Home

i-meter ™ MF12

image

Contents

1. Description of Work No Tech 1 All loads been identified confirmed at the distribution panels Suite to Breaker Verification 2 The installation drawings are accurate 3 All metering equipment installed 4 The voltage reference to metering board disconnect is pulled connected and energised 5 The voltage reference is in phase with the loads being metered A is A B is B amp C is etc All CT installation has been completed and confirmed that 6 they are installed in the correct direction and installed accordingly to the installation drawing 100 7 suites or loads been documented the installation drawings 8 All communication cables if applicable are pulled accordingly to the single line drawing CAT5 cable 9 In each metering cabinet the communication cable is identified and has enough length for proper termination 10 The communication cabinet is mounted in designated area 120 15 circuit is assigned to it communication cable CAT5 from the communication 11 cabinet to an internet connection is supplied for remote communication 12 The metering panels are all energised and working There should be no BLUE light illuminated This would indicate a reverse load and would need to be investigated 13 Page 10 Job Name Job Date Company Office Number Forman Site Number Signature Date Requesting for Site Visit
2. Intellimeter Canada Service Department Phone 905 839 9199 Fax 905 839 9198 INSTALLATION INSTRUCTIONS FOR i meter MF12 Copyright O 2013 Intellimeter Canada Inc 8 of 16 Revision 5 0 2013 06 24 7 Meter Specialization Installation Operation 1 0 MF12 meter Specification 1 1 Summary Description The MF 12 electricity meter is a solid state multi customer metering system The meters use microprocessor controlled circuitry for optimum performance and accuracy 1 2 Specifications 1 2 1 Measurements taken for monitoring 1 2 1 1 Voltage per phase Current per phase Instantaneous kilo Watt per phase Instantaneous kilo VA per phase Frequency NM Mh ok WP 1 2 1 1 2 1 1 2 1 1 2 1 1 2 2 12 measurement accuracy 1 2 2 1 Total kWh accurate within 1 1 2 22 Total kVAh accurate within 1 1 2 3 Pulse input and output specifications 1 2 3 1 No pulse inputs 1 2 3 2 12 pulse outputs for kWh be programmed to 6 pulse outputs for kWh and 6 for kVAh 1 2 4 MF 12 has an LCD which can cycle through screens in 10 patterns showing different information See Appendix A 1 2 5 MF 12 can monitor consumption based on time of use costing 1 2 6 MF 12 can be configured for different number of meters and a variety of phases See Appendix B 1 2 7 Measurements taken by the MF 12 can be viewed on a PC Display 1 3 Programming The MF 12 has the capability to be programmed to
3. li In el r CANADA INC service intellimeter on ca Innovative Metering Solutions intellimeter on ca i meter MF12 Installation amp Operation Manual MF 12 Copyright O 2013 1125 Squires Beach Road Pickering Ontario L1W 3T9 Phone 905 839 9199 Fax 905 839 9198 Revision 5 0 2013 06 24 Farn KO Ja BASS er ner 3 1 Measurement Canada 20 00422 000000000000 3 WA AA AA AA 4 23 Metering HUS o PET REP MIND NISI NC 4 Part AC T ce 5 3 Installation INSUUCHONS 5 Pisos 26 H 6 4 III US 16 6 aan NUM E EINEN IDOL AA ANA HIM IUE 7 5 CI Wiring ano Eenglbs ua 7 ax Pio e M HO 8 6 Pre Site Visi Check List 8 BASE jo P TC 9 7 Meter Specialization Installation and Operation esses 9 10 met r ENG AGA TAA ENE TEGA TANG KE a 9 1 1 Summary TI e 9 9 ME erui 9 1 4 Theory P a ai a eA a aaa agen aa a a gg ea ea gae nge aa 10 Lbs COMMUNGANON aes soi ots toate e an N
4. CANADA INC Innovative Metering Solutions o cs o m g o O og E i 5 No zum Phone 905 839 9199 Fax 905 839 9198 intellimeter on ca Project Name Distributor i Meter MF12
