PERCEPTION Getting Started Guide
Contents
1. NI OJAJ A O Po Indirect Cost Costs which are incurred for common or joint objectives and which are not readily subject to treatment as direct costs Indirect costs include overhead G amp A and any material burden 222 Glossary IPT Interim Product Team is an optional level of the COA hierarchy It is an organization structure of multiple skills and expertise engaged in planning and managing the labor and material requirements for manufacturing an interim product such as an outfitted hull block An IPT ID is limited to a maximum of 8 alpha numeric characters The combination of Contract Project COA Group COA Sub Group Supervisor IPT must be unique JIT Just In Time manufacturing philosophy designed to bring inventory balances down to zero without jeopardizing production schedule requirements An extension of MRP ensures that all the correct material is available at the correct place at the correct time In contrast to MRP JIT has been usually applied to industries featuring batch repetitive process manufacturing where costs are collected and controlled by time period or process JIT zero inventory concepts however have equal application to job shop or prototype manufacturing supported by MRP Last Rec d Date The date PO items are actually received by the yard Both the purchase order item and the requisition item are updated with this date If an item is received in partial quantity sh
2. Defining Ship Characteristics Ship characteristics identify the ship design its physical and operational attributes The Ship Characteristics library consists of four inter related tables Characteristic Types identify basic types of characteristics such as operational physical hull physical cargo etc Characteristics is the master list of ship design characteristics each cataloged by type Default Characteristics are characteristics selected from the master list to be used as a default set of characteristics when a new project is defined The user then should define the specific values of these characteristics for the project Ship Type Characteristics allows the user to develop another list of characteristics specific to each ship type These characteristics are in addition to the default characteristics These ship type characteristics also will be loaded under a project when a new project is defined with a specific ship type designation Type of Ship Characteristics To set up the types of ship characteristics select Library Ship Characteristics Characteristic Types The system will display Figure 5 15 The procedures for retrieving adding changing and deleting Characteristic Type records are the same as those outlined in General System Operation Characteristic Types Information for the Estimating Environment Characteristic Type Description l1 Cargo Cargo Characteristics 2 Coefficients Design Coefficents 3 Co
3. 17 Chapter 3 The Grand Tour FILE File provides the following New Ctrl N Open Ctri O Close Gave tS Save As Save As Web Page Save Work Space Page Setup Print Preview Printer SetUp Print Screen Print Immediate Print Ctrl P Print Bar Code Label Send To Mail Recipient As Attachment Properties PDF Writer OO Recpient List Recent gt Current Data Window Report Exit METRE Gurr O2t2 Window Report Figure 3 3 File Menu Selections e New provides user convenient wizards for starting new contracts and projects For details refer to the chapter Starting A New Project in this manual e Open e Close the active window e Save returns all of the current window s information for storage onto the system database e Save As copies the full contents of the window information to a file The user is given the option to specify the format for this file Microsoft EXCEL SQL text etc e Save As Web Page copies the full contents of the window information to a file The format of this file is HTML e Save Work Space freezes all open windows and their contents so that the user may exit the system and later return to these same windows e Page Setup specifies which pages to be printed e Print Preview displays the contents of a report window as it will be printed To return the window back to its non preview form click off the File Print Pr
4. 224 Glossary Late Start Latest possible start date for an activity after all float time has been used Any further slippage in starting the activity will slip the overall project completion date unless the activity duration time can be compressed in direct proportion to the additional amount of slippage LCC Life cycle costs LCC include design and acquisition production costs as well as operations and supports costs Life cycle costs have often been a major consideration for commercial ship owners who must look at the bottom line for profit and a return on their investment If the cost of design and construction including the cost of money cannot be recouped within a reasonable amount of time the ship will not be built If the operating and maintenance costs plus amortized construction costs exceed operating revenues again the ship will not be built When viewing the life cycle cost breakdown only about 25 of the costs may be directly related to acquisition 1 That means 75 of the total cost is operation and support and is made up of personnel maintenance and modernization For naval ships the largest of these 37 is personnel cost followed by maintenance 21 and modernization 13 Therefore in order to obtain a more complete picture of the overall cost of a ship its life cycle costs may need to be estimated and evaluated The life cycle of a ship or a piece of equipment is divided into essentially four stage
5. 53 Chapter 3 The Grand Tour e Help loads the user manual e Exit ends the session The second toolbar provides the following Close the active window workspace Print the data as displayed Save changes to all records in the active window workspace Cut removes selected record s or data to the Windows clipboard Copy copies either selected record s or data to the Windows clipboard Paste inserts either data in a column or row s from the Windows clipboard Select All selects and highlights all of the rows that have been retrieved this can also be accomplished by clicking on the upper left blank heading box e Delete will delete selected records e Add allows the user to add a new record e Retrieve provides the option to view a different set of records e Reselect Rows will re retrieve the selected records to reflect the data as it is currently saved on the database e Find searches for a string in a specific column in the rows which have been retrieved e Replace searches and replaces a string with another string in a specific column in the rows that have been retrieved or imported NOTE Care should be exercised when using replace Replace is intended for a situation where new records have been imported and a global change is required in these records The error checking that takes place after a replace is not as complete as when new data is typed into a column e Sort opens an option window that contains th
6. Chapter 6 Starting A New Project Project Details Information Details Options Mitestones Characteristics Perception WBS Cost Estimating Material Base Year 2001 Labor Rate Year 2001 Cost of Money 0 00 Default WWBS SVVBS Group Scheme 3 Character Accounts Figure 6 6 Selecting the Project Default WBS When a WBS level is assigned to another entity cost item work order pallet etc the costs and hours from that entity will be totaled to that WBS level for a variety of analyses at each level and produce valuable conclusions about their overall costs and schedule including trends and forecasts When using multiple WBS hierarchies somewhat different statistical conclusions can be made by the system depending upon the hierarchy and its particular point of view ship system interim product or shipyard organization Since only the default WBS is required the totals in other WBS hierarchies may be incomplete For an overall assessment of project performance the Default or predominant WBS will be used by the system Cost of Money Cost Estimating For cost estimating the cost of money is a factor that is computed manually by multiplying the book value of assets times interest rates and divided by direct labor dollars This factor is then multiplied by the estimated direct labor dollars to determine the Cost of Money rate Refer to SPAR s publication Guide for Estimating New Ship
7. Ctrl F Replace Ctrl H GoTo Ctrl G Global Defaults Figure 3 4 Edit Menu Editing Selections Undo Delete negates the prior record delete from the worksheet Cut removes selected record s or data to the Windows clipboard Copy copies either selected record s or data to the Windows clipboard Paste inserts either data in a column or row s from the Windows clipboard Bulk Cut is a special cut process useful for transferring to and from spreadsheets After exercising the paste or replace function the data should be validated See the discussion on Validate in the Data Menu Section 20 Chapter 3 The Grand Tour Bulk Copy is a special copy process useful for transferring to and from spreadsheets Bulk Paste is a special paste process useful for transferring to and from spreadsheets Clear Selection deselects the selected row s Select All selects and highlights all rows that have been retrieved this can also be accomplished by clicking on the upper left blank heading box Select Row selects the entire current row and high lights the row Invert Selection will deselect all rows that are selected and select all rows that are not selected Find searches for a string in a specific column in the rows that have been retrieved Replace searches and replaces a string with another string in a specific column in the rows that have been retrieved or imported Go To allows the user to specify the row num
8. Do Not Prompt Again Note The actual deleting process if specified will only be initiated when the user Saves the worksheet Worksheet Column Copy and Paste Unlike spreadsheets like EXCEL PERCEPTION does not allow copying columns of data for pasting to columns elsewhere in the worksheet In fact if the user clicks on the column heading in the worksheet the system will automatically sort the records in ascending order of the data in the column The standard Copy function will not copy the contents of the column The following outlines a procedure using the Bulk Copy and Bulk Paste options in conjunction with EXCEL to effect a column copy operation e Highlight selected rows in the PERCEPTION worksheet and click on Bulk Copy not standard Copy with preferred option to include column headings e Open EXCEL focus the cursor on row column A1 and click Paste into EXCEL e In EXCEL Copy selected column and Paste into column to receive this data e In EXCEL highlight the rows of data including the columns headings is optional and Copy e Re open PERCEPTION worksheet and click on Bulk Paste not standard Paste 69 Chapter 4 General System Operation Worksheet Row Copy and Paste The standard Copy and Paste operation will work with entire rows of data in the worksheet However it will only work pass system validation if the user has the cursor on a new record at the first column position of that row prior to
9. Planning amp Scheduling Toolbox Rollup Manpower Reports Exceptions Figure 3 15 Environment Planning amp Scheduling Menu Selections e Import MS MPX Schedules allows schedule activities developed in Microsoft Project to be imported into the PERCEPTION database e Synchronize Schedules To MS Project provides options for obtaining schedules for planning activities directly from the MS Project 2000 database or to update the Project 2000 database with current schedule status of PERCEPTION planning activities e Adjust Work Orders to Current Plan provides an option to re schedule project work orders to current planning activities schedules e Planning Activities provides direct access to PERCEPTION schedule planning activities e Planning and Scheduling Toolbox provides a variety of functions for editing and manipulating planning information e Rollup provides the user with options for re computing data summaries throughout the contract project work breakdown structures Specifically the user may perform rollups on baseline schedule data e Manpower provides a manpower analysis based upon planned actual forecast requirements e Reports provide access to all schedule planning related reports e Exceptions provide access to all schedule planning related exception reports 35 Chapter 3 The Grand Tour Production Engineering Environment has the following choices Figure 3 16 Environment Cost Estimati
10. Purchase orders can be generated directly for projects but only after the vendor has been defined on the system A list of vendors complete with address information is a required library for purchasing Other libraries used for purchase orders are the following e Currency e Standard Terms e Standard Clauses 104 Chapter 5 Starting A New System amp Database If purchase orders are to be developed for stock items and standard parts the Parts Catalog also must be installed onto the database The Parts Catalog also allows parts to be classified by Part Class and Sub Class so these tables need to be defined as well Libraries Used By Stores Management Stores management focuses on the following basic functions Delivery receiving QA inspections Material location and distribution management Stock inventory replenishment Material issues to production Pallet fitting Therefore all libraries required for purchasing also are required for stores management Libraries Used By Accounting PERCEPTION provides electronic interfaces with accounting systems that eliminate costly and time consuming duplicate data entry operations with Payroll General Ledger Accounts Receivable and Accounts Payable systems Several libraries are required before interfacing with these accounting systems General ledger accounts Employees Labor Types Customer names and addresses Interfacing With Financial Accounting Systems P
11. 0 through 9 special characters Due to internal operating requirements of database functions the system will not accept the following special characters in ID fields t t amp A lt SE ea og 175 Appendix I Operating Windows Associated Reports The chapter The Grand Tour in this manual describes the various reports available from Reports on the main menu However most worksheets estimating cost items requisitions purchase orders work orders etc offer the associated reports button on the toolbar By clicking on this button the system will display a pop up window Figure I 2 that lists the various system reports available for the information displayed in the worksheet By clicking on one of these report selections the system will generate that report directly but only for those items selected highlighted in the worksheet Select Associated Report To Run greeeeeesosesoeeseororesoseosonoeoseseenseoos Report Listing Report DE10 Requisition Item Purchase Status PO6 Requisitions Due for Purchase but Not on Purchas Print Request for Quote R1 Requisition List R2 Requisition Item Listing R3 Requisition Purchase Summary Status o oe te Figure I 2 Associated Reports Selector 176 Appendix II Viewing AutoCAD Drawings Appendix II Viewing AutoCAD Drawings A feature of PERCEPTION allows the viewing and printing of AutoCAD drawing files Before
12. By clicking on a specific level of interest and then clicking on the right mouse button a pop up menu as is shown in Figure 7 1 with options will appear The following describes each of the options currently available Details provide a summary of detail information for that level of the project Figure 7 2 is a sample of a detail worksheet for a project summarizing cost estimate information Contract PD 337 Description Ship 2 Project338 000 ShipType PAL H Labor Material SubCon Travel Hours 871 050 55 0 00 Cost 17 421 011 00 f 18 707 142 59 Profit 0 00 f 1 870 714 22 GBA 0 00 2 806 071 59 Overhead 8 71050550 O00 LocalTax 0 00 f 935 357 35 Federal Tax 0 00 0 00 Sub Totals 26 131 516 50 24 319 285 75 Start Date 00 00 0000 Min Risk 45 575 047 75 Weight Finish Date 00 00 0000 Total Cost 50 450 802 25 of Cost Items 385 Max Risk 74 713 789 90 Figure 7 2 Detail Worksheet Summarizing Cost Estimate Information Project Level Composite Cost Summary summarizes cost and schedule information for all major applications of the system the cost estimate ESTI MATE the planned schedule labor cost and schedule performance WORK PAC material cost and schedule performance MAT PAC and miscellaneous notes that can be entered by the user Use the down scroll to view the entire display of information Figure 7 3 134 Chapter 7 Project Navigator Details For Selected Leve
13. CER Equation Type Internal Code Description 1 Structure 2 Machinery 3 Pipe 4 Electrical 5 HVAC 6 Outfit 7 Paint 8 Miscellaneous CER Equation Labor Material Flag Internal Code Description 0 Material CER 1 Labor CER CER Type for IP Packages Internal Code Description 1 Manual CER 21 Structure CER Table 22 Machinery CER Table 23 Pipe CER Table 24 Electrical CER Table 25 HVAC CER Table 26 Outfit CER Table 27 Paint CER Table 28 Miscellaneous CER Table 41 Structure EQUATION CER Table 42 Machinery EQUATION CER Table 43 Pipe EQUATION CER Table 44 Electrical EQUATION CER Table 45 HVAC EQUATION CER Table 46 Paint EQUATION CER Table 47 Outfit EQUATION CER Table 48 Miscellaneous EQUATION CER Table 10 PWBS CER Table 11 SWBS CER Table 12 COA CER Table 195 Appendix VI Internal Database Codes Tool Status Indicator Internal Code Description 1 In 2 Out 3 Lost 4 Damaged 5 Inactive 196 Appendix VII Record Keys Appendix VII Record Keys All tables in the system database contain records that are uniquely identified by keys These keys must be unique for each record so that the system can recognize find and retrieve any record from the entire set of records on the particular table Some records have only a single key such as the employee file having only the employee ID for a r
14. Search Direction Forward meee Search Where All 5 k 4 4 x 5 siel M Match Case Figure 4 11 Find amp Replace Window Global Defaults Oftentimes when making multiple entries of new records certain data for example project number are repeated entry after entry In order to have the on make these specific data field entries automatically click on the Global button on the toolbar The system will present a Global Defaults window for the user to fill in as necessary Figure 4 12 Thereafter when a new record is added the system will automatically insert the values of these defaults into the appropriate data fields Global defaults will not apply to any existing records Also when retrieving records into a worksheet the user has the option to use these global defaults for the retrieval argument 74 Chapter 4 General System Operation Contract Work Center Rate Year 1900 4 Project I Use CERs from selected WBS Level Group c OA v Account PWBS Zonef Cost Centers Outfit Zone OoOo Division Unit Department O Assembly pooo Process Sub Assembly Superisor Part Load Cancel Reset Clear Help Figure 4 12 Setting Global Defaults SWBS Once global defaults have been set by clicking on the OK button they will be saved by the system into the user s personal registry The next time the defaul
15. S PLUS 2000 Guide to Statistics Volume 2 Data Analysis Products Division Seattle WA MathSoft Inc Getting Started with S PLUS 2000 Data Analysis Products Division Seattle WA General Shipyard Planning References University of Michigan Transportation Research Institute Marine Division Generic Basic Interim Product Matrices May 1999 U S Department of the Navy Generic Product Oriented Work Breakdown Structure GPWBS A Programmed Learning Course Carderock Division Naval Surface Warfare Center 1996 U S Department of Transportation Maritime Administration Outfit Planning December 1979 U S Department of Transportation Maritime Administration Product Oriented Material Management NSRP June 1985 U S Department of Transportation Maritime Administration Product Work Breakdown Structure NSRP December 1982 U S Department of Transportation Maritime Administration Information Required From Planning Yards to Support Zone Logic NSRP 0323 June 1991 Glossary Account A SWBS cost category to which estimated cost items can be assigned Normally the account resides at the third level of the SWBS project group account 204 Glossary An account ID is limited to a maximum of 8 alpha numeric characters The combination of Contract Project Group Account must be unique Activity See Planning Activity Activity Center A work center identified with a planning activity See Work Center Actual
16. and material commitments The Production Budgets may or may not be the same as the Baseline Budgets Production Budgets evolve as project planning advances and the scope of work becomes more clearly in focus Production Budgets also may be modified to accommodate contract change orders The total budgets are calculated by the system when each of the rollups is performed and can be viewed on any of the WBS level records Buyer Name Name of the person responsible for the purchase order The buyer s name is selected from a list of employees who are designated as buyers in the employee table CAD CAM Computer Aided Design and Manufacturing encompasses systems that automate engineering design drawing development and the manufacturing processes CAD CAM can link with MRP by automating material requirements CAIV CAIV is a formalized process for undertaking trade off studies to arrive at an affordable balance between cost performance and schedule This process is aimed at developing a best value solution and provides opportunities to explore new technologies and approaches to meet mission needs at an affordable cost 208 Glossary Calculated CERs Direct production based CERs determined from a single selected shipset of return cost data based on an actual man hour expenditure and it s associated measurable parameter e g square feet of painted area See also Direct CERs Predictive CERs and Manual CERs Center See Work
17. assemblies sub assemblies etc Library Company Parameters Units of Measure Work Centers Trades Resources Vendor Catalog Standard Parts Catalog gt Classifications Currency Sub Classifications Calendar Attributes Attribute Types Customers Catalog Fl2 Attribute Catalog Stages of Construction Part Attribute Yalue Worksheet Types of Work Block Types Ship Characteristics gt Ship Types Default Attributes for Classifications Default Attributes for Sub Classifications WBS gt WBS History Figure 3 22 Standard Parts Catalog Menu 43 Chapter 3 The Grand Tour e Ship Characteristics Figure 3 23 provides access to the types of characteristics the characteristics library the list of standard characteristics for example LOA displacement etc and groups of characteristics germane to specific ship types Company Defaults Units Of Measure Work Centers Trades Resources Vendor Catalog Standard Parts Catalog gt Currency Calendar Stages Of Construction Types of Work Block Types Ship Characteristics Characteristic Types Ship Types Characteristics Default Characteristics by Types ee Ship Type Characteristics WEBS History gt Figure 3 23 Ship Characteristics Menu e Characteristic Types allows the user to identify basic types of characteristics such as operational hull cargo etc e Characteristics allows the use
18. dates Finally a row of EXCEL data must be in the same order as that of the PERCEPTION row order PERCEPTION row order can be changed using the procedure described below Rearranging Columns on the Screen Copying and Pasting EXCEL Data into PERCEPTION Any permissible block of EXCEL rows and columns can be copied and pasted directly into any PERCEPTION data window e First highlight in the EXCEL worksheet the block of rows and columns to be copied and then click on the Copy button wide e Second click on the place in the PERCEPTION worksheet where the data pasting a should start and then click on the Paste button 2 e If the pasted data is a row of data the paste process will add the data into the PERCEPTION worksheet row beginning at this start location left to right e If the pasted data is a column of data the paste process will add the data down the PERCEPTION worksheet column beginning at this start location e EXCEL data that is not compatible with PERCEPTION see Restrictions on EXCEL Data above will be flagged by PERCEPTION as it attempts to paste in the data Figure 4 5 displays the two pop up error windows generated by PERCEPTION when an incompatibility has been detected DataWindow An Error Occured A Expression is not valid l pasteos4 Figure 4 5 Pop Up Error Messages for Incompatible EXCEL Data Pasting EXCEL Description Fields into PERCEPTION Special precautions should be taken whe
19. 110 019084999 01414999 00 00 0000 0000000 LSF 32 0 00 52 0 Preparation PW 110 019084999 01414999 00 00 0000 00000000 LSF 32 0 00 4 0 Preparation PW 110 019084999 01414999 00 00 0000 0000000 LSF 32 0 00 53 0 Parts Fabrication PAN 120 01424999 01434999 00 00000 0000M000 LSF 32 0 00 5 0 Parts Fabrication PAN 120 01424999 01434999 00 00000 COM0 000 LSF 32 0 00 41 0 Parts Fabrication PA 120 01424999 01434999 00 00000 0000M000 LSF 32 0 00 42 0 Sub Assembly PA 130 014441999 01454999 00 0000 0000000 LSF 32 0 00 54 0 Sub Assembly PA 130 01444999 01454999 00 00000 0000M000 LSF 32 0 00 6 0 Sub Assembly PY 130 01444999 01454999 00 0000 00000000 LSF 32 0 00 7 0 Assembly PW 140 01484999 01 214999 00 00000 00000000 LSF 64 0 00 Figure 4 17 Report Sorted In Planned Start Date Order Modifying amp Editing Reports and Worksheets PERCEPTION allows the user to customize most worksheets in the system worksheets free form worksheets and system reports In every worksheet the user can rearrange and hide unwanted data columns and re label all column headers Similarly in free form worksheets and reports the user can rearrange and hide un wanted data blocks and modify the text labels This means that the user can replace English text with native language text This new feature will support different alphabets as well provided the alphabet is supported by the local Windows operating system The operation of these editing features is described in
20. AllowltemDeletesFromAppro ltems can be deleted from already approved pallets p Pallets RequireDrawingApprovalToP lt Drawings must be Approved before they can be referenced on a pallet Pallets RequireReqnitemAuthorizaticRequisition Items must be Authorized before they can be referenced Pallets RequireRequisitionAuthorizat Requisitions must be Authorized before they can be referenced on a PartsCatalog RequireAttributes All Parts added to the Catalog must have at least one Attribute assigi POs AllowEditsOfApprovedPOs Purchase Orders that are Approved by Owner can be edited POs AllowEditsOfAuthorizedPOs Purchase Orders that are Authorized can be edited POs AllowltemDeletesOfApprovedPCltems can be deleted from already approved Purchase Orders POs AllowltemDeletesOfAuthorizedFltems can be deleted from Purchase Orders that are Authorized by o POs AutolncrementPOltemNumbers PO Item Numbers will be Auto Incremented POs AutalncrementPONumbers PO Numbers will be Auto Incremented using Company Zero Padding POs PrintPOltemDetails Print the Project Account Quantity and Need Date details for each F POs PrintTagOnPurchaseOrder Print the Tag on the next line after the Description for each item on th POs RequireAmendToChangelssuedissued Purchase Orders must be Ammended before they can be chai POs RequireAuthorizeTolssuePO Purchase Orders must be Authorized before they can be issued POs RequireOwnerApproveTolssueP Purchase Orders must be Approved by Owner before they can
21. Class VALVE Valve Part Class Valves Valves E Part Class Weld Welding E Part Class Welding Welding E Parts Catalog Details Composite Cost Summary Properties GoTo Management Graphs Figure 7 1 Project Navigator WBS Company Parameters Perception Parts Calde Company Parameters CQ Work Centers 5 Block Types Block Type A Double Bottom Block Type B Single Bottom Block Type C Tank Top Block Type D Deck Block Type E Side Shell a Work Stages Stage AS Assembling Stage DE Design Stage DL Delivery Stage DS Designing Stage EN Engineering Stage ER Erecting Stage FB Fabricating Stage GB Grand Block Constructing Stage LA Launch E Stage MM Material Menagement Stage OB On Block Outfiting Stage OO On Board Outfiting Stage OU On Unit Outfiting Stage PA Painting Stage PD Post Delivery Stage PL Planning GB Stage PR Purchasing Stage SA Sub Assembling Stage TE Testing amp Trialing Ea Work Types E Work Type AD Administration Work Type AS ASSEMBLY FIT Work Type EG ENGINEERING Work Type EL Electrical 133 a Chapter 7 Project Navigator
22. Color Codes The system provides no color coding for vendor invoices Schedule Planning Activities Color Codes The system color codes records in the Planning Activities worksheet e Gray Non critical path activities e Red Activity has been flagged as being on the critical path 189 Appendix V Function Keys Appendix V Function Keys The system supports a variety of function keys as short cuts to a number of different operations Some short cuts use the function F keys at the top of the keyboard Others use a combination of Ctrl key held down then pressing another key on the keyboard The following table lists all available function keys supported by the PERCEPTION system Function Ctrl Key New Contract Project Wizard Ctrl N Retrieve records Ctrl R Add records Save records Ctrl S Close window Print Ctrl P Access Parts Catalog Vendor Invoice Items Add Parts Vendor Invoice Items Receive Items Vendor Invoice Items Stub out PO for invoice Ctrl X Ctrl C Ctrl V Ctrl A Ctrl F Ctrl H Ctrl G 191 Appendix VI Internal Database Codes Appendix VI Internal Database Codes PERCEPTION selectively uses various coding schemes for managing information on the database These codes are often used for data fields that are used in drop down data selection boxes The following outlines the various
23. Construction for more information on cost of money Base Year Cost Estimating For cost estimating the base year identifies the year for which the cost estimate is to be provided It is used by material cost escalation formulas Refer to SPAR s publication Guide for Estimating New Ship Construction for more information on cost escalation Labor Rate Year Cost Estimating For cost estimating Labor Rate Year is the year used to determine what labor rate applies for the cost estimate from the work centers sets of yearly rates 123 Chapter 6 Starting A New Project Accounting Information Requirements For Active Projects In order to properly support the accounting systems that interface with PERCEPTION refer to the PERCEPTION manual Accounting Functions and Interfaces for details each project also requires additional information e Project General Ledger Accounts Environment Accounting Project Accounting System Setup e Billing labor rates Environment Accounting Rate Tables e Customer name and address Environment Accounting Customers The project General Ledger Accounts define what GL accounts the various revenue and expense accounts will be applicable for the project Refer to the PERCEPTION manual Accounting Functions and Interfaces for additional details The billing labor rates will define what labor rates discernable by work center will be applied to any time and materials labor charg
24. Drape Hanger 1zh7 H Cabinet Maker 1618 H Cabinet Maker Apprentice 1919 H Laborer 2020 H Center Manager 2121 H Pipe Worker 222 H Pipe Worker Apprentice 2361 H Marine Steel Fitter Figure 5 10 Trade Resources 93 Chapter 5 Starting A New System amp Database Defining Stage of Construction When a cost item is created it can be assigned to one of the pre defined stages of construction or work types In addition to the many summary and cost reports that can be run for the traditional PWBS both the Summary reports and the Cost Item Value reports can be run and will group and total by the GPWBS stage or work type The stage level includes the divisions of the shipbuilding process classified into non construction and construction processes by sequence The stages are not assigned to a specific contract and project but rather are generic to all construction Stages of construction as well as work types can be mapped to a generic category or GPWBS The GPWBS structure allows you to further define each PWBS level with a set of generic attributes that describe that product structure in terms that can be used across types of ships or even different shipyards Typical non construction stages are designing planning procurement material management launching testing delivery etc Typical construction stages are fabrication sub assembly assembly on block installation on board installation block erection etc To define stages se
25. Enter the name for the highlight area data space as EXPORT use all capital letters in the Names in Workbook window field This will provide the specific name that PERCEPTION will look to use for the importing process e Click on Add e Click on Close EXCEL Importing Once the EXCEL workbook file has been properly prepared as described above it is ready for importing into PERCEPTION The user must open the specific window prior to making the import from EXCEL Once the PERCEPTION worksheet window is open the user can begin the importing process e Select Data Get External Data from the main menu e Ifnecessary change the Look In directory to the directory where the EXCEL file resides e Select the File Type as EXCEL files e Select the EXCEL workbook file to be used for importing its data Once the EXCEL file has been opened PERCEPTION will present a split screen to the user This split screen allows the user to map the headings of the EXCEL worksheet columns against the equivalent headings of data for the PERCEPTION worksheet The descriptions that appear in the Transfer Column Data From are the column headings that the system found in the EXCEL file first row of the highlighted data space Across from these EXCEL headings on the split screen are the corresponding headings for PERCEPTION Figure 9 2 To select the correct heading in PERCEPTION e Click on the drop down arrow e Click on the correct PERCEPTION heading that a
26. For more information about the use of PWBS the user should refer to SPAR s Planning New Construction amp Major Ship Conversions Project Code of Accounts COA The Code of Accounts work breakdown structure is the shipyard s specific work breakdown structure or set of cost codes Typically COA identifies the shipyard organization and areas of responsibility These areas also can identify various manufacturing processes This structure can be completely separate from any of the other work breakdown structures in the system and can complement them It is an optional structure that can be used to catalog and collect costs The COA is a three 3 level hierarchy of cost codes consisting of Department COA Work Stage and Process Example Production Outfit Pipe Fabrication Shop Pipe Bending Not all levels of COA need to be used An abbreviated use might be using only two levels Building and Shop Each Shop may have a supervisor s name for the description so that the shipyard can use the COA summary reports to evaluate the work by supervisor Some shipyards may choose to use the following COA structure Departments Cost Centers and Trades 116 Chapter 6 Starting A New Project Since each project contains its own COA each project can have a different COA The default COA structure labels are Groups Sub Groups and Items The user can define any label structure By setting the labels all menus reports and windows
27. Jobo Project ID and Description for New Ships N Einish lt lt Back Next gt gt Cancel Project 2003 22 Description Ocean Movers Help ELA Figure 6 9 Defining the Contract Project s Enter the number of projects ships for the contract projects do not necessarily have to be ships they may be non ship projects as well Identify the type of ship s this is optional information Then enter the project identifiers and descriptions using the Add button The project ID is limited to a maximum of 8 alphanumeric characters Selecting Project WBS When the information for this window is complete click on the Next button The system will proceed to the next step by opening the next worksheet Figure 6 10 for copying project WBS information 127 Chapter 6 Starting A New Project Select Initialization Options For WBS Select the Contract and Project to copy WBS and Options from SWYBS Options Initialize SWBS from Contract and Project selected below lt lt Back Next gt gt PWYBS Options I Initialize PWBS from Contract and Project selected below 1399 01 DES 1 Cancel r COA Options Help I Initialize COA from the Contract and Project selected below 1999 01 DES 1 r Options Einish HELE M Initialize Project Options Rate Tables and Accounting Options from the Contract and Project selected below J1999 01 DES
28. LISTS FOR REPORTS c cccccsssssssssssssses 151 RECIPIENT DISTRIBUTION LIST cccccccccccssssessececccccccsssesscecceccsssessesesccsssessuussseeceeseeees 151 CHAPTER 12 INTERFACING WITH ACCOUNTING SYSTEMS ccc0088 155 CHAPTER 13 CUSTOMER BILLING INVOICEG cccccccccssssssssssessssssssssees 157 CHAPTER 14 CONFIGURING BUSINESS RULE ccccccccsssssssssscesssessssves 159 CHAPTER 15 DATA VALIDATION ccccssssssssscssssssscssssssssssssssssssssssssssssssscees 161 CHAPTER 16 EXCEPTION REPORTS cccccccssssssssssssssssssssssscssssssssssssscssscees 163 RUNNING EXCEPTION REPORTS ccccccccccccssssssscecccccccsssscssesccsscesssseusesccsssessuueuseecessseees 165 REPORT FORMATS 4S civerstaeis E E a datanpa lis Se N 167 ADDING EXCEPTION REPORTS cccccccccccccsssssssececccccceesnsceseeccsccssssueuseescceesessuaeeseecesseeaea 168 APPENDIX I OPERA TING WINDOWS 2 0 0 cccccscccscssssssssscsssssssssssesssssssssssesesess 169 PARTS OFA WINDO Wicscdis dd coc deed foe cele Se dsdbac cos caude tise sock Soeaada Sadecunca decoesesaces AA 169 SPECIAL WINDOW BUTTONS ccsssssecsccccccccssssscscccccessssessscscceccessssusseescescesssuseaensssscs 171 TYPEOF WINDOW E E E E A A ue tints vaceeads sb debecasieceba RA 172 WORKING WITH WINDOWS cccccccccccccssessssecccccecessesssceccccsscssseussececcsessuueuseeceecesesuaenees 172 MOVING ABOUT DATA FIELDS wie cccc cc cccceseececcccccccssssssc
29. Libraries Used By Cost Estimating The cost item is the basic building block of an estimate and requires both of the data types mentioned at the beginning of the chapter common use libraries and project oriented information The system requires each cost item to have the following fields completed before it can be saved to the database Contract ID project WBS information Project ID project WBS information Units of Measure from the common libraries Work Center from the common libraries Cost Item Number manually entered by user e Customer information If cost estimating is to benefit from centrally managed information then the following additional libraries need to be made available to users in addition to the complete project WBS e CER Libraries Cost Estimating Relations standard labor and or material rates per unit of measure For example so many hours per ton of steel fabrication e Package Catalog a collection of standard parts and or manufacturing processes that make up Standard Interim Products for use throughout the shipyard e Escalation used to calculate the value of materials to the material base year defined on the project option tab e Standard Parts Catalog with Classifications and Attributes e Ship Characteristics a table defined in the project characteristics tab The quantities defined here can be linked to the quantities of the cost items e Stage of Construction e Work Type Libraries Used
30. On Drawing Drawing Items should be attached to Drawings that are associated COA Group Is Invalid On BOM Item When a BOM item is associated with a COA Group that COA Grot Drawing is Invalid On Work Orders lf a Work Order is associated with a Drawing that Drawing should E Parts with Negative Qty On Hand Ifthe parts catalog quantity on hand is negative an inventory adjust Parts with Negative Total Value If the parts catalog total value is negative corrections must be A I Constrain Contract Project lt Figure 16 1 Selection Of Exception Reports The Exception Title is a brief description of the report and will appear on the top of the printed report The Exception Description is a longer more detailed description of the report and possibly the reason for running that specific report Highlight the desired report The report data can be constrained to a specific contract and project if desired Click on the Constrain box to enable the contract and project columns for typing Click on OK to run the report All exception reports will print on legal size paper so this must be available in the user s printer of choice Figure 16 2 provides a sample exception report of a PO item ETA with 7 days or later of its Need Date PO Item Schedule Exceptions Page 1 of 1 For Contract N A Project N A PO POltem CurrentETA Reqn Need Date QtyOrdered Unit Price Currency ExchRate ReqnQty Delivered Qty Amend ID
31. Paste If the cursor is not in this first column position the Paste operation will attempt to begin pasting the rows of data in the cursor column position and this will cause the system to abort the process The Bulk Copy and Bulk Paste operation however ensures that entire rows can be successfully copied and pasted into the worksheet regardless of cursor position File Save As Excel Worksheet This option is available under the File main menu and copies the entire contents of the worksheet highlighted or not into a user designated EXCEL file This option copies only the visible columns of data displayed in the worksheet and also provides the column heading names as they appear on the worksheet The resulting data can be modified and copied back using standard Windows PASTE to the PERCEPTION worksheet provided that the column order remains the same This data however cannot be pasted back to PERCEPTION using the Bulk Paste option described above This option will operate on either a grid screen worksheet or a formatted data window Sorting Records Data displayed in any worksheet can be sorted by any column of information Click on the column header and the rows of data will be sorted immediately in ascending order of the contents of that column Clicking on the column heading again will result in the data being sorted by that column in descending order Another method for sorting is selecting Data Sort or clicking on the sort butt
32. Prior moves to the previous record of selection Next moves to the next record of selection Last moves to the last record of selection 55 Chapter 4 General System Operation Chapter 4 General System Operation Generally all data entry windows tables forms etc allow the user to add change cut copy paste sort filter and delete information using the same procedures The following describes these fundamental procedures for operating the system The instructions for operating the mouse are provided in Appendix I Worksheets Worksheets are the various displays of information by the system Worksheets are used to enter data to process data to view data and to generate reports Opening Worksheets Worksheets are displayed in the workspace The various menu options provide the user with direct access to the worksheets desired Clicking on the menu selection will cause the system to open that window into the workspace However once a worksheet has been opened additional worksheets are generally available typically for details and lower level information These lower level windows can be accessed by clicking on the Drill Down button Z on the toolbar or by clicking the right mouse button This causes a sub menu to appear listing these lower level windows for the user Drag the cursor down the sub menu and select the desired menu item Closing Worksheets Worksheets can be closed simply by clicking on the X icon
33. Save as Type down arrow and select the appropriate file type If exporting to EXCEL choose the EXCEL option Enter the file name for the exported data and then click OK File Save As Excel Worksheet A special option available on the main menu is File Save As Excel Worksheet This option copies to a user selected EXCEL worksheet file all records of a PERCEPTION worksheet including all headers of the PERCEPTION worksheet Export to ACCESS or Any SQL Database PERCEPTION can export data directly to a file that can be loaded directly into ACCESS or any SQL compliant database When in any worksheet select File Save As from the main menu The system will display the Save As window Click on the Save as Type down arrow and select the SQL option Enter the file name for the exported data and then click OK 146 Chapter 9 Importing amp Exporting Data This same file now can be imported directly into ACCESS using the ACCESS File Open option 147 Chapter 10 Linking To Web Pages Chapter 10 Linking To Web Pages A feature of PERCEPTION software allows URL addresses to be saved on the vendor catalog and the parts catalog worksheet windows From these columns the user can navigate directly to an Internet web site for that vendor or part using his default browser Before this feature can be used the user must be properly set up for Internet access Using the URL Feature The column URL can be found on the
34. Scheduled BOM Bill List of Material CER Cost Estimating Relationship for estimating costs CIM Computer Integrated Manufacturing CLIN Contract Line Item Number some contract requirement for cataloging costs COA Chart of Account Breakdown Structure of Shipyard Organization CPI Cost Performance Index CPM Critical Path Method for Scheduling DWG Drawing EAC Estimate At Completion EPA Economic Price Adjustment for Inflation ERP Enterprise Resource Planning ETA Estimated Time of Arrival ETC Estimate To Complete EVMS Earned Value Management System FAQ Frequently Asked Questions FIFO First In First Out Method for Costing Stock Inventories FOB Freight On Board Freight cost included as specified by location FSC Federal U S Government Supply Classification G amp A General amp Administrative Cost A Handling Charge G L General Ledger Accounting Function GFE Government Furnished Equipment GFM Government Furnished Materiel GL General Ledger Accounting Function GST Government Sales Tax HVAC Heating Ventilating amp Air Condittioning System ID Identification Number IP Interim Product Sub Assembly Asssembly etc IPT Interim Product Team JIT Just In time Method for Replenishing Inventories LCC Life Cycle Cost Includes cost of design construction amp operation LIFO Last In First Out Method for Costing Stock Inventories LOE Level Of Effort MEL Major Equipment List MR Management Reserve MRP Material Requirements Planning NE
35. Select the contract and then click the Next button The system will proceed to the next step by opening the next worksheet Figure 6 16 for identifying one or more new projects under the contract Select Qty And Type Of Ships k Number of Ships In Contract fi Type of Ship s To Be Built ATB Project ID and Description for New Ships N Finish lt lt Back Next gt gt Cancel ELA Project Description Add Ocean Goer Help Delete Figure 6 16 Defining New Project s The New Project Wizard from this point to the end of the wizard s process is the same as for defining projects using the New Contract Wizard described above 132 Chapter 7 Project Navigator Chapter 7 Project Navigator The Project Navigator is a convenient means for displaying all WBS levels of a contract project CLINS SWBS PWBS and COA plus defined ship characteristics for the project and any design packages defined for a cost estimate Tab window options also allow the user to view common use libraries such as the list of work centers and the parts catalog Select View Project Navigator from the main menu or click on the Project Navigator button fe on the toolbar The sign beside a level indicates that lower levels are available By clicking on this the next list of lower levels will be displayed Figure 7 1 By this process the user can Drill Down into the various levels of the project P
36. The Grand Tour This sign on allows the user to choose the database that has all active on going project information or a database that maintains data for training purposes The PRESENTATION database pictured above is an example the actual DATABASE you select will be dependent upon the user and or the type of software you are using Once the user has successfully signed onto the system the Main Menu Figure 3 2 is displayed for the user Main Window The Main Window is organized in the following major processing areas The Menu Bar for system functions The Toolbar for system processes Work space Task Bar Menu Bar ToolBar Task Bar 3 Figure 3 2 Main System Menu Screen 16 Chapter 3 The Grand Tour The task bar at the bottom of your screen may differ from the one shown in the example above However you must see an application entitled PERCEPTION Total Shipyard Management encircled in figure on your task bar This represents your connection to the database This application is loaded automatically when PERCEPTION is loaded Menu Bar The Menu Bar of the Main Menu Screen provides the following supporting functions File Edit View Environment Library Data Reports Window Help Note Some of the features for example Edit that are described on the following pages may be not be active at this time but will become visible be as data is retrieved added and changed
