann or your distributor for an authorization to return any defective item during the warranty period If your distributor is unable to correct your
20. ing hanger Place the straps on the hooks Slings made by other manufacturers Guldmann shall not be liable for faults or accidents that may occur as a result of using lifting slings made by other manufacturers If there is any doubt about the selection or use of a lifting sling please contact your supplier Guldmann shall not be liable for faults or accidents due to incorrect use of the lifting sling or for reasons of inadequate attention on the part of the carer or user Working with the GH3 The GH3 runs easily in the rail system and does not have any special requirements for space or power in connection with moving Attention can thus be fully focused on the user s functional level and the helper s technique If the hoist is used correctly the user should only be lifted to the extent that she he is clear of the surface and should be moved at this height 11 2 00 Attaching the lifting sling to GH3 Cross hanger Place the straps from the lifting sling on the hooks on the lifting hanger Start with the uppermost set of straps from the back and then take the lowest set of straps from the legs Attaching the lifting sheet to Horizontal lifter foldable Read the instructions in the user manual for the Horizontal lifter Description of functions Information panel on the GH3 bottom surface on leader hoist Lamp indicator SA Information panel on the GH3 bottom surface on follower hoist Lamp indicat
21. is not activated Check the hoist has power supply Check the transformer is switched on and connected to the rail system Contact the Guldmann Service Team Classification CE marking Type B in accordance with EN 60601 1 Read the manual before use Must not be disposed of as standard household waste must be recycled Class equipment Permanent installation with protective ground Class Il equipment Non permanent installation without protective ground The equipment is not suitable for use in the presence of flammable mixtures Degree of protection against harmfull ingress of liquids water Hoist IP20 Hand control IP44 Remote control IP20 Transformer IP20 32 Guldmann GB US 09 2009 550383 Guldmann GB US 09 2009 550383 Examples of serial number label Lifting module f N GH3 Twin 250 1100000 max 250 kg 550 Ibs Part no XXXXXX A Prod date yyyy mm dd C A AX Serial no xxxxx 33V AC 2 5 A IP20 CONTINUOUS OPERATION INTERNALLY POWERED WITH SHORT TIME LOADING EQUIPMENT 24V DC Guldmann Barcode 128C www guldmann com L P Transformer Class 1 Type DK 14075 Input 115V AC 50 60 Hz 1A B A Input 230V AC 50 60 Hz 0 5A Output 33V AC 2 5A C Prod date yyyy mm dd Serial no x000x IP20 www guldmann com Guldmann Barcode 128C Transformer Class 2 Use within US CAN Transformer Class 2 Use within EU Type DK 14001 Input 115V AC 50 60 Hz 1A
22. ivation The Acoustic signal can be disabled by the Guldmann Service and Informa tion Consol software Note The display on the hand control will automatically revert to the screensaver after approx 8 minutes 25 2 09 Safety functions The emergency stop and emergency lowering device should only be used in an emergency In the event that it is necessary to use the safety functions the fault must be identified and rectified before the GH3 is taken into use again Please contact your supplier Emergency and lowering strap The red strap has the following functions One pull Emergency stop is activated Constant pull 2 steps Emergency lowering is activated It will work with following load GH3 up to 500 kg 1100 Ibs from approx load 160 kg 350 Ibs Emergency stop If the GH3 does not stop react to the hand control when the GH3 is in use pull the red strap and all lifting lowering horizontal driving functions except emergency lowering are deactivated When the emergency stop is activated the hoist will not function The green lamp is switched off Reset emergency stop Reset the emergency stop by pressing the yellow button on the bottom of the hoist The yellow button that appears when the emer gency stop is pulled must be pressed manually before the GH3 is ready for use After deactivating the emergency stop activate the hand control twice 26 Guldmann