5. CT installation are very important If the metering system is not installed according to the installation drawings the system will not work and any cost in correcting the installation by Intellimeter will be charged back to the installer developer INSTALLATION INSTRUCTIONS FOR i meter MF12 Copyright O 2013 Intellimeter Canada Inc 3 of 16 Revision 5 0 2013 06 24 2 Metering Rules 1 Current Transtormers CTs are directional 2 Voltage references must be in phase with the load being metered and from the same source 3 CTs milli Amp are certified to assigned meter and to the meters assigned phase Rule 1 If the CTs are mounted in the opposite direction the polarity of the CT will be opposite The arrow on the CT indicates the direction from LINE to LOAD LINE LOAD Similarly the 1 is on the LINE SIDE All Intellimeter milli Amp current transformers 200 0 1A 400 0 1A and 600 0 1A have self shorting protection built into the device They can safely be open circuited while under load Rule Z2 Check to verify that the voltage potential used as a reference voltage is the same phasing as the loads being metered ABC is ABC not CBA The reference voltage must come from the same source Voltage reference from another transformer is incorrect and causes inaccurate readings Connect the voltage reference to the meters disconnect or terminals making sure it is the same phase seque
6. A E A aaa EORR ue BUDE GEN Da ga 10 20 Mf 12Installation and Operation anane nane 10 2 1 Physical Description E 10 22 EDINA 12 2 3 LCD DIE 0 f VAR 14 Part EIJA aa aana sate nace T ERES 15 8 1 APPENDIX A MF 12 Meter LCD Display 15 8 2 APPENDIX B MF 12 Meter Configurations sess 16 8 8 APPENDIX C MF 12 Meter Wiring Diagram sess 17 INSTALLATION INSTRUCTIONS FOR i meter MF12 Copyright O 2013 Intellimeter Canada Inc 2 of 16 Revision 5 0 2013 06 24 1 Measurement Canada Requirements Notice to all Electrical Contractors and Owners Applies to milli Amp type CTs only This is to inform the electrical contractors who are installing any static type metering system that Current Transformers CT s are typically assigned to a specific meter and are required to stay with that meter On the side of the CTs the CT number the meter number and the potential line is indicated as a guide for the contractor FOLLOW THE INSTALLATION DRAWINGS Using the installation drawing as a guide match the CT s with the meter and install them on the correct line to the correct phase If there are any differences with the drawings compared to your distribution panel CALL US IMMEDIATELY to discuss an alternate installation plan CAUTION Phasing and
7. ED1 LED2 LED4 LED5 Reverse energy flow indicators for each group of three CTs Current Transformers They will flash blue if reversed energy is detected 2 LED LOCATIONS METERING BOARD INSTALLATION INSTRUCTIONS FOR i meter MF12 Copyright O 2013 Intellimeter Canada Inc 12 of 16 Revision 5 0 2013 06 24 2 2 2 LEDS EXTERNAL CURRENT SENSOR BOARD See section 2 2 1 FiG 3 LED LOCATIONS ON EXTERNAL CURRENT SENSOR BOARD INSTALLATION INSTRUCTIONS FOR i meter MF12 Copyright O 2013 Intellimeter Canada Inc 13 of 16 Revision 5 0 2013 06 24 2 3 LCD Display The MF 12 LCD is 4 20 character type LCD display You can select the LCD screen configuration the MF 12 through Modbus or Radio module Refer to Appendix A for description MF 12 LCD Display Table LINE LOAD FiG 4 CT PRIMARY POLARITY Secondary Refer to the drawings Confirm the polarity is correct FiG 5 CT SECONDARY POLARITY Typical Install CT1 on Line 1 Red CT2 on Line2 Black and CT3 on Line3 Blue Refer to Service Types above for your system INSTALLATION INSTRUCTIONS FOR i meter MF12 Copyright O 2013 Intellimeter Canada Inc 14 of 16 Revision 5 0 2013 06 24 Part Eight 8 1 APPENDIK A MF 12 LCD Display Table Measurements Voltage Current Instantaneous Instantaneous Power Frequency Rates Total Total