37. Unit Assembly must be unique Baseline Budget Baseline Budget is typically the initial budget set at the on set of a contract PERCEPTION manages baseline budget on the project Planning Activity Baseline Schedule Baseline Schedule is typically the initial schedule starts and finishes set at the on set of a contract PERCEPTION manages baseline schedules on the project Planning Activity BAC Budget At Completion same as Budget BCWP Budgeted Cost of Work Performed the sum of budgets for completed work packages and completed portions of open work packages plus the appropriate portion of the budgets for level of effort For material BCWP is the sum of the budgeted costs planned for the relevant time period s actual proportion of overall expenditure The BCWP is calculated by the system when either a Production Labor Rollup or a Production Material Rollup is performed and can be viewed on any of the WBS level records BCWS Budgeted Cost of Work Scheduled the sum of the budgets for completed work packages and completed portions of open work packages plus the appropriate portion of the budgets for level of effort of work scheduled to be accomplished for the relevant time period For material BCWS is the sum of the budgets scheduled for the relevant time period 206 Glossary The BCWS is calculated by the system when either a Production Labor Rollup or a Production Material Rollup is performed and can be viewed on any of the
38. WBS level records Bid Cost The cost of a ship as quoted by a shipyard competing for the contract Block A level of PWBS project zone unit block made from assemblies sub assemblies and parts which can be joined with other blocks to form a Grand Block or can be erected individually A block ID is limited to a maximum of 8 alpha numeric characters The combination of Contract Project Zone Block must be unique BOM Bill Of Material as provided within an engineering drawing PERCEPTION enables the user to tag specific estimate cost items as BOM items The system also provides a BOM worksheet A BOM ID is limited to a maximum of 8 alpha numeric characters Bottom 5 Navy Numbers The last 5 digits of the Navy Spec Item Number See Navy Spec Item l Selected photographs obtained from www nsnet com 207 Glossary Budget Portion of the bid estimate formally assigned to production and against which cost and schedule performance and job progress can be measured PERCEPTION tracks several budgets Baseline Budget see Baseline Budget Revised Baseline Budget Production Budget The Revised Baseline Budget tracked on project Planning Activities is an update of the Baseline Budget The value of this revised baseline budget is managed for informational purposes only although the Baseline Budget may be manually replaced by this revised value The Production Budget is what PERCEPTION uses to manage production work orders
39. WOs Activities No v Req from a Released Drawing ex Schedule Quick POs From Requisitions No v PO Process Time To Negotiate and aa Issue a Purchase Order from a Req 5 Schedule All Other POs From Requisitions No PO Lead Time From 14 Reports Purchase to Receipt n s Report Header Chesapeake Marine Industries Buffer Days To Receive Process and Store Material 13 Report Footer Company Confidential Information Pallet Delay To Pick Printer Paper Size English x and Issue Material Auto Increment Regs POs and Pallets No Y Currency NAF Default Storage Location SPARHOLDER Stock Cost Method Standard Price v Email Domain Name Figure 5 21 Company Parameters In the Reports group box use the drop down list to select your preferred Printer Paper Size Then click on the Save button at the bottom of this window to update the database with the selection PERCEPTION reports use 2 different paper sizes e For English units it uses Letter 8 5x11 in and Legal 8 5x14 in paper e For Metric units it uses A4 210x297 mm and B4 250 x 354mm Depending on the specific report to be generated by the system the software automatically selects the paper size based on this setting 110 Chapter 6 Starting A New Project Chapter 6 Starting a New Project To begin a new project the following steps need to be performed Determine the project work breakdown structure that will allow a convenient yet infor
40. Workbooks MDB ACCESS databases DBF dBase version 3 DB Paradox databases CSV Comma Separated text MPD MS Project Files Importing Data Prior to importing any data the user might want to set the global defaults for the data being imported To set the global defaults click on the Global Defaults button on the toolbar This feature will automatically set those values for each row imported providing the user has NOT selected that column to be transferred If the column is selected to be transferred the value from the imported file will be added not the global default To begin the import process open the window for the module into which you will be importing the data Select Data Get External Data from the main menu The system responds by displaying the import window Choose the type of file to import in the Files of Type drop down list Files of the selected type will be displayed Figure 9 1 Select the file to import and click on the OPEN button 141 Chapter 9 Importing amp Exporting Data Select File to Import DEMO data RS centers xls Figure 9 1 Import File Selection Window If the file to be imported is an ACCESS database you will be required to select the database table to be imported Once you have selected the file and table if required to import the system will show you the columns in the file the lower half of the window and allow you to
41. above libraries make use of other libraries or they have their own subsets of libraries Vendor Catalog can use Terms and Currency Libraries Standard Parts Catalog makes use of the subset libraries Classifications Sub Classifications and Part Attributes Types A third subset library Part Type is defined in the system but cannot be edited by the user It also makes use of Unit of Measure Library and can reference the Vendor Libraries Ship Characteristics Library has two subset libraries Characteristic Categories and Master List of Characteristics It also uses the Unit of Measure Library 86 Chapter 5 Starting A New System amp Database Setting Up Company Parameters These parameters are defined at the time the system is first installed and will rarely need to be changed To display the current operations parameters select Library Company Parameters from the main menu The system will respond with the System Parameters and Company Defaults worksheet Figure 5 1 System Parameters and Company Defaults _ Company Information Company Defaults Steel Setup Tax Rates Set COA Names Accounting Company Name Chesapeake Marine Industries Long Distance 11 Address 1 927 West Street Country Code 011 Address 2 Area City Code 410 City Annapolis Phone 263 8593 State Province MD Fax 267 0503 Postal Code 21401 Country USA Figure 5 1 Company Information The name and address information found on the company
42. already defined on the database so that the new record will be accepted When all data entries are successfully cross checked by the system and saved to the database the system will display the following pop up message Figure 2 2 PERCEPTION e Your update has succeeded Please continue working Figure 2 2 System Confirmation of All Data Saved to the Database Missing Key Record Error Database records that have multiple keys belong under a hierarchy of related records For example work order records require that they belong under a specific contract and under a specific project under that contract This means that before the lower level record in this case the work order can be defined and saved to the database the higher level 11 Chapter 2 Database Structure records contract and project records must be defined and stored on the database beforehand It is not sufficient just to identify the higher level records on the work order if they are not yet defined as records on the database When a lower level record is saved to the database the system will check to ensure that the required higher level records are available so that the system can link the lower level record to the higher level records When no link can be performed the system will display an error message to the user Figure 2 3 A Database Error Has Occurred Row Number Buffer Primary Database Error Code 194 Error Message SQL
43. be defined when the purchase order is first put together or at any time that the purchase order is edited This comment if needed by the user should apply to some overall condition or status of the purchase order rather than to some specific comment about one of the purchase order items The Invoice Comment like the purchase order comment should apply to some overall condition or status of the invoice rather than to some specific comment about one of the items Both the purchase order and the invoice items also have comment columns Several of the transaction tables have a comments column The purchase order comment will print on the document when the purchase order is issued to the vendor The other comments are only visible on the individual records as a means of reference or communication between users and are not included on any reports The number of characters that can be entered in the comments column is unlimited 211 Glossary Committed Cost The current total material cost committed to a project sum of all purchase orders issued of all stock inventory items withdrawn and used on the project and all stock inventory items not yet used but held in reserve The committed cost is calculated by the system when a Production Material Rollup is performed and can be viewed on any of the WBS level records Commodity Raw material such as steel pipe insulation etc Complete The following entities can be set to Comp
44. be issi POs RequireReqnitemAuthorizationT Requisition Items must be Authorized before they can be purchased Projects Project Is Contract When the Contract is entered on a new record the Project is automa Recip ContinuePrintRecipientListOnfVVhen an error is encountered on a Recipient List continue sending ti Recip ContinueRecipientListOnError Business Rule Inserted When Business Rule Was Not Found Recv CreateLocationReceive Create new location when material is received to location that does nc REFRESHROWSVIARESELECT Business Rule Inserted When Business Rule Was Not Found Reqns AllowEditsOfAuthorizedRequi Requisitions that are Authorized can be edited Reqns AllowltemDeletesFramAuthor Items can be deleted from already authorized requisitions Regqns AutolncrementReqitemNumbeRequisition Item Numbers will be Auto Incremented E Reqns AutolncrementReqNumbers Requisition Numbers will be Auto Incremented using Company Zero F Reqns RequireBOMApprovalToRequiBOMs must be Approved before they can be referenced on a requisiti Reqns RequireDrawingApprovalToRe Drawings must be Approved before they can be referenced on a requi Reqns RequireltemNeedDateBeforec Requisition Items must have a valid Need Date before they can be sav SPAR DISPLAYPROGRAMMERW A Business Rule Inserted When Business Rule Was Not Found SPAR Suppress Message Delivery CSPAR Programmer Business Rule Timecard Rollup Does Matcost RolluPerforrning a TimeCard Rollup will Automatically be follo
45. block types select Library Block Types from the main menu The Block Types window Figure 5 13 will open The procedures for retrieving adding changing and deleting block type records are the same as those outlined in General System Operation Block Type Information for the Estimating Environment 2 47 T mMib AB UST FWD 9 JST MID Block Type Description A AFT SHL Aft Shell Units 2 AFTPEAK Aft Peak Units Siren Cross Tanks AIDK MACHY Machinery Deck amp Elevator Casing 5 DK MAIN Main Deck eee Spar Deck Tween Hatches IFOREPK Fore Peak Units SIHOPPER Hoppers SIHOUSE House Funnel Focsle amp Poop Decks aojLooP Loop Belt Unit LST FWD Lower Side Tanks Fwd 12 LST MID Lower Side Tanks Midship M3 SCREEN Screen Bulkheads 4 SHRED Shredder Plates 5 TT ER Engine Room Tank Tops AGITT F A Tank Tops Fwd Aft Tank tops Midship Upper Side Tanks Fwd Upper Side Tanks Midship Figure 5 13 Block Type Information 96 Chapter 5 Starting A New System amp Database Defining Ship Types Cost Estimating Relationships CERs also can be tracked for any ship type by any of the WBS levels To define ship types select Library Ship Types from the main menu The Ship Types window Figure 5 14 will open The ship type can be assigned at the project level of the WBS The procedures for retrieving adding changing and deleting ship type records are the same as th
46. case the contract or the parent Using this scenario of creating a project record by drilling down from the contract record if a global default Edit Global Defaults has been set for the contract level that is different from the parent contract it will not apply Any global defaults other than contract will be applied to the new record Refer to the topic Linkage and Drill Downs in this manual for more information In lieu of drilling down a new project record can be created by clicking on the P button on the toolbar But the record that is added will not have the contract automatically filled in The following sections describe the process of adding a new project Creating a Project To create a new project under a new contract refer to directions for adding a new project record in the above section and enter the information using the instructions provided in Chapter 4 General System Operation 120 Chapter 6 Starting A New Project Project Numbers An important issue is the project numbering scheme for the shipyard PERCEPTION allows the same project number to be used under different contracts While projects are formally identified with a specific contract number in the system there are applications like time charges that the shipyard may not want to be associated with a contract This may be true if time charges are imported into PERCEPTION from another application and that application does not carry a contract i
47. clicking on the Save button For any of the defined distribution list names a list of individual recipients can be defined by clicking on the List Items tab Figure 11 2 Recipient List Maintenance Recipient Lists List Items Recipient Name Email Address or File Location Format Select A Prini Printer Print NTSPARA HP Lase Output to Excel file C spar ternp Email dmeissnen sparusa com Figure 11 2 Distribution List Recipients Individual recipients can be added by clicking on the Add button Highlighting them and clicking on the Delete button can delete recipients Adds changes and deletes all can be saved on the database by clicking on the Save button The Recipient s Name is a text field to identify for the user where the report is to be delivered If the format is a file that is to be saved the recipient s name is used for the file name The Recipient s Location can be a directory path if the report is to be stored as a file The location also can be an email address If the file is to be sent as an email attachment there must be a folder called Temp below the folder from which the software is run 152 Chapter 11 Distribution Lists For Reports The Format for any given recipient indicates the type of format by which the report will be delivered to the recipient Several different formats are available from the drop down menu The PDF format is the most secure because the recipient is
48. contract to contract Projects under a contract can reference one or more CLINs by means of the details of a project such as cost estimate items work orders material requisitions etc PERCEPTION can summarize costs and performance by CLIN Creating a New Contract amp Project s To create a new contract and or project on the database always start at the top of the contract project hierarchy If a new contract is required click on the C button on the toolbar This opens the contracts worksheet Enter the information as needed and save it to the database using the instructions provided in the chapter General System Operation in this user manual The Contracts data entry window allows the following general information to be defined by the user Contract ID maximum 20 characters Contract Description unlimited characters Customer Name maximum 30 characters Contract Manager maximum 30 characters The Billing Method maximum 20 characters If a selection of contracts have been added and or retrieved further information about each contract is available To see these details click on a contract row then either click on the Drill Down button Z on the toolbar or click the right mouse button to display the pop up menu In either case select Details A third method of seeing the detail information is to just double click on the contract row This also will open the Details window Details will display the Summary Con
49. data fields that employ internal codes If information is imported from other third party products such as EXCEL or ACCESS the internal codes must be used where these drop down data fields are included Parts Catalog Part Type Internal Code Description 0 _ Obsolete Direct Purchase Standard Part Manufactured Standard Part Component GFE OFE Part Stock Part Load Items amp Spares Vendor Furnished Information VFI Milestone Payment Economic Price Adjustment EPA Sub Contractor O COIN D AJAI P Parts Catalog Package Library Classification Flag Internal Code Description 1 For Parts Catalog Only 2 For Package Library Only 3 For Both 193 Appendix VI Internal Database Codes IP Interim Product Type Internal Code Description Oo N A Structure Machinery Piping Electrical HVAC Accommodations NIOJ RO Paint Miscellaneous IP Interim Product Indicator Internal Code Description N A ZERO Sub Zone Grand Block Block Unit Assembly Sub Assembly O VDIS CIWID N o Part S O Structure Outfit Indicator Internal Code Description 0 N A ZERO S Structure Z Outfit M Material V Services L Labor 194 Appendix VI Internal Database Codes
50. each individual material item must be uniquely identified with a purchase order item number maximum of 8 characters Purchase order items are then each assigned one or more detail records that identify the requisition item that is being used to place the order PWBS Product Work Breakdown Structure or PWBS is a hierarchical list of interim products Once any complex product like a ship has been designed planning efforts need to be applied toward maximizing production efficiencies This effort entails organizing work and resources that promote productivity and eliminate non value added costs The concept of group technology for example supports this objective and enables engineered systems as defined by a system Work Breakdown Structure SWBS to be broken down into definable interim products These products can exploit significant cost and schedule savings because they enable the work to be performed under more convenient and more easily performed work conditions Ship i ie Outfit Zones amp Grand Blocks Blocks amp Units Product Cost Management Assembly Process Cost Sub Assembly Management on oe Manufactured Parts 241 Glossary The elements comprising the PWBS are the contract project zone outfit zone grand block unit block assembly sub assembly and manufactured parts The name for each level of the PWBS is limited to a maximum of 8 alpha numeric characters Using the PWBS is optional f
51. field Then enter the replacement string of characters from the keyboard Once all data entry has been completed the user should click on the Save button on the toolbar No changes to the database will be made until the user formally initiates this save operation Cut Copy amp Paste Options Other data editing operations include cut copy and paste Each of the cut copy and paste operations can be accomplished several different ways 64 Chapter 4 General System Operation From Edit on the main menu From the pop up menu on the worksheet windows By clicking the appropriate icon on the toolbar By using the standard Windows key combinations i e Ctrl X Cut Ctrl C Copy and Ctrl V Paste Refer to Chapter 9 Importing amp Exporting Data for more details on cut copy and paste with EXCEL and other desktop software Copy amp Paste with EXCEL Data can be copied from PERCEPTION to EXCEL and or from EXCEL to PERCEPTION Similar operations can be performed with other desktop software products Restrictions on EXCEL Data PERCEPTION cannot import EXCEL data fields that are expressions or equations Therefore any such fields must be copied to the clip board then reset using Edit Paste Special Values PERCEPTION uses several types of data fields numeric alphanumeric and calendar dates Data pertaining to quantities cost and labor hours etc are treated as numeric These data fields in EXC
52. for contract reporting purposes System reports can summarize the cost estimate by CLIN as well as by SWBS and PWBS COA The Chart of Accounts or COA identifies the shipyard as a functional organization The organization may be broken down to levels that identify the individual workshops stages of construction and manufacturing and assembly processes The COA is one of several types of project work breakdown structures or WBS The purpose of the COA is to provide a basis for collecting project data and for generating performance reports of the shipyard organization The hierarchical levels comprising the COA are the contract project COA group COA sub group COA item COA supervisor and COA IPT These level names can be customized for each shipyard and the customized names will appear on all windows and reports in the system Each level s identifier is limited to a maximum of 8 alpha numeric characters 210 Glossary Contract Project Using COA is optional for any project When used PERCEPTION does not require the COA to be completely defined but only to the extent that is necessary for planning and production control purposes Comments PERCEPTION offers user comments to be entered and displayed throughout various functions of the system This allows users to either enter comments for their own references or to enter comments that communicate status information to other users The Purchase Order Comment may
53. has been displayed click on the Sort button on the toolbar The system will display a pop up window that lists the titles of all of the columns in the report Figure 4 15 ee tst siS Columns Available for Sorting Sort Columns Ascending Afdate Iv Asdate Authflag C Ahours C Bhours R Center Compute 1 Compute 12 Compute 13 Drag and Drop the Columns to Sort on Cancel Help Figure 4 15 Report Sort Selections Window Choose only those column headings important for the sort by dragging them over to the right side box Multiple columns can be sorted in any mix of ascending or descending order Then click on the OK button and the report will be re displayed in the order specified Figure 4 16 displays a sample work order listing report sorted in SWBS account order Figure 4 17 displays the same report but in planned start date order 79 Chapter 4 General System Operation 05 08 2002 10 56 41 Chesapeake Marine Industries Page 1 of 1 eee Work Order List W001 Contract C DEMO Demo Contract for Hull Block Const Tut Project 0 to ZZZZZZZZ Planned Date 01 01 1950 to 01 01 2050 Actual Date 01 01 1950 to 01 01 2050 Work Center 0 to ZZZZZZZZ Work Order 0 to ZZZZZZZZ Work Planned Planned Actual Actual Budgeted Actual Order Center Heading Acct Auth Start Finish Start Finish StaLabor Hours Labor Project 01 Sample Hull Block Contruction Work Orders 7 0 Berth Trials PY 03 30999 040541999 00
54. invoiceitem dw_exception_invoiceitem Figure 16 3 Database Tables amp Data Objects 167 Chapter 16 Exception Reports Adding Exception Reports The reports are run using a where clause that is stored in the data exceptions table This table has the following columns that should all contain data when the system administrator adds a record Testing is important because when new data exception records are added to the data exception table they will be displayed in the software and can be run by any PERCEPTION user The System Administration manual has detailed instructions for adding new exception reports 168 Appendix I Operating Windows Appendix I Operating Windows PERCEPTION has been developed using Microsoft Windows Graphical User Interface GUD technology The following basic conventions have been used within the system Clicking refers to the action of moving the pointer to a desired location and quickly pressing and releasing the left mouse button Double Clicking refers to the action of moving the pointer to a desired location and quickly pressing and releasing the left mouse button twice Pressing amp holding refers to holding a mouse button for a slightly extended period of time until another action is performed the cursor changes and some other specified change occurs Dragging refers to pressing and holding the left mouse button while moving the pointer to the new desired location
55. is most effective with the worksheet type windows in PERCEPTION software If using with the report writer the formatting approximates the report layout e The dBase option creates a DBF file that contains the data in dBase3 format If this option is used with a report the data comprising the report will be sent This file can then be opened by a variety of software programs including Microsoft Access and Microsoft EXCEL as well as many other database and spreadsheet programs e The CSV option creates a comma delimited file that contains the data If this option is used with a report the data comprising the report will be sent Database spreadsheet and text programs can read CSV files 153 Chapter 11 Distribution Lists For Reports e The Print option will send the data to any one of the printers defined in Windows for the user The format for the printed output will be as displayed The Select A Printer option is only a valid option if the format selected is Print However if the user has the Adobe Acrobat PDF Writer defined as a printer then this is a valid printer choice for the Print format When sending a report to the PDF Writer the user will be prompted to give the file a name and file location The Print PO Costs option provides for the standard purchase order to be printed or saved to any of the available formats without any of the associated costs The Modstring is available to customize the output of the repo
56. item serial number The NATO Stock Number MUST BE ASSIGNED to requisition items PRIOR to purchasing The use of the NATO Stock Number for material items in PERCEPTION is optional Naval Equipment Index NEI The Naval Equipment Index is a 4 digit number that Index Number identifies ship s material by weight group 100 x Hull Structure 200 x Propulsion systems 300 x Electric Plant 400 x Communications amp Surveillance 500 x Auxiliary systems 600 x Outfit amp Furnishings 700 x Armament 800 x Load Items Naval Equipment Index 207 lt 4 Major Equipment Group Main Propulsion Sub Group Main Steam Piping Group Element High Pressure Steam Drain 230 Glossary The NEI number is broken down into the following elements The Major Group identifies one of eight major functional material groups on board ship The Sub Group identifies the major function of the equipment within the group When a component serves multiple functions it is included with the group that best describes its primary function All accessory items are included with the components they serve The Group Element identifies a particular function described within a particular SUB Group The use of the NEI Number for material items in PERCEPTION is optional Navy Spec Item The US Navy uses what is called the Navy Spec Number Item coding for all repair and overhaul work The format for this coding is as follows Navy Spec Item Nu
57. items scheduling planning activities scheduling work orders work order pallets e Standard Parts and Interim Product Catalog used for estimating cost items purchase orders and work order pallets Standard Parts Catalog Material Classes and Class Attributes Unit of Measure Vendor Catalog Type of Work with mapping to a Generic Product Work Breakdown Structure GPWBS Stage of Construction e Block Type Chapter 2 Database Structure e Ship Type Other libraries are available for specific applications These libraries have been implemented to help expedite the various business processes of the shipyard Cost Estimating Libraries e Standard Cost Estimating Relationships CERs e Standard Interim Product Packages e Material Cost Escalation Table Work Order Management Libraries e Trade Resource Categories Purchasing Libraries e PO Clauses for Terms amp Conditions e PO Clauses for Headers amp Footers e Currency Exchange Rate Table Material Control Libraries e Standard Material Storage Locations Database Record Keys All tables in the system database contain records that are uniquely identified by keys These keys must be unique for each record so that the system can recognize find and retrieve any record from the entire set of records on the particular table Some records have only a single key such as the employee file having only the employee ID for a record key Other records have mult
58. most likely most optimistic and most pessimistic Pessimistic Time The longest time duration that is considered possible for an activity There is virtually no expectation of completing the activity in more than the pessimistic time Optimistic Time The shortest time duration that is considered possible for an activity There is virtually no hope of completing the activity in less than the optimistic time Most Likely Time The time duration that would occur most often if the activity were repeated under EXACTLY the same conditions many times If many knowledgeable people were asked for the most likely time the value given most often would form the most likely time estimate PERCEPTION and PERT PAC contrary to its name does not perform this probable odds analysis Pessimistic Time The longest time duration that is considered possible for an activity There is virtually no expectation of completing the activity in more than the pessimistic time 237 Glossary Planning Activity A Planning Activity is a means to develop a set of project baseline budgets and schedules from which detail planning of work orders and material requirements can proceed An activity ID is limited to a maximum of 8 alpha numeric characters The combination of Contract Project Planning Activity Activity Center must be unique PO Action Date Date prior to material delivery upon which the purchase order must be issued in order to meet required
59. on the worksheet window A double click left mouse button on a row will bring up a detail data entry window presentation of the row s data Figure 4 2 Alternative methods for opening a detail worksheet are to ma record row by giving it a single click then clicking on the Drill Down button on the toolbar or by right clicking with the mouse on the record to open the pop up sub menu that provides Detail as one of its selections 58 Chapter 4 General System Operation PERCEPTION Total Shipyard Management File Edit View Environment Library Data System Reports Window Help T w C PGAZU S B x SW 4_emn xaleoal mad than as slic lt gt 91 Issue Date Center 0 work Order faa Description Pre Outtt Hot oo oo 0000 IPT Planner Foreman Revision Rev Date 00 00 0000 COAGrp COASGrp COA ltem Drawing StartDate Finish Date Planned Actual Planned 0172271999 01 27 1999 Supervisor aty 1 00 _ Se Joorooroooo Zone L or CER 1 00 UomfeEach es m CERREN m Hours Cost Rat aaa Budget 160 00 0 00 D T h EEN 0 00 a Actual 0 00 of 0 00 Actual Material 0 00 ssem ai AT Rework 0 00 0 00 Product Code Premium 0 00 0 00 WO Type Discreet MFG Part After Close 0 00 o oo Manpower Curve x SWBS Group fi Authorization SWBS Account 140 Estimated to Complete cLIN Manual Progress Rework Status z Activity Center Change Order ID Pallet Budgeted Hour
60. option allows the user to make global changes without affecting other records in the worksheet To use the filter select Data Filter or click on the Filter button on the toolbar and the system will display a filter wizard Figure 4 9 71 Chapter 4 General System Operation Specify Filter contract_id 4 DEMO and end_date lt 2003 12 31 Verify Ea ea Functions Columns abs x acos x aval x for all tisk_min_val bitmap s tisk_max_val ceilinal x1 Ej weight E Figure 4 9 Using the Filter Wizard All of the columns in the table are available for selection in the right window and the filter clause can also be developed using the Advanced SQL functions provided in the left window Find Option In order to edit any given row of data in a data entry window the user must click on the row so that the system can tag it for editing If the row is located off the visible window the user must use the down or up scroll bar at the right side of the window until the desired row is visible in the window If a data entry window contains a large number of items this process of locating a row can be tedious The system provides a speed search Find feature to find a specific record quickly Selecting Edit Find from the main menu or clicking on the Find button on the toolbar opens the Find window Figure 4 10 The characters to search for must be typed into the Find What box The Find
61. process can either match the data in the Find window either exactly matching the case of all characters or not The search can be directed as follows Forward across the worksheet starting from the current cursor position Backward across the worksheet starting from the current cursor position All across the worksheet where matches are found Only in the Current Row of the cursor position Only in the Current Column of the current cursor position Only in the Current Selection or data field of the current cursor position of value for long text or description fields 12 Chapter 4 General System Operation The Find process will operate on either text characters or numeric data fields Clicking on the Find Next button will move directly to the first record that matches the character string in that column This feature is most useful when many records have been retrieved The system will remember previous searches and they can be selected by using the drop down arrow in the Find What box SWBS Account Information for the Estimating Environment Contract Project Group Account Description Start Date __ 650 337 oo 010000 57 PD 337 00 00 0000 58 PD 337 Find AE 00 00 0000 59 PD 337 00 00 0000 6O PD 337 Close 00 00 0000 61 posse Search Options 00 00 0000 62 PD 337 00 00 0000 63 PD 337 Search Direction Forward 0000 0000 64 PD 337 00 00 00
62. processes Examples pipe work electrical work engineering quality assurance etc Withdraw Location The location where material has been withdrawn The withdraw location must be defined on the location table If not previously defined the system will generate the new location The location ID is limited to a maximum of 12 alpha numeric characters and must be unique Zone A level of PWBS project zone and is a physical area of the ship bow stern mid body and superstructure Zones can also identify structural blocks during hull construction Bow units mid body bottom units mid body deck units etc A zone ID is limited to a maximum of 8 alpha numeric characters The combination of Contract Project Zone must be unique Ship Wide Construction Zone Zone Sequence A grouping of trade or craft on board work that eliminates trade work interference and associated costs of rework disruptions and delays For example a typical zone sequence might have hot steel outfit work ladders grates windows and doors performed first followed by pipe work then electrical distribution then linings and finally furniture and fixtures 17 Selected photographs obtained from www nsnet com 256 Abbreviations Accounting Information Requirements For Active Projects ccceeeeeee 124 Adding Exception Reports 168 Adding New Database Records 62 Allowable Characters 65 175 Assoc
63. provides a set of reports to analyze and forecast steel production by stage of construction These reports include the ability to group steel labor by zone unit block and block type for the stages of construction defined by the shipyard The steel reports use the proven PERCEPTION statistical process forecasting methods to generate production rates for planned work and work in progress It presents this information to the user for each level of the PWBS in the selected report Before the reports can be run the user must define the Steel SWBS Accounts or Steel Manufacturing Work Centers Figure 5 3 for each stage of construction fabrication sub assembly assembly erection and on ship weld out Only one of these two methods for identifying these stages can be used at any time At the same time the user has the option to select the unit of measure for each stage There are three different units of measure from which to select Weight Joint Weld Length and Area Each unit of measure has it s own corresponding quantity stored on the unit block table With this information defined the report then uses the defined stages and units of measure to generate the production rates 88 Chapter 5 Starting A New System amp Database System Parameters and Company Defaults x Company Information Company Default Tax Rates Set COA Names Accounting Fabrication FAB Acct 51 FAB WC 20 UoM Weight Erection Erect Acc
64. s Check Box is another way to make a selection by either turning it on or off by clicking on the check box When the check mark is displayed the option is turned on when there is no check mark the option is turned off Multiple check boxes can be selected Protected Data Fields Most data fields displayed on the system window screens will allow the user to enter appropriate information for storage and processing by the system However there are other fields that are protected by the system since they represent information that either has been compiled from other related data or is calculated using data on the current record On the WBS levels the system assigns the color blue to all data fields designated for display only Examples of these fields include rolled up item costs to WBS or fields of indirect costs computed by the system from rate tables etc On the data detail and worksheet windows some fields are protected because they are calculated or derived from another source In some cases tabbing will bypass the field In other cases the user can tab to the field but cannot change the data Allowable Characters The system will accept virtually any characters available in the PC Windows world However there are exceptions The database manages data as records in various database tables Each record must have a unique identifier or key The system restricts all ID fields to the following characters A through Z a through z
65. select the columns to import the upper half of the window See Figure 9 2 It is not necessary to import all of the columns from the file 142 Chapter 9 Importing amp Exporting Data Import Drawing Items Transfer Column Data Into Transfer Column Data From _AlContract Transfer to Contract ID z _ 2 fProj Transfer to ProjectID H _ 3Dwg Transfer to Drawing Alitem Transfer to Drawing Item z S Part Id Transfer to Baty Transfer to N Descriptio Transfer to Contract Proj Dwg Item Part Id DEMO 10162 01 i SPN PYGATAS 150 24 A DEMO 101 62 01 p SSPN PYBFLY 150 24 A DEMO 101 62 01 B SPN PYGATAS 150 20 is 101 62 01 f SPN PYCHK 150 20 is 101 62 01 5 SSPN PVBFLY 150 20 9 1504 RF FLG ANSI CLASS 150 CS 35 TF ofl Options M Add Rows P Include Globals M Save Column Ma ox e He M Update Rows I Clear Column Map I Add Update Figure 9 2 Import Window You must tell the system which columns of the file to import and to which column these columns will be transferred in your window On the left side of the upper part of the window is a list of the columns from your file on the right side is where you tell the system what column in your window to transfer the data to When importing from EXCEL or a comma separated text file CSV the upper half of the import window retrieves the column name
66. specific IP package and all of its items and creates a new package e Copy Rate Tables copies a specific rate table from one Contract Project Center to another Add Interim Product Package s to an open cost items worksheet Add CERs and Equations as cost items to an open cost items worksheet Add Parts from the Parts Catalog to an open cost items worksheet Import Data from another data source Global Deletes to delete multiple WBS levels at one time Modify Selected Records performs the following functions on cost items that have been retrieved and selected Modify Rate Tables changes the rates Modify Indirect Formulas changes the indirect formulas Modify Hours Cost factors labor hours and or material Modify Assignments re assign selected cost items to different work breakdowns structures work centers etc 26 Chapter 3 The Grand Tour e Cost Estimate Rollup provides options for re computing data summaries throughout the project WBS For Engineering the following special edit functions are available from the main Edit menu e Attach Detach Planning Activity to multiple selected drawings at one time e Define Requisition from BOMs generates new requisitions from drawing bills of material e Define Pallet from BOM generates new pallets from drawing bills of material e Approve Un Approve multiple selected drawings at one time e Copy BOMs from existing drawings For Production Engineering the following spe
67. the active worksheet window Save Current Column Order saves the current column order for the active worksheet window Enter Worksheet Designer Mode allows the user to customize the appearance of any window in the PERCEPTION system Refer to PERCEPTION s System Administration Manual Worksheet Designer for more information Restore Worksheet returns a customized window to the original default format as purchased Horizontal Split Scrolling allows the user to set a second horizontal scroll bar at the bottom of the worksheet Figure 3 9 30 Chapter 3 The Grand Tour PERCEPTION Total Shipyard Management File Edit View Environment Library Data System Reports Window Help BEEJ e w jcrceazuja El T EICI 4200 8 8 Ma Hanae a x B Parts Catalog Detail Information Parts Catalog Attributes Inventory Transactions Last Purchases Pending Deliveries Part Classification Part Type Part ID HV CAP Direct Purchase Direct Purchase H CAP Direct Purchase HV CAP x Direct Purchase Direct Purchase 6l Direct Purchase ZIHV CAP L 8 HV CAP L S HV CAP 10 Direct Purchase Direct Purchase Direct Purchase i Direct Purchase 15 HV COUPLING 16 H COUPLING Direct P y Direct Purchase 16 HV COUPLING L 17 HV COUPLING Hl Direct Purchase Direct Purchase gt HV CP MS PG10 100 050 H CP MS PG10 125 050 H V CP MS PG10 160
68. the new project s requisitions Database Processing When dealing with records on the database WBS cost items rate tables etc data entry windows provide options for adding new records updating existing records and deleting unwanted records The following are general rules for performing these different transactions First open the desired data entry window from a selection menu or the toolbar Most data entry windows initially open with no information displayed The user is required to either retrieve desired information from the database or begin adding new information directly Retrieving Database Records To retrieve existing records into the data entry window click on the Retrieve button se on the toolbar or select Retrieve from the Data menu The system will provide an opportunity for the user to narrow this retrieval operation to only the selection that the user specifies The Parts Catalog retrieval window Figure 4 4 is an example The record retrieval selection process is one whereby the user can specify a range minimum and maximum of values for a particular set of information The user may use any or all of the criteria available on the selection window to narrow the search and retrieval process Most data fields that identify various records for example part number work order number purchase order number etc are alphanumeric even if the user has set up numeric identifiers the system still treats these iden
69. this feature can be used the Volo View software must be installed This software is installed by SPAR s installation program or it can be downloaded from the Autodesk web site www autodesk com and installed on desktop The Volo View provides a quick easy tool to review drawings for accuracy and correctness and to print without risking changes to the original AutoCAD drawing Volo View will open DWG DWF and DXF files as well as more than 225 different document types including raster image and business formats Using the View Feature The column Drawing File Name has been added to the following worksheet windows All PWBS levels Parts Catalog Work Orders Drawings The drawing file name with directory path can be added to a record on the above worksheet windows by browsing the libraries for it Right click on the drawing file name column and select Browse For Files from the pop up menu Figure II 1 177 Appendix II Viewing AutoCAD Drawings Drawings Information for the Engineering Environment 0101 dwg 0101 262 01 Machinery Arrangement Figure II 1 Drawing Pop Up Menu Drawings Information 1999 01 DES 1 1999 01 2 1999 01 DES 1 262 01 Drawing for Tutorial 2 101 A 12345 Parts Explosion Drawing 01 10 01 Drawing for Tutorial A2 04 PI 01 10 10 Deck Lighting Diagram 01 10 15 Machinery Systems Material List I 01 100 100
70. time charging The time charge trade ID has not been defined on the database The employee clock number has not been defined on the database Charge date on timephased or incremental work orders is outside the subtask date range Errors cannot be posted to the work orders without correction The system will consider the following conditions as time charge exceptions e Time charges have been made for trade ID that has not been planned for the work order e Time charges are late for the work order planned schedule e Time charges are early for the work order planned schedule e Time charges have been made against a work order that has been closed Exceptions will be posted to the work order although relatively minor problems have been detected by the system 188 Appendix IV Color Codes The color codes for time charge transactions are as follows e Red The posting process detects errors in the transaction e Yellow Un posted transactions noted with exceptions e Green Posted transactions including those noted with exceptions e Gray Transaction has not yet been processed for posting All non posted transactions can be edited correcting errors and exceptions if necessary Posted transactions cannot be edited To make any modifications to these the user must enter additional adjustment transactions and post them Customer Bill Color Codes The system provides no color coding for customer bills Vendor Invoice
71. working conditions they are generally considered the most productive stage of construction Units may be installed either on block or on board S Selected photographs obtained from www nsnet com 14 Selected photographs obtained from www nsnet com 232 Glossary Optimistic Time The shortest time duration that is considered possible for an activity There is virtually no hope of completing the activity in less than the optimistic time Order Quantity Quantity on order of a requisition item Original Promised The vendor s original estimated time of arrival on a purchase order item Overhead An indirect cost that is normally related to direct labor costs Overhead includes such general costs as employee fringe benefits plant maintenance and utilities rents and leases equipment depreciation etc Package A group of cost items package items catalogued on the system interim product package library A package can be used any number of times within a given project or across any number of different projects Packages may be added to projects by specifying a quantity that applies to all items of the package Quantity may also be defined as a size parameter for example cargo space volume In this case each package item of the package should have its costs labor and or material normalized in terms of the size parameter S Selected photographs obtained from www nsnet com 233 Glossary When a package i
72. 00 i D 337 Search Where Jal e 00 00 0000 a F Match Case Exactly 00 00 0000 67 PD 337 00 00 0000 68 PD 337 S 00 00 0000 69 PD 337 00 00 0000 70 PD 337 337 2 241 Propulsion Reduction Gears 00 00 0000 7A PD 337 337 2 242 Propulsion Clutches amp Couplings 00 00 0000 72 PD 337 337 2 243 Propulsion Shafting 00 00 0000 Z3 PD 337 337 2 244 Propulsion Shaft Bearings 00 00 0000 Figure 4 10 Find Window Replace Option The system provides a speed search and replace feature Selecting Edit Replace from the main menu or clicking on the Replace button on the toolbar opens the Replace window Figure 4 11 The characters that need to be replaced must be typed into the Find box The replacing characters must be typed into the Replace box The find and replace process can either match the text data in the Find window either exactly matching the case of all characters or not The search can be directed as follows All across the worksheet where matches are found Only in the Current Row of the current cursor position Only in the Current Column of the current cursor position Only in the Current Selection or data field of the current cursor position of value for long text or description fields The Replace process will operate on either text characters or numeric data fields 73 Chapter 4 General System Operation 4 Find Data Ele Find CAD Find Next Replace Flagship Replace Search Options Replace All
