Home

AquaVISION Colloidal Borescope Users Guide

image

Contents

1. is enabled green and toggle the Tracking button on AquaLITE If a hazy Preview screen is evident toggle the Preview button a couple of time Status Tracking KR Preview B Swirl the water in the bucket clockwise and place the Borescope in the water against the north side of the bucket for at least 20 minutes Using the Graph View observe the colloidal particles moving towards the east 90 and observe the velocity decreasing as the water slows down and the particles begin to swirl in multiple directions When viewing the graph you should see a decrease in velocity as the water slows down and the direction lines should start to represent swirling flow figure 3 2 Repeat above but place the Borescope against the south side of the bucket the particles should now be moving west 270 When placed on the west side of the bucket the particle movement is north and when placed on the east side of the bucket the particle movement is south Conduct the experiment again pay note to the orientation of the compass versus output data Try different orientations to gain a thorough understanding No manual adjustments calculations are required when interpreting data View the live test graph to help understand how the instrument will be reading and transmitting data this in office test should provide practice and precedent for field measurements Disconnect dry and store all system components in preparation for
2. BORESCOPE PROBE Figure 1 2 Colloidal Borescope System Schematic Borescope Probe amp Cable The Borescope Probe figure 1 3 encases the camera and compass and transmits a live video feed to the AquaLITE software The software tracks colloidal particles passing through the field of view located midway between the camera lens and red backlight The camera housing and backlight head are constructed of stainless steel and are sealed for underwater use to 1000 ft 305 m depths Definition Azimuth noun The Borescope probe s magnetic heading in well The software will use this information to provide velocity and trajectory data relative to true North regardless of probe orientation lt Cable Well casing with slotted screen Formation Cable Connector Jacket Compass F Azimuth is relative to North 0 P Miscellaneous Control Components CCD Camera Direction of advective collodial 140x Magnification transport Field of View Colloidal Particles not to scale Supports x3 Back Lighting Source Red LED Figure 1 3 Detail Borescope Probe in well with slotted screen Optional Reel Systems with long lengths of cable may be equipped with a reel for ease of transport and deployment Large reels have a convenient cable port mounted to the reel hub Camera Control Unit The Camera Control Unit CCU figure 1 4 manages the information transfer from the down well Borescope to the AquaLITE soft
3. a USER Search for log file to Import find the log file exported from AquaLITE Once selected click on Import File b Enter Well name 5 click OK c Enter Depth feet gt click OK d Enter Magnetic Declination gt click OK 5 As part of the import process Excel saves your file as Well Name xIs to the location of the log file You are ready to begin filtering the field data 34 6 Inthe Data Template notice that there are two sheet tabs in the bottom left of the window Data and Graph a Thegraphontab2shouldbe Data Graph J very similar to the one generated by AquaLITE As points matches are filtered it will adjust and clarify the data 7 Column E Points captures how many particle matches AquaLITE noticed and tracked per particle It is helpful to filter these and show only particles that were matched for example 10 instances versus only 2 or 5 There is a small down arrow on this column header where you can manage the filter Select and deselect Points Time Direction Velocity aron from the filter dialog box Click 18 Sort Smallest to Largest OK ral Sort Largest to Smallest Sort by Color Example for a data set of 1000 or more points you can confidently discard data points that had less than 10 matches Number Filters Search p 8 Adjust filter as necessary referring to the updated graph a ra E
4. amp 8x Setscrews 2x Centering Ring 33 Appendix A Filtering AquaLITE Data for further Analysis Once data has been gathered and tracked through AqauLITE and the sampling event has concluded it becomes tedious to manipulate and clean up outliers within AquaLITE This Appendix will outline how to export data from AquaLITE and then use a prepared template to import data into MS Excel The excel template will generate a similar graph to the AquaLITE graph and will enable the user to filter outlier data points Steps Ge Aquaview Lite v 80 REG Day Demo 2 File Configuration Tracking Fl Preview F2 v i R a New Ctrl N 1 From an active AquaLITE project cee eae go to Close File gt Export Log Data pan Cr Save As the log data file type log Print Preview to a known location Print Setup Report Font 1 Field Days Demo_2 2 Field Days Demo 3 C Users Desktop test 2 The excel template is stored on the 4 data prodpublicS 426146 software CD provided upon SS acquisition of the Borescope Import Log Data Copy Graph to Clipboard Ctrl G Open DATA TEMPLATE xIsx Copy Graph To File Make sure macros are enabled Copy Summary to File Clipboard Exit 3 Within the Data Template Click on Begin Data Input amp Save File Begin Data Input amp Save File Source File Walrall Mama 4 At this point you will be prompted through a series of dialog screens
5. comparing the vector values with the average flow rate or directional measurements Flow rates and directions determined by the vector addition programs are obviously vectors Consequently the magnitude of flow will affect the calculated direction If a uniform flow file with steady flow rates and directions 13 were analyzed using both software packages then the direction and rates would be similar However if there is a large variation in the flow direction and a corresponding variation in flow rates then there will be differences For example if a particle is moving due north at 200 um s and a second particle is moving due south at 100um s then the average velocity and direction would show a flow rate of 150 um s in a due east direction respectively The vector addition will show a flow rate of 100 um s in a due north direction There are cases that is if two nonadjacent quadrants contain the highest number of data points then an erroneous reading can results This case however is rare and based on our experience only occurs during swirling flow which is unreliable to begin with The software will note that these files are unreliable for direction determination for the Velocity Vector reading The Well Analysis Summary Sheet has been offered to the user only as an added benefit for determining the True direction and velocity Only a certified Colloidal Borescope Operator should make the appropriate determination of direction and vel