23. l system must then be checked according to the guideline in the Installation guide distance between bracket according to max load If the brackets are not visible then a load test with 1 5 x max load of the hoist must be performed The deflection of rails must not be higher than 1 200 of the length of the rail If it is not possible to do any of the above mentioned please contact Guldmann or their representative If the rail system can not be rated to the same max load as the hoist then extra brackets must be installed according to the Installation guide distance between bracket according to max load Class equipment Fixed rail systems are class equipment and must be installed by a qualified technician or by Guldmann Service Team Equipment is disconnected from Supply Mains by breaking the mains breaker Switch Class Il equipment Mobile equipment is class 11 epuipment marked with double encassed symbol and can be connected to the mains direct by the user Equipment is disconnected from Supply Mains by detaching the mains plug from the wall outlet Emergency stop device The emergency stop device must be reset in order to connect power to the product To do this push the yellow reset button see point 2 09 1 07 Power supply GH3 is equipped with batteries that require regular recharging The power supply for charging and the battery charging point must be connected by a qualified engineer or by Guldmann Serv
24. n has been activated in the GH3 the hoist must be serviced by a qualified technician or by the Guldmann Service Team Charging connection The GH3 is automatically charged along the entire length of the straight rails This guarantees the hoist functionality and maintains the batteries to ensure a long lifetime The indicator lamp on the bottom of the hoist turns yellow if the charge status becomes low or if there is a complete interruption to the charging function The GH3 then has a limited number of lifts available at a time and must be re charged The transformer must be connected and switched on before charging can take place A green indicator lamp on the transformer indicates that it is connected and switched on Accessories Guldmann ABC slings and lifting hangers Obtain a brochure from your distributor manufacturer or at www guldmann com Extension strap 550459 The extension strap is used where the distance between the lower part of the rails and the floor exceeds 3 5 m 11 7 The extension strap is available as an accessory Cross hanger 550444 The cross hanger can be used in two ways depending on what kind of hoist is being used Lifting sling with divided leg straps Place the sling with the wide side facing the user Hook the back straps on the hoist onto the hooks closest to the user and the leg straps to the hooks farthest away from the user 28 Guldmann GB US 09 2009 550383 Guldmann GB US 09
25. nance duty 30 405 Disposal of the GH3 including batteries 30 5 00 Service and lifetime 31 0016 2 Tp l ne one den tn en tie tee 31 5 02 lis Safety service inspections 31 5 03 ne Tro bleshootlrig 2 See odin A na 32 Guldmann GB US 09 2009 550383 Guldmann GB US 09 2009 550383 TOO oiana Gertificates 000 RE een E Ren Raia nie me dense 34 8 00 Technical specifications 34 9 00 ee cece a EC Declaration of conformity 38 nr USA and countries outside the EU 39 Bruns Bebe Users guide aos icio cec e Pas Re UE e SAE estas 39 B astas Warranties aan olla ro fees Ode ERE 39 1 00 Purpose and use 1 01 Manufacturer V Guldmann A S Graham Bells Vej 21 23A DK 8200 rhus N Tel 45 8741 3100 Fax 45 8741 3131 www guldmann com 1 02 Purpose The GH3 Twin hereafter called GH3 is a ceiling mounted hoist which covers the requiments for heavy and special lifting or moving of persons in hospitals nursing homes institutions swimming pools riding schools and private homes Conditions for use The use of the GH3 is subject to the following The GH3 should only be used by trained personnel The maximum nominal load 250 kg 550 Ibs 500 kg 1100 Ibs res
26. nded load The sensors are highly sensitive and can be damaged by the effects of shock for example pulling the GH3 at extreme speed into an end stop Operation Always reset the scale module before weighing takes place When resetting the unit the lifting hanger and the desired lifting sling must be attached under the hoist Resetting the unit tara Scale Scale KG Scale KG fe n 2480 0 0 Press any key on the hand control to activate the hoist When the lifting module is activated a display on the hand control is Switched on and the Guldmann logo G appears Select Menu using the function key located immediately below the display Then select until the Scale menu appears in the display Then select Start When the lifting hanger with the lifting sling is at rest select Zero to reset the GH3 scale module The scale module has now been reset and weighing can commence 20 Guldmann GB US 09 2009 550383 Guldmann GB US 09 2009 550383 Weighing Scale Scale KG la ER n gt 248 0 Always reset the GH3 scale module before weighing takes place see section entitled Resetting the unit Place the lifting sling on the user and attach it to the lifting hanger Lift the user with care Park the hand control on the lifting hanger Select Menu using the function key located immediately below the display and then select until the Scale menu