73. 000000 00000000 1 800 0 00 79 0 Delivery PAN 04 20999 04 22999 00 00 0000 000 0000 500 0 00 76 0 Tests amp Trials PW 03 30999 04 22M999 00 00 0000 00W00M000 5 000 0 00 49 0 Block 103 PA 019054999 02 25999 00000000 00m0nm000 LS 800 0 00 37 0 Block 102 PAN 01054999 02494999 00 00 0000 0000 0000 LS 800 0 00 78 0 Sea Trials PW 044341999 0441941999 00 00000 COMON000 1 800 0 00 33 0 Block 101 PA 017054999 02454999 O0 00 0000 C0M0 0000 LS 800 0 00 80 0 Pick Lists PV 04064999 04424999 00 00 0000 DOM0000 900 0 00 68 0 Zone M On Board Outfit P 02 26999 03 31 999 00 00000 COMOMN000 855 0 00 4 0 Preparation P 110 01084999 0117 1999 O0 00 0000 0000 0000 LSF 32 0 00 52 0 Preparation PA 110 01084999 01414999 00000000 00 0 0000 LSF 32 0 00 40 0 Preparation PW 110 01081999 014114999 00 00000 COMON000 LSF 32 0 00 41 0 Parts Fabrication MAN 120 01424999 014134999 00 00000 00 0 0000 LSF 32 0 00 5 0 Parts Fabrication PAN 120 01424999 01434999 00000000 00 0 0000 LSF 32 0 00 53 0 Parts Fabrication P 120 014241999 014134999 00 00000 0000000 LSF 32 0 00 6 0 Sub Assembly PA 130 01444999 01154999 00 00000 00 0 0000 LSF 32 0 00 54 0 Sub Assembly PAN 130 01444999 01454999 00000000 00 0 0000 LSF 32 0 00 42 0 Sub Assembly PW 130 01741999 014154999 00 00000 0000000 LSF 32 0 00 43 0 Assembly PW 140 01484999 01 21999 00 00 0000 000 0000 LSF 64 0 00 55 0 Assembly PA 140 0181999 01 21999 00 00 0000 0000 0000 LSF 64 0 00 7 0 Assembly PW 140 0
74. 01 1 07730 2001 06 30 2001 235 00 2 3500 US 1 00 0 00 0 00 Figure 16 2 Sample Exception Report 166 Chapter 16 Exception Reports Report Formats Report formats and some reports are supplied The system administrator can maintain this table by adding changing or deleting the records that actually run the reports In order to add a report for users to run the system administrator must know the table names and the data object supplied to report on each of the tables All data objects in PERCEPTION including reports are available The following Figure lists the table and data object names to be used for the basic listings that SPAR has provided Item Table Name Data Object Name SWBS Accounts accounts dw_exception_acct COA Groups coagrp dw_exception_coagrp COA Sub Groups coasgrp dw_exception_coasgrp Cost Items Costitm dw exception_costitem Parts Catalog partscatalog dw_exception_parts Drawings drawing dw_exception_drawing Bills of Material bom dw_exception_bom Requisitions requisition dw_exception_req Requisition Items reqn_item dw_exception_regitems Pallets pallet dw_exception_pallet Pallet Items paltitem dw_exception_regitems Purchase Orders po dw_exception_po Purchase Order Items poitem dw_exception_poitems PO Item Details poitemdetail dw_exception_poitemdetails Work Orders workpkgs dw_exception_workorder Customer Bills billdetail dw_exception_billitem Invoices
75. 050 HV CP MS PG10 200 050 HV CP M5 PG10 250 050 gt HV CP MS PG10 315 050 HV CP MS PG40 100 080 gt HV CP MS PG40 125 080 gt HV CP MS PG40 160 080 H CP MS PG40 200 080 JHV CP MS PG40 250 080 HV CO MS PM1 125 090 AV CO MS PM1 160 090 AV CO MS PM1 200 090 Direct Purchase gt AV CO MS PM1 250 090 gt HV CO MS PM1 315 090 gt HV CO MS PN1 100 085 om Presentation EPAR Defaut Parts CataloaT Figure 3 9 Horizontal Split Scrolling Project Navigator enables the user to quickly Drill Down through projects from high levels to the details Project Navigator provides details Set Environment allows the user to easily change environment in which the current window will be viewed i e the Estimating view of Project Details may be different than the Production Engineering view of the same window Environment Cost Estimating Engineering Planning amp Scheduling Production Engineering Material Control Purchasing Stores Management Accounting Rr ee a e a Figure 3 10 Environment 31 Chapter 3 The Grand Tour e Drill Downs will open a window with the Drill Down options appropriate to the current window available for selection Each window has its own set of Drill Down options Choose Drilldown Select Drill Down DETAILS Standard Part Interim Products Interim Produc Interim Product Items Interim Produc Cost items Cost Items Drawing Items BOMs Drawing Items Requisition Items M
76. 1 ETA Figure 6 10 Copying WBS From Another Project This window allows the user to select one or more types of work breakdown structures copied from other projects on the database First click on the desired WBS SWBS PWBS or COA check boxes Then from the drop down listed select the projects from which these WBS will be copied Different projects can be specified for different types of WBS The Options selection allows the user to also copy other project related information such as the rate tables project options and accounting specifications 128 Chapter 6 Starting A New Project With the exception of rate tables this information can be viewed from the Project Details window Open the Projects worksheet retrieve the project holding the desired information and Drill Down to its Details window Figure 6 11 presents an example of the Project Details tab window showing the project options Project Details Information for the Estimating Environment Details Options Milestones Characteristics Project Type Repair z Perception Default WBS Cost Estimating Default WBS Material Base Year 2001 jswes Labor Rate Year 2001 SWBS Group Scheme Cost of Mone 0 00 E Character Accounts z u GL Account Default Schedule Options _ soneaninnninreantienncnninnnnmriennnn MS Project Project Database Use Project Accounting Setup SY Figure 6 11 Project De
77. 1181999 01 2141999 00 00000 000000 LSF 64 0 00 44 0 Pre Outfit Hot P 150 01 22999 01 27 1999 00 00 0000 COMON000 LSF 160 0 00 SR n Pre N tfit Hot MAN aan MAMAA N17 ANMAMANN AnMAmnnn 1 SF ARN nnn Figure 4 16 Report Sorted In SWBS Account Order 80 Chapter 4 General System Operation O01 Work Order List 05 08 2002 11 08 43 Chesapeake Marine Industries Page 1 of 1 irae Work Order List W001 Contract C DEMO Demo Contract for Hull Block Const Tuts Project 0 to ZZZZZZZZ Planned Date 01 01 1950 to 01 01 2050 Actual Date 01 01 1950 to 01 01 2050 Work Center 0 to ZZZZZZZZ Work Order 0 to ZZZZZZZZ Work Planned Planned Actual Actual Budgeted Actual Order Center Heading Acct Auth Start Finish Start Finish StaLabor Hours Labor Project 01 Sample Hull Block Contruction Work Orders 37 0 Block 102 Pv 019054999 02494999 00 00 000 00000000 LS 800 0 00 50 0 Lofting P 910 019054999 01 07999 00 0000 00000000 LSF 24 0 00 51 0 Planning PA 920 019054999 01 07999 00 00 0000 00000000 LSF 24 0 00 49 0 Block 103 P 019054999 02 25999 00 0000 00000000 LS 800 0 00 33 0 Block 101 P 019054999 02454999 00 0000 00000000 LS 800 0 00 38 0 Lofting PA 910 017054999 01071999 00 0000 00000000 LSF 24 0 00 39 0 Planning PA 920 014054999 014071999 00 00 0000 00000000 LSF 24 0 00 3 0 Planning P 920 01954999 014071999 00 00 0000 00000000 LSF 24 0 00 2 0 Lofting PA 910 017054999 014071999 00 00 0000 00000000 LSF 24 0 00 40 0 Preparation PW
78. BracketsOO Bottom Shell Non Standardo o 4ICLAD Tank Top CladdingoO 5IHOP NON Hopper Non Standard Incline OO BIHOP TRN Hopper TansitionOO Ready T Presentation EPAR Defaut Frame I Figure 3 30 Horizontal Tile Arrangement The Window menu also allows the user to customize the toolbars When clicking on Windows Toolbars a window Figure 3 31 appears with various options for the user The user can customize the position the button size and whether or not to display the button text of these toolbars Throughout the software the Worksheet Menu bar or third toolbar changes depending on which window is open This third toolbar provides functions that are applicable only to the current window Customize Toolbars x Toolbars MV PERCEPTION Main Menu M PERCEPTION Work Sheet Menu Application Settings T Large Buttons V Show Tooltips Position Top Bottom C Left C Right Se Floating Apply d Figure 3 31 Window Toolbar Options 51 Chapter 3 The Grand Tour If more than one window is open the Window menu also lists them The name that is preceded by a check mark is the current active worksheet Figure 3 32 The user can move to any of these windows directly by clicking on the desired one Window Window Open Style Cascade Layer Tile Vertical Tile Horizontal Toolbars v 1 Units OF Measure 2 Work Center Information 3 Block Type In
79. By Engineering 103 Chapter 5 Starting A New System amp Database The bill of materials for the drawings can be created manually or by using parts from the Standard Parts Catalog Libraries Used By Planning and Scheduling Planning Activities can be created manually or imported from Microsoft Project Since the system requires that each activity be tagged to a work center the work centers must be defined before the activities can be defined Libraries Used By Production Engineering Work orders are cataloged by contract project and work center Work order budgets may be broken down by trade Time charges are cataloged by contract project work order work center and detailed by time date employee badge trade and by charge type i e regular time and one half dirty time etc Therefore before work orders can be developed for a project the following libraries are required to be established Work Centers Trade Resources Employee Badge file Time Charge Types Libraries Used By Material Control Material control can issue project material direct purchase stock and manufactured However material typically is stored in specific locations within the shipyard and out In order to provide material management by stores location these locations must be defined on the database Requisitions can use both bills of material from the drawing files or parts from the Standard Parts Catalog Libraries Used By Purchasing
80. Carpenter s Shop Miscellaneous Joiner Shop Rigging Shop Outfit Shop Pipe Shop Machine Shop Electrical Shop Sheet Metal Shop Paint Shop Maintenance Component Group Deckhouse Group Y Units Of Measure Y Block Type Information ioj x _ Block Type Activity 1BHDS Bulkheads Trans Barrel __2 BKTS Webs amp Brackets Box 3IBS NON Bottom Shell Nor BTU 4ICLAD Tank Top Cladding Cars Ferries SIHOP NON Hopper Non Stan Case BIHOP TRN Hopper Tansitionl Cubic Feet ae Lower Side Tank Cubic Meters BISP NON Slope Plating Nor Days 3ISS NoN Side Shell Non S Each Fees Feet Gallons Gallons per Hours Gallons per Minute Hours Horsepower Hour per Cubic Foot Hour per Cubic Meter Hour per Foot Hour per Long Ton Hour per Meter Hour per Move Ready I Presentation BPAR Defaut Frame D Figure 3 29 Vertical Tile Arrangement Tile Horizontal arranges the worksheets horizontally Figure 3 30 50 Chapter 3 The Grand Tour PERCEPTION Total Shipyard Management lel x File Edit View Environment Library Data System Reports Window Help e w CPGAZU 8 8 u x G 4 Ml xkaleos Malt Snlias Work Center Information Center Description Manager Location Spar Center Hull Planking Shop Mast amp Rigging Shop Sail Loft Steel Weldout UoM Description Activity Barrel Cars Ferries Case Description Bulkheads Transverse amp LongitudinalOO Webs amp
81. Center CER A Cost Estimate Relationship CER is a formula relating the cost of an item to the item s physical or functional characteristics or relating the item s cost to the cost of another item or group of items Examples a for steel block assembly 25 labor hours ton b for pipe material 25 meter and c for shipyard support service 10 production hours A CER is limited to a maximum of 25 alpha numeric characters and must be unique CIM Computer Integrated Manufacturing encompasses systems that automate and link all of the company s operations planning engineering production accounting and finance CLIN Contract Line Item Number is usually a series of government contract requirements for either new construction or ship repair CLINs also may be used to identify a ship owner s own project WBS such a ship repair specification line items or paragraphs CLINs are usually independent of the shipyard s project work breakdown structures and represent an alternate structure for summarizing and reporting the cost estimate A series of CLINs may identify requirements across all projects under the contract 209 Glossary The hierarchical levels comprising the CLINs are the contract and CLINs The CLINs identifiers are limited to a maximum of 8 alpha numeric characters The combination of Contract CLIN must be unique PERCEPTION does not require CLINs to be defined but can be used only to the extent that is necessary
82. Cost The costs incurred to date as collected by PERCEPTION through work order time charges material purchases and usage of stock inventory items Actual Schedule Actual schedules are determined by PERCEPTION from the dates of collected time charges to work orders The actual start date is the earliest date recorded on the system to the work order s The actual finish date is the latest date recorded after the work order s has been formally closed The closing date is not necessarily the latest finish date as the closing process can be done after the last time charge has been entered Time charges made to closed work orders will result in updated actual finish dates by the system Actual Use Date The date an item is actually taken from the warehouse and used in production PERCEPTION maintains only the most recent use date for any given item ACWP Actual Cost of Work Performed costs labor and material actually incurred and apportioned or distributed in accomplishing the work performed within a given time period 205 Glossary The ACWP is calculated by the system when either a Production Labor Rollup or a Production Material Rollup is performed and can be viewed on any of the WBS level records Assembly A level of PWBS project zone unit assembly that may be made from parts and components including sub assemblies An assembly ID is limited to a maximum of 8 alpha numeric characters The combination of Contract Project Zone
83. Cost Estimate Proposal e Customer Billing Invoice e Request for Quote from Vendors 107 Chapter 5 Starting A New System amp Database Purchase Order Document In addition a logo is displayed on the user login window In order to install a company logo the user must open the system s PERCEPTION Configuration Settings File This file can be found in the same directory as the one where the PERCEPTION exe file has been installed The full name for the configuration file is perception ini The PERCEPTION Configurations Settings file can be opened using Notepad Figure 5 20 presents a partial listing of this file in which the company logo file can be referenced i Perception ini Notepad of x File Edit Format Help Profile Perception VersionNumber 7 81 DatabaseLevel 7 81 UserName CompanyName PWDD RestoreGlobals 1 TabSetUpLocation 6 SpecialColumnList contract_id proj grp acct zone unit sub_zone ass embly req req_ item po po_item drawing drawing item invoice invoice item sub_assembly center workpkg pallet paltitem part_id subtask AllowableCharacters A Za zO 9 2 Cost Codes coa Trade sgrp Center Figure 5 20 PERCEPTION Configuration Settings File 108 Chapter 5 Starting A New System amp Database From the above figure the two lines that are highlighted Logo and Logol identify the two logo picture files they may also be the same pict
84. E TIX Caterpiller TTX Diesel _ 4JEngines Diesel forec Puehass x CAT 3034 NA Caterpiller 3034 NA _5 Engines Diesel yDirect Purchase CAT 3034 TA Caterpiller 3034 TA GlEngines Diesel Direct Purchase CAT 3054 TA Caterpiller 3054 TA 7 Engines Diesel yDirect Purchase CAT 3054B NA Caterpiller 3054B NA 8 Engines Diesel Direct Purchase CAT 3056 NA Caterpiller 3056 NA jEngines Diesel Direct Purchase CAT 3056 TA Caterpiller 3056 TA 10 Engines Diesel yiDirect Purchase _ CAT 3056 TAx Caterpiller 3056 TA 11 CAT 3126 TA Caterpiller 3126 TA 1 v 12 Engines Diesel y Direct Purchase JCAT 3126B TA Caterpiller 3126B TA 43 Engines Diesel ___ l Direct Purchase _ CAT 3196 TA Caterpiller 3196 TA 14 Engines Diesel Direct Purchase CAT 3304B NA Caterpiller 3304B NA 15 Engines Diesel Direct Purchase CAT 3304B T Caterpiller 3304B T 16 Engines Diesel y Direct Purchase _ CAT 3306B TA Caterpiller 3306B TA 17 Engines Diesel z Direct Purchase CAT 3406 TA Caterpiller 3406C TA 18 Engines Diesel i Direct Purchase CAT 3406E TA Caterpiller 3406E TA 13 Engines Diesel hd Direct Purchase _ CAT 3408C TA Caterpiller 3408C TA 20 Engines Diesel z Direct Purchase F CAT 3412C TA Caterpiller 3412C TA Figure 4 3 Sample Tab Worksheet Linked Windows Another useful feature of the system is its ability to link windows of information This linking allows the
85. EL also must be formatted as numbers PERCEPTION cannot import data fields that are formatted as currency percentages or as accounting Therefore do not set EXCEL numeric data fields using the following EXCEL toolbar buttons L 2 unless these formats are changed to Numbers When copying the percentages from EXCEL the value in EXCEL should not be formatted as a percentage For example if you want an estimate cost item in EXCEL to have 10 risk then the value in the EXCEL column should be 10 If you want 12 5 then the number in the EXCEL column should be 12 5 The PERCEPTION software converts the number to a percentage Identifying labels such as part numbers cost accounts project numbers work order numbers work centers etc all are treated as alphanumeric text fields The EXCEL data corresponding to these alphanumeric fields must be formatted as text data or the importing of this particular column into PERCEPTION may not work Also PERCEPTION does not allow certain special characters Refer to Appendix I Allowable Characters for the list of accepted ones Calendar dates must be set with the slash or dash format options e g 09 15 2001 If these data fields cells have been copied and reset using the Edit Paste Special Values 65 Chapter 4 General System Operation these fields will be converted by EXCEL to a numeric value These data fields must then be reformatted as
86. ERCEPTION Total Shipyard Management Fie Edit View Environment Library Data System Reports Window Help SEES a Isle pcre eye ao 3 senmana gt gt I WBS Pes oomen Pareno Perception Parts Cot m wes Company Parameters Perception Parts C4 Dj p I Perception Parts Catalog B Contracts a Part Classifications Contract 1999 01 Ship Repair Productii E Part Class none NONE Contract 62 0101 01 Sample Industrial C Part Class BOLT Bolt Contract A DEMO Demo Contract for Tu Part Class Bolts BOLTS Contract B DEMO Demo Contract for Tu Part Class Bulb Flats Steel Bulb Flats Contract C DEMO Demo Contract for Tu Part Class Clean Up Clean Up Materials Contract PD 337 Multiple Commercial C E Part Class Fab Fabrication Contract Pirate Ships Inc High Speed v E Part Class FLANGE Flange Contract STOCK STOCK MATERIAL CC E Part Class FRM Structural Beams 5 amp Contract TSHIP CONTRACT T SHIP Ser E Part Class Gaskets Gaskets 5d Projects E Part Class Injectors Injectors Part Class P VALVE PI VALVE E Part Class Pipe Pipe E Part Class Pipe fittings Pipe Fittings Part Class Pipe Flanges Pipe Flanges Part Class Plate Steel Plate Steel E Part Class PLT Structural Plates Part Class Shapes Steel Shapes Steel Part Class STEEL Steel E Part Class STF Structural Stiffners Part Class Val Valve Part
87. ERCEPTION provides electronic interfaces with accounting systems that eliminate costly and time consuming duplicate data entry operations with Payroll General Ledger Accounts Receivable and Accounts Payable systems PERCEPTION provides job costing at various levels of detail and for different points of view Job cost reports are generated By the shipyards own internal chart of accounts By specific contract work breakdown structure By production interim product and manufacturing process By shipyard work center 105 Chapter 5 Starting A New System amp Database e By trade skill Job cost details are available by the work order by individual work order time charge transaction by material item and by purchased subcontracted service This job cost visibility relieves the accounting systems from having to produce similar reports and to focus mostly on the other accounting responsibilities In order to establish the electronic interface between PERCEPTION and the accounting systems the accounting systems must have a means for importing the information from PERCEPTION time charges purchases and purchase order amendments stock issues and physical inventory adjustments customer billing invoices and vendor payment authorizations These imported transactions can be provided by PERCEPTION ina variety of different data formats Spread sheet format for example Microsoft EXCEL dBASE Delimited ASCII text files Non del
88. General Arrangement SIADEMO fot 100 200 Midship Section 01 100 300 Machinery Arrangement 100 400 Cabin Plan 1 am an Preliminary Rlack Plan 098 O20 Qog Oe Dep O00 O98 O20 028 oe s0 020 020 020 O90 fa Ooo Do0 Del D ooo ded nor den Oo tgar mn mn l BEBES SSS 33338808E BB lo Oo0 dod Ooo Ooi Ool ood Coo fof do Figure II 2 Browse For Files To view it the drawing right click on the drawing name and select Open Referenced File Figure Il 2 The Volo View software will open with the selected drawing displayed 178 Appendix II Viewing AutoCAD Drawings Volo View has its own menu system and help files Among other things the user can print pan zoom orbit and layer The drawing can be saved in a variety of other formats but the original AutoCAD drawing file cannot be overwritten 179 Appendix III Size Of Data Fields Appendix III Size of Data Fields PERCEPTION Primary Data Fields Header Short Full Data Field Size Description Size Description Size Contract Number 20 Unlimited Project Number 8 Unlimited Schedule Planning Activity 8 Unlimited Schedule Planning Activity Center 8 Unlimited SWBS Group 8 Unlimited SWBS Account 8 Unlimited PWBS Zone 8 Unlimited PWBS Outfit Zone Grand Block 8 Unlimited PWBS Block Unit 8 Unlimited PWBS Assembl
89. I Naval U S Equipment Index 260 Abbreviations OFE Owner Furnished Equipment OFM Owner Furnished Materiel PDF Adobe Portable Document Format PERT Program Evaluation and Review Technique PO Purchase Order Product Work Breakdown Structure sub assembly assembly hull block PWBS ship zone QA Quality Assurance QTY Quantity RFQ Request For Quotation RIY Required Date In Yard ROI Return On Investment SPI Schedule Performance Index SWBS Ship Work Breakdown Structure Example Bilge amp Ballast system SWILN Navy Repair Ship Work Line Item Number TOC Total Ownership Costs LCC plus infrastructure costs UoM Units of Measure examples tonnes square meters etc VFI Vendor Furnished Information drawings etc W C Work Center W O Work Order WBS Work Breakdown Structure may include SWBS PWBS and COA WC Work Center WO Work Order 261
90. ID Work COA Work Station Contract ID Project ID COA Department Stage ID Station General Ledger Accounts General Ledger Account GL Account ID WBS Detail Data Estimate Cost Item Contract ID Project ID Cost Item No Work Center Planning Activity Contract ID Project ID Activity No Work Center Work Order Contract ID Project ID Work Order No Work Center 199 Engineering Drawings Drawing Number Drawing BOM Item Number Material Requisition Requisition Number Requisition Item Purchase Order Purchase Order PO Item Number Work Order Pallet Work Order Pallet ID Pallet Item Number Customer Bill Other Customer Vendor Employee Tool Room ID LIBRARIES Part Catalog Part Part Classification Part Sub Classification Appendix VII Record Keys Contract ID Project ID Drawing No Contract ID Project ID Drawing No Dwg BOM Item No Contract ID Project ID Requisition No Contract ID Project ID Requisition No Requisition Item No Purchase Order No Purchase Order No PO Item No Work Order Pallet Contract ID Project ID ID Work Order Pallet Contract ID Project ID ID Pallet Item No Contract ID Project ID Customer ID Bill ID Customer ID Vendor ID Employee ID Tool ID Part Number Part Classification Part Sub Part Classification Classification 200 Appendix VII Record Keys E
91. INTEGRATING SHIPYARD INFORMATION ccccessessscececccecsesessaecececccseeesenseceeeeceseeenenseaeees 5 CHAPTER 2 DATABASE STRUCTURE eeeessececsscsccscssceceesscceesseceessccecsssseceessoceessesee 7 PROJECT ORIENTED DATABASE ssssesscscescceesesensececesececsesensaaecesececsenessseeeeeceesesenentaaeees 7 COMMON USE LIBRARIES genen eneren a a a aa a a a 9 DATABASE rA e0 DA Ca AAEE E E aes eke yeas eens 10 D pli c te Keys Erot sos rest sel geass cad aiaa A AAA A a ALATE ELEA 10 Missing Key Record ETO oooosnoneennneennssnsenssssessssesesssereosssseesssseeessseressseeesseseesssseeee 11 Changing Record Keys ETTOF sccaciscniis asi cesare avin iad aaa 12 CHAPTER 3 THE GRAND TOUR wissssiccscassccccevesicousacdsvesustocassavenccdeusedasessdecccasessanseds 15 SAV A eu ner es E T rh SE Mira E re AR A 15 SIGN ON a Sachin sada het E se a a AAs iach oa teach E heli OO 15 MAN WIN DOW casniatscdcn tact sheath asset aas A A Vaguisenehe daa RO AE 16 MENU BAR 4 sa sct anc e a Aa E a dea teat ENa 17 l EEE E EE EE E E AEN EE E sO 18 D by BEES eR Re OT A EA E AEI TE E A T EE ne I T 20 Editing Data Field Seaan a a ae e E R e eiet 22 Cut Copy amp PaSte nnna E E E E E E eel eens 23 Bulk Cut Bulk Copy amp Bulk Paste scescess atavaevtas seat nash ute sutasacadantattosted siseoadeacdode Seeeteane 24 Fmd e Repa Danae ee ONT nee e PRI eM yey nt ere ly eRe on ner eT 25 GOTO BENAS E E E E E EE EEA A 26 Special Edit Functions For Different Enviro
92. Installation Of The PERCEPTION System Chapter 1 Introduction Integrating Shipyard Information PERCEPTION operates with a centralized relational database All system application modules access this database so all users are kept updated with current information Status information can be accessed from virtually all accounts Figure 1 2 subject of course to permitted security measures that can be implemented onto the system Figure 1 2 Integrating Shipyard Production Processes Chapter 2 Database Structure Chapter 2 Database Structure The database consolidates information specific to projects It also has common use libraries of information that can be used and applied for various purposes across all projects on the database Project Oriented Database The database generally is hierarchical so that information can be viewed at different levels of detail All project oriented information is cataloged according to a Work Breakdown Structure or WBS The system supports several such structures simultaneously depending upon the needs of the project e SWBS Group Schemes e PWBS e COA COA Level Names The following chapters describe these different hierarchies their merits and limitations At the very top of these structures are summary information levels e Contract e Project Project Options e CLINs The Contract is the grand summary level of a project For a single project contract the contrac
93. L data can be imported directly into PERCEPTION using either of two methods 1 Copy and Paste 2 Import Workbook Data Chapter 4 General System Operation describes the copy and paste operations This section describes the importing of workbook data Importing EXCEL Workbook Data Most of the PERCEPTION worksheet windows allow the user to import data directly from Microsoft EXCEL workbook files click on Data Get External Data from the main menu As described in the beginning of this chapter the system provides an easy to use mapping procedure where the user can identify what EXCEL columns of data relate to a corresponding data column in PERCEPTION Preparing EXCEL Workbook Data for Exporting There are however important steps that must be taken within the EXCEL workbook before its data can be imported into PERCEPTION 144 Chapter 9 Importing amp Exporting Data An EXCEL worksheet can contain almost any organization of information including rows of data that cross above and below specific columns of data The process for importing data into PERCEPTION needs to know exactly what column areas on the worksheet is appropriate and what areas should be screened out from the process To mark the areas for importing the user must perform the following e Highlight the columns and rows for importing the column headings must be limited to only one 1 row e Click on Insert Name Define on the EXCEL main menu bar e
94. Note The set of standard packages identified in this window will be copied to all projects defined for the projects being created by this wizard If a multiple project contract has projects of different standard packages then the user should use the New Contract wizard to create only those projects that use the same standard packages The other projects under the contract can be set up with different standard packages using the New Project wizard procedure that is described below When the information for this window is complete click on the Finish button The system will proceed to install the new contract information When it has finished it will display the following figure Figure 6 14 PERCEPTION x T The new contract has been created and successfuly saved Figure 6 14 A New Contract Successfully Created 131 Chapter 6 Starting A New Project New Project Wizard By clicking on the New Project Wizard the system displays the following pop up window Figure 6 15 to identify the contract under which new project s are to be defined Project Creation Wizard Select a Contract for the new Project Description lt Back Boat Yard Seamar Boat Yard customer C DEMO Demo Contract for Hull Block Const Tutorial Next gt gt General Ship Overhaul Work Einish Docking of VLCC Cancel Demo data for various manpower analyses Help s di Figure 6 15 Selecting Contract for New Project s
95. PERCEPTION Getting Started PER UM 001 Revised May 2013 VERSION 9 ASSOCIATES INC 927 WEST STREET ANNAPOLIS MD 21401 USA 410 263 8593 Fax 410 267 0503 www sparusa com Email Info SPARUSA COM PERCEPTION is a registered trademark of SPAR Associates Inc ESTI MATE MAT PAC WORK PAC and PERT PAC are trademarks of SPAR PowerBuilder and Sybase SQL Anywhere are registered trademarks of Sybase Corporation Oracle is a registered trademark of Oracle Corporation Windows is a registered trademark of Microsoft Corporation EXCEL ACCESS and Microsoft SQL are registered trademarks of Microsoft Corporation dBASE is a registered trademark of dBASE Inc All Registered Trademarks used in this manual whether marked as Trademarks or not marked are declared to belong to the owner s Category A Data PERCEPTION Trade Secrets and Proprietary Properties Of SPAR Associates Inc Annapolis MD 21401 NOTICE The information contained in this document is subject to change without notice SPAR ASSOCIATES INC MAKES NO WARRANTY OF ANY KIND WITH REGARD TO THIS MATERIAL INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF MERCHANTIBILITY AND FITNESS FOR A PARTICULAR PURPOSE SPAR Associates Inc shall not be liable for errors contained herein or for incidental or consequential damages in connection with the furnishings performance or use of this material This document contains proprietary informatio
96. Parts Catalog and Vendor Catalog worksheet windows as shown in Figure 10 1 4 PERCEPTION Total Shipyard Management BEE File Edit View Environment Library Data System Reports Window Help r w C PGAZUS B e x R JBOD X Bless MH BSED Se 44 Vendor Information Detail Details Vendor Detail Information Email Address www sparusa com Ready srarve spar spar Purchasing Vendor Figure 10 1 URL Column 149 Chapter 10 Linking To Web Pages The format for the URL name must be valid for your installation Save the record by clicking on the Save button on the toolbar To use this feature select the row and right click in the URL column to display the pop up menu Figure 10 2 4 PERCEPTION Total Shipyard Management BEE File Edit View Environment Library Data System Reports Window Help r w C PGAZU S 8 e x 4R BQ x Be os MH HSM Se 4 Parts Catalog Detail Information Parts Catalog attributes Inventory Transactions Last Purchases Pending Deliveries Trade 1 Labor Rate 2 Trade 2 Drawing File Details Part Explosion Drill Downs Cut Copy Paste Add Row Insert Row Ditto Rowfs Delete Rows Import Open Referenced File Print Referenced File Edit Referenced File Associated Reports Properties a Ready sranwe p spar spar Purchasing Fame Figure 10 2 Vendor Catalog Pop Up Menu Select Open Reference File This will launc
97. Project Tuge to select WBS for Projecf Roll Up SWBS COA A work order may relate to multiple WBS s Awork order planned to reference more than one element of any WBS may be setup as a Distributed Work Order Figure 6 1 Parallel Project WBS Labor and material costs are summarized at any of the WBS levels Manpower analysis is also done at every defined level of WBS Note that the details such as estimate cost items work orders material requirements items etc are at the bottom of the project WBS Each of these details can reference all WBS hierarchies Figure 6 2 illustrates a multi project contract 113 Chapter 6 Starting A New Project YYYY Y Y Figure 6 2 WBS for Multi Project Contract The shipyard is free to define its own WBS requirements and these may be customized for every contract and for each and every project within a contract Use of more than one of the WBS hierarchies is strictly optional The following generally describes each Project SWBS Ship Systems Work Breakdown Structure SWBS is a two tier hierarchy of work categories that typically identify various ship systems as well as work categories of shipyard engineering and support services The top tier of SWBS is called SWBS Groups These usually identify ship systems that belong to a particular set of work like structural The second levels of SWBS are the individual ship systems and are called accounts The following provid
98. RECOVAS vis tssessti cts tandelaseaneloicaveteunseshusets ancilataas fe elas 63 Selecting Multiple Records sscsveltals sss celica needa seveaSantiusisteasnedadersnedsoc mn eartaasauasteateebsans 63 Deleting Database Records aicsrelieSecciliodea idee SEIN aS Medea eee eee kas ics 63 Saving Database Recofd Senoren e a nannies Wat 63 Printing Database RECOV S iano itiesh attics eda bis ed ude taeda eng eee 64 EDING DATA DIED Sa ecreis give titra slessa A akin den iuatucanlataia veanucape E s 64 C t CODY amp Paste ODN ONS accu liuad sical colaaeiines sides cestasdaeessecatuetadmiausdanensgactaaraucdsdiateetsate 64 CONV Ce Paste with EXCEL esena i e a ea ia A a E i ans 65 Restrictions on EXCEL Data rennene R ER ER EE RE 65 Copying and Pasting EXCEL Data into PERCEPTION cccsscccceesseceeeessseeeeessnees 66 Pasting EXCEL Description Fields into PERCEPTION s cccssceeeeseeeeeseceesseees 66 Pasting EXCEL Data into PERCEPTION Drop Down Data Fields 0cc00008 67 Bulk Cut Bulk Copy and Bulk Paste ODUIONS vovicsccccsssscssoviavscsescataves iarsectsassrvesteacncees 67 Bulk Copying Rows of Data to TEX OFA occas cc ws telb ea ciipela it Masada tds ieiuatee ated 68 Bulk Pasting ROWS of Data from FX CIA wrsccas ai sesseansaia stele nmnacide aes sandbuataeeonerceaseens 68 Worksheet Column Copy and PF aSt6 iiciiiss ci ioncnrestugs Maintain dons uate east 69 Worksheet Row Copy Gnd Paste vsnciinnintieia cid titinalani a tian 70 File Save A
99. Right Mouse Button Actions will usually specify a position for example Click on the object or Hold down the right mouse button Move to the option you wish to select and left click on it Selecting refers to clicking on a toolbar icon a menu item or on the left most column of a worksheet window that causes the record to be highlighted Parts of a Window Each application or window that you choose to work will open as a separate window Every window has some common elements however not all windows use all the elements The elements in Figure I 1 are your tools for working with the window and the application or document within the window More information is provided throughout this chapter in reference to the use of elements The Control menu box is located in the upper right corner of each window With the options in this box you can re size move maximize minimize and close windows If you use a mouse you can move and re size windows simply by clicking and dragging The title bar shows the name of the application or document If more than one window is open the title bar for the active window the one in which you are working is a different color or intensity than other title bars The window title depending on the type of window it appears in can be the name of an application and the name of a document or the name of a group a directory or other data file For documents until the document is saved a placeholder su
100. Risk is the degree of uncertainty that general economic factors for example inflation foreign exchange rates etc can impact costs It can be measured simply by estimating the possible spread of costs under best and worst case scenarios A statistical analysis may provide an additional measure of Economic Risk by estimating the probability that the actual cost will equal that of the estimate in question Refer to Cost Risk Empirical CERs CERs developed by collecting a number of physical attributes parameters for a shipbuilding activity such as ship type and size part weight part area part perimeter joint weld length number of processes applied number of parts involved etc as well as the cost of performing the activity If this data is collected for a number of ships in the same shipyard statistical analysis can be used to determine the statistical significance of the parameters and the equations with coefficients and exponent values for the activity CER Empirical CERs can be used for all stages of design from conceptual through contract They are more useful for what if and tradeoff studies than direct CERs which are described above To determine general statistical significance data from different shipyards can be used as this provides a better sample size for statistical analysis However the equation coefficients and exponent values for labor CERs are shipyard dependent and will reflect the productivity levels of the differen
101. STATE 23000 Sybase ODBC Driver Adaptive Server Anywhere No primary key value for foreign key Account_to_Group in table accounts No changes made to database v Figure 2 3 System Error Message for Missing Higher Level Records In the above figure the user has tried to save a new SWBS Account record However SWBS is a hierarchical work breakdown structure and requires first that the SWBS Group for that account be defined and stored on the database beforehand The Goto Row button will identify which record in the user s worksheet contains this error The user may open the appropriate worksheet to define and save the missing records without closing the worksheet in question so that the new record then will be accepted Chapter 4 General System Operation describes opening multiple system windows This is useful when managing data at different levels of a work breakdown structure Changing Record Keys Error Record keys are used by the database to uniquely identify and retrieve records The user may change a record key provided that there are no other records sharing the same key For example a time card record relates directly to a specific work order record If the user changes the work order record the time card no longer has a link to a work order The system will then display an error message Figure 2 4 for the user when the change is attempted to be saved to the database 12 C
102. TOCK ADJUSTMENT TRANSACTIONS COLOR CODES cccccccccccccessessssececcesceesenssseeees 187 PALLET ITEMS COLOR CODES iecce osdesisdscddeusvoruedioaseecaee luted is decccaus ogsodubvasd ecacasesssssdse dex 187 TOOL ROOM TRANSACTIONS COLOR CODES cccccccesessscecccccecsssssscsccessesseseeseeseeseeees 187 WORK ORDER COLOR CODES iccccccccccccssssssceccccceccssessscecccccessssuussesceccssssuueuseescescesesaaenees 188 TIME CHARGE TRANSACTIONS COLOR CODES cccssesescecccccecesssscsesccecsessesssseecessseees 188 CUSTOMER BILL COLOR CODES ccccccccccccsssessececccccccssssssseeccsccsssessussesccessssssueesaeeccesseaea 189 VENDOR INVOICE COLOR CODES cccccccccccssessececccccccesssscseeccescssssususesccsessseuueessesceesseaes 189 SCHEDULE PLANNING ACTIVITIES COLOR CODES ccscssessecccccccesssssssececcesssesensseesees 189 APPENDIX V FUNCTION KEYS uuu ccccccscscscscscsessssssscscsssssssessssssssssesesesesess 191 APPENDIX VI INTERNAL DATABASE CODES 0 00 cccsssssssssssssssesssesssesesess 193 PARTS CATALOG PART TYPE ccccccccccccsssssssscsccceccesssssssesccssccssessssesccsscessessesesccssesees 193 PARTS CATALOG PACKAGE LIBRARY ccssssssscscccccccsssssescsccsccsssesessesccessessuaeeseeceesseees 193 GIASSIFICA TION BIGA Gigs os ce sSeie cs obs seis 55 sleek Oe Tee Seas oeaaa gece a a eee Ge ee aac eae eee 193 IP INTERIM PRODUCT TYPE senna onian r a a a r aa S ad 194 IP INTERIM PRODUCT INDICATOR ssssseseesss
103. WBS All projects managed by the system require a Work Breakdown Structure The WBS provides a convenient means for summarizing costs and performance status at various levels of detail and for varying points of view The WBS can be a traditional hierarchy of project work categories but the system also permits additional parallel WBS structures For example the traditional SWBS may identify engineered ship systems plus shipyard engineering and support services while a parallel PWBS of products ship zones hull blocks assemblies etc is often more suitable for organizing and executing manufacturing and construction work The PWBS can be broken down to whatever level of detail the shipyard believes is necessary to efficiently track and manage performance Additionally if the shipyard organization Chart of Accounts COA is defined a third WBS also can operate at the same time to summarize performance by areas of responsibility and discrete manufacturing process PERCEPTION allows all three plus CLINs if required for the contract WBS structures to operate simultaneously Figure 6 112 Chapter 6 Starting A New Project 1 illustrates how these WBS hierarchies can operate for collecting costs from labor work orders Similar relationships operate for estimating cost items and project material requirements Project documents amp transactions can reference one or more different work breakdown structures Contract CLINs
104. able systems Unpost Accounting Transfers resets transactions on the PERCEPTION database to the un posted status Reports provide access to all accounting related reports Exceptions provide access to all accounting related exception reports 41 Chapter 3 The Grand Tour LIBRARY Library provides access to all the modules of PERCEPTION including those that are on the toolbar as well as many that are not Figure 3 21 Library Company Parameters Units of Measure Work Centers Trades Resources Vendor Catalog Standard Parts Catalog gt Currency Calendar Customers Stages of Construction Types of Work Block Types Ship Characteristics gt WBS WBS History gt Figure 3 21 Library Menu Selections e Company Parameters enables special user options and defaults e Units of Measure allows the user to define the different units of measure and their conversion factors that will be used for among other things purchasing cost estimating CERs and the Parts Catalog e Work Centers allows the user to define different areas of work e Trades Resources identifies the shipyard trade categories for budgeting manpower analysis and performance measurement reporting e Vendor Catalog provides an address book for all your vendors e Standard Parts Catalog provides a place for compiling a list of commonly used parts or normal stock items e Currency table enables purchase orders to be issued in foreign curre
105. acturer ID 25 none Part NATO Number 16 none Part Attribute 50 Unlimited Part Attribute Type 50 Unlimited Part Location 8 Unlimited Unit of Measure 8 none Work Order Serial Number none Work Order Number 8 40 A N Unlimited Work Center 8 Unlimited Work Order Change Order Number 8 none Work Order Product Code 10 none Work Order Clauses 8 Unlimited Work Order Pallet ID 8 40 A N none Pallet Item Number 8 Unlimited Tool Type 50 50 A N none Tool Class 50 none Tool ID 50 40 A N none Tool Part ID 25 none Tool Serial Number 25 none Tool Manufacturer s ID 25 none General Ledger Accounts 255 Unlimited 182 Appendix III Size Of Data Fields Customer 40 none Customer Invoice Number 20 none Vendor ID 8 40 A N Unlimited Vendor Detail ID 60 Unlimited Vendor Packing List Number 15 none Vendor Invoice Voucher Number 15 none Vendor Invoice Number 18 none Vendor Invoice Item Number 8 Unlimited Trade Number 8 Unlimited Employee ID 8 none Employee Name 40 none Employee Badge Number 25 none Employee Department 8 none Labor Type 2 Unlimited Work Type 8 40 A N none Stage of Construction 8 40 A N none Calendar Integer 40 A N none Block Type 8 Unlimited 183 Appendix IV Color Codes Appendix IV Color Codes For user convenience PERCEPTION color codes various transactions Engineering Drawing Bills Of Materials Color Codes The system provides no c
106. aialderecapaatansducasaaredenacadueosties saacsuakadeoienaaoeenda 93 Defining Stage of CONSITUCHON a et hi ica a a ea 94 Defining Work Types eene r E aaa get aaa aaa aaa 95 Defining Block Types oie eoa eE RE EE Aaaa RAEE REA OSE 96 Defining Ship Types sckusiieadkaasii isan ee ae a as 97 Defining Ship CNATACTCTISTIC Sins cty tn basa aant detlstas Nahas catasdh ba Chaat Alcai bites Waa cance sadn Jatebaats 98 Tepe Or Ship CharacteristCsS iesus na E E tp I E 98 Master List of Ship Characteristics ve accssoascsesessse beaten suaseanaseesnecaansectvetsserataruebacdes 99 Default List of Ship Characteristics sc cieiscaccsesessetes caves ceeddenches des seaeadennncstanebocsacses 99 Ship Type List of Ship Characteristics sajv c 5 4 52 Gulensnchevn Wnse a cieh a eae eG 101 PCS Custom t s ral ovate st Sarda hen ea E a rane E a A ttn taadhes 102 LIBRARIES USED BY SPECIFIC ENVIRONMENTS cesccesceeseecoseeeseeesncecseecseeeseeeenees 103 Libraries Used By Cost ESUMGUIHG rss cccicscciateiaes oc Aveas arxinaetssanecladiearesn tenceeeaieseteas 103 Libraries Used By Engineering Sico5aiaskacacsitesccdess tans Gucd sinus cabadeenedsscaseastanieucsdbesesben 103 Libraries Used By Planning and Scheduling ic ccccccssccccccsscceceeserseceeecnteceesssseeeeessunaes 104 Libraries Used By Production Engineering ccccccccscccccccssseceessseceeecssecesssssesesessnaes 104 Libraries Used By Material CG ORUOl cist tie tiie ioe eitaaS ele ital nual anata 104 Lib
107. an Existing Contract Project Further information about the advanced features offered by PERCEPTION software can be found in the user manuals for each of the PERCEPTION application modules However existing projects can be copied in whole or in part to whatever level of detail is appropriate for the new contract project This copying capability can extend down to the basic details of work orders cost estimate items material requisitions etc It may be useful to create a project template that contains the typical WBS assignments This template can then be copied and used to create new projects Using the New Contract Project Wizard Click on File New from the main menu and the system will present a wizard for creating a new contract with one or more projects It is an easy alternative to the steps outlined above The wizard takes the user through a series of windows to develop the following contract project or multiple projects SWBS PWBS and or COA copied from an existing project or projects For cost estimating the wizard enables the user to declare what rate tables to use and identify the ship characteristics that may be used for parametrically estimating costs and list a set of standard interim product packages that may be used to automate large areas of the cost estimate Select Wizard To Invoke Ed goecescosososcososcoososscsoscoseseosesesesososoeseseos Installed Wizards Besososcescosecesososssessossosossosess
108. and Predictive CERs Direct Cost Any costs which are identified specifically with a particular final cost objective Direct costs are not limited to items which are incorporated in an end product For example support services that can be specifically allocated toward a given project may be direct costs Duration The number of workdays required finishing a planning activity after it has started Drawing Number Engineering drawing number Any given requisition can be cataloged with a single engineering drawing number A drawing ID is limited to a maximum of 20 alpha numeric characters The combination of Contract Project Drawing must be unique EAC Estimate At Completion is an estimate of the final costs when all work is completed PERCEPTION develops an automated labor and material EAC hours and cost based upon work performance to budgets The EAC is calculated by the system when either a Production Labor Rollup or a Production Material Rollup is performed and can be viewed on any of the WBS level records Earned Value Earned Value is the portion of the total budget earned or accomplished from the actual costs expended Early Finish Early Finish is the earliest possible finish date for an activity 217 Glossary Early Start Early Start is the earliest possible start date for an activity EPA Item Economic Price Adjustment items are special items for reimbursing the vendor for inflation Economic Risk Economic