6. exceptions such as fluctuating pumping rates or boundary conditions Each situation must be evaluated on a site specific basis Many conditions may be encountered in a monitoring well It is always important to remember that the instrument is providing a direct measurement of flow conditions in the well at the selected depth interval Fluctuating boundary conditions such as a river undergoing stage level changes cycling pumping wells or other factors that can induce pressure changes in the aquifer will affect the Colloidal Borescope measurements These external influences must be considered in order to obtain reliable flow measurements The basic principle of AquaLITE The AquaLITE Software was developed for standard Windows users Data from the Colloidal Borescope is transferred to the surface by high strength electrical cable where AquaLITE takes these magnified images and digitizes 8 them at a pre selected time frames The first digitized image is compared to the second image and numerical algorithms determine the best match for all particles A vector line is then drawn between the matched particles and the distance and direction are added to a file This data can be graphed and incorporated into various modeling packages groundwater formulas and general reports This software has various parameters that can enhance the video signal and ability to track particles Like all software the more you use it the better and easier it becomes
7. m ea A Tracking Configuration pi um This is another way IL of filtering out small Capture Delay milliseconds 100 OK electronic interference or Ba cae p article Sensitivity slimes Set the number Normal Range 1000 5000 2800 agas higher to remove small Lower Values More Particles particles Minimum Particle Size 3 i i i iy 5000 Maximum Velocity Masamum Velocity Filters out matches higher Minimum Matches 2 than this number good P zm for filtering out bad i ata Point Frequency seconds matches or electrical j Borescope Image Size microns interference Set this value 100 200 higher um sec than observed particle velocity Be Alpha Particle Colon 8 BEGPakelECalo Observant Velocity can and will change during observations Width 2700 Height 2000 IV Show Particle Movement Lines Minimum Matches The number 1 to 999999 tells the software to only enter the value in the data if the conditions exist that number of matched exists 1 to 2 is the normal operating value Borescope Image Size microns DO NOT CHANGE These numbers will be calculated before purchase These numbers are the actual size in microns of the fixed focal point If accidentally removed or edited use 2100 x 1600 width x height as default Alpha and Beta Particle color allows the user to specify the color of the first and second grabs for easy display Default is Alpha green Beta red C
8. on sheet 2 of the excel i 03 spreadsheet Depending on the 14 integrity of your data set the og 1 v6 graph should be cleaner with A7 fewer outliers EP vio 7 10 Cancel For further questions please consult with your Geotech Technical Sales Representative 35 DOCUMENT REVISIONS EDCF DESCRIPTION REV DATE z Previous Release 11 04 2014 T Updated Manual SP 6 25 2015 Updated Accessories added office test 7 17 2015 settings SP 36 The Warranty For a period of one 1 year from date of first sale product is warranted to be free from defects in materials and workmanship Geotech agrees to repair or replace at Geotech s option the portion proving defective or at our option to refund the purchase price thereof Geotech will have no warranty obligation if the product is subjected to abnormal operating conditions accident abuse misuse unauthorized modification alteration repair or replacement of wear parts User assumes all other risk if any including the risk of injury loss or damage direct or consequential arising out of the use misuse or inability to use this product User agrees to use maintain and install product in accordance with recommendations and instructions User is responsible for transportation charges connected to the repair or replacement of product under this warranty Equipment Return Policy A Return Material Authorization number RMA is req
9. operational check should be conducted prior to field deployment The following procedure is recommended 1 Connect the CCU s power adapter to a 120VAC supply Ensure that the CCU on off switch is turned OFF 2 Connect the cable between the Borescope Probe and the CCU Before plugging the connector into the probe make sure the sealing surfaces are clean and lightly lubricated with silicon grease or other seal lubricant 3 Locate the USB to USB cable provided with the system connect the USB Port from the CCU into a USB port on the laptop 4 Locate the VCE Express video card 54mm provided with the system connect the Video Out from the CCU to the Express Card Slot on the laptop 5 Install and open AquaLITE and navigate to File Compass View Configure Compass 6 Turn the CCU on off switch to ON In a few seconds the green compass circle should show a red needle indicating the probe heading internal compass Rotate the probe around the vertical axis and verify that the red needle moves in a relative fashion See Troubleshooting Section if unable to read in compass heading 7 Set up a new project in AquaLITE File gt New Enter a test well configuration as well as magnetic declination For the United States use the graph in this section 8 The AquaLITE video screen should be white and the colloidal back light should be on Enable Preview status and observe the video screen shift color Place a sm
10. soap and water During cleaning flush the windows with clean water then use a small amount of mild soap on your finger to gently clean the windows Allow to air dry or gently dry with a soft cloth or lens tissue O Rings The O rings in the housing and light head should be inspected on a yearly basis and should be replaced if any damage is noted or if they appear to be flattened or deformed in any way During replacement the O rings O ring grooves and mating surfaces should always be clean and should be lubricated with silicon grease or other O ring lubricant before assembly Backlight LED The light head uses a long life LED that should not require regular maintenance If replacement is necessary the lamp assembly should be replaced as a complete unit This is accomplished by first removing the retaining ring on the light housing and withdrawing the end closure by inserting a 74 20 bolt for use as a puller The lamp assembly can then be taken out by removing an internal retaining ring and unsoldering the leads to the lamp After replacing of the lamp circuit check the O ring seal and mating surfaces for cleanliness and for any nicks or scratches Replace the O ring if damaged Lubricate the O ring and mating surfaces with a light coating of O ring lubricant install the O ring and replace the end closure and retaining ring If repair or replacement of other components is necessary please contact Geotech Environmental Equipment In
11. the well thus deflecting groundwater around the well Another possibility is 27 that the well was screened is a low permeable zone of the aquifer with surrounding preferential flow zones that do not intersect the well screen e t may seem obvious but recheck the well log to ensure that the Borescope is located in the well screen and not the well casing Problem Poor flow zones with particles that appear on the screen then rapidly disappear Solution e If this problem occurs then there are large vertical gradients in the well Particles that stay in focus only briefly are moving across the focal plane of the lens Well screens that intersect two or more permeable flow zones with different potentials can result in vertical flow in the well Attaching packers to the instrument may reduce this vertical flow component Problem Poor flow zones in large diameter wells Solution e If this condition occurs then it is recommended that the packers be attached to the instrument The packers centralize the Borescope keeping it off the sides of the well screen and minimize vertical flow that may be affecting the measurements Problem Software Crashes Solution e Restart by double clicking on AquaView LITE icon If problem still exists then reboot computer Problem Software will not track particles Solution e Check the delay setting in the Tracking configuration menu The faster the particles are moving the smaller the Capture Delay
