Installation of the Opener

image

Contents

1. Galvanized Steel Rack gl Welding j Rack Nut Bolt amp Gate Operator Washer Concrete Pad Important Check that the rack teeth must engage the gear teeth throughout their full thickness If not adjust the position of the opener or and place a few shims between the rack and gate 4 Manually slide the gate leaf to ensure the rack is proper on the gear of opener weld the second nut 5 Repeat same steps of first rack section to install the rest rack sections until proper length is reached 6 Cut away any excess of the rack Note rack length must be longer than actual travel of the gate to accommodate limit switch brackets on each gate side 7 Thoroughly fasten the four nuts as well as spring washers onto anchor bolts tightly enabling the opener is firmly secured on the concrete pad during the whole gate travel Installation of Magnets for Limit Switches Before install Magnets make sure the gate opener is put in manual operation the clutch connected with gear shaft is disengaged and the mains power supply is disconnected Position the two Magnets approximately on the gate and move the gate manually to secure them in place Fit magnets bracket Push the gate fully closed by hand Locate and install the magnet bracket so that the opener will stop at the 9 desired close position when the close limit switch approaches it Push the gate fully open by hand Locate and install the magnet bracke
2. gate installation Correct DF F Positive Stop in fully closed position eisino gt Incorrect inc 4 minimum Positive Stop in fully opening position Parts List Remote Control 2 pcs gt g Release Key Gate Operator 1 pc 1 pc Magnet bracket M8x70 Bolt 2 pes 4 pcs 10 Lock Washer 8 Lock Washer 4 pcs 8 pcs Magnet Assembly M8x30 Bolt 2 pcs 4 pcs M10 Nut 4 pcs M8 Nut 4 pcs OFS Light Duty FAEM Havy Duty Plastic Rack Reinforced with Steel Plastic Rack Reinforced with Steel 1005mmxN pcs Optional 1005mmxN pcs Optional Galvanized Steel Rack 1005mmxN pcs Optional Optional Accessories Parts List Optional Back up battery 1 set LM125 Battery emergency charger 2 5 Video Intercom 1 pc LM135 1 set LM162 Back up battery box 1 pc Alarm Lamp 1 pc Photocell Beam System LM130 LM140 1 set LM102 Solar Controller 1 pc Solar panel 1 pc Supporting frame for solar LM117 LM109 panel 1 pc LM115 Mounting post for keypad 1 pc LM107 Keypad wireless Wired Keypad 1 pc LM106 24 1 pc LM105 ID card LM170 me 250 PCS Max External Receiver 1 pc LM138 7
3. instruction of solar panel and controller separated w Be Ge Go Ge G Ge Ge Ge Ge G Ge G Ge Ge Ge Ge Ge Ge G Hee Ee S TIPS a N The terminal 8 and 9 on control board should be shorted if the Si b photocell beam system optional does not use A wire jumper has eeo 6 been used for short to terminal 8 and 9 in factory Please check if this wire jumper is missing or keep the photocell in alignment when the gate amp can open but fails to close A D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D Setting Of The Control Board WARNING Keep away from the gate during you set the gate opener system in case of the unexpected gate moving Carefully adjust the DIP switches to avoid the risk of machine damage and injury or death Always ask the help of professional technician electrician if you have any question Control Board DIP Switches uwe iias E PHOTOCEL PUSHBUTTON 9 9 9 R 1 DIP Switches The DIP switches are used to set the running time of the motor in pedestrian mode fine adjust the soft stop period of the motor auto close time of the gate opener and fast change the open close direction which is determined by the position of the gate opener installed 12 DIP Switch 1 2 Running time of the motor in Midway Mode DIP Switch 1 ON 2 Seconds OFF 0 DIP Switch 2 ON 4 Seconds OFF 0 NOTE The mid
4. opener clean at all times Check and tighten anchors bolts Check for loose or corroded wire Ensure the opener is well earthed and correctly terminated Always check the Stop Reverse in case of obstruction function when performing any maintenance If this function can t be made operable remove this opener from service until the cause of the malfunction is identified and corrected According to Waste of Electrical and Electronic Equipment WEEE directive WEEE should be separately collected and treated If at any time in future you need to dispose of this product please do NOT dispose of this product with household waste Please send this product to WEEE collecting points E where available www WholesaleGateOpener com 7106 S 220th St Kent WA 98032 USA sales WholesaleGateOpener com 2010 2012 LockMaster All Rights Reserved 16