109. and accounting cost of money marketing etc Grand Block An optional level of the PWBS project zone sub zone grand block made from units assemblies sub assemblies and parts A grand block ID is limited to a maximum of 8 alpha numeric characters The combination of Contract Project Zone Grand Block must be unique 220 Glossary Group Group of similar or related SWBS cost accounts For example costs on separate piping systems like fire and wash and fresh water could be catalogued under the Piping Group PERCEPTION provides algorithms for automatically determining the SWBS Group when the SWBS Account is given A SWBS Group ID is limited to a maximum of 8 alpha numeric characters The combination of Contract Project Group must be unique Group Technology A method for grouping like or similar work together in order to gain the benefits possible from batch manufacturing including elimination of multiple set up process steps etc Group technology can be applied to many different kinds of work The more classical example is the fabrication of a large group of same size pipe spools However the concept evokes similar time and cost savings with zone sequencing of trade work scheduling a given trade to work uninterrupted and unencumbered in specified ship spaces or zones or on a specific structural unit s pre outfitting Structural panels and sub assemblies also can be scheduled in ways to maximize the productivity objectives of g
110. ard must be able to evaluate its operations in quantitative terms This means that the shipyard must have implemented a reasonably accurate means for measuring cost and schedule performance at appropriate levels of detail Performance measurement systems should provide the visibility of performance that will indicate whether or not changes are warranted and ultimately if the changes are proving to be effective Return cost information from such systems form the information needed to develop high quality predictive CERs that reflect not only past cost performance but also anticipated performance on new work 236 Glossary Performance Risk Performance Risk is the degree of uncertainty that the engineering manufacturing and management resources can perform for the estimated cost and schedule It can be measured simply by estimating a possible spread of costs under a best and worst case scenario A statistical analysis may provide an additional measure of Performance Risk by estimating the probability that the actual cost will equal that of the estimate in question Refer to Cost Risk Person To Contact See Responsible PERT Program Evaluation and Review Technique is a scheduling method that utilizes CPM procedures for computing activity schedules PERT also calculates odds actually happening on any given date using a very simple statistical computation upon three 3 separate manually derived estimates of duration for each network activity
111. ase Structure s s s 7 Default Project WBS 122 Defining Block Types ee eee 96 Defining Business Rules 107 Defining Company Logo 107 Defining Contract Projects 126 Defining Customers eee 102 Defining Ship Characteristics 98 Defining Ship Types s es 97 Defining Stage of Construction 94 Defining Trades Resources 2 93 Defining Units Of Measure Library 91 Defining Work Centers eee 92 Defining Work Types eeceeeeeeeee 95 Deleting Database Records 63 Detail W orksheets 22c20scccecehecisseaeertice 58 Distribution Lists For Reports 151 Drop Down Data Fields 67 Duplicate Keys Error seese 10 EDI Direna a e 20 Editing Data Fields 0 0 22 64 Engineering Drawing Bills Of Materials Color Codes uence ai 185 ENVIRONMENT oaeee 32 Escape ICY cs cadet esre ha ie 84 EXCEL Importing oseese 145 Exception Reports eeesceeeeeeeeeees 163 Export To ACCESS Or Any SQL Databas iain 146 Export to EXCEL and Other Formats 146 External Data Source File Types 141 BSE zarena een Beano 18 Filtering Records 71 Find amp Replace 00 ceeeeeeeeceeeeeeeeeees 25 Find Option escsece Suse daeade ass codebetinees T2 Function KEyS ieedit 191 General Shipyard Planning References a A S 204 General System Operation 57 Global Detaults 2 24 6 362s aeel
112. aterial Requi Pallet Items Pallet Items Figure 3 11 Drill Down Selector ENVIRONMENT Environment Figure 3 12 provides direct access to the various basic system applications grouped in typical shipyard levels of interest Environment Cost Estimating Engineering Planning amp Scheduling Production Engineering Material Control Purchasing Stores Management Accounting re Figure 3 12 Environment Menu Selections 32 Chapter 3 The Grand Tour Cost Estimating Engineering drawings and drawing bills of material Planning amp Scheduling planning activities Production Engineering work orders Material Control requisitions amp pallets Purchasing purchase orders amp amendments Stores Management inventory receiving QA inspections issues to production Accounting time charging accounting transactions vendor invoice processing amp customer billings Cost Estimating Environment has the following choices Figure 3 13 Environment Cost Estimating b Package Library Engineering gt Package ltem Library Panoias aeaa meen ae Production Engineering gt Material Control gt Cost Items Purchasing gt Rate nd Indirect Formula Tables Stores Management Escalation Accounting gt Cost Estimator s Toolbox Return Cost Rollup Risk Analysis Transfer Estimate to Production Reports Exceptions Figu
113. ating Windows This focus character moves within the field as the user types data characters Within a given data field most alphanumeric character keys are operational Some data fields however permit only numeric data such as for quantities and costs Numeric data must be entered without commas Field editing can be done using the backspace and the insert and delete keys The cursor also can be positioned among input characters within the data field using the left arrow and right arrow keys To move from field to field the tab key moves the user from left to right and shift tab moves from right to left The mouse pointer can be used to position the cursor on any field The up arrow moves the cursor to a previous line item in a worksheet window while the down arrow moves to the next line item In a worksheet window the ENTER key operates the same way as the down arrow moving the focus to the next line item Types of Data Fields There are various types of data fields that can be displayed in a worksheet e Fixed Data Field is simply a box into which the user can enter or update data e Drop down List Box is a box with an arrow at its side If the user clicks on the arrow a list of options or selections drops down By clicking on the desired option or selection the user sets that value in the box The selections in the List Box are set by the system and these selections cannot be added to or removed from by the user e D
114. ax Beam Maximum M i 12 Dimensions v Depth Depth Molded M v 13 Dimensions v Draft Draft M v 14 Dimensions FRSP Frame Spacing M v 15 Dimensions _ _ Y Ht Height of Highest Projection above DWL M _ 16 Dimensions v LOA Length overall M v 17 Dimensions vy UWL Length waterline M v 18 Dimensions MinBerth Minimum Berth Depth M Eo 19 Financial Bond Cost Amount Covered by Bond v Financial v Mortgage Mortgage Principle Amount i Financial y Mortgage Interest Mortgage Annual Interest vi Financial v Mortgage Years Mortgage Years Term YRS v 23 Financial Title XII MARAD Title XII Guarantee aa Machinery oy KW EGEN Emergency Electric Generation KW i Machinery y KW GEN Electric Generation KN v Machinery vy KW ME Main Enginefs kW v Machinery v KW TGEN Total Electric Generation KW v Machinery v KW THRSTR Bow amp Stern Thrusters KW xi MaxTanks DO Diesel Oil GAL M MaxTanks v FW Fresh Water GAL v 31MaxTanks v JP 5 JP 5 Fuel GAL v Figure 5 16 Master List of Ship Characteristics Default List of Ship Characteristics A list of Default Ship Characteristics may be defined so that each new project using PERCEPTION s New Contract Project Wizard will have these default characteristics automatically assigned to it Refer to the chapter Starting a New Project Using the New Contract Project Wizard for more information 99 Chapter 5 Starting A New System amp Database To define the defaul
115. bar to the left of the left scroll button at the bottom left corner of the window Place the pointer on this bar and drag it to the right A left hand scroll system appears that controls the left section of the window The original scroll system will move with the dragging and allow a separate scrolling of the right side of the window 172 Appendix I Operating Windows Changing Column Widths Some worksheet windows will have columns that do not appear wide enough to display the complete data field The user can increase the size of the column by placing the pointer on the column separator line within the column title area The pointer will change to a double arrow symbol Drag the column line in either direction to increase or decrease the column width Moving Columns There may be situations whereby the user wishes to re arrange the columns of a window to better suit the visual display Place the pointer in the middle of the column header and drag it to the desired location Note Re arranged columns are not saved by the system unless the user elects to save them Select View Save Current Column Order from the main menu To reset to the original column order select View Restore Column Order from the main menu Moving The Window As windows are opened and layered a newly opened window may appear somewhat off the screen This window can be re positioned by placing the pointer in the Title Bar and dragging the window to the desired posit
116. been made since the window using the drop down was opened Refer to Types of Data Fields in Appendix I for more information Refresh Linked Windows refreshes the windows in the current linkage chain Refer to Linkage and Drill Downs for more information Data Analysis Extraction Tool provides a statistical data analysis tool 46 Chapter 3 The Grand Tour REPORTS Reports provides a variety of different reports that summarize cost data for the contract by separate project SWBS by PWBS by BOM by Cost Item and by work center By clicking on the menu Figure 3 25 the following pop up menu Figure 3 26 provides a selection of available reports grouped by report category Reports Select Reports Maintain Exceptions Maintain Recipient Lists Figure 3 25 Reports Menu Select Report To Run Report List Perception Reports Collection _ Activity Listing Reports Baseline Progress Reports J BOM Reports E BILL OF MATERIAL B1 Listing E BILL OF MATERIAL B2 COST REPORT DETAIL E BILL OF MATERIAL B3 COST SUMMARY REPOR E BILL OF MATERIAL B4 DETAIL REPORT BILL OF MATERIAL B5 STATUS REPORT BOM STOCK STATUS REPORT 56 Budget and Cost Reports CERs by WBS C Cost Escalation Reports Cost Item Listings Cost Item Value Reports Estimate BOM Lists ee Fe Figure 3 26 Report Selection Window 47 Chapter 3 The Gra
117. ber to which the cursor will move This is useful when the window contains many rows Global Defaults allows the user to specify global default values Figure 3 5 of contract project number SWBS PWBS etc These defaults will be used by the system when adding new rows into the worksheet They also can be used for retrieving new records from the database Contract Work Center Rate Year 00 00 00 H Project M Use CERs from selected WBS Level SWBS Group o OA z Account PWBS Zone sd m Cost Centers Outfit Zone Dept Unit Center Assembly Trade Sub Assembly Progress Part Load Cancel Reset Clear Figure 3 5 Global Default Selections 21 Chapter 3 The Grand Tour Editing Data Fields To change data within any record displayed in a data entry window click on the field to be modified and edit or re enter the data Any number of data fields across any number of records displayed on the screen can be modified in similar ways by using the mouse cursor to move from field to field The following are frequently used operations for editing any given data field e To insert one or more characters into a data field click on the space to the right of the character where the insertion is to begin Note that the cursor becomes a vertical line Then type in the inserted characters e To delete one or more characters from a data field click on the left of the chara
118. ble people were asked for the most likely time the value given most often would form the most likely time estimate MRP Material Requirements Planning is a set of planning techniques to help better determine what to order how much to order and when to schedule delivery MRP helps set priorities for inventory planning and control capacity requirements and shop floor control functions MRP II Manufacturing Resource Planning II is all of MRP plus the integration of accounting and financial systems NATO Stock Number For warship projects each material item may need to be cataloged with the appropriate NATO Stock Number for the following reasons Insure the Government that equipment to be installed upon the ship meets required Government quality and functional specifications Insure equipment is standardized within the NATO support and maintenance program 229 Glossary NATO Stock Number 1234 56 789 0123 RRA FSC NCB Serial Number dm __ _ gt A NIIN The Federal Supply Classification FSC number is a 4 digit code which groups similar type items into classes 10xx Weapons 20xx Ships and Marine Equipment 30xx Mechanical Power Transmission Equipment The National Codification Bureau NCB number is a 2 digit alphanumeric number designating the NATO country that cataloged the item The National Item Identification Number NIIN is a composite code including the NCB and a 7 digit alphanumeric material
119. ccccssssessecsccccccesesssssescceccsssuusessesccecsessuseeseecessseaea 136 CHAPTER 8 USING EMAIL WITH PERCEPTION c cccccccssssssssssessscssscscccces 139 CHAPTER 9 IMPORTING amp EXPORTING DATA cccccccssscsssosssssecesscossseees 141 EXTERNAL DATA SOURCE FILE TYPES csccccccsseececcescececcccsececcecescensseesecceseeceeneners 141 IMPORTING DATA bie cdi Gods tes cdads Sethe is ie beaes sesh ob Sed aes voteatis abd cadl suena bbb eecaek eeateeduedeas 141 IMPORTING EX GEL DAA Reise bec et eta av hndva o Bola inc ee Mea N R 144 Importing EXCEL Workbook DGG vocwetis ihe dourtrivesdtvats Cdatish wedcase te eat non davaaein ake seddsinn 144 Preparing EXCEL Workbook Data for EXPOrting cccccccccscccccsesssceeecsteceeesstecesesssnaes 144 PEC EET TID OVUNG cnapanan a tant hea coche inated larastentstewdsriarhocdsindiberievies 145 PERCEPTION Global Defaults ccuciidancicatase cane ines E 146 EXPORT TO EXCEL AND OTHER FORMATS ccssescccceseececceceececceeeccccsseececceseeceeneners 146 File Save AS Excel Work SNE EL cccccccccnseeececcsseececcseeccccseececcueececcusecscccueececeuners 146 EXPORT TO ACCESS OR ANY SQL DATABASE cccscccccsccesessessececeseceeeesensseeeeeeeeeenenees 146 CHAPTER 10 LINKING TO WEB PAGES cccccccsssssssssssssssssssssssssssssssssscscees 149 USING THE URL FEATURE cccccccsccccccccessssssscsccceccssssssssesccssccseesscssesccsscsseessssescessesees 149 CHAPTER 11 DISTRIBUTION
120. ch as untitled usually appears 169 Appendix I Operating Windows The menu bar lists the available menus Most applications have a File menu an Edit menu and a Help menu as well as menus unique to the application The Scroll bars let you move parts of a document into view when the entire document won t fit in the window They also let you view unseen portions of lists and other information that is too long to fit in the allotted space The maximize and minimize buttons chosen with the mouse enlarge the active application window to fill the entire desktop or shrink the window to an icon Document windows enlarge to fill the application workspace only not the entire desktop After you enlarge a window the maximize button changes to a Restore button You can use the Restore button to return the window to its previous size The window border is the outside edge of a window You can lengthen or shorten each side of a border The window corner can be used to shorten or lengthen two sides of a border at the same time The workspace is where you do most of your work with an application For example if you start a word processor the contents of your document appear in the workspace Some applications allow you to open more than one document window within this workspace The selection cursor shows where you are in an individual document It marks the place text or graphics appears when you begin typing or drawing 170 Append
121. change Rate Ratio of home or domestic currency value to the foreign currency value Federal State Tax Codes Federal State Codes indicating what tax if any are included on a material item FIFO First In First Out The unit cost based upon the earliest purchase price of items on shelf 219 Glossary Float Time This is the scheduled leeway that allows flexibility in the duration of an activity without adversely affecting any other activity or the overall project Same as slack time See also Free Float Flow Chart The sequenced diagrammatic representation of events and activities FOB Instructions Instructions on the purchase order for delivery shipping of the purchased goods This would include the freight company name insurance requirements special packing requirements and any other specifics the buyer wants the delivery company to be aware of Based on these instructions the vendor can make specific delivery arrangements according to the buyer s preference Free Float Amount of time any given activity can slip its schedule before impacting the total float of other activities Functional Characteristic Based on a system or operational characteristic of a ship Functional has no physical boundary G amp A General administrative costs that can be isolated from general overhead G amp A determined more typically for government contracts identify administrative costs supporting the given work facility such as legal
122. charge out unit price manually determined Stock Inventory Some material may be required to be drawn from general stock inventories To properly account for these items the material control system must identify stock items used by project requisitions Once these items have been recorded their costs will be included in the project WBS cost accounting The PERCEPTION system accommodates this requirement either by treating the stock department as a direct vendor or by implementing the stock inventory capabilities of the PERCEPTION system This latter feature permits requisitions to be developed in the same way as for direct material purchase 248 Glossary Storage Location for Materials Location identification for storing items The location ID is limited to a maximum of 12 alpha numeric characters and must be unique Sub Assembly A level of PWBS project zone unit assembly sub assembly that is a definable unit of product that is then incorporated in a larger unit assembly A sub assembly ID is limited to a maximum of 8 alpha numeric characters The combination of Contract Project Zone Unit Assembly Sub Assembly must be unique Sub Zone An optional level of PWBS project zone sub zone that is a geographic division of the ship into compartments to suit documentation planning and scheduling of the shipbuilding process A sub zone ID is limited to a maximum of 8 alpha numeric characters The combination o
123. cial edit functions are available from the Edit main menu Define Copy Delete e Copy Work Orders to create new work orders e Import Data from another data source Modify Selected Records performs the following functions on work orders that have been retrieved and selected Authorize Un Authorize work orders for time charging Issue Un Issue work order tickets Close Open work orders Attach Detach Planning Activities to work orders Apply Labor Rates to work orders Reschedule Work Orders Modify Work Order Assignments Change Labor Budgets factoring Labor Rollup provides options for re computing data summaries throughout the project WBS Specifically the user may perform rollups on actual labor cost and schedule data including progress and final cost forecasts and trends Add Clause inserts work order clauses into a work order description 27 Chapter 3 The Grand Tour For Material Control the following special edit functions are available from the main Edit menu Define Copy Delete e Copy Requisition s also copies BOMs and or pallets if desired e Import Data from another data source e Define Pallet from Requisition generates a new pallet and items from requisition items e Define Purchase Order from Requisition s generates a new purchase order from the items attached to selected requisitions Modify Selected Records performs the following functions on requisitions that have been retrieved and s
124. cific records from the database Type of Windows There are several basic types of worksheets in PERCEPTION Worksheet windows display multiple lines or rows of data records Worksheet windows have the same appearance as spreadsheets Detail worksheets display only the contents of one row of data but allow for the viewing of more fields on a single screen They are arranged in a logical order for data entry Tab windows allow multiple views and lists of various types and details of information that are easily displayed by using the tabs provided at the top of the worksheet Reports also are worksheets but they are presented in formats specific to the type and style of the desired report Working with Windows The following describes a few of the features inherent within a windows application system like PERCEPTION Use of these features is strictly optional but there are occasions when they make use of the system much more convenient Split Scrolling Some of the worksheet windows have the ability to split the screen so that horizontal scrolling can be separately controlled on the left and on the right side of the window For example if the user wishes to scroll to the right to see other line item fields the split scroll will allow the left most columns including the item description to remain on the screen To activate the split scrolling select View Horizontal Split Scrolling from the main menu The screen will indicate a black vertical
125. ckage consists of a set of cost items and or cost item CERs each describing labor and or material costs The labor costs may be broken down into the product s sequence of manufacturing and assembly stages They may also include indirect cost efforts such as supervision and material handling as well as related direct costs such as testing The interim products can be defined at any level of the PWBS The higher the level the more ship type specific they are likely to be These interim products become in effect high level complex CERs because they may include any number of cost items and these cost items may be parametric to any number of different defining characteristics The use of the standard interim product as a vehicle for cost estimating is sometimes referred to as a Re use package that can operate with a variety of applications The important aspect of the package used repeatedly as needed in developing a project cost estimate Standard Part Number For companies desiring a standardized parts coding system often required for optional use of CAD CAM systems PERCEPTION provides a means to catalog a Standard Part Number with standard descriptions and other detailed characteristics The Standard Part Number may be made the same as the Stock Inventory Number The standard part number is limited to a maximum of 20 alpha numeric characters The combination of Part Number Part Type must be unique Standard Price A material item
126. ct WBS They also may reference part numbers in the system s Standard Parts Catalog Schedule Planning Activities are the basis for scheduling project work using the automated scheduling tools provided by the system The following three 3 identifiers catalog Schedule Planning Activities Network Number Work Center and Activity ID The Network Number allows different schedule networks to be developed for the same contract project This capability enables planners to develop schedule networks at different levels of detail Activities may have indirect references to the project WBS They also may be associated directly with series of Work Orders Drawings are cataloged by project and drawing number Items in drawing bills of materials are cataloged by project drawing and item find number in the drawing They also may reference standard part numbers in the system s Standard Parts Catalog Material Requisitions are the basis for defining material requirements The following three 3 identifiers catalog requisitions Contract Number Project Number and Requisition Number The Requisition Item Number further identifies items in the Requisition Requisition Items have indirect references to the project WBS They also may reference drawing bill of material find numbers as well as part numbers in the system s Standard Parts Catalog Purchase Orders POs are the means for ordering all project oriented materials as well as repleni
127. cter string to be deleted Then press the Delete key repeatedly for each character to be deleted e To delete a long string of characters from a data field click on the space before the left end of the string Then drag the cursor to the right end of the string Note that the system will highlight the string during this dragging process Then press the Delete key e To replace a string of characters within a data field click on the space before the left end of the string Then drag the cursor to the right end of the string Then enter the replacement string of characters from the keyboard e To replace the entire contents of the data field click on the data field until the system fully highlights the contents of the field Then enter the replacement string of characters from the keyboard If a data field has been changed but the user wishes to reset the field back to the original value the record can be re retrieved without saving this change Click on the Reselect Row button D on the toolbar Once all data entry has been completed the user should click on the Save Button on the toolbar No changes to the permanent database will be made until the user formally initiates this save operation 22 Chapter 3 The Grand Tour Cut Copy amp Paste The following outlines some of the options for cut copy and paste operations To CUT one or more rows of data and place in the Windows clipboard select the row s and select Edi
128. cts with the ability to time phase pricing and rates across planned construction schedules Planning and Scheduling PERT PAC uses the critical path method to develop integrated engineering purchasing and production construction schedules that reflect necessary work sequences as well as available constraints on resources facilities and time With PERT PAC you can define time phased resource limits so that resources can be automatically rescheduled during periods of short supply You also can develop templates of normal work sequences to expedite the planning process The system measures and analyzes the impact of actual schedule performance and material deliveries using real time data provided by the WORK PAC and MAT PAC modules Chapter 1 Introduction Manpower and Work Order Management WORK PAC plans and tracks labor costs and schedule performance at the work order level and summarizes performance by work breakdown structure The system is tied directly to time charges automatically measures work progress and forecasts final costs continuously in man hours and labor dollars Trade manpower requirements can be generated as planned and as forecast to complete for single contracts or across the entire company operations Purchasing and Material Control MAT PAC accommodates the special needs of purchasing material directly for contracts and replenishing supplies of general stock MAT PAC effectively handles real world purchasing pr
129. d assigning production time charges to trade categories Trades can be a duplication of what the COA can provide for managing departmental resource requirements and performance but without the hierarchy of COA PERCEPTION can summarize costs and performance by both structures However a historical tracking of performance can only be achieved using COA The work centers enable the estimator to identify different labor indirect and or profit rates for different areas of work to be performed If rates change for any given area the estimator can simply change the work center rates and the system will automatically update all cost items assigned to that work center If the change is due to a change in a manufacturing process for example replacing manual with automated equipment the system provides functions to apply global factors to the cost items assigned to that work center If the change is due to an alternate provider of labor for example out sourcing the work to subcontractors the system provides functions for directly replacing cost items of one work center with another and then automatically applies the new center rates 117 Chapter 6 Starting A New Project Contract CLINs Contract Line Items CLINS is a breakdown of work as specified by the ship owner This is an independent work breakdown structure that can be used in both new construction and ship repair CLINs belong strictly to the contract and typically vary from
130. data set Editing Data Fields To change data within any record displayed in the data entry window click on the field to be modified and edit or re enter the data Any number of data fields across any number of records displayed on the screen can be modified in similar ways by using the mouse cursor or the Tab key to move from field to field The following are frequently used operations for editing any given data field To insert one or more characters into a data field click on the space to the right of the character where the insertion is to begin Note that the cursor becomes a vertical line Then type in the characters to insert To delete one or more characters from a data field click on the left of the character string to be deleted Then press the Delete key repeatedly for each character to be deleted To delete a long string of characters from a data field click on the space before the left end of the string Then drag the cursor to the right end of the string Note that the system will highlight the string during this dragging process Then press the Delete key To replace a string of characters within a data field click on the space before the left end of the string Then drag the cursor to the right end of the string Then enter the replacement string of characters from the keyboard To replace the entire contents of the data field click on the data field until the system fully highlights the contents of the
131. dentifier In this case all project numbers must be unique Therefore if project numbers for the shipyard are not unique then the timecards must also carry a contract identifier After the project numbering scheme has been decided the remaining information about the overall project should be entered such as budget SWBS Group Schemes If the project is not to use SWBS as one of its WBS levels then this section can be ignored One of the data fields on the project record is labeled Group Scheme Figure 6 5 The SWBS Group number can be automated such that once the SWBS account is entered the system can determine what SWBS group it belongs to The drop down worksheet allows the user to identify the SWBS account number as a numeric field where the group number can be derived as a leading digit or digits of this account number For example if a 3 digit account scheme is specified the system will assume that the group number is the leading digit in the 100 series An account number 314 under a 3 digit scheme belongs under group 3 The account number 1314 also may be a 3 digit scheme and therefore will belong to group 13 However if the account number 1314 is identified as a 4 digit scheme that account will then belong to group 1 121 Chapter 6 Starting A New Project Project Details Information for the Material Control Environment Details Material Status Overall Status Indexes Variances Notes Baseline Opt
132. des the user with options for re computing data summaries throughout the contract project work breakdown structures Specifically the user may perform rollups on actual labor cost and schedule data including progress and final cost forecasts and trends e Reports provide access to all labor cost and schedule related reports e Exceptions provide access to all labor cost and schedule related exception reports Material Control Environment has the following choices Figure 3 17 Environment Cost Estimating b Engineering b Planning amp Scheduling gt Production Engineering gt Request for Quote aiai Requisitions Stores Management TR Requisition Items Accounting b Pallets Pallet Items Material Control Toolbox Reports Exceptions Figure 3 17 Environment Material Control Menu Selections e Request for Quote provides the means for developing an RFQ to prospective vendors e Requisitions opens the material requisition window for viewing editing adding and deleting records e Requisitions Items opens the material requisition items window for viewing editing adding and deleting records e Pallets opens the material and work order pallet window for viewing editing adding and deleting records e Pallet Items opens the material and work order pallet items window for viewing editing adding and deleting records e Material Control Toolbox provides a variety of functions for editing and
133. detail in the Systems Administration User Manual under Chapter 17 Datawindow Designer Figure 4 18 provides a sample standard format of a cost estimate report Figure 4 19 provides the same report modified to eliminate the Unit Price and detailed price extensions from the report The user can reset the report back to the original format using View Reset Data Window from the main me nu of the system 81 Chapter 4 General System Operation Page 1 of 1 a arino TO CUSTOMER ESTIMATE PROPOSAL FROM 927 West Street SPAR Associates Inc Annapolis MD 21401 USA 927 West Street Annapolis MD 21401 USA Contract 1999 01 Ship Repair Production Demo Project DES 1 Sample Ship Repair Project onome cumaiy uon pesonn CC im rnd Account 200 Manual CERS Man labor CER pari Bronze Gate Valve 2 inch threaded 150 psi Ubrary lator amp material CEAS Ubray labor CER amp manual material CER Ubray material CER amp manual labor CER Ib CER amp Bronze Gale Valve 2 inch threaded 150 pal Bronze Gate Valve 2 inch threaded 150 psi Total for Acct 200 Total for Project DES 1 Total for Contract 45 0000 Figure 4 18 Sample Cost Estimate Report before Datawindows Designer Modifications Page 1 of 1 arino ae TO CUSTOMER ESTIMATE PROPOSALFROM 927 West Street SPAR Associates Inc Annapolis MD 21401 USA 927 West Street Annapolis MD 21401 USA Contract 1999 01 Ship Repai
134. dule A trend of schedule variance at 100 completion also is tracked e Labor Performance tracks labor hours as scheduled planned earned value actually charged total budget which may vary in time and the estimate at completion EAC e Performance Indices are tracked for labor hour performance e Material Cost tracks material cost budgets purchases commitments etc e Combined Graphs display all of the above graphs except for the Material Cost graph Figure 7 4 Snap shots of the historical data presented in these graphical reports is generated automatically by the system whenever the user initiates a project rollup by selecting Environment Production Engineering Rollup from the main menu When time charges are entered into the system Environment Accounting Timecards the system provides the user with an option to perform the same rollup after the time charges have been posted to the work orders The historical data can be viewed project by project WBS level by level by selecting Library WBS History from the main menu This data then is displayed in a worksheet window 136 Chapter 7 Project Navigator Figure 7 4 provides a sample of the combined graphics option from the Project Navigator pop up menu The individual graphs can be expanded to full window by clicking on the maximize border button at the upper right corner of the desired graph These graphs can be sent to the printer by clicking on the printer bu
135. e 74 Glossar yerai tiaa 204 257 Abbreviations Go Forrsoinhannus inienn 26 Halt JULI CG eRe RN ne oer erery naan 84 Halting a PERCEPTION Process 84 Hardware And Software Technology 2 HELP oein a AA 52 Importing amp Exporting Data 141 Importing Data eee eeeeeeeeeeeeees 141 Importing EXCEL Data 0 144 Importing EXCEL Workbook Data 144 Integrating Shipyard Information 5 Interfacing with Accounting Systems 155 Interfacing with Financial Accounting Syste aeaa 105 Internal Database Codes 67 193 Introducn Onis 5 ieee 1 Labor Rate Year Cost Estimating 123 Libraries Used By Accounting 105 Libraries Used By Cost Estimating 103 Libraries Used By Engineering 103 Libraries Used By Material Control 104 Libraries Used By Planning And Scheduling 104 Libraries Used By Production Engineering ot esas seeders accu stele 104 Libraries Used By Purchasing 104 Libraries Used By Specific Environment 0 0 0 ceeseesseceseeeees 103 Libraries Used By Stores Management sh sty sits cee svat at iicrasann meat a A 105 LIBRARY ni ote taut ade ase 42 Linkage And Drill Downs 0 75 Linked Windows cceeeseeseeereeeeees 60 Linking To Web Pag es ee 149 Main Window i2i cccs c2ssceiniiecccunaocicds 16 Management Graph Reports 136 Manpower And Work Order Management i icascs
136. e Project costs therefore can be assigned to any one or more of these individual work breakdown structures 8 CLINs can be used to summarize costs and contract performance by an owner s own work breakdown structure 111 Chapter 6 Starting A New Project Contract amp Project s All projects developed on the system must be assigned to an overall contract This requirement enables multiple projects to be developed for any given contract proposal or cost management plan Some examples are series ship construction and other projects for class ship design and engineering training programs integrated logistics support and other major elements of a large procurement program Table 6 1 For ship repair phased maintenance contracts allow multiple ships to be processed with an ability to manage overall contract performance Smaller repair facilities may use the contract as the means to identify a particular customer this allows each customer s workload to be tracked and performance and level of profitability assessed Project No Project Description 2001 Ship Design Development 2002 Ship 1 2003 Ship 2 2004 Ship 3 2005 Ship 4 2100 Integrated Logistics Support Program 2101 Financial amp Operational Costs 2102 Scrap Value Table 6 1 Example of Multi Project Contract for Life Cycle Cost Estimate If summarizing costs by CLIN is also a requirement these CLINs must be defined under the contract Project
137. e column headings The displayed data can be sorted either in ascending or descending order by any single or multiple columns e Filter opens an option window that allows the user to further fine tune the selection of rows displayed NOTE See General System Operation for further discussion of filter functionality e Validate will check the data for the entire dataset in the window that is active e Run Associated Reports opens a window that displays all reports that are relevant to the selected records The report will run using the selected records for the retrieval argument e Mail will create an EXCEL file of the complete dataset in the window that is active and attach it to an email that can be sent to anyone in the user s email address book 54 Chapter 3 The Grand Tour PDF Writer will create an Adobe Acrobat PDF file containing the data in the current data set The Adobe Acrobat software must be properly installed Adobe Acrobat Version 4 0 or greater is needed for this capacity to work The PDF Distiller that is installed and the path to the PDF ini file must be entered in the company defaults table To do this select Library Company Parameters from the main menu Drill Downs opens a window with the Drill Down options appropriate to the current window available for selection The following buttons are available only when the free form worksheets are open 4 a gt hi First moves to the first record of selection
138. e multiplied by to obtain the Convert To unit of measure Units Of Measure Conversion Factors i Convert To Conversion Factor Ere Description Ai IN 12 00000 Feet to Inches 2 FT M 0 30480 Figure 5 8 Units Of Measure And Conversion Factors Defining Work Centers To access the Work Centers Definition Window Figure 5 9 select Library Work Centers from the main menu amp Work Center Information ae jol xj Center sa Description Manager Location Productivity Fa 4401 Steel Fabrication 1 45 T02 Steel Assembly 1 4g T03 Steel Erection 1 47704 Steel Weldout 1 4giT05 Mould Loft 1 49 706 Material Control 1 sojo Planning and Control i 51 T09 Drawing Office 1 52710 Production Services 1 531711 Carpenter s Shop 1 5415 Miscellaneous 1 55721 Joiner Shop 1 56722 Rigging Shop 1 57123 Outfit Shop 1 58124 Pipe Shop 1 59 725 Machine Shop 1 60 126 Electrical Shop 1 61 1731 On Board Joinerwork al 62 T32 On Board Rigging 1 63 T33 On Board Outfit 1 bel N Figure 5 9 Work Centers Work Centers are areas of responsibility and can be equivalent to departments although they may be specific functional areas of departments or process stages of manufacturing The system provides for a brief description of the work center The work center also can be assigned to a specific manager location and productivity factor 92 Chapter 5 Starting A New System amp Database The procedu
139. e standard Windows functions The user can customize the position the button size and whether or not to display the button text of these toolbars By right clicking on a toolbar the changes can be made to that toolbar The second toolbar is only visible while in one of the modules and several of the buttons on this toolbar are only active when an appropriate action has been taken to make them active There is also a third toolbar that is window specific It provides functions that are exclusive to the active window E k an Hon Oe H CPGAZU Ss x 66 42 gt 0 84 08 8 La Figure 3 34 Toolbar Functions The first toolbar provides direct access to define view or modify the following e New opens a wizard fro creating a new contract or project e Project Navigator opens the tree view navigation through the projects e Environment Selector allows the user to easily change environment in which the current window will be viewed i e the Estimating view of Project Details may be different than the Production Engineering view of the same window e Global Defaults allows the user to enter default values that the system will use for entry of new records and for the range retrieval selection windows e C P G A Z U opens either the WBS Contract Project Group Account Zone or Unit windows e Parts Catalog opens the window to view or enter standard parts e Run Reports opens the report selector window
140. e system Some validations are made on the spot as the user enters data into a worksheet Other automated validation features restrict the user to only previously defined data using drop down windows that access tables developed elsewhere on the database Many validations are made by the system when the user attempts to save data onto the database There is a special data validation button on the toolbar This validation checks for data discrepancies that may not be in error but nevertheless may warrant user attention The system manages a list of business rules many of which the user s systems administrator can turn on or off Many of these business rules instruct the system on how to treat various transactions as being valid or not Refer to the chapter Configuring Business Rules for more information The system finally offers a wide range of exception reports These reports allow the users to scan information on the database according to specified criteria Those items on the database that meet or fail the criteria will be reported as directed by the user Refer to the chapter Exception Reports for more information 161 Chapter 15 Data Validation There are several methods available for initiating data validation e Click on the data validation button ko on the toolbar and the system will run validation tests on all records currently retrieved in the worksheet e Click on Data Validate Row on the main me
141. e system will set that item to complete automatically If the received quantity is less than the ordered quantity but no more material is expected to be received to that item it must then be manually closed by the user The system will then update the parts catalog and requisition items When all purchase order items have been set to complete the system will automatically set the purchase order to complete If the user sets the purchase order to complete the system will automatically set all of its items to complete Concept Design Estimate The cost estimating possible during concept design is at a very high level and makes rather broad assumptions about the ship design its general mission and its physical and operational characteristics Concept design may also make broad assumptions about the general methods and organization of the design engineering and construction processes 213 Glossary Contract A contract describes an overall scope of work to be performed One or more projects may be developed under a contract Cost and schedules can be summarized across projects within a contract Contract Project A Project B Project C A contract ID is limited to a maximum of 20 alpha numeric characters and must be unique Contract Design Estimate Cost estimating at this phase of design describes costs on the basis of production interim products hull blocks outfit modules and ship zones and manufacturing processes p
142. ecord key Other records have multiple keys such as the work order which requires the contract project and work order number and work center ID the work order also can be uniquely identified by the system generated work order sequence number The following table lists the keys for various database table records All of these keys may be alphanumeric and the length of characters for each is provided in Appendix III 197 TABLE VII Database Record Keys Appendix VII Record Keys Key 1 Key 2 Key 3 Key 4 Key 5 Key 6 Key 7 Work Breakdown Structures Contract Contract ID Contract CLIN Contract ID CLIN ID Project Contract ID Project ID SWBS Group Contract ID Project ID SWBS Group SWBS Account Contract ID Project ID SWBS Group SWBS Account PWBS Zone Contract ID Project ID PWBS Zone Outfit Zones amp Grand PWBS Outfit Zone Contract ID Project ID PWBS Zone Blocks PWBS Unit or Block Contract ID Project ID PWBS Zone Units amp Blocks PWBS Assembly Contract ID Project ID PWBS Zone Units amp Blocks Assemblies PWBS Subassembly Contract ID Project ID PWBS Zone Units amp Blocks Assemblies Subassemblies PWBS Mfg Part Contract ID Project ID PWBS Zone Units amp Blocks Assemblies Subassemblies Mfg Parts COA Department Contract ID Project ID COA Department COA Stage of Construction Contract ID Project ID COA Department Stage
143. ed either to the right or to the left When the edge of the screen is reached it doesn t appear that the column can be dragged any farther At this point release the mouse button and this will temporarily insert the column at that point Then use the horizontal scroll bar to shift the display further so that moving the column can be resumed Return to the column being moved click on it and keep the button depressed and continue dragging the column to the desired location When the columns are rearranged the new column order can be saved so that they will be displayed this way the next time this window is opened either in the current session or future sessions Do this by selecting View Save Current Column Order from the main menu To restore the column order to the original default order select View Restore Column Order 7 Rearranged column orders are automatically saved by the system and will appear in that same rearranged order when the worksheet is reopened any other time until changed again The column order is maintained on each client PC and is not a global setting for all users 11 Chapter 4 General System Operation Other Helpful Features As the user enters information within various worksheets there are often times that the user cannot remember all the details necessary to complete a worksheet In many instances the system provides convenient drop down data fields that will display the available list of specific in