12. to operate Software Installation To Install the USB Adapter Drivers Quatech CD e Follow the instructions described in the Quatech Driver Installation Guide To Install the VCE Software VCE CD e From explorer double click on the D VCE Setup exe from the provided CD Follow the instructions on the screen Insert VCE Express Card Follow Found New Hardware instructions When prompted for the driver location browse the CD Find folder VCE Drivers inside it find the folder for your system To Install the VCE PRO Software VCE CD e Follow the instructions described in the VCE PRO Quick Start Guide To Install the AquaLITE Software e Exit any open programs including those that run automatically at startup e Insert the AquaLITE software CD into the computer s CD drive e From explorer double click on the Setup exe from your CD e Follow the instructions on the screen For AquaLITE v 7 3 and newer Click File twice to navigate away from the splash page and into the software s user interface Before using the Video Preview or Tracking functions for the first time you must perform the following steps to initialize the VCE Video Configuration e Start a New File Enter Well Configuration information click OK Save the file e From the menu select Configuration gt Video gt Configuration or press F5 e ignore the error message that says VCE Capture Card Registry Data Not Available Cl
13. BORESCOPE 52070003 1 CONTROL BOX BORESCOPE 52070002 A PEA E NS 00 BORESC STD CONN NO 52070006 1 HA a N er BORESC STD CONN NO 52070005 1 ASSY POWER CORD AC W AMP 57500007 1 ASSY POWER CORD DC W AMP 57500008 1 VIDEO CARD BORESCOPE W CABLE 22070030 1 MANUAL BORESCOPE 22070014 1 REEL HAND BLACK IN SITU B 00520000XX 06 72050629 2 O RING NTL 38MM X 2MM 12070037 1 O RING NTL 22MM X 2 5MM 12070038 32 Optional Accessories QTY Parts Description Part 1 REEL PORTABLE SMALL 11400010 1 REEL PORTABLE LARGE 11400011 1 ASSY CENTERING DEVICE BORESCOPE 52070018 CLAMP FLOW RESTRICTOR BORESCOPE 22070018 RING CENTER RUB 3 75 0Dx1 75 ID BORESCOPE 12070053 SCREW 3 8 24 SET FLOW RESTRICTOR BORESCOPE 12070054 Probe Centering Device If deploying the Borescope probe into a 4 well Geotech recommends the Borescope be equipped with centering disks The disks will help stabilize the Borescope within the larger diameter well and can help guide colloidal flow into the camera s field of view A full centering device kit consists of 4 flow restrictor clamps 2 centering rings 8 setscrews The centering rings are held in between the restrictor clamps The restrictor clamps are secured to the probe with setscrews Before deploying the Probe with Centering Devices ensure the clamp assemblies are tight by gently tugging with your hand 4x Flow Restrictor Clamp
14. Frame value should be and vice versa e Check the Particle Sensitivity in the same menu screen If numerous particles exist on the preview screen then the sensitivity should be increased to approx 2500 4500 If only a few particles are visible then the sensitivity should lowered to be between 500 2000 e If the visible amount of particles is overwhelming click on the tracking preview window upper and drag the box corners in so that the image window is smaller This tells the software to grab only that portion of screen This works well is there is something obstruction a portion of the video image i e large debris mud or synthetic material drag the preview box away from that portion of the frame grabber Turn particle tracking off and on again e Turn tracking off while viewing graph and or modifying parameters Turn back on after changes are made Problem Backlight source does not work Solution e Check all cables to ensure connections are right Check 1 amp fuse within Camera Control Unit above plug outlet If camera is sending image use auxiliary light and look at monitor and if no light is present 28 it is possible that the internal camera unit has been jarred and is not contacting the two light source connections THE FOLLOWING SHOULD BE PERFOMED BY AN AUTHORIZED TRAINED COLLOIDAL BORESCOPE OPERATOR Remove three screws from lower light unit on Borescope note position of light unit compared to Borescope mark wit
15. all object pencil tip piece of paper finger etc approximately midway between the backlight head and the camera A magnified silhouetted image should be observed on the monitor Move the object up and down within the field of view to characterize the focal point 9 Hold the Borescope with the backlight head down and rotate the unit around its vertical axis Observe the compass display on the monitor to make sure it 18 0 changes smoothly and corresponds to the angular position of the Borescope Confirm cardinal orientation North q N N Da N A PN j Y ba J 3 i 4 N t Q i F kin NS es JAG 4 was 2 Naa N z Mag at E Kao a ang CA PW N ON CA Ba 4 i 4 Kua W P ER g Figure 3 1 Magnetic Declination USA 19 Now that the Borescope is set up and delivering live video we recommend conducting a quick in office test to gain experience with viewing collecting and analyzing data The test uses a water bucket and municipally plumbed water source tap or faucet to observe predictable velocities and directions Follow the instructions below 1 2 Recommended Settings for in office bucket test Minirum Pariele Swe jp Minimum Matches Data Point Frequency seconds 0 0 Borescope Image Size microns 2700 x 2000 Fill a bucket with at least 8 of water so that the bottom portion of the Borescope can be submerged Ensure that Preview
16. asure these preferential flow zones Prior to flow measurements the geologic log for a particular well should be consulted and possible high permeable zones selected Based on this information the Borescope should be placed in the center of these zones Subsequent measurements should offset by selected intervals from the initial zone until a preferential zone is located 22 System Deployment amp Data Interpretation Always use a grounding wire attached to the power supply if inserted into a stainless steel or metal cased well With the CCU s power switch turned off connect all CCU cables to the laptop and to the probe Initialize the AquaLITE software turn on the CCU check the compass configuration and then begin probe deployment When the Borescope is lowered in position and the well has settled use the knob on the camera control unit to adjust the backlight low medium high intensity for optimum contrast and observation of the maximum number of colloidal particles In relatively clear water the best results are obtained with the backlight at a low setting Use the AquaLITE software to gather data as outlined in the previous section 23 Section 4 System Maintenance amp Calibration Regular Maintenance Maintenance for the camera and light head is limited to cleaning and maintenance of the O ring seals and cleaning the housing and window Lens To avoid scratching the windows they should only be cleaned with mild