5. six holes for heavy duty on the gate 3 Fit the rack by self threading screws This kind of plastic rack is quieter and allows height adjustments to be made even after it has been fixed Please keep 1 0mm space between the rack and the gear to avoid the weight of the gate leaf effect on the opener oe Magnet Bracket 10 15mm Higher Magnet 2 pes Component Hex Bolt M8x70 4 pcs N om Plain Washer 8 4 pcs _ Lower Magnet Spring Wahser 8 4 pcs il Pa Hex Nut M8 4 pcs x Plastic rack N A reinforced with steel Component Gate Operator Concrete Pad amp Plate B Fit the galvanized steel rack 1 Start with gate in closed position 2 There are four sections of steel rack which is one meter length each section for standard package you can order extra rack from dealer if necessary 2 Put one end of rack section on the gear of opener as a temporary support Make rack level and mark the rack s mounting holes three holes on the gate 3 Weld the rack nut on the gate as mark and connect the rack to the gate using the bolt provided Before weld please keep 1 0mm space between the rack and the gear to avoid the weight of the gate leaf effect on the opener Magnet Bracket Higher Magnet 2 pes _ Component Hex Bolt M870 4 pcs z Lower Magnet Plain Washer 8 4pcs Sil Component Spring Wahser 8 4 pcs Hex Nut M8 4 pcs
6. LockMaster DSR 600 1000 Please read and follow all warnings precautions and instructions before installation and use Periodic checks of the operator are required to ensure safe operation For residential use only Save this manual Rev 11c www WholesaleGateOpener com Table of Contents General Safety esac vind deodoves sienna pave ea dada eed e AE die ited dca e ara s TREE wing dea vated sae Dade 2 Preparation Tor Installations sseivia ce ceases ne date dea eee cgeg se vars aa a pind nye vhe etal A Lee aga SAh 3 Pants List sosteisne sch chorale vag wiesa a a e Md bad etabsesn gud dash aa aaa aa aag Ana Taai EE 4 Optional Accessories Part List c ccccec eee c eee e cee eee eee eee ene eee ee ee ee eae ences ea ease ea eseeeaeaeaeaeeeeeseees 5 Technical Specifications amp Feature cccccccceeee eee eee ee eee eee eee nett nent eens ee eeeeeeeeeeeeeeeeeeeeeeeeeeeeasas 6 Installation Overview neiseina eran teste ea aa od ahead eta book tage ee oe 6 Installation of the Opener s22 eavce aces ced cave ceccdede sped edeneeed oa paris eee Fae ates eeie tint va ddeaeeenedeadaceeegiaa ee 7 Manual Operations eesin penniga ui ace shed d feels deca deysaesegeaneus seehess yeegigdaqsaedbeetiewetu ced ncdcua teats 8 Fit THe RACK cobain duties di aie Gabi cl onda o TE or vd eta eae ic ee aia eee ee 8 Installation of Magnets for Limit Switches ccccccce cece eee eee eee ee ee eae seeee eee eee e
7. Video Intercom 1 set LM165 Wall push button 1 pc LM147 Bracket for solar panel 1 pc LM116 Loop Detector 1 pc LM155 Technical Specifications amp Features Specifications Power supply 230V 50HZ or 120VAC 60Hz Rated input power 180W for DSR 600 350W for DSR 1000 Gate moving speed 0 2m sec Max gate weight 600KGS for DSR 600 1000KGS for DSR 1000 Max torque 12Nm for DSR 600 24Nm for DSR 1000 Ambient from 15 C to 40 C Humidity max 75 Protection class IP44 Dimensions 396mmx190mmx315 5mm Features Soft start and soft stop Midway mode Quick selection for the gate open close direction Reliable rolling code technology for remote control Emergency release key in case of power failure Stop Reverse in case of obstruction during gate opening closing Built in adjustable auto close none 30 60 90 seconds Built in motor running limitation max 90 sec Reliable electromagnetism limit for easy adjustment Can be equipped with a wide range accessories Installation Overview Sliding Gate Alarm Lamp __ Higher Magnet Concrete Pad Gate Operator Rack Lower Magnet Installation of the Opener Caution Be sure that the opener is installed in a horizontal and paralleled position and is properly secured Improper installation could result in property damage severe injury and or death Before starting installation ensure that t
8. aeeeaeeeeeeeeeeaeaes 9 Connecting of Power Supply cccccecec eee ce eee eect eee eee ea eae ease eases e eee eeeeeeetgegaeseaeeeeseneaes 10 Connecting of the Control Board ccc cece cece cece ee eee eee eee eee eee eee eee eee eee eee eee ranner terrenet 11 Setting of the Control Board cccccc cece eee ee eee eee eee eee eee ences eee e eee ease eeeeeneeeeeaseeeeteees 12 Test the reversing sensitivity ccc cece cece eee eee eee eee ene ee eee ence sean een ee ea ea esa naesaaeaaaeeeneees 14 How to learn or erase the remote cccceece eee ee eee ee eee eee ee ence ne eee eee cee e nent eee neetae 14 How to use the remote to control the Opener ccceceee cece eect eee e eect eee cent ee eee tees tees eaeeeeaeaes 14 Trouble Shootings e e een A Gelade a e a Pade eee nee lasting acide dard sta ate 15 Maintenance nerne a a a O oA N heed EE a OSANA aa i ORE ata ia O 16 Thank you for purchasing DSR 600 DSR 1000 sliding gate opener We are sure that the products will be greatly satisfying as soon as you start to use it The product is supplied with a user s manual which encloses installation and safety precautions These should be read carefully before installation and operation as they provide important information about safety installation operation and maintenance This product complies with the recognized technical standards and safety regulations General Safety A WARNING An