144. either in the upper right corner of the worksheet or the X button x on the toolbar If information in the worksheet has been altered in any way the system will always ask the user if the changes should be saved onto the database Opening Multiple Worksheets The system allows any number of worksheets to be open at any time Any of these windows can be activated by clicking anywhere inside that window or by clicking on its title bar which when made active becomes highlighted The other open worksheets will have title bars that are not highlighted 57 Chapter 4 General System Operation Multiple worksheets can be displayed differently at the option of the user Refer to the chapter Windows in the main menu bar in this user manual Worksheet Worksheets Many of the worksheets of the system are worksheets Figure 4 1 that list multiple rows of records This type of worksheet looks like a spreadsheet and is a convenient means for the user to visually see a range of records and their information PERCEPTION Total Shipyard Management MAE File Edit View Environment Library Data System Reports Window Help f liz iw CPGAZU S B O BCEE AEETI NEE 3 ES a Work Orders Information _ oO x A L Contract Project Center Work Order Heading Revision Revision Date Planned Qty Actual Qty _1 C DEMO j0 o zp10 Pre Outfit Cold 00 00 0000 1 00 E __2 C DEMO xj D Loftin
145. elected Authorize Un Authorize requisitions for purchasing Complete Un Complete Attach Detach Planning Activity Attach Detach Work Order Reschedule Requisition s changes the need dates required in yard dates etc Generate RFQ of Selected Req creates a Request for Quote document that can then be sent to prospective vendors Material Rollup provides options for re computing data summaries throughout the project WBS For Purchasing the following special edit functions are available from the main Edit menu Edit Create PO Header Text Edit Create PO Footer Text Amend Selected PO Generate Draft of Selected PO s Issue Selected PO s Print Copy of Selected PO s with Bar Code 28 Chapter 3 The Grand Tour For Stores Management the following special edit functions are available from the main Edit menu when receiving purchased materials e Stub Out Purchase Order Receipts copies the items of the purchase order into the receiving worksheet to record receiving information e Back Out Selected Receive Transactions reverses selected receiving transactions e Post Selected Receive Transactions posts receiving transactions For Stores Management the following special edit functions are available from the main Edit menu when returning purchased materials to the vendor e Back Out Return Transactions reverses selected return transactions e Post Return Transactions posts return transactions For Stores Mana
146. em assignment or an invalid storage location Withdraw Transactions Color Codes When posting withdrawal transactions the system performs a validation check The contract project and the rest of the WBS must be defined on the database The Work Order must be valid with a valid contract project and WBS The requisition and requisition item must be defined on the database The part ID and part type must match the requisition item The specified quantity to withdraw cannot exceed the requisition item s quantity available e Ifthe part is stored in more than one location the withdraw location must be specified e A valid location must be entered unless the company s business rules allow for locations to be created upon withdraw And additional checks for the Quick Stock Withdraw transactions are e The part ID must exist in the Parts Catalog e The part ID in the Parts Catalog must have a unit price 186 Appendix IV Color Codes The color codes for withdraw transactions are as follows e Gray Transaction has not yet been processed for posting e Green Transactions that have successfully passed the validation The user cannot modify posted transactions e Red The posting process detects errors in the transaction The specific errors detected by the system will be given placed on the transaction in the Error Message column Transactions with errors can be corrected any time by retrieving them from the database makin
147. equisition header that provide general overall information about the requisition Requisition items that are the individual material item in the requisition For stock items a purchase requisition is a listing of stock inventory items A requisition ID is limited to a maximum of 8 alpha numeric characters Sequential requisition IDs can be automatically generated by the system The combination of Contract Project Requisition must be unique Requisition Date The date the requisition was created 243 Glossary Requisition Heading Description of the material items contained within the requisition This heading is printed on each requisition report A requisition heading is limited to a maximum of 40 alpha numeric characters Requisition Item Within a given requisition each individual material item must be uniquely identified with a requisition item number A requisition item ID is limited to a maximum of 8 alpha numeric characters Sequential requisition item IDs can be automatically generated by the system The combination of Contract Project Requisition Item must be unique Reserve See Management Reserve Responsible Name of person placed on project requisition pallet and or purchase order document Some reports show person responsible as Foreman The responsible column is limited to 20 alpha numeric characters Return Cost The actual cost of a ship as computed by summing all the costs associated with completed wo
148. er to the vendor VFI Vendor Furnished Information is technical data such as drawings manuals etc available from a vendor and often required either as a load item and or as information required to complete engineering drawings installation instructions etc The parts catalog supports a part type of VFI which allows these items to be tracked in the system WBS Most projects are identified by the major components that comprise the project These components may be the major items to be designed or manufactured or the particular services to be rendered These components are the basis for the project System Work Breakdown Structure SWBS the Product Work Breakdown Structure PWBS and the optional Code of Accounts COA 254 Glossary WBS Mapping The conversion of cost data from one product oriented work breakdown structure to another e g from the Generic PWBS to a shipyard unique PWBS The conversion is direct in that there is a one to one correspondence between the data elements in one structure and the elements in the other so that there is no judgmental allocation required WBS Translation The conversion of cost data from one product oriented work breakdown structure to a system work breakdown structure e g from the Generic PWBS to SWBS or the reverse conversion There is not necessarily a one to one correspondence between the data elements in the two structures so judgmental allocation is often required Wor
149. erating rules that can be tailored specifically to the way the shipyard wishes to do business These are available to users who have been defined to the system as having Database Administrator authority By clicking on System System Administration Manage Business Rules the system will display the various rules that can be turned on or off Figure 14 1 Each of the business rules can be turned on or off by clicking on the Yes or No options Once the rules has been determined click on the Save button to stored them onto the database and to make them active for subsequent use of the system Refer to the System Administration Manual for additional details 159 Chapter 14 Configuring Business Rules Manage Business Rules ule E Bills AllowDeletesOfPostedBills Customer Bills that have been Posted can be deleted Bills AllowEditsOfApprovedBills Bills that are Approved can be edited Bills RequireApprovalTolssueBill Bills must be Approved before they can be issued to the customer Dwgs AllowEditsOfApprovedDrawing Drawings that are Approved can be edited Dwgs AllowltermDeletesFromApproveBOMs can be deleted from already approved drawings Invoices AutolncrementVoucherNum Voucher Numbers for Invoices will be Auto Incremented Issue CreateLocationWithdraw Create new location when material is withdrawn from a location that d Pallets AllowEditsOfApprovedPallets Pallets that are Approved can be edited Pallets
150. es examples of SWBS Groups for both new construction and ship repair The U S Navy s Ship Work Breakdown Structure is an example although PERCEPTION is capable of handling any user defined SWBS The SWBS definition may vary from project to project 114 Chapter 6 Starting A New Project SWBS Group US Navy SWBS Commercial SWBS Repair SWBS 100 Design amp General 200 Structural 300 Equipment amp Outfit 400 Hull Engineering Systems 500 Propulsion System 600 Outfit amp Furnishings General Ship Services 700 Cargo Systems 800 Integration amp Engineering Electrical amp Electronics 900 Shipyard Support Services Shipyard Support Services Shipyard Services amp Dry Dock Table 6 2 Examples of SWBS for Production PERCEPTION has no limit to the number of SWBS groups and they may be alphanumeric PERCEPTION also is useful for managing the costs of plant maintenance and overhead activities The following table illustrates this capability when these efforts are developed on an annual basis such as under a project 2001 for the year 2001 The shipyard is free to develop whatever SWBS categories best suit its purpose SWBS Group Plant Maintenance Overhead 100 Production Overhead 200 Indirect Support 300 Management 400 Human Resources 500 Research amp Development 600 Marketing 700 800 900 Janitorial Table 6 3 Examples of SWBS for Maintenance amp Overhead For more information about t
151. es for the project Refer to the PERCEPTION manual Accounting Functions and Interfaces for additional details The Customer name and address is required for generating the billing invoices for the project Creating A Project WBS Once the overall project record has been created and saved onto the database the WBS hierarchy then must be defined At a minimum the default WBS as described above must be defined Alternate WBS hierarchies also need to be developed before being referenced by any of the project cost details The project does not require a full definition of the alternate WBS hierarchies For example it may only use the PWBS ship zones and no lower PWBS levels The best method for creating the WBS levels is to Drill Down to the next level Once again the advantage to using this Drill Down approach is that as the user proceeds to move down the various levels of the WBS each level automatically inherits the identification of the level above If global defaults are set Edit Global Defaults for levels that are above the level being added the values inherited from the parent levels will be used not the global defaults Any other global defaults will be applied to the new record For each WBS level enter the information as needed and save it to the database using the instructions provided in the chapter General System Operation in this user manual 124 Chapter 6 Starting A New Project Copying Data from
152. eview 18 Chapter 3 The Grand Tour Printer SetUp specifies the printer selection print options etc Print Screen prints only the information visible in the window to the user s default printer Print Immediate performs the same function as File Print except that the user has no option for selecting the printer device The system chooses the default printer available to the user Print prints the full contents of the window information or as modified by the specification of the File Page Setup The user is given the option for selecting the printer device etc Print Bar Code Label allows the user to print a bar code label from any column of data on any window in the system Placing the cursor in the column to be printed and making this selection will open the print options window Use the Help button on this window for more information Send To allows the user to designate the destination of reports besides the printer Note that before you send to PDF file you should make sure the Acrobat PDF writer on LPT 1 is selected in the printer setup Reports can be emailed Refer to the chapter Using Email With PERCEPTION in this manual Reports can be sent to the Adobe Acrobat software to generate a PDF file Adobe Acrobat Version 4 0 or greater is required for this feature to work Reports can be sent to a distribution list that can identify any number of different destinations formats etc Refer to the chapter Distrib
153. f Contract Project Zone Sub Zone must be unique SWBS System Work Breakdown Structure or SWBS is a means for identifying work components of a project SWBS is one of several types of project work breakdown structures or WBS Normally the SWBS is oriented around engineered systems that make up the ship as a deliverable product SWBS may also be applied to ship repair projects Since each project requires its own SWBS each project can have a different SWBS For ship repair and non construction projects the SWBS can be tailored to suit specific contract job orders The hierarchies that comprise the SWBS are the contract project SWBS groups and SWBS accounts that are cataloged under the SWBS groups 249 Glossary Contract Project Both the SWBS group and SWBS account IDs are limited to a maximum of 8 alpha numeric characters Both the combination of Contract Project Group and of Contract Project Group Account must be unique SWBS Account A SWBS cost category to which project costs can be assigned The SWBS account resides at the fourth level of the contract WBS contract project group account under the SWBS group A SWBS account ID is limited to a maximum of 8 characters The combination of Contract Project Group Account must be unique SWBS Group A SWBS cost category to which project costs can be assigned The SWBS group resides at the third level of the contract WBS contract project group A SWBS group ID i
154. f data that has been loaded into a worksheet from the database e Validate Row selection results in the system validating the data in the current row to ensure necessary assignments work breakdown structure etc have been properly defined e Validate Selection results in the system validating the data entered in all records that have been selected highlighted in a worksheet window e Validate New Modified Data will validate every record in the current data set that has been added or modified Any column in a worksheet also can be sorted automatically with a double click on the column heading 45 Chapter 3 The Grand Tour Validate Current Data Set will validate every row in the current data set whether it has been modified or not This would be valuable for records that have been previously created possibly by using the import or paste function and saved without validating Get External Data imports records that have been created elsewhere Ditto Records creates an exact copy of one or more selected record s The unique key fields will have to be modified before the record can be saved This is a very fast way to duplicate rows Ditto records is only available for records that have not yet been saved to the database Create Rows quickly creates a specified number of rows Add Record opens a new record at the bottom of the active worksheet If global defaults have been set the new record will automatically have these val
155. formation Figure 3 32 Window Menu Displaying Open Worksheets HELP Help provides various user on line aids including the contents of the user manual by chapters index of key words and search function for user specified topics Figure 3 33 Help Contents Fl Getting Started With Perception Help with Cost Estimating Environment Help with Engineering Environment Help with Planning and Scheduling Environment Help with Production Engineering Environment Help with Material Control Environment Help with Purchasing Environment Help with Stores Management Environment Help with Accounting Environment About Perception 7 0 Figure 3 33 Help Menu Options 52 Chapter 3 The Grand Tour e Help Contents gives access to PERCEPTION user manuals and opens the help manual topic that relates to the window that is currently open e Getting Started With Perception gives access to this User Manual This manual provides basic How To instructions for navigating the PERCEPTION system and performing the basic functions for data entry database retrieval and reporting e Help With Environments provides access to the user manuals that have been broken out by subject matter e About PERCEPTION 7 0 displays the current version of the software TOOLBAR Many of the supporting functions that are in the main menu system can also be executed by clicking a button on the toolbar Figure 3 34 Many of these functions ar
156. formation that the user may select In other cases where no drop downs are available the user may enter a question mark The system will respond with a pop up window that lists the available selections Figure 4 14 illustrates the use of the question mark The user is entering a new work order but cannot remember which project number belongs under the contract By entering the question mark in the project field the system displays the pop up window of available project numbers available under the identified contract ork Orders Information Contract Project Center Work Order Heading Revision Revision Date Planned Qty Actual Qty A DEMO a R x 00 00 0000 1 00 0 00ft m Select Replacement Data Project Description 01 Sample Material Control p2 Buoy Tender 101 Sample Material Control F Constrain To Contract Project Refresh Data Return Data Figure 4 14 Using a Question Mark Entry to Display Available Data Field Selections By highlighting the correct project number and then clicking on the Return Data button the system will fill in the project number for the work order Special Sorts for Reports There are many reports available in the system The user can generate these reports across ranges of selection criteria and for various reporting options 78 Chapter 4 General System Operation However the system also allows the user to sort information within many of these reports Once the report
157. functions They also can be used to help users develop high level cost estimating relations Finally the characteristics provide a good historical record of the project Special Note The set of ship characteristics identified in this window will be copied to all projects defined for the projects being created by this wizard If a multiple project contract has projects of different ship characteristics then the user will need to modify the results as necessary Open the Projects worksheet retrieve the project holding the desired information and Drill Down to its Details window Open the Characteristics tab and modify the values as necessary Configure Interim Products When the information for this window is complete click on the Next button The system will proceed to the next step by opening the next worksheet Figure 6 13 for defining any standard interim product packages for the project s 130 Chapter 6 Starting A New Project Configure Interim Products 9 Add Packages to your Project s Unit Add 0 Drydocking X 3 P CS FIN v Delete Package Zone lt lt Back Cancel Einish Help Figure 6 13 Defining Project Standard Packages The use of standard interim products is only for the cost estimating process When the wizard is complete the system will copy all package items into the projects as estimate cost items If standard packages are not required click on the Finish button Special
158. g 00 00 0000 1 00 E _3 C DEMO zj 0 SJ E Planning 00 00 0000 1 00 E __4 C DEMO x01 0 33 Block 101 00 00 0000 1 00 SEE _5 C DEMO j0 0 37 Block 102 00 00 0000 1 00 E ng _6 C DEMO p 0 Js Lofting 00 00 0000 1 00 E _7 C DEMO x01 0 339 Planning 00 00 0000 1 00 g Me _8 C DEMO yj01 0 zj4 Preparation 00 00 0000 1 00 E i _9 C DEMO zj01 0 zj40 Preparation 00 00 0000 1 00 E 10 c DEMO x01 0 zjn Parts Fabrication 00 00 0000 1 00 E 11 C DEMO yj01 0 7j42 Sub Assembly 00 00 0000 1 00 E 3 12c Assembly 00 00 0000 1 00 E 13 Pre Outfit Hot a T 14C 0 Block Paint 00 00 0000 1 00 E 18 C D Pre Outfit Cold o0 00 0000 1 00 E 16 c 0 aja Erect 00 00 0000 1 00 E l o z7 48 On board Weld out 00 00 0000 1 00 E 0 7149 Block 103 00 00 0000 1 00 E 0 j5 Parts Fabrication 00 00 0000 1 00 E 0 gt 50 Lofting 00 00 0000 1 00 E 0 j51 Planning 00 00 0000 1 00 E 0 x52 Preparation 00 00 0000 1 00 E 0 53 Parts Fabrication 00 00 0000 1 00 E o yj54 Sub Assembly 00 00 0000 1 00 E D 55 Assembly oo 00 0000 1 00 E 0 z 56 Pre Outfit Hot 00 00 0000 1 00 E 0 57 Block Paint 00 00 0000 1 00 E 0 58 Pre Outfit Cold 00 00 0000 1 00 E 0 z 5 Erect 00 00 0000 1 00 E o 7j6 Sub Assembly 00 00 0000 1 00 E 0 z o On board Weld out 00 00 0000 1 00 E 5 7 r 9 EPAR Presentation Enar Production Frame M Figure 4 1 Sample Worksheet Window Detail Worksheets Rows of records in any given worksheet usually have details that are not easily displayed
159. g the appropriate corrections and re posting Stock Adjustment Transactions Color Codes The system color codes transactions entered in the Stock Adjustment worksheet e Gray All un posted adjustments e Green All posted adjustments Pallet Items Color Codes The system provides no color coding for pallet items Tool Room Transactions Color Codes The system requires formal posting of tool room transactions both direct and imported The posting process performs a data validation of the transactions to help ensure correct information is being entered The system color codes each transaction as follows e Gray Transaction has not yet been processed for posting e Red The posting process detects errors in the transaction e Green Posted and successfully validated transaction 187 Appendix IV Color Codes Work Order Color Codes The system color codes work orders by type e Gray Discrete Work Order e Dark Blue Distributed Work Order e Light Blue Time Phased Work Order e Yellow Incremental Work Order Time Charge Transactions Color Codes Time charge transaction must be posted before their charges are formally accepted into the system and charged against project work orders The posting process performs a validation test for errors and exceptions The system will consider the following conditions as time charge errors Work Order does not exist on the database Work Order has not been authorized for
160. gement the following special edit functions are available from the main Edit menu when issuing materials to production e Stub Out Requisition Withdraws copies requisition items into the production issue worksheet to record what is to be issued e Stub Out Pallet Withdraws copies pallet items into the production issue worksheet to record what is to be issued e Back Out Selected Withdraw Transactions reverses selected issue transactions e Post Selected Withdraw Transactions posts issue transactions e Add Stock Parts s adds stock parts for issue to production For Stores Management the following special edit functions are available from the main Edit menu when adjusting stock inventory information e Post Selected Adjust Transactions posts stock adjustment transactions VIEW View Figure 3 8 provides options to quickly move from one application to another to access application specific features reports etc View also provides various options for adjusting visual parameters of the system 29 Chapter 3 The Grand Tour View Zoom Restore Column Order Save Current Column Order Enter Data Window Designer Mode Restore Data Window Horizontal Split Scrolling Project Navigator Set Environment gt Drill Downs Figure 3 8 View Menu Options Zoom allows the user to adjust the visual distance between the user and the window Restore Column Order restores the default column order of
161. grees with the heading from the EXCEL file When the mapping has been completed for all desired columns from the EXCEL file headings not mapped to PERCEPTION will not be imported click on OK PERCEPTION will then proceed with the importing of the data and fill up the 145 Chapter 9 Importing amp Exporting Data PERCEPTION worksheet with the imported rows and columns of data from the EXCEL file PERCEPTION Global Defaults The Tel process honors any PERCEPTION global default specifications Global button on the PERCEPTION toolbar that may be in effect at the time of importing if the column has NOT been mapped for importing For example if the PERCEPTION worksheet requires that a project be identified for each row of data and the EXCEL file has not identified a column for project PERCEPTION will apply the global default for project for each row of EXCEL data imported If the user had not defined the project as a global default then the rows of new data will have this project column left blank undefined If the EXCEL file provides the project column and it has been mapped for importing PERCEPTION will use the EXCEL data and not use the global default value Export to EXCEL and Other Formats PERCEPTION can export data directly to a file that can be loaded directly into Microsoft EXCEL spreadsheet When in any worksheet select File Save As from the main menu The system will display the Save As window Click on the
162. h the Internet browser with the selected web site active The Drawing File Name column operates basically the same as the URL column Enter the directory path that the Drawing File is located and Save the path 150 Chapter 11 Distribution Lists For Reports Chapter 11 Distribution Lists For Reports PERCEPTION provides many features for generating system reports Reports can be viewed on line they can be printed they can be saved to files and they can be emailed Refer to the chapter Using Email With PERCEPTION PERCEPTION also allows reports to be distributed in multiple copies to various destinations called recipients Recipient Distribution List The user can set up recipient distribution lists by clicking on Reports Maintain Recipient Lists from the main menu The system will pop up a tab window Figure 11 1 that defines names for any number of recipient distribution lists Recipient List Maintenance Recipient Lists List Items Distribution Name Description PO List Group 1 In House Distribution of Purchase Orders for Group 1 PO List Group 2 Outside Distribution of Purchase Orders for Group 2 Figure 11 1 Report Distribution Lists 151 Chapter 11 Distribution Lists For Reports Additional lists can be added by clicking on the Add button Lists can be deleted by highlighting them and clicking on the Delete button Adds changes and deletes all can be saved on the database by
163. h the following specifications Computer Personal Computer PC Operating System Clients Windows XP or Vista Server Novell Netware Windows NT 2000 XP Vista or UNIX Memory Clients Pentium Processor with 300 MHz processor speed or more Minimum 128 megabytes of RAM Server Pentium Processor with 500 MHz processor speed or more Minimum 128 megabytes of RAM Display Monitor VGA display or above Disk Drives Clients 500 megabytes of free hard disk space for client software temporary files etc Note lesser PC may provide acceptable performance Server 500 megabytes of free hard disk for database database size depends upon size of shipyard and extent of active and historical information maintained Note A PC of lesser specifications may provide acceptable performance At least one CD ROM drive to install the software Printer Any Windows compatible printer Other Mouse or comparable device System database backup hardware System electrical power protection hardware recommended for server and clients If PERCEPTION Internet and EMAIL features are desired access to the Web also is required Chapter 1 Introduction A typical client server network configuration is illustrated in Figure 1 1 Client Server Configuration For PERCEPTION Switch oa Sy Purchasing Finance Engineering amp amp amp Expediting Accounting Lofting Figure 1 1 Example of a Client Server
164. hapter 2 Database Structure i A Database Error Has Occurred Row Number g Buffer Primary Database Error Code 198 Error Message SQLSTATE 23000 Sybase ODBC Driver Adaptive Server Anywhere Primary key for row in table Wworkpkgs is referenced by foreign key subtasks_to_workorder in table subtasks No changes made to database Figure 2 4 System Error Message for Changing a Linked Record Key If there is no related record the changing of any given record s key is acceptable 13 Chapter 3 The Grand Tour Chapter 3 The Grand Tour The following is a brief outline of the PERCEPTION system The system operates in the Microsoft Windows environment Those new users not familiar with Windows should review their Windows manual which describes the basics for working in this environment Appendix I of this manual also provides general instructions Start Up Microsoft Windows must be running before you can start PERCEPTION To run PERCEPTION 1 Run Windows 2 Double click on the PERCEPTION icon in the Program Manager to start the program Sign On When PERCEPTION begins its execution the user is required to enter his her name and password If entered incorrectly the system halts and will proceed no further Login To Perception Database Presentation Password anal Exit Advanced IV Presentation Figure 3 1 Sign On Screen 15 Chapter 3
165. he cursor or backwards Search Where Search everywhere All in the worksheet or within the Current Row or within the Current Column or only within the current highlighted Current Selection rows A Match Case Exactly option allows the search to locate only those instances where case i e capital letters is an important criterion Find Find Next Replace Replace Search Options Replace All Search Direction Forward Close Search Where all FU I Match Case Exactly Figure 3 7 The Find And Replace Pop Up Window 25 Chapter 3 The Grand Tour The Edit Replace from the main menu operates in a similar fashion as the find option but with the added feature of replacing the designated expression with another The replacing operation can be performed incrementally or across the designated search directions Go To The Go To function takes the user directly to a row number Special Edit Functions For Different Environments The system is organized by basic shipyard department responsibilities Each of these sections called environments is given special sets of editing functions For Cost Estimating the following special edit functions are available from the main Edit menu e Copy Project creates a new project by copying all or part of one project to another e Copy CERs copies selected types of CERs from one ship type to another e Copy Interim Products Packages copies a
166. he use of SWBS the user should refer to SPAR s publication Planning New Construction amp Major Ship Conversions 115 Chapter 6 Starting A New Project Project PWBS The Product Work Breakdown Structure or PWBS is a hierarchical list of interim products basic building blocks of the total ship definable during the construction stages of acontract At the top of the PWBS are the physical ship zones A ship wide zone usually designates work that is not zone specific Further down the hierarchy of PWBS are the lower levels of interim products at earlier stages of construction from construction units and hull blocks to assemblies sub assemblies etc The PWBS includes all work defined under the SWBS but grouped in PWBS ways that better reflect the general build strategy of production phases as particularly effective with modular construction The PWBS can be defined down to six 6 levels of detail although the extent that the shipyard wishes to use depends entirely upon their preferences PERCEPTION is capable of handling any user defined PWBS and the PWBS may vary from project to project The PWBS may not be as important for ship repair contracts as they are for new construction However PWBS can be important for ship modernization programs that have significant elements of new construction On the other hand PWBS ship zones can be very helpful in planning and managing on board work to minimize work crew conflicts etc
167. hen either e Click on the Drill Down button Z on the toolbar e Right click to open a pop up menu that has the Drill Downs option on it e Select View Drill Downs from the main menu The system will open the Drill Down Selector window and give the user a number of selections Selecting the desired Drill Down option and clicking on the OK button will open the new window and automatically retrieve its related details Choose Drilldown Select Drill Down DETAILS SWBS Gros SWBS Group History SVWBS Grol SVWBS Group CERS SVWBS Grol SYYBS Accounts SYYBS Accc Cost items Cost Items Cost items BOM BOM Costi Cost items MEL MEL Cost It Activities Planning At work Orders work Order Drawings Drawings Drawing Items BOOMs Drawing Ite Pallets Pallets v gt ox ee Figure 4 13 Drill Down Selector When a window is opened by means of drilling down that window is now the child and is linked to its parent which is the window from which it was opened If the Drill Down feature is used from a child window that window will then become both a child and a parent window Any new records that are added to a child level will automatically have the key values from its parent Once a Drill Down has been completed changing the currently selected row in the parent window will cause the system to go out to the database and retrieve the information for 76 Chapter 4 General System Operation all of its children i
168. iated Reports cceesceeeeceeeees 176 Base Year Cost Estimating 123 Before You Begin A New Project 111 Bulk Copying Rows of Data to Excel 68 Bulk Cut Bulk Copy amp Bulk Paste 24 Bulk Cut Bulk Copy and Bulk Paste OPUONS 225 el cea ae elas haa 67 Bulk Pasting Rows of Data from Excel EA ha N E 68 Changing Record Keys Error 12 Closing Worksheets ceeceeeeeees 57 Color Codes heiii seek 185 Common Libraries Used By All Environments 000 0 eeeeseceeeeeeeeenees 86 Common Use Libraries eee 9 Configure Interim Products 130 Configuring Business Rules 159 Contract amp Project S eeeeeeeeeees 112 Contract CLINS s c2 6 4 aaa 118 Copying and Pasting EXCEL Data into PERCEPTION vissticssisatasaciscvasisietans 66 Copying Data from an Existing Contract Project Acsincattetnioonias 125 Cost Estimating ccccscssscscnsscsssteceees 1 Cost of Money Cost Estimating 123 Creating a New Contract amp Project s R E S 118 Creating a PrOJe CU sastecssseejewateiedassacte 120 Creating A Project WBS 0 124 Customer Bill Color Codes 189 Customer Billing Invoices 157 Cut Copy amp Paste 23 Cut Copy amp Paste Options 64 DATA cutest ative hicatea aurea td haces 45 Data Validation 0 0 eee eeeeeeeeeeeee 161 Database Processing ccccceseeeeteees 61 Index Datab
169. ication of lead work package Learning Factor Cataloged CERs usually establish costs under a certain prescribed set of production circumstances Traditionally the CER relates to costs for a prototype or the first of a series construction program However it is normally anticipated that for a series of ships each ship labor cost should decrease from continued improvements introduced over time in the build strategy and manufacturing processes and refinements in production engineering Cost Learning Curves 120 0 100 0 80 0 95 slope 60 0 90 Slope 40 0 20 0 Percentage Cost Compared to 1st Ship Cost 0 5 10 15 20 25 Ship Number in Series Ship Construction Program While the above learning curves indicate a gradual cost reduction per ship of the series examining cost reductions for standard interim products and manufacturing processes across all ship types can realize a similar experience As shipyards introduce standard interim products as the primary means for designing and building ships learning becomes a less important consideration This is a good indication that the cost reductions are gained not by an actual learning experience but more by a diminishing of expensive rework that should not have occurred in the first place Level of Effort Support type effort e g vendor liaison that does not readily lend itself to measurement of discrete acco
170. imited ASCII text files SQL Database transactions Refer to the chapter Interfacing with Accounting Systems in this manual for details For details on these PERCEPTION transactions the reader is referred to the following user manuals PERCEPTION Material Planning Purchasing amp Inventory Control for processing purchases stock transactions journal adjustments and vendor invoices PERCEPTION Labor Manpower Planning amp Management for time charge transaction processing 106 Chapter 5 Starting A New System amp Database Accounting Systems PERCEPTION Employee Time E l Charges mployee BPR lela o i Time Charge Validation Management Stock Purchases amp Issues to Production Shipyard Employee Work Orders Labor Rates Vendor Invoice Payment Authorizations Material Cost Management Stock Inventory Customer Invoices labor amp material Material Purchase Vendor Customer Requisitions Orders Invoices Invoices Figure 5 19 PERCEPTION Transactions for Accounting Defining Business Rules PERCEPTION provides considerable flexibility in how the shipyard wishes to establish procedures for operating the system Refer to the chapter Configuring Business Rules in this user manual for additional details Defining Company Logo PERCEPTION displays a company logo on a number of standard reports These reports include the following e Customer
171. information tab is used throughout the system as needed in particular for report headings and on purchase orders The information displayed under the Company Defaults tab Figure 5 2 is used primarily for purchasing in calculating the amount of lead time needed for placing orders the currency used and the method for calculating stock costs Details of these options are described in the MAT PAC Purchasing amp Material Control User Manual 87 Chapter 5 Starting A New System amp Database System Parameters and Company Defaults Steel Setup Tax Rates Set COA Names Accounting Company Defaults Currency fus z Default Number of Days Process Times Req Delay To Create and Approve a Stock Cost Method Average Cost x Req from a Released Drawing Automatic Scheduling Options Schedule Requsitions From PalletsWvOs Activities No z Schedule Quick POs From Requisitions No z Schedule All Other POs From Requisitions No z Company Information PO Process Time To Negotiate and rs Issue a Purchase Order from a Req 5 PO Lead Time From 14 Purchase to Receipt Buffer Days To Receive Report Header Chesapeake Marine Industries 13 Process and Store Material Report Footer Company Confidential Information Pallet Delay To Pick and Issue Material Email Domain Name fsparusa com PDF Distiller Acrobat PDFWriter Default Storage Location SPARHOLDER z Figure 5 2 Company Defaults PERCEPTION
172. ing New Database Records To add new records the user must click on the Add button on the toolbar or the Add Record or Insert Record options from the Data menu More records can be added by clicking Add each time however using the keyboard down arrow key also will open a new record for data entry 62 Chapter 4 General System Operation Modifying Database Records Moving from one field to another can be done by with the mouse or the tab key Then the user must click on the Save button to make these changes permanent on the database The user also can Close the data screen window without clicking on the Save button and the system will respond by instructing the user that changes have been made to the record and that the user can either save or discard them Additional details are given below for a variety of data editing features Selecting Multiple Records On the worksheet windows multiple rows can be selected There are two methods for highlighting multiple records i e rows of data For a series of records that are together row wise hold down the keyboard Shift key and a click at the top most record to select Keep holding the Shift key down and move the cursor down to the lowest record to select and click on it All rows in this series will then become highlighted or selected For rows that are not all together in a series but are interspersed in various rows hold down the keyboard Ctrl key and then click on each
173. ion Customer Listing for the Estimating Environment Customer ID Company Name Address Line 1 Address Line 2 Address Line 3 City State Country Postal Code 1 CDMNY Curacao Drydock Company Willemstaad Curacao Netherlands Antilles 2INSWC 211 NSWCCD Code 211 9500 MacArthur Blvd West Bethesda MD USA 20817 5700 3 ONR Office of Naval Research 800 North Quincy Street Arlington VA USA 22217 5660 4 Proteus Proteus Engineering 301 Pier One Road Stevensville MD USA 21666 5 ISPAR SPAR Associates Inc 927 West Street Annapolis MD USA 21401 Figure 5 19 Customer List Table Customer information includes the following Customer ID must be unique for each customer entry Customer Name this is what is printed on cost estimates and invoices Address Contact person Phone amp FAX numbers Email address Billing terms 102 Chapter 5 Starting A New System amp Database Libraries Used By Specific Environments Each application environment uses libraries often unique to that application The following outlines these applications specific libraries the details of which are covered in the four basic application user manuals PERCEPTION ESTI MATE Cost Estimating New Construction amp Ship Repair PERCEPTION PERT PAC Planning amp Scheduling Shipyard Operations PERCEPTION MAT PAC Material Planning Purchasing amp Inventory Control PERCEPTION WORK PAC Labor Manpower Planning amp Management
174. ion Opening Supplemental Windows There may be situations whereby the user wishes to open another window to perform some function that permits the processing of the current window For example if the user wishes to approve a requisition to be able to continue creating a purchase order using that requisition the requisition can be opened approved and saved without closing the purchase order window The requisition can then be used to complete the purchase order There is no limit to the number of windows other than available PC memory that can be opened at any time However sometimes with too many windows opened Windows catches a cold and aborts the session With multiple windows open the user may wish to jump from one to another without having to close windows and re open them later Moving from one open window to another can be done by selecting Window from the main menu A menu displays all open windows A check mark flags the window that is currently active Clicking on another window in the list will cause the system to bring that window into active status Moving About Data Fields Most of the system is involved with entering data Each data entry window provides a series of data fields where the user can enter information Clicking on it with the mouse can access any data field The click turns on the data field focus which displays as the special data entry positioning cursor within the data field 173 Appendix I Oper
175. ions Milestones Characteristics Project Type New Construction z m Perception Default WBS Cost Estimating Default WBS Material Base Year 2001 swes Labor Rate Year 2001 SWBS Group Scheme Cost of Mone 0 00 E Character Accounts z H GL Expense Account Defaults Schedule Options Use ProjectAccounting Setup x Project Accounting Setup MS Project Project Database Lisparidata Project 023 mpd Figure 6 5 SWBS Group Scheme Options The Manual selection for group scheme requires that each account number numeric or alphanumeric be individually identified to a specific group number numeric or alphanumeric Default Project WBS The shipyard must identify which WBS scheme the system will use to catalog all project hours and costs from estimate cost items work orders material requisitions etc up to the contract and project levels SWBS PWBS or COA This selection identifies the one WBS hierarchy that must be defined and must be used The other WBS hierarchies may also be used but they are optional and are not requirements for cataloging the project costs When the new project record is defined designate the default WBS by opening the Details window and clicking on the Options tab 10 The system does require that when costs are cataloged against any WBS hierarchy predominant or not that WBS level must have been defined on the database for the project beforehand 122
176. iple keys such as the work order which requires the contract project and work order number and work center ID the work order also can be uniquely identified by the system generated work order sequence number Appendix VII provides a table that lists the keys for various database table records All of these keys may be alphanumeric and the length of characters for each is provided in Appendix II Duplicate Keys Error Whenever a new record is entered and the user tries to save the record to the database the system will check to ensure that its keys are unique If the keys are not unique i e 10 Chapter 2 Database Structure another record already has the same keys defined the system will display an error message to the user Figure 2 1 ti A Database Error Has Occurred Row Number el Buffer Primary Database Error Code 193 Error Message SQLSTATE 23000 Sybase ODBC Driver Adaptive Server Anywhere Primary key for table projects is not unique No changes made to database Cancel al Figure 2 1 Error Message for Duplicating Record Keys In the above figure the Projects table already has a project number defined the same as what the user has tried to enter as a new record The Goto Row button will identify which project record in the user s worksheet contains this error The user may change the project number and save again or delete the project record
177. ipments PERCEPTION maintains only the most recent receiving date for the item Late Finish Latest possible finish date for an activity after all float time has been used Any further slippage in the finishing of the activity will slip the overall project completion date Late PO Item A purchased item for which its full quantity has not been will not be received in time to meet the item s Required In Yard date 223 Glossary To measure a late item the Required In Yard date must be defined There are several conditions for lateness e If the item is complete lateness is the number of calendar days the last quantity was received relative to the Required In Yard date e Ifthe last quantity was received prior to or on the same day as the Required In Yard date then the item is not regarded as late e Ifthe item is incomplete lateness is the number of calendar days today s date is after the Required In Yard date e Ifthe vendor s current ETA is later than today the measure of lateness is extended to that ETA date e If both today s date and the vendor s current ETA are earlier than or the same day as the Required In Yard date the item is not regarded as late Late Purchase A purchase order for which deliveries of all its Order items have not been will not be received in time to meet Required In Yard date schedules To measure a late purchase order the system scans all purchase order items and measures individual
178. iring ships PERCEPTION is comprised of proven application software modules that can operate either independently or on an integrated basis for maximum benefit to your operations e PERCEPTION ESTI MATE cost estimating for new construction and ship repair commercial and government contracts e PERCEPTION PERT PAC integrated planning and scheduling of design engineering purchasing production vendors and subcontractors e PERCEPTION WORK PAC work order earned value system work progressing manpower planning and contract labor job costing and performance reporting e PERCEPTION MAT PAC material control from engineering bills of material and requisitions to purchase orders deliveries warehousing and pick lists with comprehensive quantity and contract job cost controls Cost Estimating ESTI MATE provides the power and flexibility to develop complete accurate contract cost and pricing information to reduce risk and successfully win contracts It can develop both new construction and repair modernization project estimates and has features that support modular construction and out sourced subcontracting pricing options ESTI MATE organizes costs by work breakdown structures that can be cross related to construction zones and product modules Libraries are available to use standardized work packages and parametric functions that reflect actual manufacturing and construction rates The system accommodates multiple project contra
179. items for lateness The overall measure of lateness for the purchase order is the measure of lateness for the item that exhibits the largest calendar days of being late The measure of lateness makes no consideration for relative item size or purchase value Some system reports allow lateness to be measured by screening out completed items and measuring the purchase order only on the basis of incomplete items Some system reports allow other means to break down the purchase order for lateness analysis If the purchase order report is to be generated on the basis of the project accounts and a purchase order includes items for more than one account the purchase order lateness will be measured separately for each account based upon the collection of items cataloged for each account in the purchase order Late Requisition A requisition for which deliveries of all its items have not been will not be received in time to meet Required In Yard date schedules To measure a late requisition the system scans all requisition items and measures individual items for lateness The overall measure of lateness for the requisition is the measure of lateness for the item that exhibits the largest calendar days of being late The measure of lateness makes no consideration for relative item size or purchase value Some system reports allow lateness to be measured by screening out completed items and measuring the requisition only on the basis of incomplete items