17. c Calibration Details amp Field Test The Colloidal Borescope is calibrated before shipping Therefore it only requires simple occasional tests to ensure that the instrument s settings have not accidentally changed Laboratory Calibration An extensive laboratory testing program was undertaken to determine the accuracy of the Colloidal Borescope for determining groundwater flow direction and rate Details of these laboratory tests are presented in Kearl Observations of particle movement in a monitoring well using the Colloidal Borescope 1997 Journal of Hydrology 200 323 344 24 Factory calibration The Borescope is calibrated and verified before leaving the factory making the instrument ready for deployment The magnification factor for the software is checked by measuring the width and length of a micrometer placed in the field of view The final pre shipping test involves the placement of the instrument in water and observing the particles passing through the field of view as well as testing the tracking software via AquaLITE For example if the particle is observed at the top of the field of view and moves toward the bottom of the field of view then the resulting direction tracked calculated by the imaging software should be approximately 180 degrees Field Tests To ensure the Borescope is in operating condition conduct this simple test to ensure the Borescope is aligned with Earth s magnetic North 1 First
18. color if preview screen is blue then check to see if the BNC cable from the camera control unit to the computer Express slot is plugged in There is a light adjustment switch on the Camera Control Unit however this is only for small light increases Is system powered up Check to see if the Colloidal Borescope red backlight is ON Camera control unit and laptop must be ON Is Borescope sending the compass readout to the Compass Configuration screen in AquaLITE If the compass is providing a reading then the turbidity of the well may be too high Remove Borescope from well and look at lenses Place object under lens to see if image comes back If not check to see that the seals have not been breached and water has entered the camera compartment If image looks fine on surface then well is most likely too turbid to characterize Another well should be selected until the water clarity returns If there is no compass reading recheck all power supplies and cables Make sure to use grounding wire if a Power Inverter is being used to supply power to equipment in the field If the grounding wire is not used damage can occur to the camera Problem Abrupt change in groundwater flow direction Solution If consistent directional flow is interrupted by an abrupt change in flow direction the first item to check is the velocity graph If there has been a steady decline in the magnitude of the velocity when the directional change occurred then chance
19. determine magnetic north with an external Compass 2 Open AquaLITE gt File gt Compass gt View Configure Compass and align the internal Borescope compass with North or 0 degrees on the configuration screen 3 Keeping the compass stable open a new well tracking file and initiate Preview mode 4 The bottom screen should now track any objects moving in and out of the field of view 5 Place a small object ex pen tip at the North side of the field of view and move it towards the South observe that the Preview screen shows the object moving from top to bottom Moving the object West to East should correlate with the Previews screen left to right If the Borescope follows the conditions laid out above it is in pristine working condition Should any other behavior be observed please contact Geotech Environmental Equipment Inc for further assistance 25 Section 5 System Troubleshooting amp FAQs If you are experiencing other problems than mentioned in this section please contact Geotech at sales geotechenv com so that others may benefit from your experience Problem No picture with the instrument in the well Solution There are several possible causes of no picture from the instrument while in the well Make sure all connections are complete as shown in Figure 1 1 and Figure 1 2 Check contrast and brightness levels in the Video Source Menu increase or decrease brightness depending on preview
20. ees 26 FREQUENTLY ASKED QUESTIONS u s 29 SECTION 6 SYSTEM SPECIFICATIONG 0 0ssssssssseessssessssessseseseseeeess 30 SECTION 7 PARTS AND ACCESSORIES 11110111111 kk ERE ERE E ERE E REE E ERE E REE E ERE E ERE E ERE E 32 PROBE CENTERING DEVICE aa a ee Res en ne ee eee 33 APPENDIX A FILTERING AQUALITE DATA FOR FURTHER ANALYSIS 34 THE WARRANTY seicicccsedssicanudecdussvdd accuse dbuvusavduaveasndusdussvddavssinduattesunsduvsanduatonsuned 37 DOCUMENTATION CONVENTIONS This document uses the following conventions to present information An exclamation point icon indicates a WARNING of a situation or condition that could lead to personal injury or death You should not proceed until you read and thoroughly understand the WARNING message WARNING A raised hand icon indicates CAUTION information that relates to a situation or condition that could lead to equipment malfunction or damage You should not proceed until you read and thoroughly understand the CAUTION message CAUTION UNG A note icon indicates NOTE information Notes provide additional or supplementary information about an activity or concept NOTE In order to ensure your Colloidal Borescope System has a long service life and operates properly adhere to the following cautions and read this manual before use Disconnect from power source when not in use Power input source must not exceed maximum ratings Equipment must be wired to a negative gro
21. env com Printed in the United States of America
22. er to lower center Used if multiple files are open Align Icons Typical Windows aligning protocol Split View displays the graph and the Tracking screen Not recommended while tracking is on as the computer s resources are limited To return to normal view simply click View Normal If tracking has stopped then double click on the tracking button to start the tracking Other Commands Save the File Save the file in the directory of choice Open a File Opens a previously created file Print the File Option allows user to print report graph or both see Print and Preview commands below Preview the File Allows user to see report graph or both prior to printing Print Setup Allows user to select printer and printer options Report Font Allows user to select from many font types for report output Export Log Data Allows user to export data log for use in other spreadsheets Import Log Data Allows user to import data from previous versions of AquaVIEW LITE 17 Section 3 System Check Installation amp Deployment It is recommended that the operator read the journal article by Kearl 1997 Journal of Hydrology 200 323 344 for an understanding of the theory of groundwater flow in a borehole observed flow conditions and laboratory testing of the instrument System Hook Up Operational Check amp Data Collection Tests After unpacking the Colloidal Borescope system and installing the AquaLITE software an