9. aker with a 30mA threshold is fitted before the power supply mains NOTE The protection class of the emergency stop switch should be at least IP44 Connecting Of The Control Board CONTROL BOARD GAGS CJZIEI GSLiED CALE MOTOR LL COM RL LAMP PHOTOCELL PUSHBUTTON LOCK LOOP 24VDCOUT BAT Reserved reserved reserved Limit Switches Battery LM125 Alarm Lamp LM140 1 RED Emitter Receiver ae OUT TERMINAL IN RECEIVER D nee TERMINAL IN RECI 716 A I Es aaa E l External Receiver LM138 Photocell LM102 TERMINAL IN EMITTER l OOOO Loop Detector LM154 Push Button LM145 Wired Keypad LM106 24 1 Motor The YELLOW wire of the motor should be connected into the 1 terminal The RED wire of the motor should be connected into the 2 terminal 2 Limit Switches The YELLOW wire of the limit switches should be connected into the 3 terminal The BLACK wire of the limit switches should be connected into the 4 terminal The RED wire of the limit switches should be connected into the 5 terminal 3 Alarm Lamp 24VDC The WHITE wire of the alarm lamp should be connected into the 6 terminal 11 The RED wire of the alarm lamp should be connected into the 7 terminal 4 Photocell Use a 2 core cable to connect the terminal of the photocell s emitter to the 16 terminal the terminal to the 17 terminal Also t
10. d close toward right eee 2 Potentiometers Potentiometer A and B are used to adjust the stall force of the gate opener Both two potentiometers of factory default force have been set to at 15 00 o clock Turn the potentiometer clockwise to increase the stall force Turn the potentiometer counter clockwise to decrease the stall force 13 Potentiometer A Potentiometer B Control Board MAX MIN Test the reversing sensitivity For the sake of safety it is very important to test the reversing sensitivity as soon as the control board set is finished The reversing sensitivity adjustment is inverse correlation with stall force adjustment in potentiometer A and B In other word the stall force level is higher the reversing sensitivity level is lower Put an immobile object along the gate path and then operate the gate to strike it during the open and close cycles The gate must reverse as soon as object is struck with it If the gate doesn t reverse please increase the reversing sensitivity by turning the potentiometer in counter clockwise direction Turning the stall force potentiometer toward to MIN position to increase the reversing sensitivity Note 1 If the sensitivity setting is too higher the gate will stop or reverses very easy by itself while there is little obstruction or resistance such as strong wind or heavy snow sometimes Note 2 Always check the gate reversing function every each time o
11. f control board set or restart after power off How to learn or erase the remote REM LED PWRLED Learn the remote Press and release the learn button the REM LED light will be on then press the key in the remote twice Learn Button in 2 seconds the REM LED light will flash for 4 eo seconds Now the remote has been learnt successfully Erase all the remote codes Press and hold the learn button until the REM LED light is off Now all remote codes have been erased How to use the remote to control the opener KeyA REMOTE Key 8 Key A is used to operate the opener to work alternately open stop close stop open When the Pedestrian Mode function is enabled Key B is used to achieve the Pedestrian Mode function open the gate for the pre setting time When the Pedestrian Mode function is disabled the opener works alternately open stop close stop open by pressing Key B Troubleshooting Have a multimeter to check voltage and continuity Use caution when checking high voltage terminals Symptom Possible Solution s The opener does not run Power LED is OFF 1 Make sure that the power cord is properly plugged into the mains outlet 2 Check if the output voltage of the transformer is 24VAC If the voltage measures 0 the transformer may be overheated or damaged Turn power off and allow board to cool for several minutes then reset Replace the transformer if the symptom still exists 3 Check the fuse in t