8. hat is to be completed verified and faxed back to Intellimeter before commissioning is scheduled NOTE The electrical contractor will provide an electrician for the duration of the commissioning for inspection and for any modification re work required Intellimeter is not liable to work on the electrical distribution and will only be terminating the communication lines All deficiencies will be recorded and sent to the electrical contractor for correction before returning to site 4 Service Types Single Phase 2Wire 120 Line 1 CT1 Single Phase 3 Wire 120 240 Line 1 CT1 Line 2 CT2 Network Two Phase Three Wire 120 208 3 sets Typical Colour Code Meter1 Line 1 A phase Red Line 2 CT2 B phase Black amp Meter 2 Line 1 2 CT3 C phase Blue Line 2 CT4 A phase Red amp Meter 3 Line 1 2 CT5 B phase Black Line 2 CT6 C phase Blue If the load is on B amp C phase Line 1 CTX is on B phase and Line 2 CTY is on C phase This staggering of phasing is to match the typical three phase four wire distribution panel for 2 phase loads Three Phase Meter Typical 120 208 277 480 347 600 Colour Code Continued on next page INSTALLATION INSTRUCTIONS FOR i meter MF12 Copyright 2013 Intellimeter Canada Inc 6 of 16 Revision 5 0 2013 06 24 Line 1 A phase Red Orange Line 2 CT2 B phase Black Brown Line 3 2 CT32 C phase Bl
9. ify the type of panel and that the distribution is the same It is important that all assigned breaker phasing is correct 2 Assign the proper panel to the identified distribution 3 Verify the number of loads is the same as the number of meters 4 Verify the type of system is the same as the meters supplied Ex 120 208V 100A or 200A 3 phase 4 wire single phase 3 wire network System etc 5 Mount the panel as indicated by the drawing Call to inquire if a different mounting configuration would work better 6 Refer to the drawings to sort out the CTs to be installed on the load feeders 7 One feeder at a time install the CTs so the arrow is pointing towards the load Confirm on the drawing the installed CT corresponds to the correct phase of the suite Continue until all CT s are installed 8 Supply a voltage reference from the distribution panel Depending on the configuration minimum is a 15A breaker and the number of phases should match what is required on the drawing INSTALLATION INSTRUCTIONS FOR i meter MF12 Copyright O 2013 Intellimeter Canada Inc 5 of 16 Revision 5 0 2013 06 24 9 If the system is automated 5e min 4 pair 24 Network cable is required to be pulled from one metering panel to the next until it reaches the communication cabinet that is usually mounted in the communication room or main electrical room Refer to single line drawing 10 Attached is a checklist t
10. kilo watts kilo VA Factor kVAh kWh Display Options Default Yes Yes Yes Option 1 Yes Yes Yes Yes Option 2 Yes Yes Yes Yes Option 3 Yes Yes Yes Yes Option 4 Yes Yes Yes Yes Option 5 Yes Yes Yes Yes Option 6 Yes Yes Yes Yes Yes Yes Option 7 Yes Yes Yes Yes Yes Yes Option 8 Yes Yes Yes Yes Yes Yes Option 9 Yes Yes Yes Yes Yes Yes All screen cycles include the meter screen and the customer screen Meter screen displays meter number serial number customer number service type and date time Customer screen displays customer number total kWh total kVAh and the current rate and price Configuration is done at the manufacture only No on site re configuration INSTALLATION INSTRUCTION FOR M3 8 16 24 Centres meters Copyright O 2013 Intellimeter Canada Inc 15 of 16 Revision 5 0 2013 06 24 8 2 APPENDIX B MF 12 configurations Service Pulse Meter 8 Type Outputs Configuration kWh kVAh B 102W 12 N A WIES ME 304W Y 4 Bc Vl 203W 6 ca WH MI 23W N AB ll Wii 203W A A A 102W VH 303W A B 183 1 amp 3 Configuration is done at the manufacture only on site re configuration Copyright O 2013 Intellimeter Canada Inc INSTALLATION INSTRUCTION FOR M3 8 16 24 Centres meters 16 of 16 Revision 5 0 2013 06 24 iC Typical i Meter MF12 Wiring Diagram