23. eters detailed in the Video Format Menu if the picture is too light or dark or out of focus Status Tracking KR Preview Tracking Menu F1 or clicking on the red tracking button located in the upper left hand corner of the data information window starts the tracking program in the upper image box The preview button F2 must be activated before the tracking operation will work Once the tracking button is on the upper video window will display the alpha and beta particles with the yellow matching line in between Change the tracking configuration as outlined earlier for the most grabs Turn tracking off before changing any configuration parameters View Menu Normal View displays both the preview screen and the tracking screen with status area normally highlighted Graph View displays the graph only below while in tracking mode the graph will automatically update as the data is captured This utility allows the user to track the data i e a preferential flow zone or a swirling flow zone Having the graph view on however will slow the program as this takes up the available computer memory Hence it is a good idea to check the graph regularly then return to the normal view 16 Window Menu New option allows for a new tracking window Primarily used if an existing file has been used Cascade Aligns the windows from upper right to lower left Used if multiple files are open Tile Aligns the windows from upper cent
24. field installation 20 Velocity Direction 5000 360 POH OUHUDy JEN BOO 1000 i NN enna NEL NAAPI UDE val Paan pn 300 ala HALD N ND flo aa i Tik el Te EET hal i UI I i 4 ni dla na NA de Sau o o o o o o o o o s a S B s a m m N N TH txt t i lt ong Nag I AANOVVAOg Figure 3 2 Bucket Test Data Report 21 32 17 16 0 Data Points 14 03 23 i im w N m pi Time Swirling Flow Velocity slowing towards 0 um sec 90 East Direction Direction 180 South Installation amp Preparation for Field Measurements When deploying equipment in the field with portable power be sure to read and understand your portable generator s User Manual for proper installation operating and earth ground instructions Failure to do so may result WARNING in unaccounted static disturbance during data collection For the Colloidal Borescope to provide reliable measurements of groundwater flow rates and directions it is important that the instrument be placed ina developed high quality well The well screen should consist of mechanically slotted screen with a minimum of three columns of slots or wire wound screen Prior to measurements the well should be adequately developed using a jetting tool or mechanical surging A low permeable skin surrounding the we
25. geotecn AquaVision Colloidal Borescope Installation and Operation Manual Rev 07 17 2015 Part 22070014 Table of Contents DOCUMENTATION CONVENTIONS c ccccccceeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeseeeeesenesens 2 SECTION 1 SYSTEM DESCRIPTION 11111 aa 4 EUNGTION AND THEORY038 20Na NAA Na Naa NN anan NG ZA a sad LAB RG 4 SYSTEM COMPONENTS kna baba dag ce dans RD KALA NADIN NAA ha GN 5 BORESCOPE PROBE 8 CABLE 0sseseeeeeeseseeeseseseeeseseseseseseseeeseseseseseseeeeeeeseeeess 5 OPTIONAL REEL 22nn na AN wanna AD ADD NAAN A 6 CAMERA CONTROL UN T ma anG NAL GN ha O NG NAL h nana ka kakaisa 7 SECTION 2 SYSTEM SOFTWARE AQUALITE cccccssssscseeeeesssssssceteeeeenes 8 SOFTWARE INSTALLATION 0 20332004 a aan GA ad aaa BAG aaa 9 GENERAL LAYOUT OF SCREEN bagi STAG nr ennen RAHA AN AN 10 GENERAL OVERVIEW OF MENU BARS AND SUB MENUS 0100000 re rerenerer 12 SECTION 3 SYSTEM CHECK INSTALLATION amp DEPLOYMENT 18 SYSTEM HOOK UP OPERATIONAL CHECK amp DATA COLLECTION TESTS 18 INSTALLATION amp PREPARATION FOR FIELD MEASUREMENTS 2 a 22 SYSTEM DEPLOYMENT amp DATA INTERPRETATION renere renere renerne 23 SECTION 4 SYSTEM MAINTENANCE amp CALIBRATION 000 0ssseeees 24 REGULAR MAINTENANCE 3na anna AN GANG BUAN KAANIB UNG 24 CALIBRATION DETAILS amp FIELD TEST 24 SECTION 5 SYSTEM TROUBLESHOOTING amp FAQG sssssssseseeeeeee
26. h pen if needed Pull the light unit apart Check with a multi meter for power from Borescope voltage should read approximately 12 millivolts Tap instrument so that camera unit slides towards the open end Replace light unit matching pen lines Light should come on at this point Remove light unit replace rubber seals and add silicon vacuum grease Replace light unit matching pen lines If light does not work at this point check depth of contact with ruler and check depth of light source to ensure contact is being made Make sure that the spring contract is not stuck If camera unit will not move or there is no power to light source equipment must be sent back to Geotech for repair Problem Compass software cannot find port Solution From the Windows start menu click Settings Control Panel System Hardware Device Manager Ports and simply see which port is being used by AquaLITE Then go back into AquaLITE and in the compass calibration automatic port scroll down to highlight the appropriate port and retry Power cycle the CCU to reset the connection Frequently asked Questions What is the minimum particle size and ratio needed for the Colloidal Borescope to function properly The limit is somewhere between 200 and 500 NTU Naturally occurring particles are between 5um and 20um Particle sensitivity is just less than tum What is the minimum velocity that can be detected As many days weeks months as u
27. half of the field of view then horizontal flow conditions dominant the measurement zone If variable flow conditions persist then the instrument should be moved to a different depth Experience has shown that if swirling flow conditions persist after 15 to 20 minutes especially if the Borescope has been in the well at other test intervals then a non preferential flow zone has been encountered and the instrument should be moved to a new test interval When the Colloidal Borescope is inserted into the well the ambient groundwater flow is disturbed The Borescope acts as a slug that can cause water from the well bore to flow into the surrounding aquifer and affect flow measurements These effects commonly last 10 to 30 minutes before ambient flow conditions re establish in the well bore Use the graph view in the tracking software to view the consistency of the directional measurements and changes in the magnitude of the velocity If directional measurements are consistent but the velocity decreases with time then additional measurements are needed to ensure a reliable flow file It has commonly been observed that consistent flow directions can occur but as the velocity slowly decreases the flow directions can change and become swirling This is typical of initial flow measurements in non preferential flow zones It is important that both direction and velocity stabilize before a measurement can be considered reliable There are however