12. he and terminals of the photocell s receiver should be connected to the 16 and 17 terminals in parallel Use another 2 core cable to connect the OUT terminal of the receiver to the 8 terminal the COM terminal to the 9 terminal 5 Push Button The push button should be wired to the 10 and 11 terminals The gate opener works alternately by pushing the button open stop close stop open 6 Loop Detector First insert the LOOP DETECTOR BOARD into the CONTROL BOARD and then connect the twisted pair to the 14 and 15 terminals 7 External Receiver The BROWN wire of the external receiver should be connected into the 11 terminal The BLACK wire of the external receiver should be connected into the 16 terminal The RED wire of the external receiver should be connected into the 17 terminal 8 Wired Keypad 24VDC The RED wire of the wired keypad should be connected into the 17 terminal The BLACK wire of the wired keypad should be connected into the 16 terminal The BLUE wire of the wired keypad should be connected into the 10 terminal The WHITE wire of the wired keypad should be connected into the 11 terminal 9 Battery The negative terminal of the battery should be wired to the 18 terminal The positive terminal of the battery should be wired to the 19 terminal 10 Solar panel Please refer to the manual
13. he control board Replace the fuse if it was burnt out 4 Check the control board Replace the control board if necessary The opener does not run Power LED is ON 1 Check to be sure the beam is not blocked if a photocell is used as a secondary entrapment prevention device If a photocell is not used terminal 8 should be shorted with terminal 9 by a jumper wire 2 Check the motor Release the clutch then disconnect the wires of the motor from terminal 1 and 2 Connect the wires to the terminal 16 and 17 directly the motor should run and then exchange the wires the motor should run in the opposite direction If the motor runs in both directions please check the other parts listed below 3 Check the limit switches Use a jumper wire to short terminal 4 with terminal 3 and 5 and then use a keying device to operate the opener replace the higher limit switch if the motor couldn t run in clockwise direction and replace the lower limit switch if the motor couldn t run in counter clockwise direction 4 Replace the control board if the motor runs in all steps above Remote control does not work 1 The indicator light of remote control is not on Check the battery in your remote control Replace the battery if necessary 2 The distance you use the remote is too far away from the opener Try it again closer 3 Remote control is not suitable for receiver After making sure the codes are correct erase remote controls and
14. here is no point of friction during the entire movement of the gate and there is no danger of derailment Ensure that the Warning Signs are present pf Hex Bolt M8x30 4 pes H aot Spring Washer 8 4 pcs Plain Washer 8 4 pcs Gate Operator Hex NutM10 4pcs qe o Doj Spring Washer U 1 7 x ae 10 4 pes Big Plain Washer 10 4 pcs Base Plate 1 pc Anchor Bolt 4 pcs Cable Conduit Concrete Pad 600 mm Necessary Tools The following tools may be necessary to install the Gate opener You will need screwdrivers an electric drill wire cutters and a wire stripper a socket set and possibly access to a welder When install the opener you should build a concrete pad to support the base plate of opener in order to maintain proper stability The installation proceeds are as follows 1 Dig a hole for a concrete pad which should be approximately 600 x 320 x 350mm 24 x 13 x 14 It may protrude 100mm 4 above ground and 250mm 10 in depth underground Increase the pad height if necessary to protect the system from flooding heavy snow etc 2 Prepare one or more conduits for the electrical cables before pouring concrete Remember that cable conduits have to pass through the hole in the base plate 3 Pour concrete and before it starts to harden check that it is parallel to the gate leaf and perfectly level 4 The four anchor bolts must be set into the co