180. ities naval ships designs now must be developed with an increasing focus on getting the biggest bang for the buck Design and engineering trade off studies can minimize costs without sacrificing mission capabilities The objective for these studies is an increase in mission capabilities without an increase in cost Rollup Rollup is a function that summarizes cost and performance information from the lowest level of detail under a work breakdown structure s to the highest level The system provides four different rollups Cost Estimate Rollup Production Baseline Rollup Production Labor Rollup and Production Material Rollup Rollups are initiated by the user for a specific contract and project Multiple projects can be selected for rollup at one time The results of these rollups can be viewed on any of the WBS level records Schedule Risk Schedule Risk is the degree of schedule uncertainty within an area of a project It can be measured simply by relating the schedule estimate against potential minimum and maximum schedules A statistical analysis may provide an additional measure of risk by estimating the probability that the actual schedule will equal the schedule estimate in question Costs typically have some dependency upon schedule For example schedule directly impacts overhead costs and effects cost escalation Economic Risk Schedule also can have a direct impact upon the cost to perform the work Performance Risk and affect the avai
181. ix I Operating Windows The arrow shaped mouse pointer is used to indicate items you want to select or choose with the mouse Minimize Window Border Control Menu Wind ow Border Button Application Icon acacia oe Button Title Bar on Close Window B order Button Window Corner Column Title Berol Up Area Column Vertical Separator Line Scroll Bar Vertical Floater Selection Cursor i Scroll Down Mouse Pointer apah Horizontal Scroll Bar Scroll Left orizontal Floater Scroll Right Button Button Button Figure I 1 Window Elements NOTE Some applications might use different types of cursors and pointers than the ones shown in the previous illustration Special Window Buttons Each window often displays buttons that perform special functions The following are examples The OK button when clicked with the mouse normally directs the system to execute the given function such as generate a specific report The CANCEL button allows the user to exit from the given function window and return to the prior window 171 Appendix I Operating Windows The CLOSE button allows the user to exit from a given data entry screen and return to the prior window The ADD button allows the user to add new records to the database The SAVE button allows the user to update the database after modifications have been entered The DELETE button allows the user to delete spe
182. k Center A company department or stage of construction which is assigned specific responsibility and resources needed to perform work Work centers may also be assigned to subcontractors A work center ID is limited to a maximum of 8 alpha numeric characters and must be unique Work Order A work order is a distinct and definable unit of work that can be started and completed without significant interruption under the direction of a single work center PERCEPTION manages 4 types of work orders e Discrete work orders that can be identified to a single level of the project WBS such as SWBS e Distributed work orders that can be identified across any number of levels of a project WBS e Time phased work orders that can manage level of effort support efforts Time phased work orders operate with monthly budgeted sub tasks e Incremental process work orders that manage manufacturing process by tracking quantities of throughput as well as costs A work order ID is limited to a maximum of 8 alpha numeric characters The combination of Contract Project Work Order Work Center must be unique Work Order Serial Number The work order serial number is a system generated number that uniquely identifies a work order on the system database The work order serial number can be used as a shortcut to retrieving and applying costs material and time charges to a work order 255 Glossary Work Type A category of work exhibiting similar work
183. l handling operations control production service quality assurance testing trials etc The construction work types are typically electrical hull outfit HVAC joinery machinery paint pipe structure etc To define work types select Library Work Types from the main menu The Work Types window Figure 5 12 will open The procedures for retrieving adding changing and deleting work type records are the same as those outlined in General System Operation Figure 5 12 Work Types Information ich RN He gt GPWBS Worktype jo Administration Administration cT Coatings Paint Coatings Paint i nE Design Engineering Design Engineering i EL Electrical Electrical BBHo Hull Outfit Hull Outfit i iy HVAC HVAC i Bw Joiner Work Joiner Work i Machinery Machinery i Bac Material Control Material Control i Moc Operations Control Operations Control i Be Pipe Pipe i Wrs Production Services Production Services i Baa Quality Assurance Quality Assurance i is Structure Structure ITT Test amp Trials Test amp Trials i i Chapter 5 Starting A New System amp Database Defining Block Types The block type library is used in the PWBS to assign the Unit Block record with a block type When the Unit Block record has been assigned a block type steel reports can be generated to track the costs of the different stages of the manufacturing process for the different types of blocks To define
184. l Project SHIP CONTRACT po Severn Bulk Carriers Detail Work Orders 1 350 000 00 05 30 1991 24 300 000 00 01 01 1993 25 000 000 00 200 000 000 00 08 01 1991 21 600 000 06 01 1993 22 000 000 Figure 7 3 Each Project Level Is Summarized For Each PERCEPTION Module Installed Properties displays general information Properties of the level that is selected Go To opens up the standard worksheet window for the level of the project selected From there the user may add change delete as described in the chapter General System Operation and Starting A New Project in this user manual Management Graphs provide a series of graphical reports that track historical summary information of production data labor and material costs at each level of the project See the section on Management Graph Reports for details of these graphic reports 135 Chapter 7 Project Navigator Management Graph Reports From the Project Navigator the following management graph reports can be generated at any level of a project WBS e Planned versus Actual Progress tracks planned and actual percent progress e Cost 1 Progress tracks labor hours planned versus actual per one 1 percent of recorded progress e Forecast Over Under Run tracks the forecast over under run EAC BAC A trend of over under run at 100 completion also is tracked e Ahead Behind Schedule tracks measured weeks ahead behind sche
185. lable resources and technical information Schedule can have an effect upon Technical Risk and upon contractual items such as penalties and incentives Refer to Cost Risk 245 Glossary Schedule Variance The difference between BCWP and BCWS At any point in time it represents in terms of cost the difference between work actually performed accomplished and work scheduled The schedule variance is calculated by the system when either a Production Labor Rollup or a Production Material Rollup is performed and can be viewed on any of the WBS level records Serial Number For parts catalog items A manufacture supplied identifier of a particular material item and is limited to a maximum of 8 alpha numeric characters For tools A manufacture supplied identifier of a particular tool and is limited to a maximum of 25 alpha numeric characters For purchase orders and for work orders A system generated unique number This column is numeric and can not be edited by the user Ship The highest level of interim product Shelf Life Shelf life in days of a material item Size Size of a material item Maximum of 20 alpha numeric characters Slack Path Sequences of activities having excess time as opposed to the critical or negative slack paths Slack may exist in varying amounts positive slack indicates scheduling flexibility within the path 246 Glossary Slack Time Slack time is the number of workdays that a pla
186. lect Library Stages of Construction from the main menu The Stages window Figure 5 11 will open The procedures for retrieving adding changing and deleting stage records are the same as those outlined in General System Operation amp Stages Information Description GPWEBS Stage Assembly Assembly i Delivery Delivery Designing Engineering Designing Engineering i Erection Erection Fabrication Fabrication i Grand Block Construction Grand Block Constructii Launching Launching i Material Management Material Management i On Block Installation On Block Installation L On Board Installation On Board Installation i i On Unit Installation On Unit Installation i Post Delivery Post Delivery Planning Planning i i Purchasing Purchasing i i Sub Assembly Sub Assembly i Testing amp Trials Testing amp Trials i Welding i Figure 5 11 Stages Of Construction 94 Chapter 5 Starting A New System amp Database Defining Work Types Work type distinguishes the work by skill facility and tooling requirements special conditions and or organizational entities The scope or pallet of work associated with an interim product for a stage of shipbuilding is attached to the work type For example an interim product block at stage design with the work type engineering has a scope of work to produce the drawing of the block The non construction work types are typically administration engineering materia
187. let items are furthered cataloged by a sequential Pallet Item Number Pallet items have indirect references to their supporting requisitions or drawing bill of material These references may extend to part numbers in the system s Standard Parts Catalog that may include manufactured parts and standard interim products Time Charges are the transactions of actual labor costs required by the system to evaluate cost and schedule performance against budgets and planned schedules Time charges are cataloged by a unique data entry Time Stamp date and time An option may be used to eliminate the need for the Contract Number key For this option the system requires that the Project Number is unique Since time charges reference a work order directly they are associated with whatever WBS has been defined for the work orders Vendor Invoices from purchase orders are cataloged by the vendor invoice number Items in the invoices are sequentially numbered However they must reference items in a purchase order Customer Billing Invoices may be generated for projects Formal billing invoices can be produced for labor charges and material item details within user specified billing periods Appendix III provides sizes and characteristics of the library and catalog identifiers Common Use Libraries The PERCEPTION database provides the following libraries that can be used across many different system applications e Work Centers used for estimating cost
188. lete Requisition Requisition Item Pallet Pallet Item Purchase Order Purchase Order Item All WBS levels When a project is completed it should be closed Closing a project is necessary in order for the system to calculate final value information It also is the best way to inhibit time charges to completed projects Closing a project performs the following functions All Work Orders are closed Their actual finish date is set to the current date and their progress is set to 100 All Pallets marked as complete If the Pallet was not fully issued the database will update the Parts Catalog with the proper quantities All Requisitions are marked as completed If the Requisition was not fully purchased and received or issued the database will update the Parts Catalog for the proper quantities After closing a project a rollup must be done for that project Rollup options for time cards should be checked for each WBS used by the project The rollup will update each WBS as being complete and calculate their final values For the various modules purchase orders requisitions pallets when all items are complete the system will set the header record to complete Likewise if the user sets a header record to complete the system will set all of its associated items to complete 212 Glossary Complete Requisition Item A requisition item is considered complete when no more material will be withdrawn to that item When a requisi
189. line Draft Depth Molded Cost Amount Covered by Bond Mortgage Years Term Mortgage Annual Interest MARAD Title XII Guarantee Mortgage Principle Amount Main Engine s Electric Generator Emergency Electric Generation Bow amp Stern Thrusters Total Electric Generation Range Number of crew Speed Light Ship Displacement Gross tons Deadweight metric tans Full Load Displacement Figure 5 17 Default Ship Characteristics PERS KTS MTON MTON MTON MTON 100 RRRRRRRRRIRI SKISS S S S Ssss Chapter 5 Starting A New System amp Database Ship Type List of Ship Characteristics A list of Ship Type Characteristics may be defined that are unique to a specific ship type When each new project is added to the database using PERCEPTION s New Contract Project Wizard the project and when the project is identified by a specific ship type the ship type characteristics will be added automatically to the list of default characteristics described above Refer to the chapter Starting a New Project Using the New Contract Project Wizard for more information To define the list of ship type characteristics select Library Ship Characteristics Ship Type Characteristics The system will display Figure 5 18 The procedures for retrieving adding changing and deleting work type records are the same as those outlined in General System Operation Note that each default ship type characteristic is assig
190. m is withdrawn to a project cost is transferred with it This exception checks that the cost has been recorded on the transactions that PERCEPTION tracks e SWBS Account Is Invalid On Reqn Item When a requisition item has an invalid SWBS Account material costs will not be exported to the General Ledger System PERCEPTION s internal Material Costs will not be correct e SWBS Account Missing From Reqn Item When a requisition item has no SWBS Account specified material costs will not be exported to the General Ledger System and PERCEPTION s own Material Cost tabulations will be wrong e Unscheduled Requisition Items Retrieves requisition items that have not been scheduled The item need date is null This exception will cause the material to not show on certain material schedule reports e UoM Is Invalid On Req Item The UoM on all Requisitions Items should exist in the Unit of Measure Library Running Exception Reports To run an exception report select Environment Environment Name Exceptions from the main PERCEPTION menu The data exception selection window Figure 16 1 will open 165 Chapter 16 Exception Reports Select Exception To Check Exception Title Exeption Description Activity Center Invalid On Work Orders lf a Work Order has a Planning Activity attached to it that Activity Activity Center is Invalid On BOM When a BOM item has an invalid Activity and Center attached requ Activity Center is Invalid
191. manipulating material control information e Rollup provides the user with options for re computing material cost data summaries throughout the contract project work breakdown structures e Reports provide access to all material control related reports e Exceptions provide access to all material control related exception reports 37 Chapter 3 The Grand Tour Purchasing Environment has the following choices Figure 3 18 Environment Cost Estimating Engineering Planning amp Scheduling Production Engineering Material Control Pach a al Stores agement gt Clauses Accounting gt at tg a e Request for Quote Purchase Orders Purchase Order Items Reports Exceptions Figure 3 18 Environment Purchasing Menu Selections e Terms opens the library of standard purchase order terms and conditions for viewing editing adding and deleting records e Clauses opens the library of standard clauses for purchase order headers and footers for viewing editing adding and deleting records e Request for Quote provides the means for developing an RFQ to prospective vendors e Purchase Orders opens the purchase order window for viewing editing adding and deleting records e Purchase Order Items opens the purchase order items window for viewing editing adding and deleting records e Reports provide access to all purchasing related reports e Exceptions provide access to all purchasing related e
192. mative means to summarize costs and schedule performance Determine the various work centers that will be engaged in the work activities both within the shipyard and outside The system can summarize costs and schedule performance by these different areas of responsibility i e work centers Manpower requirements planned actual and as forecasted can be calculated for each work center Enter the details of the project For cost estimates the details are the cost items For schedule planning the details are the planning activities and their relationships to each other and time and resource constraints For material control the details are the drawing bills of material optional production material requisitions purchase orders parts catalog and pallets optional For labor cost management the details are the project work orders and time charges Before You Begin a New Project The user must first understand how to organize the contract project This entails defining the following The overall contract proposal which may include multiple projects such as for a series ship proposal and any contract line items CLINs if they are needed The project work breakdown structure WBS that will be used for the project s The WBS may include a ship system oriented WBS SWBS a product oriented WBS PWBS a shipyard organization WBS COA or any combination of these distinct hierarchies CLINs also are an additional WBS structur
193. mber 401 14 003 3 Digit Major System Number akin to Navy SWBS 2 Digit Sub System Number 3 Digit Sequence Number The Navy Spec Item is also called the SWLIN It is limited to a maximum of 10 alpha numeric characters and is recorded on the cost item record Need Date The Need Date is the date that material is planned to be withdrawn to the work site or marshaled for a pallet The Need Date can be scheduled manually or by way of Planning Activities or Work Orders On Block Outfit A method of installing outfit system components and equipment items onto an assembled structural block before it is erected This work is often called Pre outfitting Pre outfitting often is performed in two distinct phases Pre outfitting hot refers to work that must be performed on the block before the block can be painted steel outfit items seats pipe etc Pre outfitting cold refers to work that can be performed after the block has been painted value fitting HVAC electrical cabling equipment etc 231 Glossary On Board Outfit A method of installing outfit system components and equipment items on board after blocks have been erected fitted and welded This is typically the least productive stage of construction for outfit installation On Unit Outfit A method of installing outfit system components and equipment items as an outfit module Since units often can be assembled in a shop environment under mostly ideal
194. menu Libraries drop down menu are the libraries common and available to all applications Of those the following libraries are independent and do not require any other library and should be completed first All libraries can be edited later to add delete or correct entries Company Parameters defines a number of shipyard specific parameters and processing functions Units of Measure used to standardize units of measure a mandatory field for many of the other libraries Work Centers a mandatory field for many of the project orientated data Trades Resources required for time charging and optional work order budgeting trades and resources are used in scheduling functions Vendor Catalog used for purchasing and access for cost estimating Currency an exchange rate table for purchasing Standard Parts Catalog used for cost estimating engineering purchasing material control functions Stage of Construction used to identify and track different phases of the manufacturing process Types of Work with mapping to a Generic Product Work Breakdown Structure or GPWBS can be used to summarize the shipyard s PWBS by an industry standard PWBS Block Types used for specifying what manufacturing processes are required to produce a particular hull block or unit assembly Ship Characteristics used for project identification and for parametric cost estimating Ship Types optionally used to catalog the project Several of the
195. meric characters The combination of Contract Project Zone Unit must be unique Unit of Measure A unit of measure is a metric by which work and cost can be measured such as hours per ton dollars per square foot etc Units of measure must be defined before they can be used The unit of measure ID is limited to a maximum of 8 alpha numeric characters and must be unige Unit Price Price per unit item quantity When multiplied by the quantity produces the extended price The method for determining the unit price for stock items is option that is set for the shipyard by the accounting department The options are Last Purchased Price Average Cost or Standard Price where the user enters the unit price UoM See Unit of Measure Selected photographs obtained from www nsnet com 253 Glossary Used Quantity Quantity of a requisitioned and received item that has already been used Vendor Detail ID A means for identifying multiple vendor addresses Maximum of 60 alpha numeric characters Vendor Name Name of the vendor supplying material from a purchase order Maximum of 40 alpha numeric characters Vendor Number Identifies one vendor from another on the system database Maximum of 8 alpha numeric characters and must be unique Vendor Reference The Vendor s RFQ response reference identification maximum 40 alpha numeric characters is useful for expediters to communicate any problems with the purchase ord
196. mpany Defaults Great Plains Dynamics Great Plains Dynamics ACCPAC Great Plains Dynamics Peachtree Accounting Quick Books Pro Generic Figure 5 6 Identifying Accounting Systems To Interface With PERCEPTION Defining Units Of Measure Library Unit of Measure is required on many of the tables in the system Select Library Units of Measure from the main menu The Units of Measure window Figure 5 7 will display The procedures for adding changing and deleting units of measure are the same as those outlined in General System Operation Of Measure Degrees Celsisus Cars Ferries CASE Cubic Feet Cubic Meters Days Each Fees Feet Gallons Gallons per Hours Gallons per Minute Hours Horsepower Hour per Cubic Foot Hour per Cubic Meter Hour per Foot Figure 5 7 Units Of Measure 91 Chapter 5 Starting A New System amp Database Right clicking on any row in the unit of measure window will pop up a menu Select Drill Downs and then Details or double click with the left mouse button on the unite of measure record The Units of Measure Conversion Factor window will open Figure 5 8 The conversion table can be used on purchase orders when the unit of measure by which you must order is different from the normal unit of measure that is requisitioned and issued to production The conversion factor number is the number by which the UoM must b
197. mplishment It is generally characterized by a uniform rate of activity over a specific period of time 226 Glossary LIFO Last In First Out The unit cost based upon the most recent purchase price of items on shelf Lot Number A manufacturer supplied identifier for material items manufactured at a specific point in time and having common design and manufactured characteristics The lot number is limited to a maximum of 8 alpha numeric characters Manual CERs Direct production based CERs determined by a user from external data which are then entered into the system library to replace any CERs stored in the database Also see Calculated CERs Direct CERs and Predictive CERs Management Reserve Management Reserve is a portion of a bid estimate that is withheld and not allocated as production budget to cover contingencies and unplanned production costs Reserves may also be withheld to provide cost incentives for production to enable cost performance to be lower than what was estimated MAP Manufacturing Automation Protocol describes a standardization of communications amongst various CIM systems modules Margin An added percentage placed upon unit cost Average or LIFO of items on shelf that will be charged to contracts MEL Major Equipment List PERCEPTION enables the user to tag specific estimate cost items as MEL items The system also provides an MEL worksheet 227 Glossary Microsoft Project Task A Mic
198. n pasting text description fields into PERCEPTION for example cost item descriptions If more than one data field is 66 Chapter 4 General System Operation attempted to be pasted into PERCEPTION and if the pasting operation is set to begin at a description field PERCEPTION will paste all data fields into that first description field in the PERCEPTION worksheet To avoid this problem always start the paste operation with a non description data field for example work center a date field or cost values Pasting EXCEL Data into PERCEPTION Drop Down Data Fields Most of the PERCEPTION drop down data fields will accept pasting of data directly from EXCEL However some drop downs use internal database codes and do not use the text data that is displayed from them The following are the drop downs that will require the EXCEL data to provide the codes as described in Appendix VI e Parts Catalog Worksheet o Part Type o Part Class e Estimating Standard Package Worksheet o Package Class e Estimating Package Item Worksheet o CER Equation Type o CER Type e Estimating Equation CER Worksheet o CER Equation Labor Material Flag e Tool Room Tool Item Worksheet o Tool Status Indicator Bulk Cut Bulk Copy and Bulk Paste Options Besides the standard Cut Copy and Paste operations the system provides a variation called Bulk Cut Bulk Copy and Bulk Paste These operations are available under Edit on the main menu The sta
199. n that is protected by copyright All rights reserved No part of this document may be copied or distributed transmitted transcribed stored in any retrieval system or translated into human or computer language in any form or by any means electronic mechanical magnetic manual or otherwise without the express written permission of SPAR Associates Inc Changes to This Manual 5 May 2005 e New option File Save As Excel Worksheet Chapter 4 amp Chapter 9 e Parts Catalog New Part Type Obsolete Appendix VI Internal Database Codes e Vendor ID amp Vendor Detail ID Appendix III Size of Data Fields 2 June 2005 e Explain changing record key error Chapter 2 14 July 2005 e New paper size options for printing reports Chapter 5 14 March 2006 e Added Abbreviations at end of manual 30 May 2013 e Upgraded to Version 9 Table of Contents CHAPTER 1 INTRODUCTION veissssacecsseciiacicecesdesspeaesdstecetacapetuensdecustvecstasevtekveveecapeesees 1 COST ESTIMATING sitiena a T EE A A A R A E AA EA EA ELR 1 PLANNING AND SCHEDULING cccceessssccececcceceesensececeseceesesessaaecececeesesessaeaeeeseesenenersaaeees 1 MANPOWER AND WORK ORDER MANAGEMENT ssesssssecececeessssececesececsesessaseeeseseeeeeenens 2 PURCHASING AND MATERIAL CONTROL cccceseessscecesececessenseaeceseceeseeessnsecececeesesenensaaeees 2 HARDWARE AND SOFTWARE TECHNOLOGY cssssssscesccecessessnsececececsesesenseaeeesceseeesensaaeees 2
200. n windows that are currently open The system will at this point discard any modifications to the children s data that have not been saved to the database If a parent window is closed all of its children will also be closed If any of the windows in the linkage chain have updates pending at this point the system will prompt to either save the changes or discard them before closing the windows The number of linked windows that can be open at one time is limited only to the amount of memory available on the user s PC Multiple copies of the same window can be opened at one time If changes have been made to any of the records in a linkage chain either by the current user or another user its own parent and children windows can be updated without closing and re retrieving all the windows in the chain To do this select Data Refresh Linked Windows from the main menu Rearranging Columns on the Screen Columns in a worksheet window can be arranged in any order you wish for ease of data 7 entry In general you may want to move empty columns or columns not needed by the user to the right or conversely you may want to move full columns to the left To rearrange the columns point at the top of a column the gray heading box that is to be moved and depress the left mouse button holding it down The entire column of data will be highlighted and a vertical bar will appear The column can then be dragged keep the mouse button depress
201. ncies The system will apply exchange rates as defined in this table for domestic currency budget performance reporting e Calendar sets list of holidays e Customers provides an address book for all the company customers e Stages of Construction allows the user to define shipbuilding process by sequence 42 Chapter 3 The Grand Tour Types of Work allows the user to define shipbuilding process by work type Block Types allows the user to define structural interim products made from assemblies sub assemblies and parts Ship Characteristics is used to record the primary and secondary characteristics specific to the ship Ship Types provides a window for retrieving adding and editing ship types WBS provides access to the work breakdown structures defined for all projects on the database Refer to the topic Linkage and Drill Downs WBS History provides access to snap shots of project performance indicators for example budgets expended costs earned values estimates at completion etc at every level of a project s WBS Refer to the topic Linkage and Drill Downs Several of the items on the Library menu have a second level An arrow pointing to the right indicates this For example Standard Parts Catalog Figure 3 22 provides access to material type classifications and sub classifications part class attributes physical material performance and default class attributes and to the catalog of parts and interim products
202. nd Tour WINDOW Window allows the user to arrange window positions and other related functions Figure 3 27 Window Window Open Style Cascade Layer Tile Vertical Tile Horizontal Toolbars v 1 Units Of Measure 2 Work Center Information 3 Block Type Information Figure 3 27 Window Menu Selections When multiple worksheets are open the user has the following options for arranging them in the workspace Cascade is shown in Figure 3 28 By clicking on the worksheet title bar activates that window 48 Chapter 3 The Grand Tour PERCEPTION Total Shipyard Management Activity Barrel Box BTU Cars Ferries Case Cubic Feet Cubic Meters Days Each Fees Feet Gallons Gallons per Hours Gallons per Minute Figure 3 28 Cascading Multiple Worksheets Layer will fill the workspace with only the active window default Tile Vertical arranges the worksheets vertically Figure 3 29 49 Chapter 3 The Grand Tour PERCEPTION Total Shipyard Management File Edit View Environment Library Data System Reports Window Help w CPGAZU S B t BEES x S BQ FB OS MA Heanlas Work Center Information Iof x Descripti Spar Center Hull Planking Shop Mast amp Rigging Shop Sail Loft Steel Weldout Mould Loft Material Control Planning amp Control Drawing Office Production Servces
203. nd anticipated performance on remaining work Same as EAC Promised Delivery Date PERCEPTION monitors the promised delivery date Estimated Time of Arrival or ETA for material items both as originally provided by the vendor and as updated by entries made by the expeditor The various system functions process the promised delivery dates accordingly New Purchase Order Installs ETA the same for all items defined on the purchase order Added Purchase Order Item Installs new item with specified ETA that if earlier from the PO s prior ETA changes the PO s ETA to agree Expeditor s Entry of ETA Updates PO ETA Updates all items accordingly if directed to do so by the user Anytime the system has an entry for a new ETA and no original PO ETA has been defined the original ETA will be set to that new ETA The ETA date is carried at the item level of the purchase order However the system will rollup the earliest item ETA for the ETA for the purchase order 240 Glossary Purchase Order Collection of requisitioned material items to be purchased from a vendor The purchase order ID is limited to a maximum of 8 alpha numeric characters and must be unique The purchase order number normally is a sequential number and can be automatically created by the system or is controlled within the purchasing department Purchase Order Date The date the purchase order was created Purchase Order Item Number Within a given purchase order
204. nd schedule It can be measured simply by estimating the costs for best and worst case scenarios including possible need to pursue alternate technologies A statistical analysis may provide an additional measure of Technical Risk by estimating the probability that the actual cost and schedule for the technology will equal those of the estimates in question Refer to Cost Risk Then Year Dollars Then Year Dollars are a level of costs estimated at the time when actual costs will be incurred When estimating then year costs using current year costs as a basis the latter must be adjusted using predicted escalation indices See Current Year Dollars and Escalation TOC An extension to LCC is the Navy s Total Ownership Costs TOC TOC covers the same cost elements of life cycle costs but also includes the added costs for the infrastructures required to support training facilities and other activities normally treated as indirect costs to the ship and its operations Top 3 Navy Numbers First three digits of the Navy Spec Item Number Total Risk Refer to Cost Risk Transfer Project Project that is borrowing material from another 252 Glossary Transfer Quantity Quantity of excess or borrowed material from one project to another Unit A level of PWBS project zone unit that defines a structural assembly such as hull block A unit may also define an equipment and or outfit module A unit ID is limited to a maximum of 8 alpha nu
205. nd selection processes The part classification is limited to 25 alpha numeric characters and must be unique Part Number The unique identifier for any part in the Parts Catalog The part number ID is limited to a maximum of 25alpha numeric characters The combination of Part ID Part Type must be unique Parts Catalog A listing of all standard purchased parts stock items and standard interim products manufactured for each stage in the construction of a complete ship 235 Glossary Part Sub Classification The user can catalog parts in the Parts Catalog under user defined Part Classifications These classifications can be further broken down into Sub Classifications Part classifications and sub classifications provide a means for focusing on certain identifiers make the search and selection processes easier The part sub classification is limited to 25 alpha numeric characters The combination of Classification Sub Classification must be unique Part Type A broad category of material Internal Code Description 1 Direct Purchase Standard Part Manufactured Standard Part Component GFE OFE Part Stock Part Load Items amp Spares Vendor Furnished Information VFI Milestone Payment Economic Price Adjustment EPA Sub Contractor CO N A AIIN Performance Measurement System In order to identify what changes will provide the most significant levels of benefit the shipy
206. ndard Cut Copy and Paste processes operate on rows of data or on individual data fields in a worksheet The Bulk Cut Bulk Copy and Bulk Paste processes however only operate on entire rows of data Unlike the standard Cut Copy and Paste operations that deal only with data visible in the worksheet the bulk variations operate on both the visible and non visible data that defines the entire data record on the database This is often necessary when copying rows of data from PERCEPTION to a spreadsheet like EXCEL The following are four frequently used applications for these bulk editing features 67 Chapter 4 General System Operation Copying to EXCEL Pasting from EXCEL Copying worksheet columns of data Copying worksheet rows of data Bulk Copying Rows of Data to EXCEL The standard Copy of worksheet rows to EXCEL will only copy the row data that is visible in the worksheet There may be additional information in the row as stored on the database that is not visible but also needed for the copy The Bulk Copy of selected rows will copy all data related to the worksheet records In addition the Bulk Copy operation will ask the user if column names are to be included in the copy process The standard Copy does not provide this option The column names are very useful when performing editing in EXCEL However these column names are the column names as defined on the database which are not always easily identified with the col
207. ndnote tees es nan 203 Replace Option 13 Report Formats 167 REPORTS naoa nane 47 Requisition Color Codes 0 185 Requisition Items Color Codes 185 Restrictions on EXCEL Data 65 Retrieving Database Records 61 Running Exception Reports 165 Saving Database Records 00 63 Schedule Planning Activities Color MODE Se Mittane tiled tachitatiaat 189 Selecting Multiple Records 63 Selecting Project WBS eee 127 Setting Up Company Parameters 87 Ship Characteristics 0 ceeeeeeeeeee 129 Ship Characteristics Default List of 100 Ship Characteristics Master List of 99 258 Abbreviations Ship Characteristics Types of 98 Ship Type Characteristics 44 98 101 Shipyard Trade Resources 117 SINON eian ee aE ES 15 Size of Data Fields eee 181 Sorting RECOKIS Si uhree Beene eae as 70 Special Characters 65 143 175 Special Edit Functions For Different Environment ceeeeseeeeseeeeeeee 26 Special Sorts For Reports 06 78 Special Window Buttons 171 Starting a New Project eee 111 Starting A New System amp Database 85 Start Up aise e an enti 15 Statistical Analysis References 204 Stock Adjustment Transactions Color CodeS naa nuns 187 SWBS Group Schemes 006 121 Tab Style Worksheets cece 59 The G
208. ne a ee aa 120 Project Numbers riasin ii sites lied imi a tel E a E a a a 121 SWBS Group Schem s iaman e a ins a a A a OR i 121 Defa lt Project WBS a aaee aa aaa aa daia aaae aa aaa a diarad oaoa 122 Cost of Money Cost Estimating ssssssssssssssssessesseseosssseesssseressseressseseessssessssseese 123 Bas Year Gost ESumating cross csssviieiil ega aan eae 123 Labor Rate Year Cost Estimating sist sscttsciosserciscatendecesatasiahiagueidestinsiatteassisesadaaintbas 123 Accounting Information Requirements For Active Projects nsss 124 CREATING A PROJECT WBS i2ccciseticecetie sessed uetetete cistevs eid eed aati educa 124 COPYING DATA FROM AN EXISTING CONTRACT PROJECT sseceseeseesseecsseceseesseeeenees 125 USING THE NEW CONTRACT PROJECT WIZARD cessceecceccecsseeesneesncesseecseerseeesnee 125 New Contract Wiz rd resi maenna a a a i aaa 126 Defining Contract Projects ssessesssesesseeesseesseesseesseeeseeesseeessressrssereseeessseesseest 126 Selecting Project WBS i ieccscisssexccashavcistsnseacctusaetssasaeendedsbanaadaseieneceasavzanesdeenceesbwnens 127 SoC aE ACHE TIS CS E EE EEA E EEEE E 129 Configure Interim Products 3 visiaiscssgdcadsascieaccasgeietesaseadeasesdaataegetad te cnbedat woealranstane 130 New Project Wizard crates na naaa a a tot a e a aaa aa 132 CHAPTER 7 PROJECT NA VIGATOR cccccccccssssssssssscscssccsssssscssscssscssscsssssces 133 MANAGEMENT GRAPH REPORTS ccccc
209. ned to a specific ship type a specific characteristic and a specific characteristic type All of these must first be defined Ship Type Characteristics Information for the Estimating Environment Ship Type Characteristic Type Characteristic Description UoM 1 CON v Dimensions v LOA v Length overall M Mi 2 CON v Cargo v TEU 20 v 20ft containers EACH v 3 CON v Cargo v TEU 40 v 4Oft containers EACH v 4 CON v Cargo v TEU Reefers v Reefer containers EACH v SFASTCAT Cargo PAX v Number of Passengers PERS v BFASTCAT Cargo Vehicles v Number of Vehicles PERS vi 7 Repair v Repair v AnchorCalib v Length of anchor chain to calibrate M 4 8 Repair v Repair AnchorChain v Length of anchor chain amp cable M va 9 Repair Repair y lAnchorShift y Length of anchor chain to shift M isa 10 Repair __ Repair Y AnchorStuds Y Legnth of anchor chain to reweld studs Me 11 Repair v Repair lAnchorWash v Length of anchor chain to clean M xj 12 Repair v Repair Bottom GritBlast Bottom Grit Blasting Area SQM v 13 Repair v Repair v MudCuM v Cubic Meters to remive mud CUM v 14 Repair v Repair v MudDrurn v Drums to remove mud EACH Mi 15 Repair v Repair ShaftDiarm vy Shaft Diam MM vi 16 Repair v Repair Sides GritBlast v Sides Grit Blasting Area SaM v 17 Repair v Repair SidesBTHosingDow SidesBT Hosing down with fresh wa
210. ng Engineering Planning amp Scheduling v Yv YV VAA Y Y Y Production Engineering Manpower i Define Work Orders From Activity Purchasing Work Order Clauses Stores Management Accounting Work Orders Sub Tasks Pallets Production Engineer s Toolbox Time Cards Barcoded Time Card Data Entry Rollup Reports Exceptions Figure 3 16 Environment Production Engineering Menu Selections e Manpower provides a manpower analysis based upon planned actual forecast requirements e Define Work Orders From Activity allows project work orders to be developed directly under schedule activities e Work Orders opens the work order window for viewing editing adding and deleting records e Sub Tasks opens the work order sub task window for viewing editing adding and deleting records Sub tasks apply to the special work orders distributed time phased and incremental process work orders e Pallets opens the material and work order pallet window for viewing editing adding and deleting records e Production Engineer s Toolbox provides a variety of functions for editing and manipulating work order information e Timecards provides functions for entering and managing work order time charges e Bar Coded Timecard Data Entry is an alternate data entry window for entering time charges using bar code identification and data collection devises 36 Chapter 3 The Grand Tour e Rollup provi
211. nments ssssseessseenssesesseseessssssssssee 26 NATE W e525 20 hiss E E T RE E e aT E a Ss ec BSG A E E E cd GES b ae 29 ENVIRONMEN Bora an Bove tags densa Na a T a a N A pes Sah ovate ees 32 TETRA RAY a a A E e A 42 DAA a E A A 45 REROR TSZ SEE T E E Ra E A EE E PN E ESS a a eS 47 WINDOW a e ETE ea N E R N E LI I a 48 HELP runea a in a a a he aes a ee a 52 TOO PAR a a RTT aay aaa 53 CHAPTER 4 GENERAL SYSTEM OPERATION ccccssssscscssssscccsssscsccessscccoes 57 WORKSHEETS lin a es a T edo EE E on Ree R TR RA Sod 57 Opening Worksheets cisrenan ea a a E E bee a E les 57 Closing WOTKSICCIS cox cas ice cciatuseds ie R E e a aad ave a a eter aai 57 Opening Multiple Worksheets sccsccsieisiinaiiciain neidi aaa a ena 57 WOT SIDGEE W OGRSIIC CUS sicsa sits stun nada ctdiraetteh eta beaded teats ba tehnadctactins wiepsan dude A adadeluada 58 D t il Worksheets cic cae etc 55 teal baited Saeiall e ateaat concede Ue a a naar vate aaaea Taa 58 LAD Style Worksheets 6 sivas en csuiietacxstintehs fuvarctatwcaiaoitis eiicuns A EE tenentahutnei nic wie pees eect 59 Linked WHO a scsi yin she pcheve char aha tinea EO eer aaa aa eh eae beeen lee oes 60 DATABASE PROCESSING weg c ctei ac iiis a Bee eee ee Hen ee eae BAGS 61 Retrieving Database Records siacaget ht cassatacaasouasaeasuaiaesont de sacabaata coon coaeeetanmonancanann 6l Adding New Database Records wiciciat Westesatetoutiatveasesdiibeastlsstuns eaebieaaeatddabaat 62 Modifying Database
212. nning activity may slip its finish schedule before it impacts other activities in the project PERCEPTION manages two values of slack Free slack is the number of workdays that a planning activity may slip its schedule before it impacts the next activity in sequence Total slack is the number of workdays that a planning activity may slip its schedule before it impacts the overall project completion date When all total slack is completely used the planning activity is on the critical path Slack also is called float The two terms are synonymous S O Indicator Structural Outfit Indicator identifies nature of cost Internal Code Description N A ZERO Structure Outfit Material Services Labor TI lt XJ ZININIO Special Items Items on a purchase order that are not requisitioned such as freight duty etc Stage of Construction Stage of Construction is the division of the manufacturing and assembly process by sequence Standard Interim Product An interim product is any output of a production work stage that can be considered complete in and of iteself It also can be presented as an element within any level of a product work breakdown structure PWBS As shipyards adopt standard interim products as the primary basis for building ships the interim products themselves can form the means for developing high quality cost estimates 247 Glossary The interim product cost estimate pa
213. not able to modify the report when it is received The available formats are e The Powersoft Sybase Report option creates a PSR file showing the formatted report This option is suggested primarily for sending a copy of a report to an individual within the organization who is not a user of PERCEPTION software The file can be opened with the Internet browser if the plug ins have been installed The plug ins can be found on the Sybase web site http www sybase com e The Adobe PDF option transforms the active worksheet retrieved data or report into a format that the recipient can read and print but cannot modify This format requires the recipient to have a copy of the Adobe reader which can be downloaded at no charge from the Adobe web site http www adobe com The Adobe Acrobat software must be installed to create the PDF file Adobe Acrobat Version 4 0 or greater is needed for this capacity to work This can be purchased for a nominal cost from the same Adobe web site The PDF format is widely used by many organizations and since the reader is easily available SPAR suggests this option for sending documents to customers or vendors e The Microsoft EXCEL option creates an XLS file that contains the data If this option is used with a report the data comprising the report will be sent Any spreadsheet program can then read the file e The HTML option creates an HTML file that is opened with the Internet browser This option
214. nstraint in the accomplishment of the end event Current Year Dollars Level of costs in the year that the actual costs have been or will be incurred Refer to Then Year Dollars Deflation A reduction in the level of costs over time The opposite of inflation Refer to Escalation Design To Cost Design To Cost is similar to CAIV by prescribing strict cost objectives and constraints for the development of the detail design However Design To Cost places more emphasizes upon design producibility and manufacturing efficiencies and less upon innovations in design technologies and new ship systems Destination Destination of requisition items This field is in addition to warehouse storage locations The destination is limited to a maximum of 20 alpha numeric characters Domestic PO A purchase order is a domestic PO when the currency used by the vendor is the same as that used by the shipyard Direct CERs CERs developed directly from a measurement of a single physical attribute quantity and unit of measure for a shipbuilding activity and the cost of performing the activity If the shipyard uses the same attribute for the same activities for each ship it builds it can compile a database of cost per unit of measure for each of its different activities 216 Glossary Three types of Direct CERs are used and are defined separately as follows Calculated Manual override Predictive Refer also to Calculated CERs Manual CERs