28. ick OK e Click the Auto Crop button e Click the Close button e From the menu select Configuration gt Video gt Save Configuration or press F6 e Close the File When software is first initiated agreement to the software terms and limitations is required Software will not work without consent The next screen will ask which Video Grabber card is being used Determine if you are using the MRT Video Port Professional or the IMPERX Video Capture Essentials Enter the data This information can be changed at any time under the file menu Software must be re started after changing the video card General Layout of Screen The general layout of the AquaVISION AquaLITE Colloidal Borescope Software has a menu bar top two video windows left and a status screen right The menu bar will be discussed in detail below The upper video window tracking window is a digitized version of the lower video window camera preview 76 MEE Fie Co Iracking F1 Preview F2 View Window Help 215 x Disa ej ajel Staus Tacking mm Preview mn Time pag Alpha me be 5 Matches BB Lat Avg Min Max Azimuth B14 zes fata Basa Data Points 418 F1 Toggle Tracking On Off F2 Toggle Video Preview On Off F3 Well Configuration F4 Patticle Tracking Configuration F5 Video Source F6 Video Format F7 Video Driver The lower video window or the preview window allows the user to see video image of the par
29. le and are simply run for average median minimum maximum direction and the standard deviation These values must be scrutinized for accuracy of depth of observation angle or azimuth reading entered while collecting the data date time and total number of data points collected during the observation In addition average direction values should be compared with velocity vector azimuth as there can be discrepancies with the directions of 0 vs 360 The report also gives the same statistics for the velocity data This data must also be scrutinized as an elevated average will occur if the file was initially started before flow stabilized from insertion of the Borescope into the well Well Analysis Summary Well Name MW113 Depth 33 meters Mag Dec 10 00 Date May 12 2015 Time 12 05 58 13 41 40 Data Points 5382 Avg Dir Med Dir Min Dir Max Dir Std Dev 182 23 199 20 0 09 359 98 108 31 Avg Vel Med Vel Min Vel Max Vel Std Dev um sec 199 75 183 50 3 58 882 09 134 53 ft day 56 75 52 13 1 02 250 59 38 22 fi day 2 28 37 26 07 0 51 125 30 19 11 ft day 3 18 92 17 38 0 34 83 53 12 74 filday 4 14 19 13 03 0 25 62 65 9 55 Velocity Vector Azimuth 295 69 Actual Velocity um sec 30 74 day 8 73 lday 2 4 37 ft day 3 2 91 ft day 4 2 18 The Vector Analysis bottom was created to help with determining the true direction and velocity due to larger variations in the data One must be careful in
30. ll screen will result in groundwater flowing around the well and swirling flow within the well Finally any devices in the well such as dedicated pumps should be removed from the well at least 24 hrs prior to testing This will allow the ambient hydraulic conditions in the well and the surrounding porous media to re establish and any turbidity effects from removing the pump to subside Prior to placing the Colloidal Borescope in a test well the video image should be checked by placing an object such as a pen between the lens and the back light The Borescope should be slowly lowered into the well to minimize disturbing the formation which may result in excessive turbidity in the well If this occurs there will not be a clear picture on the video screen and several hours or perhaps a full day may be required for the well water clarity to return The Colloidal Borescope provides depth specific measurements of groundwater flow direction and velocity Several important factors must be considered in order to obtain a reliable measurement It is widely accepted that flow occurs in preferential flow zones within subsurface aquifers These preferential flow zones dominate groundwater flow even in homogeneous aquifer For a reliable measurement the Colloidal Borescope must be placed in these preferential flow zones A combination of relevant geologic information and the proper utilization of the Colloidal Borescope system are necessary to locate and me
31. mpliant Cable Lift Capacity 426 pounds Camera Control Unit AC power requirements 90 240V AC 47 to 63 Hz 7 Watts Service requirement lt 1 amp DC power requirements 10 to 16 VDC lt 1 amp CCU size 3 98 W 10 cm x 7 89 20 cm L x 3 16 8 cm H Electrical component material Non ROHS compliant dispose of properly Operating temperature range 10 to 45 C 14 113 F Not including laptop or PC 30 AquaLITE Software Requirements Pentium based laptop computer with an available PCMCIA slot or Express Card slot 64mm Windows 98or higher Windows NT 4 0 or higher At least 8 MB of free hard disk space in the Windows Drive At least 13 MB of free hard disk space At least 12 MB of RAM 32 MB is recommended 31 Section 7 Parts and Accessories Standard Model Inclusions Equipment List QTY Parts Description Part 1 ASSY PROBE DOWNWELL BORESCOPE 52070003 1 CONTROL BOX BORESCOPE 52070002 1 ASSY POWER CORD AC W AMP 57500007 1 ASSY POWER CORD DC W AMP 57500008 1 VIDEO CARD BORESCOPE W CABLE 22070030 1 SOFTWARE AQUALITE VERSION 7 2 22070031 1 MANUAL BORESCOPE 22070014 4 PANG AE BORESC STD CONN NO 52070005 1 CASE PELICAN 1600 BLACK W FOAM 17500020 Replacements QTY Parts Description Part 1 ASSY PROBE DOWNWELL
32. ndwater velocity and particle flow trajectory The Borescope provides a magnified image of moving colloidal particles suspended in the borehole these particles are tracked against magnetic heading information and efficiently provide velocity and trajectory of the colloidal particles The Borescope s compass is calibrated to true North and provides relative data regardless of the probe s down well heading Therefore no data adjustments are required from site analysis Accidental spills and leaks associated with various facility operations have resulted in significant sub surface contamination The Colloidal Borescope offers an accurate methodology for assessing contaminant transport potential Data acquired with the instrument may be used to quantify heterogeneities and dispersion parameters necessary to estimate the extent and magnitude of underlying contaminants define exposure routes and assess risks STAINLESS STEEL CABLE CONNECTOR HIGH STRENGTH INTERCONNECT CABLE PRECISION MAGNETIC RESISTANCE COMPASS ASSEMBLY HIGH RESOLUTION COLLOID VIEWING CCD CAMERA STAINLESS STEEL UNDERWATER HOUSING FIELD OF VIEW COLLOID VIEWING OPTICAL SYSTEM WITH 140X MAGNIFICATION HIGH INTENSITY COLLOID BACK LIGHT MODULE Figure 1 1 Colloidal Borescope Probe Features System Components AC POWER for CCU and Laptop LARGE REEL WITH CABLE CONNECTION VIDEO CARD 3 INPUT m MONITORING WELL a TOP OF SCREEN
33. ocity Configuration Field Well Tracking Video and Graph Configuration Well F3 allows modification of well parameters entered when creating a new file i e name depth azimuth and date Azimuth b The Borescope probe s magnetic heading in well The software will use this information to provide velocity and trajectory data relative to true North regardless of probe orientation Automatic azimuth detection via AquaLITE is recommended as manual azimuth entry should only be used if down well probe orientation is known Configuration Tracking F4 It is recommended to change only one or two tracking configuration fields at a time Allow the unit to stabilize after making edits to ensure controlled sensible tracking configuration edits Capture Delay milliseconds Sends a signal to the frame grabber to snap the second comparative image every 1 to 99999 milliseconds Setting the window to 1 allows the software to grab as fast as possible Particle Sensitivity This parameter acts like a filter Increase this value if large amounts of colloids exist or electrical interference is present Lower the value if only a few colloids exist and the electrical source is clean This parameter will need to be changed throughout a session as colloids decrease Normal Range is between 1000 5000 This is ONLY the Normal Range can be smaller or larger depending on the conditions of the aquifer 14 Minimum Particle Size