15. incorrect installation or improper use of the product can cause damage to persons animals or properties e Scrap packing materials plastic cardboard polystyrene etc according to the provisions set out by current standards Keep nylon or polystyrene bags out of children s reach e This product was exclusively designed and manufactured for the use specified in the present documentation Any other use not specified in this documentation could damage the product and be dangerous e The factory declines all responsibility for any consequences resulting from improper use of the product or use which is different from that expected and specified in the present documentation e Do not install the product in explosive atmosphere e The factory declines all responsibility for any consequences resulting from failure to observe Good Technical Practice when constructing closing structures door gates etc as well as from any deformation which might occur during use e Disconnect the electrical power supply before carrying out any work on the installation Also disconnect any buffer batteries if fitted e Fit an omnipolar or magnetothermal switch on the mains power supply having a contact opening distance equal to or greater than 3 5 mm e Make sure a residual current circuit breaker with a 30mA threshold is fitted before the power supply mains e Check that earthing is carried out correctly connect all metal parts for closure doors gates etc a
16. ncrete when it is poured make sure the position of anchor bolts was placed according to the position of mounting holes on the base plate before concrete become harden 5 Mount the base plate to the concrete pad 6 Place the opener onto base plate Check that it is perfectly parallel to the gate and then screw the four bolts and washers supplied It s only temporary installation Further adjustment will be required when install the rack Manual Operation The opener should be put in the manual emergency release position before fitting the rack installing the opener and limit switch The process is as follows 1 Take off the rubber stopple 2 Insert the Release Key provided and turn it in counter clockwise 180 to disengage the clutch between the gear shaft and power output Now the opener is in the manual operation Release Fit the Rack There are two kinds of rack available as per your options which are steel reinforced plastic rack and galvanized steel rack The galvanized steel rack is usually used for the heavy duty gate A Fit the plastic rack reinforced with steel 1 Start with gate in closed position 2 There are four sections of plastic rack which is one meter length each section for standard package you can order extra rack from dealer if necessary 2 Put one end of rack section on the gear of opener as a temporary support Make rack level and mark the rack s mounting holes four holes for light duty or
17. nd all system components provided with an earth terminal e Fit all the safety devices photocells electric edges etc which are needed to protect the area from any danger caused by squashing conveying and shearing e Position at least one visible indication device Alarm lamp and fix a Warning sign to the structure Install Warning Sign On Both Sides Of The Gate T Moving Gate Can Cause Injury Or Death 1 Keep Cloar Gate may move at any time N Don t remove this warning label Made in China e The factory declines all responsibility with respect to the automation safety and correct operation when other supplier s components are used e Only use original parts for any maintenance or repair operation e Do not modify the automation components unless explicitly authorized by the factory e Instruct the product user about the control systems provided and the manual opening operation in case of emergency e Do not allow persons or children to remain in the automation operation area e Keep radio control or other control devices out of children s reach in order to avoid unintentional automation activation The user must avoid any attempt to carry out work or repair on the automation system and always request the assistance of qualified personnel e Anything which is not expressly provided for in the present instructions is not all
18. owed e Before installing the gate opener check that all moving part as well as the sliding gate is in good mechanical condition correctly balanced and opens and closes properly e Save these instructions for future use Preparation for Installation Before proceeding to your opener installation check if your gate structure is in accordance with the current standards especially as follows The gate sliding track is linear and horizontal The wheels are suitable for use The gate should be mounted and moved freely Check that the structure is sufficiently strong and rigid and that its dimensions and weights conform to those listed in the specifications table of this document Make sure that the gate is plumb and level The fence posts must be mounted in concrete The gate does not bind or drag on the ground e The gate manual operation can be carried out smoothly along its entire run and there is no excessive side slipping The opening and closing gate stops are positioned A WARNING Remember that control devices are intended to facilitate gate operation but can not solve problems due to any defects or deficiency resulting from failure to carry out correct installation or maintenance Take the product out of its packing and inspect it for damage Should it be damaged contact your dealer Remember to dispose of its components cardboard polystyrene nylon etc according to the current prescriptions Refer to the following Figures for