215. nstruction Construction Events 4 Dimensions Dimensional Characteristics 5 Financial Financial Parameters 6 Machinery Machinery Characteristics 7 MaxTanks Maximum Tank Capacities 8 Operational Operational Characteristics 9 Repair Repair Parameters 10Weights Weight Characteristics Figure 5 15 Types of Ship Characteristics 98 Chapter 5 Starting A New System amp Database Master List of Ship Characteristics To define the master list of ship characteristics select Library Ship Characteristics Characteristics The system will display Figure 5 16 The procedures for retrieving adding changing and deleting master list of ship characteristic records are the same as those outlined in General System Operation Note that each characteristic should be assigned to a specific type and that type must first be defined Characteristics Information for the Estimating Environment Characteristic Type Characteristic Description 1 Cargol wv BBL Liquid barrels BBL w 2 Cargo v_ PAX Number of passengers PERS vi 3 Cargo v TEU 20 20ft containers EA amp 4 Carga v TEU 40 40t containers EA x 5 Cargo v TEU Reefers Reefer containers EA xj 6Cargo Y Vehicles Number of Vehicles EA ss ew 7 Coefficients Cb Block coefficient FACTOR vi 8 Coefficients v CuNo Cubic number FACTOR v 9Construction Months Months of Construction MONTHS v 10 Dimensions v Beam Beam M x 11 Dimensions oy BeamM
216. nu to validate only that record currently in focus e Click on Data Validate Selection on the main menu to validate only those records highlighted e Click on Data Validate New Modified Data on the main menu to validate only those records that are new or modified in the worksheet e Click on Data Validate Current Data Set on the main menu to validate all records in the worksheet This is the same function as provided by the data validation button on the toolbar Data validation tests also can be automated via a business rule whenever a user saves any data to the database To turn on this Windows Validate Before Save rule refer to the Chapter Managing Business Rules in the System Administration User Manual 162 Chapter 16 Exception Reports Chapter 16 Exception Reports An exception reporting tool has been added to PERCEPTION and is available from the PERCEPTION module This new tool is fully programmable by the customer system administrator and can be utilized by all users of the system The exception reporting can be very valuable for identifying bad or missing data in the database For example requisition or pallet items with missing or invalid WBS identifiers will not properly roll dollars to the upper levels Stock items without unit prices cannot be properly charged to a contract when withdrawn Any standard part with a negative quantity needs to have an inventory adjustment performed If a purchase order item d
217. oblems such as use of foreign funds federal state sales taxes and escalation clauses for long term contracts With MAT PAC you can engineer bills of material requirements and utilize full featured purchasing functions including requests for quotations and purchase order issues printing and amending The system tracks receiving and quality control inspections manages quantities costs and multiple storage locations to support production pick lists Hardware and Software Technology PERCEPTION has been developed using a state of the art object oriented graphical programming language and open relational database Sybase Oracle or Microsoft The system operates on Windows based PC client server networks Version 8 operates only under Windows XP and Vista and has features for importing and exporting information to from popular PC software products such as spreadsheets word processors and other desktop office applications These features also support systems integration with a variety of financial and accounting software and with popular computer aided design engineering and manufacturing systems As a client server product PERCEPTION is scaleable so that it can be used by both the small shipyard and by the largest The system is modular The shipyard may use only those modules it chooses or the system can be installed in phases to suit almost any desired implementation schedule Chapter 1 Introduction PERCEPTION requires a system wit
218. oes not have a valid term ID transfer of received or withdrawn dollars to general ledger will not be correct Each environment has its own set of exception reports that are relevant to that environment Many of the reports are available to more than one environment There are an infinite number of exception reports that can be useful to the organization SPAR has provided many of these reports but the system administrator can add others The following is a sampling of the reports provided Accounts Table SWBS Acct Budgets lt gt Sum of WO Budgets Checks the SWBS Account Budget Hours and compares to the rolled up sum of all Work Order budgets assigned to that account COA Group Table COA Group Budgets lt gt Sum of WO Budgets Checks the COA Group Budget Hours and compares to the rolled up sum of all Work Order budgets assigned to that COA Group COA Sub Group COA Sub Grp Budgets lt gt Sum of WO Budgets Checks the COA Sub Group Budget Hours and compares to the rolled up sum of all Work Order budgets assigned to that COA Sub Group 163 Chapter 16 Exception Reports Parts Catalog Table Parts with Negative Qty On Hand If the Parts Catalog quantity on hand is negative an inventory adjustment must be done Parts with Negative Total Value If the Parts Catalog total value is negative corrections must be made in the database Stock Items Missing Hi Lo Quantities The Parts Catalog high and low quantities
219. of a project It can be measured simply by relating the cost estimate against potential minimum and maximum cost values Cost Risk can be impacted by Schedule Risk Technical Risk Performance Risk and Economic Risk A statistical analysis may provide an additional measure of risk by estimating the probability that the actual return cost will equal the cost estimate in question Refer to Risk Management Schedule Risk Technical Risk Performance Risk and Economic Risk The Minimum and Maximum risk values are calculated by the system when a Cost Estimate Rollup is performed and can be viewed on any of the Estimate WBS level records Mean Cort value Approrima tly 3 Standard Os da toni Probability Cost 12 Cost Variance The difference between BCWP and ACWP At any point in time it shows whether the work actually performed has cost more or less than that budgeted The cost variance is calculated by the system when either a Production Labor Rollup or a Production Material Rollup is performed and can be viewed on any of the WBS level records CPM Critical Path Method a procedure for determining activity schedules based upon their individual durations and lead times and upon the organization of activity sequences within the project network 12 Selected photographs obtained from www nsnet com 215 Glossary Critical Path That particular sequence of activities in a flow chart that comprise the most rigorous time co
220. olor coding for drawing bills of material Requisition Color Codes The system color codes requisitions in the requisition worksheet e Green Requisition is approved Requisition Items Color Codes The system color codes requisition items in the requisition item worksheet e Gray Non stock requisition item not yet linked to a purchase order e Red Requisition item successfully linked to a purchase order e Blue Requisition item linked to a stock item Purchase Order Color Codes The purchase order worksheet provides a color coding of the rows of purchase orders on display e Green PO has been issued e Red PO has been amended but not yet re issued e Light Blue PO is complete In addition the PO item worksheet also provides the following color codes PO items are flagged red under the following conditions e PO item has been received but for a quantity greater than ordered e PO item has been invoiced for a quantity greater than what was ordered e Current ETA is later than the need date 185 Appendix IV Color Codes Receiving Transactions Color Codes When the system has completed the posting process it will color code the receiving transactions as follows e Gray Transaction has not yet been processed for posting e Green Transaction has been successfully posted The user cannot modify posted transactions e Red The posting process detects errors in the transaction in either the purchase order it
221. on eS on the toolbar which displays a pop up window listing all of the column headings that can be selected for sort operations Figure 4 8 70 Chapter 4 General System Operation Columns Available for Sorting Sort Columns Ascending Acknowledge Date Acknowledge Reqd Address 1 Address 2 Amendment Date Amendment Id Authorized Buyer C Desc Drag and Drop the Columns to Sort on Cancel Help Figure 4 8 Selecting Sort Columns In the section that describes Data Sort the user is presented with two boxes On the left is the selection of data fields columns of information in the worksheet to be sorted In the right box are the columns selected by the user that are to be the basis for the sort To select a column the user highlights the column name from the list in the left side box and drags it to the right side box Multiple columns can be selected using this same procedure The column identified at the top of the right side box is the column to be the major sort column Columns listed below are the minor sort columns in descending order of priority The check boxes if turned on will cause the system to sort that column in ascending order If turned off no check the column will be sorted in descending order A column can be deselected from the right side box by highlighting it and dragging it back to the left side box Filtering Records Once a worksheet has been loaded with records of data the filter
222. on stock items are used for the stock reorder report STKO3 Stock Items Without Unit Price Verifies that all stock items have a unit price BOM Table COA Group Is Invalid On BOM Item When a BOM item has an invalid COA Group requisitions created from the BOM will not be correct PWBS Zone Is Invalid On BOM Item When a BOM item has an invalid PWBS Zone requisitions created from the BOM will not be correct SWBS Account Is Invalid On BOM Item When a BOM item has an invalid SWBS Account requisitions created from the BOM will not be correct Activity Center Is Invalid ON BOM When a BOM has an invalid Activity and Center attached requisitions created from the BOM will not be correct Pallet Item COA Group Is Invalid On Pallet Item When a pallet item has an invalid COA Group material withdrawn from the pallet item will not be charged correctly PWBS Zone Is Invalid On Pallet Item When a pallet item has an invalid PWBS Zone material withdrawn from the pallet item will not be charged correctly SWBS Account Is Invalid On Pallet Item When a pallet item has an invalid SWBS Account material withdrawn from the pallet item will not be charged correctly Drawing BOM Are Invalid On Pallet Item If a Pallet Item is associated with a Drawing and Drawing Item that Drawing and item should be valid Purchase Order PO Table PO Terms Not on Terms Table Verifies that all Purchase Order Terms exist in the Terms Table PO Vendor N
223. or any project When used PERCEPTION does not require the PWBS to be completely defined but only to the extent that is necessary for planning and production control purposes The Generic PWBS GPWBS is an attempt to standardize the definition of the PWBS across the shipbuilding industry Such a standard benefits the Navy by enabling a common basis for comparing ship designs and build strategies and evaluating their costs Project estimate cost items may be mapped to the GPWBS and GPWBS reports are available on the system The GPWBS is limited to Ship Zone Work Type and Stage of Construction QA Flag For purchased parts it is a user defined code scheme to identify specific quality assurance QA inspections for delivered parts and components The QA flag is used by PERCEPTION to place received material into a pending inspection status The QA Flag has a maximum limit of 8 alpha numeric characters Quantity Available For purchased parts it is the net quantity remaining of quantity received less quantity used by production For stock parts it is the net quantity remaining of quantity currently on hand on shelf less quantity reserved for projects Quick PO Item A Quick PO Item is a purchase order item added to a purchase order without having a pre existing requisition item as its source The system instead allows the user to create the requisition item as the Quick PO Item is being created The requisition item is required by the sys
224. ose outlined in General System Operation The upper level WBS CER records are created and updated for the appropriate ship type by the project refresh if the user chooses to do so Budgets EAC or actuals can be chosen for this calculation The labor rate per unit of measure is calculated from the work orders using the predominate unit of measure This measures actual costs Refer to PERCEPTION s ESTI MATE user manual Beginning the Cost Estimate for more information Figure 5 14 Ship Types Ship Types Bme Ship Type Ship Name Description eed Oceangraphic Research Ship Oceangraphic Research Ship 2 A0E Fleet Oiler Fleet Oiler SIBY Misc Miscellanous Boat Yard Category AIBY SAIL Sail Boat Boat Yard Category SIBY POWER Power Boat Boat Yard Category BICAF Car Ferry Car Ferry FICAG Cargo Carrier Cargo Carrier eeicHT Chemical Tanker Chamical Tanker ICON Container Container Ship _A0COT Crude Oil Tanker Crude Oil Tanker A1ICRS Cruise Ship Cruise Ship 12 CVN Aircraft Carrier Nuclear Powered Aircraft Carrier 13 DDG Destroyer Destroyer 1A4 FF Fast Ferry Maestro Fast Ferry 15 FFG Frigate Frigate 16 0B0 Bulk Carrier Oil Ore Bulk Carrier AZIPAL Passenger Liner Passenger Liner 18 ROR RO RO Rall On Roll Off Carrier A9 SSBN Submarine Nuclear Missle Submarine 20 TAKR Sealift Fast Sealift 21 TA0 T Ship Fleet Oiler Fleet Oiler 4 97 Chapter 5 Starting A New System amp Database
225. ost productive and to eliminate or minimize any efforts that do not add value to the activity This means that work done in shops are typically more productive than if the work were scheduled for on board To complement this concept modular construction techniques including on block construction and pre outfitting have become the preferred methods for maximizing production efficiencies These methods however do require more advanced product engineering in order to gain the full potential of efficiencies and cost savings What was once a ship systems oriented way of organizing work and collecting costs has now given way to organizing work and collecting costs by interim products sub assemblies assemblies hull blocks ship zones and manufacturing processes cutting welding assembling etc The interim products can be standardized and identified within a PWBS 228 Glossary Module The placement of equipment and its related systems together on a machine foundation seat prior to its installation on unit or on board Monte Carlo Techniques A simulation methodology based on the general idea of using sampling to estimate the desired result The sampling process requires describing the problem under study with appropriate probability distributions from which samples are drawn Most Likely Time The time duration that would occur most often if the activity was repeated under EXACTLY the same conditions many times If many knowledgea
226. ot on Vendor Table Verifies that all Purchase Order Vendors exist in the Vendor Table PO Item without Unit Price Verify that all PO items have a unit price PO Schedule Exceptions Current PO Item ETA is within 7 days of current Need Date Requisition Items Missing Invalid On PO Items Requisition Items referenced on the PO Item must be valid 164 Chapter 16 Exception Reports Requisition Item Table e COA Group Is Invalid On Reqn Item When a requisition item has an invalid COA Group PERCEPTION s internal Material Costs will not be correct e COA Group Missing From Regn Item When a requisition item has no COA Group specified PERCEPTION s own Material Cost tabulations will be wrong e Material Over Usage This exception checks for items that have been over withdrawn in excess of its reservation e Material Over Ordered Checks for items that have a quantity ordered in excess of requirement e PWBS Zone Is Invalid On Reqn Item When a requisition item has an invalid PWBS Zone PERCEPTION s internal Material Costs will not be correct e PWBS Zone Missing From Regn Item When a requisition item has no PWBS Zone specified PERCEPTION s own Material Cost tabulations will be wrong e Regn Item Need Date Vs Work Order Start Checks to see if a requisition item s need date is out of sync with its Work Order Schedule as specified by Production Engineering e Stock Usage Without Cost When a stock ite
227. performed for a ship repair project The paragraph column on the cost item is for informational use only A paragraph number is limited to a maximum of 25 alpha numeric characters 234 Glossary Part The lowest level of the PWBS project zone unit assembly sub assembly part shipyard manufactured interim product A part ID is limited to a maximum of 8 alpha numeric characters The combination of Contract Project Zone Unit Assembly Sub Assembly Part must be unique Part Attribute The user can catalog parts in the Parts Catalog with any number of different attributes such as size color material specifications etc There are functions in the system where the user can search the catalog for parts according the user defined criteria that are applied to these attributes in the selection process The part attribute is limited to 50 alpha numeric characters Part Attribute Type Part attributes can be cataloged by type categories such as physical performance etc Part attribute types provide a means for focusing on certain identifiers to make the search and selection processes easier Part attribute types must be defined before they can be used The part attribute type is limited to 50 alpha numeric characters and must be unique Part Classification The user can catalog parts in the Parts Catalog under user defined Part Classifications Part classifications provide a means for focusing on certain identifiers to make the search a
228. production schedules The PO Action Date is computed by the system by subtracting a user defined PO Lead Time from the Required In Yard Date Therefore the Required In Yard Date must be defined before the system can determine the PO Action Date PO Lead Time The number of calendar days needed before the Required In Yard Date for the vendor to process a purchase order The PO Action Date will be calculated by the system in appropriate calendar days from the Required In Yard Date and the Lead Time PO Planned Start Date Planned date to begin the purchasing process This should be the latest date that the requisition should have been completed by production engineering The time between the PO Planned Date and the PO Action Date is the PO Process Time Pre outfitting See On Unit and On Block Outfit Predictive CER A single Direct production based CER determined from analysis of several selected shipsets of return cost data based on actual man hour expenditures and their associated measurable parameters e g square feet of painted area The analysis can be a regression or simple averaging Also see Calculated CERs Direct CERs and Manual CERs 238 Glossary Preliminary Design Estimate The cost estimating during preliminary design remains at a relatively high level but there is more detail information about the ship design with regard to the hull structure the equipment and outfit systems During preliminary design cost e
229. r Production Demo Project DES 1 Sample Ship Repair Project convene ovary vom osson Cd eean Account 200 Manual CERS Man labor CER pari Bronze Gate Valve 2 Inch threaded 150 psi Ubrary lator amp material CERS Ubray labor CER amp manual material CER Ubray material CER amp manual labor CER Ib CER amp Bronze Gale Valve 2 Inch threaded 150 pal Bronze Gate Valve 2 inch threaded 150 psi Total for Acct 200 Total for Project DES 1 Total for Contract 45 0000 82 Chapter 4 General System Operation Figure 4 18 Sample Cost Estimate Report before Datawindows Designer Modifications 83 Chapter 4 General System Operation Halting a PERCEPTION Process Occasionally a particular process that requires a relatively long time to execute needs to be terminated before it is complete Some PERCEPTION processes like database retrievals offer the halt button e on the toolbar However the universal halt feature of Windows use of the escape key on the keyboard always will interrupt any process being executed by the system 84 Chapter 5 Starting A New System amp Database Chapter 5 Starting a New System amp Database The database is comprised of two basic types of data Common use libraries parts catalog vendor catalog list of work centers etc Project oriented information cost estimates work orders requisitions etc Project oriented information requi
230. r to develop a master list of ship design characteristics each cataloged by type e Default Characteristics allows the user to assign selected characteristics from the master list as a default set of characteristics when a new project is defined The user then should define the specific values of these characteristics for the project e Ship Type Characteristics allows the user to develop another list of characteristics specific to each ship type These characteristics are in addition to the default characteristics These ship type characteristics also will be loaded under a project when a new project is defined with a specific ship type designation 44 Chapter 3 The Grand Tour DATA Data provides options for manipulating data Figure 3 24 Data Sort Filter Validate Row Validate Selection Validate New Modified Data Validate Current Data Set Get External Data Ditto Records Create Rows Add Record F8 Insert Record Delete Records Retrieve Ctrl R Re Select Rows Refresh Drop Downs Refresh Linked Windows Data Analysis Extraction Tool Figure 3 24 Data Menu Options e Sort opens an option window that contains the column headings of the active worksheet The displayed rows of data can be sorted either in ascending or descending order by any single designated column e Filter opens an additional selection window and allows the user to refine a selection o
231. rand Tour 15 The Work Centers n os 117 Time Charge Transactions Color Codes e aa aee N aT an a S a ETE 188 Tool Room Transactions Color Codes AE EAE E ERT 187 TOOLBAR iren timate ara aE 53 Type of WindowS ceeeeeeeereeeeees 172 Types of Data Fields eee eee 174 Using Email With PERCEPTION 139 Using the New Contract Project Wizard Fe ete Meer tera ee ae Seen area 125 Using the URL Feature 149 Using the View Feature 0 177 Vendor Invoice Color Codes 189 VIEW sesiesa yah ca esas taste 8o at i 29 Viewing AutoCAD Drawings 177 WINDOW onin innin at resis aad 48 Withdraw Transactions Color Codes 186 Work Order Color Codes 00 188 Working with Windows 172 Worksheet Column Copy And Paste 69 Worksheet Row Copy And Paste 70 Worksheet Worksheets c0 58 W OTKSHOCtS i ccdcadacthanrtecsurigsilestedcceiaals 57 259 Abbreviations ABBREVIATIONS A P Accounts Payables Accounting Function A R Accounts Receivables Accounting Function Acct SWBS Account a Ship System ACWP Actual Cost of work Performed AP Accounts Payables Accounting Function AR Accounts Receivables Accounting Function BAC Budget at Completion Total Budget BCWP Budgeted Cost of Work Performed BCWS Budgeted Cost of Work
232. raries Used BYP UP CIASIN G acct cored aN daw euaccnanla tide tatewtndiscaticn arene easieshiuasabersudtivn 104 Libraries Used By Stores Management 0 cccccccceessececeessececesssscecesseaececuuseeeeessunaes 105 Libraries Used By Accounting asec csecteaivinte chitin ita voctuersdveaniavaclestutcbbinidoclectadhsblerces 105 INTERFACING WITH FINANCIAL ACCOUNTING SYSTEMS c sccsssessseesseessseesseeeseeeenees 105 DEFINING BUSINESS RULES lt coifecsc2t a rain aE a EERE E 107 DEFINING COMPANY LOGO riesi oaa oe a a EA AE E ER eee 107 SETTING PRINTER PAPER SIZE s ssssseseeseesesssesseesetsresreesteseesetestesseseresreseserestesseseessresseeee 109 CHAPTER 6 STARTING A NEW PROJECT essoescessessossoessesooesocsseseoesosssessoseoe 111 BEFORE YOU BEGIN A NEW PROJECT sessessseseseeseesessresreestsssesreesteseesrresresseseresresseseest 111 Contract BETO COU sects casa ie hs acl aa nary a a aa aea AaS 112 IEAI s E EE EEE E E 112 Project SWB Sors ae a e i EE A ae E A E E RAS 114 PT OPOCE FW Dee id Bae IRR e T E E E RA E EEE a 116 Project Code of Accounts COA sis cated ctasats scaaind vactars ta lccttaaiauausuesseesuisarien aa iawabea 116 The Work Centrs oiriin ir a E E EEE tat oceans at te atv aetna 117 Shipyard Trade ROSOUTCES ernieren aE te Geant i A E R EAS 117 CONTACT CLIN E E E E T EE 118 CREATING A NEW CONTRACT amp PROJECT S ccccssssscecccccecesssssececeseceesesessseeeseeeesenenens 118 Creating a Project coi aie Gra
233. re 3 13 Environment Cost Estimating Menu Selections e Package Library gives full access to the Standard Interim Product Packages e Package Item Library provides access to Interim Product Package Items e CER Libraries gives the user direct access to all types of CERs in the library e Cost Items gives the user direct access to the individual cost items for an estimate e Rate amp Indirect Formula Tables gives the user direct access to project related rates labor overhead profit etc and indirect formulas e Escalation gives the user direct access to the material cost escalation table e Cost Estimator s Tool Box provides a variety of functions for editing and manipulating cost estimating information e Return Costs gives the user access to return costs information 33 Chapter 3 The Grand Tour e Rollup provides the user with options for re computing data summaries throughout the contract project work breakdown structures Specifically the user may perform rollups on cost estimate data e Risk Analysis provides a Monte Carlo risk assessment of the cost estimate e Transfer Estimate to Production exports cost estimate data directly to the Production Engineering and Material Control environments Cost Estimate Items are gathered into preliminary work orders and material requisitions e Reports provide access to all of the reports related to cost estimating e Exceptions provide access to all of the special exception repo
234. reparation fabrication assembly installation testing etc Cost estimating can be integrated with detail engineering trade off studies that include not only alternatives in design but alternatives in production engineering and manufacturing processes The cost estimating at this stage can be used as a successful strategy for managing the detail design process and will help ensure that the final design stays within prescribed cost objectives The costing information provides the fundamental basis for establishing production budgets Cost Driver A controllable design characteristic or manufacturing process that has a dominant effect on cost Cost Item A PERCEPTION component of ship cost which includes either labor material or both A cost item can be an entire ship the smallest piece included in the ship such as a nut or bolt or anything between these two extremes In addition to the direct material and labor costs each cost item also has indirect cost elements such as overhead G amp A and taxes A cost item can include the methodology used to estimate cost schedule information in terms of start complete dates and the risk associated with it in terms of maximum minimum percentage increase decrease 214 Glossary A cost item ID is limited to a maximum of 8 alpha numeric characters The combination of Contract Project Cost Item Work Center must be unique Cost Risk Cost Risk is the degree of cost uncertainty within an area
235. res for adding changing and deleting work centers are the same as those outlined in General System Operation Defining Trades Resources To access the Trades Resource Definition Window Figure 5 10 select Library Trades Resources from the main menu Trades are labor resource categories used by the system to catalog both budgets and actual return costs Trades are designated with the letter H from the drop down in the Type column A given trade can be used across any number of different work centers A work order can accommodate any number of different trades although good scheduling practices would probably limit the trade selections for a given work order so that the work can be scheduled as a single task of controllable budget and work duration Other resources designated by the letter R can be assigned to activities for schedule management but they cannot be assigned to work orders The procedures for adding changing and deleting trades are the same as those outlined in General System Operation amp Trade Information for the Estimating Environment Trade ID Type Description H h Carpenter Class 1 Ea H Carpenter Class II E3 H Carpenter Apprentice 4 H Concrete Worker H Electricians 3 H Electrician Apprentice fi H Plumber Class H Plumber Class Il H Painter 100 H Painter Apprentice 4411 H Excavator 12 12 H Carpet Layer 13 13 H ilron Worker KEE H Tile Setter as5hs H Heating AC Worker 16h6 H
236. res use of the information obtained from the common use libraries For example purchase orders cannot be generated without use of information found on the vendor catalog Therefore in order to get underway using PERCEPTION the common use libraries must be loaded first before project data can be developed Libraries can be developed manually using PERCEPTION Start at the main menu Library and select the particular library you wish to develop or modify This selection will open the appropriate worksheet for entering the information relevant to the library file Follow the instructions for adding changing deleting and saving data provided in the chapter General System Operation However data from legacy systems spread sheets etc also can be imported into the PERCEPTION database Refer to the chapter Importing amp Exporting Data which provides instructions on how to perform these imports For additional information on setting up libraries and general methods for managing shipyard information the reader is referred to the following SPAR documents Planning New Construction amp Major Ship Conversions Guide for Shipyard Material Control Guide for Cost Estimating New Construction These documents also have relevance to the business of ship repair and plant maintenance activities 85 Chapter 5 Starting A New System amp Database Common Libraries Used By All Environments The libraries included in the main
237. rk orders and purchase orders The return cost is calculated by the system when either a Production Labor Rollup or a Production Material Rollup is performed and can be viewed on any of the WBS level records Risk Management Risk management is the process of isolating areas of cost which have the greatest uncertainty and taking appropriate action to minimize or eliminate their potential adverse impact upon a project Refer to Cost Risk Schedule Risk Technical Risk Performance Risk amp Economic Risk The Minimum and Maximum risk values are calculated by the system when a Cost Estimate Rollup is performed and can be viewed on any of the Estimate WBS level records 244 Glossary ROI ROI measures the estimated costs against estimated revenues The balance or profit margin for the ship owner can make or break a design proposal It also can form the basis for a design optimization strategy and trade off effort that seeks to maximize the ship owner s return on investment Another form of ROI measurement strategy is to determine required freight rates RFR for the ship design proposed for service Minimizing the RFR also can form the basis for design optimization studies Naval ships do not have a bottom line commercial profit consideration These ships are put into service only to satisfy a national security commitment to its citizens However as limited government funds address an ever widening array of government responsibil
238. rop down Worksheet is also a box with an arrow at its side If the user clicks on the arrow a list of options or selections drops down By clicking on the desired option or selection the user sets that value in the box The selections in the Drop down Worksheet are items that are present in another table i e the Unit of Measure table Users can modify add or delete records in the Unit of Measure table Doing so will result in these changes being reflected in the Drop down Worksheet the next time a window that uses this table in a drop down worksheet is opened If a user makes a change to the table while a window using this table is open selecting Data Refresh Drop Downs from the main menu will cause the changed data to display in the drop down e Multi Line Edit Data Field is a box for text that expands downward as multiple lines of information is entered e Spin Control Data Field is a box that has a set of arrows on the right side for changing the value incrementally The user can also type directly into most fields with the spin control e Radio Button is a way to make a selection by either turning it on or off by clicking on the radio button When the radio button has a black dot in its center the option is turned on when the center of the button is clear the option is turned 174 Appendix I Operating Windows off When radio buttons are used only one of the selections can be chosen Choosing one selection unselects the other
239. rosoft Project task is a scheduling activity developed in Microsoft Project When linked to PERCEPTION the task develops project Planning Activities in PERCEPTION To be consistent with PERCEPTION the user should identify the Microsoft Project task Planning Activity Planning Activity Center Microsoft Project further identifies a task with the following unique identification Microsoft Project Project ID Microsoft Project Unique ID for the task These two Microsoft Project identifiers are stored on the PERCEPTION planning activity when it is created from the Microsoft Project transfer process and the user should not modify them They are the only means for PERCEPTION to re locate the task on Microsoft Project should the task be updated with performance information available in PERCEPTION Milestone Item A pseudo item carrying a purchase order milestone payment This milestone item provides a means to plan and schedule cash flow requirements outside the normal delivery schedule parameters of the system Modular Construction In the past shipyards used to build ships ship system by ship system The collecting of costs by ship system was a relatively straightforward procedure However better methods for more productive organization of work have come into play The packaging of work now focuses not on the specific ship systems but upon the nature of the work to be performed The objective is to do the work when the working conditions are m
240. roup technology Imposed Start Imposed Start is a schedule constraint applied to either a planning activity or project milestone In Care Of Vendor A material broker or distributor to whom the purchase order is issued Indirect Cost Costs which are incurred for common or joint objectives and which are not readily subject to treatment as direct costs Indirect costs include overhead G amp A and any material burden Inflation An increase in the level of costs over time The opposite of deflation Refer to Escalation 221 Glossary Interim Product Standard Manufactured Items Interim Products are those components and assemblies that can exploit the cost savings benefits from bulk manufacturing methods Both overall costs and schedules can be reduced where ship designs can apply these standard interim products across different ships even different ship types Any part on the Parts Catalog can be developed into an interim product IP package This enables the cost estimating data for manufacturing the part to be standardized IP Indicator Interim Product Indicator identifies where work is performed Internal Code Description 0 N A ZERO S Sub Zone G Grand Block B Block U Unit A Assembly P Sub Assembly C Part IP Type Interim Product Type identifies type of work performed Code Description 0 N A Structure Machinery Piping HVAC Electrical Accommodations Unit
241. row to be selected Deleting Database Records Generally there are two types of data entry screens that have slightly different methods for deleting records For screens that display only a single record most detail windows a click on the Delete button or selecting Data Delete Records from the main menu will command the system to delete just that record which is on display On the worksheet windows multiple records can be deleted at one time by selecting the rows to be deleted and then clicking on the Delete button Saving Database Records When finished adding changing and or deleting database records click on the Save button E on the toolbar to write the changes to the database This Save transaction will also permanently delete any records that have been deleted in the worksheet The system will then inform the user if the update is successful The user also can Close the worksheet X button without clicking on the Save button and the system will prompt the user to either save the changes or discard them 63 Chapter 4 General System Operation If for some reason the program aborts before the Save button has been clicked the current changes will not be saved on the database and must be re entered Printing Database Records To print a copy of the window as displayed select Print Screen from the File menu Clicking on the Print button on the toolbar will print all of the data that is displayed in the current
242. rt This is an advanced feature The most common use would be to make columns such as costs invisible extended_cost visible 0 The user would need to know the syntax and the column names 154 Chapter 12 Interfacing With Accounting Systems Chapter 12 Interfacing with Accounting Systems PERCEPTION provides a comprehensive job costing capability from detail cost transactions to summaries at all levels of the project WBS However this information also needs to be reflected in the company s accounting systems payroll general ledger G L accounts payable A P and accounts receivable A R For details on these interfaces please refer to the manual Accounting Functions and Interfaces 155 Chapter 13 Customer Billing Invoices Chapter 13 Customer Billing Invoices PERCEPTION provides a means for generating customer billings These billings are made on the basis of time and materials over a user prescribed date range For details on these interfaces please refer to the manual Accounting Functions and Interfaces 157 Chapter 14 Configuring Business Rules Chapter 14 Configuring Business Rules Each shipyard has a preferred way of doing business For example larger yards may require that material requisitions be formally approved before they can be processed for purchase orders Smaller companies on the other hand may not want such strict procedures PERCEPTION provides a series of op
243. rts related to cost estimating Engineering Environment has the following choices Figure 3 14 Environment Cost Estimating gt E o Planning heduling gt Drawing Items Production Engineering gt Material Control A Search for Part s Purchasing gt View CAD Drawing Stores Management gt Accounting gt Reports Exceptions Figure 3 14 Environment Engineering Menu Selections e Drawings provide access to drawings information e Drawing Items provides access to drawing bills of material information e Search for Part s allows the users to search the Parts Catalog using specific selection criteria e View CAD Drawing allows user to directly open a DWG file using AutoCAD s VoloView software embedded in the system Refer to Viewing AutoCAD Drawings in the Appendix for additional information e Reports provide access to all drawing related reports e Exceptions provide access to all drawing related exception reports 34 Chapter 3 The Grand Tour Planning amp Scheduling Environment has the following choices Figure 3 15 Environment Cost Estimating gt Engineering gt Planning amp Scheduling gt Import MS MFX Schedules Production Engineering gt i 2 Z Synchronize Schedules To MS Project Material Control gt i Adjust Work Orders to Current Plan Purchasing gt Stores Management gt Planning Activities Accountin gt
244. s e Conception Stage All activities necessary to develop and define a means for meeting a stated requirement For ships and equipment this normally includes research and development design contract specifications identification of all support necessary for introduction into service and identification of funding required and managerial structure for the acquisition e Acquisition Stage All activities necessary to acquire the ship and provide support for the ship and equipment identified in the conception stage e In Service Stage All activities necessary for operation maintenance support and modification of the ship or equipment throughout its operational life The in service stage is normally the longest stage e Disposal Stage All activities necessary to remove the ship or equipment and its supporting materials from service In order to determine the overall life cycle cost for a ship costs must be estimated for each of the above stages 225 Glossary Lead Time For Work Orders The extra amount of time expected to be required after a preceding activity or set of activities has been completed before a succeeding activity can begin A negative lead time called lag represents a succeeding activity that can start before a preceding activity has been totally completed For Requisition Items The number of days planned to process a purchase order from requisition to delivery Lead Work Center Completes identif
245. s 0 00 Planning Activity 44 Figure 4 2 Sample Detail Worksheet When a detail worksheet is open the scroll buttons on the toolbar First Prior Next Last pias will move through all the records that are on the worksheet window that is behind the detail window Note also that if you click on the Print button on the toolbar when a detail window is open or select File Print from the main menu the system will print all of the records that are on the worksheet window not just the record in the detail window that is currently visible Tab Style Worksheets Some of the information on the database can be more conveniently presented to the user in what is called a tab worksheet Figure 4 3 The controlling worksheet is a worksheet window But after highlighting a particular record in the worksheet window the user can then click on the different tabs to open different detail windows for that record 59 Chapter 4 General System Operation PERCEPTION Total Shipyard Management a x File Edit View Environment Library Data System Reports Window Help Det B CPGAZU 8B T x SH Ol xe oS Me Gan Hon 4 i x Bs Parts Catalog Detail Information for the Stores Environment Parts Catalog Attributes Part Classification Part Type Description Qty On Shelf IE Caterpiller MaK6 Diesel 2 Engines y Direct Purchase _ CAT 3034 NXA Caterpiller Diesel Engine 3 Engines z Direct Purchase CAT 3412
246. s Excel WOTISICEN 65 sols tbcobaas SssiassinnlapetaSissassiciscstasniavasdsedd sabsadapecoessdusebsales 70 Sorting COOLS nonnisi erii iE tale OI el le ai ek CRED ON E a 70 Filtering Records is cvcetuaasheaicatccalasileniss kcal nts Lovaeasadntil ada ee aa tee aps 71 Find Optone R EEE E E ed ater E E eae meres teat 72 Replace ODI ccs ica ite eae e i E ia ua ati R aati hs A RSA 73 GLOBAL DEFAULTS 5 236 a 5 ai Ceo sed ea A ls na eo he a la aad ds 74 LINKAGE AND DRITE DOWNS sae atetcotictaletstea thas isosisko tia e Rad saii e 75 REARRANGING COLUMNS ON THE SCREEN csssccsssecsseceseeesneeeseecsaeceseeeseeesaeecsaecseesses 11 OTHER HELPFUI FEATURES ioaea r a ra iaaa a rE O E Ea a E N ade 78 SPECIAL SORTS FOR REPORTS ren aneno ena a E R nia Natalee 78 MODIFYING amp EDITING REPORTS AND WORKSHEETS cssscesseesseceseeeseeesseeenaecnseeses 81 HALTING A PERCEPTION PROCESS ie tactigeachesanhliestadsbevzartedelive tel iisisti gels 84 CHAPTER 5 STARTING A NEW SYSTEM amp DATABASE cc ccssssccsseseeeees 85 COMMON LIBRARIES USED BY ALL ENVIRONMENTS cssscesssecsseceseeeseeesseecaeeeseeeees 86 Setting Up Company Parameters ccccccccccccccscscececeeseecsessececeeeeesnssessesececeseessnssennnaeees 87 Defining Units Of Measure TADI GI iisavcciccishoietiancensstlaciesdignccdatts towentiangonsithiaueanercoess 9 Defining Work Centers sae Sethe OO ah io len ese AT NG IR ee Ree eS 92 Defining Trades ResourcesS so oicks caain te aacnv
247. s added to a project each package item becomes additional cost items for the project A package ID is limited to a maximum of 25 alpha numeric characters and must be unique Package Item A package item defines a cost item within a package on the interim product package library When a package is added to a project the user supplies a value of quantity which applies to all of the package items Quantity may also be defined as a size parameter for example cargo space volume In this case each package item of the package should have its costs labor and or material normalized in terms of the size parameter When a package is added to a project each package item becomes additional cost items for the project A package item ID is limited to a maximum of 8 alpha numeric characters Packing Slip A document from the vendor that itemizes the material items included in a particular delivery The packing slip number is limited to 15 alpha numeric characters Pallet A pallet is a list of material specifically identified for a work order The pallet items are linked to requisition items and or drawing BOM The use of pallets for issues to production work orders is optional A pallet ID is limited to a maximum of 20 alpha numeric characters The combination of Contract Project Pallet must be unique Panel Sub assemblies that typically have unidirectional stiffening members Paragraph A paragraph identifies each item of work to be
248. s from the first row of the file When you define the column names in your spreadsheet or text file you should refrain from using special characters such as any of the characters above the number keys because they may not always be imported properly The system will not import the first row of the spreadsheet or file because it assumes that this row is your column heading After you have mapped each column of your file you may save this column mapping by clicking on the Save Column Map box If you chose to do this the next time the import is performed the transfer into column will be completed 143 Chapter 9 Importing amp Exporting Data The options for import are e Add Rows if a row exists with the same key values as the import data the import row will be ignored e Update Rows existing rows will be updated with the data being imported New rows will be ignored e Add Update Rows new rows will be added and existing rows will be updated After all the options have been selected click on the OK button to begin the import process Once all columns have been transferred you are returned to the window with the data imported This data may now be edited prior to updating the database You may also opt to delete rows from the new items prior to updating the imported information After all data transfers and modifications have been completed the user should click on the Save button Importing EXCEL Data EXCE
249. s limited to a maximum of 8 alpha numeric characters The combination of Contract Project Group be unique SWLIN Also called the Navy Spec Item Number Ship Work Line Item Number identifies each item of work to be performed for a government ship repair project The SWLIN is a composite number Navy SWLIN 123 45 6789 3 Digit Navy SWBS Number 2 Digit Sub System Number 4 Digit Sequence Number 250 Glossary The SWLIN is limited to a maximum of 10 alpha numeric characters and is recorded on the cost item record Tag Number Each requisition item may be labeled with a tag number that is used primarily for storage and production identification purposes Normally this identifier should have commodity significance and may be developed directly from a commodity index code if available or at least from a quasi code index that essentially permits cataloging material items within material family groups The universal index is preferable for developing a meaningful material coding system that helps purchasing the most however adherence to a rigid coding system causes problems for engineering Using a standard material program for all design activities can minimize these problems For example an 8 bronze flanged globe valve may be designated a commodity identifier of 4101 where 41 indicates the globe valve under the family group number 4 valves and 01 is the sequential number for the 8 size The composite tag number for