34. on e For aquifers that contain few colloidal particles such as coarse grain sands particle density may decrease to one or two particles every minute Be sure to set the delay between frames to the minimum values possible The particles between the two frames however should not overlap to ensure an accurate measurement Several hours may be required at a test interval in order to obtain enough particle matches to ensure a reliable flow zone e Another potential problem is if the particles become blurry and then disappear altogether This effect could result from a dirty well Numerous particles can settle on the backlight source and decrease the amount of light available for viewing Gently shaking the Borescope can remove these particles and allow a good image without disturbing the fines in the surrounding formation Be sure to carefully lower the Borescope into these types of wells Problem No flow zones detected in a well Solution e First keep trying different zones within the well screen Remember preferential flow zones can be in small laminar zones a matter of inches so keep on looking e f5to 10 measurement where taken in a 5 ft well screen and no steady consistent flow zones where found then the instrument should be moved to a new well It is possible that the well is located in a stagnant flow zone within the aquifer however it is more likely that the well was poorly developed and there is a low permeable skin surrounding
35. onfiguration Video F5 Allows changes in the video driver and configuration IMPERX VCE cards will show a hardware screen refer to VCE card instructions booklet for more information Video Configuration Allows the user to specify the specific video parameters i e RGB and color settings X offset and Y offset crops the capture image and removes interference on side of image B Brightness sets the image brightness This will need to be adjusted after Borescope is inserted into well C contrast sets the image contrast This will need to be adjusted after Borescope is inserted into well 15 S Saturation sets the saturation leave at 0 H hue sets the Hue leave at 0 All Other fields will be set back to original if modified Video Driver sets the MRT Video Port video capture device driver If error code states video card no longer exists then reboot computer Configuration Graph Allows changes in the graph appearance This option allows multiple changes to all aspects of the graphing software There are too many options to describe in this manual The main options that the user will find beneficial are the Data Tab and the Colors and Styles Tab Preview Menu F2 or clicking on the red preview button located in the upper right hand corner of the data information window previews the image in the lower image box Preview allows the user to see the video image in the well Change the brightness and contract param
36. onnect the probe and the CCU and turn the CCU ON Ensure you are receiving a reading by seeing Success and a red needle that changes as the Borescope is rotated around its vertical axis If there is no immediate reading check the RS 232 C Manual Serial Port COM6 v Diagnose Azimuith Magnetic Declination 0 18 90 Success Cancel COM port in Windows gt Device Manager adjust as necessary and power cycle the CCU Sometimes a baud rate adjustment is necessary activate this feature with the Diagnose button on the configuration screen See troubleshooting for further information 11 General Overview of Menu Bars and Sub Menus Fie New CtrlsN Cos The user will be prompted weiname 0 to input the following Depth Cancel Well Name paaa 0 2015 in fi M ti Alphanumeric field Docination O specific identifier for the Enter actual Magnetic Declination AquaLite will well of interest calculate true north Example If Magnetic Declination is 10 W enter 10 Depth Alphanumeric field depth that the Colloidal Borescope instrument is viewing and tracking Enter in feet or meters Date Automatic Field Date can be modified Magnetic Declination Magnetic Declination can be found in Section 3 for the United States only File Open Ctrl O Open a previous file File Close Close current file does not e
37. s are the measurement zone is a non preferential flow zone and the Borescope should be moved to a different test interval If velocity is consistent check for outside interference such as pumping wells tidal influences or fluctuating river stages Even in steady preferential flow zones short term directional changes can occur Continue to observe for 10 15 minutes If direction charges to a third direction then the Borescope is in a non preferential flow zone 26 Problem Numerous particles are being grabbed but no data is being recorded Solution e If this condition occurs then the maximum velocity setting in the Tracking Configuration is lower than the velocity of the particles Reset the maximum velocity to a value approximately twice the measured velocity Problem Numerous particles are being grabbed but computer is slow writing to file Solution e First option is to increase the particle sensitivity until only a few particles are being grabbed e The second option is to click on the tracking window and manually drag decrease the size of the window so that the grabbing area is smaller This tells the software to grab only that portion of screen This works well if there is something obstructing a portion of the video image i e large debris mud or synthetic material on the lens or backlighting source drag the preview box away from that portion of the frame grabber Problem Loss of particles in the viewing area Soluti
38. ser is willing to spend taking measurements determines the minimum velocity Minimum velocity is essentially zero If a particle sits in the field of view it will not be tracked until it moves For example if it takes a year to move 1um then the flow speed would be 1um per year Is additional data manipulation required to account for the azimuth No After entering in magnetic declination the AquaLITE software will always orient to true North regardless of the azimuth The azimuth reading is present to help the user orient their view when watching the live video feed and tracking 29 Section 6 System Specifications System Applications 2 5 8 cm or larger well diameter Borescope Maximum operating depth 1000 305 m Maximum water pressure 1200 PSI 82 bar or 3000 915m water column Maximum Ground Water ie 30 mm s Velocity Minimum Ground Water 0 mm s Velocity Minimum Particle Size 10 um Maximum Particle Size Within camera field of view Probe size 21 25 54 cm L x 1 75 4 5 cm OD Probe weight 5 Ibs 2 5 kg Probe housing material 300 series stainless steel Window materials Sapphire Camera Field of View 2 7 to 2 mm Depth of focus 2 mm Cable size 32 O D 81 cm Customer specified length from 100 to 1000 30 5m to 305 m Cable jacket material Urethane composite cable material ROHS co