27. or Guldmann GB US 09 2009 550383 Guldmann GB US 09 2009 550383 2 01 Pictograms Emergency stop N L 44 V Emergency lowering function EE Reset emergency stop 2 02 Indicator lamps and audio signals ES Eod EE M si EN GH3 Eod EN E Q 3 3 slam 91212 E S 212 18 s E SENE 3 E i by All OK Green XA No charging Yellow 3 x Beep after 60 sec x x x x x after 15 sec Low battery Yellow X X X x x Fault on Yellow Beeps at button activation x x hoist Battery Yellow Beeps at button activation x x x critically low that is not permitted Over load Yellow Beeps at button activation x x Service date Yellow Beeps at button activation X X X xX x exceeded more than 60 days x Only if the hoist is with Service modul 2 03 o BONS OF BN Operation Hand control The GH3 is switched on automatically when a button on the hand control is pressed The GH3 is switched off automatically after approx 8 minutes without activation GH3 Lift Lower Lift leader hoist Tilt fuction Lower leader hoist Tilt fuction GH3 with sumplementary modules Lift Lower Lift leader hoist Tilt fuction Lower leader hoist Tilt fuction Function selection button section 2 05 supplementary modules Function selection button section 2 05 supplementary modules PDA interface mini USB 4
28. pectively must not be exceeded The instruction offered by Guldmann to all customer groups in connection with the purchase of a ceiling mounted hoist has been received The helper pays attention to the well being of the user when using the hoist The hoist is used in rail systems which are installed tested and approved according to Guldmann s stipulation Only technicians who have been certified by Guldmann may install and test the rail systems The hoist is used with the Guldmann lifting hanger or with other suitable hanger section 1 08 The hoist is used with a Guldmann lifting sling or with other suitable slings section 1 09 1 03 Important Precautions Read the instructions carefully before using the GH3 and in connection with cleaning and service of the hoist The GH3 s maximum load must never be exceeded The GH3 may only be used to lift a person The red strap for the emergency stop and the emergency lowering must be adjutsed to the helpers reach and must not be removed The GH3 must not be used where there is a risk of it being splashed with water If a defect appears during use of the GH3 stop using the hoist and contact the Guldmann Service Team for repairs The GH3 is controlled by a micropro cessor PCB which can be damaged by static electricity if touched without the necessary precautions see point 1 07 The electronics may only be serviced by Guldmann approved service technicians Guldmann GB US 09 2009
29. problem by telephone you will be provided with a return authorization number and address for returning the defective item for warran ty service or replacement You must insure any defective item being returned because Guldmann does not assume the risk of loss or damage while in transit Do not return items or warranty service to Guldmann The warranties set forth are in lieu of all other express and implied warran ties whether oral written or implied and the remedies set forth above are your sole and exclusive remedies Only an authorized officer of Guldmann may take modifications to this warranty or additional warranties binding on Guldmann Accordingly additional statements such as advertising or presen tations whether oral or written do not constitute warranties by Guldmann and should not be relied upon as such The warranty gives you specific legal rights and you may also have the other rights which vary from state country 40 Guldmann GB US 09 2009 550383 8 0SS 6002 60 SN 49 uugeup no 41 8 0SS 6002 60 SN 49 uugeup no O 42 E8E0SS 6002 60 SN 49 uugeup no 43 Guldmann GB US 08 2009 550383 ime to care E Evocare www evocare com au Ph 07 3355 8000 Fax 07 3355 5043 Email sales evocare com au V Guldmann A S Graham Bells Vej 21 23A DK 8200 Arhus N Tel 45 8741 3100 Fax 45 8741 3131 info guldmann com www guldmann com