19. t so that the opener will stop at the desired open position when the open limit switch approaches it The higher magnet component must be installed at left side and lower magnet component must be installed at right side from the view inside of property Finally adjust the magnet to the proper position by moving the gate with the motor The magnet should be 39 59 away from the magnetic limit switch If it is too far away the switch will fail to work The distance between the magnet and the opener should be 1 2 12mm with the opener cover on Adjust the position of the magnet until the positions of the opening and closing meet the requirement Connecting Of Power Supply eR The power supply cord should be at least HOSR1V F 3x0 75mm2 J Connect the live wire neutral wire and earth wire to the L N and PE terminal respectively It is strongly recommended that an emergency stop switch is installed in the electrical system which can be used in case of the remote control failure You can connect the switch by the following steps B coe 1 Cut off the wire which has been connected between terminal A a ae 4 and 5 in factory to deactivate the existed short circuit of IM icte ARS IBN terminal 4 and 5 loli SZ a 2 Solder the two wires to the terminals of the switch respectively D O g NOTE The power supply cord is not included in the package NOTE Make sure a residual current circuit bre
20. then re program the codes in the device 4 Replace the control board The gate starts but it is immediately stop or reverse 1 Check that the clutch is adjusted properly and is not slipping 2 The opening force or closing force is adjusted too small Turn the Potentiometer A to increase the force 3 Disconnect the gate from the gate opener and check that the gate slides freely without any binding 4 Replace the control board The gate opens but stops and will not return 1 Please note the two magnet brackets fixed plate are different one is higher and another is lower Please try to exchange the two brackets position 2 Please try to exchange the limit switch wires CL close and OP open 15 3 Maybe the magnet position was installed in the middle so it inducts both switches Adjust the magnet higher or lower 1 Photocell is obstructed Remove obstruction 2 The limit switch is failed Use a jumper wire to short terminal 4 with terminal 3 and 5 and then use a keying device to operate the opener replace the higher limit switch if the motor couldn t run in clockwise direction and replace the lower limit switch if the motor couldn t run in counter clockwise direction 3 Replace the control board The gate can open but fails to close Maintenance Every six months check the following items for proper operation of the unit Lubricate shafts and sprockets Keep
21. way mode function would be disabled if both DIP switches are turned off Factory default setting is disabled 12 3456 7 8 Running time of the opener in pedestrian mode is 2 4 6 seconds DIP Switch 3 5 Fine adjust the soft stop period of the motor DIP Switch 3 ON 1 Second OFF 0 DIP Switch 4 ON 2 Seconds OFF 0 DIP Switch 5 ON 4 Seconds OFF 0 NOTE Every time you restart the gate opener after power off you should use the access control device such as remote push button and etc to operate the gate opener to run for a complete opening cycle and a complete closing cycle to get the full opening time and the full closing time You would achieve the soft stop in your next opening closing cycle Factory default soft stop time is 0 Second You can turn the DIP switches on off to fine adjust the soft stop time to meet your actual needs 12345678 DIP ON The soft stop period of the motor is 1 2 3 seconds DIP Switch 6 7 Auto close time of the gate opener DIP Switch 6 ON 30 Seconds OFF 0 DIP Switch 7 ON 60 Seconds OFF 0 NOTE The auto close function would be disabled if both DIP switches are turned to off factory default setting Auto close time of the gate opener is 30 60 90 seconds DIP Switch 8 Left Right open r ON Right open factory default setting For gate to open toward right and close toward left OFF Left open For gate to open toward left an

Download Pdf Manuals

image

Related Search

Related Contents

ELFOROOM IN 5-11-15  Operation and Installation ATR833A-OLED  Vigo VG15220 Installation Guide  Manuel utilisateur - aks  Untitled - Racer Parts Wholesale  

Copyright © All rights reserved.
Failed to retrieve file