39. ticles moving in the well as it annears maanified 140 times The tracking window displays the particle grabbing and matching process The Alpha or first particle is represented by a green cluster these colors can be modified in the configuration menu the Beta or second particle is represented 10 by a red cluster A yellow line connecting the alpha and beta clusters represents the particle vector After all matched particles have been analyzed the data will be averaged and added to the file specified in the File Save section The status box on the right details the incoming data The Tracking and Preview buttons toggle red off green on allows the user to see if these two parameters are enabled or disabled The Last Avg Min and Max boxes are capturing incoming information and displaying for easy reference Other boxes include the time Elapsed time and data points number of averaged data points k With the cursor grab the lower right hand corner of the screen and expand it out to show a live graph view the graph will update as data is collected Compass Configuration Before creating a new file File Compass View Configure Compass OR Once a new file has been created Configuration Compass F7 Compass configuration is i conosco E s necessary before opening a new file or beginning to track data Navigate to the compass configuration screen c
40. uired prior to return of any equipment to our facilities please call our 800 number for appropriate location An RMA will be issued upon receipt of your request to return equipment which should include reasons for the return Your return shipment to us must have this RMA clearly marked on the outside of the package Proof of date of purchase is required for processing of all warranty requests This policy applies to both equipment sales and repair orders FOR A RETURN MATERIAL AUTHORIZATION PLEASE CALL OUR SERVICE DEPARTMENT AT 1 800 833 7958 Model Number Serial Number Date of Purchase Equipment Decontamination Prior to return all equipment must be thoroughly cleaned and decontaminated Please make note on RMA form the use of equipment contaminants equipment was exposed to and decontamination solutions methods used Geotech reserves the right to refuse any equipment not properly decontaminated Geotech may also choose to decontaminate the equipment for a fee which will be applied to the repair order invoice 37 Geotech Environmental Equipment Inc 2650 East 40th Avenue Denver Colorado 80205 303 320 4764 e 800 833 7958 e FAX 303 322 7242 email sales geotechenv com website www geotechenv com In the EU Geotech Equipos Ambientales Calle Francesc Ferrer Guardia Local 19 Mollet del Valles Barcelona 08100 Espa a Tlf 34 93 5445937 email ventas geotechenv com website http spanish geotech
41. und system Equipment may not operate properly with excess wiring not supplied by manufacturer Avoid spraying fluid directly at equipment Never submerge equipment Avoid pulling on wires to unplug equipment wiring Avoid using equipment with obvious physical damage To prevent equipment damage avoid dropping it E The Colloidal Borescope cannot be made dangerous or unsafe because of failure due to EMC interference Do not operate this equipment if it has visible signs of significant physical damage other than normal wear and tear WARNING Notice for consumers in Europe This symbol indicates that this product is to be collected separately The following applies only to users in European countries e This product is designated for separate collection at an appropriate collection point Do not dispose of as household waste e For more information contact the seller or the local authorities in charge of waste management Section 1 System Description Function and Theory There are naturally occurring particles colloids in groundwater that are neutrally buoyant These colloidal particles being carried by the natural groundwater can be observed and measured to obtain groundwater velocity and direction The Colloidal Borescope System integrates a high resolution magnetic resistance compass a high magnification particle imaging camera and accurate tracking software AquaLITE to identify and measure grou
42. ware live video feed All components in the system connect to this box The CCU has an ON OFF switch and corresponding green ON light as well as an adjustment knob for probe backlight brightness a AC POWER ADAPTER F j FOR CCU KR PROBE CONNECTION VIDEO CONNECTION TO LAPTOP K4 ng lt o ja a VCE Requires a laptop with gt Z 335 PCMCIA or Express Card slot ba CA ojo o z Figure 1 4 Camera Control Unit Cable Hook Up Guide Laptop The Borescope system requires a customer supplied laptop the laptop must have an Express Card Slot to accommodate the PC video card shipped with the system The video card is a VCE Express Card 54mm wide Software The AquaLITE software provided with the system is installed and operated as outlined in the next section When you receive the Colloidal Borescope unpack it carefully and inspect for any shipping damage Please contact Geotech Environmental Equipment if any damage is noted Section 2 System Software AquaLITE The AquaLITE software included in the Colloidal Borescope system is a key component in obtaining a reliable flow measurement Typically there are two types of measurements that can be encountered in a well if consistent horizontal flow in a steady direction for two or more hours occurs then the Borescope is in a preferential flow zone where groundwater flow is occurring If the colloids remain in focus across at least one
43. xit the program Viewing Printing Well Analysis Summary After a logging event AquaLITE will analyze the data and create an in depth cohesive Well Analysis Summary There are a few options to view this report they are outlined below File Print Ctrl P With this option AquaLITE will offer a few options Print i Summary will print only the Well C Print Graph Analysis Summary only the pa KARA R Cancel graph or both These files can be printed to PDF depending on the device setup on the configured laptop File Copy Graph to Clipboard Allows user to export graph to the Windows Clipboard it can be pasted as JPEG or BITMAP File Copy Graph to File Allows user to save the graph image to disk JPEG BITMAP or WMF 12 File Copy Summary to File Clipboard This option will place the Summary to the clipboard allowing the user to post the well summary as an image into an external file in The image file can be easily copied and pasted into a word document Explanation of the Well Analysis Summary Sheet The AquaVISION Env LLC software offers a report for the user The report gives the well date and data information top general statistical analysis middle and a vector analysis bottom The general information top gives the well name the statistical analysis middle offers the basic statistics that can be used for direction and velocity determination These values are taken from the data fi

Download Pdf Manuals

image

Related Search

Related Contents

Trumatic E 4000 E 4000 A  Fasade L86-33 Installation Guide  VersaKey Users Manual 80074502-001 R1007.indd  appareils fitness programme de garantie 2009-2010  DELL Venue 5055 64GB 4G Black  Network Camera VB-R11 Installation Guide  Dokument 1. - Dokumentenserverhosting der SUB  TABLE OF CONTENTS  量大精華 ー 600俺  Instruction Manual - Test Equipment Depot  

Copyright © All rights reserved.
Failed to retrieve file