30. the lifting beam downward until the other eye turn toward the other strap attachment Fig 3 3 For mounting the last eye properly the lifting strap must be twisted so the hook on the hoist can be mounted from inside of the eye on the lifting beam Fig 4 and 5 Important Check that none of the lifting straps are twisted after the installation of the lifting beam Hold the GH3 Cross hanger and press the yellow button using the thumb with the same hand that holds the hanger Fig 6 Insert the hook on the lifting beam in the slot on the Cross hanger s top cover with the open side facing upward Fig 7 and release the yellow button Rotate the Cross hanger downward Fig 7 Check that the yellow button has returned to its locked position by checking that it is flush with the cover of the hanger and that the Cross hanger can rotate freely Guldmann GB US 09 2009 550383 Guldmann GB US 09 2009 550383 Installation of GH3 Horizontal lifter foldable For installing the Horizontal lifter it is necessary to use 2 oval hooks Fig 1 and 2 These can be ordered from Guldmann or your supplier on item no 21160 1 09 Lifting sling A lifting sling with four to six lifting straps designed for mounting on hooks should be used when using a Guldmann lift
31. uldmann GB US 09 2009 550383 Guldmann GB US 09 2009 550383 2 06 Setting the units kg lbs Scale module Scale Statistics Next service Setup Scale om diui Press any key on the hand control to activate the hoist When the lifting module is activated the display on the hand control is switched on and the Guldmann logo G appears Select Menu using the function key located below the display Then select until the Setup menu appears in the display Select Setup and then until the Units menu appears in the display Select Change to switch between the units kg and Ibs and confirm the selection by pressing OK Select to return to the start menu The display in the hand control switches off automatically after use approx 8 min See the complete menu summary section 2 04 Supplementary modules GH3 Scale module GH3 with integrated scale module The GH3 with scale module option provides the facility to determine the user s weight Warning The integrated scale in GH3 is not approved to determine mass in medical practice including the weighing of patients in connection with health moni toring diagnosis and medical treatment The provisions for medical weighing are specified in accordance with EEC Directive 90 384 Shock effects The GH3 with scale module includes high sensitive sensors to register mass corresponding to the nominal recomme
32. week 1 Press any key on the GH3 hand control to activate the hoist When the lifting module is activated the display on the hand control is switched on and the Guldmann logo G appears 2 Select Menu using the function key located below the display 3 Then select until the CLM menu appears in the display 4 Then select Show 5 Then select Next until the required information appears in the display 6 Select Exit to return to the main menu Note The display on the hand control will automatically revert to the screensaver after approx 8 min Accessories for the CLM module GH3 The CLM module includes an extended management menu which can be operated via a PDA Net Book with Guldmann Service and Information consol installed The PDA Net Book is connected to the hand control via a mini USB plug located in the base of the hand control see section 2 04 Contact supplier or the Guldmann Service Team for further information about CLM accessories 23 2 08 Service module GH3 with service module The GH3 with Service module option saves all of the information about time and indication of next safety service inspection The GH3 with Service module specifies the date of the next safety service inspection Operation ea Scale CLM Next service n i 2008 04 22 Press any key on the hand control to activate the hoist When the lifting module is activated a display on the hand

Download Pdf Manuals

image

Related Search

Untitled untitled boxing game codes untitled document untitled goose game untitled spreadsheet untitled notepad untitled paint untitled app untitled presentation untitled entertainment untitled attack on titan codes untitled 1 untitled boxing codes untitled tag game codes untitled stream untitled ui untitled 2 untitled boxing game wiki untitled paint 3d untitled diagram untitled music app untitled boxing game tier list untitled form untitled design untitled music untitled mod menu

Related Contents

Full HD Speed Dome IP Camera 104  Lithium Battery Products Guide Lithium Battery Products Guide  2 - Konica Minolta    Nomina del Responsabile dei Lavori  IGT-805AT-UserManual  AVRIL 2009 - Passion 3 roues  RAIN MASTER LIMITED WARRANTY - Rain Master Control Systems  BLUE LAGOON MANUEL D`UTILISATION  Détecteurs de fumée, mode d`emploi  

Copyright © All rights reserved.
Failed to retrieve file