250. scccccscessseesescsccsessseenseeecescesesauenens 173 TYPES OF DATA FIELDS 205 ccc E E ENE Deedadasgsea duds jexdauedesaaepeaseee 174 PROTECTED DATA FIELDS 5cc0c5 tfc dil ncec 228 20Gb A abn OG aR OETA A ha ease 175 ALLOWABLE CHARACTERS cccsssssscscccccccssssssececcccccsssseussesscsscsssuusuesesccssssssuuuesaeeceseseees 175 ASSOGIATED REPORTS 95 503590 66205 so 25h sish ced oi shen db Seded seemed eee EAE E 176 APPENDIX II VIEWING AUTOCAD DRAWINGS cccccsssossscececosescscecesessseceee 177 USING THE VIEW FEATURE cccccccsssscccccsssccccccsscccescssceceesssesseesssseseescessssesesseeseessseeeness 177 APPENDIX ITT SIZE OF DATA FIELDS e e e eoe0e000e0eoooeoeoeoeoeseseseoesesesesesesesesesesso 181 APPENDIX IV COLOR CODES e eoeoeoeoeceoeoeseoeseseseseseseseseseseseseoesesesesesesesesesesso 185 ENGINEERING DRAWING BILLS OF MATERIALS COLOR CODES cssseececceseececeeeees 185 REQUISITION COLOR CODES ccccccccccccccscessssececcccccesssscesceccsscssesssesesccsssessuuenseeccesseaes 185 REQUISITION ITEMS COLOR CODES u ccccesececscccccccessscsscscccccsssssscseeccsesessuuseseecesseeees 185 PURCHASE ORDER COLOR CODES ccccccsssessececcccccessssscsescccccsssesscsesccsessssuueasaeecessesees 185 RECEIVING TRANSACTIONS COLOR CODES cccccccccccssssssscecccccecsssscssceccessessusessseeceesseees 186 WITHDRAW TRANSACTIONS COLOR CODES ccccsesseccccccccssssescscccccscsssesssseceecesseenenees 186 S
251. sccesantes geasesensceostens 2 Mena Baisorii hates aa 17 Missing Key Record Error 11 Modifying amp Editing Reports and Worksheets ciccctstiecs cues 81 Modifying Database Records 63 Moving About Data Fields 173 New Contract Wizard 0 0 0 eee 126 New Project Wizatd cccceesceeeees 132 Opening Multiple Worksheets 57 Opening Worksheets eeeeeeeeee 57 Operating Windows sseeeeeeeseeeeeee 169 Other Helpful Features 78 Pallet Items Color Codes 187 Parts Of A Window eeeeeeeeeee 169 Pasting EXCEL Description Fields into PERCEPTION unnan 66 PERCEPTION Global Defaults 146 PERCEPTION References 203 Planning and Scheduling 1 Preparing EXCEL Workbook Data for EX POLLING isiin 144 Printer Paper Size 109 Printing Database Records 64 Project Code of Accounts COA 116 Project Navigator c e 133 Project Numbers 121 Project P WES wiz ssa caiiesetectncdat oe 116 Project SWB Soetoro nin 114 Project WBSiisisninisisiisiisinssiss 112 Project Oriented Database 7 Protected Data Fields ee 175 Purchase Order Color Codes 185 Purchasing and Material Control 2 Rearranging Columns on the Screen 77 Receiving Transactions Color Codes 186 Recipient Distribution List 151 Record Key sicicasisiccsacseedecataseacanees 10 197 Referenc s e
252. sesessereerseretssostessssressssrreessereesssseessssreess 194 S O STRUCTURE OUTFIT INDICATOR cccsessssscesccecessesseseceseceeeeeessnseceeeseceeeenenteaeees 194 CER FOUATION D A 2 E A E PEE S E EE E A E E E 195 CER EQUATION LABOR MATERIAL FLAG uu cccccccccccccssessscecccccecesssssesccecsessusessseeceeseeees 195 CER TYPE FOR IP PACKAGES ccccccccccccccssssessececcccccesssscssceccsscssseseuseesccsssessuuuessescesseeaes 195 TOOL STATUS INDICATOR ccccsesssccccccccessssssscsccceccesssseesesccsscsssssusssesscescessuuussesceseeeees 196 APPENDIX VII RECORD KEYS eoooooeoeoeoeoeceoeseseseoeseseseseoeseoeoesesesesesesesesesso 197 REFERENCES oaccicdscecsiscdscecitintccctsiccceckccscscscescesccseas seccsgeccocdcascaesceacsuccstasedecesacetocdcasevcees 203 PERCEPTION REFERENCES s sssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssaaes 203 STATISTICAL ANALYSIS REFERENCES cccccsssssececcccccssssesssescceccscssssssescsccessssuensusesses 204 GENERAL SHIPYARD PLANNING REFERENCES ssssccccccsecccccsseccccecssccceusesccceeaesecceaes 204 GLOSSARY eiiiiscccidd lecicesestetatsssessccadscethicecececasestecalasdestenacseecdlaececscageetecalasssstesacesesabaocscees 204 ABBREVIATIONS Orr Chapter 1 Introduction Chapter 1 Introduction PERCEPTION is a system designed specially for planning estimating and managing labor material and subcontractors in the processes of building and repa
253. shment of stock and general consumables A sequential Purchase Order Number catalogs POs on the database PO items have the following two 2 catalog identifiers Purchase Order Number and a sequential PO Item Number within the PO PO Items also may have indirect references to Schedule Planning Activities PO Items have indirect references to their supporting Requisitions These references may extend to part numbers in the system s Standard Parts Catalog Work Orders are the means for identifying and authorizing all shipyard work The following four 4 identifiers catalog work orders Contract Number Project Number Work Order Number and Work Center The Work Center Number must identify work orders This allows the same work order number to be used to identify interim products of Cost Item Numbers can be automatically incremented There is a special Stock Project for stock items and consumables gt Requisition Item Number can be automatically incremented PO Item Numbers can be automatically incremented Chapter 2 Database Structure manufacturing as they move through different stages of construction Work orders have indirect references to the project WBS They also may have indirect references to planning activities Pallets optional are available to expedite the marshalling of material for work orders The following five 3 identifiers catalog Material Pallets Contract Number Project Number and Pallet Number Pal
254. sition List R1 Printer SetUp Contract B DEMO Demo Contract Print Screen Project DINA Sealift Print Immediate Drawing Range 0 to ZZZZZZZZZZZZZZZZZZZZ Print Ctrl P oo0000 to 00 00 0000 Project Range 0 to ZZZZZZZZ Zone R eT MAL de de AL e A d Cap Range 0 to ZZZZZZZZ Unit R Send To Mail Recipient s ey iR i 0 to ZZZZZZZZ Requisition R eri PAE ie Grow Zone WkCnir Drawing Revisios REA p __Fecpient List ired Acct Unit Wo Rev Date Exit Spar Support gt 42001 1 A 110 20 00000 Project DINA Total Requisitions Reported vv 4 gt Email Data to someone I SPAR spar spar Default Frame Figure 8 1 Selecting the Email 139 Chapter 8 Using Email With PERCEPTION The system will respond with an email window display showing the attached report Figure 8 2 The email can then be embellished with whatever communications or remarks are necessary to complete the message before sending to the recipient x 30 ms See Attached Data ZZZZZZZZZZZZ Zone R Unit R Requisition R Revisio Rev Dat 0000AN tions Reported spar 2001 06 1 ad SKB Figure 8 2 Completing the Email amp Sending 140 Chapter 9 Importing amp Exporting Data Chapter 9 Importing amp Exporting Data The system provides import and export data to and from external data sources External Data Source File Types The following data types can be imported into PERCEPTION XLS EXCEL
255. ss to functions for taking physical inventory and initiating adjustments to the database records e Import Bar Coded Material Transactions provides the means for importing data files collected by bar code data collection devises e Tool Management Center provides functions for managing the issuing of tools to production e Reports provide access to all stores related reports e Exceptions provide access to all stores related exception reports 39 Chapter 3 The Grand Tour Accounting Environment has the following choices Figure 3 20 Environment Cost Estimating Engineering Planning amp Scheduling Production Engineering Material Control Purchasing Stores Management vendor Invoice Items Customers Customer Invoices Customer Statement Rate Tables Terms a ee a ee Timecards Labor Types Employees Rollup Transactions General Ledger Accounts Project Accounting System Setup Transfer to Accounting System Unpost Accounting Transfers Reports Exceptions Figure 3 20 Environment Accounting Menu Selections e Vendor Invoices provides access to the functions for entering vendor invoices for the system s cross checking features with purchase orders e Vendor Invoice Items provide access to vendor invoice items level of detail e Customers provide access to customer worksheet necessary for creating customer billing invoices e Customer Billing provides access to
256. ssoesssesesosoe New Contract Wizard New Project Wizard New Contract From Asset x ie Figure 6 7 New Contract Project Wizard 125 Chapter 6 Starting A New Project Other features are available from within the system to copy existing work orders drawings and drawing bills of material requisitions and pallets For details on these options refer to PERCEPTION Labor Manpower Planning amp Cost Schedule Management and PERCEPTION Material Planning Purchasing amp Inventory Control user manuals New Contract Wizard By clicking on the New Contract Wizard the system displays the following pop up window Figure 6 8 for identifying the new contract Contract Creation Wizard i Define Your New Contract Contract D 2003 14 Description General Ship Overhaul Work Next gt gt Einish Cancel Customer Atlantic Water Transit Ble Manager Who Dunnit Figure 6 8 New Contract Wizard Defining New Contract Enter the information as required The contract ID is limited to a maximum of 20 alphanumeric characters Defining Contract Projects When the information for this window is complete click on the Next button The system will proceed to the next step by opening the next worksheet Figure 6 9 for identifying one or more projects under the contract 126 Chapter 6 Starting A New Project Select Qty And Type Of Ships Number of Ships In Contract R Type of Ship s To Be Built
257. stimating CERs CER ID Estimating Standard Packages Package Package ID Package Item Package ID Package Item Package Class Package Class Package Subclass Package Class Package Subclass Ship Characteristics Ship Characteristics Ship Characteristic Characteristic Class Characteristic Class Characteristic Characteristic Subclass Characteristic Class Subclass 201 Reference References PERCEPTION References SPAR Associates Inc Cost Estimating With CAD Systems SPAR Associates Inc Shipyard Cost Estimating SPAR Associates Inc Planning New Construction amp Major Ship Conversions SPAR Associates Inc Shipyard Material Control SPAR Associates Inc Shipyard Material Control with Bar Codes SPAR Associates Inc Getting Started With PERCEPTION SPAR Associates Inc PERCEPTION ESTI MATE User Manual SPAR Associates Inc PERCEPTION PERT PAC User Manual SPAR Associates Inc PERCEPTION MAT PAC User Manual SPAR Associates Inc PERCEPTION WORK PAC User Manual SPAR Associates Inc PERCEPTION Accounting Functions amp Interface Manual SPAR Associates Inc PERCEPTION Systems Administration Manual 203 Reference Statistical Analysis References MathSoft Inc Axum6 User s Guide Data Analysis Products Division Seattle WA MathSoft Inc S PLUS 2000 Guide to Statistics Volume 1 Data Analysis Products Division Seattle WA MathSoft Inc
258. stimating can be successfully integrated with the design engineering process to produce high level trade off studies useful for developing an appropriate direction for the ship design These studies set the basic design parameters for meeting mission requirements within general cost and schedule constraints Preliminary design cost estimating may begin to reflect the effects of alternate build strategies Product Oriented Work Breakdown Structure The PWBS is a combination of a number of breakdown structures that form a hierarchical representation of the products stage and work type associated with the shipbuilding process The components of the PWBS hierarchy are Zone Outfit Zone Grand Block optional Unit Assembly Sub Assembly Manufactured Part Product Structure A hierarchical framework that identifies interim products and their related parts and components Productivity Factor A productivity factor is a cost multiplier that adjusts an estimated cost for an anticipated increase or decrease in work productivity Different productivity can be expected for different manufacturing work centers skill groups stages of construction work orientation design complexity learning etc Progress Progress is a measure work accomplishment PERCEPTION measures progress essentially as the percent of earned value to the total budget The system adjusts the earned value over the course of the project s execution based upon the projec
259. t s actual cost performance to its budgets PERCEPTION also tracks a manual progress that is rolled up from work orders The progress is calculated by the system when either a Production Labor Rollup or a Production Material Rollup is performed and can be viewed on any of the WBS level records 239 Glossary Project A project defines the major work and cost elements to be estimated Each project must have a work breakdown structure to summarize costs at various levels from the detail cost items up to the overall project Each project may have a product work breakdown structure against which cost items may be catalogued for summary purposes Projects usually are developed for each ship to be built or ship to be repaired Each project may be all inclusive with respect to work requirements such as design construction and management support costs However additional projects may be developed for class design work that applies across all ships i e projects of the contract Separate projects also may be developed for other non construction contract requirements such as training programs operational cost estimating etc A project ID is limited to a maximum of 8 alpha numeric characters The combination of Contract Project must be unique Projection Estimated total final cost determined periodically throughout the course of a contract s execution based upon the budget and modified to reflect actual performance on completed work a
260. t 53 Erect WC 80 UoM Weight Sub Assembly Sub Assy Acct 215 Sub Assy WC 40 UoM Weight z On Ship Weldout Weld Acct 54 Weld WC 100 UoM Weight x Select Steel Summary Method Use SWBS Accounts Assembly Assy Acct 52 Assy WC 60 UoM fWeight Save Close Figure 5 3 Steel Production Setup The Tax Rate tab Figure 5 4 is used for default values for purchase orders and invoices System Parameters and Company Defaults xi Company Information Company Defaults Steel Setup Set COA Names Accounting Tax Codes Federal Tax Code Fed State Tax Code MD Local Tax Code City Misc Tax Code Mise Tax Rates Federal Pet Tax 5 00 State Pct Tax 5 00 Local Pct Tax 0 Misc Pct Tax 0 Tax Exempt ID Number l Figure 5 4 Tax Rate Specifications 89 Chapter 5 Starting A New System amp Database The Set COA Names tab Figure 5 5 is used to define names of the shipyard s organization structure for Chart of Accounts COA performance reporting System Parameters and Company Defaults Division _ Figure 5 5 Defining Company Organization COA Names The Accounting tab Figure 5 6 identifies the accounting system to be interfaced with PERCEPTION The chapter Interfacing With Accounting Systems in this manual provides additional details 90 Chapter 5 Starting A New System amp Database System Parameters and Co
261. t Bulk Cut from the main menu A message box will ask whether you wish to copy the column headings to the Windows clipboard with the data If you are planning to use the data within PERCEPTION do not copy the column headings To CUT data from a field and place in the Windows clipboard highlight the data and either select Edit Cut from the main menu or press the Cut button on the toolbar or press Ctrl X on the keyboard To COPY one or more rows of data and place in the Windows clipboard select the row s and select Edit Bulk Copy from the main menu A message box will ask whether you wish to copy the column headings to the Windows clipboard with the data If you are planning to use the data within PERCEPTION do not copy the column headings To COPY data from a field and place in the Windows clipboard highlight the data and either select Edit Copy from the main menu or press the Copy button on the toolbar or press Ctrl C on the keyboard To PASTE one or more rows of data from the Windows clipboard into an active worksheet window either highlight a row to be replaced or add a blank row using the Add button ke on the toolbar then select Edit Bulk Paste from the main menu An option window Figure 3 6 will open Select whether or not the data includes column headings and whether or not to delete replace selected rows Data can be pasted into a worksheet window from any Windows application but if the columns of data do not ma
262. t level is a simple duplication of the project level However the contract has its value when it contains multiple projects such as ship series programs and non recurring design and engineering each to be managed separately The Project is the summary level of all costs and performance information of a major scope of work All details required to build a ship for example can be summarized at this project level CLINs Contract Line Items are used mostly for government contracts CLINs usually have no bearing upon any other means for breaking down the scope of work for a contract CLINs may simply differentiate between labor costs and material costs or they may identify specific sources of government funds CLINs may be used to identify the ship owner s own work breakdown structure such as may be required for ship repair At the detail levels information is cataloged depending upon the type of information Chapter 2 Database Structure The following is an overview of these details Estimating Cost Items are the details of a cost estimate The following four 4 identifiers catalog Estimating Cost Items Contract Number Project Number Work Center and Cost Item Number Estimate cost items are cataloged by work center so that cost rates can be made different depending upon the work center This requirement allows separate rate tables to apply to different cost items Cost items have indirect references to the proje
263. t list of ship characteristics select Library Ship Characteristics Default Characteristics The system will display Figure 5 17 The procedures for retrieving adding changing and deleting default ship characteristic records are the same as those outlined in General System Operation Note that each default characteristic is assigned to a specific characteristic and to a specific type Both of these must first be defined Default Characteristics Information for the Estimating Environment i Characteristic Type Characteristic 1 Coefficients CuNo 2 Coefficients Cb 3 Construction Months 4 Dimensions LOA 5 Dimensions Beam 6 Dimensions BearnMax 7 Dimensions LAL 8 Dimensions Draft 9 Dimensions Depth 10 Financial p Bond 11 Financial Mortgage Years 12 Financial Mortgage Interest 13 Financial Title XII 14 Financial Mortgage 15 Machinery KW ME 16 Machinery KW GEN 17 Machinery KW EGEN 18 Machinery KW THRSTR 19 Machinery KVWW TGEN 20 Operational Range 21 Operational Crew HENCE Ceca eacalealcaeacalicacacalcalcalcalicalicaiicalicalicalical 22 Operational Speed 23 Weights LtShip 24 Weights GRT 25 Weights DWT 26 Weights FL Displ JRRRRRERRRRRRRRERRRRERRRRRRER Description Cubic number Block coefficient Months of Construction Length overall Beam Beam Maximum Length water
264. t window is opened the saved values will be presented and can be used in the current session by clicking on the OK button The defaults can be removed from the registry by clicking on the Clear button Values on the window that have not yet been saved can be removed from the window by clicking on the Reset button Linkage and Drill Downs Many windows in the PERCEPTION system have an option to Drill Down from the currently selected row to get a more detailed view of the data that is presented Drill Down can also be used to view records in another window that are in some way related to the current row This navigation can be to view either e Additional information about the current record identified as Details e Records that are lower in a hierarchy i e in the WBS such as from Zone to Unit e Records that are related to the current record i e from a Zone record to all cost items work orders etc that are assigned to that contract project and zone Drilling down to a level is useful in the analysis of data as well as serving to eliminate some data entry by automatically initializing any new rows that are added from the Drill Down view When used in conjunction with the system Global Defaults the 75 Chapter 4 General System Operation initialization will result in shortened data entry times as many of the fields will be filled in automatically To open the Drill Down selector Figure 4 13 click on a row and t
265. t yards If facility parameters are included the impact of facilities on productivity will also be evident Equation A user define formula stored on the equation library that can be used to compute costs and develop a cost item on the project An equation ID is limited to a maximum of 25 alpha numeric characters and must be unique 218 Glossary Escalation An increase in the level of costs and prices over time Escalation can be measured from indices from such sources as Consumer Price Index CPI Wholesale Price Index Producer Price Index Bureau of Labor Statistics and others These indices typically apply to specific cost items or commodities and can be used to adjust costs from one time period to another for comparison purposes Refer to Current Year Dollars and Then Year Dollars Estimate Original cost figure developed to anticipate the cost for executing proposed work The estimate normally becomes the production budget less any management reserves withheld from the estimate Estimating CERs CERs used by estimators for relating cost to ship parameters available at the time of preparing the estimate ETA Estimated time of arrival or vendor promised delivery date See Promised Delivery Date Event Specific point in time within a project when activities begin and or finish Events correspond to node points within a CPM network Exchange Date Date on which foreign currency exchange rate has been quoted Ex
266. ta Does Not Have Column Headings C Data Does Have Column Headings Post Pasting Actions Delete Selected Rows C Do Not Delete Selected Rows Cancel Figure 3 6 Bulk Pasting Options The Data Format options allow the user to state whether or not the buffer contains column headings that the system should ignore in the pasting operation The Post Pasting Actions allow the user to either delete selected i e highlighted rows in the worksheet or not 24 Chapter 3 The Grand Tour Find amp Replace In order to edit any given data field in a worksheet the user must click on the data field so that the system can tag it for editing If the line item is located off the visible window the user must use the down or up scroll bars at the right side of the window until the desired data field is visible in the window If the window contains a large number of items this process of locating an item can be tedious The system provides a speed search feature to find a specific record quickly By clicking on Edit Find in the main menu the system will open the find and replace pop up window Figure 3 7 Enter the data field expression that you want to find with this pop up window The find process can be limited in the following ways Find Next Find the next occurrence of the expression beginning at the current position of the cursor Search Direction Search either forward from the current position of t
267. tails Tab Window Showing Project Options Special Note The set of WBS identified in this window will be copied to all projects defined for the contract in the previous wizard window If a multiple project contract has projects of different WBS then the user should use the New Contract wizard to create only those projects that use the same WBS The other projects under the contract can be set up with a different WBS from copies of another WBS from another project using the New Project wizard procedure that is described below Ship Characteristics When the information for this window is complete click on the Next button The system will proceed to the next step by opening the next worksheet Figure 6 12 for defining the ship characteristics for the project s 129 Chapter 6 Starting A New Project Ship s Characteristics Define Your Ship s Characteristics Uom Characteristic 30 Meters Beam Maximum Beam Description Add KTS CruiseSpeed x Cruise Speed Meters Depth y Depth of Hull Delete 20000 MTON Displ MT gt Full Load Displacement Meters Draft Designed Draft Meters DWL Designed Waterline MTON DWT y Dead Weight Tons Meters Freeboard gt Freeboard draught MTON GRT Gross Tonnes a lt lt Back rcs Cancel Finish Help Figure 6 12 Defining the Project Ship Characteristics The values of ship characteristics can be used in various cost estimating process
268. tch what is expected in the current window the system will display an error message for each column of each row that is incorrect For example if you attempt to paste a character string into a column that is formatted for date or numeric an error will result To PASTE data into a field either select Edit Paste from the main menu or press the Paste button on the toolbar or press Ctrl V on the keyboard 23 Chapter 3 The Grand Tour Bulk Cut Bulk Copy amp Bulk Paste The bulk cut copy and paste operates in a similar way to the normal cut copy and paste operation The bulk copy will copy the entire data contents of selected rows in the worksheet The system provides an option for column headings to be included This is often helpful when copying data from PERCEPTION and pasting it into EXCEL The bulk copy process however does not necessarily copy columns in the order that appears in the PERCEPTION worksheet particularly if the user has re arranged the columns Refer to Appendix I Operating Windows The bulk paste is the complimentary process to the bulk copy Special care must be exercised to ensure that the column order of the data in the bulk paste buffer agrees with the same order that would apply for the bulk copy for the given PERCEPTION worksheet Before the bulk paste can be performed the system displays a pop up window of bulk pasting options Figure 3 6 Bulk Pasting Options Data Format Da
269. tem because it rather than the purchase order item carries the necessary information about the project WBS etc A purchase order item can reference multiple requisition items across different projects if necessary 242 Glossary Quick Stock Withdraw The Quick Stock Withdraw allows stock items to be withdrawn to production work orders without having a pre existing requisition or pallet item as its means for identification The system automatically creates requisition items in the posting process of the Quick Stock withdraw complete with appropriate project WBS assignments The system gets this WBS information from the work order that referenced for the material withdraw Receipt Date Actual delivery date Received Quantity The quantity of a purchased item actually delivered and logged into the system Required In Yard The date the material is required by the requisition to be delivered and received Required In Yard date is carried at the item level of the requisition It is also carried at the overall requisition header level as the earliest Required In Yard date of items on file for the requisition It is also carried at the overall purchase order header level again as the earliest Required In Yard date of the items on file for the purchase order Requisition A requisition is a detail listing bill of material requirements that define some portion of the project PERCEPTION manages requisition at two levels of detail R
270. ter SQM v 18 Repair v Repair SidesBTHPwaterjet Y SidesBT Cleaning by HP waterjet with fresHSQM vi 19 Repair v Repair SidesBTOilySpots Y SidesBT Remove oily spots SQM E 20 Repair v Repair SidesBTPaint SidesBT Paint Flat SQM v 21 Repair Repair SidesBTPaintMicroi Y SidesBT Paint microns EACH Mi 22 Repair v Repair SidesBTScraping SidesBT Scraping marine growth SQM v 23 Repair v Repair SidesBTTouch up Y SidesBT Paint touch up SaM xi 24 Repair v Repair SidesBTTouchMicre Y SidesBT Paint touch up microns EACH v 25 Repair v Repair TopSides GritBlast Y Topsides Grit Blasting Area SQM Mi 26 Repair v Repair TopSidesHosingDo TopSides Hosing down with fresh water SQM v 27 Repair v Repair TopSidesHPwaterje Y TopSides Cleaning by HP waterjet with fres SQM v 28 Repair y Repair TopSidesOilySpots Y TopSides Remove oily spots SQM E7 23 Repair __ Repair v TopSidesPaint Y TopSides Paint Flat SQM Mi 30 Repair v Repair TopSidesPaintMicre Y TopSides Paint microns EACH v Figure 5 18 Ship Type Characteristics 101 Chapter 5 Starting A New System amp Database Defining Customers A customer table is used for generating cost estimates and customer invoices To set up the customer table select Library Customers The system will display Figure 5 19 The procedures for retrieving adding changing and deleting customer records are the same as those outlined in General System Operat
271. the customer billing worksheet e Customer Statement provides access to customer billing statement window e Rate Tables provides access to the project rate tables by work center for generating customer billing invoices e Terms provide access to billing and purchasing terms library table 40 Chapter 3 The Grand Tour Timecards to view edit add and delete work order time charges Labor Types to view edit add and delete types of labor charges regular over time etc Employees allows access to view edit add or delete employee data for timecard processing Valid employee entries also are required for buyers to issue purchase orders from PERCEPTION Rollup provides the user with options for re computing data summaries throughout the contract project work breakdown structures Specifically the user may perform rollups on actual labor cost and schedule data including progress and final cost forecasts and trends Similar rollups of material costs also can be performed Transactions allows viewing of all system transactions that can be processed by financial and accounting systems General Ledger Accounts allows the definition of the accounting transaction codes Project Accounting System Setup defines the general ledger accounts for a new project Transfer To Accounting System exports various transactions from PERCEPTION for importing into the accounting system General Ledger Payroll Accounts Payable and Accounts Receiv
272. this example would be the following Tag Number 1222 402 4101 Project Number Project SWBS Account or PWBS Element ID Material Identification Code Where the first two characters of the commodity identifier help to point out the item as a Pipe Valve For large ticket items scheduling may require the identification of milestone payments as dummy requisition items For long term procurement contracts there may be special provisions for inflationary economic price adjustments to these milestone payments The item tag number should be assigned to requisition items prior to purchasing If a requisition item does not have any tag ID assigned to it by the user the system will update the tag with an ID that is the combination of the project plus the SWBS account This tag can then used for identification purposes by material control A tag ID is limited to a maximum of 25 alpha numeric characters 251 Glossary Task See Microsoft Project Task Taxes The system provides features that will compute sales taxes chargeable as a cost to the project automatically Both Federal and State Provincial sales taxes can be identified The total taxes are calculated by the system when a Production Material Rollup is performed and can be viewed on any of the WBS level records Technical Risk Technical Risk is the degree of uncertainty that a technology required for the project can be developed and implemented within estimated costs a
273. tifiers as alphanumeric The system s sorting order for characters is as follows 0123456789ABCDEFGHIJKLMNOPQRSTUVWXYZ Small letters and capital letters are treated equally 61 Chapter 4 General System Operation The lowest possible value for an identifier is the numeric character zero 0 and the highest possible value for an identifier is the maximum length of characters for the identifier filled with the character Z If the default values of 0 and ZZZZZZZZ are left unchanged for any field s on the retrieval window then the system will not use that field when building the query from the database For example on the figure below if the Part ID range is changed to 101200 to 101300 and the Asset Account range is not changed from the default of 0 ZZZZZZZZ then all records with a Part ID between 101200 and 101300 will be retrieved regardless of what Asset Account the part is assigned to Retrieval Selection for Part information Part Classification y To Engines Part Sub Classification Diesel Steam PatID 0 lt i sCSCSL COC d eI MigPat fo IOI NATO ID 10000 00 000 0000 ZZZZ 77 Z77 I777 Stock Class p zzzz7777 Part Type Retrieval Options Stock M Reset Retrieval J Reset tio Globals I Append M Direct Purchase M Manufactured Part M Load Item Spare MV GFE OFE MV VFI cance Figure 4 4 Parts Catalog Retrieval Window Add
274. tion item is set to complete if the quantity used is not equal to the quantity required the system will update the quantity required to be equal to the quantity used The reservation on the parts catalog will also be updated Requisition items must be set to complete by the user The only time the system will automatically set an item to complete is when the associated project is closed When all requisition items have been set to complete the system will automatically set the requisition to complete If the user sets the requisition to complete the system will automatically set all of its items to complete Complete Pallet Item A pallet item is considered complete when no more material will be withdrawn to that item When a pallet item is set to complete if the quantity used is not equal to the quantity pallet the system will update the quantity pallet to be equal to the quantity used The pallet reservation on the parts catalog will also be updated Pallet items must be set to complete by the user The only time the system will automatically set an item to complete is when the associated project is closed When all pallet items have been set to complete the system will automatically set the pallet to complete If the user sets the pallet to complete the system will automatically set all of its items to complete Complete Purchase Order Item When a purchase order item quantity received is equal to or greater than the quantity ordered th
275. tract Information window Figure 6 3 that contains details of the contract Most of the information displayed in this detail worksheet is the result of other functions within the system and cannot be modified by the user 118 Chapter 6 Starting A New Project Contract Detail Information 72 114 909 38 7 211 853 12 10 817 367 83 93 749 876 34 0 00 oo oo 0000 157 832 733 42 00 00 0000 171 480 316 74 239 381 163 69 Figure 6 3 Summary Contract Information Display Cost Estimate Environment To create the project s for the new contract click on the Drill Down button on the toolbar or click on the right mouse button on the new contract to display the pop up menu that provides the Drill Down Figure 6 4 option 119 Chapter 6 Starting A New Project Choose Drilldown DETAILS Contract De Contract History Contract Hi CLINs CLINS Projects Projects SWBS Groups SWBS Grol 5WBS Accounts SWBS Accec PYYBS Zones PYYBS Zone PYYBS Outfit Zones Grand Blocks PYYBS Outti PYVBS Units PBS Unit PYVBS Assemblies PBS Asse PYYBS Sub Assemblies PYYBS Sub PBS Mfg Parts PBS Part b ox e Figure 6 4 Drill Down Selections The advantage to using this Drill Down approach is that as lower levels of details in this case the project being a lower level of the contract or the child automatically inherit the identification of the level above in this
276. tton or File Print on the main menu Use the landscape option setting for the printer amp Combined Graph Presentation For Planned Ys Actual Progress For Proj 1 Cont 47K Tanker E Planned Vs Actual Progress F E3 E Cost of 1 Progress For Proj ES E Forecast Overrun For Proj 1 Mwn AN o heget oo AMT ca oo LANUN N 13 38 63 13 38 63 Progress Progress Forecast vernun as Bat E 200 000 g 2 G a ar w pa 2 3 100 000 uns 4 0 iiil 13 38 63 Jan00 Aproo JulOO Oct oo Progress Date Figure 7 4 Sample Project Navigator Combined Graphs Display 137 Chapter 8 Using Email With PERCEPTION Chapter 8 Using Email With PERCEPTION PERCEPTION allows the user to send data and reports including purchase orders over the Internet as email attached documents To perform this the user needs to retrieve the appropriate data into any window or generate the report in the usual manner for on line display Once the data or report is displayed click on File Send To Mail Recipient As Attachment Refer to Figure 8 1 a PERCEPTION Total Shipyard Management _ x File Edit View Environment Library Data System Reports Window Help oe Ctrl N AZU 2 t se ae al od Ma them Gl am File gt oi DAVE Eijks Save s Op x Save As Web Page a Save Work Space 5 ar ae Chesapeake Ship Builders age Setup faze A Pa Preview Requi
277. ues If the current window was opened by drilling down from another window these new records will have the key values of its parent Insert Record inserts a new record above the current row If global defaults have been set the new record will automatically have these values If drilling down from another window opened the current window these new records will have the key values of its parent record Other data columns will need to be provided manually by the user Delete Records will delete the current row or multiple rows if more than one is selected highlighted These records will be deleted permanently in the database only when the user initiates a SAVE operation Retrieve enables the user to retrieve a range of records from the database into the active worksheet Re Select Rows refreshes the current row or multiple rows if more than one is selected highlighted with the data that has been saved on the database This is useful when changes have been made on a record that the user does not wish to save but there are other modifications in the current data set and closing the window without saving would lose those other changes Another use for this feature will apply when a record is changed by another action or by another user while it was displayed in your session Re selecting this row will reflect the changes that have been previously saved Refresh Drop Downs refreshes the data in a drop down worksheet with any changes that have
278. umn names appearing on the worksheet See File Save As Excel Worksheet option below that saves only the visible data on the worksheet with the column names as appearing on the worksheet Bulk Pasting Rows of Data from EXCEL The Bulk Paste of rows of data from EXCEL reverses the Bulk Copy process described above The system responds with the options shown in Figure 4 6 Bulk Pasting Options Data Format Data Does Not Have Column Headings C Data Does Have Column Headings Post Pasting Actions Delete Selected Rows C Do Not Delete Selected Rows N i Cancel Figure 4 6 Bulk Pasting Options The first set of options allows the user to indicate whether or not the Bulk Paste includes a row of column headings If there are column headings the system will not paste them in as a row of worksheet data 68 Chapter 4 General System Operation The second set of options allows the user to indicate whether or not selected rows are to be deleted after the Bulk Paste has been complete If the user specifies the delete option a second set of options Figure 4 7 are presented Delete Project 101 Contract 62 0101 01 Select Delete Options C Delete The Record C Delete The BNI And Do Not Prompt Again Cancel This Delete Process Figure 4 7 Select Delete Options This delete options window is presented for each row identified highlighted in the worksheet unless the user selects
279. ure file The first line Logo login jpg references the logo that will be used on the login window and the second line Logol reports jpg will be used on the reports wherever a logo is displayed printed The company logo can be either a jpg or gif file and must be stored in the same directory as this PERCEPTION Configuration Settings file While the logo will be adjusted automatically by the system to fit within its allocated space of the window and reports it is best that the logo be developed within the following dimensions Width 8 1 cm 3 2 inches or 307 pixels Height 3 1 cm 1 2 inches or 118 pixels Note The logo picture files can be stored in any folder as long as its full address is included in the PERCEPTION Configurations Settings file Setting Printer Paper Size PERCEPTION allows the user to choose between Metric and English units of measure for the printer paper size The default is English units The selection for which units to use is found on the Company Parameters window Select Library Company Parameters on the PERCEPTION main menu and click on the Company Defaults tab Figure 5 21 109 Chapter 5 Starting A New System amp Database System Parameters and Company Defaults Steel Setup Tax Rates Set COA Names Accounting Default Number of Days Process Times Automatic Scheduling Options Req Delay To Create and Approve a O Schedule Requsitions From Pallets
280. user to change the focus of the system from one displayed record to another The system then will automatically reload linked windows with information relating to the new focused record To link windows open the first desired window of information Then using the Drill Down open lower level windows that the system links automatically to a record in the first window For example open the project worksheet P button and retrieve the projects from the database Highlight one of the projects and click on the Drill Down button and open the work order worksheet The system will fill the work order worksheet with all work orders for that project Next select Windows Vertical Tiles The system will respond by placing the first window projects worksheet over the second window work order worksheet Click on any project row in the upper tiled worksheet and the system will fill the lower worksheet with the work orders for that project 60 Chapter 4 General System Operation Linking can be done to multiple windows of Drill Down For example after the projects worksheet is opened the Drill Down can open not only the work order worksheet but also the material requisitions worksheet The window tiling will place all three worksheets on display When the user clicks on another project row in the first worksheet the system will fill the work order worksheet with the new project s work orders and will fill in the requisitions worksheet with
281. ution Lists For Reports in this manual Reports and worksheets can be emailed directly to SPAR support Properties outline the operating of the system as installed for the user This is important information for reporting to SPAR problems regarding connecting to the database and the windows environment Recent allows the user to go directly to the 5 most recent report formats or to the 5 most recent windows that were in use Exit from system 19 Chapter 3 The Grand Tour EDIT Edit provides functions that operate on specific data records which are selected and highlighted Records can be selected individually by clicking on the left most row indicator column or by choosing Select All from the Edit menu In addition there is an empty cell in the upper most left hand column of the worksheet windows Clicking on this cell will select all rows that have been retrieved If a record has been selected clicking on it again will deselect it Most of the functions on the Edit menu are also available by clicking on the appropriate button on the toolbar and by using a Ctrl key combination on the keyboard Note Each module in PERCEPTION Drawing Requisitions Pallets Purchase Orders etc has its own Edit menu with functions that are specific to that module Edit Undo Delete Cut Ctrl g Copy Ctrl C Paste Ctrl V Bulk Cut Bulk Copy Bulk Paste Clear Selection Select All Ctrl A Select Row Invert Selection Find
282. wed by a Mat TimeCardErrorNotification Inform user of Time Card data entry errors before leaving the column TimeCardPostingAllowedAfterVWVOCIcAllow posting of time charges to closed work orders for up to 3 weeks TimeCardPostingRestriction Restrict Time Card Posting to Accounting or Production Engineering UpdateParentLinkage SPAR Programmer Business Rule Windows Refresh Rows On Save Re Retrieve the rows after a save recommend yes Windows Show Status Bar Show the Database connection Userid Environment and Active Win Windows alidate Before Save Validates the data before rows are saved recommend yes WOs AllowEditsOflssued Complete VVork Orders that are Issued or Complete can still be edited gt Figure 14 1 PERCEPTION Business Rules 160 Chapter 15 Data Validation Chapter 15 Data Validation It is important that any system use valid information The old saying garbage in garbage out still applies even for the most sophisticated of systems This means that data going into the system must be accurate and that for certain areas the information must be complete Incomplete data can create problems when the system attempts to summarize status information However the responsibility for maintaining accurate and complete data can be shared between the users and the system PERCEPTION has many features that help minimize data errors and omissions These validation features generally are initiated at different points of th
283. will reflect the shipyard s name for each of these levels The Work Centers The system requires that many cost details estimate cost items and work orders for example be assigned to specific work centers These work centers may identify separate departments or manufacturing processes within the shipyard For cost estimating purposes major subcontractors and vendors providing major equipment and perhaps turnkey services also should be identified as separate work centers For cost estimating the system automatically computes labor costs by applying work center labor rates to user defined labor hour estimates The system further computes indirect costs and profit by applying work center rates for these costs to labor and material estimates developed by the user These rates are stored in tables for each work center which the user must develop Work centers can be a duplication of what the COA can provide for managing departmental resource requirements and performance but without the hierarchy of COA PERCEPTION can summarize costs and performance by both structures However a historical tracking of performance can only be achieved using COAs Shipyard Trade Resources For the shipyard that also needs to track costs and performance by a production trade PERCEPTION provides a table for these to be defined There are features for budgeting work orders by trade developing manpower requirements planned actual and forecast by trade an
284. xception reports 38 Chapter 3 The Grand Tour Stores Management Environment has the following choices Figure 3 19 Environment Cost Estimating Engineering Planning amp Scheduling Production Engineering Material Control Purchasing Stores Management Accounting he Locations Storage Items vA Y YY v v v Receive Purchased Material Receive Other Material Withdraw Material QA Material Return Material Stock Adjustments Import Bar Coded Material Transactions Tool Management Center Reports Exceptions Figure 3 19 Environment Stores Management Menu Selections e Locations provide access to all defined material storage locations and to the material stored in these locations e Storage Items provides access to all the material stored in these locations e Receive Purchased Material is the window used to receive purchased material deliveries e Receive Other Material is the window used to receive other non purchased material such as owner furnished material and manufactured parts e Withdraw Material is the window used to issue material to production work orders either by requisition by pallet or by Quick Stock Withdraw e QA Material provides access to QA inspection functions for delivered material being received e Return Material provides access to the function for formally identifying material rejected that is to be sent back to vendor e Stock Adjustments provides acce
285. y 8 Unlimited PWBS Sub Assembly 8 Unlimited PWBS Part 8 Unlimited COA Groups 8 Unlimited COA Sub Groups 8 Unlimited COA Items 8 Unlimited COA Item Supervisor 8 Unlimited COA Item Team Number 8 Unlimited CLIN Contract Line Item 8 Unlimited Contract Paragraph 25 Unlimited Estimating Cost Item Number 8 40 A N Unlimited CER Name ID 25 Unlimited CER equation field Unlimited Unlimited Standard Package Name ID 25 Unlimited Standard Package Items 8 Unlimited Standard Package Classification 25 Unlimited Standard Package Sub Classification 25 Unlimited Ship Types 8 Unlimited Ship Characteristic Types 50 Unlimited Ship Characteristics Incl Type Char Default Char 50 Unlimited 5 decimal escalation Cost Escalation factor none 181 Appendix III Size Of Data Fields Drawing Number 20 40 A N Unlimited Drawing BOM Item Number 8 40 A N Unlimited Requisition Number 8 40 A N none Requisition Item 8 Unlimited Requisition Item Tag Number 25 none Purchase Order Number 8 40 A N none PO Item Number 8 Unlimited PO Header 8 Unlimited PO Footer 8 Unlimited PO Terms amp Conditions 8 Unlimited PO Reference Number 40 none 4 decimal exchange Currency Rate Table 8 rate none Part Classification 25 Unlimited Part Sub Classification 25 Unlimited Part ID 25 Unlimited Part QA Flag 8 none Part Manuf