11. nce Usually Line 1 Red or A phase Line 2 z Black or B phase Line 3 Blue or phase Neutral White Note Colour sequence may vary depending on the country and region INSTALLATION INSTRUCTIONS FOR i meter MF12 Copyright O 2013 Intellimeter Canada Inc 4 of 16 Revision 5 0 2013 06 24 Rule 3 Intellimeter milli Amp current transformers range from 200 0 1A to 600 0 1A only When the metering system was tested at the factory the CT s were assigned to a meter and to a specific element of that meter The CTs are recommended to be installed and used only with the meter and element that it was tested with We have identified each CT so it can be easily installed following the installation drawing that was designed for that particular distribution Follow the Installation Drawing If there is a discrepancy with the drawing in comparison to your distribution panel call us for assistance PLEASE CALL IF ANYTHING IS NOT CLEAR IT IS DIFFICULT TO CORRECT ERRORS ONCE INSTALLATION HAS BEEN COMPLETED Technical Assistance 905 839 9199 3 Installation Instructions These installation instructions are generic for multi customer sub metering systems Again call before you install if you reguire additional information this process If any of these steps incorrect call for assistance 1 Confirm the drawings that were sent with the metering system are accurate Ver
12. set some parameters and to change the behaviour of the meter INSTALLATION INSTRUCTIONS FOR i meter MF12 Copyright O 2013 Intellimeter Canada Inc 9 of 16 Revision 5 0 2013 06 24 These settings changed ONLY prior to shipping the meter and ONLY by the manufacturer a Serial Number b Customer Number CT Ratio d Service Configuration These settings can be changed on site by the customer a Date Time b LCD Display arrangement Rates and Prices 1 4 Theory of Operation The MF 12 is a channel interval multi customer kilowatt hour metering system lt can be programmed for single phase or polyphase applications with up to 12 meters Refer to Configuration table in Appendix B 1 5 Communication 1 Modbus RTU 2 BacNet MSTP 3 Radio Wireless 2 0 Mf 12 installation and operation 2 1 Physical Description See Fig 1 The MF 12 is comprised of the following major components 1 Metering Board 2 Power supply Board 3 LCD Display 4 External current sensors INSTALLATION INSTRUCTIONS FOR i meter MF12 Copyright O 2013 Intellimeter Canada Inc 10 of 16 Revision 5 0 2013 06 24 1 METERING BOARD FiG 1 PHYSICAL DESCRIPTION INSTALLATION INSTRUCTIONS FOR i meter MF12 Copyright O 2013 Intellimeter Canada Inc 11 of 16 Revision 5 0 2013 06 24 2 2 LED Indicators 2 2 1 LEDS ON METERING BOARD LEDS The power indicator L
13. ue Yellow Note Colour code and sequence may vary depending on the country and region 5 CT Wiring and Lengths Current Transformers CTs are directional An arrow points to the load or H1 indicates Line Side LINE LOAD Typical Install CT1 on Line 1 Red CT2 on Line2 Black and on Line3 Blue Refer to Service Types above for your system External Current Transformers CTs Twisted Pair 18 14 stranded colour code 1 Intellimeter CTs White 200A ICI30CT21 Black 2 Intellimeter CTs White 400A ICI30CT41 Black 43 Intellimeter CTs White 600A ICIS0CT61 Black The maximum length the CT leads can be extended is 400 feet for 1 amp 2 and 3 1 twisted pair wire only for each CT Intellimeter CT s CT s lead wire gage 50 ft Min 18 50 ft lt CT s lead wire gage lt 150 ft Min 16 150 ft lt CT s lead wire gage lt 250 ft Min 14 250 ft lt CT s lead wire gage lt 400 ft Min 12 Identify the polarity and the phase the CT is installed on for proper termination Always identify all wires Refer to installation drawings and terminal labels for polarity and connection INSTALLATION INSTRUCTIONS FOR i meter MF12 Copyright O 2013 Intellimeter Canada Inc 7 of 16 Revision 5 0 2013 06 24 6 Pre Site Visit Check List Yes

Download Pdf Manuals

image

Related Search

Related Contents

SS5速トランスミッションキット 取扱説明書  (A-MJS12)取扱説明書PDFダウンロード(1.37MB)  

Copyright © All rights reserved.
DMCA: DMCA_mwitty#outlook.com.